4
HILTON

HILTON cards/Hotel_Hilton... · 2020. 4. 20. · Architect: Albert Viaplana, Helio Piñon Palla-res, Jordi Mir i Valls, Rafael Coll i Pujol. Main contractor: Fomento de Obras y Con-strucciones

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HILTON cards/Hotel_Hilton... · 2020. 4. 20. · Architect: Albert Viaplana, Helio Piñon Palla-res, Jordi Mir i Valls, Rafael Coll i Pujol. Main contractor: Fomento de Obras y Con-strucciones

HILTON

Page 2: HILTON cards/Hotel_Hilton... · 2020. 4. 20. · Architect: Albert Viaplana, Helio Piñon Palla-res, Jordi Mir i Valls, Rafael Coll i Pujol. Main contractor: Fomento de Obras y Con-strucciones

Technical card

Employer /Customer / Archi-

tect ...

Architect: Albert Viaplana, Helio Piñon Palla-res, Jordi Mir i Valls, Rafael Coll i Pujol.

Main contractor: Fomento de Obras y Con-strucciones

Description and location of the

project

Location: Barcelona, Spain

Description: Hotel

Description of the scope of work Engineering, testing for all facade items, as

well as, supply manufacture and installation

on site of suspended stainless steel C.W.

through s. steel connectors, canopies, room

windows, etc.

400 m² suspended C.W.

The work was performed as a ... Subcontractor

Total contract amount 500.000 €

Duration of the contract Subcontract Awarded: 1988

Construction period: 1989

Page 3: HILTON cards/Hotel_Hilton... · 2020. 4. 20. · Architect: Albert Viaplana, Helio Piñon Palla-res, Jordi Mir i Valls, Rafael Coll i Pujol. Main contractor: Fomento de Obras y Con-strucciones

Technical solution

Page 4: HILTON cards/Hotel_Hilton... · 2020. 4. 20. · Architect: Albert Viaplana, Helio Piñon Palla-res, Jordi Mir i Valls, Rafael Coll i Pujol. Main contractor: Fomento de Obras y Con-strucciones

Technical solution