1
RPC Pipe Systems Pty Ltd 11 Christie Road, Lonsdale SA 5160 PO Box 246, Lonsdale SA 5160 T +61 8 8329 1111 F +61 8 8329 1122 www.rpcpipesystems.com case study: Culvert Reline project: client: location: product: manufacture & supply: value: year of project: description: Macline and Cowra Reline ITS Trenchless Western Australia Flowtite GRP Piping 676m DN1200—DN3000, PN6 SN10000 in 6m lengths, REKA Rubber Ring Jointed $750,000—$1,000,000 2011 The steel culverts under a privately owned railway line were failing due to corrosion. Flowtite GRP with its inherent corrosion resistance and high inte- gral stiffness was a quick and lightweight solution to the problem and provides a service life of 100 years +. The GRP lengths were slip lined into the existing steel culvert and grouted structurally into place providing a total stiffness (ability to handle traffic loading) above that required in the original install. An unique feature of Flowtite GRP, was during transportation to site, the various sizes were ‘nested’ inside each other thereby maximising freight and reducing transportation costs.

case study: Culvert Reline - RPC Pipe Systems · RPC Pipe Systems Pty Ltd 11 Christie Road, Lonsdale SA 5160 PO Box 246, Lonsdale SA 5160 T +61 8 8329 1111 F +61 8 8329 1122

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: case study: Culvert Reline - RPC Pipe Systems · RPC Pipe Systems Pty Ltd 11 Christie Road, Lonsdale SA 5160 PO Box 246, Lonsdale SA 5160 T +61 8 8329 1111 F +61 8 8329 1122

RPC Pipe Systems Pty Ltd 11 Christie Road, Lonsdale SA 5160 PO Box 246, Lonsdale SA 5160

T +61 8 8329 1111 F +61 8 8329 1122 www.rpcpipesystems.com

case study:

Culvert Reline

project:

client:

location:

product:

manufacture & supply:

value:

year of project:

description:

Macline and Cowra Reline

ITS Trenchless

Western Australia

Flowtite GRP Piping

676m DN1200—DN3000, PN6 SN10000 in 6m lengths,

REKA Rubber Ring Jointed

$750,000—$1,000,000

2011

The steel culverts under a privately owned railway line were failing

due to corrosion.

Flowtite GRP with its inherent corrosion resistance and high inte-

gral stiffness was a quick and lightweight solution to the problem

and provides a service life of 100 years +.

The GRP lengths were slip lined into the existing steel culvert and

grouted structurally into place providing a total stiffness (ability to

handle traffic loading) above that required in the original install.

An unique feature of Flowtite GRP, was during transportation to

site, the various sizes were ‘nested’ inside each other thereby

maximising freight and reducing transportation costs.