2
Two Brine lines of 315mm CLASS 19 Location: Dead sea, Israel Working Conditions: Working pressure of 13 BAR, working temperature of 80°c Pipes Used: Two 315mm CLASS 19, each line 3000 meters long. 6000 meters in total. The pipes are connected with special Electro fusion couplers Description: One line transports from Dead Sea Magnesium to Dead Sea 'Maklef' potash factory. The other line transports from Maklef to Magnesium The lines were installed over 15 years ago and are working constantly without problems Location: Dead sea, Israel Working Conditions: Working pressure of 6 BAR, working temperature of 60°c Pipes Used: Four 315mm CLASS 10 lines. Each line 4000 meters long, 16,000 meters in total. The pipes are connected with Electro fusion couplers Description: The lines are transporting waste slurries from the Dead Sea Works production facilities to their waste disposal site The lines were installed in different times during the last 16 years and are working constantly without problems Four tailing lines of 315 mm CLASS 10 Dredging lines in the Dead Sea Location: Dead sea, Israel Working Conditions: Working temperature of 60°c Pipes Used: 400/450/500mm CLASS 10/10/8, total length of over 5,000 meters. The pipes are connected with special mechanical couplers Description: The lines transport dredged salt harvested from the bottom of the evaporation ponds. The lines were installed 20 years ago and are working according to project's needs without problems The 400mm CLASS 10 pipes replaced special High molecular weight PE pipe that failed after only two months. Future dredging project will include PEXGOL 630 CLASS 10 pipe. www.pexgol.com For further details on this project, please contact your local pexgol system representative. TM INDUSTRIAL High temperature brine transportation Installation cases collection

Case 4 Installation Collection

Embed Size (px)

DESCRIPTION

Hidráulica. Instalación Pexgol

Citation preview

Page 1: Case 4 Installation Collection

Two Brine lines of 315mm CLASS 19

Location: Dead sea, Israel

Working Conditions: Working pressure of 13 BAR, working

temperature of 80°c

Pipes Used: Two 315mm CLASS 19, each line 3000 meters

long. 6000 meters in total. The pipes are connected with

special Electro fusion couplers

Description: One line transports from Dead Sea Magnesium to

Dead Sea 'Maklef' potash factory. The other line transports

from Maklef to Magnesium

The lines were installed over 15 years ago and are working

constantly without problems

Location: Dead sea, Israel

Working Conditions: Working pressure of 6 BAR, working

temperature of 60°c

Pipes Used: Four 315mm CLASS 10 lines. Each line 4000

meters long, 16,000 meters in total. The pipes are connected

with Electro fusion couplers

Description: The lines are transporting waste slurries from

the Dead Sea Works production facilities to their waste

disposal site

The lines were installed in di!erent times during the last

16 years and are working constantly without problems

Four tailing lines of 315 mm CLASS 10

Dredging lines in the Dead SeaLocation: Dead sea, Israel

Working Conditions: Working temperature of 60°c

Pipes Used: 400/450/500mm CLASS 10/10/8, total length of

over 5,000 meters. The pipes are connected with special

mechanical couplers

Description: The lines transport dredged salt harvested from

the bottom of the evaporation ponds. The lines were installed

20 years ago and are working according to project's needs

without problems

The 400mm CLASS 10 pipes replaced special High molecular

weight PE pipe that failed after only two months. Future

dredging project will include PEXGOL 630 CLASS 10 pipe.

www.pexgol.comFor further details on this project, please contact your local pexgol system representative.

TM

IND

US

TR

IAL

High temperature

brine transportation

Installation cases collection

Page 2: Case 4 Installation Collection

26,000 meters long salt tailing line, 315

and 280mm CLASS 12Location: Dead sea and 26km West, Israel

Pipes Used: 315mm CLASS 12, 26,000km in total, connected

with Electro fusion couplers

Description: The line transports salt tailing from Periklas factory

down to the Dead Sea, designed for gravity "ow

The line was installed in 1995 and is working constantly

without problems

Short sections

Cre

ati

ve

gro

up

Temperature,

In °C

Years

of service

Pipe series (S)

7.6 6.3 5 4 3.2

Standard dimension ratio (SDR)

16.2 13.6 11 9 7.4

Allowable working pressure (bar)

50 50 7,0 8,4 10,6 13,4 16,8

60 50 6,3 7,5 9,5 11.9 15,0

70 50 5,6 6,7 8,5 10,7 13,4

80 50 5,1 6,1 7,5 9,5 12,0

90 50 4,5 5,4 6,8 8,6 10,9

95 50 4,1 4,9 6,4 8,1 10,3

110 50 2,3 2,8 3,75 4,6 5,7

v/3

.13

TM

IND

US

TR

IAL

High temperature

brine transportation

Installation cases collection

www.pexgol.comFor further details on this project, please contact your local pexgol system representative.

Location: Dead sea, Israel

Working Conditions: Extremely high temperatures (up to

114°c), high corrosive, abrasion conditions

Pipes Used: Various lengths and diameters

Description: Thousands of meters of PEXGOL pipes are

installed in the Dead Sea Works factories, transporting hot (up

to 114 °c) and cold brine for years, without failure