217 217 217 200 200 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56 48 130 120 111 237 237 237 80 119 27 252 174 .59 The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.Linda Adcock, Project Manager 27 March 2018 CENTER HILL DAM SAFETY UPDATE

CENTER HILL DAM SAFETY UPDATE - Energy.gov › sites › prod › files › 2018 › 04 › f50... · CENTER HILL MAJOR REHABILITATION PROJECT 2 Reinforcing Berm In Progress $50M-MRER

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CENTER HILL DAM SAFETY UPDATE - Energy.gov › sites › prod › files › 2018 › 04 › f50... · CENTER HILL MAJOR REHABILITATION PROJECT 2 Reinforcing Berm In Progress $50M-MRER

217217217

200200200

255255255

000

163163163

131132122

2396553

110135120

1129256

62102130

1025648

130120111

237237237

8011927

252174.59

“The views, opinions and findings contained in this report are those of the authors(s) and should not be

construed as an official Department of the Army position, policy or decision, unless so designated by other

official documentation.”

Linda Adcock, Project Manager

27 March 2018

CENTER HILL DAM SAFETY UPDATE

Page 2: CENTER HILL DAM SAFETY UPDATE - Energy.gov › sites › prod › files › 2018 › 04 › f50... · CENTER HILL MAJOR REHABILITATION PROJECT 2 Reinforcing Berm In Progress $50M-MRER

CENTER HILL MAJOR REHABILITATION PROJECT2

Reinforcing Berm

In Progress

$50M

-MRER approved 2006

Main Dam Grouting 2007-2010

Main Dam Barrier Wall 2009-2015

-Supplemental MRER & RA1 2011-2015

Saddle Dam RCC Berm 2016-2019

Total Project Est. $353M

- PIE & RA2 2016: Residual Risk Gates:

Dam Safety Modification Study

Center Hill Dam Safety Project

Page 3: CENTER HILL DAM SAFETY UPDATE - Energy.gov › sites › prod › files › 2018 › 04 › f50... · CENTER HILL MAJOR REHABILITATION PROJECT 2 Reinforcing Berm In Progress $50M-MRER

Status of Dam Safety Modification Study

(for Gate Operability)

Status of Saddle Dam RCC Berm Construction

Update of Interim Risk Reduction Measures

(IRRM) and O&M Action Item

File Name

3

Page 4: CENTER HILL DAM SAFETY UPDATE - Energy.gov › sites › prod › files › 2018 › 04 › f50... · CENTER HILL MAJOR REHABILITATION PROJECT 2 Reinforcing Berm In Progress $50M-MRER

Dam Safety Modification Study, Residual Risk4

Tailwater inundates service station

Fuse Plug

Tainter Gates

Page 5: CENTER HILL DAM SAFETY UPDATE - Energy.gov › sites › prod › files › 2018 › 04 › f50... · CENTER HILL MAJOR REHABILITATION PROJECT 2 Reinforcing Berm In Progress $50M-MRER

5

1Raise gate machinery & controls up to the road level

(require elevated road OR new road & bridge downstream)

2Replace spillway gate machinery with hydraulic machinery intended

to operate under water

3 Mechanically open the gates from the top of the dam

4 Replace Fuse Plug w/ fuse gates or active gates on RCC Berm

5Water Control Manual update: Open Gates Sooner during

extreme flood events

Dam Safety Modification Study Array of Measures

Page 6: CENTER HILL DAM SAFETY UPDATE - Energy.gov › sites › prod › files › 2018 › 04 › f50... · CENTER HILL MAJOR REHABILITATION PROJECT 2 Reinforcing Berm In Progress $50M-MRER

Dam Safety Mod Study Next Steps:

• Tentatively Recommended Plan- July

• Draft Report- Fall 2018

• NEPA- EA or EIS?

Page 7: CENTER HILL DAM SAFETY UPDATE - Energy.gov › sites › prod › files › 2018 › 04 › f50... · CENTER HILL MAJOR REHABILITATION PROJECT 2 Reinforcing Berm In Progress $50M-MRER

RCC BERM AT SADDLE DAM

Existing

Fuse Plug

Rock Fill RCC

Berm

RCC Berm Profile

Section View

EL. 658.0

Rock Fill

EL. 658.0

Existing Saddle Dam

Page 8: CENTER HILL DAM SAFETY UPDATE - Energy.gov › sites › prod › files › 2018 › 04 › f50... · CENTER HILL MAJOR REHABILITATION PROJECT 2 Reinforcing Berm In Progress $50M-MRER

Existing Saddle Dam

and Fuse Plug

Proposed RCC Berm

Plan View

Page 9: CENTER HILL DAM SAFETY UPDATE - Energy.gov › sites › prod › files › 2018 › 04 › f50... · CENTER HILL MAJOR REHABILITATION PROJECT 2 Reinforcing Berm In Progress $50M-MRER

9

Berm Status –

September 2017

Page 10: CENTER HILL DAM SAFETY UPDATE - Energy.gov › sites › prod › files › 2018 › 04 › f50... · CENTER HILL MAJOR REHABILITATION PROJECT 2 Reinforcing Berm In Progress $50M-MRER

10

Haul Roads

Concrete Materials Stockpile,

Batch Plant and QA Lab

RCC Berm

Foundation

Excavation

14 January 2018

RCC Test Section Site

Main

Dam

Mechanics

Shop

Water

Intake

Page 11: CENTER HILL DAM SAFETY UPDATE - Energy.gov › sites › prod › files › 2018 › 04 › f50... · CENTER HILL MAJOR REHABILITATION PROJECT 2 Reinforcing Berm In Progress $50M-MRER

File Name

11

Page 12: CENTER HILL DAM SAFETY UPDATE - Energy.gov › sites › prod › files › 2018 › 04 › f50... · CENTER HILL MAJOR REHABILITATION PROJECT 2 Reinforcing Berm In Progress $50M-MRER

12

14 Dec 2017 RCC berm right

abutment rock excavation6 Feb 2018 RCC berm right

abutment rock excavation

6 Feb 2018 RCC berm right

abutment rock excavation & rock fill

6 Feb 2018 RT abutment

solution feature

Page 13: CENTER HILL DAM SAFETY UPDATE - Energy.gov › sites › prod › files › 2018 › 04 › f50... · CENTER HILL MAJOR REHABILITATION PROJECT 2 Reinforcing Berm In Progress $50M-MRER

6 Feb 2018 RT abutment

solution feature

2 March 2018

Page 14: CENTER HILL DAM SAFETY UPDATE - Energy.gov › sites › prod › files › 2018 › 04 › f50... · CENTER HILL MAJOR REHABILITATION PROJECT 2 Reinforcing Berm In Progress $50M-MRER

RCC Berm Next Steps:

• Prepare the Foundation- March to June─ Finish Cleaning/Mapping & Dental Concrete

─ Place Leveling Layer of Concrete

─ Consolidation Grouting

• Concrete Test Section & Report- Apr to June

• Start the RCC Placement- July

Page 15: CENTER HILL DAM SAFETY UPDATE - Energy.gov › sites › prod › files › 2018 › 04 › f50... · CENTER HILL MAJOR REHABILITATION PROJECT 2 Reinforcing Berm In Progress $50M-MRER

Lake Level Reduction is an Interim Risk Reduction

Measure (IRRM)

• Update current IRRM Plan - June 2018

• Approval of IRRMP - Aug 2018

• Recommendations:-Interim Raise of Lake, in increments, back to

normal operating levels

- dependent upon Modification Study Risk Estimates

• Gate Electrical & Rehab Work- FY20