C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d y t u d y Central York County Connections Study Meetings of November 30 th , 2010

Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Central York County

Connections Study

Meetings of November 30th, 2010

Page 2: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Advisory Committee Agenda

• Welcome and Introductions: 15 minutes

• Study Overview: 15 minutes

• Where are we now - Current Conditions in Study Area:60 minutes

• Lunch and Conversation: 30 minutes

• Review Purpose and Need Statement: 30 minutes

• Sample Measures of Effectiveness (MOEs): 20 minutes

• Next Steps/Next Meetings: 10 minutes

Page 3: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Study Basics

Page 4: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

STPA PrinciplesSTPA Principles

Page 5: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Consistency with STPAConsistency with STPA

Page 6: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Study CommitteesStudy Committees

•• Study TeamStudy Team

•• Consultants, Consultants, MaineDOTMaineDOT, MTA, SMRPC, MTA, SMRPC

•• Manage and conduct studyManage and conduct study

•• Steering CommitteeSteering Committee

•• Ten communities in Study Area, plus agenciesTen communities in Study Area, plus agencies

•• Inform Study process by local understanding and regional perspectiveInform Study process by local understanding and regional perspective

•• Update municipal officialsUpdate municipal officials

•• Advisory CommitteeAdvisory Committee

•• Diverse interest groupsDiverse interest groups

•• Reflect voice of the publicReflect voice of the public

•• Update constituentsUpdate constituents

Page 7: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Public CommunicationsPublic Communications

•• Public Meetings/WorkshopsPublic Meetings/Workshops

•• Five meetings held throughout Study AreaFive meetings held throughout Study Area

•• Study Website: www.Study Website: www.ConnectingYorkCountyConnectingYorkCounty.org.org

•• Meeting minutes, study documents, questions and answersMeeting minutes, study documents, questions and answers

•• WEBOTWEBOT

•• Provides details about potential costs and tradeoffs of study optionsProvides details about potential costs and tradeoffs of study options

being consideredbeing considered

•• Interactive, solicits opinions and attitudesInteractive, solicits opinions and attitudes

•• Helps public to understand impactsHelps public to understand impacts

Page 8: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Public CommunicationsPublic Communications

•• MediaMedia

•• Proactive relationshipProactive relationship

•• Press releases plus some paid advertisingPress releases plus some paid advertising

•• Increase awareness of study goals, meetings, websiteIncrease awareness of study goals, meetings, website

•• Newsletter and Interested Party emailsNewsletter and Interested Party emails

•• Four newsletters, printed and electronicFour newsletters, printed and electronic

•• IP list is key update tool - need your help to buildIP list is key update tool - need your help to build

•• Purpose and Need StatementPurpose and Need Statement

•• Developed by committees and publicDeveloped by committees and public

•• Key guiding document that leads to measures by which toKey guiding document that leads to measures by which todetermine study recommendationsdetermine study recommendations

Page 9: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Study OverviewStudy Overview

Page 10: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Study FocusStudy Focus

•• Guided by Purpose and Need StatementGuided by Purpose and Need Statement

•• Considerations may include:Considerations may include:

•• Economic development and growthEconomic development and growth

•• Mobility and accessMobility and access

•• Traffic safetyTraffic safety

•• Environmental, livability considerationsEnvironmental, livability considerations

Page 11: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Economic Development ConsiderationsEconomic Development Considerations

We will look at:We will look at:

•• To which future markets shouldTo which future markets should

Central York County relate?Central York County relate?

•• How can Central York CountyHow can Central York County

most effectively and efficientlymost effectively and efficiently

connect to the larger job andconnect to the larger job and

consumer markets along the I-95consumer markets along the I-95

axis?axis?

•• How will a better jobs-housingHow will a better jobs-housing

balance in Central York Countybalance in Central York County

affect traffic?affect traffic?

Page 12: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Transportation ConsiderationsTransportation ConsiderationsWe will look at:We will look at:

•• What do travel patterns look like todayWhat do travel patterns look like today

and how might they change in theand how might they change in the

future?future?

•• How do existing corridors performHow do existing corridors perform

today & in the future (mobility, access,today & in the future (mobility, access,

safety)?safety)?

•• How might added capacity or newHow might added capacity or new

connections change accessibility andconnections change accessibility and

desireddesired development opportunities?development opportunities?

•• How can TDM, TSM and transit help?How can TDM, TSM and transit help?

Page 13: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Land Use ConsiderationsLand Use ConsiderationsWe will look at:We will look at:

•• Do current plans, zoning andDo current plans, zoning andcodes support current and futurecodes support current and futureregional travel corridor functions?regional travel corridor functions?

•• Do current plans, zoning andDo current plans, zoning andcodes support the corridorscodes support the corridors’’enhanced economic developmentenhanced economic development

potential for the region?potential for the region?

•• Are the answers to the above twoAre the answers to the above twoquestions in conflict? How mightquestions in conflict? How mightany such conflicts be resolved?any such conflicts be resolved?

Page 14: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Study Work FlowStudy Work Flow

•• Study InitiationStudy InitiationSept. 2010 Sept. 2010 –– Dec. 2011 Dec. 2011

•• Initial Development and Evaluation of ConceptsInitial Development and Evaluation of ConceptsNov. 2010 Nov. 2010 –– April 2011 April 2011

•• Detailed Screening and Evaluation of StrategiesDetailed Screening and Evaluation of StrategiesMarch 2011 March 2011 –– Aug. 2011 Aug. 2011

•• Study FinalizationStudy FinalizationAug. 2011 Aug. 2011 –– Jan. 2012 Jan. 2012

Page 15: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Study Work Flow

! Study Initiation

• Mobilize team and administer the study

• Collect and assess data and information

• Build models and tools

• Develop Purpose and Need statement

• Initiate public outreach

Page 16: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Study Work Flow

! Initial Development and Evaluation of Concepts

• Develop evaluation criteria and MOEs

• Define range of concepts for consideration

• Work with committees to develop and refine

• Evaluate concepts (key MOEs)

• Recommend and select concepts for furtherrefinement and evaluation

Page 17: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Study Work FlowStudy Work Flow

•• Detailed Screening and Evaluation of StrategiesDetailed Screening and Evaluation of Strategies

•• Refine evaluation criteria and Refine evaluation criteria and MOEsMOEs

•• Develop packages of complementary strategies forDevelop packages of complementary strategies fordetailed evaluationdetailed evaluation

•• Detailed evaluation of strategy packagesDetailed evaluation of strategy packages

•• Modeling (travel modeling, econ impacts, WEBOT)Modeling (travel modeling, econ impacts, WEBOT)

•• Select and prioritize recommendationsSelect and prioritize recommendations

Page 18: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Study Work FlowStudy Work Flow

•• Study FinalizationStudy Finalization

•• Document study processDocument study process

•• Public review and comment of study reportPublic review and comment of study report

Page 19: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Baseline Conditions:Where Are We Today?

• Economic context

• Development trends

• Planning, zoning andaccess management

• Environmental andcultural resources

• Transportation

Page 20: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Economic Context

Page 21: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Commute PatternsWhere do York Co. Workers Live?

Residential Location

Share of

Workers

York County 70.4%

Biddeford 9.0%

Saco 7.0%

Sanford/S Sanford/Springvale 9.6%

Cumberland County 13.1%

New Hampshire 6.4%

Elsewhere 10.1%

Page 22: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Rural AreasP.C. Income, 2003 = $28,800

Regional Center (Greater Boston)P.C. Income, 2003 = $43,800

Income Growth, 1992-2003 = 73%

Net Migration, 2000-2004 = -72,500

Satellite CentersP.C. Income, 2003 = $35,100

Income Growth, 1992-2003 = 85%

Natural Increase, 2000-2004 = 35,200

Net Migration, 2000-2004 = 41,400

Suburban BorderlineP.C. Income, 2003 = $31,600

Income Growth, 1992-2003 = 72%

Natural Increase, 2000-2004 = 19,400

Net Migration, 2000-2004 = 57,900

Income Growth, 1992-2003 = 54%

Natural Increase, 2000-2004 = -11,400

Net Migration, 2000-2004 = 8,800

Natural Increase, 2000-2004 = 25,400

Patterns of GrowthSource: An Economic Development Strategy for the SMRPC Region,Planning Decisions Inc., 2004

Page 23: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Development Trends

Page 24: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Projecting Growth: Factors Used toCluster Communities

• Commuting patterns

• Population growth trends

• Metro area proximity

Page 25: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

How does the region cluster?

• Proposedsubareas forallocating futuregrowthprojections

Page 26: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Planning, Zoning and AccessManagement

Page 27: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Page 28: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

How Do Current Plans and Codes Support

the Study’s Purpose and Need?

• Reviewing current Plans and codes showspotential impacts of land use on road networkcapacity and efficiency

• Understanding where there is consistency or

conflict with the P&N will help shape Phase IIrecommendations for improving land use andaccess management

• Review therefore focused on how Plansaddressed a set of very specific questions.

Page 29: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

What We Found: Key Best Practices InPlace or Required (Not Just “Encouraged”)

• Orderly Zoning---minimal scattering of commercialand light industrial– Biddeford, Sanford, North Berwick, Ogunquit, Kennebunk,

Wells, Arundel

• Future Land Use Map and Current Zoning HighlyConsistent– Biddeford, Kennebunk, Ogunquit, Sanford

• Limited Access to at least Some Specified Roads– Alfred, Lyman, Biddeford, Kennebunk, North Berwick,

Ogunquit, Sanford

• Open Space Zoning (in at least some districts)– Alfred, Sanford, Wells, Kennebunk, Ogunquit

Page 30: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Best Practices Sometimes in Place

• Access location requirements for different uses• Phasing of development to better manage traffic issues• Connectivity required between adjacent uses or for

access needs of major subdivisions• Visual character of highway frontages• Environmental and Cultural Resource Protection

Guidelines– Environmental generally more specific than cultural

• Thoroughness of development plan review coverage• Several towns require comparison of conventional and

cluster plans as part of approval process• Sunset provisions for dormant subdivisions

Page 31: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Main Issues Needing More Attention

• Stripping of Commercial Uses– Policies and zoning to shift traditional pattern to more

nodal one for new and redeveloped uses

• Consistent linking of access managementrequirements to functional classification map– Apply to both commercial and residential uses

– More consistent standards and applicability acrossthe study area

Both these issues have direct impacts on managingtraffic volumes and flows

Page 32: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Environmental and CulturalResources

Page 33: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Page 34: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Environmental resources – regulated

Page 35: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Environmental resources – Other

Page 36: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Page 37: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Transportation

Page 38: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Transportation Infrastructure

• Insert Highway System map (Class + Speeds)

Page 39: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Average Daily Traffic

• Insert AADT Map

Page 40: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Level of Service (LOS)Planning-Stage Estimate

• Insert LOS Map

Page 41: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Crashes with Injuries

• Insert Map of Injury Crashes

Page 42: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

High Crash Locations (HCLs)

• Insert Map of High Crash Locations

Page 43: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Corridor Crash Rates

!

"!

#!!

#"!

$!!

$"!

%!!

%"!

&'()#!* &'()### +,)- +,)$!$

./0'0123)&2'( ./245)&2'(

Page 44: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Composite Crash Rate –Injury Crashes

!

"!

#!!

#"!

$!!

$"!

%!!

%"!

&'()#!* &'()### +,)- +,)$!$

./012)&0'( ./012)&0'()34567/8)./012(19Injury Crash

Rate Overall Crash Rate

Page 45: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Crash Types

!"#$%&' !"#$%%% ()$* ()$+&+

!#,-$./-0)1-#2314# !"#$% !&#'% !"#$% &(#(%

5#,-67/0)1-#2314# '#)% '#"% '#)% !#"%

8/"#92#:;7/0<=9/1/> &&#&% &$#*% &&#&% &*#!%

!,/$7?$!7,- +$#+% +'#"% +$#+% +*#*%

@/1A,B &#$% )#&% '#(% (#,%

C1D#0E#- '#"% $#$% $#&% )#&%

F"G#9 &#,% !#)% )#+% '#!%

Page 46: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Crash Locations

!"#$%&' !"#$%%% ()$* ()$+&+

)"9,1>G"6,3,H '+#+% ')#)% ',#!% &"#)%

I=9J# '#&% +#&% "#!% +'#(%

8/"#92#:;7/ )(#+% !!#$% ),#"% !'#!%

K91J#3,H +"#$% *#*% *#'% "#'%

F"G#9 $#!% $#"% $#$% $#$%

Page 47: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Bus Services

• Biddeford Area

• Zoom Turnpike Express

• Biddeford & Saco P&R to Portland via Turnpike

Bus Service/Route IG,9,:"#912;:2

C8KK.LF!K$@!.@

MFFN$<=9/41D#$.O49#22 -./0123.445678429/42:9;72<=>2?7;9@7/12A72<78A?9/4

)G=PB#C=2$8/"#9:1"H 3.44567842A72<78A?9/42B.AC2./A58D54.9A521A7E1

)G=PB#C=2$Q7:,B -7;9?2158F.;52B.AC./23.4456784G2:9;729/42H?42H8;C9842359;C

)@RLF!K$@!.@

),/S79-$F:#,/$)G=PB# I9.?J21;C54K?542158F.;52L5AB55/2:9/678429/42M5??1

),/S79-$<9,/21"$TNH

C=2U

-7;9?249.?J21;C54K?542158F.;52B.AC./2:9/678429/42:E8./NF9?5

<G#$V@W. O7802P72P7DDK/.AJ2Q;@7/2P78E#285158F9@7/2158F.;5#•:58F.;52A723.445678426782R7L1G2D54.;9?G21;C77?29/421C7EE./N2A8.E1#

•:58F.;52A72M5??126782R7L1G2D54.;9?G29/421;C77?2A8.E1#

V.QQ)0XYC(RX0FZ(R[

)=AA#9$)#,27/$)G=PB#2 :C785?./52S87??5J29/42T5//5LK/02:CKU?5

Page 48: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Summary Highlights – Our take:• Economic Context: SW vs. NE orientation an open,

valid question

• Development Trends: the study area divides well into5 spheres of influence

• Plans and Codes: a mixed bag in terms of support forP&N

• Environmental and Cultural Resources: these arewidely spread throughout the study area

• Transportation: most all congestion and half thecrashes are limited to key intersections; overall corridorsafety ranking - Rtes.109, 111, 202, 4.

Page 49: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Purpose and Need Statement

Page 50: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

How Purpose and Need Drive the ProcessHow Purpose and Need Drive the Process

Z7,B2$\

F]^#:;J#2

R##-

E=9472#

N#,2=9#2

FS

.?#:;J#/#22

_NF.2`

@B"#9/,;J#

)7B=;7/2

.J,B=,;7/ !#:Y2

Page 51: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Purpose and Need StatementSteering Committee Input: Round 1

• Plan for regional needs/support visual/cultural character

• Fix what we have

• Promote economic growth

• Address traffic safety issues

• Development of state/local networks - address local concerns

• Move goods/services/people efficiently

• Provide relief for Rte. 1 through-traffic

• Destination-ease

• Promote increased development & trucking on Rte. 202

• Include discussion of funding feasibility

Page 52: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Purpose and Need Statement:Steering Committee Input: Round 2

• Review multi-modal options to reduce traffic

• No negative impact on municipal budgets

• Fix intersections

• Do not sacrifice visual/cultural characteristics

• Address vehicle/bicycle/pedestrian safety issues

• Correlate buildout potential with access management

• Respect environmental systems/water supply/land use

• Coordinate with other planning processes

• Assure connectivity of Rtes. 109, 111, 95 with Rtes. 16 and 125corridor

• Increase proportion of transit funding in region

Page 53: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Draft Purpose and Need:Advisory Committee Input

Page 54: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Measures of Effectiveness –An Example

(Also called Indicators, Criteria,Performance Measures….)

Page 55: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Page 56: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

1. Local roads which exceed 2000 VPD

How do the Various Development Patterns Stack up?(Comparative Rank of the MOEs in the Gateway 1 Plan)

Page 57: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Corridor wide JobsStrip Commercial:

Corridor wide Findings

MOE #5

Page 58: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Low Density 4,729

Micropolitan 4,550

TOC 2,228

Acres of Development within

TAZ that have Wildlife Habitat

Page 59: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Applying MOEs to this Study

An Example

Page 60: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Purpose &

Need Element

Goals related Objectives MOEs Source

EconomicDevelopment

Increase jobbase inCentral YorkCo.

Target themost likelykinds of jobgrowth toTownsseeking suchgrowth

• # jobs bytype/location• $ impacts ofjobs bytype/location• # and $ ofspinoffsecondary

jobs bytype/location

• PRISM

• PRISM

• PRISM

Manageassociatedpop. growth

• # pop andhomesgenerated bynew jobs

• PRISM

Example of How P&N Ripplesthrough the Study

Page 61: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Candidate MOEs-Stage One• Travel times and delay – changes in accessibility estimated from

travel forecasting model outputs summarized for key origin-destination pairs; system-wide Vehicle Hours of Delay.

• Travel patterns and capacity – Changes in traffic volumes on otherroutes. Segment volume-to-capacity comparisons.

• Travel efficiency – Vehicle Miles of Travel (VMT) and Vehicle Hoursof Travel (VHT).

• Improved transit access – Corridor improvements which supportenhanced transit potential.

• Costs – gross approximation of capital costs including ROWsufficient to identify major cost differences among the conceptsevaluated.

• Economic Impact – changes in economic output and activity ($)estimated from the PRISM model.

Page 62: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Candidate MOEs-Stage One (Cont.)• Structures impacted – residential and non-residential structures

affected; generalized assessment (High/Medium/Low).

• Environmental impacts – Composite assessment of proximity tofloodplains, wetlands, steep slopes, rare/threatened/endangeredspecies (RTE).

• Rural and urban character impacts – composite of cultural resources,rural areas opened up and current centers reinforced, consistent withthe policies & future land use maps of local comp. plans and with thegoals of the Growth Management Act.

• Safety – Do improvements address known High Crash Locations?

• Consistency with STPA - (i.e. capacity expansion as last resort)

• Implementability – Likelihood of community acceptance and support(consistency with plans, zoning and public response).

Page 63: Central Y Connections Study - Maine Point Prese… · • How might added capacity or new connections change accessibility and desired development opportunities? • How can TDM,

C C e n t r a l e n t r a l Y Y o r k o r k C C o u n t y o u n t y C C o n n e c t I o n s o n n e c t I o n s S S t u d yt u d y

Next Steps• Make economic forecasts

• Develop initial range of corridor concepts

• Review these with AC and SC and refine concepts

• Set up travel and economic impact models

• Determine impacts (Stage One MOEs)

• Next SC and AC Meeting: Wednesday, January 19th

• First Public Meeting: Thursday January 20th