30
FLORIDA AVIATION DEPARTMENT - Fort Lauderdale/Hollywood International Airport 2200 SW 45 1 h Street, Suite 101 • Dania Beach, Florida 33312 • 954-359-6100 November 20, 2015 Mario Cartaya, President Cartaya and Associates Architects, P.A. 2400 E. Commercial Blvd, Suite 201 Fort Lauderdale, FL 33308 SUBJECT: Professional Consultant Services for Fort Lauderdale-Hollywood International Airport and North Perry Airport Building Projects Contract #Z1224902P1 Exhibit 8 Approvals Dear Mr. Cartaya, This letter memoria li zes the approval of all Exhibit Bs going forward for al l Work Authorizations under Contract #Z1224902P1 . The Contract #Z1224902P1 was approved by the Broward County Board of Commissioners on June 2, 2015 with Exhibit Bs based on the prime and sub-consultant's 2013 FAR's and/or waivers. Per the contract and after the contract was executed, Cartaya and Associates Architects then submitted the sub- consultant's 2014 FAR's and/or waivers for County Auditor's review and approval. At the same time, Cartaya and Associates Architects was provided additional time to submit their 2014 FAR Audit in which was finally forwarded to the County Auditor for review and approval. A Sunshine Meeting was held on Thursday, July 23, 2015 in which all Exh ibit Bs were discussed and approvals were provided. Furthermore, per the attached letter dated October 21, 2015 from Cartaya and Associates Architects, P.A. and letter dated September 21 , 2015 from RS&H (sub-consultant), a "Typographical Error" was identified in RS&H's Exhibit B under the executed contract. The errors occurred within (5) five different job "Titles" that were duplicated. Instead, the job "Titles" should have been consecutive Engineer and Arch itect positions. As mentioned in the attached letters, these "Titles" match previous contracts/agreements RS&H has had with the Broward County Aviation Department and are not new job "Titles ". Thus, RS&H's Exhibit B based on the 2013 FAR is being replaced and does not affect the Overhead, Fringe, Profit and Multiplier. The following chart demonstrates the differences between the 2013 vs. 2014 Exhibits Bs submitted by the prime and sub-consultants. The highlighted values denote the approved Exhibit Bs in accordance with the County Auditor's requirements. Broward County Board of County Commissioners Mark D Bogen • Beam Furr • Dale V.C Holness· Martin David K1ar • Chip LaMarca - Stacy R1tter • T1m Ryan • Barbara Shaner · L01s Wexler www.broward.org/www.fll.net

Cartaya and Associates Architects, P.A. 2400 E. Commercial ... · Furthermore, per the attached letter dated October 21, 2015 from Cartaya and Associates Architects, P.A. and letter

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • FLORIDA

    AVIATION DEPARTMENT - Fort Lauderdale/Hollywood International Airport

    2200 SW 451h Street, Suite 101 • Dania Beach, Florida 33312 • 954-359-6100

    November 20, 2015

    Mario Cartaya, President Cartaya and Associates Architects , P.A. 2400 E. Commercial Blvd, Suite 201 Fort Lauderdale, FL 33308

    SUBJECT: Professional Consultant Services for Fort Lauderdale-Hollywood International Airport and North Perry Airport Building Projects Contract #Z1224902P1 Exhibit 8 Approvals

    Dear Mr. Cartaya,

    This letter memorializes the approval of all Exhibit Bs going forward for all Work Authorizations under Contract #Z1224902P1 .

    The Contract #Z1224902P1 was approved by the Broward County Board of Commissioners on June 2, 2015 with Exhibit Bs based on the prime and sub-consultant's 2013 FAR's and/or waivers. Per the contract and after the contract was executed, Cartaya and Associates Architects then submitted the subconsultant's 2014 FAR's and/or waivers for County Auditor's review and approval. At the same time, Cartaya and Associates Architects was provided additional time to submit their 2014 FAR Audit in which was finally forwarded to the County Auditor for review and approval.

    A Sunshine Meeting was held on Thursday, July 23, 2015 in which all Exhibit Bs were discussed and approvals were provided.

    Furthermore, per the attached letter dated October 21, 2015 from Cartaya and Associates Architects, P.A. and letter dated September 21 , 2015 from RS&H (sub-consultant) , a "Typographical Error" was identified in RS&H's Exhibit B under the executed contract. The errors occurred within (5) five different job "Titles" that were duplicated. Instead, the job "Titles" should have been consecutive Engineer and Arch itect positions. As mentioned in the attached letters, these "Titles" match previous contracts/agreements RS&H has had with the Broward County Aviation Department and are not new job "Titles". Thus, RS&H's Exhibit B based on the 2013 FAR is being replaced and does not affect the Overhead, Fringe, Profit and Multiplier.

    The following chart demonstrates the differences between the 2013 vs. 2014 Exhibits Bs submitted by the prime and sub-consultants. The highlighted values denote the approved Exhibit Bs in accordance with the County Auditor's requirements.

    Broward County Board of County Commissioners

    Mark D Bogen • Beam Furr • Dale V.C Holness· Martin David K1ar • Chip LaMarca - Stacy R1tter • T1m Ryan • Barbara Shaner · L01s Wexler

    www.broward.org/www.fll.net

    http:www.broward.org/www.fll.net

  • Approve ighted in Yellow)

    2013

    d Exhibi t "B" (Highl

    2014

    Overhead Fringe Profit Multiplier Overhead Fringe Profit Mulitipl ier

    FAR

    AUDITS

    Cartaya ~ --'18:0!) ~ _..:n;l 116.93 36.70 10.00 2.79 AirQuest Environmental, Inc. ~ ~ _....A:OO ~ 111.27 31.46 10.00 2.67 CTS Engineering, Inc. 173.10 0.00 6.00 2.89 ~ ~~ ~ HDR, Inc. 160.92 0.74 10.00 2.90 ~ ~ ~ ~ Keith and Associates, Inc. ~ ~ ~ ~ 78.52 27.31 10.00 2.26 Miller Legg and Associates, Inc. 125.00 38.70 10.00 2.90 ~ ~~ ~ RS&H,Inc. 126.17 51.89 4.30 2.90 ~ ~ ~ ~ Tierra South Florida, Inc. 110.40 37.77 10.00 2.73 ~ ~~ .:::::n?"

    CMS -Construction Management Services, Inc. ~ ~ ~ ~ 124.71 35.16 10.00 2.85 WaiversValancourt International, LLC ~ ~ ~ ~ 82.00 8.00 10.00 2.09

    Delta G Consulting Engineers 117.04 42.07 10.00 2.85 ~ _Afr.S1 ~ ~

    The following Exhibit Bs listed below did not change from the original contract but have been updated to be more legible.

    • CTS Engineering , Inc. • HDR, Inc. • Miller Legg and Associates, Inc. • Tierra South Florida, Inc. • Delta G Consulting Engineers

    The following Exhibit B listed below did not change from the original contract but has been updated only to correct typographical errors within Job Titles.

    • RS&H, Inc.

    The following Exhibit Bs listed below have been updated in reference to the 2014 FAR and waiver submittals and approval.

    • Cartaya and Associates Architects, P.A. • AirQuest Environmental , Inc. • Keith and Associates, Inc. • CMS- Construction Management Services, Inc. • Valancourt International, LLC.

    The former Exhibit Bs from agreement are hereby replaced in their entirety by the attached and approved Exhibit B - R1 (revision 1) dated 11/20/2015, which will be utilized going forward.

    2

  • Sincerely,

    Marc Gambrill , P.E. Contract Administrator Director, Capital Improvement Program

    cc: Evan Lukic, County Auditor Laura Rogers, County Auditor Michal Durden, Purchasing Agent Sarah Townsend, Purchasing Agent Alexander Williams, Assistant County Attorney David Arthur, Assistant County Attorney Alejandro Cuevas, Project Manager II Carlos Hernandez, Engineer Ill Renee Barlow, Administrative Manager II Steven Wiesner, Assistant Director of Aviation Trevor Fisher, Aviation Director of Airport Expansion Mike Pacitto, Director of Planning Airport Development avaddoccontrol@browa rd. org

    3

  • AAC001388

    QUALilY

    ARCHITECTURE

    AND SERVICE

    SINCE 1979

    October 21 , 2015

    Alejandro Cuevas Project Manager II SCAD 4101 Ravenswood Road Suite 219 Fort Lauderdale, FL 33312 Document Tracking No. CAA-004 CPF No. 3.07

    RE: Fort Lauderdale I Hollywood International Airport Professional Consultant Services, Building Projects Z1224902P1

    Dear Alex:

    Per our discussions, typograph ical errors occurred in the position titles of the RS&H Exhibit B that was included in the above noted agreement. The current Exhibit B and the corrected Exhibit B are attached. The RS&H corrected Exhibit B will match other SCAD contracts with RS&H.

    Please provide acceptance of the corrected RS&H Exhibit B. We apologize for the inconvenience.

    If you have any questions with regard to the above information, please do not hesitate to contact our office.

    Sincerely,

    uan Justiniano, LEED AP, AlA Vice President

    2400 E COMMERC IAL BOULEVARD I SUITE 201 PHONE: (954) 771-2724 FORT LAUDERDALE I FLORIDA I 33308 WWW.CARTA Y AANDASSOCIATES.COM

    http:AANDASSOCIATES.COMWWW.CARTA

  • 3125 \\'est Commercial BoulevMd 0 95+ 474 3005S&H ~tute 130 F 954-474-3006

    rOJt I dUdt•t d.tl

  • rsund/J.com

    Mr. Roger Lebida

    September 21, 2015

    Page Two

    These corrections will make this contract's Exhibit B match our Exhibit B in the Ut ilities GEC

    contract wit h Keith & Associates and the title li sting of our historical Exhibit B's with the County.

    We ask that you bring this corrected Exhibit B to the Contract Administrator for his approval. I

    apologize for the inconvenience and please don't hesitate to call with any questions.

    Sincerely,

    RS&H, Inc.

    ~28.: Senior Engineer

    cc: Alex Cuevas - BCAD

    File

    http:rsund/J.com

  • Exhibit B- R1

    11/20/2015

    Page 91 of 138

    Professional Services Agreement

    EXHIBIT B-R1

    SALARY COSTS

    Project No: Z1224902P1

    p • 1

    Professional Consultant Services for Fort Lauderdale-Hollywood International roJect Tit e: Airport and North Perry_Airport Building ProJects

    Prime Consultant: Cartaya and Associates Architects, P.A.

    Sub Consultant: AlrQuest Environmental, Inc.

    FILL IN/REVISE POSITIONS AS APPLICABLE

    MAXIMUM MAXIMUM BILLING

    TITLE HOURLY RATE X MULTIPLIER = RATE($/HR)

    ($/HR)

    Project Director $41.94 2.67 $111.98

    Project Manager {Environmental Professional) $41.94 2.67 $111.98

    Field Manager $34.00 2.67 $90.78

    Field Manager (Environmental Scientist) $34.00 2.67 $90.78

    Field Technician $29.24 2.67 $78.07

    Documentation Manager $20.21 2.67 $53.96

    $0.00 2.67 $0.00

    $0.00 2.67 $0.00

    $0.00 2.67 $0.00

    $0.00 2.67 $0.00

    $0.00 2.67 $0.00

    $0.00 2.67 $0.00

    $0.00 2.67 $0.00

    $0.00 2.67 $0.00

    $0.00 2.67 $0.00

    NOTE: ALL INVOICES MUST REFLECT ACTUAL HOURLY RATES UP TO THE MAXIMUM

    Multiplier of 2.67 is calculated as follows:

    For calculation purposes only, MAXIMUM HOURLY RATE= $1 $1.00

    Entering the % below will automatically calculate the multiplier and insert it in the table above.

    ONLY use numbers with a maximum of 2 decimal places (x.xx - xx.xx - xxx.xx) % $

    OVERHEAD= HOURLY RATE X OVERHEAD (xxx)% 111.27 $1.11

    FRINGE= HOURLY RATE X FRINGE (xx)% 31.46 $0.31

    PROFIT= (HOURLY RATE+ OVERHEAD+ FRINGE) X PROFIT (xx)% 10.00 $0.24

    MAXIMUM BILLING RATE $2.67

    Multiplier

    2.67

  • Exhibit 1

    Page 91 or 138

    VOID

    Pn>lasak>l\l!.l SoMcaa AQroomant

    !iXHJB!TQ

    SALARYC~S

    Projac:t No: Zt~P1

    Pn>jec:t 'Tllle: .;_~_lllld=:::s:l4lna~ Prtnle Consullal'll: c.rtay11 and Aaii0Cia1c8 ArchKec:t:l, P.A..

    S~Conaulmll: AtrQunt En-.lronrr.a1taf,lrtc:.

    FlU IN/RIMS& PO$JTIOH$ AS .APf'UCABUi

    MAlUMUIII 1lTU! HOURLY RATE X fl!YbmmB

    (SIHR)

    Pro»et DllllCtllt $41.94 2.87

    Pro!act Mil!IIIlOI IProfH11onall $41.94 2.87

    Fldd...,..!PI, $34.00 2.87 Flelcl Manaaor l&Mtonmenllll Settdsf) ~.00 2.87

    Flolcl Todlnlclan $29.24 2.87

    ~MaNIIOr $2021 2.87

    !0.00 2.87

    eo.oo 2.87 to.OO 2.87

    Ul.OO 2.07

    10.00 2.87

    so..oo 2.87 10.00 2.87

    so.oo 2.87 .a.oo 2.87

    NOTE: AU. IWO:CES MUST R£FU:CTACltiAL HOURLY RA1ES UP TO 'nm MAXIMUM

    Mll!tQlller of2.871s c::alculltd iJI fll lloWB:

    For calaJiatlon purJ101141sonly, MAXIMUM HOURLY RAlE a $1 EntGflng tn. ¥. below'MID automatically caleulale the muHiplierand Insert It In the table o!:love.

    ONLY UiOnuJ!Ibofs .r!h a rnutmum of 2 deetmal placea (JLU • lOLia •lWUUI)

    OVERHEAD" HOURLY RATE X OVERHEAD (laoo)'K

    fJUHGE., HOURLY RATE XFRIHG£ (10()"

    PROFIT • (liOURLYAATE + OVERHEAD+ FRINOE) XPROFIT CoO'K

    ..,__

    fi'IAXIMUM B!L.IJNO..

    RAT!: eMiR)

    $120.37

    $120.37

    197.58

    m.sa sas.a:z $5&00

    _JQ,OO

    so.oo $0.00

    so.oo $0~

    $0.00

    so.oo $0.00

    so.oo

    t1.00

    ... • 16UO $1.55

    21AO $0.21

    4.00 S0.1t

    MAXIMUAA BILUHG RATE $2.87

    Mllll!plcr

    2.87

  • Exhibit B - R 1

    11/20/2015

    Page 92 of 138

    Professional Services Agreement

    EXHIBIT B-R1

    SALARY COSTS

    Project No: Z1224902P1

    p j Titl Professional Consultant Services for Fort Lauderdale-Hollywood International ro ect e: Airport and North Perry Airport, Building Projects

    Prime Consultant: Cartaya and Associates Architects, P .A.

    Sub Consultant: N/A

    FILL IN/REVISE POSITIONS AS APPLICABLE

    MAXIMUM MAXIMUM BILLING

    TITLE HOURLY RATE X MULTIPLIER = ($/HR)

    RATE ($/HR)

    Principal $53.80 2.79 $150.10

    Sr. Architect $75.00 2.79 $209.25

    Architect $39.06 2.79 $108.98

    Field Representative $34.15 2.79 $95.28

    Drafter $20.98 2.79 $58.53

    Administrative Assistant $15.23 2.79 $42.49

    $0.00 2.79 $0.00

    $0.00 2.79 $0.00

    $0.00 2.79 $0.00

    $0.00 2.79 $0.00

    $0.00 2.79 $0.00

    $0.00 2.79 $0.00

    $0.00 2.79 $0.00

    $0.00 2.79 $0.00

    $0.00 2.79 $0.00

    NOTE: ALL INVOICES MUST REFLECT ACTUAL HOURLY RATES UP TO THE MAXIMUM

    Multiplier of 2.79 Is calculated as follows:

    For calculation purposes only, MAXIMUM HOURLY RATE = $1 $1.00

    Entering the % below will automatically calculate the multiplier and insert it in the table above.

    ONLY use numbers with a maximum of 2 decimal places (x.xx - xx.xx - xxx.xx) % $

    OVERHEAD= HOURLY RATE X OVERHEAD (xxx)% 116.93 $1.17

    FRINGE= HOURLY RATE X FRINGE (xx)% 36.70 $0.37

    PROFIT= {HOURLY RATE+ OVERHEAD+ FRINGE) X PROFIT (xx)% 10.00 $0.25

    MAXIMUM BILLING RATE $2.79

    Multiplier

    2.79

  • Exhibit 1

    Pogo 92 of 138

    VOID

    Pr~nlll$oMcoo~

    EXH!B!TB

    SALARY!jg!mi

    Pro.)l!e1t.lo: Z'I2214802P1

    Pnl)lct T111o: ~-~A~cai'OI ...... . Prlmil ConsCI!Ianl: 04~ and ANodalo. An;hltccD, P.A

    aid> COI\Jvll&nl: NlA

    RU.IHIRIMSE POSrnONS AS AfiPUCAB&.E

    MAXIMUM Tn\.E HOURLYAATE X M!:!b]~ ..

    ~

    IP!tnc:tDll t.s.UO 2.82 lsr.~ mco 2.82 l.wu!.d $3ll.C)8 2.82 FJ.Id Resweantallw 134.15 2.11:2 Drai!M S2D.BB 2.82

    AutsUinl $15.23 2.82

    so.oo 2.11:2 so.oo 2.11:2 so.oo 2.82 $0..00 2.82

    so.oo 2.82 SO.DO 2.82 so.oo 2.82 som 2.82 $0.DO 2.82

    MOTE: AU. INVOICES MUSTREJ:1.ECT AC1UA1. HOURLY RATES UP TO THE MAXIMUM

    6!ulllfl(lofol2.82 Ia ~a tollowa:

    For c:alaUI!c.n pwpo~~taon!y,MAXIMUM HOURLY RAlE o St Entoltng ltlo 11. below IMll automatically c:aJcWte 1t1o mull/pilar and ln1111rtllln the tab& abowe.

    OHLYusc n&lftlbln .tit! 11 mulmwnol2 dedmal P-s(a..u -u.u • lDDUUl) ~

    OVERHEAD D HOUIU.y RAJE X~HEAD ()coc),. t18.00

    FRINGE o HOURLY AATE XFRINCC CoO,. 38.0U

    PROFIT• (HOURLY RATE • OVERHEAD • FRIHQE) X PROfTT ()Dc)'l5 10.CO

    MA.XIM\IM 81WNO RATe

    MAJOMUM BQ...L.IHQ

    RAT£ ~

    $151.72

    S2tt.50

    $110.15

    S8UO

    159.18

    $42.9S

    so.oo so.oo sa..oo so.oa sa..oo so.oo so.oo $0.00

    so.oo

    $1.CO

    • $1.18

    SG.3e

    $0.26

    $2.82

    ~ 2..82

  • Exhibit 8 - R 1

    11/20/2015

    Page 93 of 138

    Professional Services Agreement

    EXHIBIT B·R1

    SALARY COSTS

    Project No: Z1224902P1

    p j Titl Professional Consultant Services for Fort Lauderdale-Hollywood International ro ect e: Airport and North Perry Airport. Buildina ProJects

    Prime Consultant Cartaya and Associates Architects, P.A.

    Sub Consultant CMS • Construction Management Services, Inc.

    FILL IN/REVISE POSITIONS AS APPLICABLE

    MAXIMUM MAXIMUM BILLING

    TITLE HOURLY RATE X MULTIPLIER = RATE($/HR)

    ($/HR)

    Principal $65.16 2.85 $185.71

    Proiect Manager CE04) $43.56 2.85 $124.15

    Senior Inspector $30.30 2.85 $86.36

    Senior Estimator $37.88 2.85 $107.96

    Estimator $28.41 2.85 $80.97

    Scheduler $28.41 2.85 $80.97

    Administrative Assistant $24.62 2.85 $70.17

    $0.00 2.85 $0.00

    $0.00 2.85 $0.00

    $0.00 2.85 $0.00

    $0.00 2.85 $0.00

    $0.00 2.85 $0.00

    $0.00 2.85 $0.00

    $0.00 2.85 $0.00

    $0.00 2.85 $0.00

    NOTE: ALL INVOICES MUST REFLECT ACTUAL HOURLY RATES UP TO THE MAXIMUM

    Multiplier of 2.85 is calculated as follows:

    For calculation purposes only, MAXIMUM HOURLY RATE =$1 $1.00

    Entering the % below will automatically calculate the multiplier and insert it in the table above.

    ONLY use numbers with a maximum of 2 decimal places (x.xx • xx.xx - xxx.xx) % $

    OVERHEAD =HOURLY RATE X OVERHEAD (xxx)% 124.21 $1.24

    FRINGE= HOURLY RATE X FRINGE (xx)% 35.16 $0.35

    PROFIT= (HOURLY RATE+ OVERHEAD+ FRINGE) X PROFIT (xx)% 10.00 $0.26

    MAXIMUM BILLING RATE $2.85

    Multiplier

    2.85

  • Exhibit 1

    Page 93 or 138

    VOID

    Profoulon;l ~~

    EXHIBITII

    SAl A![! COSTS

    P\'ojoct r.llr. Z1mmi>1

    Pl'ojgct Tltkl· "....t Gcnlces tot 1'011 ; Alnlctt Olld llorttl Ponv Aln>Ort Bulldtnnll'ro-..

    PJtme Contull8nt: Cmtllyllalld APOC:I.Itn Anlhtlocte, P .A.

    aub Consul1am: CM$ ·Consm:ctlon ~ Servlcea. Inc.

    FUJ.IMUMSii POSmOH& AS APPUCABI.ii

    MAX!MUIII 'Tm..2 HOURLYRATI! X ldl.!I:Jl~l.l m! •

    (MIA)

    IPrtnctmt $65.18 2.85

    Prollel Ma!'llallf !EOCl $43.56 2.85

    lac.riGt la:liledz>• $30.30 :us ~nlcl ElllmJtcr $37.88 2.65 ~ 128.~\ 2.8S

    lsct.du!at $20.41 2.!5 ~ $24.82 2.«1

    10.00 2.eS

    so.oo 2.&5 *>.00 2.85

    *>.00 2.«1

    *>.00 2.&5 SOJX) z.as SOUl 2.11!1 so.oo 2.1:1!1

    NOTE: AU. INVOICESMUST REFLECT ACT\JAl. HOURLY RATES UP 10'mE MAXIMUM

    Mu lllpllofor 2.16 Ia calailatailll'S follows:

    For calw!iltlon pUflXI$01 only, MAXIMUM HOURLY RATE n It Enlorlng tho~ bolow\NIU oW!mal!cally c:alculllle ltla muhlplll!fan:f lnsut II In the tabla obov11.

    ONLY U10 nu~ wllh 4 I'Mlllmum Of2 d~ pl&ctla (X.XX • IOI.Xl • X!D!.IUI) .. CNeJIHEAD • KOURLY RATE XOVERHEAD ()CXX)~ 124.21

    f'RtHGE a HOURLY RATE X FRIHOE ()DO'IIo $6.18

    PROFIT • !HOURLY RAre • OVERHEAD • FR INOE) XPROFIT (!of)'l6 10.00

    MAXIMUM BIWHO RATE

    ·--..- ·-

    AlA)(!MUM 81WNG

    RATE (tMR)

    S1115.71

    512415

    18a.38

    $107.86

    $80.!17

    SI0..97

    S7D.tt

    10.00

    10.00

    10.00

    10.00

    10.00 10.00 JQ.OO

    JO.OO

    S1.00

    • S1.2.35

    fQ.2e

    sus

    ..~-ua

  • Exhibit B - R 1

    11/20/2015

    Page 94 of 138

    Professional Services Agreement

    EXHIBIT B·R1

    SALARY COSTS

    Project No: Z1224902P1

    • 1

    Professional Consultant Services for Fort Lauderdale-Hollywood International Project Tit e: Airport and North Peny_Airoort Building ProJects

    Prime Consultant: Cartaya and Associates Architects, P.A.

    Sub Consultant: CTS Engineering, Inc.

    FILL IN/REVISE POSITIONS AS APPLICABLE

    MAXIMUM MAXIMUM

    TITLE HOURLY RATE X MULTIPLIER = BILLING

    ($/HR) RATE ($/HR)

    Project Manager $58.00 2.89 $167.62

    Engineering Intern $31.00 2.89 $89.59

    Designer $34.00 2.89 $98.26

    S_Q_ecialist $37.00 2.89 $106.93

    Engineer $34.00 2.89 $98.26

    Senior Engineering Technician $28.50 2.89 $82.37

    Senior Project Engineer $45.00 2.89 $130.05

    Senior Engineer $54.00 2.89 $156.06

    Secretary $21.00 2.89 $60.69

    Senior Planner $36.05 2.89 $104.18

    Project Planner $31.72 2.89 $91.67

    $0.00 2.89 $0.00

    $0.00 2.89 $0.00

    $0.00 2.89 $0.00

    $0.00 2.89 $0.00

    NOTE: ALL INVOICES MUST REFLECT ACTUAL HOURLY RATES UP TO THE MAXIMUM

    Multiplier of 2.89 is calculated as follows:

    For calculation purposes only, MAXIMUM HOURLY RATE= $1 $1.00

    Entering the % below will automatically calculate the multiplier and insert it in the table above.

    ONLY use numbers with a maximum of 2 decimal places (x.xx • xx.xx - xxx.xx) % $

    OVERHEAD = HOURLY RATE X OVERHEAD (xxx)% 173.10 $1.73

    FRINGE= HOURLY RATE X FRINGE (xx)% $0.00

    PROFIT= (HOURLY RATE+ OVERHEAD+ FRINGE) X PROFIT (xx)% 6.00 $0.16

    MAXIMUM BILLING RATE $2.89

    Multiplier

    2.89

  • ExhlbU 1

    Page 94 of 136

    VOID

    ProiQioloiiiiiSorvlcoo ~

    €.XHfB!TR

    SAI..ARY'eJ!mJ

    Phljla No: Z122AS02P1

    Phljoc:t Tllle: Alnat Clld ::::'latll-l'llf""" Pnmo Ccntlllllnl: ~and Auod.21Cil Al'llhltccb. P.A.

    &bConaulllnt: CTS En;lllftrlrt9, Inc.

    RU.IICIRIMSI! POSntONS AS APPUCABlE

    MAJUMUI!I Tm..£ HOURLYRATE X M!l!.TtPJ.a;R 0

    (Mia)

    ~~_, $58.00 2.88 ... III!Cm $31.00 2.89 '~ $34.00 2..119

    ~ m.co 2.59 Enc:tneer $3.1.00 2.119

    isoriar• Tlldlntdan 628.SO 2.89 lson!ct Prolod Emlnoer $45.00 2.89 :tor*w~r $54.00 2.88 lsocrobl'l \11.00 2.89 isoniGt Plannltr $36.05 2.88 PrvllctPlai!Mf $)1.72 2.89

    so.m 2.88 so.m 2.89 SDCD 2.89 SO.OO 2.1111

    NOTE: AU.INVOIC£5 MUST ASUiCT AC1\W. MOUJU.Y RAli:B UP TO TME UAXIIIIUM

    fdulllplttf of2.8:1 ItClfca4lledat tollowa:

    For m!Qd4Uan purpoaoa only, MAXIMUM HO\JRLV RATE a $1 Enlellng 11\t ~ bt!ow..ta autcmatlcaO, cala!l.ltlllhe mu!Up!ilf .nd lnuut It In the lab!e 11booto.

    ONLY 1110 llllll\!lGtlllllftha mu.lmum al2 doclmAI pilc41 (LU • n.u •Da.P) '11>

    0\IERMEAD o HOVRlYRATe XOVERHEAD (lalQ'I5 173.10

    FRINGE

  • Exhibit 8- R1

    11/20/2015

    Page 95 of 138

    Professional Services Agreement

    EXHIBIT B-R1

    SALARY COSTS

    Project No: Z1224902P1

    p . t T"tl Professional Consultant Services for Fort Lauderdale-Hollywood International rojec 1 e: Airport and North Penv Airport, Building ProJects

    Prime Consultant: Cartaya and Associates Architects, P .A.

    Sub Consultant: Delta-G Consulting Engineers, Inc.

    FILL IN/REVISE POSITIONS AS APPLICABLE

    MAXIMUM MAXIMUM BILLING

    TITLE HOURLY RATE X MULTIPLIER = ($/HR)

    RATE ($/HR)

    Principal $65.98 2.85 $188.03

    Senior Project Manager $43.43 2.85 $123.78

    Project Manager $36.60 2.85 $104.31

    Senior Engineer $43.43 2.85 $123.78

    Senior Designer $34.15 2.85 $97.34

    Senior CADD Tech $25.38 2.85 $72.32

    Administrative Assistant $23.43 2.85 $66.76

    $0.00 2.85 $0.00

    $0.00 2.85 $0.00

    $0.00 2.85 $0.00

    $0.00 2.85 $0.00

    $0.00 2.85 $0.00

    $0.00 2.85 $0.00

    $0.00 2.85 $0.00

    $0.00 2.85 $0.00

    NOTE: ALL INVOICES MUST REFLECT ACTUAL HOURLY RATES UP TO THE MAXIMUM

    Multiplier of 2.85 is calculated as follows:

    For calculation purposes only, MAXIMUM HOURLY RATE= $1 $1.00

    Entering the % below will automatically calculate the multiplier and insert it in the table above.

    ONLY use numbers with a maximum of 2 decimal places (x.xx - xx.xx - xxx.xx) % $

    OVERHEAD= HOURLY RATE X OVERHEAD (xxx)% 117.04 $1.17

    FRINGE= HOURLY RATE X FRINGE (xx)% 42.07 $0.42

    PROFIT = (HOURLY RATE + OVERHEAD + FRINGE) X PROFIT (xx)% 10.00 $0.26

    MAXIMUM BILLING RATE $2.85

    Multiplier

    2.85

  • Exhlbll 1

    Page 95 of 13B

    VOID

    Pfof410ionoS ~ Agr.arnm1

    EXHUIIIII

    SAlP.R'I' snm Projod No: Z1~2P1

    Pro~ Tltta: ~ lll'td Ndoi'OnYI~a::,=~ Prime CCUIIUII.I nt: CaMyl and Ataodomnl Mhttocll, p.A.

    SlltiCDI\S4jiW'IC OIQa.Q Can1untng l!ncJinoet'l. Inc.

    FlU. tNIRS\IISE POsm~S AS APPUCA8U!

    MAXIMUM Tm.£ HOWU.VAA1E X !6!!1.~ a

    (CMR)

    IPrtnc!mr sa.s.ea :us !le«*w Proioct Man1u;or $43.43 2.~ .....,..,......._, S3UO 2.85 lse~DEn;ner S43..C) 2.85

    lso• Oeslllrlor 134.15 2.85 lse.aCADDTodl $25.34 2.BS !AIImlnblra!No Aablanl $23.43 2.BS

    10.00 2.BS

    10.00 2.85

    so.oo 2.BS so.oo :us sooo 2.65 so.oo 2.85 sooo 2.8S so.oo 2.115

    NOTE: ALL INVOICE$MUST REFlECT AC'T\JAl. KOURLV RATES UP TO TlUi MAXIUUH

    Multiplier ol 2M Ia cab4ateil •• fallowa:

    Fcrca~ flUI'POIOUnly . MAXIMUM HOURLY RATE o $1 Entorlng 1111-. betow v.4!l automotlcoDy e~tcullle lltt multipfiar and IMttt II In the table ahov«t.

    C#iLY utei'IUII\bon l!lfltla mulnvnofZdKim&l pllat (a.u • a.ax • lWI.D) " OJERHEAD o HOURLVRATE XOVERiiEAD ()coc)YI 117.04

    FRIKGE" HOURLY RATE X FRINGE (IDe)._ 4U7

    PACf1T • (HOURLY RATE • OVERHEAD • FRINGE) X PROFIT CO),. 10.DO

    MAXIMUI.ISIUINO RATE

    MIUCIMUM BIUINCa

    RATE (MiR)

    staa.m St%178

    Sttw.31

    $1~.70

    SfT-"' S12.S2

    sa&.78

    so..oo so.oo $0..00

    so.oo so.oo so.oo so.oo so.oo

    tUO

    • 11.17

    10.42

    $0.26

    S2.4S

    MU!Upllor

    z.as

  • Exhibit B- R1

    1112012015

    Page 96 of 138

    Professional Services Agroemont

    EXHIBIT 8-R1

    SALARY COSTS

    Project No: Z1224902P1

    Project Tltlo: ~r:!,~•!:':~~::•;!,"'.:!o:~:~:~~·lo-Hollywood lntemalfonal Prtmo consultant: cartaya and Anoclatos Architac:ts, P.A.

    Sub COnsultant: HDR, Inc.

    FILL INJREVJSE POSITIONS AS APPUCABLE

    MAXIMUM MAXIMUM

    TITLE HOURLY RATE X MULDPUER .. BIWNG RATE

    ($1HR) (SIHR)

    Principal $86.85 2.90 $250.00

    Chief Engineer $86.85 2.90 $250.00

    Senior ProJect Manaaer $86.85 2.90 $250.00

    Senior DisciPline Lead $86.85 2.90 $250.00

    Proiect Manaaer $65.98 2.90 $189.89

    Senior Enalnoer $71.05 2.90 $204.50

    Staff Enaineer $60.90 2.90 $175.29

    Proiect Enaineer $45.68 2.90 $131.47

    Enaineerina Intern $40.60 2.90 $116.88

    Senior Designer $41.62 2.90 $119.78

    Designer $26.90 2.90 sn.42

    Senior Technician $35.53 2.90 $102.25

    Technician $22.58 2.90 $65.00

    Field Technician $20.30 2.90 $58.43

    Senior Environmental Scientist $71.05 2.90 $204.50

    Environmental Scientist $44.41 2.90 $127.81

    Environmental Technician $35.53 2.90 $102.25

    Senior Planner $67.70 2.90 $194.86

    Planner $41.45 2.90 $119.31

    Principal Atchitect $86.85 2.90 $250.00

    Senior Architect $65.98 2.90 $198.89

    Staff Architect $55.83 2.90 $160.68

    Architect $38.24 2.90 $110.05

    Senior Graphic:JGIS $58.62 2.90 $168.71

    GraohicsiGIS $38.06 2.90 $109.55

    COnstruction Manaaer $76.13 2.90 $219.11

    Senior lnsDOCtor $66.99 2.90 $192.82

    Prolect Field lnsoector $55.83 2.90 $160.68

    Inspector $40.60 2.90 $116.86

    Scheduler $45.68 2.90 $131.47

    Estimator $45.68 2.90 $131.47

    I Proiect COntroUer $45.68 2.90 $131.47

    Senior Administrative Assistant $35.53 2.90 $102.25

    Administrative Assistant $22.33 2.90 $64.27

    NOTE: ALL INVOICES MUST REFLECT ACTUAL HOURLY RATES UP TO THE MAXIMUM

    Multiplier of 2.90 Is calculated as follows:

    For calculation purposes only, MAXIMUM HOURLY RATE =$1 $1.00

    Entering the % below will automatically calculate the multiplier and insert It in the table above.

    ONLY use numbers with a maximum of 2 decimal places (x.xx- xx.xx- xxx.xx) % $

    OVERHEAD= HOURLY RATE X OVERHEAD (XXX)% 160.92 $1.61

    FRINGE= HOURLY RATE X FRINGE (xx)% 0.74 $0.01

    PROFIT= (HOURLY RATE + OVERHEAD+ FRINGE) X PROFIT (xx)% 10.00 $0.26

    MAXIMUM BILUNG RATE $2.90

    Multiplier

    2.90

  • Exhibit 1

    Pogo 96 of 138

    VOID

    -- Dl'lKUI.

    -SISli!D-.-..-~,...~.t-.,;,;i.-....__ --~---,....___....

    n.a.____...-..r:AIIUI

    -... liN! -~""" l -.a.mLIIB . 110

  • Exhibit B - R1

    11/20/2015

    Page 97 of 138

    Professional Services Agreement

    EXHIBIT B-R1

    §~LAB:!CQ§I§

    Project No: Z1224902P1 Professional consultant :ierv1ces for fort Lauderdale-Hollywood

    Project TIUe: International Airport and North Perry Airport, Buildtna Proiects

    Prime Consultant Cartaya and Associates Architects, P.A.

    Sub Consultant Keith and Associates, Inc

    MAXIMUM MAXIMUM BILLING

    :m:LE HOURLY RATE X MULIJ~L!ER = RATE($/HR) ($/HR)

    Princioal Proiect Manaaer $102.04 2.26 $230.61

    Sr. Proiect Manaaer $88.09 2.26 $199.08

    Proiect Manaaer $62.18 2.26 $140.52

    Construction Manaaer $57.00 2.26 $128.81

    Assist. Project Manager $51.82 2.26 $117.10

    Proiect Enaineer $41.45 2.26 $93.68

    Senior RPR $46.63 2.26 $105.39

    RPR Inspector $41.45 2.26 $93.68

    RPR Junior lnsoector $31.09 2.26 $70.26

    Cost I Contracts Controls $36.27 2.26 $81.97

    Construction Admin $25.91 2.26 $58.55

    Administrative Assistant $20.73 2.26 $46.84

    Sr. Professional Eng. CPE) $77.72 2.26 $175.66

    Desic:m Enaineer II $46.63 2.26 $105.39

    Desian Engineer I $31.09 2.26 $70.26

    Profl Survevor CPSM) $51.82 2.26 $117.10

    Survevorl $29.02 2.26 $65.58

    Survevorll $39.38 2.26 $89.00

    CADD Operator/Technician $20.73 2.26 $46.84

    Senior GIS Soecia!ist $45.00 2.26 $101.70

    GIS Specialist $37.56 2.26 $84.88

    Senior Planner $51.82 2.26 $117.10

    Planner $31.09 2.26 $70.26

    Subsurface Uti!itv Enaineer $56.50 2.26 $127.69

    Senior Utilitv Coordinator $51.82 2.26 $117.10

    Utilitv Coordinator $31.09 2.26 $70.26

    Utilitv Technician $20.73 2.26 $46.84 NOTE: ALL INVOICES MUST REFLECT ACTUAL HOURLY RATES UP TO THE MAXIMUM

    Multiplier of 2.26 Is calculated as follows:

    For calculation purposes only, MAXIMUM HOURLY RATE= $1 $1.00Entering the % below will automatically calculate the multiplier and insert it in the table above.

    ONLY use numbers with a maximum of 2 decimal places (x.xx • xx.xx • xxx.xx) % $

    OVERHEAD= HOURLY RATE XOVERHEAD (xxx)% 78.52 $0.79

    FRINGE = HOURLY RATE X FRINGE (xx)% 27.31 $0.27

    PROFIT= (HOURLY RATE+ OVERHEAD+ FRINGE) X PROFIT (xx)% 10.00 $0.21

    MAXIMUM BILLING RATE $2.26

    Multiplier

    2.26

  • Exhibit 1

    Page 97 or 138

    VOID--..-·~ llmiiWI..

    II&U'IY c:r>J1'I

    "''>dMr. n=Ptoltdlla~PA

    - ~: lldlllr.ciAaodan.lll

  • Exhibit B- R1

    11/20/2015

    Page 98 of 138

    Professional Services Agreement

    EXHIBIT B-R1

    SALARY COSTS

    Project No: Z1224902P1

    p ~ Tltl Professional Consultant Services for Fort Lauderdale-Hollywood lntematJonal ro ect e: Airport and North Perry Airport, Building Prolects

    Prime Consultant: Cartaya and Associates Architects, P.A.

    Sub Consultant: Miller, Legg & Associates, Inc.

    FILL IN/REVISE POSITIONS AS APPLICABLE

    MAXIMUM MAXIMUM

    TITLE HOURLY RATE X MULTIPLIER = BILLING

    ($/HR) RATE ($/HR)

    Project Manager Ill $49.72 2.90 $144.19

    Project Manager $47.21 2.90 $136.91

    Quality Assurance Person $50.69 2.90 $147.00

    Design/Construdion Specialist $44.48 2.90 $128.99

    Project Engineer $43.06 2.90 $124.87

    Sr. Project Engineer $46.89 2.90 $135.98

    Registered Land Surveyor $49.93 2.90 $144.80

    Surveyor Ill $35.68 2.90 $103.47

    Survey Crew (2 Person) $46.92 2.90 $136.07

    Survey Crew (2 Person) $61.95 2.90 $179.66

    SUE Supervisor $35.68 2.90 $103.47

    SUE 2 Person Crew $48.80 2.90 $141.52

    SUE 2 Person Location Crew $60.08 2.90 $174.23

    SUE 3 Person Location Crew $78.82 2.90 $228.58

    Biol()gist $29.68 2.90 $86.07

    Pro_l_ect Biologist $39.78 2.90 $115.36

    Senior Bioloaist $40.50 2.90 $117.45

    Environmental Scientist $20.30 2.90 $58.87

    Senior Environmental Scientist $49.72 2.90 $144.19

    Junior Technician/Designer $23.69 2.90 $68.70

    Senior Technician/Designer $32.29 2.90 $93.64

    CADD Operator $26.43 2.90 $76.65

    Administrative Assistant $23.28 2.90 $67.51

    NOTE: AU INVOICES MUST REFLECT ACTUAL HOURLY RATES UP TO THE MAXIMUM

    Multiplier of 2.90 Is calculated as follows:

    For calculation purposes only, MAXIMUM HOURLY RATE= $1 $1.00

    Entering the % below will automatically calculate the multiplier and insert it in the table above.

    ONLY use numbers with a maximum of 2 decimal places (x.xx - xx.xx - xxx.xx) % $

    OVERHEAD c HOURLY RATE X OVERHEAD (xxx)% 125.00 $1.25

    FRINGE c HOURLY RATE X FRINGE (xx)% 38.70 $0.39

    PROFIT= (HOURLY RATE+ OVERHEAD+ FRINGE) X PROFIT (xx)% 10.00 $0.26

    MAXIMUM BILLING RATE $2.90

    Multiplier

    2.90

  • Exhlb!t 1

    Page 9B or t38

    VOID

    l'l-=n.J..-~

    mmiJLIL

    !lAURY COSTll

    Pro)lctllo:ll~t

    ~11111:-· '"'""''··-l"'ooict. PM1o CcniiAinl: c.t.,. o.ndAIOK!daAic~t.P.A.

    04CI ComiAinl: fi!IDn,l..o!w aAuod&m. b>c. FlLL ~ POSITIOICS ASAI'PI.ICABI.S

    ~ -mw HCIURLY IIATt! IC ~ . lllWIIO MTI!($IIIR) (t/ICRj

    -~--c ~n 2.11) 11"-10

    W7.2l uo .lllt.OI M4m 1110 IIC_.IlQ_

    IW40 ,.., II:Ill.Gil_ $401S 2.!1) I12U17

    ~&.-- WU!I UD SIZUIIl ~Lind- 148.8:) uo &14&.1!10 ~ID 13M& uo IICDAr s.-o-a~ a.ca.m 2.1D 11:11.07 ~o-n-\ ai!UIS uo &17'UII laue~ I3II.Q uo IICDAr lsu!2-0.. ..aeo 2.00 &1.,.112 ~2-t.oc:za>nC.... l&lDIS 2.111 _ll7UJ izwE :S -lDmllollCtwn 171lll2 2.11) _tzl:O.SO ~ 1:211111 2.110 148m

    ~-- Pl-7'11 2.110 111!.311 ~IWo!lla l&:xl '-0:1 aur..a- PUG 1110 "".111 Soal=~~ ~&n 2.Q:I 11"-10 J

  • Exhibit 8- R1

    11/20/2015

    Page 99 of 138

    Professional Services Agreement

    EXHIBIT B-R1

    SALARY COST§

    Project No: Z1224902P1

    Professional Consultant Services for Fort Lauderdale-Hollywood International Project Title: AirPOrt and North Perry Airport. Building ProJects

    Prime Consultant: Cartaya and Associates Architects, P.A.

    Sub Consultant: RS&H, Inc.

    FILL IN/REVISE POSITIONS AS APPLICABLE

    MAXIMUM MAXIMUM

    TITLE HOURLY RATE X MULTIPLIER = BILUNG

    ($/HR) RATE ($/HR)

    Regional Director VP (X05) $85.26 2.90 $247.25

    Project Officer VP (X05) $81.20 2.90 $235.48

    Project Director VP (X05) $71.05 2.90 $206.05

    Senior Project Manager EV (E05) $86.20 2.90 $249.98

    Proiect Manager (E04) $71.05 2.90 $206.05

    Engineer V (E05) $86.20 2.90 $249.98

    Engineer IV CE04) $71.05 2.90 $206.05

    Engineer Ill CE03) $57.86 2.90 $167.78

    Engineer II CE02) $48.72 2.90 $141.29

    Engineer I CE01) $35.53 2.90 $103.02

    Architect V CA05) $84.25 2.90 $244.31

    Architect IV CA04) $59.89 2.90 $173.67

    Architect Ill (A03) $49.74 2.90 $144.23

    Architect II (A02) $40.60 2.90 $117.74

    Architect I (A01) $32.48 2.90 $94.19

    Planner V (Q05) $69.02 2.90 $200.16

    Planner IV (Q04) $62.93 2.90 $182.50

    Planner Ill (Q03) $55.83 2.90 $161.89

    Planner II (Q02) $33.50 2.90 $97.14

    Planner I (Q01) $28.42 2.90 $82.42

    Tech/Oesigner V (T05) $62.93 2.90 $182.50

    Tech/Oesigner IV (T04) $44.66 2.90 $129.51

    Tech/Designer Ill (T03) $40.60 2.90 $117.74

    Tech/Oesigner II (T02) $31.47 2.90 $91.25

    Tech/Oesigner I (T01) $23.35 2.90 $67.70

    Environmental Specialist V (E14) $66.99 2.90 $194.27

    Environmental Specialist IV (E13) $62.93 2.90 $182.50

    Environmental Specialist Ill (E12) $43.65 2.90 $126.57

    Environmental Specialist II (E11) $33.50 2.90 $97.14

    Environmental Specialist I (E10) $27.41 2.90 $79.47

    Administrative Assistant IV (063) $32.48 2.90 $94.19

    Administrative Assistant Ill (062) $30.45 2.90 $88.31

    Administrative Assistant II (061) $29.44 2.90 $85.36

    Administrative Assistant I (060) $20.30 2.90 $58.87

    Interior Designer V (195) $52.78 2.90 $153.06

  • Ellhlbft 1 Pago 99 of 138

    VOIDProfosalonal Strvtees Agroomont !§XH!flfT§

    li~HICOSTS

    ProJect Ho: Z12l4902P1 PrvraalonAJ C

  • Exhibit B - R 1 11/2012015

    Page 100 of 138

    Interior Oesianer IV (194) $34.51 2.90

    Interior Desioner Ill (193) $33.50 2.90

    Interior Desianer II (192) $23.35 2.90

    Interior Desianer I (191) $20.30 2.90

    Document Coordinator IV CM63) $32.48 2.90

    Document Coordinator Ill CM62) $30.45 2.90

    Document Coordinator II CM61) $29.44 2.90

    Document Coordinator I CM60) $23.35 2.90

    Landscace Architect V CPOS) $62.93 2.90

    Landscaoe Architect IV CP04) $43.65 2.90

    Landscaoe Architect Ill CP03) $37.56 2.90

    Landscape Architect II (P02) $27.41 2.90

    Landscaoe Architect I (P01) $22.33 2.90

    IT Specialist IV (012) $42.63 2.90

    IT Specialist Ill (011) $41.62 2.90

    IT Specialist II CS02} $31.47 2.90

    Financial Specialist V (005) $70.04 2.90

    Field Recresentative V CF05} $48.72 2.90

    Field Recresentative IV CF04) $44.66 2.90

    Field Recresentative Ill CF03) $39.59 2.90

    Field Recresentative II (F02) $28.42 2.90

    Field Recresentative I (F01) $26.39 2.90

    Accountina Scecialist Ill (S74) $31.47 2.90

    Accountlna Scecialist II CS73) $25.38 2.90

    NOTE: ALL INVOICES MUST REFLECT ACTUAL HOURLY RATES UP TO THE MAXIMUM

    Multiplier of 2.90 Is calculated as follows:

    For calculation purposes only, MAXIMUM HOURLY RATE= $1 Entering the % below will automatically calculate the multiplier and insert it in the table above.

    ONLY use numbers with a maximum of 2 decimal places (x.xx • xx.xx • xxx.xx) o/o

    OVERHEAD =HOURLY RATE X OVERHEAD (xxx)% 126.17

    FRINGE =HOURLY RATE X FRINGE (xx)% 51.89

    PROFIT =(HOURLY RATE + OVERHEAD + FRINGE) X PROFIT (xx)% 4.30

    MAXIMUM BILLING RATE

    $100.08

    $97.14

    $67.70

    $58.87

    $94.19

    $88.31

    $85.36

    $67.70

    $182.50

    $126.57

    $108.91

    $79.47

    $64.76

    $123.63

    $120.68

    $91.25

    $203.10

    $141.29

    $129.51

    $114.80

    $82.42

    $76.53

    $91.25

    $73.59

    $1.00

    $

    $1.26

    $0.52

    $0.12

    $2.90

    Multiplier

    2.90

  • Exh!bll 1 PagG 100 01138

    VOIDlntllltct Ooslanar tv 11941 $34.51 2.80 Inter!« DesiQnar Ill (193) 133.50 2.90

    lntii!IOt De&lgnaf II ~ 123.35 2.00

    lnlaltor DeslgNrtl (1111} $20.30 2.90

    Oocumelll CoontlniiDr r.IIM83l $32.48 2.80

    Document COOrdlna1or m(MII2) $30.45 2.90 Ooc:umenl Coc:nl!nalor II IM81l 12U4 2.110

    Document Coott!tnatct 1(M60) S23.3S 2.90

    L.ond.se.Opo Atchlle St EmeMo 1M % ~ow wiD outomallcally eelallate ltte multip!lar and 1nse1t It In IIIII Iabia aboYe.

    ONI.Yuso I\UJI\betB wttfla maximum ofZd~~ttmal pliCell (ltJa • IIX.IX •JOCLD) %

    OVERHEAD : HO\JRlY RATE XOVERHEAD (XXI)% 126.17

    FRINGE" HOURLY RATE XFRINGE (leX)% 111.89

    PROFIT" (HOURLY RATE+ OVERHEAD+ FRINGE) XPROfiT(XX)% 4.30

    MAXIMUM BILUNG RATE

    ·

    $100.08

    $97.14

    $87.70

    S58.87

    $94.19

    588.31

    185.38

    $87.70

    $182.80

    $126.67

    $108.91

    $79.47

    $64.76

    $123.1!3

    $120.1!9

    $91.25

    $203.10

    St41.29

    $120.151

    S114.80

    $92.42

    $78.53

    $01.25

    $73.159

    11.00

    s

    St.26

    $0.52

    $0.12

    $2.90

    Multlpllor

    2.90

    rev9.3.14

    http:rev9.3.14

  • Exhibit B - R 1

    11/20/2015

    Page 101 of 138

    Professional Services Agreement

    EXHIBIT B-R1

    SALARY COSTS

    Project No: Z1224902P1

    p j t T"tl • Professional Consultant Services for Fort Lauderdale-Hollywood International ro ec 1 e. Airport and North Perry Airport. Building Projects

    Prime Consultant: Cartaya and Associates Architects, P .A.

    Sub Consultant: Tierra South Florida, Inc.

    FILL IN/REVISE POSITIONS AS APPLICABLE

    MAXIMUM MAXIMUM

    TITLE HOURLY RATE X MULTIPLIER = BILLING

    ($/HR) RATE ($/HR)

    Principal $77.09 2.73 $210.46

    Senior Engineer $54.65 2.73 $149.19

    Project Manager $52.45 2.73 $143.19

    Project Engineer $46.35 2.73 $126.54

    Senior Technician (CADD) $34.15 2.73 $93.23

    Junior Technician $25.00 2.73 $68.25

    Secretary $22.12 2.73 $60.39

    NOTE: ALL INVOICES MUST REFLECT ACTUAL HOURLY RATES UP TO THE MAXIMUM

    Multiplier of 2.73 is calculated as follows:

    For calculation purposes only, MAXIMUM HOURLY RATE= $1 $1.00

    Entering the % below will automatically calculate the multiplier and insert it in the table above.

    ONLY use numbers with a maximum of 2 decimal places (x.xx - xx.xx - xxx.xx) o/o $

    OVERHEAD = HOURLY RATE X OVERHEAD (xxx)o/o 110.40 $1.10

    FRINGE = HOURLY RATE X FRINGE (xx)o/o 37.77 $0.38

    PROFIT= (HOURLY RATE+ OVERHEAD+ FRINGE) X PROFIT (xx)o/o 10.00 $0.25

    MAXIMUM BILLING RATE $2.73

    Multiplier

    2.73

  • Exhlblt 1

    Page 101 of 138

    VOID

    Profotlalanal SOMc:ot Ag...ofllant

    rnM!T!.J

    W.aBX~O$TS

    ProjoctNo: Z1224802Pt l-IOIHIRI

    Pfvjcct Tille: Air-' aid 1141t11-•-,.. Blllldlnll ProiOCb

    Prime Con~unant: ~ lllld ~sodata Aldll1rx:b. P .A.

    Sui) Conaut=t: Thlfr.a SOU!h Florlda,IIIC.

    FILL IHIRIMSE POSmONS AS APPLICABl.E

    MAllIliUM Tm.E HOURLY RATE X I!I!W.I.Ifl.l&8 0

    (M-!R)

    Pltnclp31 sn.o9 2.73 Senior Ettlllnoer $54.65 2.73 1Ptoloet Manlalr SS2A5 2.73 IP!olltd Er~G~Mer S48.35 2.73

    Sonlor Tcdlnldan ICADOI ~.15 2.73

    ~Tc:dlnlcbn S2S.OO 2.73 ls.a.wy 122.12 2.73

    NOTE: AU..IHWICES MUST RE1l.ECT ACTUAl. HOURl.Y RATES UJ1 TO THE MAX!MUM

    Mulllp!lof of 2.7l I • calc:u1Diod at followJ:

    For~leulal!on purposea only. MAXIMUM HOURLY RATE = $1 Entaring lha 'I> beiow will outomaUcally ealall.ata 11\e mu!tipHer and Insert llln tho table above.

    OM1.Y liM I\U.IIIMn """' a IUJdmwn of 2dodmal piceo• (x.xx - IILlDI •lWt.lUl) ""

    OVERHEAD a HOURl.YRATE XOVERHEAD ()oaO'a t10.40

    FRINGE • HOURLY RATE X FRIHOE {IDC)gr, '¥1.'17

    PROFIT (HOURLY RATE • OVERHEAD • RUNGE) X PROFIT (a)'l 10.00

    MAXIMUM BIWNG RATE

    MAXIMUM B ILUMO

    RATE (t/HR)

    S210...S

    $149.19

    S14S.18

    1126.54

    SB3.23

    188.25

    180..39

    $1.CO

    s

    $1.10

    so.»

    $0.2.S

    $2.73

    Mutllpllec

    2.7S

  • Exhibit B - R 1 11/20/2015

    Page 102 of 138

    Professional Services Agreement

    EXHIBIT B-R1

    SALARY COSTS

    Project No: Z1224902P1

    p • t Titl • Professional Consultant Services for Fort Lauderdale-Hollywood International roJec e. Airport and North Perry Airport, Building ProJects

    Prime Consultant: Cartaya and Associates Architects, P .A.

    Sub Consultant: Valancourt International, LLC

    FILL IN/REVISE POSITIONS AS APPLICABLE

    MAXIMUM MAXIMUM BILLING

    TITLE HOURLY RATE X MULTIPLIER = ($/HR)

    RATE ($/HR)

    Project Manager $82.70 2.09 $172.84

    Senior Designer $66.95 2.09 $139.93

    Designer $51.19 2.09 $106.99

    CAD Technician $28.12 2.09 $58.77

    $0.00 2.09 $0.00

    $0.00 2.09 $0.00

    $0.00 2.09 $0.00

    $0.00 2.09 $0.00

    $0.00 2.09 $0.00

    $0.00 2.09 $0.00

    $0.00 2.09 $0.00

    $0.00 2.09 $0.00

    $0.00 2.09 $0.00

    $0.00 2.09 $0.00

    $0.00 2.09 $0.00

    NOTE: ALL INVOICES MUST REFLECT ACTUAL HOURLY RATES UP TO THE MAXIMUM

    Multiplier of 2.09 is calculated as follows:

    For calculation purposes only, MAXIMUM HOURLY RATE= $1 $1.00

    Entering the % below will automatically calculate the multiplier and insert it in the table above.

    ONLY use numbers with a maximum of 2 decimal places (x.xx - xx.xx - xxx.xx) % $

    OVERHEAD= HOURLY RATE X OVERHEAD (xxx)% 82.00 $0.82

    FRINGE= HOURLY RATE X FRINGE (xx)% 8.00 $0.08

    PROFIT= (HOURLY RATE+ OVERHEAD+ FRINGE) X PROFIT (xx)% 10.00 $0.19

    MAXIMUM BILLING RATE $2.09

    Multiplier

    2.09

  • Exhibit 1

    Page 102 o f 138

    VOID

    Protaalonal SIMcotl A;roonmtl!

    EXHJR!TR

    SAl ARY CQ8T8

    Projocl No: Z122190lP1

    Propct'Tltlt:!bl:alll!tloual&lw.••andN.oc!!I~~ButWI"!!~-Primo~; Cctaraand AJ&Od&JCI Ardlllectl, P.A.

    Sl.lbCGnsullanl.: vat&ncowt lrdemzltlollai,UC

    FIU.IJ'UREVISE POSmONS A5 APPUCAIU.E

    MAm!U!S MAXIMUM

    l1Tl..E HOURLYRATE X l:!ll!!:Jle1.!5B 0 BIUJNO

    RATE(IIHR) (1/HRl

    ~fobnaJrer W.70 2.09 S1T.1.84

    isenlor~or $86..95 2.09 __1_1~.93 Dos~gnet $51.10 2.09 $106.99

    leAD Tectllllclan $28.12 2.00 $58.77 moo 2.09 so.oo so..oo 2.09 so__m so..oo 2.09 so.oo so..oo 2.09 so.oo sn.oo 2.09 tom 10.00 2.09 10..00

    so..oo 2.09 so.oo sn.oo 2.09 -~..00 so..oo 2.011 so.oo so.oo 2.011 so.oo $0.00 2.09 so..oo

    NOTE: AU.INVOtCB MUST REflECTACTUAL HOUA1.V RATES UP TO 1NE IIWCIMUM

    MUU!pll« of 2.011 ta ca!a41tod OS tel 10M:

    Far c::a!Q4at!cn JlliiPOSGSOnly, MAXIMUM HOURLY RATE a $1 tt.ooEntering ttle '1!. belowYIID autornatlc:a!ly Ql!a.llale the multiplier and Insert llln lhe tablll above. ONL.Y US0 numtltfla wfOI 0 mlaltmln'l 012 dodmaJ ~ (LD • XIUIX • U)t.)l•) ~ I

    O"JERHEAO a HOUR~V RATE X OVERHEAD (lOCI)~ 82.00 tl).82

    FRINGE • HOUFU.Y RATE Ji;FRIHGE (IOQ~ B.OD to.oe

    PROfTT•(HOURLVRATE • OVERHEAD+ FRIHGC) XPROFTT(xll)'l6 10.00 al-19

    MAXIMUM BIUINO RATE S2.0D

    ~ 2..111

    Structure BookmarksArtifactArtifact-ArtifactProfessional Services Agreement EXHIBIT B-R1 SALARY COSTS Project No: Z1224902P1 p • 1 Professional Consultant Services for Fort Lauderdale-Hollywood International roJect Tit e: Airport and North Perry_Airport Building ProJects Prime Consultant: Cartaya and Associates Architects, P.A. Sub Consultant: AlrQuest Environmental, Inc. FILL IN/REVISE POSITIONS AS APPLICABLE MAXIMUM MAXIMUM BILLING TITLE HOURLY RATE X MULTIPLIER = RATE($/HR) ($/HR) Project Director $41.94 2.67 $111.98 Project Manager {EnvironmentalPn>lasak>l\l!.l SoMcaa AQroomant !iXHJB!TQ SALARYC~S Projac:t No: Zt~P1 Pn>jec:t 'Tllle: .;_~_lllld=:::s:l4lna~ Prtnle Consullal'll: c.rtay11 and Aaii0Cia1c8 ArchKec:t:l, P.A.. S~Conaulmll: AtrQunt En-.lronrr.a1taf,lrtc:. FlU IN/RIMS& PO$JTIOH$ AS.APf'UCABUi MAlUMUIII 1lTU! HOURLY RATE X fl!YbmmB (SIHR) Pro»et DllllCtllt $41.94 2.87 Pro!act Mil!IIIlOI IProfH11onall $41.94 2.87 Fldd...,..!PI, $34.00 2.87 Flelcl Manaaor l&Mtonmenllll Settdsf) ~.00 2.87 Flolcl Todlnlclan $29.24 2.87 ~MaNIIOr $2021 2.87 !0.00 2Professional Services Agreement EXHIBIT B-R1 SALARY COSTS Project No: Z1224902P1 p j Titl Professional Consultant Services for Fort Lauderdale-Hollywood International ro ect e: Airport and North Perry Airport, Building Projects Prime Consultant: Cartaya and Associates Architects, P .A. Sub Consultant: N/A FILL IN/REVISE POSITIONS AS APPLICABLE MAXIMUM MAXIMUM BILLINGTITLE HOURLY RATE X MULTIPLIER = ($/HR) RATE ($/HR) Principal $53.80 2.79 $150.10 Sr. Architect $75.00 2.79 $209.25 Architect $39.06 2.79 $108.Pr~nlll$oMcoo~ EXH!B!TB SALARY!jg!mi Pro.)l!e1t.lo: Z'I2214802P1 Pnl)lct T111o: ~-~A~cai'OI...... . Prlmil ConsCI!Ianl: 04~and ANodalo. An;hltccD, P.A aid> COI\Jvll&nl: NlA RU.IHIRIMSE POSrnONS AS AfiPUCAB&.E MAXIMUM Tn\.E HOURLYAATE X M!:!b]~ .. ~ IP!tnc:tDll t.s.UO 2.82 lsr.~ mco 2.82 l.wu!.d $3ll.C)8 2.82 FJ.Id Resweantallw 134.15 2.11:2 Drai!M S2D.BB 2.82 AutsUinl $15.23 2.82 so.oo 2.11:2 so.oo 2.11:2 so.oo 2.82 $0..00 2.82 so.oo 2.82 SO.DO 2.82 so.oo 2.82 som 2.82 $0.DO 2.82 MOTE: AU.INVOICES MUSTREJ:1Professional Services Agreement EXHIBIT B·R1 SALARY COSTS Project No: Z1224902P1 p j Titl Professional Consultant Services for Fort Lauderdale-Hollywood International ro ect e: Airport and North Perry Airport. Buildina ProJects Prime Consultant Cartaya and Associates Architects, P.A. Sub Consultant CMS • Construction Management Services, Inc. FILL IN/REVISE POSITIONS AS APPLICABLE MAXIMUM MAXIMUM BILLINGTITLE HOURLY RATE X MULTIPLIER = RATE($/HR) ($/HR) Principal $65.16 2.85 $185.71 Proiect Manager CE04) $4Profoulon;l ~~ EXHIBITII SAl A![! COSTS P\'ojoct r.llr. Z1mmi>1 Pl'ojgct Tltkl· "....t Gcnlces tot 1'011 ; Alnlctt Olld llorttl Ponv Aln>Ort Bulldtnnll'ro-.. PJtme Contull8nt: Cmtllyllalld APOC:I.Itn Anlhtlocte, P .A. aub Consul1am: CM$ ·Consm:ctlon ~Servlcea. Inc. FUJ.IMUMSii POSmOH& AS APPUCABI.ii MAX!MUIII 'Tm..2 HOURLYRATI! X ldl.!I:Jl~l.l m! • (MIA) IPrtnctmt $65.18 2.85 Prollel Ma!'llallf !EOCl $43.56 2.85 lac.riGt la:liledz>• $30.30 :us ~nlclElllmJtcr $37.88 2.65 ~ 128.~\ 2.8S lsct.du!at $20.41 2.!5 Professional Services Agreement EXHIBIT B·R1 SALARY COSTS Project No: Z1224902P1 • 1 Professional Consultant Services for Fort Lauderdale-Hollywood International Project Tit e: Airport and North Peny_Airoort Building ProJects Prime Consultant: Cartaya and Associates Architects, P.A. Sub Consultant: CTS Engineering, Inc. FILL IN/REVISE POSITIONS AS APPLICABLE MAXIMUM MAXIMUM TITLE HOURLY RATE X MULTIPLIER = BILLING ($/HR) RATE ($/HR) Project Manager $58.00 2.89 $167.62 Engineering Intern $31.00 2.89 $89.59 DProiQioloiiiiiSorvlcoo ~ €.XHfB!TR SAI..ARY'eJ!mJ Phljla No: Z122AS02P1 Phljoc:t Tllle: AlnatClld ::::'latll-l'llf""" Pnmo Ccntlllllnl: ~andAuod.21Cil Al'llhltccb. P.A. &bConaulllnt: CTS En;lllftrlrt9, Inc. RU.IICIRIMSI! POSntONS AS APPUCABlE MAJUMUI!I Tm..£ HOURLYRATE X M!l!.TtPJ.a;R 0 (Mia) ~~_, $58.00 2.88 ... III!Cm $31.00 2.89 '~ $34.00 2..119 ~ m.co 2.59 Enc:tneer $3.1.00 2.119 isoriar• Tlldlntdan 628.SO 2.89 lson!ct Prolod Emlnoer $45.00 2.89 :tor*w~r $54.00 2.88 lsocrobl'l \11.00 2.89 isoniGt PlannlProfessional Services Agreement EXHIBIT B-R1 SALARY COSTS Project No: Z1224902P1 p . t T"tl Professional Consultant Services for Fort Lauderdale-Hollywood International rojec 1 e: Airport and North Penv Airport, Building ProJects Prime Consultant: Cartaya and Associates Architects, P .A. Sub Consultant: Delta-G Consulting Engineers, Inc. FILL IN/REVISE POSITIONS AS APPLICABLE MAXIMUM MAXIMUM BILLINGTITLE HOURLY RATE X MULTIPLIER = ($/HR) RATE ($/HR) Principal $65.98 2.85 $188.03 Senior Project Manager $43.4Pfof410ionoS ~Agr.arnm1 EXHUIIIII SAlP.R'I' snm Projod No: Z1~2P1 Pro~Tltta: ~lll'td Ndoi'OnYI~a::,=~ PrimeCCUIIUII.I nt: CaMyl and Ataodomnl Mhttocll, p.A. SlltiCDI\S4jiW'IC OIQa.Q Can1untng l!ncJinoet'l. Inc. FlU. tNIRS\IISE POsm~SAS APPUCA8U! MAXIMUM Tm.£ HOWU.VAA1E X !6!!1.~ a (CMR) IPrtnc!mr sa.s.ea :us !le«*w Proioct Man1u;or $43.43 2.~ .....,..,......._, S3UO 2.85 lse~DEn;ner S43..C) 2.85 lso• Oeslllrlor 134.15 2.85 lse.aCADDTodl $25.34 2.BS !AIImlnblra!No Aablanl $23.43 2.BS 10.00 2.BS 10.00 2.85 soProfessional Services Agroemont EXHIBIT 8-R1 SALARY COSTS Project No: Z1224902P1 Project Tltlo: ~r:!,~•!:':~~::•;!,"'.:!o:~:~:~~·lo-Hollywoodlntemalfonal Prtmo consultant: cartaya and Anoclatos Architac:ts, P.A. Sub COnsultant: HDR, Inc. FILL INJREVJSE POSITIONS AS APPUCABLE MAXIMUM MAXIMUM TITLE HOURLY RATE X MULDPUER .. BIWNG RATE($1HR) (SIHR) Principal $86.85 2.90 $250.00 Chief Engineer $86.85 2.90 $250.00 Senior ProJect Manaaer $86.85 2.90 $250.00 Senior DisciPline Lead $86.85 2.90 $250.00 Proiect Manaa--Dl'lKUI. -SISli!D-.-..-~,...~.t-.,;,;i.-....__ --~---,....___.... n.a.____...-..r:AIIUI -... liN! -~""" l -.a.mLIIB . 110J1'I "''>dMr. n=Ptoltdlla~PA -~: lldlllr.ciAaodan.lll