Identify and produce estimated costs for projects CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

Embed Size (px)

Citation preview

Page 1: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

Identify and produce estimated costs for projects

CERTIFICATE 4 IN BUILDING BCGBC4004A

Page 2: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

Page 22&23

A

B

1 2

43

5

67

Page 3: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

Black – original dwelling

Red – extra metre for excavation

(eg) 1.0 + 8.250 + 1.0 = 10.250

Page 4: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

Ground Works

A Preamble omitedNote

Siteworks

B Clear the site of all rubbish and vegetable matters including shrubs and trees, not exceeding 0.05m girth, grub up roots and stump

Page 5: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

Ground Works

A Preamble omitedNote

Siteworks

B Clear the site of all rubbish and vegetable matters including shrubs and trees, not exceeding 0.05m girth, grub up roots and stump

8.25 +

2 x 1.0

= 10.25

3.8 +

2 x 1.0

= 5.8

3.45 +

2 x 1.0

= 5.45

Do your side casts, or working out first

Page 6: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

Ground Works

A Preamble omitedNote

Siteworks

B Clear the site of all rubbish and vegetable matters including shrubs and trees, not exceeding 0.05m girth, grub up roots and stump

10.25

8.25 +

5.8 59.45 Tree c

2 x 1.0

= 10.25

3.8 +

2 x 1.0

= 5.8

3.45 +

2 x 1.0

= 5.45

Calculate your first area

Page 7: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

Ground Works

A Preamble omitedNote

Siteworks

B Clear the site of all rubbish and vegetable matters including shrubs and trees, not exceeding 0.05m girth, grub up roots and stump

10.25

8.25 +

5.8 59.45 Tree c

2 x 1.0

5.45

= 10.25

5.00 27.25

3.8 +

2 x 1.0

= 5.8

3.45 +

2 x 1.0

= 5.45

Calculate your second area

Page 8: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

Ground Works

A Preamble omitedNote

Siteworks

B Clear the site of all rubbish and vegetable matters including shrubs and trees, not exceeding 0.05m girth, grub up roots and stump

10.25

8.25 +

5.8 59.45 Tree c

2 x 1.0

5.45

= 10.25

5.00 27.25

86.70 3.8 +

2 x 1.0

= 5.8

3.45 +

2 x 1.0

= 5.45

Total your two areas

Page 9: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

Ground Works

A Preamble omitedNote

Siteworks

B Clear the site of all rubbish and vegetable matters including shrubs and trees, not exceeding 0.05m girth, grub up roots and stump

m²87

10.25

8.25 +

5.8 59.45 Tree c

2 x 1.0

5.45

= 10.25

5.00 27.25

86.70 3.8 +

2 x 1.0

= 5.8

3.45 +

2 x 1.0

= 5.45

Round up your final answer

Page 10: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

C Remove trees including excavating ground, grubbing up roots, return filling and well ram with clean earth to trees exceeding 1.0 but not exceeding 1.5m

Page 11: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

C Remove trees including excavating ground, grubbing up roots, return filling and well ram with clean earth to trees exceeding 1.0 but not exceeding 1.5m

1 Tree A No

Page 12: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

C Remove trees including excavating ground, grubbing up roots, return filling and well ram with clean earth to trees exceeding 1.0 but not exceeding 1.5m

1 Tree A No 4

3 Tree B

4

Page 13: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

C Remove trees including excavating ground, grubbing up roots, return filling and well ram with clean earth to trees exceeding 1.0 but not exceeding 1.5m

1 Tree A No 4

3 Tree B

4

D Ditto exceeding 1.0 but not exceeding 1.5m girth No

Page 14: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

C Remove trees including excavating ground, grubbing up roots, return filling and well ram with clean earth to trees exceeding 0.5 but not exceeding 1.0m

1 Tree A No 4

3 Tree B

4

D Ditto exceeding 1.0 but not exceeding 1.5m girth No 2

2 Tree D

Page 15: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

E Strip top soil to average depth of 75mm and stockpile on site for re-use m²

Remember ! this is the same maths as item B, just the description is different

Page 16: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

E Strip top soil to average depth of 75mm and stockpile on site for re-use m² 87

10.25

5.80 59.45 Same quantities as site clearance

5.45

5.0 27.25

86.70Remember ! this is the same maths as item B, just the description is different

Page 17: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

Siteworks (cont)

A Poison all tree suckers and roots with approved chemicals ite

m

Remember ! this for me is a new page, so heading continues at top, and start with A again.

Page 18: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

Siteworks (cont)

A Poison all tree suckers and roots with approved chemicals ite

m

B Treat site area with spraying with approved chemical pesticide on completion of excavation work

m² 44

87.0

X 50%

43.50

Remember ! this for me is a new page, so heading continues at top, and start with A again.

Page 19: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

Surface Excavation

C Excavate over site to reduced levels in material OTR. Commencing at existing ground level after the stripping, spread and level surplus soil on site as directed (77.78m²)

m² 37

5.45 Part A

10.80

0.44 25.90

4.80 Part B

5.80

0.39 10.86

36.76

ITEM

PARTICULARS

Points 1.0m beyond ext walls

Part A

Point 1

RL 12.0

Point 2

RL 12.25 + 1.60 ÷ 4.40 x 0.25 = 12.34

Point 3 RL 13.0

Point 4 RL 13.0 + 1.50 ÷ 2.70 x 0.25 = 13.14

total 50.48

50.48 ÷ 4

= av RL height 12.62

Excavation RL - 12.10

Av cut from

ground= 0.52

Topsoil (.075 spec

round up)

- 0.08

= 0.44

ITEM

PARTICULARS

Points 1.0m beyond ext walls

Part B

Point 2

RL 12.34

Point 5

RL 12.25 + 3.10 ÷ 5.10 x 0.25 = 12.40

Point 6

RL 12.50 + 3.10 ÷ 3.40 x 0.25 = 12.73

Point 7 RL 12.75 + 0.65 ÷ 2.85 x 0.25 = 112.81

total 50.28

50.28 ÷ 4

= av RL height 12.57

Esxcavation RL - 12.10

Av cut from

ground= 0.47

Topsoil (.075 spec

round up)

- 0.08

= 0.39

Page 20: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

Surface Excavation

C Excavate over site to reduced levels in material OTR. Commencing at existing ground level after the stripping, spread and level surplus soil on site as directed (86.7m²)

m³ 37

5.45 Part A

10.80

0.44 25.90

4.80 Part B

5.80

0.39 10.86

36.76

Page 21: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

Black – original dwelling brickwork

Page 22: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

Trench Excavation

A Trench excavation for strip footings, in material OTR, commencing at existing ground level and not exceeding 1.0m total depth, put backfilling with selected excavated material and surplus soil spread on site were directed

Page 23: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

Trench Excavation

A Trench excavation for strip footings, in material OTR, commencing at existing ground level and not exceeding 1.0m total depth, put backfilling with selected excavated material and surplus soil spread on site were directed

length

8.57 - .6

7.97

Total length

Page 24: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

Trench Excavation

A Trench excavation for strip footings, in material OTR, commencing at existing ground level and not exceeding 1.0m total depth, put backfilling with selected excavated material and surplus soil spread on site were directed

length

8.57 - .6

7.97

4.12 - .6

3.52

4.80 4.80

5.00 5.00

3.77 - .6

3.17

9.12 - .6

8.52

Total length

32.98

Page 25: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

Trench Excavation

A Trench excavation for strip footings, in material OTR, commencing at existing ground level and not exceeding 1.0m total depth, put backfilling with selected excavated material and surplus soil spread on site were directed

m³ 9

length

8.57 - .6

7.97

4.12 - .6

3.52

4.80 4.80

5.00 5.00

3.77 - .6

3.17

9.12 - .6

8.52

Total length

32.98

32.98

.60

.45

8.90

Page 26: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

Working Space and / or maintaining faces

B Working space and / or maintaining sides of trench excavation not exceeding 1.0m total depth

Page 27: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

Working Space and / or maintaining faces

B Working space and / or maintaining sides of trench excavation not exceeding 1.0m total depth

m² 30

area32.9

8

.45

14.84

Page 28: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

ITEM

PARTICULARSUNIT

QUAN RAT

E$

Working Space and / or maintaining faces

B Working space and / or maintaining sides of trench excavation not exceeding 1.0m total depth

m² 30

area32.9

8

.45

14.84

2 @14..8

4

29.68

Page 29: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

Page 25&26

Page 30: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

Page 31: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012Page 30

Break up trenches

Page 32: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012Page 31

Page 33: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012Page 45&46

Page 34: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012Page 47

Page 35: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012Page 48

Page 36: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012Page 48

Page 37: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012Page 45&46

Page 38: CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012

N. Preston / M Martin Cert IV Estimating 2012

Exercise 3

To be completed at home, and handed in next week