CAVITE-LAGUNA EXPRESSWAY
Soft-Sounding 22 March 2013
Republic of the Philippines
Department of Public Works and Highways
1
2
High Standard Highway Priority List
Source: High Standard Highway report submitted by JICA dated July 2010.
Republic of the Philippines
Department of Public Works and Highways
3
High Standard Highway Master Plan
Republic of the Philippines
Department of Public Works and Highways
PRIORITY SHORTLIST 1. NLEX-SLEX Connector 2. CALA Expressway 3. C-5/FTI/Skyway Connector
Road 4. C-6 Expressway
Project Description
4
Republic of the Philippines
Department of Public Works and Highways
47 Km 4-lane tolled expressway from CAVITEX to SLEX Private Sector to finance, design,
and construct the Cavite Section with total of 28.9 Km from Kawit to Aguinaldo Highway, Silang, Cavite; and operate and maintain the entire 47 km CALAX.
Government to finance, design and construct the Laguna Section with 18.1 Km from Aguinaldo Highway to SLEX Mamplasan Exit, Laguna.
5
Republic of the Philippines
Department of Public Works and Highways
PPP Scheme Build-Transfer-Operate
Concession Period 35 years; including period of
design and construction
Project Objectives
Support national development policy and provide efficient transport facilities for the Ecozones in Cavite & Laguna
Solve current traffic congestion on existing national road
network, particularly: Governor’s Drive Aguinaldo Highway and Sta. Rosa – Tagaytay Road
Reduce travel time from CAVITEX to SLEX by about 45 minutes
6
Republic of the Philippines
Department of Public Works and Highways
7
2nd largest contributor to the country’s total economic output at 17.4%, next to NCR at 35%
61.8% of its economy is from the industry sector
70% of freight movement (about 9,000 trucks) are to/from the Cavite-Laguna region
11 million population as of 2007 survey and growing by 3% annually
Republic of the Philippines
Department of Public Works and Highways
Economic Activities Surrounding CALAX
8
Industrial/Residential Estates Surrounding CALAX
49 ecozones/industrial estates (1-5Km away from CALAX)
1,590 companies/locators (1-5Km away from CALAX)
500,000 estimated number of workers (directly employed)
27 residential subdivisions (0.5-5Km away from CALAX)
Republic of the Philippines
Department of Public Works and Highways
Route 5
Route 2
Route 3
Route 4
Route 1
Less than 20km/hr 20km ~ 30km/hr 30km ~ 40km/hr Over 40km/hr
L E G E N D
9
Route Description Max
Speed (Km/hr)
1 Evangelista Bridge to Aguinaldo; Gen. Antonio to Gov. Ferrer Drive
15
2 Along Aguinaldo Highway (Palico-Daanan to Daang Hari)
20
3 M. Alvarez Town Proper 15
Carmona, Cavite to SLEX 7
4 Nuvali area, Sta. Rosa, Laguna 20-30
5 Canlubang Toll Booth, Laguna 30-40
Ideal Speed of Road: 60-70 Km/hr
Republic of the Philippines
Department of Public Works and Highways
Existing Travel Speed Surrounding CALAX
Unit: AADT 2017 2020 2030
CAVITE SECTION
CLASS 1 11,722 54,391 80,516
CLASS 2 4,826 21,830 28,239
CLASS 3 2,587 11,066 14,181
LAGUNA SECTION
CLASS 1 7,481 88,107 147,706
CLASS 2 3,049 31,319 43,344
CLASS 3 1,658 16,092 20,978
Republic of the Philippines
Department of Public Works and Highways
10
Traffic Forecast
11
Republic of the Philippines
Department of Public Works and Highways
TOLL RATE = PhP5.00/Km
Application Year 2017
VAT Inclusive
Adjustment Every 2 years based on CPI
Class Toll Rate Multiplier
CLASS 1 1
CLASS 2 2
CLASS 3 3
Toll Fee
CAVITE Section LAGUNA Section
Length 28.9KM 18.1KM Lanes Lane Width Median Width Inner Shoulder Width Outer Shoulder Width
4 lanes 3.5 meters/lane 1.2 meters 1.0 meters 2.5 meters
4 lanes 3.5 meters/lane 1.2 meters 1.0 meters 2.5 meters
ROW 60 meter wide ROW through generally flat terrain
60 meter wide ROW through rolling/hilly terrain
Interchanges 4 grade separated interchanges 5 grade separated interchanges
Structures 7,928 meters total length of bridges inclusive of 1,118 Km of viaduct
4,279 meters total length of bridges inclusive of 3,500 Km of viaduct
Design Speed 100 kph 100 kph
Roughness Index 2.5 2.5
12
Republic of the Philippines
Department of Public Works and Highways
Technical Details/Design Standards
CAVITE Section LAGUNA Section
Design Private Government
Finance Private Government
ROW Private/ Government Government
Construct Private Government
O&M Private Private
ODA Loan Repayment N/A Government
Concession Fees Private Private
13
Republic of the Philippines
Department of Public Works and Highways
Scope of Work
Estimated Project Cost
14
Republic of the Philippines
Department of Public Works and Highways
Component Cavite Section (28.9 km.)
Laguna Section (18.1 km.)
Civil Works, DED & Other Costs 13,695.38 10,435.34
Government Subsidy/ Cost Share 72.10 1,327.49
ROW 5,937.32 4,109.20
Sub-TOTAL 19,704.79 15,872.03
Grand TOTAL PhP 35,576.82 Million
Bid Parameter
15
Republic of the Philippines
Department of Public Works and Highways
Highest Concession Fee
Basis Highest NPV
Payment Annual
Amount Minimum payment set by Government
Indicative Implementation Schedule
Milestones Target Date
NEDA Board Final Approval 18 January 2013
ITPB Advertisement 25 March 2013, 01 and 08 April 2013
PQ Conference 15 April 2013
PQ Document Submission 27 May 2013
ITB Issuance 10 June 2013
Pre-Bid Conference 01 August 2013
Bid Submission 01 October 2013
NOA Issuance 04 November 2013
Contract Signing 06 December 2013
DED Period December 2013 – December 2014
Construction Period January 2015 – December 2017
16
Republic of the Philippines
Department of Public Works and Highways
Thank You.