Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
CASQA‐LIDI BIORETENTION DETAILSTABLE OF CONTENTS
NAME NO.
STREET SIDE BIORETENTION (WITH PARKING)
STREET SLOPE‐SIDED BIORETENTION, WITH PARKING, WITH UNDERDRAIN SW‐1
STREET SLOPE‐SIDED BIORETENTION, WITH PARKING, NO UNDERDRAIN SW‐1A
STREET BIORETENTION PLANTER BOX, WITH PARKING, WITH UNDERDRAIN SW‐2
STREET BIORETENTION PLANTER BOX, WITH PARKING, NO UNDERDRAIN SW‐2A
STREET SIDE BIORETENTION (NO PARKING)
STREET SLOPE‐SIDED BIORETENTION, NO PARKING, WITH UNDERDRAIN SW‐3
STREET SLOPE‐SIDED BIORETENTION, NO PARKING, NO UNDERDRAIN SW‐3A
STREET BIORETENTION PLANTER BOX, NO PARKING, WITH UNDERDRAIN SW‐4
STREET BIORETENTION PLANTER BOX, NO PARKING, NO UNDERDRAIN SW‐4A
STREET BIORETENTION BULB OUT, NO PARKING, NO UNDERDRAIN SW‐5
STREET BIORETENTION BULB OUT, MID BLOCK CROSSING PLAN VIEW SW‐5.1
PARKING LOT BIORETENTION
PARKING LOT SLOPE‐SIDED BIORETENTION, WITH UNDERDRAIN SW‐6
PARKING LOT SLOPE‐SIDED BIORETENTION, NO UNDERDRAIN SW‐6A
PARKING LOT BIORETENTION PLANTER BOX, WITH UNDERDRAIN SW‐7
PARKING LOT BIORETENTION PLANTER BOX, NO UNDERDRAIN SW‐7A
BIOFILTRATION PLANTER BOX (NO PARKING)
PLANTER BOX, NO PARKING SW‐9
APPURTENANT STRUCTURESCURB AND GUTTER SW‐12
CURB AND GUTTER SW‐12A
DEEP CURB SW‐13
THICKENED EDGE SIDEWALK SW‐14
FLUSH CURB AT SIDEWALK SW‐15
PARKING LOT EDGE OPTIONS SW‐16
CURB CUT INLET FOR PLANTERS SW‐17
CURB CUT INLET FOR SLOPE SIDED
BIORETENTION FACILITY
SW‐18
INLET WITH GRATE SW‐19
GRAVEL CHECK DAM SW‐20
CONCRETE CHECK DAM SW‐21
OVERFLOW STRUCTURE WITH BEEHIVE GRATE SW‐22
OVERFLOW STRUCTURE COLLAR SW‐22A
CASQA‐LIDI BIORETENTION DETAILSTABLE OF CONTENTS
NAME NO.
OVERFLOW STRUCTURE WITH SQUARE GRATE SW‐23
IMPERMEABLE LINER CONNECTION SW‐24
OTHERPERVIOUS PAVEMENT SW‐25
PLANTING INUNDATION ZONES & BIORETENTION PLANT LIST SW‐26
DRYWELL STORMWATER BMP SW‐27
SPECIFICATIONS
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
CONSTRUCTION NOTES
1. MAINTAIN UNDISTURBED NATIVE SOIL BENCH TO SUPPORT ADJACENT SIDEWALK/ROAD. SEQUENCE WORK TO CONSTRUCT CURBSBEFORE EXCAVATING BIORETENTION AREA FOR AGGREGATE AND BSM.
2. SCARIFY SUBGRADE BEFORE INSTALLING BIORETENTION AREA AGGREGATE AND BSM.
3. FACILITY EXCAVATION TO ALLOW FOR SPECIFIED AGGREGATE, BSM, AND MULCH DEPTHS TO ACHIEVE FINISHED ELEVATIONS ONCIVIL PLANS.
4. INSTALL UNDERDRAIN WITH HOLES FACING DOWN. TOP OF UNDERDRAIN 6" BELOW TOP OF AGGREGATE LAYER. UNDERDRAINSLOPE MAY BE FLAT.
5. PLACE BSM IN 6" LIFTS. COMPACT EACH 6" LIFT OF BSM WITH LANDSCAPE ROLLER OR BY LIGHTLY WETTING. IF WETTING, LET DRYOVERNIGHT BEFORE PLANTING.
6. DO NOT WORK WITHIN BIORETENTION AREA DURING RAIN OR UNDER WET CONDITIONS.
7. KEEP HEAVY MACHINERY OUTSIDE BIORETENTION AREA LIMITS.
8. STORMWATER SHOULD BE DIRECTED AWAY FROM BIORETENTION UNTIL CONSTRUCTION IS COMPLETE AND DRAINAGE AREAVEGETATION IS STABILIZED.
SIDEWALK
MIN 24"BOTTOM WIDTH
DO NOT USE FILTER FABRICBETWEEN BSM AND AGGREGATE
CALTRANS CLASS 2 PERMEABLEMATERIAL (AGGREGATE). DEPTH PERPROJECT REQUIREMENTS ORMINIMUM 12", SEE DESIGN NOTE 10
OVERFLOW STRUCTUREELEV. (OE)
FINISHEDELEVATION(FE)
6" MIN NATIVE SOIL BENCH,12" PREFERRED OR ASDIRECTED BY CIVIL ORGEOTECHNICAL ENGINEER
STREET
SIDEWALKELEVATION (SE)
AGGREGATEBOTTOM WIDTH TO
MATCH BSM BOTTOMWIDTH
OVERFLOW OUTLET-CONNECT TO STORM DRAIN ORAPPROVED DISCHARGE LOCATIONNATIVE SIDE SLOPE
TO BE DETERMINEDBY GEOTECHNICALCONDITIONS.
MIN 1" DROPSEE DESIGN NOTE 16
3:1 MAX. WITHSHELF, SEENOTE 15
3" MULCHLAYER
6" MIN
6" MIN/12" MAX PONDING
2% SHELF,SEE NOTE 15
18" MINOR 24" IF
REQUIRED
2" MIN
6" MIN
UNDERDRAIN, MIN. 4" DIA. PVCSDR 35 PERFORATED PIPE, SEECONSTRUCTION NOTE 4
STREET
LEGENDMULCH/COMPOST LAYER(SEE DESIGN NOTE 12)
BIORETENTION SOIL MEDIA (BSM)
AGGREGATE
NATIVE SOIL
ASPHALT PAVEMENT
CONCRETE
CURB INLETDETAILSW-18, GUTTERINLET ELEV.(GIE)
CURB ANDGUTTER DETAILSW-12A
STREET SLOPE-SIDED BIORETENTION WITHPARKING, WITH UNDERDRAIN SW-1
SHEET 1 OF 2
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
DESIGN NOTES
1. BIORETENTION FACILITY DESIGN SHOULD OPTIMIZE THE FLAT BOTTOM DIMENSIONS (I.E., WIDTH, LENGTH) TO MAXIMIZETHE FUNCTIONAL AREA OF THE FACILITY.
2. CAPTURE AND CONVEY OVERFLOW TO STORM DRAIN SYSTEM (DETAIL SW-22, SW-23). ALTERNATIVELY, CONVEYOVERFLOW TO APPROVED DISCHARGE LOCATION THROUGH OTHER OVERLAND METHODS (IE. CURB CUTS, SIDEWALKUNDERDRAIN, WEIR, ETC.).
3. PROVIDE SPOT ELEVATIONS AT INLETS AND OVERFLOW STRUCTURES ON CIVIL PLANS (FE, OE, GIE, SIE), PER DETAILSW-18.
4. DUE TO SITE VARIABILITY, TO ENSURE THE LONG-TERM STRUCTURAL STABILITY OF THE BIORETENTION FACILITY AND ANYADJACENT INFRASTRUCTURE CONSULT WITH A GEOTECHNICAL ENGINEER.
5. A VERTICAL LINER MAY BE USED FOR BIORETENTION FACILITIES TO PREVENT LATERAL FLOW AND TO SEPARATE THENATIVE SOIL FROM THE BSM AND THE AGGREGATE, HOWEVER A HORIZONTAL LINER SHALL NOT BE USED.
6. DO NOT USE FILTER FABRIC BETWEEN BSM AND AGGREGATE.
7. PROVIDE CAPPED, THREADED PVC CLEANOUT FOR UNDERDRAIN, 4" MIN. DIA. WITH SWEEP BEND.
8. PROVIDE A CLEAN-OUT/OBSERVATION PORT IN EACH FACILITY, PER BIORETENTION TECHNICAL SPECIFICATIONS.
9. ON LONGITUDINAL SLOPE, USE CHECK DAMS (DETAILS SW-20, SW-21)
10. DEPTH OF AGGREGATE DETERMINED BY FACILITY SIZING. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE,SUBSTITUTE CLASS 3 PERMEABLE WITH AN OVERLYING 3" DEEP CHOKING LAYER OF EITHER CALTRANS COURSEAGGREGATE 1/2" (NO. 4) OR 3/4" X (NO.4) OPEN-GRADED AGGREGATE.
11. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BIORETENTION TECHNICAL SPECIFICATIONS.
12. PLANT SELECTION PER BIORETENTION TECHNICAL SPECIFICATIONS.
13. MULCH PER BIORETENTION TECHNICAL SPECIFICATIONS.
14. LOCATE ENERGY DISSIPATION AS SPECIFIED IN INLET DETAILS.
15. NATIVE SIDE SLOPE 4:1 (H:V) PREFERRED, 3:1 WITH SHELF. 6" MINIMUM SHELF WITH 2% SLOPE TOWARDS FACILITYADJACENT TO PEDESTRIAN USE OR CURB UNLESS 4:1 SLOPE PROVIDED.
16. INCLUDE AT LEAST 1" DROP FROM CURB ABOVE MULCH LAYER.
17. AVOID DECORATIVE USE OF COBBLE THAT CAN INTERFERE WITH WITH INFILTRATION.
STREET SLOPE-SIDED BIORETENTION WITHPARKING, WITH UNDERDRAIN SW-1
SHEET 2 OF 2
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
SIDEWALK
CONSTRUCTION NOTES
MIN 24"BOTTOM WIDTH
DO NOT USE FILTER FABRICBETWEEN BSM AND AGGREGATE
CALTRANS CLASS 2 PERMEABLEMATERIAL (AGGREGATE). DEPTH PERPROJECT REQUIREMENTS OR MINIMUM12", SEE DESIGN NOTE 9
OVERFLOW STRUCTUREELEV. (OE)
FINISHEDELEVATION(FE)
1. MAINTAIN UNDISTURBED NATIVE SOIL BENCH TO SUPPORT ADJACENT SIDEWALK/ROAD. SEQUENCE WORK TO CONSTRUCTCURBS BEFORE EXCAVATING BIORETENTION AREA FOR AGGREGATE AND BSM.
2. SCARIFY SUBGRADE BEFORE INSTALLING BIORETENTION AREA AGGREGATE AND BSM.
3. FACILITY EXCAVATION TO ALLOW FOR SPECIFIED AGGREGATE, BSM, AND MULCH DEPTHS TO ACHIEVE FINISHED ELEVATIONS ONCIVIL PLANS.
4. PLACE BSM IN 6" LIFTS. COMPACT EACH 6" LIFT OF BSM WITH LANDSCAPE ROLLER OR BY LIGHTLY WETTING. IF WETTING, LET DRYOVERNIGHT BEFORE PLANTING.
5. DO NOT WORK WITHIN BIORETENTION AREA DURING RAIN OR UNDER WET CONDITIONS.
6. KEEP HEAVY MACHINERY OUTSIDE BIORETENTION AREA LIMITS.
7. STORMWATER SHOULD BE DIRECTED AWAY FROM BIORETENTION UNTIL CONSTRUCTION IS COMPLETE AND DRAINAGE AREAVEGETATION IS STABILIZED.
6" MIN NATIVE SOIL BENCH,12" PREFERREDOR AS DIRECTED BY CIVIL ORGEOTECHNICAL ENGINEER
STREET
SIDEWALKELEVATION (SE)
AGGREGATEBOTTOM WIDTH TO
MATCH BSM BOTTOMWIDTH
OVERFLOW OUTLET-CONNECT TO STORM DRAIN ORAPPROVED DISCHARGE LOCATION
NATIVE SIDE SLOPE TO BEDETERMINED BYGEOTECHNICAL CONDITIONS.
MIN 1" DROPSEE DESIGN NOTE 15
3:1 MAX. WITHSHELF, SEENOTE 14
3" MULCHLAYER
6" MIN
2% SHELF,SEE NOTE 14
6" MIN/12" MAX PONDING
18" MIN
LEGENDMULCH/COMPOST LAYER(SEE DESIGN NOTE 12)
BIORETENTION SOIL MEDIA (BSM)
AGGREGATE
NATIVE SOIL
ASPHALT PAVEMENT
CONCRETE
CURB INLETDETAILSW-18, GUTTERINLET ELEV.(GIE)
CURB ANDGUTTER DETAILSW-12A
STREET SLOPE-SIDED BIORETENTION, WITHPARKING, NO UNDERDRAIN SW-1A
SHEET 1 OF 2
DESIGN NOTES
1. BIORETENTION FACILITY DESIGN SHOULD OPTIMIZE THE FLAT BOTTOM DIMENSIONS (I.E., WIDTH, LENGTH) TO MAXIMIZETHE FUNCTIONAL AREA OF THE FACILITY.
2. CAPTURE AND CONVEY OVERFLOW TO STORM DRAIN SYSTEM (DETAIL SW-22, SW-23). ALTERNATIVELY, CONVEYOVERFLOW TO APPROVED DISCHARGE LOCATION THROUGH OTHER OVERLAND METHODS (IE. CURB CUTS, SIDEWALKUNDERDRAIN, WEIR, ETC.).
3. PROVIDE SPOT ELEVATIONS AT INLETS AND OVERFLOW STRUCTURES ON CIVIL PLANS (FE, OE, GIE, SIE), PER DETAILSW-18.
4. DUE TO SITE VARIABILITY, TO ENSURE THE LONG-TERM STRUCTURAL STABILITY OF THE BIORETENTION FACILITY AND ANYADJACENT INFRASTRUCTURE CONSULT WITH A GEOTECHNICAL ENGINEER.
5. A VERTICAL LINER MAY BE USED FOR BIORETENTION FACILITIES TO PREVENT LATERAL FLOW AND TO SEPARATE THENATIVE SOIL FROM THE BSM AND THE AGGREGATE, HOWEVER A HORIZONTAL LINER SHALL NOT BE USED.
6. DO NOT USE FILTER FABRIC BETWEEN BSM AND AGGREGATE.
7. PROVIDE A CLEAN-OUT/OBSERVATION PORT IN EACH FACILITY, PER BIORETENTION TECHNICAL SPECIFICATIONS.
8. ON LONGITUDINAL SLOPE, USE CHECK DAMS (DETAILS SW-20, SW-21)
9. USE AND DEPTH OF AGGREGATE DETERMINED BY FACILITY SIZING. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE,SUBSTITUTE CLASS 3 PERMEABLE WITH AN OVERLYING 3" DEEP CHOKING LAYER OF EITHER CALTRANS COURSEAGGREGATE 1/2" (NO. 4) OR 3/4" X (NO. 4) OPEN-GRADED AGGREGATE.
10. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BIORETENTION TECHNICAL SPECIFICATIONS.
11. PLANT SELECTION PER BIORETENTION TECHNICAL SPECIFICATIONS.
12. MULCH PER BIORETENTION TECHNICAL SPECIFICATIONS.
13. LOCATE ENERGY DISSIPATION AS SPECIFIED IN INLET DETAILS.
14. NATIVE SIDE SLOPE 4:1 (H:V) PREFERRED, 3:1 WITH SHELF. 6" MINIMUM SHELF WITH 2% SLOPE TOWARDS FACILITYADJACENT TO PEDESTRIAN USE OR CURB UNLESS 4:1 SLOPE PROVIDED.
15. INCLUDE AT LEAST 1" DROP FROM CURB ABOVE MULCH LAYER.
16. AVOID DECORATIVE USE OF COBBLE THAT CAN INTERFERE WITH WITH INFILTRATION.
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
STREET SLOPE-SIDED BIORETENTION, WITHPARKING, NO UNDERDRAIN SW-1A
SHEET 2 OF 2
CONSTRUCTION NOTES
4" MIN. EXPOSED WALLHEIGHT
SIDEWALK
FINISHED ELEVATION (FE)
CURB INLET WITHGRATE DETAILSW-19,GUTTER INLETELEV. (GIE)
1. MAINTAIN UNDISTURBED NATIVE SOIL BENCH TO SUPPORT ADJACENT SIDEWALK/ROAD. SEQUENCE WORK TO CONSTRUCT CURBSBEFORE EXCAVATING BIORETENTION AREA FOR AGGREGATE AND BSM.
2. SCARIFY SUBGRADE BEFORE INSTALLING BIORETENTION AREA AGGREGATE AND BSM.
3. FACILITY EXCAVATION TO ALLOW FOR SPECIFIED AGGREGATE, BSM, AND MULCH DEPTHS TO ACHIEVE FINISHED ELEVATIONS ON CIVILPLANS.
4. INSTALL UNDERDRAIN WITH HOLES FACING DOWN. TOP OF UNDERDRAIN 6" BELOW TOP OF AGGREGATE LAYER. UNDERDRAIN SLOPE MAYBE FLAT.
5. COMPACT EACH 6" LIFT OF BSM WITH LANDSCAPE ROLLER OR BY LIGHTLY WETTING. IF WETTING, LET DRY OVERNIGHT BEFORE PLANTING.
6. DO NOT WORK WITHIN BIORETENTION AREA DURING RAIN OR UNDER WET CONDITIONS.
7. KEEP HEAVY MACHINERY OUTSIDE BIORETENTION AREA LIMITS.
8. STORMWATER SHOULD BE DIRECTED AWAY FROM BIORETENTION UNTIL CONSTRUCTION IS COMPLETE AND DRAINAGE AREA VEGETATIONIS STABILIZED.
OVERFLOWSTRUCTUREELEV. (OE)
CALTRANS CLASS 2 PERMEABLEMATERIAL (AGGREGATE). DEPTHPER PROJECT REQUIREMENTS ORMINIMUM 12", SEE DESIGN NOTE 10
UNDERDRAIN, MIN. 4" DIA. PVCSDR 35 PERFORATED PIPE,SEE CONSTRUCTION NOTE 4
6" MIN NATIVE SOIL BENCH,12" PREFERRED OR ASDIRECTED BY CIVIL ORGEOTECHNICAL ENGINEER
DEEP CURBDETAIL SW-13
UNDERDRAIN ANDOVERFLOW-CONNECT TO STORMDRAIN OR APPROVEDDISCHARGE LOCATION
6" MIN
6" MIN/12" MAX PONDING
18" MIN OR24" MIN IF
REQUIRED
2" MIN
3" MULCHLAYER
STREET
CURB ANDGUTTERDETAILSW-12
LEGENDMULCH/COMPOST LAYER(SEE DESIGN NOTE 12)
BIORETENTION SOIL MEDIA (BSM)
AGGREGATE
NATIVE SOIL
ASPHALT PAVEMENT
CONCRETE
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
STREET BIORETENTION PLANTER BOX,WITH PARKING, WITH UNDERDRAIN SW-2
SHEET 1 OF 2
DESIGN NOTES
1. BIORETENTIONFACILITY DESIGN SHOULD OPTIMIZE THE FLAT BOTTOM DIMENSIONS (I.E., WIDTH, LENGTH) TO MAXIMIZETHE FUNCTIONAL AREA OF THE FACILITY.
2. CAPTURE AND CONVEY OVERFLOW TO STORM DRAIN SYSTEM (DETAIL SW-22, SW-23). ALTERNATIVELY, CONVEYOVERFLOW TO APPROVED DISCHARGE LOCATION THROUGH OTHER OVERLAND METHODS (IE. CURB CUTS, SIDEWALKUNDERDRAIN, WEIR, ETC.).
3. PROVIDE SPOT ELEVATIONS AT INLETS AND OVERFLOW STRUCTURES ON CIVIL PLANS (FE,OE, GIE, SIE), PER DETAILSW-18.
4. DUE TO SITE VARIABILITY, TO ENSURE THE LONG-TERM STRUCTURAL STABILITY OF THE BIORETENTION FACILITY AND ANYADJACENT INFRASTRUCTURE CONSULT WITH A GEOTECHNICAL ENGINEER.
5. A VERTICAL LINER MAY BE USED FOR BIORETENTION FACILITIES TO PREVENT LATERAL FLOW AND TO SEPARATE THENATIVE SOIL FROM THE BSM AND THE AGGREGATE, HOWEVER A HORIZONTAL LINER SHALL NOT BE USED.
6. DO NOT USE FILTER FABRIC BETWEEN BSM AND AGGREGATE.
7. PROVIDE CAPPED, THREADED PVC CLEANOUT FOR UNDERDRAIN, 4" MIN. DIA. WITH SWEEP BEND.
8. PROVIDE A CLEAN-OUT/OBSERVATION PORT IN EACH FACILITY, PER BIORETENTION TECHNICAL SPECIFICATIONS.
9. ON LONGITUDINAL SLOPE, USE CHECK DAMS (DETAILS SW-20, SW-21)
10. USE AND DEPTH OF AGGREGATE DETERMINED BY FACILITY SIZING. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE,SUBSTITUTE CLASS 3 PERMEABLE WITH AN OVERLYING 3" DEEP CHOKING LAYER OF EITHER CALTRANS COURSEAGGREGATE 1/2" (NO. 4) OR 3/4" X (NO. 4) OPEN-GRADED AGGREGATE.
11. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BIORETENTION TECHNICAL SPECIFICATIONS.
12. PLANT SELECTION PER BIORETENTION TECHNICAL SPECIFICATIONS.
13. MULCH PER BIORETENTION TECHNICAL SPECIFICATIONS.
14. LOCATE ENERGY DISSIPATION AS SPECIFIED IN INLET DETAILS.
15. AVOID DECORATIVE USE OF COBBLE THAT CAN INTERFERE WITH WITH INFILTRATION.
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
STREET BIORETENTION PLANTER BOX,WITH PARKING, WITH UNDERDRAIN SW-2
SHEET 2 OF 2
CONSTRUCTION NOTES
4" MIN. EXPOSEDWALL OR CURBHEIGHT
SIDEWALK
FINISHED ELEVATION (FE)
CURB INLET WITHGRATE DETAIL SW-19,GUTTER INLETELEV. (GIE)
1. MAINTAIN UNDISTURBED NATIVE SOIL BENCH TO SUPPORT ADJACENT SIDEWALK/ROAD. SEQUENCE WORK TO CONSTRUCTCURBS BEFORE EXCAVATING BIORETENTION AREA FOR AGGREGATE AND BSM.
2. SCARIFY SUBGRADE BEFORE INSTALLING BIORETENTION AREA AGGREGATE AND BSM.
3. FACILITY EXCAVATION TO ALLOW FOR SPECIFIED AGGREGATE, BSM, AND MULCH DEPTHS TO ACHIEVE FINISHED ELEVATIONS ONCIVIL PLANS.
4. COMPACT EACH 6" LIFT OF BSM WITH LANDSCAPE ROLLER OR BY LIGHTLY WETTING. IF WETTING, LET DRY OVERNIGHT BEFOREPLANTING.
5. DO NOT WORK WITHIN BIORETENTION AREA DURING RAIN OR UNDER WET CONDITIONS.
6. KEEP HEAVY MACHINERY OUTSIDE BIORETENTION AREA LIMITS.
7. STORMWATER SHOULD BE DIRECTED AWAY FROM BIORETENTION UNTIL CONSTRUCTION IS COMPLETE AND DRAINAGE AREAVEGETATION IS STABILIZED.
OVERFLOWSTRUCTUREELEV. (OE)
CALTRANS CLASS 2 PERMEABLEMATERIAL (AGGREGATE). DEPTH PERPROJECT REQUIREMENTS ORMINIMUM 12", SEE DESIGN NOTE 9
OVERFLOW OUTLET-CONNECT TOSTORM DRAIN ORAPPROVEDDISCHARGELOCATION
6" MIN NATIVE SOIL BENCH,12" PREFERREDOR AS DIRECTED BY CIVIL ORGEOTECHNICAL ENGINEER
DEEP CURBDETAIL SW-13
STREET6" MIN/12" MAX PONDING
18" MIN
3" MULCHLAYER
CURB ANDGUTTERDETAILSW-12
LEGENDMULCH/COMPOST LAYER(SEE DESIGN NOTE 12)
BIORETENTION SOIL MEDIA (BSM)
AGGREGATE
NATIVE SOIL
ASPHALT PAVEMENT
CONCRETE
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
STREET BIORETENTION PLANTER BOX,WITH PARKING, NO UNDERDRAIN SW-2A
SHEET 1 OF 2
DESIGN NOTES
1. BIORETENTION FACILITY DESIGN SHOULD OPTIMIZE THE FLAT BOTTOM DIMENSIONS (I.E., WIDTH, LENGTH) TO MAXIMIZETHE FUNCTIONAL AREA OF THE FACILITY.
2. CAPTURE AND CONVEY OVERFLOW TO STORM DRAIN SYSTEM (DETAIL SW-22, SW-23). ALTERNATIVELY, CONVEYOVERFLOW TO APPROVED DISCHARGE LOCATION THROUGH OTHER OVERLAND METHODS (IE. CURB CUTS, SIDEWALKUNDERDRAIN, WEIR, ETC.).
3. PROVIDE SPOT ELEVATIONS AT INLETS AND OVERFLOW STRUCTURES ON CIVIL PLANS (FE, OE, GIE, SIE), PER DETAILSW-18.
4. DUE TO SITE VARIABILITY, TO ENSURE THE LONG-TERM STRUCTURAL STABILITY OF THE BIORETENTION FACILITY AND ANYADJACENT INFRASTRUCTURE CONSULT WITH A GEOTECHNICAL ENGINEER.
5. A VERTICAL LINER MAY BE USED FOR BIORETENTION FACILITIES TO PREVENT LATERAL FLOW AND TO SEPARATE THENATIVE SOIL FROM THE BSM AND THE AGGREGATE, HOWEVER A HORIZONTAL LINER SHALL NOT BE USED.
6. DO NOT USE FILTER FABRIC BETWEEN BSM AND AGGREGATE.
7. PROVIDE A CLEAN-OUT/OBSERVATION PORT IN EACH FACILITY, PER BIORETENTION TECHNICAL SPECIFICATIONS.
8. ON LONGITUDINAL SLOPE, USE CHECK DAMS (DETAILS SW-20, SW-21)
9. USE AND DEPTH OF AGGREGATE DETERMINED BY FACILITY SIZING. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE,SUBSTITUTE CLASS 3 PERMEABLE WITH AN OVERLYING 3" DEEP CHOKING LAYER OF EITHER CALTRANS COURSEAGGREGATE 1/2" (NO. 4) OR 3/4" X (NO. 4) OPEN-GRADED AGGREGATE.
10. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BIORETENTION TECHNICAL SPECIFICATIONS.
11. PLANT SELECTION PER BIORETENTION TECHNICAL SPECIFICATIONS.
12. MULCH PER BIORETENTION TECHNICAL SPECIFICATIONS.
13. LOCATE ENERGY DISSIPATION AS SPECIFIED IN INLET DETAILS.
14. AVOID DECORATIVE USE OF COBBLE THAT CAN INTERFERE WITH WITH INFILTRATION.
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
STREET BIORETENTION PLANTER BOX,WITH PARKING, NO UNDERDRAIN SW-2A
SHEET 2 OF 2
CONSTRUCTION NOTES
1. MAINTAIN UNDISTURBED NATIVE SOIL BENCH TO SUPPORT ADJACENT SIDEWALK/ROAD. SEQUENCE WORK TO CONSTRUCT CURBSBEFORE EXCAVATING BIORETENTION AREA FOR AGGREGATE AND BSM.
2. SCARIFY SUBGRADE BEFORE INSTALLING BIORETENTION AREA AGGREGATE AND BSM.
3. FACILITY EXCAVATION TO ALLOW FOR SPECIFIED AGGREGATE, BSM, AND MULCH DEPTHS TO ACHIEVE FINISHED ELEVATIONS ONCIVIL PLANS.
4. INSTALL UNDERDRAIN WITH HOLES FACING DOWN. TOP OF UNDERDRAIN 6" BELOW TOP OF AGGREGATE LAYER. UNDERDRAINSLOPE MAY BE FLAT.
5. PLACE BSM IN 6" LIFTS. COMPACT EACH 6" LIFT OF BSM WITH LANDSCAPE ROLLER OR BY LIGHTLY WETTING. IF WETTING, LET DRYOVERNIGHT BEFORE PLANTING.
6. DO NOT WORK WITHIN BIORETENTION AREA DURING RAIN OR UNDER WET CONDITIONS.
7. KEEP HEAVY MACHINERY OUTSIDE BIORETENTION AREA LIMITS.
8. STORMWATER SHOULD BE DIRECTED AWAY FROM BIORETENTION UNTIL CONSTRUCTION IS COMPLETE AND DRAINAGE AREAVEGETATION IS STABILIZED.
SIDEWALK
MIN 24"BOTTOM WIDTH
DO NOT USE FILTER FABRICBETWEEN BSM AND AGGREGATE
CALTRANS CLASS 2 PERMEABLEMATERIAL (AGGREGATE). DEPTH PERPROJECT REQUIREMENTS ORMINIMUM 12", SEE DESIGN NOTE 10
OVERFLOW STRUCTUREELEV. (OE)
FINISHEDELEVATION(FE)
6" MIN NATIVE SOIL BENCH,12" PREFERRED OR ASDIRECTED BY CIVIL ORGEOTECHNICAL ENGINEER
SIDEWALKELEVATION (SE)
AGGREGATEBOTTOM WIDTH TO
MATCH BSM BOTTOMWIDTH
OVERFLOW OUTLET-CONNECT TO STORM DRAIN ORAPPROVED DISCHARGE LOCATIONNATIVE SIDE SLOPE
TO BE DETERMINEDBY GEOTECHNICALCONDITIONS.
MIN 1" DROPSEE DESIGN NOTE 16
3:1 MAX. WITHSHELF, SEENOTE 15
3" MULCHLAYER
6" MIN
6" MIN/12" MAX PONDING
2% SHELF,SEE NOTE 15
18" MINOR 24" IF
REQUIRED
2" MIN
6" MIN
UNDERDRAIN, MIN. 4" DIA. PVCSDR 35 PERFORATED PIPE, SEECONSTRUCTION NOTE 4
STREET
LEGENDMULCH/COMPOST LAYER(SEE DESIGN NOTE 12)
BIORETENTION SOIL MEDIA (BSM)
AGGREGATE
NATIVE SOIL
ASPHALT PAVEMENT
CONCRETE
CURB INLET DETAILSW-18, GUTTERINLET ELEV. (GIE)
CURB ANDGUTTER DETAILSW-12
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
STREET SLOPE-SIDED BIORETENTION, NOPARKING, WITH UNDERDRAIN SW-3
SHEET 1 OF 2
DESIGN NOTES
1. BIORETENTION FACILITY DESIGN SHOULD OPTIMIZE THE FLAT BOTTOM DIMENSIONS (I.E., WIDTH, LENGTH) TO MAXIMIZETHE FUNCTIONAL AREA OF THE FACILITY.
2. CAPTURE AND CONVEY OVERFLOW TO STORM DRAIN SYSTEM (DETAIL SW-22, SW-23). ALTERNATIVELY, CONVEYOVERFLOW TO APPROVED DISCHARGE LOCATION THROUGH OTHER OVERLAND METHODS (IE. CURB CUTS, SIDEWALKUNDERDRAIN, WEIR, ETC.).
3. PROVIDE SPOT ELEVATIONS AT INLETS AND OVERFLOW STRUCTURES ON CIVIL PLANS (FE, OE, GIE, SIE), PER DETAILSW-18.
4. DUE TO SITE VARIABILITY, TO ENSURE THE LONG-TERM STRUCTURAL STABILITY OF THE BIORETENTION FACILITY AND ANYADJACENT INFRASTRUCTURE CONSULT WITH A GEOTECHNICAL ENGINEER.
5. A VERTICAL LINER MAY BE USED FOR BIORETENTION FACILITIES TO PREVENT LATERAL FLOW AND TO SEPARATE THENATIVE SOIL FROM THE BSM AND THE AGGREGATE, HOWEVER A HORIZONTAL LINER SHALL NOT BE USED.
6. DO NOT USE FILTER FABRIC BETWEEN BSM AND AGGREGATE.
7. PROVIDE CAPPED, THREADED PVC CLEANOUT FOR UNDERDRAIN, 4" MIN. DIA. WITH SWEEP BEND.
8. PROVIDE A CLEAN-OUT/OBSERVATION PORT IN EACH FACILITY, PER BIORETENTION TECHNICAL SPECIFICATIONS.
9. ON LONGITUDINAL SLOPE, USE CHECK DAMS (DETAILS SW-20, SW-21)
10. DEPTH OF AGGREGATE DETERMINED BY FACILITY SIZING. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE,SUBSTITUTE CLASS 3 PERMEABLE WITH AN OVERLYING 3" DEEP CHOKING LAYER OF EITHER CALTRANS COURSEAGGREGATE 1/2" (NO. 4) OR 3/4" X (NO.4) OPEN-GRADED AGGREGATE.
11. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BIORETENTION TECHNICAL SPECIFICATIONS.
12. PLANT SELECTION PER BIORETENTION TECHNICAL SPECIFICATIONS.
13. MULCH PER BIORETENTION TECHNICAL SPECIFICATIONS.
14. LOCATE ENERGY DISSIPATION AS SPECIFIED IN INLET DETAILS.
15. NATIVE SIDE SLOPE 4:1 (H:V) PREFERRED, 3:1 WITH SHELF. 6" MINIMUM SHELF WITH 2% SLOPE TOWARDS FACILITYADJACENT TO PEDESTRIAN USE OR CURB UNLESS 4:1 SLOPE PROVIDED.
16. INCLUDE AT LEAST 1" DROP FROM CURB ABOVE MULCH LAYER.
17. AVOID DECORATIVE USE OF COBBLE THAT CAN INTERFERE WITH WITH INFILTRATION.
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
STREET SLOPE-SIDED BIORETENTION, NOPARKING, WITH UNDERDRAIN SW-3
SHEET 2 OF 2
SIDEWALK
CONSTRUCTION NOTES
MIN 24"BOTTOM WIDTH
DO NOT USE FILTER FABRICBETWEEN BSM AND AGGREGATE
CALTRANS CLASS 2 PERMEABLEMATERIAL (AGGREGATE). DEPTH PERPROJECT REQUIREMENTS OR MINIMUM12", SEE DESIGN NOTE 9
OVERFLOW STRUCTUREELEV. (OE)
FINISHEDELEVATION(FE)
1. MAINTAIN UNDISTURBED NATIVE SOIL BENCH TO SUPPORT ADJACENT SIDEWALK/ROAD. SEQUENCE WORK TO CONSTRUCTCURBS BEFORE EXCAVATING BIORETENTION AREA FOR AGGREGATE AND BSM.
2. SCARIFY SUBGRADE BEFORE INSTALLING BIORETENTION AREA AGGREGATE AND BSM.
3. FACILITY EXCAVATION TO ALLOW FOR SPECIFIED AGGREGATE, BSM, AND MULCH DEPTHS TO ACHIEVE FINISHED ELEVATIONS ONCIVIL PLANS.
4. PLACE BSM IN 6" LIFTS. COMPACT EACH 6" LIFT OF BSM WITH LANDSCAPE ROLLER OR BY LIGHTLY WETTING. IF WETTING, LET DRYOVERNIGHT BEFORE PLANTING.
5. DO NOT WORK WITHIN BIORETENTION AREA DURING RAIN OR UNDER WET CONDITIONS.
6. KEEP HEAVY MACHINERY OUTSIDE BIORETENTION AREA LIMITS.
7. STORMWATER SHOULD BE DIRECTED AWAY FROM BIORETENTION UNTIL CONSTRUCTION IS COMPLETE AND DRAINAGE AREAVEGETATION IS STABILIZED.
6" MIN NATIVE SOIL BENCH,12" PREFERREDOR AS DIRECTED BY CIVIL ORGEOTECHNICAL ENGINEER
STREET
SIDEWALKELEVATION (SE)
AGGREGATEBOTTOM WIDTH TO
MATCH BSM BOTTOMWIDTH
OVERFLOW OUTLET-CONNECT TO STORM DRAIN ORAPPROVED DISCHARGE LOCATION
NATIVE SIDE SLOPE TO BEDETERMINED BYGEOTECHNICAL CONDITIONS.
MIN 1" DROPSEE DESIGN NOTE 15
3:1 MAX. WITHSHELF, SEENOTE 14
3" MULCHLAYER
6" MIN
2% SHELF,SEE NOTE 14
6" MIN/12" MAX PONDING
18" MIN
LEGENDMULCH/COMPOST LAYER(SEE DESIGN NOTE 12)
BIORETENTION SOIL MEDIA (BSM)
AGGREGATE
NATIVE SOIL
ASPHALT PAVEMENT
CONCRETE
CURB INLET DETAILSW-18, GUTTERINLET ELEV. (GIE)
CURB ANDGUTTER DETAILSW-12
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
STREET SLOPE-SIDED BIORETENTION,NO PARKING, NO UNDERDRAIN SW-3A
SHEET 1 OF 2
DESIGN NOTES
1. BIORETENTION FACILITY DESIGN SHOULD OPTIMIZE THE FLAT BOTTOM DIMENSIONS (I.E., WIDTH, LENGTH) TO MAXIMIZETHE FUNCTIONAL AREA OF THE FACILITY.
2. CAPTURE AND CONVEY OVERFLOW TO STORM DRAIN SYSTEM (DETAIL SW-22, SW-23). ALTERNATIVELY, CONVEYOVERFLOW TO APPROVED DISCHARGE LOCATION THROUGH OTHER OVERLAND METHODS (IE. CURB CUTS, SIDEWALKUNDERDRAIN, WEIR, ETC.).
3. PROVIDE SPOT ELEVATIONS AT INLETS AND OVERFLOW STRUCTURES ON CIVIL PLANS (FE, OE, GIE, SIE), PER DETAILSW-18.
4. DUE TO SITE VARIABILITY, TO ENSURE THE LONG-TERM STRUCTURAL STABILITY OF THE BIORETENTION FACILITY AND ANYADJACENT INFRASTRUCTURE CONSULT WITH A GEOTECHNICAL ENGINEER.
5. A VERTICAL LINER MAY BE USED FOR BIORETENTION FACILITIES TO PREVENT LATERAL FLOW AND TO SEPARATE THENATIVE SOIL FROM THE BSM AND THE AGGREGATE, HOWEVER A HORIZONTAL LINER SHALL NOT BE USED.
6. DO NOT USE FILTER FABRIC BETWEEN BSM AND AGGREGATE.
7. PROVIDE A CLEAN-OUT/OBSERVATION PORT IN EACH FACILITY, PER BIORETENTION TECHNICAL SPECIFICATIONS.
8. ON LONGITUDINAL SLOPE, USE CHECK DAMS (DETAILS SW-20, SW-21)
9. USE AND DEPTH OF AGGREGATE DETERMINED BY FACILITY SIZING. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE,SUBSTITUTE CLASS 3 PERMEABLE WITH AN OVERLYING 3" DEEP CHOKING LAYER OF EITHER CALTRANS COURSEAGGREGATE 1/2" (NO. 4) OR 3/4" X (NO. 4) OPEN-GRADED AGGREGATE.
10. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BIORETENTION TECHNICAL SPECIFICATIONS.
11. PLANT SELECTION PER BIORETENTION TECHNICAL SPECIFICATIONS.
12. MULCH PER BIORETENTION TECHNICAL SPECIFICATIONS.
13. LOCATE ENERGY DISSIPATION AS SPECIFIED IN INLET DETAILS.
14. NATIVE SIDE SLOPE 4:1 (H:V) PREFERRED, 3:1 WITH SHELF. 6" MINIMUM SHELF WITH 2% SLOPE TOWARDS FACILITYADJACENT TO PEDESTRIAN USE OR CURB UNLESS 4:1 SLOPE PROVIDED.
15. INCLUDE AT LEAST 1" DROP FROM CURB ABOVE MULCH LAYER.
16. AVOID DECORATIVE USE OF COBBLE THAT CAN INTERFERE WITH WITH INFILTRATION.
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
STREET SLOPE-SIDED BIORETENTION, NOPARKING, NO UNDERDRAIN SW-3A
SHEET 2 OF 2
CONSTRUCTION NOTES
4" MIN. EXPOSED WALLHEIGHT
SIDEWALK
FINISHED ELEVATION (FE)
1. MAINTAIN UNDISTURBED NATIVE SOIL BENCH TO SUPPORT ADJACENT SIDEWALK/ROAD. SEQUENCE WORK TO CONSTRUCT CURBSBEFORE EXCAVATING BIORETENTION AREA FOR AGGREGATE AND BSM.
2. SCARIFY SUBGRADE BEFORE INSTALLING BIORETENTION AREA AGGREGATE AND BSM.
3. FACILITY EXCAVATION TO ALLOW FOR SPECIFIED AGGREGATE, BSM, AND MULCH DEPTHS TO ACHIEVE FINISHED ELEVATIONS ON CIVILPLANS.
4. INSTALL UNDERDRAIN WITH HOLES FACING DOWN. TOP OF UNDERDRAIN 6" BELOW TOP OF AGGREGATE LAYER. UNDERDRAIN SLOPE MAYBE FLAT.
5. COMPACT EACH 6" LIFT OF BSM WITH LANDSCAPE ROLLER OR BY LIGHTLY WETTING. IF WETTING, LET DRY OVERNIGHT BEFORE PLANTING.
6. DO NOT WORK WITHIN BIORETENTION AREA DURING RAIN OR UNDER WET CONDITIONS.
7. KEEP HEAVY MACHINERY OUTSIDE BIORETENTION AREA LIMITS.
8. STORMWATER SHOULD BE DIRECTED AWAY FROM BIORETENTION UNTIL CONSTRUCTION IS COMPLETE AND DRAINAGE AREA VEGETATIONIS STABILIZED.
OVERFLOWSTRUCTUREELEV. (OE)
CALTRANS CLASS 2 PERMEABLEMATERIAL (AGGREGATE). DEPTHPER PROJECT REQUIREMENTS ORMINIMUM 12", SEE DESIGN NOTE 10
UNDERDRAIN, MIN. 4" DIA. PVCSDR 35 PERFORATED PIPE,SEE CONSTRUCTION NOTE 4
6" MIN NATIVE SOIL BENCH,12" PREFERRED OR ASDIRECTED BY CIVIL ORGEOTECHNICAL ENGINEER
DEEP CURBDETAIL SW-13
UNDERDRAIN AND OVERFLOW-CONNECT TO STORM DRAIN ORAPPROVED DISCHARGELOCATION
6" MIN
6" MIN/12" MAX PONDING
18" MIN OR24" MIN IF
REQUIRED
2" MIN
3" MULCHLAYER
STREET
LEGENDMULCH/COMPOST LAYER(SEE DESIGN NOTE 12)
BIORETENTION SOIL MEDIA (BSM)
AGGREGATE
NATIVE SOIL
ASPHALT PAVEMENT
CONCRETE
CURB INLETDETAIL SW-17,GUTTER INLETELEV. (GIE)
CURB ANDGUTTERDETAIL SW-12
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
STREET BIORETENTION PLANTER BOX, NOPARKING, WITH UNDERDRAIN SW-4
SHEET 1 OF 2
DESIGN NOTES
1. BIORETENTIONFACILITY DESIGN SHOULD OPTIMIZE THE FLAT BOTTOM DIMENSIONS (I.E., WIDTH, LENGTH) TO MAXIMIZETHE FUNCTIONAL AREA OF THE FACILITY.
2. CAPTURE AND CONVEY OVERFLOW TO STORM DRAIN SYSTEM (DETAIL SW-22, SW-23). ALTERNATIVELY, CONVEYOVERFLOW TO APPROVED DISCHARGE LOCATION THROUGH OTHER OVERLAND METHODS (IE. CURB CUTS, SIDEWALKUNDERDRAIN, WEIR, ETC.).
3. PROVIDE SPOT ELEVATIONS AT INLETS AND OVERFLOW STRUCTURES ON CIVIL PLANS (FE,OE, GIE, SIE), PER DETAILSW-18.
4. DUE TO SITE VARIABILITY, TO ENSURE THE LONG-TERM STRUCTURAL STABILITY OF THE BIORETENTION FACILITY AND ANYADJACENT INFRASTRUCTURE CONSULT WITH A GEOTECHNICAL ENGINEER.
5. A VERTICAL LINER MAY BE USED FOR BIORETENTION FACILITIES TO PREVENT LATERAL FLOW AND TO SEPARATE THENATIVE SOIL FROM THE BSM AND THE AGGREGATE, HOWEVER A HORIZONTAL LINER SHALL NOT BE USED.
6. DO NOT USE FILTER FABRIC BETWEEN BSM AND AGGREGATE.
7. PROVIDE CAPPED, THREADED PVC CLEANOUT FOR UNDERDRAIN, 4" MIN. DIA. WITH SWEEP BEND.
8. PROVIDE A CLEAN-OUT/OBSERVATION PORT IN EACH FACILITY, PER BIORETENTION TECHNICAL SPECIFICATIONS.
9. ON LONGITUDINAL SLOPE, USE CHECK DAMS (DETAILS SW-20, SW-21)
10. USE AND DEPTH OF AGGREGATE DETERMINED BY FACILITY SIZING. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE,SUBSTITUTE CLASS 3 PERMEABLE WITH AN OVERLYING 3" DEEP CHOKING LAYER OF EITHER CALTRANS COURSEAGGREGATE 1/2" (NO. 4) OR 3/4" X (NO. 4) OPEN-GRADED AGGREGATE.
11. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BIORETENTION TECHNICAL SPECIFICATIONS.
12. PLANT SELECTION PER BIORETENTION TECHNICAL SPECIFICATIONS.
13. MULCH PER BIORETENTION TECHNICAL SPECIFICATIONS.
14. LOCATE ENERGY DISSIPATION AS SPECIFIED IN INLET DETAILS.
15. AVOID DECORATIVE USE OF COBBLE THAT CAN INTERFERE WITH WITH INFILTRATION.
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
STREET BIORETENTION PLANTER BOX, NOPARKING, WITH UNDERDRAIN SW-4
SHEET 2 OF 2
CONSTRUCTION NOTES
4" MIN. EXPOSED WALLOR CURB HEIGHT
SIDEWALK
FINISHED ELEVATION (FE)
CURB INLETDETAIL SW-17,GUTTER INLETELEV. (GIE)
1. MAINTAIN UNDISTURBED NATIVE SOIL BENCH TO SUPPORT ADJACENT SIDEWALK/ROAD. SEQUENCE WORK TO CONSTRUCTCURBS BEFORE EXCAVATING BIORETENTION AREA FOR AGGREGATE AND BSM.
2. SCARIFY SUBGRADE BEFORE INSTALLING BIORETENTION AREA AGGREGATE AND BSM.
3. FACILITY EXCAVATION TO ALLOW FOR SPECIFIED AGGREGATE, BSM, AND MULCH DEPTHS TO ACHIEVE FINISHED ELEVATIONS ONCIVIL PLANS.
4. COMPACT EACH 6" LIFT OF BSM WITH LANDSCAPE ROLLER OR BY LIGHTLY WETTING. IF WETTING, LET DRY OVERNIGHT BEFOREPLANTING.
5. DO NOT WORK WITHIN BIORETENTION AREA DURING RAIN OR UNDER WET CONDITIONS.
6. KEEP HEAVY MACHINERY OUTSIDE BIORETENTION AREA LIMITS.
7. STORMWATER SHOULD BE DIRECTED AWAY FROM BIORETENTION UNTIL CONSTRUCTION IS COMPLETE AND DRAINAGE AREAVEGETATION IS STABILIZED.
OVERFLOWSTRUCTUREELEV. (OE)
CALTRANS CLASS 2 PERMEABLEMATERIAL (AGGREGATE). DEPTH PERPROJECT REQUIREMENTS ORMINIMUM 12", SEE DESIGN NOTE 9
OVERFLOW OUTLET-CONNECT TOSTORM DRAIN ORAPPROVEDDISCHARGELOCATION
6" MIN NATIVE SOIL BENCH,12" PREFERREDOR AS DIRECTED BY CIVIL ORGEOTECHNICAL ENGINEER
DEEP CURBDETAIL SW-13
LEGENDMULCH/COMPOST LAYER(SEE DESIGN NOTE 12)
BIORETENTION SOIL MEDIA (BSM)
AGGREGATE
NATIVE SOIL
STREET6" MIN/12" MAX PONDING
18" MIN
3" MULCHLAYER
CURB ANDGUTTERDETAILSW-12
ASPHALT PAVEMENT
CONCRETE
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
STREET BIORETENTION PLANTER BOX, NOPARKING, NO UNDERDRAIN SW-4A
SHEET 1 OF 2
DESIGN NOTES
1. BIORETENTION FACILITY DESIGN SHOULD OPTIMIZE THE FLAT BOTTOM DIMENSIONS (I.E., WIDTH, LENGTH) TO MAXIMIZETHE FUNCTIONAL AREA OF THE FACILITY.
2. CAPTURE AND CONVEY OVERFLOW TO STORM DRAIN SYSTEM (DETAIL SW-22, SW-23). ALTERNATIVELY, CONVEYOVERFLOW TO APPROVED DISCHARGE LOCATION THROUGH OTHER OVERLAND METHODS (IE. CURB CUTS, SIDEWALKUNDERDRAIN, WEIR, ETC.).
3. PROVIDE SPOT ELEVATIONS AT INLETS AND OVERFLOW STRUCTURES ON CIVIL PLANS (FE, OE, GIE, SIE), PER DETAILSW-18.
4. DUE TO SITE VARIABILITY, TO ENSURE THE LONG-TERM STRUCTURAL STABILITY OF THE BIORETENTION FACILITY AND ANYADJACENT INFRASTRUCTURE CONSULT WITH A GEOTECHNICAL ENGINEER.
5. A VERTICAL LINER MAY BE USED FOR BIORETENTION FACILITIES TO PREVENT LATERAL FLOW AND TO SEPARATE THENATIVE SOIL FROM THE BSM AND THE AGGREGATE, HOWEVER A HORIZONTAL LINER SHALL NOT BE USED.
6. DO NOT USE FILTER FABRIC BETWEEN BSM AND AGGREGATE.
7. PROVIDE A CLEAN-OUT/OBSERVATION PORT IN EACH FACILITY, PER BIORETENTION TECHNICAL SPECIFICATIONS.
8. ON LONGITUDINAL SLOPE, USE CHECK DAMS (DETAILS SW-20, SW-21)
9. USE AND DEPTH OF AGGREGATE DETERMINED BY FACILITY SIZING. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE,SUBSTITUTE CLASS 3 PERMEABLE WITH AN OVERLYING 3" DEEP CHOKING LAYER OF EITHER CALTRANS COURSEAGGREGATE 1/2" (NO. 4) OR 3/4" X (NO. 4) OPEN-GRADED AGGREGATE.
10. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BIORETENTION TECHNICAL SPECIFICATIONS.
11. PLANT SELECTION PER BIORETENTION TECHNICAL SPECIFICATIONS.
12. MULCH PER BIORETENTION TECHNICAL SPECIFICATIONS.
13. LOCATE ENERGY DISSIPATION AS SPECIFIED IN INLET DETAILS.
14. AVOID DECORATIVE USE OF COBBLE THAT CAN INTERFERE WITH WITH INFILTRATION.
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
STREET BIORETENTION PLANTER BOX, NOPARKING, NO UNDERDRAIN SW-4A
SHEET 2 OF 2
6" MIN NATIVE SOIL BENCH,12" PREFERREDOR AS DIRECTED BY CIVIL ORGEOTECHNICAL ENGINEER
CONSTRUCTION NOTES
1. MAINTAIN UNDISTURBED NATIVE SOIL BENCH TO SUPPORT ADJACENT SIDEWALK/ROAD. SEQUENCE WORK TO CONSTRUCTCURBS BEFORE EXCAVATING BIORETENTION AREA FOR AGGREGATE AND BSM.
2. SCARIFY SUBGRADE BEFORE INSTALLING BIORETENTION AREA AGGREGATE AND BSM.
3. FACILITY EXCAVATION TO ALLOW FOR SPECIFIED AGGREGATE, BSM, AND MULCH DEPTHS TO ACHIEVE FINISHED ELEVATIONS ONCIVIL PLANS.
4. PLACE BSM IN 6" LIFTS. COMPACT EACH 6" LIFT OF BSM WITH LANDSCAPE ROLLER OR BY LIGHTLY WETTING. IF WETTING, LET DRYOVERNIGHT BEFORE PLANTING.
5. DO NOT WORK WITHIN BIORETENTION AREA DURING RAIN OR UNDER WET CONDITIONS.
6. KEEP HEAVY MACHINERY OUTSIDE BIORETENTION AREA LIMITS.
7. STORMWATER SHOULD BE DIRECTED AWAY FROM BIORETENTION UNTIL CONSTRUCTION IS COMPLETE AND DRAINAGE AREAVEGETATION IS STABILIZED.
LEGENDMULCH/COMPOST LAYER(SEE DESIGN NOTE 12)
BIORETENTION SOIL MEDIA (BSM)
AGGREGATE
NATIVE SOIL
ASPHALT PAVEMENT
CONCRETE
SIDEWALK
MIN 1" DROPSEE DESIGN NOTE 15
FINISHEDELEVATION (FE)
CURB INLETDETAIL SW-17,GUTTER INLETELEV. (GIE)
OVERFLOWSTRUCTUREELEV. (OE)
6" MIN NATIVE SOIL BENCH,12" PREFERRED
OR AS DIRECTED BY CIVIL ORGEOTECHNICAL ENGINEER
STREET
6" MIN/12" MAX PONDING
18" MIN
CURB AND GUTTERDETAIL SW-12
3" MULCHLAYER
DO NOT USE FILTER FABRICBETWEEN BSM AND AGGREGATE
CALTRANS CLASS 2 PERMEABLEMATERIAL (AGGREGATE). DEPTH PERPROJECT REQUIREMENTS OR MINIMUM12", SEE DESIGN NOTE 9
AGGREGATEBOTTOM WIDTH TO
MATCH BSM BOTTOMWIDTH
OVERFLOW OUTLET-CONNECT TO STORM DRAIN ORAPPROVED DISCHARGE LOCATION
SIDEWALKELEVATION (SE)
2% SHELF,SEE NOTE 14
3:1 MAX.WITH SHELF,SEE NOTE 14
NATIVE SIDE SLOPE TO BEDETERMINED BYGEOTECHNICAL CONDITIONS.
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
STREET BIORETENTION BULB OUT, NOPARKING, NO UNDERDRAIN, SINGLE SLOPE SW-5
SHEET 1 OF 2
1. BIORETENTION FACILITY DESIGN SHOULD OPTIMIZE THE FLAT BOTTOM DIMENSIONS (I.E., WIDTH, LENGTH) TO MAXIMIZETHE FUNCTIONAL AREA OF THE FACILITY.
2. CAPTURE AND CONVEY OVERFLOW TO STORM DRAIN SYSTEM (DETAIL SW-22, SW-23). ALTERNATIVELY, CONVEYOVERFLOW TO APPROVED DISCHARGE LOCATION THROUGH OTHER OVERLAND METHODS (IE. CURB CUTS, SIDEWALKUNDERDRAIN, WEIR, ETC.).
3. PROVIDE SPOT ELEVATIONS AT INLETS AND OVERFLOW STRUCTURES ON CIVIL PLANS (FE, OE, GIE, SIE), PER DETAILSW-18.
4. DUE TO SITE VARIABILITY, TO ENSURE THE LONG-TERM STRUCTURAL STABILITY OF THE BIORETENTION FACILITY AND ANYADJACENT INFRASTRUCTURE CONSULT WITH A GEOTECHNICAL ENGINEER.
5. A VERTICAL LINER MAY BE USED FOR BIORETENTION FACILITIES TO PREVENT LATERAL FLOW AND TO SEPARATE THENATIVE SOIL FROM THE BSM AND THE AGGREGATE, HOWEVER A HORIZONTAL LINER SHALL NOT BE USED.
6. DO NOT USE FILTER FABRIC BETWEEN BSM AND AGGREGATE.
7. PROVIDE A CLEAN-OUT/OBSERVATION PORT IN EACH FACILITY, PER BIORETENTION TECHNICAL SPECIFICATIONS.
8. ON LONGITUDINAL SLOPE, USE CHECK DAMS (DETAILS SW-20, SW-21)
9. USE AND DEPTH OF AGGREGATE DETERMINED BY FACILITY SIZING. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE,SUBSTITUTE CLASS 3 PERMEABLE WITH AN OVERLYING 3" DEEP CHOKING LAYER OF EITHER CALTRANS COURSEAGGREGATE 1/2" (NO. 4) OR 3/4" X (NO. 4) OPEN-GRADED AGGREGATE.
10. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BIORETENTION TECHNICAL SPECIFICATIONS.
11. PLANT SELECTION PER BIORETENTION TECHNICAL SPECIFICATIONS.
12. MULCH PER BIORETENTION TECHNICAL SPECIFICATIONS.
13. LOCATE ENERGY DISSIPATION AS SPECIFIED IN INLET DETAILS.
14. NATIVE SIDE SLOPE 4:1 (H:V) PREFERRED, 3:1 WITH SHELF. 6" MINIMUM SHELF WITH 2% SLOPE TOWARDS FACILITYADJACENT TO PEDESTRIAN USE OR CURB UNLESS 4:1 SLOPE PROVIDED.
15. INCLUDE AT LEAST 1" DROP FROM CURB ABOVE MULCH LAYER.
16. AVOID DECORATIVE USE OF COBBLE THAT CAN INTERFERE WITH WITH INFILTRATION.
DESIGN NOTES
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
STREET BIORETENTION BULB OUT, NOPARKING, NO UNDERDRAIN, SINGLE SLOPE SW-5
SHEET 2 OF 2
DESIGN NOTE:
1. THIS STANDARD DETAIL ASSUMES GRADUALLONGITUDINAL AND CROSS SLOPES OF THE ROADWAY.STEEPER SLOPES IN EITHER DIRECTION WILL IMPACTCONVEYANCE AND ELEVATION DIFFERENCES BETWEENTHE FACILITY AND ADJACENT ROADWAY, CURB, ANDSIDEWALK SURFACES. RETROFIT PROJECTS WILL FACEGREATER CONSTRAINTS THAN NEW CONSTRUCTION. SITESPECIFIC DESIGN IS CRITICAL TO AVOID GRADE CONFLICTSAND MAXIMIZING PONDING AREA. GRADING PLANS THATPROVIDE SPOT ELEVATIONS ACROSS THE ENTIRE FACILITYAND ALONG ADJACENT SURFACES ARE NECESSARY.
1/4" ALLEN WRENCH BOLTS,FLUSH
CONSTRUCTION NOTES:
1. INSTALL GRAVEL BAGS AT CURB CUTS TO BLOCK FLOWFROM ENTERING BIORETENTION AREA. CITY TO REMOVEGRAVEL BAGS AT A TIME FOLLOWING CONSTRUCTIONCOMPLETION.
BIORETENTIONAREA
BIORETENTIONAREA
CURB CUTOUTLET
CURB CUTINLET REMOVE AND REPLACE EXISTING
CURB & GUTTER WITH RAISEDDEEP CURB LENGTH OF FACILITY
RAISED DEEP CURBAT SIDEWALK PERLIDI DETAIL SW-15
CURB CUTOUTLET
2" DROPTO COBBLE
FE
CURB CUT INLET GRATE & FRAME
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
STREET BIORETENTION BULB OUT, MIDBLOCK CROSSING SW-5.1
SHEET 1 OF 1
CONSTRUCTION NOTES
1. MAINTAIN UNDISTURBED NATIVE SOIL BENCH TO SUPPORT ADJACENT SIDEWALK/ROAD. SEQUENCE WORK TO CONSTRUCTCURBS BEFORE EXCAVATING BIORETENTION AREA FOR AGGREGATE AND BSM.
2. SCARIFY SUBGRADE BEFORE INSTALLING BIORETENTION AREA AGGREGATE AND BSM.
3. FACILITY EXCAVATION TO ALLOW FOR SPECIFIED AGGREGATE, BSM, AND MULCH DEPTHS TO ACHIEVE FINISHED ELEVATIONSON CIVIL PLANS.
4. INSTALL UNDERDRAIN WITH HOLES FACING DOWN. TOP OF UNDERDRAIN 6" BELOW TOP OF AGGREGATE LAYER. UNDERDRAINSLOPE MAY BE FLAT.
5. PLACE BSM IN 6" LIFTS. COMPACT EACH 6" LIFT OF BSM WITH LANDSCAPE ROLLER OR BY LIGHTLY WETTING. IF WETTING, LETDRY OVERNIGHT BEFORE PLANTING.
6. DO NOT WORK WITHIN BIORETENTION AREA DURING RAIN OR UNDER WET CONDITIONS.
7. KEEP HEAVY MACHINERY OUTSIDE BIORETENTION AREA LIMITS.
8. STORMWATER SHOULD BE DIRECTED AWAY FROM BIORETENTION UNTIL CONSTRUCTION IS COMPLETE AND DRAINAGE AREAVEGETATION IS STABILIZED.
PARKING LOTPARKING LOT
FLUSH CURBSURFACEELEVATION (SE)SEE DETAIL SW-16
MIN 1" DROPSEE DESIGNNOTE 16
MIN 24"BOTTOM WIDTH
DO NOT USE FILTER FABRICBETWEEN BSM AND AGGREGATE
CALTRANS CLASS 2 PERMEABLEMATERIAL (AGGREGATE). DEPTH PERPROJECT REQUIREMENTS ORMINIMUM 12", SEE DESIGN NOTE 10
FINISHEDELEVATION(FE)
6" MIN NATIVE SOIL BENCH,12" PREFERRED OR ASDIRECTED BY CIVIL ORGEOTECHNICAL ENGINEER
AGGREGATEBOTTOM WIDTH TO
MATCH BSM BOTTOMWIDTH
OVERFLOW OUTLET-CONNECT TO STORM DRAIN ORAPPROVED DISCHARGE LOCATIONNATIVE SIDE SLOPE
TO BE DETERMINEDBY GEOTECHNICALCONDITIONS.
3" MULCHLAYER
6" MIN
6" MIN/12" MAX PONDING
2" MIN
6" MIN
UNDERDRAIN, MIN. 4" DIA. PVCSDR 35 PERFORATED PIPE,SEE CONSTRUCTION NOTE 4
OVERFLOW STRUCTUREELEV. (OE)
2% SHELF,SEE NOTE 15
3:1 MAX. WITHSHELF, SEENOTE 15
18" MIN OR24" MIN IF
REQUIRED
LEGENDMULCH/COMPOST LAYER(SEE DESIGN NOTE 12)
BIORETENTION SOIL MEDIA (BSM)
AGGREGATE
NATIVE SOIL
ASPHALT PAVEMENT
CONCRETE
CURB AND GUTTERDETAIL SW-12
CURB INLET DETAILSW-18, GUTTERINLET ELEV. (GIE)
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
PARKING LOT SLOPE-SIDED BIORETENTION,WITH UNDERDRAIN SW-6
SHEET 1 OF 2
DESIGN NOTES
1. BIORETENTION FACILITY DESIGN SHOULD OPTIMIZE THE FLAT BOTTOM DIMENSIONS (I.E., WIDTH, LENGTH) TO MAXIMIZETHE FUNCTIONAL AREA OF THE FACILITY.
2. CAPTURE AND CONVEY OVERFLOW TO STORM DRAIN SYSTEM (DETAIL SW-22, SW-23). ALTERNATIVELY, CONVEYOVERFLOW TO APPROVED DISCHARGE LOCATION THROUGH OTHER OVERLAND METHODS (IE. CURB CUTS, SIDEWALKUNDERDRAIN, WEIR, ETC.).
3. PROVIDE SPOT ELEVATIONS AT INLETS AND OVERFLOW STRUCTURES ON CIVIL PLANS (FE, OE, GIE, SIE), PER DETAILSW-18.
4. DUE TO SITE VARIABILITY, TO ENSURE THE LONG-TERM STRUCTURAL STABILITY OF THE BIORETENTION FACILITY AND ANYADJACENT INFRASTRUCTURE CONSULT WITH A GEOTECHNICAL ENGINEER.
5. A VERTICAL LINER MAY BE USED FOR BIORETENTION FACILITIES TO PREVENT LATERAL FLOW AND TO SEPARATE THENATIVE SOIL FROM THE BSM AND THE AGGREGATE, HOWEVER A HORIZONTAL LINER SHALL NOT BE USED.
6. DO NOT USE FILTER FABRIC BETWEEN BSM AND AGGREGATE.
7. PROVIDE CAPPED, THREADED PVC CLEANOUT FOR UNDERDRAIN, 4" MIN. DIA. WITH SWEEP BEND.
8. PROVIDE A CLEAN-OUT/OBSERVATION PORT IN EACH FACILITY, PER BIORETENTION TECHNICAL SPECIFICATIONS.
9. ON LONGITUDINAL SLOPE, USE CHECK DAMS (DETAILS SW-20, SW-21)
10. DEPTH OF AGGREGATE DETERMINED BY FACILITY SIZING. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE,SUBSTITUTE CLASS 3 PERMEABLE WITH AN OVERLYING 3" DEEP CHOKING LAYER OF EITHER CALTRANS COURSEAGGREGATE 1/2" (NO. 4) OR 3/4" X (NO.4) OPEN-GRADED AGGREGATE.
11. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BIORETENTION TECHNICAL SPECIFICATIONS.
12. PLANT SELECTION PER BIORETENTION TECHNICAL SPECIFICATIONS.
13. MULCH PER BIORETENTION TECHNICAL SPECIFICATIONS.
14. LOCATE ENERGY DISSIPATION AS SPECIFIED IN INLET DETAILS.
15. NATIVE SIDE SLOPE 4:1 (H:V) PREFERRED, 3:1 WITH BENCH. 6" MINIMUM SHELF WITH 2% SLOPE TOWARDS FACILITYADJACENT TO PEDESTRIAN USE OR CURB UNLESS 4:1 SLOPE PROVIDED.
16. INCLUDE AT LEAST 1" DROP FROM CURB ABOVE MULCH LAYER.
17. AVOID DECORATIVE USE OF COBBLE THAT CAN INTERFERE WITH WITH INFILTRATION.
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
PARKING LOT SLOPE-SIDEDBIORETENTION, WITH UNDERDRAIN SW-6
SHEET 2 OF 2
PARKING LOT
CONSTRUCTION NOTES
1. MAINTAIN UNDISTURBED NATIVE SOIL BENCH TO SUPPORT ADJACENT SIDEWALK/ROAD. SEQUENCE WORK TO CONSTRUCT CURBSBEFORE EXCAVATING BIORETENTION AREA FOR AGGREGATE AND BSM.
2. SCARIFY SUBGRADE BEFORE INSTALLING BIORETENTION AREA AGGREGATE AND BSM.
3. FACILITY EXCAVATION TO ALLOW FOR SPECIFIED AGGREGATE, BSM, AND MULCH DEPTHS TO ACHIEVE FINISHED ELEVATIONS ONCIVIL PLANS.
4. PLACE BSM IN 6" LIFTS. COMPACT EACH 6" LIFT OF BSM WITH LANDSCAPE ROLLER OR BY LIGHTLY WETTING. IF WETTING, LET DRYOVERNIGHT BEFORE PLANTING.
5. DO NOT WORK WITHIN BIORETENTION AREA DURING RAIN OR UNDER WET CONDITIONS.
6. KEEP HEAVY MACHINERY OUTSIDE BIORETENTION AREA LIMITS.
7. STORMWATER SHOULD BE DIRECTED AWAY FROM BIORETENTION UNTIL CONSTRUCTION IS COMPLETE AND DRAINAGE AREAVEGETATION IS STABILIZED.
PARKING LOT
FLUSH CURBSURFACEELEVATION (SE)SEE DETAIL SW-16
MIN 1" DROPSEE DESIGNNOTE 15
MIN 24"BOTTOM WIDTH
DO NOT USE FILTER FABRICBETWEEN BSM AND AGGREGATE
CALTRANS CLASS 2 PERMEABLEMATERIAL (AGGREGATE).DEPTH PER PROJECT REQUIREMENTSOR MINIMUM 12", SEE DESIGN NOTE 9
FINISHEDELEVATION(FE)
6" MIN NATIVE SOIL BENCH,12" PREFERRED OR ASDIRECTED BY CIVIL ORGEOTECHNICAL ENGINEER
AGGREGATEBOTTOM WIDTH TO
MATCH BSM BOTTOMWIDTH
OVERFLOW OUTLET-CONNECT TO STORM DRAIN ORAPPROVED DISCHARGE LOCATION
NATIVE SIDE SLOPE TO BEDETERMINED BYGEOTECHNICAL CONDITIONS.
3" MULCHLAYER
6" MIN
2% SHELF,SEE NOTE 14
6" MIN/12" MAX PONDING
3:1 MAX. WITHSHELF, SEENOTE 14 OVERFLOW STRUCTURE
ELEV. (OE)
18" MIN
LEGENDMULCH/COMPOST LAYER(SEE DESIGN NOTE 12)
BIORETENTION SOIL MEDIA (BSM)
AGGREGATE
NATIVE SOIL
ASPHALT PAVEMENT
CONCRETE
CURB AND GUTTERDETAIL SW-12
CURB INLET DETAILSW-18, GUTTERINLET ELEV. (GIE)
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
PARKING LOT SLOPE-SIDEDBIORETENTION, NO UNDERDRAIN SW-6A
SHEET 1 OF 2
DESIGN NOTES
1. BIORETENTION FACILITY DESIGN SHOULD OPTIMIZE THE FLAT BOTTOM DIMENSIONS (I.E., WIDTH, LENGTH) TO MAXIMIZETHE FUNCTIONAL AREA OF THE FACILITY.
2. CAPTURE AND CONVEY OVERFLOW TO STORM DRAIN SYSTEM (DETAIL SW-22, SW-23). ALTERNATIVELY, CONVEYOVERFLOW TO APPROVED DISCHARGE LOCATION THROUGH OTHER OVERLAND METHODS (IE. CURB CUTS, SIDEWALKUNDERDRAIN, WEIR, ETC.).
3. PROVIDE SPOT ELEVATIONS AT INLETS AND OVERFLOW STRUCTURE ON CIVIL PLANS (FE,OE, GIE, SIE), PER DETAIL SW-18.
4. DUE TO SITE VARIABILITY, TO ENSURE THE LONG-TERM STRUCTURAL STABILITY OF THE BIORETENTION FACILITY AND ANYADJACENT INFRASTRUCTURE CONSULT WITH A GEOTECHNICAL ENGINEER.
5. A VERTICAL LINER MAY BE USED FOR BIORETENTION FACILITIES TO PREVENT LATERAL FLOW AND TO SEPARATE THENATIVE SOIL FROM THE BSM AND THE AGGREGATE, HOWEVER A HORIZONTAL LINER SHALL NOT BE USED.
6. DO NOT USE FILTER FABRIC BETWEEN BSM AND AGGREGATE.
7. PROVIDE A CLEAN-OUT/OBSERVATION PORT IN EACH FACILITY, PER BIORETENTION TECHNICAL SPECIFICATIONS.
8. ON LONGITUDINAL SLOPE, USE CHECK DAMS (DETAILS SW-20, SW-21)
9. USE AND DEPTH OF AGGREGATE DETERMINED BY FACILITY SIZING. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE,SUBSTITUTE CLASS 3 PERMEABLE WITH AN OVERLYING 3" DEEP CHOKING LAYER OF EITHER CALTRANS COURSEAGGREGATE 1/2" (NO. 4) OR 3/4" X (NO. 4) OPEN-GRADED AGGREGATE.
10. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BIORETENTION TECHNICAL SPECIFICATIONS.
11. PLANT SELECTION PER BIORETENTION TECHNICAL SPECIFICATIONS.
12. MULCH PER BIORETENTION TECHNICAL SPECIFICATIONS.
13. LOCATE ENERGY DISSIPATION AS SPECIFIED IN INLET DETAILS.
14. NATIVE SIDE SLOPE 4:1 (H:V) PREFERRED, 3:1 WITH SHELF. 6" MINIMUM SHELF WITH 2% SLOPE TOWARDS FACILITYADJACENT TO PEDESTRIAN USE OR CURB UNLESS 4:1 SLOPE PROVIDED.
15. INCLUDE AT LEAST 1" DROP FROM CURB ABOVE MULCH LAYER.
16. AVOID DECORATIVE USE OF COBBLE THAT CAN INTERFERE WITH WITH INFILTRATION.
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
PARKING LOT SLOPE-SIDEDBIORETENTION, NO UNDERDRAIN SW-6A
SHEET 2 OF 2
CONSTRUCTION NOTES1. MAINTAIN UNDISTURBED NATIVE SOIL BENCH TO SUPPORT ADJACENT SIDEWALK/ROAD. SEQUENCE WORK TO CONSTRUCT CURBS
BEFORE EXCAVATING BIORETENTION AREA FOR AGGREGATE AND BSM.
2. SCARIFY SUBGRADE BEFORE INSTALLING BIORETENTION AREA AGGREGATE AND BSM.
3. FACILITY EXCAVATION TO ALLOW FOR SPECIFIED AGGREGATE, BSM, AND MULCH DEPTHS TO ACHIEVE FINISHED ELEVATIONS ON CIVILPLANS.
4. INSTALL UNDERDRAIN WITH HOLES FACING DOWN. TOP OF UNDERDRAIN 6" BELOW TOP OF AGGREGATE LAYER. UNDERDRAIN SLOPEMAY BE FLAT.
5. COMPACT EACH 6" LIFT OF BSM WITH LANDSCAPE ROLLER OR BY LIGHTLY WETTING. IF WETTING, LET DRY OVERNIGHT BEFOREPLANTING.
6. DO NOT WORK WITHIN BIORETENTION AREA DURING RAIN OR UNDER WET CONDITIONS.
7. KEEP HEAVY MACHINERY OUTSIDE BIORETENTION AREA LIMITS.
8. STORMWATER SHOULD BE DIRECTED AWAY FROM BIORETENTION UNTIL CONSTRUCTION IS COMPLETE AND DRAINAGE AREAVEGETATION IS STABILIZED.
PARKING LOTPARKING LOT
CURB INLET DETAILSW-17
6" MIN NATIVE SOIL BENCH,12" PREFERRED OR ASDIRECTED BY CIVIL ORGEOTECHNICAL ENGINEER
OVERFLOWSTRUCTUREELEV. (OE)
UNDERDRAIN AND OVERFLOWCONNECT TO STORM DRAINOR APPROVED DISCHARGELOCATION
CURB AND GUTTERDETAIL SW-12
FLUSH CURBSURFACEELEVATION (SE)SEE DETAIL SW-16
FINISHED ELEVATION(FE)
6" MIN/12" MAX PONDING
3" MULCHLAYER
18" MIN OR24" MIN IF
REQUIRED DO NOT USE FILTER FABRICBETWEEN BSM AND AGGREGATE
6" MIN
2" MIN
CALTRANS CLASS 2 PERMEABLEMATERIAL (AGGREGATE). DEPTHPER PROJECT REQUIREMENTS ORMINIMUM 12", SEE DESIGN NOTE 10
UNDERDRAIN, MIN. 4" DIA. PVCSDR 35 PERFORATED PIPE,SEE CONSTRUCTION NOTE 4
6' MIN WIDTH
LEGENDMULCH/COMPOST LAYER(SEE DESIGN NOTE 12)
BIORETENTION SOIL MEDIA (BSM)
AGGREGATE
NATIVE SOIL
ASPHALT PAVEMENT
CONCRETE
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
PARKING LOT BIORETENTION PLANTERBOX, WITH UNDERDRAIN SW-7
SHEET 1 OF 2
DESIGN NOTES
1. BIORETENTION FACILITY DESIGN SHOULD OPTIMIZE THE FLAT BOTTOM DIMENSIONS (I.E., WIDTH, LENGTH) TO MAXIMIZETHE FUNCTIONAL AREA OF THE FACILITY.
2. CAPTURE AND CONVEY OVERFLOW TO STORM DRAIN SYSTEM (DETAIL SW-22, SW-23). ALTERNATIVELY, CONVEYOVERFLOW TO APPROVED DISCHARGE LOCATION THROUGH OTHER OVERLAND METHODS (IE. CURB CUTS, SIDEWALKUNDERDRAIN, WEIR, ETC.).
3. PROVIDE SPOT ELEVATIONS AT INLETS AND OVERFLOW STRUCTURES ON CIVIL PLANS (FE, OE, GIE, SIE), PER DETAILSW-18.
4. DUE TO SITE VARIABILITY, TO ENSURE THE LONG-TERM STRUCTURAL STABILITY OF THE BIORETENTION FACILITY AND ANYADJACENT INFRASTRUCTURE CONSULT WITH A GEOTECHNICAL ENGINEER.
5. A VERTICAL LINER MAY BE USED FOR BIORETENTION FACILITIES TO PREVENT LATERAL FLOW AND TO SEPARATE THENATIVE SOIL FROM THE BSM AND THE AGGREGATE, HOWEVER A HORIZONTAL LINER SHALL NOT BE USED.
6. DO NOT USE FILTER FABRIC BETWEEN BSM AND AGGREGATE.
7. PROVIDE CAPPED, THREADED PVC CLEANOUT FOR UNDERDRAIN, 4" MIN. DIA. WITH SWEEP BEND.
8. PROVIDE A CLEAN-OUT/OBSERVATION PORT IN EACH FACILITY, PER BIORETENTION TECHNICAL SPECIFICATIONS.
9. ON LONGITUDINAL SLOPE, USE CHECK DAMS (DETAILS SW-20, SW-21)
10. USE AND DEPTH OF AGGREGATE DETERMINED BY FACILITY SIZING. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE,SUBSTITUTE CLASS 3 PERMEABLE WITH AN OVERLYING 3" DEEP CHOKING LAYER OF EITHER CALTRANS COURSEAGGREGATE 1/2" (NO. 4) OR 3/4" X (NO. 4) OPEN-GRADED AGGREGATE.
11. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BIORETENTION TECHNICAL SPECIFICATIONS.
12. PLANT SELECTION PER BIORETENTION TECHNICAL SPECIFICATIONS.
13. MULCH PER BIORETENTION TECHNICAL SPECIFICATIONS.
14. LOCATE ENERGY DISSIPATION AS SPECIFIED IN INLET DETAILS.
15. AVOID DECORATIVE USE OF COBBLE THAT CAN INTERFERE WITH WITH INFILTRATION.
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
PARKING LOT BIORETENTION PLANTERBOX, WITH UNDERDRAIN SW-7
SHEET 2 OF 2
CONSTRUCTION NOTES1. MAINTAIN UNDISTURBED NATIVE SOIL BENCH TO SUPPORT ADJACENT SIDEWALK/ROAD. SEQUENCE WORK TO CONSTRUCT
CURBS BEFORE EXCAVATING BIORETENTION AREA FOR AGGREGATE AND SOIL.
2. SCARIFY SUBGRADE BEFORE INSTALLING BIORETENTION AREA AGGREGATE AND BSM.
3. FACILITY EXCAVATION TO ALLOW FOR SPECIFIED AGGREGATE, BSM, AND MULCH DEPTHS TO ACHIEVE FINISHED ELEVATIONSON CIVIL PLANS.
4. COMPACT EACH 6" LIFT OF BSM WITH LANDSCAPE ROLLER OR BY LIGHTLY WETTING. IF WETTING, LET DRY OVERNIGHTBEFORE PLANTING.
5. DO NOT WORK WITHIN BIORETENTION AREA DURING RAIN OR UNDER WET CONDITIONS.
6. KEEP HEAVY MACHINERY OUTSIDE BIORETENTION AREA LIMITS.
7. STORMWATER SHOULD BE DIRECTED AWAY FROM BIORETENTION UNTIL CONSTRUCTION IS COMPLETE AND DRAINAGE AREAVEGETATION IS STABILIZED.
PARKING LOTPARKING LOT
6" MIN NATIVE SOIL BENCH,12" PREFERRED OR ASDIRECTED BY CIVIL ORGEOTECHNICAL ENGINEER
OVERFLOWSTRUCTUREELEV. (OE)
18" MIN
CALTRANS CLASS 2 PERMEABLEMATERIAL (AGGREGATE). DEPTHPER PROJECT REQUIREMENTSOR MINIMUM 12", SEE DESIGNNOTE 9
CURB AND GUTTERDETAIL SW-12
FLUSH CURBSURFACEELEVATION (SE)SEE DETAIL SW-16CURB INLET
DETAIL SW-17
6" MIN/12" MAX PONDING
3" MULCHLAYER
DO NOT USE FILTERFABRIC BETWEEN BSMAND AGGREGATE
OVERFLOW OUTLETCONNECT TO STORMDRAIN OR APPROVEDDISCHARGE LOCATION
FINISHED ELEVATION(FE)
6' MIN WIDTH
LEGENDMULCH/COMPOST LAYER(SEE DESIGN NOTE 12)
BIORETENTION SOIL MEDIA (BSM)
AGGREGATE
NATIVE SOIL
ASPHALT PAVEMENT
CONCRETE
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
PARKING LOT BIORETENTION PLANTERBOX, NO UNDERDRAIN SW-7A
SHEET 1 OF 2
DESIGN NOTES
1. BIORETENTION FACILITY DESIGN SHOULD OPTIMIZE THE FLAT BOTTOM DIMENSIONS (I.E., WIDTH, LENGTH) TO MAXIMIZETHE FUNCTIONAL AREA OF THE FACILITY.
2. CAPTURE AND CONVEY OVERFLOW TO STORM DRAIN SYSTEM (DETAIL SW-22, SW-23). ALTERNATIVELY, CONVEYOVERFLOW TO APPROVED DISCHARGE LOCATION THROUGH OTHER OVERLAND METHODS (IE. CURB CUTS, SIDEWALKUNDERDRAIN, WEIR, ETC.).
3. PROVIDE SPOT ELEVATIONS AT INLETS AND OVERFLOW STRUCTURES ON CIVIL PLANS (FE, OE, GIE, SIE), PER DETAILSW-18.
4. DUE TO SITE VARIABILITY, TO ENSURE THE LONG-TERM STRUCTURAL STABILITY OF THE BIORETENTION FACILITY AND ANYADJACENT INFRASTRUCTURE CONSULT WITH A GEOTECHNICAL ENGINEER.
5. A VERTICAL LINER MAY BE USED FOR BIORETENTION FACILITIES TO PREVENT LATERAL FLOW AND TO SEPARATE THENATIVE SOIL FROM THE BSM AND THE AGGREGATE, HOWEVER A HORIZONTAL LINER SHALL NOT BE USED.
6. DO NOT USE FILTER FABRIC BETWEEN BSM AND AGGREGATE.
7. PROVIDE A CLEAN-OUT/OBSERVATION PORT IN EACH FACILITY, PER BIORETENTION TECHNICAL SPECIFICATIONS.
8. ON LONGITUDINAL SLOPE, USE CHECK DAMS (DETAILS SW-20, SW-21)
9. USE AND DEPTH OF AGGREGATE DETERMINED BY FACILITY SIZING. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE,SUBSTITUTE CLASS 3 PERMEABLE WITH AN OVERLYING 3" DEEP CHOKING LAYER OF EITHER CALTRANS COURSEAGGREGATE 1/2" (NO. 4) OR 3/4" X (NO. 4) OPEN-GRADED AGGREGATE.
10. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BIORETENTION TECHNICAL SPECIFICATIONS.
11. PLANT SELECTION PER BIORETENTION TECHNICAL SPECIFICATIONS.
12. MULCH PER BIORETENTION TECHNICAL SPECIFICATIONS.
13. LOCATE ENERGY DISSIPATION AS SPECIFIED IN INLET DETAILS.
14. AVOID DECORATIVE USE OF COBBLE THAT CAN INTERFERE WITH WITH INFILTRATION.
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
PARKING LOT BIORETENTION PLANTERBOX, NO UNDERDRAIN SW-7A
SHEET 2 OF 2
CONSTRUCTION NOTES
4" MIN. EXPOSED WALLHEIGHT
SIDEWALK
FINISHED ELEVATION (FE)
1. MAINTAIN UNDISTURBED NATIVE SOIL BENCH TO SUPPORT ADJACENT SIDEWALK/ROAD. SEQUENCE WORK TO CONSTRUCT CURBSBEFORE EXCAVATING BIOFILTRATION AREA FOR AGGREGATE AND BSM.
2. SCARIFY SUBGRADE BEFORE INSTALLING BIORETENTION AREA AGGREGATE AND BSM.
3. FACILITY EXCAVATION TO ALLOW FOR SPECIFIED AGGREGATE, BSM, AND MULCH DEPTHS TO ACHIEVE FINISHED ELEVATIONS ON CIVILPLANS.
4. COMPACT EACH 6" LIFT OF BSM WITH LANDSCAPE ROLLER OR BY LIGHTLY WETTING. IF WETTING, LET DRY OVERNIGHT BEFORE PLANTING.
5. DO NOT WORK WITHIN BIOFILTRATION AREA DURING RAIN OR UNDER WET CONDITIONS.
6. KEEP HEAVY MACHINERY OUTSIDE BIOFILTRATION AREA LIMITS.
7. STORMWATER SHOULD BE DIRECTED AWAY FROM BIOFILTRATION UNTIL CONSTRUCTION IS COMPLETE AND DRAINAGE AREA VEGETATIONIS STABILIZED.
OVERFLOWSTRUCTUREELEV. (OE)
CALTRANS CLASS 2 PERMEABLEMATERIAL (AGGREGATE). DEPTHPER PROJECT REQUIREMENTS ORMINIMUM 12", SEE DESIGN NOTE 9
UNDERDRAIN, MIN. 4" DIA. PVCSDR 35 PERFORATED PIPE,SEE CONSTRUCTION NOTE 4
6" MIN NATIVE SOIL BENCH,12" PREFERRED OR ASDIRECTED BY CIVIL ORGEOTECHNICAL ENGINEER
DEEP CURBDETAIL SW-13
UNDERDRAIN ANDOVERFLOW-CONNECT TO STORMDRAIN OR APPROVEDDISCHARGE LOCATION
6" MIN/12" MAX PONDING
18" MIN OR24" MIN IF
REQUIRED
LEGENDMULCH/COMPOST LAYER(SEE DESIGN NOTE 12)
BIORETENTION SOIL MEDIA (BSM)
AGGREGATE
NATIVE SOIL
3" MULCHLAYER
STREET
IMPERMEABLE LINER PER DETAILSW-24, BOTTOM LINER OPTIONALPER STRUCTURAL DESIGN
CURB INLETDETAIL SW-17,GUTTER INLETELEV. (GIE)
CURB ANDGUTTERDETAIL SW-12
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
BIOFILTRATION PLANTER BOX,NO PARKING SW-9
SHEET 1 OF 2
DESIGN NOTES
1. BIOFILTRATION FACILITY DESIGN SHOULD OPTIMIZE THE FLAT BOTTOM DIMENSIONS (I.E., WIDTH, LENGTH) TO MAXIMIZETHE FUNCTIONAL AREA OF THE FACILITY.
2. CAPTURE AND CONVEY OVERFLOW TO STORM DRAIN SYSTEM (DETAIL SW-22, SW-23). ALTERNATIVELY, CONVEYOVERFLOW TO APPROVED DISCHARGE LOCATION THROUGH OTHER OVERLAND METHODS (IE. CURB CUTS, SIDEWALKUNDERDRAIN, WEIR, ETC.).
3. PROVIDE SPOT ELEVATIONS AT INLETS AND OVERFLOW STRUCTURES ON CIVIL PLANS (FE,OE, GIE, SIE), PER DETAILSW-18.
4. DUE TO SITE VARIABILITY, TO ENSURE THE LONG-TERM STRUCTURAL STABILITY OF THE BIOFILTRATION FACILITY AND ANYADJACENT INFRASTRUCTURE CONSULT WITH A GEOTECHNICAL ENGINEER.
5. DO NOT USE FILTER FABRIC BETWEEN BSM AND AGGREGATE.
6. PROVIDE CAPPED, THREADED PVC CLEANOUT FOR UNDERDRAIN, 4" MIN. DIA. WITH SWEEP BEND.
7. PROVIDE A CLEAN-OUT/OBSERVATION PORT IN EACH FACILITY, PER BIORETENTION TECHNICAL SPECIFICATIONS.
8. ON LONGITUDINAL SLOPE, USE CHECK DAMS (DETAILS SW-20, SW-21)
9. USE AND DEPTH OF AGGREGATE DETERMINED BY FACILITY SIZING. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE,SUBSTITUTE CLASS 3 PERMEABLE WITH AN OVERLYING 3" DEEP CHOKING LAYER OF EITHER CALTRANS COURSEAGGREGATE 1/2" (NO. 4) OR 3/4" X (NO. 4) OPEN-GRADED AGGREGATE.
10. BIORETENTION SOIL MEDIA (BSM) SPECIFICATION PER BIORETENTION TECHNICAL SPECIFICATIONS.
11. PLANT SELECTION PER BIORETENTION TECHNICAL SPECIFICATIONS.
12. MULCH PER BIORETENTION TECHNICAL SPECIFICATIONS.
13. LOCATE ENERGY DISSIPATION AS SPECIFIED IN INLET DETAILS.
14. AVOID DECORATIVE USE OF COBBLE THAT CAN INTERFERE WITH WITH INFILTRATION.
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
BIOFILTRATION PLANTER BOX,NO PARKING SW-9
SHEET 2 OF 2
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
R=3/4"
CONSTRUCTION NOTES
DESIGN NOTES
1. SPECIAL DESIGN CONSIDERATION OR STRUCTURAL REVIEW MAY BE REQUIRED FOR LONGER PLANTER WALL SPANS.STEEL REINFORCEMENT OR ADDITIONAL CONCRETE CHECK DAMS MAY BE NEEDED FOR STABILITY.
2. EDGE CONDITION WILL VARY FOR NEW AND RETROFIT PROJECTS. CURB, GUTTER, AND WALL DETAILS MAY BE MODIFIEDBY CIVIL AND GEOTECHNICAL ENGINEERS SUBJECT TO APPROVAL BY CITY ENGINEER.
3. CONCRETE AND EXPANSION JOINTS SHALL MEET THE REQUIREMENTS OF THE MUNICIPALITY.
4. STEEL REINFORCEMENT OR ADDITIONAL CONCRETE CHECK DAMS MAY BE NEEDED FOR STABILITY.
1. FINISH ALL EXPOSED CONCRETE SURFACES.
2. LAYBACK SLOPE AS FLAT AS POSSIBLE UNTIL TOP WIDTH PRODUCES 1:1 SLOPE & 24" BOTTOM WIDTH. AS PLANTER GETSWIDER MAINTAIN 1:1 SLOPE AND INCREASE BOTTOM WIDTH WIDER THAN 24". ALTERNATIVE TRENCH WALLCONFIGURATIONS MAY BE PROPOSED BY THE PROJECT GEOTECHNICAL ENGINEER (I.E. VERTICAL SHORING, REINFORCEDTRENCH SIDEWALL) THAT DO NOT REQUIRE SIDEWALK SUPPORT FROM THE LIGHTLY COMPACTED BSM.
6"
R=3/4"
REINFORCING PERMUNICIPAL STANDARD
1.5"
BIORETENTION AREA
AGGREGATE BASE PERMUNICIPAL STANDARD
MIN. 24"
SEECONSTRUCTIONNOTE 2
6" MIN.
30 MIL LINERREQUIRED ATSTREET (SWALEONLY)
MUNICIPAL STANDARDSWIDTH PER
CURB AND GUTTER SW-12SHEET 1 OF 1
6"
R=3/4"R=3/4"
1.5"
BIORETENTION AREA
AGGREGATE BASEPER MUNICIPALSTANDARD
MUNICIPAL STANDARDS 4"
6" MIN. SEECONSTRUCTIONNOTE 2
30 MIL LINERREQUIRED ATSTREET(SLOPE-SIDEDONLY)
18"
R=3/4"
CONCRETE VEHICLEACCESS STRIP
CONSTRUCTION NOTES
DESIGN NOTES
1. SPECIAL CONCRETE AND EXPANSION JOINS SHALL MEET THE REQUIREMENTS OF THE MUNICIPALITY.
2. PROVIDE OPENINGS IN CURB (12" WIDE) TO ALLOW FOR SURFACE DRAINAGE TO BIORETENTION AREAS IF DEDICATEDINLET NOT USED. SPACING TO BE DETERMINED BY PROJECT ENGINEER BASED ON DESIGN STORM TO MINIMIZEPONDING AGAINST CURB FOR MEDIAN ISLAND APPLICATION.
3. STEEL REINFORCEMENT OR ADDITIONAL CONCRETE CHECK DAMS MAY BE NEEDED FOR STABILITY.
4. SEE REFERENCE DETAIL SW-24 FOR ATTACHMENT OF IMPERVIOUS LINER.
1. FINISH ALL EXPOSED CONCRETE SURFACES.
2. LAYBACK SLOPE AS FLAT AS POSSIBLE UNTIL TOP WIDTH PRODUCES 1:1 SLOPE & 24" BOTTOM WIDTH. AS PLANTERGETS WIDER MAINTAIN 1:1 SLOPE AND INCREASE BOTTOM WIDTH WIDER THAN 24". ALTERNATIVE TRENCH WALLCONFIGURATIONS MAY BE PROPOSED BY THE PROJECT GEOTECHNICAL ENGINEER (I.E. VERTICAL SHORING,REINFORCED TRENCH SIDEWALL) THAT DO NOT REQUIRE SIDEWALK SUPPORT FROM THE LIGHTLY COMPACTED BSM.
SEE DESIGN NOTE 4
1/2" DIAMETER SMOOTH DOWEL, 24"LONG AT ALL EXPANSION JOINTS OR
PER MUNICIPAL STANDARDS
6"
WIDTH PER
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
CURB AND GUTTER SW-12ASHEET 1 OF 1
6" R=3/4"
1/2" DIAMETER SMOOTH DOWEL, 24"LONG AT ALL EXPANSION JOINTS ORPER MUNICIPAL STANDARDS
R=3/4"
CONSTRUCTION NOTES
DESIGN NOTES
1. SPECIAL DESIGN CONSIDERATION OR STRUCTURAL REVIEW MAY BE REQUIRED FOR LONGER SWALE EDGE SPANS. STEELREINFORCEMENT OR ADDITIONAL CONCRETE CHECK DAMS MAY BE NEEDED FOR STABILITY.
2. WHEN SIDEWALK DRAINS TO PLANTER, PROVIDE 4" - 6" WIDE NOTCH OPENINGS, 1" BELOW SIDEWALK, SLOPED TOFACILITY, PER BIORETENTION PLANTER DETAILS. SPACE OPENINGS TO CONVEY FLOWS. PROVIDE MINIMUM 2" COVERBETWEEN DRAINAGE NOTCH OPENING AND DOWELS.
3. CONCRETE AND EXPANSION JOINTS SHALL MEET THE REQUIREMENTS OF THE MUNICIPALITY.
4. STEEL REINFORCEMENT OR ADDITIONAL CONCRETE CHECK DAMS MAY BE NEEDED FOR STABILITY.
1. FINISH ALL EXPOSED CONCRETE SURFACES.
2. LAYBACK SLOPE AS FLAT AS POSSIBLE UNTIL TOP WIDTH PRODUCES 1:1 SLOPE & 24" BOTTOM WIDTH. AS PLANTER GETSWIDER MAINTAIN 1:1 SLOPE AND INCREASE BOTTOM WIDTH WIDER THAN 24". ALTERNATIVE TRENCH WALLCONFIGURATIONS MAY BE PROPOSED BY THE PROJECT GEOTECHNICAL ENGINEER (I.E. VERTICAL SHORING,REINFORCED TRENCH SIDEWALL) THAT DO NOT REQUIRE SIDEWALK SUPPORT FROM THE LIGHTLY COMPACTED BSM.
1.5"
STREET/SIDEWALK/PARKING
MIN. 24"
6" STREET/4" SIDEWALK
6"
STORMWATERFACILITY
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
DEEP CURB SW-13SHEET 1 OF 1
1/2" DIAMETER SMOOTH DOWEL, 24"LONG AT ALL EXPANSION JOINTS ORPER MUNICIPAL STANDARDS
8"
6"
SIDEWALK SECTION PERMUNICIPAL STANDARDS
SIDEWALK
CONSTRUCTION NOTES
DESIGN NOTES
1. SPECIAL DESIGN CONSIDERATION OR STRUCTURAL REVIEW MAY BE REQUIRED FOR LONGER FACILITY EDGE SPANS.STEEL REINFORCEMENT OR ADDITIONAL CONCRETE CHECK DAMS MAY BE NEEDED FOR STABILITY.
2. FINISHED ELEVATION REVEAL - WHERE SIDEWALK CONVEYS SHEET FLOW TO FACILITY, A 1"-2" REVEAL SHOULD BEMAINTAINED BETWEEN SIDEWALK AND FACILITY FINISHED GRADE TO AVOID MULCH OR PLANT BUILDUP FROM BLOCKINGFLOWS.
3. CONCRETE AND EXPANSION JOINTS SHALL MEET THE REQUIREMENTS OF THE MUNICIPALITY.
1. FINISH ALL EXPOSED CONCRETE SURFACES.
PROVIDE 2% SHELF ATPEDESTRIAN INTERFACE
1"-2"MIN. 12"
STORMWATERFACILITY
FINISHED ELEVATION REVEAL,SEE DESIGN NOTE
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
THICKENED EDGE SIDEWALK SW-14SHEET 1 OF 1
6"
MIN. 8"
1/2" DIAMETER SMOOTH DOWEL, 24"LONG AT ALL EXPANSION JOINTSOR PER MUNICIPAL STANDARDS
CONSTRUCTION NOTES
DESIGN NOTES
1. SPECIAL DESIGN CONSIDERATION OR STRUCTURAL REVIEW MAY BE REQUIRED FOR LONGER FACILITY EDGE SPANS.STEEL REINFORCEMENT OR ADDITIONAL CONCRETE CHECK DAMS MAY BE NEEDED FOR STABILITY.
2. EDGE CONDITION WILL VARY FOR PROJECTS. CURB DETAILS MAY BE MODIFIED BY CIVIL AND GEOTECHNICALENGINEERS SUBJECT TO APPROVAL BY CITY ENGINEER.
3. CONCRETE AND EXPANSION JOINTS SHALL MEET THE REQUIREMENTS OF THE MUNICIPALITY.
4. FINISHED ELEVATION REVEAL AT SIDEWALK - WHERE SIDEWALK CONVEYS SHEET FLOW TO FACILITY, A 1"-2" REVEALSHOULD BE MAINTAINED BETWEEN SIDEWALK AND FACILITY FINISHED GRADE TO AVOID MULCH OR PLANT BUILDUPFROM BLOCKING FLOWS AND REDUCE DROP AT PEDESTRIAN INTERFACE.
1. FINISH ALL EXPOSED CONCRETE SURFACES.
SIDEWALK/PARKING SECTIONPER MUNICIPAL STANDARDS(MAY BE USED WITH EXISTINGSURFACE)
PROVIDE 2% SHELF ATPEDESTRIAN INTERFACE
1"-2"
MIN. 12"
FINISHED ELEVATION REVEAL,SEE DESIGN NOTE
STORMWATERFACILITY
SIDEWALK/PARKING
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
FLUSH CURB AT SIDEWALK SW-15SHEET 1 OF 1
DESIGN NOTES
1. WHEEL STOPS MAY BE USED ON NON-FLUSH DESIGNS TO KEEP CARS FROM OVERHANGING BIORETENTION FACILITY.
2. VEHICLE OVERHANG CAN BE USED TO REDUCE IMPERVIOUS PAVEMENT AREA.
3. WHERE VEHICLE OVERHANG IS UTILIZED SELECT LOW GROWING PLANTS THAT WILL TOLERATE SHADING.
PARKING LOT
DEEP CURB
DEEP CURBDETAIL SW-13
STORMWATERFACILITY
PARKING LOT
CURB AND GUTTER
CURB ANDGUTTER
DETAILSW-12
PARKING LOT
STORMWATERFACILITY
FLUSH EDGE/WHEEL STOPS
FLUSH CURBDETAIL SW-15
STORMWATERFACILITY
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
PARKING LOT EDGE OPTIONS SW-16SHEET 1 OF 1
ST
RE
ET
4'-6"AA
STREET 1'-6"
12"-18"
12"C
UR
BC
UR
B
6"
1'-6"
6"
1'-6"
6"
8"
SECTION A-A
BIORETENTION DESIGN NOTES
1. FOR USE WITH STORMWATER FACILITIES WITHFLAT BOTTOMS.
2. PROVIDE SPOT ELEVATIONS ON PLANS (FE, OE,GIE, IE). SEE DETAIL SW-2, SW-2A, SW-4 ORSW-4A.
3. CURB AND WALL DETAILS MAY BE MODIFIED BYCIVIL AND GEOTECHNICAL ENGINEERSSUBJECT TO APPROVAL BY CITY ENGINEER.
4. CURB HEIGHT MAY BE REDUCED TO 4-INCHESWHERE ADJACENT TO A SIDEWALK. SEEDETAILS SW-12 & SW-13.
CONSTRUCTION NOTES
1. AFTER CONSTRUCTION PLACE SAND BAGSAT GUTTER OPENINGS TO KEEP STORMFLOWS FROM ENTERING FACILITY UNTILVEGETATION IS ESTABLISHED.
PLAN VIEW
PERSPECTIVE VIEW
6"
4" THICK CONCRETESPLASH PAD
DEPRESS GUTTER2" AT OPENING,GUTTER INLETELEVATION (GIE)
R=6"
R=3/4" TYP.
4" THICK CONCRETESPLASH PAD ATFACILITY FINISHEDELEVATION
DEPRESS GUTTER2" AT OPENING
R=3/4" TYP.
6"
DEPRESS GUTTER2" AT OPENING,GUTTER INLETELEVATION (GIE)
CURB AND GUTTER,DETAIL SW-12
FINISHEDELEVATION (FE)
4"-6" MIN.
OR WIDER IFNEEDED TOHYDRAULICALLYPASS INFLOW
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
CURB CUT INLET FOR PLANTERS SW-17SHEET 1 OF 1
PLAN VIEW
6"
PERSPECTIVE VIEW
BIORETENTION DESIGN NOTES
1. FOR USE WITH STORMWATER FACILITIESWITH SIDE SLOPES.
2. PROVIDE SPOT ELEVATIONS ON PLANS (FE,OE, GIE, IE). SEE DETAIL SW-1, SW-1A, SW-3OR SW-3A.
3. CURB AND WALL DETAILS MAY BE MODIFIEDBY CIVIL AND GEOTECHNICAL ENGINEERSSUBJECT TO APPROVAL BY CITY ENGINEER.
4. WHERE INLET FLOW VELOCITY IS HIGH,EXTEND COBBLE INTO FACILITY, BUT AVOIDEXCESSIVE USE.
5. CURB HEIGHT MAY BE REDUCED TO 4-INCHESWHERE ADJACENT TO A SIDEWALK. SEEDETAILS SW-12 & SW-13.
1'-6"
1 : 2
SECTION A-A
8"CURB RETURN
CURB RETURN
CONSTRUCTION NOTES
1. AFTER CONSTRUCTION PLACE SAND BAGS ATGUTTER OPENINGS TO KEEP STORM FLOWSFROM ENTERING FACILITY UNTIL VEGETATIONIS ESTABLISHED.
ST
RE
ET
4'-6"A
A
12"-18"
12"
CU
RB
CU
RB
2'-6"
1'-6"
STREET
DEPRESS GUTTER2" AT OPENING
1'-6"
8"
4"
PLACE 6" DEEP 3"-6"ROUNDED, WASHED, COBBLEAT CONCRETE INLET, SEEDESIGN NOTES
2'-0"
COBBLEENERGYDISSIPATION
DEPRESS GUTTER2" AT OPENING,GUTTER INLETELEVATION (GIE)
DEPRESS GUTTER2" AT OPENING,GUTTER INLETELEVATION (GIE)
CURB AND GUTTER,DETAIL SW-12
FINISHEDELEVATION (FE)
STORMWATERFACILITY
OR WIDER IFNEEDED TOHYDRAULICALLYPASS INFLOW
4"-6" MIN.
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
CURB CUT INLET FOR SLOPE SIDEDBIORETENTION SWALE SW-18
SHEET 1 OF 1
AA
ST
RE
ET
6"
1" SHELF
18" GAP
DEPTH PERMANUFACTURER
B
B
INLET CURB
INLET CURB
18" MIN, 24" MAX
SIDEWALKOR PARKING
EGRESS
6"
2%
VARIES
2%
STORMWATER FACILITYFLAT BOTTOM OR
SLOPE SIDED
STORMWATERFACILITY
GU
TT
ER
CU
RB
PLAN VIEW
SECTION B-B
BIORETENTION DESIGN NOTES1. FOR USE WITH STORMWATER FACILITIES WITH SLOPED SIDES OR FLAT BOTTOMS.
2. PROVIDE SPOT ELEVATIONS ON PLANS (FE, OE, GIE, IPE). SEE DETAIL SW-2, SW-2A,SW-4 OR SW-4A.
3. REFER TO MUNICIPAL STANDARD DRAWINGS AND MATCH GUTTER PAN OF ADJACENTCURB AND GUTTER.
4. IF SLOPED SIDES, WHERE INLET FLOW VELOCITY IS HIGH, EXTEND COBBLE INTOFACILITY, BUT AVOID EXCESSIVE USE.
5. BASE MATERIAL FOR CURB, GUTTER, AND SIDEWALK PER MUNICIPAL STANDARDS.
6. GRATE AND FRAME SHALL SUPPORT H-20 LOADING (ALHAMBRA FOUNDRY A-1540/A-1551OR EQUIVALENT).
7. SOLID COVER AND FRAME (ALHAMBRA FOUNDRY A-1430/A-1433 OR EQUIVALENT) MAYBE USED IN PLACE OF GRATE AND FRAME.
SECTION A-A
CONSTRUCTION NOTES
1. AFTER CONSTRUCTION PLACE SANDBAGS AT GUTTER OPENINGS TO KEEPSTORM FLOWS FROM ENTERINGFACILITY UNTIL VEGETATION ISESTABLISHED.
12" TYP.
PLA
NT
ER
WA
LL
24"
2"
GRATE AND FRAME
DEPRESS GUTTER2" AT OPENING(GIE)
ADA COMPLIANTMANUFACTURED STEELGRATE AND FRAME
6" DEPTH OF 3" - 6"ROUNDED, WASHEDCOBBLE SPLASH PAD
BEVEL PLANTER WALL TOTOP OF INLET
INLET CHANNELWALLS GRATE/FRAME
WIDTH PERPLAN BOLT GRATE
IN PLACE
SEE GRATEAND FRAMEDETAILABOVE
WALL PER FACILITYDESIGN
OVERFLOW ELEV.PER FACILITYDESIGN (GOE)
GRATE
1/4" BOLTS,FLUSH
THREAD BOLTINTO FRAME PERMANUFACTURER
TOP OF GRATE =TOP OF CURB
FRAME
MATCH EXIST.CURB/GUTTER
EXPANSIONJOIN EACHSIDE (TYP.)
GUTTERFLOW LINE
COBBLE SPLASH PAD
DEPRESSGUTTER 2",(GIE)
INLET PANELEVATION(IPE)
DEPRESS GUTTER2", (GIE)
INLET PAN ELEVATION(IPE)
CURB ANDGUTTER, DETAILSW-12
SIDEWALK/GRATE FINISHED
ELEVATION(FE)
FLOW
PLA
NT
ER
WA
LL
6"
GU
TT
ER
CU
RB
4"-6" MIN.
18" MIN.
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
INLET WITH GRATE SW-19SHEET 1 OF 1
A
A
2" MIN
FLOW
SPECIFY
SPECIFY
SECTION A-A
BIORETENTION DESIGN NOTES
1. FOR USE WITH STORMWATER FACILITIES WITH SLOPED SIDES.
2. BEST SUITED FOR FACILITIES WITH <= 2% LONGITUDINAL SLOPE.
3. PROVIDE ELEVATIONS AND STATIONING AND/OR DIMENSIONING FOR CHECK DAMS.
4. SPACE CHECK DAMS TO MAXIMIZE PONDING ACROSS ENTIRE CELL.
5. ENSURE THAT CHECK DAM ELEVATIONS DO NOT CAUSE STORMWATER TO OVERFLOW TO SIDEWALK.
CONSTRUCTION NOTES1. DO NOT WORK DURING RAIN OR UNDER WET CONDITIONS.
2. KEEP ALL HEAVY MACHINERY OUTSIDE BIORETENTION AREA LIMITS.
CURB AND GUTTERPER BIORETENTIONWITH SIDESLOPEDETAIL
4" -6" WASHED COBBLE
BIORETENTION SOIL MEDIA(BSM)
TOP OF CHECK DAM
SLOPE 2:1
4" - 6" WASHED COBBLE
SLOPE 2:1
BSM
SIDEWALKSTREET2" MIN
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
GRAVEL CHECK DAM SW-20SHEET 1 OF 1
BIORETENTION DESIGN NOTES
1. FOR USE WITH BIORETENTION PLANTERS OR SLOPED SIDEDSWALES/RAIN GARDENS.
2. FOR CHECK DAMS LONGER THAN 12' SPECIFY REBAR OVERLAPLENGTH.
3. SPACE CHECK DAMS TO MAXIMIZE PONDING ACROSS CELLS.
4. PROVIDE ELEVATIONS AND STATIONING AND/OR DIMENSIONING FORCHECK DAMS.
5. ENSURE THAT CHECK DAM ELEVATIONS DO NOT CAUSESTORMWATER TO OVERFLOW TO SIDEWALK.
6. SHOW PLANTER WALL EMBEDDED IN EXISTING SUBGRADE ORDRAINROCK.
7. PREFERRED DESIGN IS TO CONSTRUCT TOP OF SIDEWALK ATGRADE WITH TOP OF PLANTER WALL TO ALLOW RUNOFF TOSHEETFLOW INTO BIORETENTION PLANTER. IF CURB IS NEEDED, USEALTERNATE DESIGN AND ENSURE TOP OF CONCRETE CHECK DAM ISA MINIMUM OF 1" BELOW BOTTOM OF CURB NOTCH.
CONSTRUCTION NOTES
1. EMBED #3 REBAR 3" INTO CURB AND PLANTERWALL.
2. DO NOT WORK DURING RAIN OR UNDER WETCONDITIONS.
3. KEEP ALL HEAVY MACHINERY OUTSIDEBIORETENTION AREA LIMITS.
SIDEWALK3" (TYP.)
3" (TYP.)
3" 3"EXISTING
SUBGRADE ORROCK STORAGE
3" (TYP.)
SEE CONSTRUCTIONNOTE 2
PLANTER WALL
LAP SPLICE #4 REBAR TO EMBEDDEDREBAR, OVERLAP 12" (SEE DESIGN NOTE2)
CURB AND GUTTER ORPLANTER WALL
BSM 18" MINBSM
6"
6"
TOP OF SIDEWALK
TOP OF PLANTER WALL
#4 REBAR
6" OF 3"-6"ROUNDED,WASHEDCOBBLE
EXISTINGSUBGRADE OR
ROCK STORAGE
FLOW
1" MIN.
SIDEWALK
3" (TYP.)
3" (TYP.)
3" 3"EXISTING
SUBGRADE ORROCK STORAGE
3" (TYP.)
SEE CONSTRUCTIONNOTE 2
PLANTER WALL
LAP SPLICE #4 REBAR TO EMBEDDEDREBAR, OVERLAP 12" (SEE DESIGN NOTE2)
CURB AND GUTTER ORPLANTER WALL
ALTERNATE DESIGN
PREFERRED DESIGN SEE DESIGNNOTE 7
SEE DESIGNNOTE 7
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
CONCRETE CHECK DAM SW-21SHEET 1 OF 1
24"
24 3 4"
9"
BEEHIVE GRATE
17 7/8"
24"x4" REVERSIBLE MANHOLE FRAME
10"
DESIGN NOTES1. PROVIDE GRATE OVERFLOW ELEVATION ON PLANS.
2. TO INCORPORATE FLEXIBILITY INTO DESIGN OVERFLOW ELEVATION OR CORRECT ELEVATION OF AN EXISTING STRUCTURE,INSTALL OVERFLOW COLLAR, PER DETAIL SW-22A.
3. IN PRIVATE SITES NOT IN CITY R/W THE PROJECT CIVIL ENGINEER MAY PROPOSE ALTERNATIVES FOR GRATE INSTALLATIONSUSING ALTERNATIVE MANUFACTURER'S PRODUCT/CONFIGURATION.
CONSTRUCTION NOTES1. DO NOT ADJUST OVERFLOW GRATE ELEVATION, CONSTRUCT AS SHOWN ON PLANS.
SLOPE TO DRAIN
WIRE ROPE
SPECIFY GRATE OVERFLOWELEVATION TO ACHIEVEDESIGN PONDING DEPTH (GOE)
ADJACENT STORMWATERFACILITY PLANTINGSURFACE
#4 REBAR U-BOLT
CONNECT TO APPROVEDDISCHARGE POINT
2500 PSI COMMERCIALGRADE CONCRETE
BEEHIVE GRATE, SEE BELOW
MANHOLE FRAME, SEE BELOW
EPOXY MANHOLE FRAME TO STD.REINF. CONC. PIPE CLASS III
MANHOLE RING AND BEEHIVE GRATE MH25BH BYOLYMPIC FOUNDRY OR APPROVED EQUAL
GROUT PIPE AT BASE
STD. REINF. CONC. PIPE CLASS III
PRECAST OR POURED IN PLACE6" MIN. DEPTH
19 3/4"19"
17 7/8"
19"
25 3/8"
3"1/2" 3/4"
PONDINGDEPTH
GROUT AT CONNECTION
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
OVERFLOW STRUCTURE WITHBEEHIVE GRATE SW-22
SHEET 1 OF 1
DESIGN NOTES1. MAY BE USED IN CONJUNCTION WITH OVERFLOW STRUCTURES TO ALLOW FOR FIELD ADJUSTMENT OF
OVERFLOW ELEVATION, OR AS RETROFIT TO CORRECT EXISTING STRUCTURE THAT DOES NOT ALLOWPONDING TO OCCUR.
2. PROVIDE COLLAR OVERFLOW ELEVATION (COE) ON PLANS.
3. PCC PIPE RISER EXTENSIONS MAY BE UTILIZED IN LIEU OF OVER FLOW STRUCTURE COLLAR.
CONSTRUCTION NOTES
1. CENTER COLLAR ON OVERFLOW GRATE.
SPECIFY COLLAR OVERFLOWELEVATION TO ACHIEVE DESIGNPONDING DEPTH (COE)
ADJACENT STORMWATERFACILITY PLANTINGSURFACE
OVERFLOW STRUCTURE
2"-5"
MIN. 10"
30" OR 36" DIA. STEEL OR RIGIDPLASTIC PIPE COLLAR, OR DIA. ASNEEDED TO SURROUND EXISTINGOVERFLOW STRUCTURE FORRETROFITS
BACKFILL WITH CALTRANS CLASS2 OR 3 PERMEABLE
PONDING DEPTH VARIES
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
OVERFLOW STRUCTURE COLLAR SW-22ASHEET 1 OF 1
C.I. GRATE
C.I. FRAME
EXTENSION
BOTTOM
DESIGN NOTES
1. PROVIDE GRATE OVERFLOW ELEVATION ON PLANS.
2. PROVIDE EXTENSION OVERFLOW ELEVATION (COE) ON PLANS.
3. ON PRIVATE SITES NOT IN CITY RIGHT-OF-WAY THE PROJECT CIVIL ENGINEER MAY PROPOSEALTERNATIVES FOR GRATE INSTALLATIONS USING ALTERNATIVE MANUFACTURER'SPRODUCTION/CONFIGURATION.
CONSTRUCTION NOTES
1. DO NOT ADJUST OVERFLOW GRATE ELEVATION, CONSTRUCT AS SHOWN ON PLANS.
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
OVERFLOW STRUCTURE WITHSQUARE GRATE SW-23
SHEET 1 OF 1
HDPE ORPVC 30MILLINER
1/8" MIN ALUMINUM FLATBAR, 2" WIDTH
2" x 1/4" HIT ANCHOR 12"O.C.
TRIM LINER TO TOP EDGE OF FLAT BAR. SILICONESEAL TOP EDGE OF FLAT BAR. TOP OF LINER TO BE3" BELOW SOIL LEVEL.
ADJACENTCURB ORPLANTER
WALL
DEPTH OF LINER PERCIVIL/GEOTECHNICALENGINEER
BIORETENTIONFACILITY
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
IMPERMEABLE LINER CONNECTION SW-24SHEET 1 OF 1
WASHED 4" ASTM NO. 57 BASE ORSIMILAR CRUSHED AGGREGATE OVERASTM NO. 2, 3, OR 4 AGGREGATESUBBASE - THICKNESS VARIES WITHWATER STORAGE AND TRAFFIC.
PAVERS WITH (MAX 12" WIDE) OPEN SURFACESPACES. FILL WITH WASHED ASTM NO. 8, 89
OR 9 AGGREGATE (NOTE 6)
POROUS ASPHALT: USE WASHED 1" -2" CHOKE LAYER OF WASHED NO. 57AGGREGATE OVER ASTM NO. 2, 3 OR4 AGGREGATE - THICKNESS VARIESWITH WATER STORAGE AND TRAFFICLOADS.
PERVIOUS CONCRETE: USE WASHEDASTM NO. 57 AGGREGATE -THICKNESS VARIES WITH WATERSTORAGE AND TRAFFIC LOADS.
SUBGRADE, SEE DESIGNREQUIREMENTS FORCOMPACTION INFORMATION
GEOTEXTILE IF SPECIFIED
POROUS ASPHALT OR PERVIOUSCONCRETE
SUBGRADE, SEE DESIGNREQUIREMENTS FORCOMPACTION INFORMATION
GEOTEXTILE IF SPECIFIED
RESIDENTIALDRIVEWAY
ORPEDESTRIAN
ONLY
PRIVATESTREET,PARKING
LOT
PUBLICSTREETOR FIRE
LANE
PERVIOUSCONCRETE
POROUSASPHALT
PERMEABLEINTERLOCKINGPAVERS
ENGINEERINGREQ'D
COMPACTIONREQ'D
4"
3"
2 3 8"
NO
NO YES
YES
3 18"
4"
6"
95%
YES
3 18"
6"
8"
NOTES:
1. UNDERDRAIN TO REMOVE WATER THATCANNOT BE INFILTRATED WITHIN 72 HOURS.
2. DESIGNS PROVIDED SHALL BE SIGNED &STAMPED BY A GEOTECHNICAL &/OR CIVILENGINEER REGISTERED IN THE STATE OFCALIFORNIA.
3. GEOTEXTILE USE AND SELECTION MAY BEDETERMINED BY A GEOTECHNICAL ENGINEERPER AASHTO M-288.
4. UNDERDRAIN AND ORIFICE CONFIGURATIONSHALL BE BASED ON ENGINEERED DESIGN.
EDGE RESTRAINTAS SHOWN ON PLANS
EDGE RESTRAINTAS SHOWN ON PLANS
1 12" TO 2" ASTM NO. 8 BEDDINGLAYER
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
PERVIOUS PAVEMENT SW-25SHEET 1 OF 1
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
PLANTING INUNDATION ZONES
SHEET 1 OF 4
DESIGNED BY:
DRAWN BY:
CHECKED BY:
TITLE:
DEPARTMENT OF PUBLIC WORKS
IMPE`RIAL BEACH
STANDARD PLAN
CITY ENGINEER:
DATE:APPROVED:
ZONE A LID RECOMMENDED PLANT LIST
SW-26SHEET 2 OF 6
DESIGNED BY:
DRAWN BY:
CHECKED BY:
TITLE:
DEPARTMENT OF PUBLIC WORKS
IMPE`RIAL BEACH
STANDARD PLAN
CITY ENGINEER:
DATE:APPROVED:
ZONE A LID RECOMMENDED PLANT LIST
SW-26SHEET 3 OF 6
DESIGNED BY:
DRAWN BY:
CHECKED BY:
TITLE:
DEPARTMENT OF PUBLIC WORKS
IMPE`RIAL BEACH
STANDARD PLAN
CITY ENGINEER:
DATE:APPROVED:
ZONE A LID RECOMMENDED PLANT LIST
SW-26SHEET 4 OF 6
DESIGNED BY:
DRAWN BY:
CHECKED BY:
TITLE:
DEPARTMENT OF PUBLIC WORKS
IMPE`RIAL BEACH
STANDARD PLAN
CITY ENGINEER:
DATE:APPROVED:
ZONE A LID RECOMMENDED PLANT LIST
SW-26SHEET 5 OF 6
DESIGNED BY:
DRAWN BY:
CHECKED BY:
TITLE:
DEPARTMENT OF PUBLIC WORKS
IMPE`RIAL BEACH
STANDARD PLAN
CITY ENGINEER:
DATE:APPROVED:
ZONE A LID RECOMMENDED PLANT LIST
SW-26SHEET 6 OF 6
VARIES
BIORETENTIONSOIL MEDIA
(18" MIN)
6"
SIDEWALKSTREET
4
3
710
11
13
8
14
12
6
5
15
2
12" MIN
1
EXISTINGSUBGRADE
INFILTRATION WELL
24
16
23
9 SIDEWALKINLET ELEV.(SIE):
OVERFLOWSTRUCTURE
ELEV. (OE)
17
18 19 20
21
CLAY
MIN. 10ft abovegroundwater
SIDEWALK
16
22
10
8
15
CURB
CLAY
28
22
27
SIDEWALK
EXISTING STORM DRAIN EXISTING STORM DRAIN
31
TO STORMDRAIN
TO STORM DRAIN(if needed)
26
25
29
30
21
3:1 MAX
3:1 MAX
SEE PAGE 2 FOR CALL OUT SPECIFICATIONS AND DESIGNNOTES
6" MIN./ 12" MAX.PONDING DEPTH
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
DRYWELL STORMWATER BMP
SHEET 1 OF 2
SPECIFICATIONS1. 12” DEEP OPEN GRADED WASHED STONE (TYPICALLY 3/4” TO 1-1/2” (ASTM #4 STONE) OR 1” TO 2” (ASTM #3 STONE).2. BRIDGING LAYER(S) PER LIDI BIORETENTION TECHNICAL SPECIFICATIONS (BTS). DO NOT USE FILTER FABRIC BETWEEN BSM AND AGGREGATE. DO NOT USE
FILTER FABRIC BETWEEN BIOFILTER SOIL MATERIAL (BSM) AND AGGREGATE.3. 30 ML LINER MAY BE REQUIRED TO AVOID LATERAL INFILTRATION BELOW STREET; SUBJECT TO GEOTECHNICAL RECOMMENDATIONS.4. MAINTAIN 6” MINIMUM BENCH OF NATIVE SOIL FOR SUPPORT OF ADJACENT SIDEWALK/ROAD (TYPICAL).5. CURB AND GUTTER DETAIL SW-12.6. CURB INLET DETAIL SW-17, GUTTER INLET ELEV (GIE). LOCATE ENERGY DISSIPATION COBBLE PADS AS SPECIFIED IN INLET DETAILS.7. OVERFLOW STRUCTURE REQUIRED FOR IN-LINE SYSTEMS WITHOUT OVERFLOW BYPASS, DETAIL SW-22, SW-22A, and SW-23.8. MAINTENANCE PIPES - 4” MIN. DIA. VERTICAL PVC PIPES CONNECTED TO UNDERDRAIN. PLACED AT START AND 3 FEET BEFORE END OF UNDERDRAIN.
REQUIRES DIRECTIONAL SWEEP BEND. THREADED AND CAPPED9. VEGETATION - PLANT SELECTION AND MULCH (OPTIONAL) PER BIORETENTION TECHNICAL SPECIFICATIONS.10. 4” MIN. EXPOSED WALL HEIGHT11. SIDEWALK DRAINAGE NOTCH 1” LOWER THAN SIDEWALK, SLOPED TO FACILITY12. SEE PLANS FOR SIDEWALK RESTORATION13. DEEP CURB DETAIL SW-1314. BIORETENTION SOIL MEDIA (BSM). SPECIFICATION PER BIORETENTION TECHNICAL SPECIFICATIONS (BTS). SPECIFICATION SHOULD AVOID COMPOST OR
OTHER MATERIAL KNOWN TO LEACH NUTRIENTS.15. UNDERDRAIN, MIN. 4” DIA. PVC SDR 35 PERFORATED PIPE OR LARGER AS NEEDED TO CONVEY PEAK TREATED FLOWRATE WITH MINIMAL HEAD LOSS, SEE
CONSTRUCTION NOTES.16. 8” INLET PIPE OR OTHER.17. LOW FLOW ORIFICE. (SEE DESIGN NOTE 11).18. STABILIZED BACKFILL - TWO-SACK SLURRY MIX.19. SIDEWALK PER MUNICIPAL STANDARDS.20. COMPACTED BASE MATERIAL.21. ACCESS HATCH WITH SHUT OF VALVE SWITCH. CONNECTED TO SHUT OF VALVE IN INLET PIPE.22. MAINTENANCE HOLE COS TYPE 204-204 MH A OR B. ¾” I.D. MIN OBSERVATION PORT.23. MANHOLE CONE - MODIFIED FLAT BOTTOM.24. EXISTING SOILS. (SEE CONSTRUCTION NOTE 4, 8).25. COMPACTED BACKFILL26. PRE-CAST OR INSITU CAST CONTROL VAULT (SEE DESIGN NOTE 8)27. ROCK - WASHED, SIZED BETWEEN 3/8” AND 1-1/2"28. PERFORATED BASE OF CONTROL VAULT29. DRILLED SHAFT WITH 6” WELDED STEEL OR THREADED PVC CASING (SEE DESIGN NOTE 13 & CONSTRUCTION NOTE 7,8)30. 6 - 8” O.D. WELDED WIRE STAINLESS STEEL WELL SCREEN OR THREADED PVC SLOTTED SCREEN. SCREEN LENGTH + LENGTH + SLOT WIDTH TO BE
DETERMINED IN ACCORDANCE WITH LOCAL CONSTRAINTS .I.E. DISTANCE BETWEEN CLAY LAYER AND MIN. 10FT ABOVE SEASONAL HIGH GROUNDWATERLEVEL
31. PVC STORMDRAIN CONNECTOR PIPE. SAME DIAMETER AS INFLOW PIPE TO CONTROL VAULT.
DESIGN NOTES1. ADDITIONAL DESIGN GUIDANCE FOR BIOFILTRATION SYSTEM PROVIDED IN LIDI BIORETENTION TECHNICAL SPECIFICATIONS (BTS) DOCUMENT.2. BOTTOM WIDTH - PROVIDE 2 FT MINIMUM FLAT BREGENALL3. BOTTOM WITH A MAX 3:1 SLOPE FOR SURFACE FINISHING WITHIN BIOFILTRATION SYSTEM4. IF CALTRANS CLASS 2 PERMEABLE IS NOT AVAILABLE, SUBSTITUTE CLASS 3 PERMEABLE WITH AN OVERLYING 3” DEEP LAYER OF ¾” (NO. 4) OPEN-GRADED
AGGREGATE.5. PROVIDE SPOT ELEVATIONS AT INLETS ON CIVIL PLANS (FE, OE, GIE, SIE). SEE DETAIL SW-17.6. EDGE CONDITION WILL VARY FOR NEW AND RETROFIT PROJECTS. CURB, WALL, AND SIDEWALK DETAILS MAY BE MODIFIED FOR PROJECT BY CIVIL AND
GEOTECHNICAL ENGINEERS.7. PROVIDE MONITORING WELL IN EACH FACILITY, PER BIORETENTION TECHNICAL SPECIFICATIONS.8. LONGITUDINAL SLOPE 6% WITH CHECK DAMS.9. IF CHECK DAMS ARE NEEDED, SEE CONCRETE CHECK DAM DETAIL SW-18.10. VARIATIONS IN DRY WELL DESIGN SHOULD BE MADE TO ACCOMMODATE STORAGE VOLUME DESIGN AND TO SUIT LOCAL CONDITIONS AND
CONSTRAINTS.11. IN AREAS WITHOUT A STORMDRAIN, THE SYSTEM SHOULD ONLY BE CONSTRUCTED WHERE THE MAINTENANCE HOLE SURFACE INVERT IS ABOVE THE
BIOFILTER OVERFLOW ELEVATION.12. ALTERNATIVE VAULT LOCATIONS POSSIBLE INCLUDING WITHIN THE BIOFILTER FOOTPRINT.13. VALVE CAN BE MOVED TO THE BIOFILTER IF DESIRED. REQUIRES STRUCTURAL SUPPORT.14. ALTERNATIVE PRODUCTS SUCH AS VENDOR-SUPPLIED DRY WELL PRODUCTS MAY BE USED AS A SUBSTITUTE PROVIDED THAT THE ALTERNATIVE PRODUCT
IS EQUAL.15. THIS DESIGN IS LIKELY TO QUALIFY AS A CLASS V WELL SUBJECT TO REGISTRATION WITH THE USEPA.
LOW IMPACT DEVELOPMENT STORMWATER MANAGEMENT STANDARD DETAILS
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORK CONSTRUCTION
VERSION:
STANDARD PLAN NO.
08/31/2017
APPROVED BY:
DEVELOPED UNDER PROP. 84 GRANT
DRYWELL STORMWATER BMP
SHEET 2 OF 2
Version: 5/16/17
page 1/5
Low Impact Development Initiative (LIDI) Bioretention Technical Specifications
The following technical information is for use in conjunction with the complete set of bioretention area standard details developed by the LIDI for use in the Central Coast region and throughout California. Central Coast region-specific requirements are noted where applicable.
Facility Design/Dimensions
Bioretention facilities should be sized to retain and/or treat the water quality design flow and/or volume in accordance with the stormwater permit requirements that apply to the local jurisdiction and appropriate local, countywide, and/or statewide (CASQA) guidance documents. Design parameters specified in stormwater permits will determine the surface area and storage volume required within the facility.
Bottom width – facilities should have flat bottoms and sufficient width for ease of constructability and maintenance. – Provide 2’ wide minimum for facilities with side slopes and planters
(facilities with vertical side walls).
Allowable standing water duration – generally 48 to 72 hours Allowable ponding time is typically associated with mosquito vector control or perceived nuisance flooding and varies by location.
Ponding depth - Min. 6", max. 12". The depth is measured from the surface of the bioretention soil media and not adjusted for application of mulch.
Planter depth – (from adjacent pedestrian walking surface to facility finished elevation/planting surface) is based on desired ponding plus freeboard, but also relates to planter width. Planters can be deeper if they are wider, and need to be shallower as they narrow. This is a pedestrian perception and safety issue. Some recommended width to depth guidelines are as follows (allowable depths and appropriate edge treatments may be specified by the local jurisdiction and may be determined by ADA requirements):
PLANTER WIDTH
MAX. PLANTER
DEPTH > 5’ 16”
4’ – 5’ 12” 3’ – 4’ 10” 2’ – 3’ 8”
Version: 5/16/17
page 2/5
Slope/grades
– Side slope - 4:1 preferred • Max. 3:1 allowed with min. 12" wide shoulder (2% slope toward
facility) adjacent to pedestrian use or curb.
– Longitudinal slope – Facility should be relatively flat (i.e., maximum of 2% longitudinal slope of bottom) so that water ponds and infiltrates evenly across the facility surface. • If installed on a slope, facilities should be terraced and separated
by check dams and weir overflows to provide flat-bottomed cells with proper storage and infiltration.
• Installation not recommended on slopes > 8%.
– Grades on opposite sides within a facility should be similar to optimize ponding across the entire basin/cell.
Hard Infrastructure
Inlet curb cut design selection should be based on application considerations:
– Sloped sided or planter facility – Curb and gutter adjacent to facility or separated by pedestrian sidewalk
Curb cut width – 12”-18” minimum, with rounded edges, depress gutter 2” at opening (see SW-14, SW-15, SW-16)
Sidewalk edge type selection should be based on application considerations:
– New or retrofit – Sloped sided or planter box
Sidewalk wall - planter box requires 4” min. height wall adjacent to sidewalk for pedestrian safety.
Sidewalk wall drainage notch – when sidewalk drains to planter, provide 4”-6” wide notch openings in wall, opening 1” below sidewalk, slope to facility. Space openings to convey flows.
– Provide minimum 2” cover between notch and structural dowels in curbs/walls.
Energy dissipation – provide aggregate or concrete splash pads at inlets per inlet details.
– For aggregate: 6” depth, 3" – 6" rounded, washed cobble – For sloped sided facilities where inlet flow velocity is high, extend cobble
into facility, but avoid excessive or decorative use.
Where impermeable liner is included between facility and adjacent
Version: 5/16/17
page 3/5
infrastructure (street, parking lot), use 30 ML HDPE or PVC material, see Impermeable Liner detail.
Check dams – provide for facilities installed on slope
– Per check dam details SW-17 and SW-18 – Check dams should be placed for every 4-6” of elevation change and so
that the top of each dam is at least as high as the toe of the next upstream dam.
Overflow structure – required for on-line systems without an overflow bypass
– Per overflow structure details SW-19, SW-20 – Connect to approved discharge point or another downstream bioretention
area. Provide observation well in facility if required
– Upright 6 inch rigid PVC (SDR 40 or equivalent) pipe, perforated for the section extending through the depth of the bioretention soil media (and aggregate layer if included), extending 6 inches above the top of soil elevation, with a threaded cap.
– Locate to avoid damage from maintenance activities. Facility Media (soil, aggregate, mulch)
Aggregate layer – where an aggregate layer is included in the design (underdrain design or optional use based on project requirements, depth based on sizing calculations), specify “CalTrans Class 2 Permeable.”
– CalTrans Class 2 Permeable does not require an aggregate filter course between the aggregate storage layer and the bioretention soil media above.
– When CalTrans Class 2 Permeable is not available, substitute CalTrans Class 3 Permeable.
• Class 3 Permeable requires an overlying 3” deep layer of ¾” (No. 4) open graded aggregate (between Class 3 and bioretention soil media above).
– Filter fabric - do NOT use fabric between bioretention soil media and aggregate layer
Bioretention soil media (BSM) - use local jurisdiction approved/recommended BSM (e.g. Bay Area Stormwater Management Agencies Association (BASMAA) Regional Biotreatment Soil Specification (revised January 29, 2016)1.
1 http://www.waterboards.ca.gov/sanfranciscobay/water_issues/programs/stormwater/MRP/provisionC.3/Revised_%20Biotreatment%
Version: 5/16/17
page 4/5
– Using a performance specification for alternative bioretention soil mix is not recommended (but may be allowed by the local jurisdiction).
– A pre-mixed bioretention soil media is preferable to mixing soil on-site. BSM depth – 18” minimum depth; 24” recommended, or as required by the
local jurisdiction. 24” depth required in the Central Coast Region for facilities with underdrains. – Where trees are specified, increase BSM depth in tree planting
locations, per arborist’s or landscape architects direction, or allow trees access to sufficient volume of native soil.
• Tree planting in bioretention - see BASMAA Literature Review - Bioretention Design for Tree Health (September 15, 2016)2
Bioretention soil media placement and compaction – place BSM in 6” lifts. Compact each lift with a landscape roller or by lightly wetting. Allow BSM to dry overnight before planting.
Mulch depth – 2” – 3” (3” recommended and required by State Model Water Efficiency Landscape Ordinance) – Do not apply mulch in ponding zone just prior to or during rainy season. – When mulch is used, excavation must allow for specified bioretention soil
depth to achieve finished elevations as shown on civil plans
Mulch type - when used in ponding zone, must be aged, stabilized, non-floating mulch, such as a specified composted wood mulch. Gravel mulch may also be used when high flow velocities through the system are expected.
Landscape (planting and irrigation)
Irrigation - Provide irrigation for plant establishment (2-3 years), and supplemental irrigation during periods of prolonged drought.
– Provide separate zone for connection to water supply Planting - see LIDI plant guidance for bioretention areas technical
assistance memo (TAM) or use bioretention plant list in other local or countywide guidance document.
– Landscape Architects who have not previously designed bioretention systems should use plants from the LIDI TAM or other approved plant list. Landscape Architects with experience designing for bioretention may use additional plant species consistent with the above lists and
20_Soil.pdf 2 www.basmaa.org
Version: 5/16/17
page 5/5
appropriate for the facility design and local conditions.
– Do not locate plants at inlets. Consider mature growth to determine planting layout and avoid future blockage of inlets by plants.
– Trees located on slopes should be 5’ minimum from inlets to avoid erosion of soil at root ball.
Underdrain Design
Aggregate layer depth – 12” minimum depth.
Underdrain – use 4” diameter, PVC SDR 35 perforated pipe.
– Install underdrain with holes facing down. – Underdrain discharge elevation should be near top of aggregate layer if
facility is allowed to infiltrate into native soil. – Underdrain slope may be flat or have a slight slope. – Connect underdrain to approved discharge point. – Provide capped, threaded PVC cleanout for underdrain, 4" min. dia. with
sweep bend. – Do NOT wrap underdrain with filter fabric.