S.NO. Description Unit Qty. Rates Amount 1 Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, for all leads and lifts. 1.1 All kinds of soil. Cum 10.00 2 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, for all leads and lifts. Cum 8.00 3 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size) Cum 3.00 4 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) Cum 3.00 5 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level with : 5.1 Cement mortar 1:6 (1 cement : 6 coarse sand). Cum 5.00 6 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 6.1 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) Cum 4.00 MALAVIYA NATIONAL INSTITUTE OF TECHNOLOGY, JAIPUR ESTATE SECTION Name of Work: Covering of Stage at Central Lawn in MNIT. G Schedule Part I Civil Work Page 1

central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

1 Earth work in excavation by mechanical means

(Hydraulic Excavator )/ manual means in foundation

trenches or drains (not exceeding 1.5 m in width or 10

sqm on plan) including dressing of sides and ramming

of bottoms, lift upto 1.5 m, including getting out the

excavated soil and disposal of surplus excavated soil

as directed, for all leads and lifts.

1.1 All kinds of soil. Cum 10.00

2 Filling available excavated earth (excluding rock) in

trenches, plinth, sides of foundations etc. in layers not

exceeding 20cm in depth, consolidating each deposited

layer by ramming and watering, for all leads and lifts.

Cum 8.00

3 Providing and laying in position cement concrete of

specified grade excluding the cost of centring and

shuttering - All work upto plinth level :

3.1 1:5:10 (1 cement : 5 coarse sand :10 graded stone

aggregate 40 mm nominal size) Cum 3.00

4 1:2:4 (1 cement : 2 coarse sand : 4 graded stone

aggregate 20 mm nominal size) Cum 3.00

5 Random rubble masonry with hard stone in foundation

and plinth including levelling up with cement concrete

1:6:12 (1 cement : 6 coarse sand : 12 graded stone

aggregate 20mm nominal size) upto plinth level with :

5.1 Cement mortar 1:6 (1 cement : 6 coarse sand). Cum 5.00

6 Providing and laying in position specified grade of

reinforced cement concrete excluding the cost of

centering, shuttering, finishing and reinforcement - All

work up to plinth level

6.1 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone

aggregate 20 mm nominal size) Cum 4.00

MALAVIYA NATIONAL INSTITUTE OF TECHNOLOGY, JAIPUR

ESTATE SECTION

Name of Work: Covering of Stage at Central Lawn in MNIT.

G Schedule

Part I Civil Work

Page 1

Page 2: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

7 Reinforced cement concrete work in walls (any

thickness), including attached pilasters, buttresses,

plinth and string courses, fillets, columns, pillars,

piers, abutments, posts and struts, beams, suspended

floors, roofs having slope up to 15° landings,

balconies, shelves, chajjas, lintels, bands, plain

window sills, staircases and spiral stair cases etc. up to

floor five level, excluding cost of centering, shuttering,

finishing and reinforcement :

7.1 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone

aggregate 20 mm nominal size) Cum 2.00

8 Centering and shuttering including strutting, propping

etc. and removal of form for : Foundations, footings,

bases of columns, etc. for mass concrete.

8.1 Foundations, footings, bases of columns, etc. for mass

concrete. Sqm 5.00

9 Lintels, beams, plinth beams, girders, bressumers and

cantilevers. Sqm 10.00

10 Columns, Pillars, Piers, Abutments, Posts and Struts.

Sqm 3.00

11 Steel reinforcement for R.C.C. work including

straightening, cutting, bending, placing in position and

binding all complete up to plinth level.

11.1 Thermo-Mechanically Treated bars. Kg 1000.00

12 Steel reinforcement for R.C.C. work including

straightening, cutting, bending, placing in position and

binding all complete above plinth level.

12.1 Thermo-Mechanically Treated bars. Kg 600.00

13 Brick work with common burnt clay F.P.S. (non

modular) bricks of class designation 7.5 in

superstructure above plinth level up to floor V level in

all shapes and sizes in :

13.1 Cement mortar 1:6 (1 cement : 6 coarse sand) Cum 3.00

Page 2

Page 3: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

14 Half brick masonry with common burnt clay F.P.S.

(non modular) bricks of class designation 7.5 in

superstructure above plinth level up to floor V level.

14.1 Cement mortar 1:4 (1 cement :4 coarse sand) Sqm 20.00

15 12 mm cement plaster of mix :

15.1 1:6 (1 cement: 6 fine sand) Sqm 10.00

16 15 mm cement plaster on the rough side of single or

half brick wall of mix :

16.1 1:6 (1 cement: 6 fine sand) Sqm 12.00

17 6 mm cement plaster of mix :

17.1 1:3 (1 cement: 3 fine sand) Sqm 15.00

18 Finishing walls with Acrylic Smooth exterior paint of

required shade :

18.1 New work (Two or more coat applied @ 1.67 ltr/10

sqm over and including priming coat of exterior primer

applied @ 2.20 kg/10 sqm). Sqm 100.00

19 Painting with synthetic enamel paint of approved

brand and manufacture of required colour to give an

even shade:

19.1 Two or more coats on new work over an under coat of

suitable shade with ordinary paint of approved brand

and manufacture. Sqm 250.00

20 Kota stone slab flooring over 20 mm (average) thick

base laid over and jointed with grey cement slurry

mixed with pigment to match the shade of the slab

including rubbing and polishing complete with base of

cement mortar 1 : 4 (1 cement : 4 coarse sand) :

20.1 25 mm thick. Sqm 150.00

21 Kota stone slabs 20 mm thick in risers of steps,

skirting, dado and pillars laid on 12 mm (average)

thick cement mortar 1:3 (1 cement 3coarse sand) and

jointed with grey cement slurry mixed with pigment to

match the shade of the slabs, including rubbing and

polishing complete. Sqm 15.00

Page 3

Page 4: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

22 Steel work in built up tubular ( round, square or

rectangular hollow tubes etc.) trusses etc., including

cutting, hoisting, fixing in position and

applying a priming coat of approved steel primer,

including welding and bolted with special shaped

washers etc. complete.

22.1 Hot finished welded type tubes Kg 5200.00

23 Supply & Installation of Multi cell/tight cell

Polycarbonate Panel System of minimum thickness

8mm of approved colour and shade confirming to

specifications mentioned below:

Panel Width shall not be less than 600 mm to ensure

best performance for wind uplift, vibration, oil canning

and visual appearance. The panels shall be uniform in

colour with an integral Tight-Cell core. Panels shall be

manufactured with Vertical Standing Seam at both

sides of the panel. Snap-on connector to interlock the

panels shall have a grip-lock locking mechanism to

ensure maximum uplift capability. End-

cap/Aluminium U Profile (mill finish) shall be

provided for end closure. Panels shall be co-extruded

UV protected. The polycarbonate panels shall be bent

to required profile (circular,linear,curvilinear) and

fixed in position, to the structural steel framework,

using self-driving self-tapping screws, Aluminium or

other profiles, accessories etc.

Sqm 160.00

TOTAL of Part I Civil Work

1

Wiring of light point/ fan point/ exhaust fan point/ call

bell point with 1.5 sq. mm nominal size FR PVC

insulated unsheathed flexible copper conductor 1.1 kV

grade and 1.5 sq. mm nominal size FR PVC insulated

unsheathed flexible copper earth conductor 1.1 kV

grade (IS:694) of approved make in surface / recessed

ISI marked MMS ( IS:9537 P - III ) PVC

conduit & it's accessories, round tiles,18 SWG M.S.

box with earth terminal, 6 A switch, 3.0 mm thick ISI

marked phenolic laminated sheet, zinc plated / brass

screws, cup washers, making connections, testing etc.

as required.

1.1Long point (up to 10 mtr..) P.

point40.0

Part II Electrical Work

Page 4

Page 5: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

2

S&F following sizes (dia.) of ISI marked medium duty

PVC conduit along with accessories in surface /

recessed using saddles, clamps, fastener as required

including cutting the wall, covering conduit and

making good the same as required.

2.120 mm R.

mtr.150.0

2.225 mm R.

mtr.150.0

3

Supplying and drawing FR PVC insulated &

unsheathed flexible copper conductor ISI marked

(IS:694) of 1.1 kV grade and approved make in

existing surface or recessed conduit/casing capping

including making connections etc. as required. (BSR

Group-1)

3.1 1 x 1.5 sq.mm Mtr. 300.00

3.2 1 x 2.5 sq.mm Mtr. 540.00

3.3 1 x 4.0 sq.mm Mtr. 540.00

3.4 1 x 6.0 sq.mm Mtr. 450.00

3.5 1 x 10.0 sq.mm Mtr. 450.00

4

P&F Recessed/ Surface mounting heavy duty

horizontal type sheet steel Distribution board

phophatised/ powder painted complete with suitable

rating insulated copper bus bar, shorting link , neutral

link, earth link and din bar,masking sheet, conforming

to IS13032 & IS8623 including making internal DB

terminations with copper lugs , testing etc. as required.

Double door (Three phase)

6 Way Each 3.0

5

P&F 240/415 V AC MCB with positive isolation of

breaking capacity not less than 10 KA (B/ C/ D

tripping characteristic) ISI marked IS 8828(1996)]/

conforming to IEC 60898 in existing board/sheets

including making connections, testing etc. as required.

Single pole MCB

6 A to 32 A rating Each 48.0

Triple pole MCB

40 A/ 63 A rating Each 10.0

4.1

5.1

5.2

Page 5

Page 6: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

6

P&F 240/415 V isolator conforming to IS:13947-III/

IEC 60947-3 on existing board / sheet including

making connections, testing etc. as required.

Four pole Isolator

100 A rating Each 4.0

7

P&F metal clad industrial plug top & socket unit with

pin and sleeve type contact on porcelain/ bakelite base

in sheet steel enclosure (without MCB) including

making connections, testing etc.as required

Single / Double Pole (Three pin)

20 A Each 24.0

Three / Four pole (Five pin)

30A-32A Each 4.0

7.3 63 A Each 1.0

8

P & F 18 SWG Sheet steel boxes duly finished with

two coats of red oxide and with earthing terminal of

following sizes (nominal size) on surface or in

recessed as required.

8.1 175mm x 100mm x 60mm Each 20.0

9

P & F surface/recessed type 10 mm thick Teak wood

board duly antitermite treated, varnished and fixed by

using gutties/ PVC fasteners of following size as

required.

9.1 250 mm x 100 mm Each 20.0

9.2 100 mm x 175 mm Each 20.0

10

P & F ISI marked (IS :3854) 16 amp. flush type switch

including cutting hole in tile and making connection

testing etc. as required.

Each 40.0

11

P & F 3/6 pin 16 amp flush type socket including

cutting hole in tile and making connection testing etc.

as required.

Each 40.0

12

P & F ISI marked 6 amp bakelite batten/angle holder

including making connection testing etc. as required. Each 40.0

13

P & F paper phenolic resin bonded laminates

confirming to IS : 2036 - 1995 for boxes/ frames

including making holes for switches etc, with brass

screws, washers/ zinc plated nut and bolts as required.

13.1 3.0 mm thick Sq.m 5.0

6.1

7.1

7.2

Page 6

Page 7: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

14

P/Laying P.V.C. / XLPE insulated & P.V.C. sheathed

cable of 1.1 KV grade with aluminium conductor of

IS:1554 P-I / IS :7098 P - I of Group 1 of approved

make in ground as per IS:1255 including excavation

of 30cmx75cm size trench, 25 cm thick under layer of

sand,IInd class bricks covering, refilling

earth,compaction of earth, making necessary

connection, testing etc. as required of size.

16.0 Sq.mm

4 core Mtr. 60.0

25.0 Sq.mm

4 core Mtr. 30.0

15

P & F IP -65 protected integral flood light luminaire

suitable for HPSV/ Metal halide lamp comprising of

powder coated die cast aluminium housing,

electrochemically brightened and anodized stippled

aluminium reflector, covered with suitably gasketed

heat resistant and toughened glass, porcelain holder,

integral control gear box having copper ballast,

capacitor, electronic ignitor prewired with pvc

insulated copper conductor up to terminal block

including making connection testing etc. as required.

(with out lamp)

15.1 1 X 400 Watt Each 10

16

P & F Normal / High Output High pressure sodium

vapour/ Metal halide / Halogen lamp as required.

Metal halide lamp single ended tubular

400 Watt Each 10

Total of Part II Rs.

Total of Part I & Part II

Signature of the Contractor with Seal and Address

16.1

Executive Engineer

14.1

14.2

Page 7

Page 8: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 8

Page 9: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 9

Page 10: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 10

Page 11: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 11

Page 12: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 12

Page 13: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 13

Page 14: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 14

Page 15: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 15

Page 16: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 16

Page 17: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 17

Page 18: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 18

Page 19: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 19

Page 20: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 20

Page 21: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 21

Page 22: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 22

Page 23: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 23

Page 24: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 24

Page 25: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 25

Page 26: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 26

Page 27: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 27

Page 28: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 28

Page 29: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 29

Page 30: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 30

Page 31: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 31

Page 32: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 32

Page 33: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 33

Page 34: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 34

Page 35: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 35

Page 36: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 36

Page 37: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 37

Page 38: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 38

Page 39: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 39

Page 40: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 40

Page 41: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 41

Page 42: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 42

Page 43: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 43

Page 44: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 44

Page 45: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 45

Page 46: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 46

Page 47: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 47

Page 48: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 48

Page 49: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 49

Page 50: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 50

Page 51: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 51

Page 52: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 52

Page 53: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 53

Page 54: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 54

Page 55: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 55

Page 56: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 56

Page 57: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 57

Page 58: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 58

Page 59: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 59

Page 60: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

S.NO. Description Unit Qty. Rates Amount

Page 60

Page 61: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 61

Page 62: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 62

Page 63: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 63

Page 64: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 64

Page 65: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 65

Page 66: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 66

Page 67: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 67

Page 68: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 68

Page 69: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 69

Page 70: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 70

Page 71: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 71

Page 72: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 72

Page 73: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 73

Page 74: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 74

Page 75: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 75

Page 76: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 76

Page 77: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 77

Page 78: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 78

Page 79: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 79

Page 80: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 80

Page 81: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 81

Page 82: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 82

Page 83: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 83

Page 84: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 84

Page 85: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 85

Page 86: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 86

Page 87: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 87

Page 88: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 88

Page 89: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 89

Page 90: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 90

Page 91: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 91

Page 92: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 92

Page 93: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 93

Page 94: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 94

Page 95: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 95

Page 96: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 96

Page 97: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 97

Page 98: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 98

Page 99: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 99

Page 100: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 100

Page 101: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 101

Page 102: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 102

Page 103: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 103

Page 104: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 104

Page 105: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 105

Page 106: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 106

Page 107: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 107

Page 108: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 108

Page 109: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 109

Page 110: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 110

Page 111: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 111

Page 112: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 112

Page 113: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 113

Page 114: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 114

Page 115: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 115

Page 116: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 116

Page 117: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 117

Page 118: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 118

Page 119: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 119

Page 120: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 120

Page 121: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 121

Page 122: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 122

Page 123: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 123

Page 124: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 124

Page 125: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 125

Page 126: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 126

Page 127: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 127

Page 128: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 128

Page 129: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 129

Page 130: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 130

Page 131: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 131

Page 132: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 132

Page 133: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 133

Page 134: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 134

Page 135: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 135

Page 136: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 136

Page 137: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 137

Page 138: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 138

Page 139: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 139

Page 140: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 140

Page 141: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 141

Page 142: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 142

Page 143: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 143

Page 144: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 144

Page 145: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 145

Page 146: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 146

Page 147: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 147

Page 148: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 148

Page 149: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 149

Page 150: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 150

Page 151: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 151

Page 152: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 152

Page 153: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 153

Page 154: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 154

Page 155: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 155

Page 156: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 156

Page 157: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 157

Page 158: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 158

Page 159: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 159

Page 160: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 160

Page 161: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 161

Page 162: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 162

Page 163: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 163

Page 164: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 164

Page 165: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 165

Page 166: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 166

Page 167: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 167

Page 168: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 168

Page 169: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 169

Page 170: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 170

Page 171: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 171

Page 172: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 172

Page 173: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 173

Page 174: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 174

Page 175: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 175

Page 176: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 176

Page 177: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 177

Page 178: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 178

Page 179: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 179

Page 180: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 180

Page 181: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 181

Page 182: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 182

Page 183: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 183

Page 184: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 184

Page 185: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 185

Page 186: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 186

Page 187: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 187

Page 188: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 188

Page 189: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 189

Page 190: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 190

Page 191: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 191

Page 192: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 192

Page 193: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 193

Page 194: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 194

Page 195: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 195

Page 196: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 196

Page 197: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 197

Page 198: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 198

Page 199: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 199

Page 200: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 200

Page 201: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 201

Page 202: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 202

Page 203: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 203

Page 204: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 204

Page 205: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 205

Page 206: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 206

Page 207: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 207

Page 208: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 208

Page 209: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 209

Page 210: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 210

Page 211: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 211

Page 212: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 212

Page 213: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 213

Page 214: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 214

Page 215: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 215

Page 216: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 216

Page 217: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 217

Page 218: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 218

Page 219: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 219

Page 220: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 220

Page 221: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 221

Page 222: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 222

Page 223: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 223

Page 224: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 224

Page 225: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 225

Page 226: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 226

Page 227: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 227

Page 228: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 228

Page 229: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 229

Page 230: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 230

Page 231: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 231

Page 232: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 232

Page 233: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 233

Page 234: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 234

Page 235: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 235

Page 236: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 236

Page 237: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 237

Page 238: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 238

Page 239: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 239

Page 240: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 240

Page 241: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 241

Page 242: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 242

Page 243: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 243

Page 244: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 244

Page 245: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 245

Page 246: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 246

Page 247: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 247

Page 248: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 248

Page 249: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 249

Page 250: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 250

Page 251: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 251

Page 252: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 252

Page 253: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 253

Page 254: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 254

Page 255: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 255

Page 256: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 256

Page 257: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 257

Page 258: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 258

Page 259: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 259

Page 260: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 260

Page 261: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 261

Page 262: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 262

Page 263: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 263

Page 264: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 264

Page 265: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 265

Page 266: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 266

Page 267: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 267

Page 268: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 268

Page 269: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 269

Page 270: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 270

Page 271: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 271

Page 272: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 272

Page 273: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 273

Page 274: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 274

Page 275: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 275

Page 276: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 276

Page 277: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 277

Page 278: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 278

Page 279: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 279

Page 280: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 280

Page 281: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 281

Page 282: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 282

Page 283: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 283

Page 284: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 284

Page 285: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 285

Page 286: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 286

Page 287: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 287

Page 288: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 288

Page 289: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 289

Page 290: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 290

Page 291: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 291

Page 292: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 292

Page 293: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 293

Page 294: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 294

Page 295: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 295

Page 296: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 296

Page 297: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 297

Page 298: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 298

Page 299: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 299

Page 300: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 300

Page 301: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 301

Page 302: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 302

Page 303: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 303

Page 304: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 304

Page 305: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 305

Page 306: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 306

Page 307: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 307

Page 308: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 308

Page 309: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 309

Page 310: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 310

Page 311: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 311

Page 312: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 312

Page 313: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 313

Page 314: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 314

Page 315: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 315

Page 316: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 316

Page 317: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 317

Page 318: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 318

Page 319: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 319

Page 320: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 320

Page 321: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 321

Page 322: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 322

Page 323: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 323

Page 324: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 324

Page 325: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 325

Page 326: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 326

Page 327: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 327

Page 328: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 328

Page 329: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 329

Page 330: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 330

Page 331: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 331

Page 332: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 332

Page 333: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 333

Page 334: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 334

Page 335: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 335

Page 336: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 336

Page 337: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 337

Page 338: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 338

Page 339: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 339

Page 340: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 340

Page 341: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 341

Page 342: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 342

Page 343: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 343

Page 344: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 344

Page 345: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 345

Page 346: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 346

Page 347: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 347

Page 348: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 348

Page 349: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 349

Page 350: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 350

Page 351: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 351

Page 352: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 352

Page 353: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 353

Page 354: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 354

Page 355: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 355

Page 356: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 356

Page 357: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 357

Page 358: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 358

Page 359: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 359

Page 360: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 360

Page 361: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 361

Page 362: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 362

Page 363: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 363

Page 364: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 364

Page 365: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 365

Page 366: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 366

Page 367: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 367

Page 368: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 368

Page 369: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 369

Page 370: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 370

Page 371: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 371

Page 372: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 372

Page 373: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 373

Page 374: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 374

Page 375: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 375

Page 376: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 376

Page 377: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 377

Page 378: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 378

Page 379: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 379

Page 380: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 380

Page 381: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 381

Page 382: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 382

Page 383: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 383

Page 384: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 384

Page 385: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 385

Page 386: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 386

Page 387: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 387

Page 388: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 388

Page 389: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 389

Page 390: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 390

Page 391: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 391

Page 392: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 392

Page 393: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 393

Page 394: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 394

Page 395: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 395

Page 396: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 396

Page 397: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 397

Page 398: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 398

Page 399: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 399

Page 400: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 400

Page 401: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 401

Page 402: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 402

Page 403: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 403

Page 404: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 404

Page 405: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 405

Page 406: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 406

Page 407: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 407

Page 408: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 408

Page 409: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 409

Page 410: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 410

Page 411: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 411

Page 412: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 412

Page 413: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 413

Page 414: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 414

Page 415: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 415

Page 416: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 416

Page 417: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 417

Page 418: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 418

Page 419: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 419

Page 420: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 420

Page 421: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 421

Page 422: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 422

Page 423: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 423

Page 424: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 424

Page 425: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 425

Page 426: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 426

Page 427: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 427

Page 428: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 428

Page 429: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 429

Page 430: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 430

Page 431: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 431

Page 432: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 432

Page 433: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 433

Page 434: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 434

Page 435: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 435

Page 436: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 436

Page 437: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 437

Page 438: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 438

Page 439: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 439

Page 440: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 440

Page 441: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 441

Page 442: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 442

Page 443: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 443

Page 444: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 444

Page 445: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 445

Page 446: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 446

Page 447: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 447

Page 448: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 448

Page 449: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 449

Page 450: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 450

Page 451: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 451

Page 452: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 452

Page 453: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 453

Page 454: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 454

Page 455: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 455

Page 456: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 456

Page 457: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 457

Page 458: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 458

Page 459: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 459

Page 460: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 460

Page 461: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 461

Page 462: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 462

Page 463: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 463

Page 464: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 464

Page 465: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 465

Page 466: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 466

Page 467: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 467

Page 468: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 468

Page 469: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 469

Page 470: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 470

Page 471: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 471

Page 472: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 472

Page 473: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 473

Page 474: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 474

Page 475: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 475

Page 476: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 476

Page 477: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 477

Page 478: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 478

Page 479: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 479

Page 480: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 480

Page 481: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 481

Page 482: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 482

Page 483: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 483

Page 484: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 484

Page 485: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 485

Page 486: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 486

Page 487: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 487

Page 488: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 488

Page 489: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 489

Page 490: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 490

Page 491: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 491

Page 492: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 492

Page 493: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 493

Page 494: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 494

Page 495: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 495

Page 496: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 496

Page 497: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 497

Page 498: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 498

Page 499: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 499

Page 500: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 500

Page 501: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 501

Page 502: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 502

Page 503: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 503

Page 504: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 504

Page 505: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 505

Page 506: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 506

Page 507: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 507

Page 508: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 508

Page 509: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 509

Page 510: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 510

Page 511: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 511

Page 512: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 512

Page 513: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 513

Page 514: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 514

Page 515: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 515

Page 516: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 516

Page 517: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 517

Page 518: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 518

Page 519: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 519

Page 520: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 520

Page 521: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 521

Page 522: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 522

Page 523: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 523

Page 524: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 524

Page 525: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 525

Page 526: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 526

Page 527: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 527

Page 528: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 528

Page 529: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 529

Page 530: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 530

Page 531: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 531

Page 532: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 532

Page 533: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 533

Page 534: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 534

Page 535: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 535

Page 536: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 536

Page 537: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 537

Page 538: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 538

Page 539: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 539

Page 540: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 540

Page 541: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 541

Page 542: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 542

Page 543: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 543

Page 544: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 544

Page 545: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 545

Page 546: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 546

Page 547: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 547

Page 548: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 548

Page 549: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 549

Page 550: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 550

Page 551: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 551

Page 552: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 552

Page 553: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 553

Page 554: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 554

Page 555: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 555

Page 556: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 556

Page 557: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 557

Page 558: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 558

Page 559: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 559

Page 560: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 560

Page 561: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 561

Page 562: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 562

Page 563: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 563

Page 564: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 564

Page 565: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 565

Page 566: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 566

Page 567: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 567

Page 568: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 568

Page 569: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 569

Page 570: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 570

Page 571: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 571

Page 572: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 572

Page 573: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 573

Page 574: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 574

Page 575: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 575

Page 576: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 576

Page 577: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 577

Page 578: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 578

Page 579: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 579

Page 580: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 580

Page 581: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 581

Page 582: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 582

Page 583: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 583

Page 584: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 584

Page 585: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 585

Page 586: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 586

Page 587: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 587

Page 588: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 588

Page 589: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 589

Page 590: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 590

Page 591: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 591

Page 592: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 592

Page 593: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 593

Page 594: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 594

Page 595: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 595

Page 596: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 596

Page 597: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 597

Page 598: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 598

Page 599: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 599

Page 600: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 600

Page 601: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 601

Page 602: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 602

Page 603: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 603

Page 604: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 604

Page 605: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 605

Page 606: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 606

Page 607: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 607

Page 608: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 608

Page 609: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 609

Page 610: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 610

Page 611: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 611

Page 612: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 612

Page 613: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 613

Page 614: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 614

Page 615: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 615

Page 616: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 616

Page 617: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 617

Page 618: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 618

Page 619: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 619

Page 620: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 620

Page 621: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 621

Page 622: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 622

Page 623: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 623

Page 624: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 624

Page 625: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 625

Page 626: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 626

Page 627: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 627

Page 628: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 628

Page 629: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 629

Page 630: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 630

Page 631: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 631

Page 632: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 632

Page 633: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 633

Page 634: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 634

Page 635: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 635

Page 636: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 636

Page 637: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 637

Page 638: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 638

Page 639: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 639

Page 640: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 640

Page 641: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 641

Page 642: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 642

Page 643: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 643

Page 644: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 644

Page 645: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 645

Page 646: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 646

Page 647: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 647

Page 648: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 648

Page 649: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 649

Page 650: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 650

Page 651: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 651

Page 652: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 652

Page 653: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 653

Page 654: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 654

Page 655: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 655

Page 656: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 656

Page 657: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 657

Page 658: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 658

Page 659: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 659

Page 660: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 660

Page 661: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 661

Page 662: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 662

Page 663: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 663

Page 664: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 664

Page 665: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 665

Page 666: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 666

Page 667: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 667

Page 668: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 668

Page 669: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 669

Page 670: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 670

Page 671: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 671

Page 672: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 672

Page 673: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 673

Page 674: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 674

Page 675: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 675

Page 676: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 676

Page 677: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 677

Page 678: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 678

Page 679: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 679

Page 680: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 680

Page 681: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 681

Page 682: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 682

Page 683: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 683

Page 684: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 684

Page 685: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 685

Page 686: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 686

Page 687: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 687

Page 688: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 688

Page 689: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 689

Page 690: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 690

Page 691: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 691

Page 692: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 692

Page 693: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 693

Page 694: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 694

Page 695: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 695

Page 696: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 696

Page 697: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 697

Page 698: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 698

Page 699: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 699

Page 700: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 700

Page 701: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 701

Page 702: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 702

Page 703: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 703

Page 704: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 704

Page 705: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 705

Page 706: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 706

Page 707: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 707

Page 708: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 708

Page 709: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 709

Page 710: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 710

Page 711: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 711

Page 712: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 712

Page 713: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 713

Page 714: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 714

Page 715: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 715

Page 716: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 716

Page 717: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 717

Page 718: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 718

Page 719: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 719

Page 720: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 720

Page 721: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 721

Page 722: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 722

Page 723: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 723

Page 724: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 724

Page 725: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 725

Page 726: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 726

Page 727: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 727

Page 728: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 728

Page 729: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 729

Page 730: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 730

Page 731: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 731

Page 732: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 732

Page 733: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 733

Page 734: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 734

Page 735: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 735

Page 736: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 736

Page 737: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 737

Page 738: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 738

Page 739: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 739

Page 740: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 740

Page 741: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 741

Page 742: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 742

Page 743: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 743

Page 744: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 744

Page 745: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 745

Page 746: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 746

Page 747: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 747

Page 748: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 748

Page 749: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 749

Page 750: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 750

Page 751: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 751

Page 752: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 752

Page 753: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 753

Page 754: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 754

Page 755: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 755

Page 756: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 756

Page 757: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 757

Page 758: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 758

Page 759: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 759

Page 760: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 760

Page 761: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 761

Page 762: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 762

Page 763: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 763

Page 764: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 764

Page 765: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 765

Page 766: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 766

Page 767: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 767

Page 768: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 768

Page 769: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 769

Page 770: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 770

Page 771: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 771

Page 772: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 772

Page 773: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 773

Page 774: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 774

Page 775: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 775

Page 776: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 776

Page 777: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 777

Page 778: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 778

Page 779: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 779

Page 780: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 780

Page 781: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 781

Page 782: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 782

Page 783: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 783

Page 784: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 784

Page 785: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 785

Page 786: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 786

Page 787: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 787

Page 788: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 788

Page 789: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 789

Page 790: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 790

Page 791: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 791

Page 792: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 792

Page 793: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 793

Page 794: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 794

Page 795: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 795

Page 796: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 796

Page 797: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 797

Page 798: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 798

Page 799: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 799

Page 800: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 800

Page 801: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 801

Page 802: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 802

Page 803: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 803

Page 804: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 804

Page 805: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 805

Page 806: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 806

Page 807: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 807

Page 808: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 808

Page 809: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 809

Page 810: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 810

Page 811: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 811

Page 812: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 812

Page 813: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 813

Page 814: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 814

Page 815: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 815

Page 816: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 816

Page 817: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 817

Page 818: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 818

Page 819: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 819

Page 820: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 820

Page 821: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 821

Page 822: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 822

Page 823: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 823

Page 824: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 824

Page 825: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 825

Page 826: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 826

Page 827: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 827

Page 828: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 828

Page 829: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 829

Page 830: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 830

Page 831: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 831

Page 832: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 832

Page 833: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 833

Page 834: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 834

Page 835: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 835

Page 836: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 836

Page 837: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 837

Page 838: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 838

Page 839: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 839

Page 840: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 840

Page 841: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 841

Page 842: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 842

Page 843: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 843

Page 844: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 844

Page 845: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 845

Page 846: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 846

Page 847: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 847

Page 848: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 848

Page 849: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 849

Page 850: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 850

Page 851: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 851

Page 852: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 852

Page 853: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 853

Page 854: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 854

Page 855: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 855

Page 856: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 856

Page 857: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 857

Page 858: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 858

Page 859: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 859

Page 860: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 860

Page 861: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 861

Page 862: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 862

Page 863: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 863

Page 864: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 864

Page 865: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 865

Page 866: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 866

Page 867: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 867

Page 868: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 868

Page 869: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 869

Page 870: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 870

Page 871: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 871

Page 872: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 872

Page 873: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 873

Page 874: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 874

Page 875: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 875

Page 876: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 876

Page 877: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 877

Page 878: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 878

Page 879: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 879

Page 880: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 880

Page 881: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 881

Page 882: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 882

Page 883: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 883

Page 884: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 884

Page 885: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 885

Page 886: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 886

Page 887: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 887

Page 888: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 888

Page 889: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 889

Page 890: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 890

Page 891: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 891

Page 892: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 892

Page 893: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 893

Page 894: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 894

Page 895: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 895

Page 896: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 896

Page 897: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 897

Page 898: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 898

Page 899: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 899

Page 900: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 900

Page 901: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 901

Page 902: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 902

Page 903: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 903

Page 904: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 904

Page 905: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 905

Page 906: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 906

Page 907: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 907

Page 908: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 908

Page 909: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 909

Page 910: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 910

Page 911: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 911

Page 912: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 912

Page 913: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 913

Page 914: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 914

Page 915: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 915

Page 916: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 916

Page 917: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 917

Page 918: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 918

Page 919: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 919

Page 920: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 920

Page 921: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 921

Page 922: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 922

Page 923: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 923

Page 924: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 924

Page 925: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 925

Page 926: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 926

Page 927: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 927

Page 928: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 928

Page 929: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 929

Page 930: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 930

Page 931: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 931

Page 932: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 932

Page 933: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 933

Page 934: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 934

Page 935: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 935

Page 936: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 936

Page 937: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 937

Page 938: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 938

Page 939: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 939

Page 940: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 940

Page 941: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 941

Page 942: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 942

Page 943: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 943

Page 944: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 944

Page 945: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 945

Page 946: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 946

Page 947: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 947

Page 948: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 948

Page 949: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 949

Page 950: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 950

Page 951: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 951

Page 952: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 952

Page 953: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 953

Page 954: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 954

Page 955: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 955

Page 956: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 956

Page 957: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 957

Page 958: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 958

Page 959: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 959

Page 960: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 960

Page 961: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 961

Page 962: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 962

Page 963: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 963

Page 964: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 964

Page 965: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 965

Page 966: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 966

Page 967: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 967

Page 968: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 968

Page 969: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 969

Page 970: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 970

Page 971: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 971

Page 972: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 972

Page 973: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 973

Page 974: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 974

Page 975: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 975

Page 976: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 976

Page 977: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 977

Page 978: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 978

Page 979: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 979

Page 980: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 980

Page 981: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 981

Page 982: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 982

Page 983: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 983

Page 984: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 984

Page 985: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 985

Page 986: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 986

Page 987: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 987

Page 988: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 988

Page 989: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 989

Page 990: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 990

Page 991: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 991

Page 992: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 992

Page 993: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 993

Page 994: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 994

Page 995: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 995

Page 996: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 996

Page 997: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 997

Page 998: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 998

Page 999: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 999

Page 1000: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1000

Page 1001: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1001

Page 1002: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1002

Page 1003: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1003

Page 1004: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1004

Page 1005: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1005

Page 1006: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1006

Page 1007: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1007

Page 1008: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1008

Page 1009: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1009

Page 1010: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1010

Page 1011: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1011

Page 1012: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1012

Page 1013: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1013

Page 1014: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1014

Page 1015: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1015

Page 1016: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1016

Page 1017: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1017

Page 1018: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1018

Page 1019: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1019

Page 1020: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1020

Page 1021: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1021

Page 1022: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1022

Page 1023: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1023

Page 1024: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1024

Page 1025: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1025

Page 1026: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1026

Page 1027: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1027

Page 1028: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1028

Page 1029: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1029

Page 1030: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1030

Page 1031: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1031

Page 1032: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1032

Page 1033: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1033

Page 1034: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1034

Page 1035: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1035

Page 1036: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1036

Page 1037: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1037

Page 1038: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1038

Page 1039: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1039

Page 1040: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1040

Page 1041: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1041

Page 1042: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1042

Page 1043: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1043

Page 1044: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1044

Page 1045: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1045

Page 1046: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1046

Page 1047: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1047

Page 1048: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1048

Page 1049: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1049

Page 1050: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1050

Page 1051: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1051

Page 1052: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1052

Page 1053: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1053

Page 1054: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1054

Page 1055: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1055

Page 1056: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1056

Page 1057: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1057

Page 1058: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1058

Page 1059: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1059

Page 1060: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1060

Page 1061: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1061

Page 1062: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1062

Page 1063: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1063

Page 1064: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1064

Page 1065: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1065

Page 1066: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1066

Page 1067: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1067

Page 1068: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1068

Page 1069: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1069

Page 1070: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1070

Page 1071: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1071

Page 1072: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1072

Page 1073: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1073

Page 1074: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1074

Page 1075: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1075

Page 1076: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1076

Page 1077: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1077

Page 1078: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1078

Page 1079: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1079

Page 1080: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1080

Page 1081: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1081

Page 1082: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1082

Page 1083: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1083

Page 1084: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1084

Page 1085: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1085

Page 1086: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1086

Page 1087: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1087

Page 1088: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1088

Page 1089: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1089

Page 1090: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1090

Page 1091: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1091

Page 1092: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1092

Page 1093: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1093

Page 1094: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1094

Page 1095: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1095

Page 1096: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1096

Page 1097: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1097

Page 1098: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1098

Page 1099: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1099

Page 1100: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1100

Page 1101: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1101

Page 1102: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1102

Page 1103: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1103

Page 1104: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1104

Page 1105: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1105

Page 1106: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1106

Page 1107: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1107

Page 1108: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1108

Page 1109: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1109

Page 1110: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1110

Page 1111: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1111

Page 1112: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1112

Page 1113: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1113

Page 1114: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1114

Page 1115: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1115

Page 1116: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1116

Page 1117: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1117

Page 1118: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1118

Page 1119: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1119

Page 1120: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1120

Page 1121: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1121

Page 1122: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1122

Page 1123: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1123

Page 1124: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1124

Page 1125: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1125

Page 1126: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1126

Page 1127: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1127

Page 1128: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1128

Page 1129: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1129

Page 1130: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1130

Page 1131: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1131

Page 1132: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1132

Page 1133: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1133

Page 1134: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1134

Page 1135: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1135

Page 1136: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1136

Page 1137: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1137

Page 1138: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1138

Page 1139: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1139

Page 1140: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1140

Page 1141: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1141

Page 1142: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1142

Page 1143: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1143

Page 1144: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1144

Page 1145: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1145

Page 1146: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1146

Page 1147: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1147

Page 1148: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1148

Page 1149: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1149

Page 1150: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1150

Page 1151: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1151

Page 1152: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1152

Page 1153: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1153

Page 1154: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1154

Page 1155: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1155

Page 1156: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1156

Page 1157: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1157

Page 1158: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1158

Page 1159: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1159

Page 1160: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1160

Page 1161: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1161

Page 1162: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1162

Page 1163: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1163

Page 1164: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1164

Page 1165: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1165

Page 1166: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1166

Page 1167: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1167

Page 1168: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1168

Page 1169: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1169

Page 1170: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1170

Page 1171: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1171

Page 1172: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1172

Page 1173: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1173

Page 1174: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1174

Page 1175: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1175

Page 1176: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1176

Page 1177: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1177

Page 1178: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1178

Page 1179: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1179

Page 1180: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1180

Page 1181: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1181

Page 1182: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1182

Page 1183: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1183

Page 1184: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1184

Page 1185: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1185

Page 1186: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1186

Page 1187: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1187

Page 1188: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1188

Page 1189: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1189

Page 1190: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1190

Page 1191: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1191

Page 1192: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1192

Page 1193: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1193

Page 1194: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1194

Page 1195: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1195

Page 1196: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1196

Page 1197: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1197

Page 1198: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1198

Page 1199: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1199

Page 1200: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1200

Page 1201: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1201

Page 1202: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1202

Page 1203: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1203

Page 1204: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1204

Page 1205: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1205

Page 1206: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1206

Page 1207: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1207

Page 1208: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1208

Page 1209: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1209

Page 1210: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1210

Page 1211: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1211

Page 1212: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1212

Page 1213: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1213

Page 1214: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1214

Page 1215: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1215

Page 1216: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1216

Page 1217: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1217

Page 1218: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1218

Page 1219: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1219

Page 1220: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1220

Page 1221: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1221

Page 1222: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1222

Page 1223: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1223

Page 1224: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1224

Page 1225: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1225

Page 1226: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1226

Page 1227: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1227

Page 1228: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1228

Page 1229: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1229

Page 1230: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1230

Page 1231: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1231

Page 1232: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1232

Page 1233: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1233

Page 1234: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1234

Page 1235: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1235

Page 1236: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1236

Page 1237: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1237

Page 1238: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1238

Page 1239: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1239

Page 1240: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1240

Page 1241: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1241

Page 1242: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1242

Page 1243: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1243

Page 1244: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1244

Page 1245: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1245

Page 1246: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1246

Page 1247: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1247

Page 1248: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1248

Page 1249: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1249

Page 1250: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1250

Page 1251: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1251

Page 1252: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1252

Page 1253: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1253

Page 1254: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1254

Page 1255: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1255

Page 1256: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1256

Page 1257: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1257

Page 1258: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1258

Page 1259: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1259

Page 1260: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1260

Page 1261: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1261

Page 1262: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1262

Page 1263: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1263

Page 1264: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1264

Page 1265: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1265

Page 1266: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1266

Page 1267: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1267

Page 1268: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1268

Page 1269: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1269

Page 1270: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1270

Page 1271: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1271

Page 1272: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1272

Page 1273: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1273

Page 1274: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1274

Page 1275: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1275

Page 1276: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1276

Page 1277: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1277

Page 1278: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1278

Page 1279: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1279

Page 1280: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1280

Page 1281: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1281

Page 1282: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1282

Page 1283: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1283

Page 1284: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1284

Page 1285: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1285

Page 1286: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1286

Page 1287: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1287

Page 1288: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1288

Page 1289: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1289

Page 1290: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1290

Page 1291: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1291

Page 1292: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1292

Page 1293: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1293

Page 1294: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1294

Page 1295: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1295

Page 1296: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1296

Page 1297: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1297

Page 1298: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1298

Page 1299: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1299

Page 1300: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1300

Page 1301: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1301

Page 1302: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1302

Page 1303: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1303

Page 1304: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1304

Page 1305: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1305

Page 1306: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1306

Page 1307: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1307

Page 1308: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1308

Page 1309: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1309

Page 1310: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1310

Page 1311: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1311

Page 1312: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1312

Page 1313: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1313

Page 1314: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1314

Page 1315: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1315

Page 1316: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1316

Page 1317: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1317

Page 1318: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1318

Page 1319: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1319

Page 1320: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1320

Page 1321: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1321

Page 1322: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1322

Page 1323: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1323

Page 1324: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1324

Page 1325: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1325

Page 1326: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1326

Page 1327: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1327

Page 1328: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1328

Page 1329: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1329

Page 1330: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1330

Page 1331: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1331

Page 1332: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1332

Page 1333: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1333

Page 1334: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1334

Page 1335: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1335

Page 1336: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1336

Page 1337: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1337

Page 1338: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1338

Page 1339: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1339

Page 1340: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1340

Page 1341: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1341

Page 1342: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1342

Page 1343: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1343

Page 1344: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1344

Page 1345: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1345

Page 1346: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1346

Page 1347: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1347

Page 1348: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1348

Page 1349: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1349

Page 1350: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1350

Page 1351: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1351

Page 1352: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1352

Page 1353: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1353

Page 1354: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1354

Page 1355: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1355

Page 1356: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1356

Page 1357: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1357

Page 1358: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1358

Page 1359: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1359

Page 1360: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1360

Page 1361: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1361

Page 1362: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1362

Page 1363: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1363

Page 1364: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1364

Page 1365: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1365

Page 1366: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1366

Page 1367: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1367

Page 1368: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1368

Page 1369: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1369

Page 1370: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1370

Page 1371: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1371

Page 1372: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1372

Page 1373: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1373

Page 1374: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1374

Page 1375: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1375

Page 1376: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1376

Page 1377: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1377

Page 1378: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1378

Page 1379: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1379

Page 1380: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1380

Page 1381: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1381

Page 1382: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1382

Page 1383: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1383

Page 1384: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1384

Page 1385: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1385

Page 1386: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1386

Page 1387: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1387

Page 1388: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1388

Page 1389: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1389

Page 1390: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1390

Page 1391: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1391

Page 1392: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1392

Page 1393: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1393

Page 1394: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1394

Page 1395: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1395

Page 1396: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1396

Page 1397: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1397

Page 1398: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1398

Page 1399: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1399

Page 1400: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1400

Page 1401: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1401

Page 1402: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1402

Page 1403: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1403

Page 1404: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1404

Page 1405: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1405

Page 1406: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1406

Page 1407: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1407

Page 1408: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1408

Page 1409: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1409

Page 1410: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1410

Page 1411: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1411

Page 1412: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1412

Page 1413: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1413

Page 1414: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1414

Page 1415: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1415

Page 1416: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1416

Page 1417: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1417

Page 1418: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1418

Page 1419: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1419

Page 1420: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1420

Page 1421: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1421

Page 1422: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1422

Page 1423: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1423

Page 1424: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1424

Page 1425: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1425

Page 1426: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1426

Page 1427: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1427

Page 1428: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1428

Page 1429: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1429

Page 1430: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1430

Page 1431: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1431

Page 1432: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1432

Page 1433: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1433

Page 1434: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1434

Page 1435: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1435

Page 1436: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1436

Page 1437: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1437

Page 1438: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1438

Page 1439: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1439

Page 1440: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1440

Page 1441: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1441

Page 1442: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1442

Page 1443: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1443

Page 1444: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1444

Page 1445: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1445

Page 1446: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1446

Page 1447: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1447

Page 1448: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1448

Page 1449: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1449

Page 1450: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1450

Page 1451: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1451

Page 1452: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1452

Page 1453: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1453

Page 1454: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1454

Page 1455: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1455

Page 1456: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1456

Page 1457: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1457

Page 1458: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1458

Page 1459: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1459

Page 1460: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1460

Page 1461: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1461

Page 1462: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1462

Page 1463: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1463

Page 1464: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1464

Page 1465: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1465

Page 1466: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1466

Page 1467: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1467

Page 1468: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1468

Page 1469: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1469

Page 1470: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1470

Page 1471: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1471

Page 1472: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1472

Page 1473: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1473

Page 1474: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1474

Page 1475: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1475

Page 1476: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1476

Page 1477: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1477

Page 1478: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1478

Page 1479: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1479

Page 1480: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1480

Page 1481: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1481

Page 1482: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1482

Page 1483: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1483

Page 1484: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1484

Page 1485: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1485

Page 1486: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1486

Page 1487: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1487

Page 1488: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1488

Page 1489: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1489

Page 1490: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1490

Page 1491: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1491

Page 1492: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1492

Page 1493: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1493

Page 1494: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1494

Page 1495: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1495

Page 1496: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1496

Page 1497: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1497

Page 1498: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1498

Page 1499: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1499

Page 1500: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1500

Page 1501: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1501

Page 1502: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1502

Page 1503: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1503

Page 1504: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1504

Page 1505: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1505

Page 1506: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1506

Page 1507: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1507

Page 1508: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1508

Page 1509: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1509

Page 1510: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1510

Page 1511: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1511

Page 1512: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1512

Page 1513: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1513

Page 1514: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1514

Page 1515: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1515

Page 1516: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1516

Page 1517: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1517

Page 1518: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1518

Page 1519: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1519

Page 1520: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1520

Page 1521: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1521

Page 1522: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1522

Page 1523: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1523

Page 1524: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1524

Page 1525: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1525

Page 1526: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1526

Page 1527: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1527

Page 1528: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1528

Page 1529: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1529

Page 1530: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1530

Page 1531: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1531

Page 1532: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1532

Page 1533: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1533

Page 1534: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1534

Page 1535: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1535

Page 1536: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1536

Page 1537: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1537

Page 1538: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1538

Page 1539: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1539

Page 1540: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1540

Page 1541: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1541

Page 1542: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1542

Page 1543: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1543

Page 1544: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1544

Page 1545: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1545

Page 1546: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1546

Page 1547: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1547

Page 1548: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1548

Page 1549: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1549

Page 1550: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1550

Page 1551: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1551

Page 1552: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1552

Page 1553: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1553

Page 1554: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1554

Page 1555: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1555

Page 1556: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1556

Page 1557: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1557

Page 1558: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1558

Page 1559: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1559

Page 1560: central stage 15.01.15 - mnit.ac.inmnit.ac.in/cms/uploads/2015/05/G_Schedule_Covering.pdf · shuttering - All work upto plinth level : 3.1 1:5:10 (1 cement : 5 coarse sand :10 graded

Page 1560