81
Centrale” Centrale” Sewer Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Waste water Planning, PA DEP Mike Millard Southeast Pump & Equipmen

“Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

Embed Size (px)

Citation preview

Page 1: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

““Centrale” Centrale” SewerSewer

WELCOME

“ There are no major obstacles to a decentralized

infrastructure for wastewater treatment”

Ed Corriveau, Director of Wastewater Planning, PA DEP

Mike Millard

Southeast Pump & Equipment

Page 2: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

What is Centrale Sewer?

Page 3: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Centrale Sewer is a Permanent, Localized (Distributed) Wastewater

( “mini-municipal” )

Collection

Treatment

Dispersal System

Page 4: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Lakeview WPCP, Ontario – 100 MGDMunicipal Upgrade To Meet New Ammonia Limits

Lakeview WPCP, Ontario – 100 MGDMunicipal Upgrade To Meet New Ammonia Limits

IFAS Upgradewith ActiveCell media

Page 5: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Typical “Mini-Municipal” Installation

Wise Living

Condo Units

ActiveCell media

Page 6: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Why Do We Need Centrale Sewer?

Page 7: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Septic Systems

Page 8: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

The Septic ParadigmEPA Stats:

2/3 of Land Not Suitable for Septic

Millions of Failed Septic Systems Exist

Serious Pollution Source

Yet 41% of New Residential Housing Built with Septic that are NOT regulated !

Centrale Sewer is regulated by the state… forever.

Page 9: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

The ultimate goal of an onsite wastewater treatment system is to protect public health and ground water quality. This is achieved by matching the effluent quality to the treatment capacity of the receiving environment. A clean effluent requires less work from the receiving environment (soil).

Septic

Water

Centrale Sewer

Water

(10+ times cleaner

then septic water)

Page 10: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

TMDL !!!Total Maximum Daily Load is the maximum amount of a pollutant that a waterbody can receive and still meet water quality standards

Section 303(d) of the Clean Water Act

Failure to comply can result in fines &/or penalties to the municipality !

Page 11: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Impacts of High Nitrate Levels from Septic Tanks

Although nitrate is necessary, high concentrations can be harmful to the health of the environment, as well as the economy.

Babies under 6 months, may get a disease commonly called, Blue Baby Syndrome, or medically called Methemoglobinemia.

Page 12: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Why “Alternative” Systems?

Funding ? (not there!)

Failures ! (septics)

Capacity ? (diminishing)

Build on Un-buildable Lots

Page 13: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Types of “Alternative” Systems

STEP SYSTEM

VACUUM SYSTEM

VARIABLE GRADE

AEROBIC SYSTEM

TRICKLING FILTER

500,000 ATU’s in TX ….. 83% NOT WORKING !

Page 14: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

THREE STAGES OF THE SOLUTION

Collection

Treatment

Water Dispersal

It is NOT a It is NOT a “Community “Community

Septic” SystemSeptic” System

Page 15: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Engineered “Stamped” SystemsFast Permitting under GA General Permit

Page 16: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

GA General Permit

Issued by the State

Covers Plants from 10,000 to 150,000 GPD

Permit Allows Installation Anywhere in Georgia

Requires Operator to be “Onsite” 2 hours/month

Zoning Determines Density

Page 17: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Conservation Subdivision

Page 18: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Conservation Community50% Plus “Green Space”

Preserves Trees/Forest

Minimizes Infrastructure

Environmental protection and enhancement

A healthy lifestyle

A sense of place

A sense of community

Page 19: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Typical Installations

Wise Living

Condo Units

Page 20: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Clancy’s

Restaurant on Estuary

Page 21: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Ducks Bay

Homes Near the Beach, Mixed Use

Page 22: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Jericho Village

311 Home Subdivis

ion

Page 23: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Larger Systems to 2 MGD

Page 24: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Liberty Mutual

Office Compl

ex

Page 25: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Lowe’s

Big Box Hardw

are Store

Page 26: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Wal-Mart

Page 27: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

STAGE ONE:

Collection and DeliveryThe EPA considers decentralized systems as “a goal of the

Clean Water Act….to be evaluated on the same basis as

traditional sewer…”

Page 28: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Collection and Delivery Types

Gravity and Lift Stations - tried and true but EXPENSIVE ! Manholes every 400’ , Deep cuts !

Low PressureGrinder Pumps STEP Systems

Page 29: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Low Pressure Systems

Pumps Wastewater from Individual Homes, Businesses, Facilities, Communities, etc.

Page 30: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Low Pressure Systems

Provides Central Sewer40-60% Less ExpensiveNo Fall Requirement Eliminates Pump StationsLower O&M Cost Infrastructure

Advantages

Page 31: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Low Pressure Systems

No I&I – a Low Pressure System is SEALED !!Shallow Pipe InstallationLess Disruptive to EnvironmentEasy to Monitor 24/7No Scheduled Maintenance

Advantages

Page 32: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Patent Pending Features

Measured Flow from STEP-Plus units to check for force-main leaksCommand STEP-Plus units to pump simultaneously to Flush linesSTEP-Plus units maintain a minimum level in each tank to allow for maximum storageAll STEP-Plus units can be commanded to Stop pumping to prevent a spill at the WWTP

Protects the Environment !

Page 33: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Applicatio

ns

Complete Sealed Low Pressure System

Gravity Systems are NOT Sealed and Should not be used

Page 34: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Low Pressure Grinder Pumps

Pumps All Waste to the WWTP

Smaller Tank

Lower Head Pumps

Page 35: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

AQUAWORXControl Panel

Inlet From Home

SNYDER Trash Tank

ZABEL Filter

AQUAWORX Level Sensor

STEP+ by S.P.E.

SOUTHEAST PUMP & EQUIPMENT, INC. (SPE)3515 TROTTER DR., ALPHARETTA, GA 30004

(678) 990-1388 OFFICE 9/22/06RISER/LIDTYPICAL

Effluent Discharge

ABS/GOULDS Effluent Pump

SNYDER Pump Tank

STEP+ System: Can Be Added Existing Homes on Septic

Pumps Liquid Waste to the WWTP Large 1000 Gallon TankVery High Head Pumps

FRALO

FRALO

Page 36: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

SEALED “STEP” TANKSOne-piece seamless

construction - FRALO tanks are blow-molded to resist leaking and cracking better than concrete and fiberglass. Unlike other materials, they will not rust or corrode and require no additional coating. And they are easier to install!

50 Year Guarantee !

www.fralo.net

FRALO Sludge & Pump Tanks

Page 37: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Effluent Filter

Zabel/Polylok Filters 1/16” mesh High level sensor Permanent

Optional

Page 38: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

GOULDS Filtered Effluent

Heads to 650’ Flows to 25 GPM Optional Cord Types

Page 39: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

AQUAWORXPump Controller, Data Logging, and Autodialer

Page 40: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

AQUAWORX Controller Features

• Highly integrated controller• Built-in modem for communication

– Reprogram onsite systems from your office.– Get alarm conditions reported to your PC instantly.– Get weekly/monthly status from each site over the phone line.

• Built-in Calendar/Clock• Biological parameter monitoring (smooth

flow to WWTP)• Current,Voltage, level monitoring• Solid state switching of pumps

Page 41: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

AQUAWORXBased on an embedded microcomputer in the pump controller,

and a float-less level transducer in the pump chamber

Page 42: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Centralized Management of Decentralized Systems

Page 43: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

How do smart controllers help?

• Facilitate Centralized Management

• Predict a component failure• Allows time and day dependent

biological process control• Simulate an onsite operator

Page 44: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

SEALED Fiberglass Tanks

Water-tightness. Never rust , made of corrosion-resistant materials, eliminates the possibility of leakage Strongest, most robust underground storage tanks , 5,000 to 60,000 Gallon Once installed, require no corrosion maintenance or EPA-mandated corrosion monitoring. Easy and quick to install because they are lightweight.

Page 45: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

STAGE TWO:Modular Wastewater Treatment

“…privatization of wastewater treatment operations offer

increased efficiency, cost reduction, environmental benefits,

and access to capital for municipalities” (EPA’s Draft

Guidance on the Privatization of Federal Funded

Wastewater Treatment Facilities)

Page 46: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Treatment TechnologyTrickling Filter. developed 1964Sized to Flow : Typically 300 GPD/home (or less) 100 homes = 30,000 GPDFixed Film Process – No Chemicals Reqd.Reduces BOD & TSSMeet NSF & EPA12,000 Installed Worldwide, 1190 in USAUp to 70% Sludge Reduction

Page 47: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Trickling Filter Technology

Settling Tank

Bioclere™

Discharge

Vent

Page 48: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Trickling Filter Technology

Handles Wide Range of Flows

Handles Wide Range of Temperature

Page 49: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Lotus-Active_Cell

TREATMENT EFFICIENCY (mg/l)

S.S.T. DBO5 NH4 N NO3 N P

< 3 < 3 < 0.4 < 4 < 0.2

Flows from 40,000 to 2,000,000 GPDFixed Film Process – No Chemicals Reqd.

Page 50: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Lotus-Active_Cell media

Floating, Large Surface Area,

Neutral Buoyancy

Page 51: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Lotus-Active_Cell can be installed Above or In-ground

Page 52: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Tertiary Effluent Requirements

6

H E A D L O S S G A U G E

A N D V E N T A S S E M B L Y

A C C E S S L A D D E R

F I N A L D I S P O S A L

S A N D W A S H E R

T O P O F S A N D B E D

I N F L U E N T H O U S I N G

I N F U E N T R A D I A L S

A I R L I F T P U M P

B A C K W A S H

C H E M I C A L F E E D

( E X T E R N A L C A R B O N )

F L O A T A S S E M B L Y

(2 ) A L T E R N A T IN G S .S . S U B M E R S IB L E P U M P S

N IT R IF IE D

E F F L U E N T

P U M P

A C C E S S

D IA P H R A G M

( M E D I A S U P P O R T & D R A I N A G E )

S .S . D O S IN G P U M P

(IN C E N T E R B A F F L E )

S .S . R E C IR C U L A T IO N P U M P

B A F F L EP R I M A R Y T A N K

I N F L U E N T

R E C Y C L E L IN E

M A N H O L E T O G R A D E

G R O U N D L E V E L

F A N /E L E C T R IC A L B O X

IN S U L A T E D B IO F IL T E RH IG H R A T E P V C M E D IA

T E R T I A R Y T R E A T M E N T F L O W S C H E M A T I C (N T S )

6

H E A D L O S S G A U G E

A N D V E N T A S S E M B L Y

A C C E S S L A D D E R

F I N A L D I S P O S A L

S A N D W A S H E R

T O P O F S A N D B E D

I N F L U E N T H O U S I N G

I N F U E N T R A D I A L S

A I R L I F T P U M P

B A C K W A S H

C H E M I C A L F E E D

( E X T E R N A L C A R B O N )

F L O A T A S S E M B L Y

(2 ) A L T E R N A T IN G S .S . S U B M E R S IB L E P U M P S

N IT R IF IE D

E F F L U E N T

P U M P

A C C E S S

D IA P H R A G M

( M E D I A S U P P O R T & D R A I N A G E )

S .S . D O S IN G P U M P

(IN C E N T E R B A F F L E )

S .S . R E C IR C U L A T IO N P U M P

B A F F L EP R I M A R Y T A N K

I N F L U E N T

R E C Y C L E L IN E

M A N H O L E T O G R A D E

G R O U N D L E V E L

F A N /E L E C T R IC A L B O X

IN S U L A T E D B IO F IL T E RH IG H R A T E P V C M E D IA

T E R T I A R Y T R E A T M E N T F L O W S C H E M A T I C (N T S )

Meet Regulatory Demand

Nitrogen Reduction

Phosphorous Reduction

Reuse Quality Water (purple pipe to each home or golf course)

Page 53: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

UV Sterilization Added safety factor when used with reuse

or drip dispersal

No corrosive byproducts , i.e. Chlorine

Easy installation/maintenance

Low power consumption

Removes pathogens that chlorine won’t , i.e. Cryptosporidium

99.9999% bacteria free water

Page 54: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

UV Pure® – a better design

Revolutionary Design

No Shadowing

• 360o Coverage

• Dual Lamp Design

No Fouling

• Self-cleaning

• Sensors in air

No Overheating

• Air Cooled Lamps

No Maintenance

Page 55: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

UV Pure®

Community SystemEasy to Maintain

Change Lamps in 5 minutes

Page 56: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Modular Treatment Benefits

Reduced CostRecharge WatershedLow MaintenanceLow Profile AppearanceEliminates On-Site Septic & Aerobic SystemsThousands installed in North

America & Europe

Page 57: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Build & Sewer Anywhere !

Page 58: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Reduce Installation Costs

Page 59: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Recharge Watershed

Centralized Sewer Depletes Watershed, Water transported miles awayDistributed Sewer Replenishes Water Locally

Page 60: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Low Maintenance &

Operating Expense

Brush Spray Heads & Inside Tank/Lid, Every Quarter (only routine maintenance required!)Media Requires Neither Maintenance Nor ReplacementSelf-Regulating Bio-Mass

Page 61: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Low Maintenance & Operating Expense

Page 62: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Complete System Monitoring 24/7

Centrale SewerCentrale Sewer

Page 63: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Low Profile

High Homeowner AcceptanceCan be installed in virtually any locationBlends into landscaping

Page 64: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Eliminates On-Site Systems

Septic Tank Sand Filter

Page 65: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

STAGE THREE:

Reuse or Subsurface

Drip

The EPA has endorsed”decentralized wastewater treatment”

as a “goal of the Clean Water Action Plan: and as a

“permanent long-term solution, to be evaluated on the same

basis as traditional sewer”. (1998)

Page 66: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Reuse Water

Supplement Golf Course Irrigation WaterEasy to InstallRecycles WaterRequires Tertiary Treatment & DisinfectionRequires Class I Operator to be onsite 4 hours per day

Page 67: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Subsurface DripSupplement Treatment Easy to InstallRecycles WaterNo Disinfection Required but Recommended !Shorten Permit ProcessEffective with Wide Range of SoilsRequires Class III Operator to be onsite only 2 hours per month !

Page 68: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Subsurface Drip SystemGEOFLOW drip tubing , 20 year Guarantee NO ROOT INTRUSIONGEOFLOW drip tubing , bactericide lining, NO slime buildupRecharges Local WatershedEcologically Sound SystemSupports “Smart” or “Green” Building

Page 69: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Wasteflow PC Emitter

Page 70: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

GEOFLOWdrip tubing

20 year Guarantee NO

ROOT INTRUSION

Page 71: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Subsurface Drip

Soil Scientist Analysis Design Software AvailableEngineering AssistanceTotal Integrated System

Engineering & Soil Analysis

Page 72: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Know Your Soils !Soil “Quality” will determine amount of land required for the drip field: 10,000 GPD in 0.1 gallons/ft2/day soils requires 2.3 acres !The Drip Zones can be located wherever the GOOD soils areZones can be ¼ to 2 acres in sizeNOTE: Make sure you do not disturb the drip areas (with heavy equipment , etc)

Page 73: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Subsurface Drip System

Provides irrigation potential for landscaping and open areas

Best to have REUSE Water Quality (Purple Pipe)

Page 74: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

SURFLO Drip Controller

Filters Effluent, 100 micron 24/7 Monitoring Zone Dosing Factory Assembled & Tested

Page 75: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

SURFLO Drip Controller

Touch Screen Controls Patented Air Purge Backwash

Page 76: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

1 MGD Drip System

Page 77: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Drip Installation

Tubing Is Easy to Install in All Soils

Page 78: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Drip Installation

Installing Tubing Near Bodies of WaterIn High Ground Water, only 12” separationIn Bedrock, only 12” separation

Page 79: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Drip Installation

Installing Tubing Across Slopes

Page 80: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

www.southeastpump.comwww.southeastpump.com

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

Summary - Centrale Sewer Features

Protects the Public Health & the EnvironmentBuild AnywhereReduces Risks !Distributed Sewer Low Cost InfrastructureIncreases Home Values

Page 81: “Centrale” Sewer WELCOME “ There are no major obstacles to a decentralized infrastructure for wastewater treatment” Ed Corriveau, Director of Wastewater

““Centrale” SewerCentrale” Sewer

www.centralesewer.comwww.centralesewer.com

www.southeastpump.comwww.southeastpump.com

Thank You for You Time !

Mike Millard

Southeast Pump & Equipment Inc

3515 Trotter Drive, Alpharetta, GA 30004

phone: 678-990-1388

fax: 678-990-1396

www.southeastpump.com