Case Study: Redhook Brewery Portsmouth, NH Anaerobic Digestion and Biogas Reuse Presented by: Alex Ramsey, Tietjen Hynes, Operations Project Engineer

Case Study: Redhook Brewery

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

CaseStudy:RedhookBreweryPortsmouth,NH

AnaerobicDigestionandBiogasReusePresentedby:AlexRamsey,TietjenHynes,Operations

ProjectEngineer

RedhookBreweryRedhookwasfoundedinSeattle,WAin1981.

Redhookexpandedfromaformertransmissionshoptoanoldtrolleybarn,thenin1994toacustombuilt220,000barrelbreweryintheSeattlesuburbs.

In1996,RedhookexpandedtotheEastCoastwithanewbrewerybuiltwiththesameplansinPortsmouthNH.

CraftBrewAllianceIn2008,RedhookmergedwithrivalWidmerBrothersBrewingfromPortland,ORtobecometheCraftBrewAlliance(CBA).

CBAaddedKonaBrewingCompanytothefamilyin2012,followedbythelaunchofOmissionandSquareMileCider,andpartnershipswithAppalachianMountainBrewing,CiscoBrewing,andWynwoodBrewingfollowed.

OriginalDesignParameters(1996)•  Averageof72,000gpdofwastewater.•  CODconcentrationsaveragearound8,000mg/L,

althoughtheycanreachdoublethat.•  Incomingsolidsaverage1,300mg/Lafter

screening.•  Additionally,thewastewaterpHfluctuates

significantlyfromthecleaningchemicalsinusethroughoutthefacility.

•  Thetemperatureofthewastewatercanalsobevariable,althoughgenerallywithintherequirementsofconventionalwastewatertreatment.

•  Wastewaterisonlygenerated4daysperweek.

Beer

CleaningChemicals

SpentGrain

Hops

Yeast

WastewaterTreatmentPlantAsOriginallyConstructed,1996

1996Installation

InfluentScreen

Pre-assembledanaerobicreactor.

Installedanaerobicconditioningtankandreactor.

Veolia’sBiothaneanaerobictechnologiesAnaerobicGranularSystems

Biobed®AdvancedEGSB

0

500

1000

1500

2000

2500

3000

3500

4000

9/23

/199

6 3/

24/1

997

9/22

/199

7 3/

23/1

998

9/21

/199

8 3/

22/1

999

9/20

/199

9 3/

20/2

000

9/18

/200

0 3/

19/2

001

9/17

/200

1 3/

18/2

002

9/16

/200

2 3/

17/2

003

9/15

/200

3 3/

15/2

004

9/13

/200

4 3/

14/2

005

9/12

/200

5 3/

13/2

006

9/11

/200

6 3/

12/2

007

9/10

/200

7 3/

10/2

008

9/8/

2008

3/

9/20

09

9/7/

2009

3/

8/20

10

9/6/

2010

3/

7/20

11

9/5/

2011

3/

5/20

12

11/1

2/20

12

5/13

/201

3 11

/11/

2013

5/

12/2

014

11/1

0/20

14

5/11

/201

5 11

/9/2

015

5/9/

2016

11

/7/2

016

5/8/

2017

11

/6/2

017

5/7/

2018

11

/5/2

018

Tota

l Sus

pend

ed S

olid

s (T

SS),

mg/

L

DATE Week Starting

REDHOOK Weekly Average TSS

TSS in TSS eff

TSSEffluentLimit

HighrateanaerobictreatmentsystemisnotdesignedforTSSremoval

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000

9/23

/199

6 3/

23/1

997

9/23

/199

7 3/

23/1

998

9/23

/199

8 3/

23/1

999

9/23

/199

9 3/

23/2

000

9/23

/200

0 3/

23/2

001

9/23

/200

1 3/

23/2

002

9/23

/200

2 3/

23/2

003

9/23

/200

3 3/

23/2

004

9/23

/200

4 3/

23/2

005

9/23

/200

5 3/

23/2

006

9/23

/200

6 3/

23/2

007

9/23

/200

7 3/

23/2

008

9/23

/200

8 3/

23/2

009

9/23

/200

9 3/

23/2

010

9/23

/201

0 3/

23/2

011

9/23

/201

1 3/

23/2

012

9/23

/201

2 3/

23/2

013

9/23

/201

3 3/

23/2

014

9/23

/201

4 3/

23/2

015

9/23

/201

5 3/

23/2

016

9/23

/201

6 3/

23/2

017

9/23

/201

7 3/

23/2

018

9/23

/201

8

TCO

D (m

g/l)

Date (week starting)

Redhook Weekly Average TCOD

TCOD in TCOD eff

0

10

20

30

40

50

60

70

80

90

100

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000

9/23

/199

6 3/

23/1

997

9/23

/199

7 3/

23/1

998

9/23

/199

8 3/

23/1

999

9/23

/199

9 3/

23/2

000

9/23

/200

0 3/

23/2

001

9/23

/200

1 3/

23/2

002

9/23

/200

2 3/

23/2

003

9/23

/200

3 3/

23/2

004

9/23

/200

4 3/

23/2

005

9/23

/200

5 3/

23/2

006

9/23

/200

6 3/

23/2

007

9/23

/200

7 3/

23/2

008

9/23

/200

8 3/

23/2

009

9/23

/200

9 3/

23/2

010

9/23

/201

0 3/

23/2

011

9/23

/201

1 3/

23/2

012

9/23

/201

2 3/

23/2

013

9/23

/201

3 3/

23/2

014

9/23

/201

4 3/

23/2

015

9/23

/201

5 3/

23/2

016

9/23

/201

6 3/

23/2

017

9/23

/201

7

TCO

D R

educ

tion

(%)

TCO

D (m

g/l)

Date (week starting)

Redhook Weekly Average TCOD

TCOD in TCOD eff TCOD red.

Loadingin2004-2006wasgreaterthanoriginaldesignbasisofanaerobicsystem.

REDHOOKDaily TCOD Loading

0

1000

2000

3000

4000

5000

6000

7000

10/1

/200

4

11/1

/200

4

12/1

/200

4

1/1/

2005

2/1/

2005

3/1/

2005

4/1/

2005

5/1/

2005

6/1/

2005

7/1/

2005

8/1/

2005

9/1/

2005

10/1

/200

5

11/1

/200

5

12/1

/200

5

1/1/

2006

2/1/

2006

3/1/

2006

4/1/

2006

5/1/

2006

6/1/

2006

7/1/

2006

8/1/

2006

9/1/

2006

10/1

/200

6

11/1

/200

6

12/1

/200

6

Date

TCO

D L

oad

(kgT

CO

D/d

)

TCOD in Design Max Inf TCOD Load/Rx

Loadingin2004-2006wasgreaterthanoriginaldesignbasisofanaerobicsystem.ThekeydesignparameterforananaerobicsystemisVolumetricLoadingRate.

REDHOOKDaily Volumetric Loading Rate

0.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00

10/1

/200

4

11/1

/200

4

12/1

/200

4

1/1/

2005

2/1/

2005

3/1/

2005

4/1/

2005

5/1/

2005

6/1/

2005

7/1/

2005

8/1/

2005

9/1/

2005

10/1

/200

5

11/1

/200

5

12/1

/200

5

1/1/

2006

2/1/

2006

3/1/

2006

4/1/

2006

5/1/

2006

6/1/

2006

7/1/

2006

8/1/

2006

9/1/

2006

10/1

/200

6

11/1

/200

6

12/1

/200

6

Date

Volu

met

ric L

oad

(kgT

CO

D/m

3/d)

Vol. Load t Design Max Vol. Load/Rx

WastewaterTreatmentPlant-AsUpgraded2007

12

1.  80,000gallonsofequalization(2tanks)added.Abletosegregateconcentratedflows.

2.  Secondanaerobicreactoradded.TCODreductionhasaveraged81%andSCODreductionhasaveraged92%sincestartup

2007UpgradeInstallationEqualization

TanksConditioning

TankAnaerobicReactors

MechanicalProcessControl

•  Parametersdirectlyinourcontrol:– pH-additionofNaOHorH2SO4

– Flowratetoreactors– Temperature

•  Parametersoutsideourcontrol:–  Influentconcentration– Flowratetotreatmentplant–  Incomingsolidsloading– Chemicaldumping

ProcessControlOtherControlStrategies•  Improvedtesting•  Improvednotification•  Behavioralcontrolsinbrewery•  Communication

BehavioralProcessControls

•  Recipechanges,partnerbrews,andincreasedeffortstoconservebeerandwaterallincreaseoursolidsratio.

•  Makesurewastewaterisinvolvedinallhighlevelconversations.

•  Attempttoharvestsolidsbeforetheygodownthedrainusingsolidstotes,diaphragmpumps,andincreasedlabor

TreatmentPlantPerformance

•  SystemisexcellentatremovingsolubleCOD(SCOD)–average92%removal.BODremovalaverage89%.

•  TotalCOD(TCOD)reductionislowerduetoTSSineffluent–average81%removal

•  Systemisstillnotdesignedtoremovesolids–averageTSSremoval27%.

Evolutionofflowandloadingtoplant

Upgradeof

System

MethaneGeneration140,000CFMofbiogasproducedeachweek,onaverage.Biogasproductionextremelydependentonorganicloading,breweryproductionschedule.90kWgeneratorselectedwithICengineforoptimalturn-down.

ResourceRecovery

CogenerationSystem

Biogasanalysisindicatedupto320ppmofH2Sinthegasstream.Redhookbiogasrangedfrom68-78%methane,dependingonthefeedstockquality.Redhookselecteda90kWgeneratorwithsulfurremoval(activatedcarbon)forbiogasreuse.

CogenerationSystemLiebherr4-cylinderderatednaturalgasengineLeroy-Somer90kWgeneratorset.Dualfuelsystempoweredbyeitherbiogasornaturalgas.Blowertobringlowpressuregasupfrom26mBarto50forcombustion.PackagedsystemwithcontrolsprovidedbyTech3

HeatRecovery

PermitChallenges

•  CityofPortsmouth:(2weeks)•  Foundation•  Plumbing•  Electrical•  Fire

•  State:(2months)•  NHDESrequiredamendedAirResourcespermitbecausesystemispart

ofthePollutionControlsystem.•  CompliancewithTierIIIemissionsismandateddespiteoutput<100kW

•  Other:(10months)Eversource,theelectricalutility,requiredfullInterconnectionStudyandpermitting.BecausetheydidnothaveanyprecertifiedUtilityProtectiveRelaysavailableforsynchronousgenerators,hadtohaveBaslerRelaystudied.

OperatingChallenges

0

50000

100000

150000

200000

250000

Total

kWH

YTD

SumofAvailablekWHSumofkWHGeneratedSumofTargetkWH(2017)

Earlyproblemswith:•  Automaticgeneratorcontrols

•  Start/stopcontrolbasedontightbiogaspressurerange

•  Analogcontrolofgeneratorrunratebasedonfuelavailability.

•  Faultresetforgeneratorshutdown.•  Warrantyrepairissues

•  Oilpressure•  Jacketwaterpressure•  Turbocharger

•  ConflictbetweenTSSreductionprogramandbiogasgeneration.

Questions?