Cazul 6
Cazul 6 Generatoarele alimentate de pe bara 1, consumatorii alimentati de pe bara 2, cupla transversala stanga inchisa, cupla transversala dreapta deschisa, cupla longitudinala inchisa
Paladin DesignBase Power System Reliability Evaluation Program V5.40.00
=======================================================================
Project No. : Date & Time : 11/12/14 04:48:09 PM
Project Name: Title :
Drawing No. : Company :
Revision No.: Engineer :
Jobfile Name: Proiect Check by :
Scenario : Date :
System Information
==================
Base Power = 100000.00 (kVA)
Frequency = 50 (Hz)
MaxIterations = 1000
Error Tolerance = 10.000 (kVA), 0.0100 (%)
# of Active Buses = 23
# of Swing Buses = 0
# of Generators = 2
# of Lines/Breakers = 16
# of Transformers = 2
# of Loads = 2
# of Shunts = 0
Generator outages considered = upto 1
Branch outages considered = upto 1
Combine generator & branch outages = No
Abbreviations
=============
2-W xfmr = 2-winding transformer FeederM = Feeder in Magnetic Conduit
3-W xfmr = 3-winding transformer occ/yr = Occurrences per year
Autoxfmr = Autotransformer IEAR = Interrupted Energy Assessment Rate
curt = Curtailment or curtailed PhS xfmr = Phase-Shift Transformer
f./y = Failures per year SeriesC = Series Capacitor
Generator Reliability Input Information
=======================================
Generator Name Pmax Qmax Qmin Failure Repair Priority Consider
(MW) (MVAR) (MVAR) Rate Time 1 to 99 Reliability
(f./y) (hours) (Yes/No)
------------------------ -------- -------- -------- --------- ------- -------- --------
Generatorul 1 200.000 0.500 -0.500 0.001050 952.0 1 Yes
Generatorul 2 200.000 0.500 -0.500 0.001050 952.0 1 Yes
Branch Reliability Input Information
====================================
Branch Name Type Carrying Failure Repair Consider
Capacity Rate Time Reliability
(MVA) (f./y) (hours) (Yes/No)
------------------------ -------- -------- --------- ------- --------
Intrerupator 5 Breaker 15.588 0.010700 93.6 Yes
Intrerupator 6 Breaker 15.588 0.010700 93.6 Yes
Intrerupator cupla Breaker 15.588 0.010700 93.6 Yes
Intrerupatorul 1 Breaker 15.588 0.010700 93.6 Yes
Intrerupatorul 2 Breaker 15.588 0.010700 93.6 Yes
Intrerupatorul 4 Breaker 15.588 0.010700 93.6 Yes
Separatorul 1 Switch 25.981 0.000000 0.0 No
Separatorul 10 Switch 25.981 0.000000 0.0 No
Separatorul 11 Switch 25.981 0.000000 0.0 No
Separatorul 13 Switch 25.981 0.000000 0.0 No
Separatorul 14 Switch 25.981 0.000000 0.0 No
Separatorul 3 Switch 25.981 0.000000 0.0 No
Separatorul 5 Switch 25.981 0.000000 0.0 No
Separatorul 6 Switch 25.981 0.000000 0.0 No
Separatorul 7 Switch 25.981 0.000000 0.0 No
Separatorul 9 Switch 25.981 0.000000 0.0 No
Trafo 1 2-W xfmr 1.050 0.001620 616.0 Yes
Trafo 2 2-W xfmr 1.050 0.001620 616.0 Yes
Bus Availability Checking
=========================
Bus Name Type Required Calculated Pass/Fail
Availability (%) Availability (%)
------------------------ ------ ---------------- ---------------- ---------
Consumatorul 1 P_Load 100.00000 99.96592 Fail
Consumatorul 2 P_Load 100.00000 99.95450 Fail
System Summary - Expected Indices
=================================
------------------------------------------------------------------------------
Power supply disturbances
--------------------------------------------------------
All Causes Load Voltage Voltage
&Problems Interruption violations Violations
Load Level Events No Mvar With Mvar
------------ ------------ ------------ ------------
Probability 0.000682 0.000682 0.000000 0.000000
Frequency (occ/yr) 0.045990 0.045990 0.000000 0.000000
Duration (hrs/yr) 5.971329 5.971329 0.000000 0.000000
------------------------------------------------------------------------------
Power system interruption index = 0.027273 (MW/MW-yr)
Power system average MW interruption index = 0.296508 (MW/curt.)
Power system energy interruption index = 3.385902 (MWh/MW-yr)
Modified power system energy interruption index = 0.000387
Severity index = 203.154129 (Sys-Min)
System availability = 99.961349 (%)
Expected loss of load probability = 0.000682
Expected power not supplied = 0.000193 (MW/occ)
Expected energy not supplied = 0.047274 (MWh/occ)
Expected reactive power injection = 0.00 (Mvar/yr)
Average reactive power injection = 0.00 (Mvar/viol)
Expected outage cost = 0.00 (k$/yr)
Average outage cost = 0.00 (k$/curt.)
Bus Summary - Expected Indices
==============================
------------------------------------------------------------------------------------------
Bus Prob Freq Load curt Energy curt Duration Availability
(occ/yr) (MW/yr) (MWh/yr) (hrs/yr) (%)
------------------- ------- ----------- ---------- ----------- -------- ------------
Consumatorul 2 .000455 0.033689 0.0067 0.797 3.986 99.954498
Consumatorul 1 .000341 0.022995 0.0069 0.896 2.986 99.965919