Job title Main client Our client Completion A61 Birdwell Junction Improvements Barnsley Metropolitan BC/Highways England Lumsden and Carroll Autumn 2017 Project brief Upgrade of the M1 Junction 36 slip road and elongation of the A61 Birdwell Junction to alleviate congestion. The project aims to improve access and development potential of the Rockingham Employment site and improve pedestrian and cycling safety by providing shared-use routes and designated crossing facilities. As stated by Cllr Roy Millar, Cabinet Spokesperson for Place, “It remains a priority to minimise any disruption and any restrictions on traffic movement”. Therefore, the project has required innovative solutions to complete the works in as smooth a manner as possible. Delivery Achievements “Toppesfield has been a helpful and resourceful supply chain partner and has reprogrammed its work at short notice to accommodate changes to our programme. The operations team is extremely knowledgeable and has provided innovative solutions to problems encountered on site. The workforce are polite, helpful and have completed their work to a very high standard.” Michael Sherrard, Senior Project Manager, Lumsden and Carroll Case study A61 Birdwell Junction Zero accidents during 12 week surfacing Right first time - no programme implications for the client

Case study A61 Birdwell Junction - Toppesfield · A61 Birdwell Junction Improvements Barnsley Metropolitan BC/Highways England Lumsden and Carroll Autumn 2017 Project brief Upgrade

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Case study A61 Birdwell Junction - Toppesfield · A61 Birdwell Junction Improvements Barnsley Metropolitan BC/Highways England Lumsden and Carroll Autumn 2017 Project brief Upgrade

Job title

Main client

Our client

Completion

A61 Birdwell Junction Improvements

Barnsley Metropolitan BC/Highways England

Lumsden and Carroll

Autumn 2017

Project brief Upgrade of the M1 Junction 36 slip road and elongation of the A61 Birdwell Junction to

alleviate congestion. The project aims to improve access and development potential of the

Rockingham Employment site and improve pedestrian and cycling safety by providing

shared-use routes and designated crossing facilities. As stated by Cllr Roy Millar, Cabinet

Spokesperson for Place, “It remains a priority to minimise any disruption and any

restrictions on traffic movement”. Therefore, the project has required innovative solutions

to complete the works in as smooth a manner as possible.

Delivery

Achievements

“Toppesfield has been a helpful

and resourceful supply chain

partner and has reprogrammed

its work at short notice to

accommodate changes to our

programme. The operations team

is extremely knowledgeable and

has provided innovative

solutions to problems

encountered on site. The

workforce are polite, helpful and

have completed their work to a

very high standard.”

Michael Sherrard, Senior Project Manager,

Lumsden and Carroll

Case study

A61 Birdwell Junction

Zero accidents during 12

week surfacing

Right first time - no

programme implications for

the client