Cardinal Environmental Consultants, Inc. 2691 Dow Avenue, Suite C-2
Tustin, CA 92780 Phone: (714) 730-5931
Fax: (714) 730-1697
Date: April 5th, 2018 Owner/Client: Tustin Unified School District Maintenance and Operations 1302 Service Road Tustin, California 92780 Attention: Mr. Dave Heckathorn SUBJECT: Results of AHERA Six Month Surveillance of Asbestos-Containing
Materials – Winter, 2018 Dear Dave Heckathorn: During Winter 2018 Cardinal conducted the Six-Month Surveillance of Asbestos-Containing Materials, as required by the Asbestos Hazard Emergency Response Act (AHERA). Removals have been noted throughout the district, and some enclosures have also been noted. Our staff witnessed new improvements made in a couple of administration buildings. Carpet has been laid over enclosing some of the vinyl asbestos tiles. The damaged report lists materials that are located in mechanical rooms and storage rooms not inhabited by students. No other damaged materials were found at the District. At a minimum, staff should continue to observe any damaged areas. Damage to the fire doors can cause a risk of exposure. It is highly recommended these be replaced with newer more suitable materials. As you know, copies of individual school reports must be kept at each school site, which in turn must make them available to staff and parents upon request. As agreed, we have included a “thumb drive” with the AHERA documents.
Sincerely yours,
CARDINAL ENVIRONMENTAL CONSULTANTS INC., A California Corporation
By:
Ronald R. McDaniel California Certified Asbestos Consultant #01-2865
CDPH Certified Lead Inspector/Assessor and Project Monitor/Designer #3599 Registered Environmental Assessor
Certified Microbial Consultant by American Indoor Air Quality Council
Tustin Unified School DistrictDISTRICT ADMINISTRATION
TUSD17H
4/5/2018Inspection Date:
DAMAGE REPORT: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Building CBoiler room and A/C room - Left door
Fire door insulationMISCF
1 EADAMAGEDLOW1
Damaged
Remove and replace.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recomended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
Tustin Unified School DistrictNELSON ELEMENTARY SCHOOL
TUSD17V
4/5/2018Inspection Date:
DAMAGE REPORT: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Building DMechanical room
Aircell duct insulationTSIF
5 LF 6"DDAMAGEDLOW1
Deteriorating
Repair or replace
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recomended Response Action
Building EMechanical room
Aircell duct insulationTSIF
6 LF 6"DDAMAGEDLOW4
Torn; deteriorating, debris
Repair or remove
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recomended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
Tustin Unified School DistrictTUSTIN MEMORIAL ELEMENTARY SCHOOL
TUSD17S
4/5/2018Inspection Date:
DAMAGE REPORT: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
C: KindergartenCustodial storage
Fire door insulationMISCF
2 EASIGNIFICANT DAMAGELOW6
Door is coming apart to reveal interior insulation
Repair or Replace
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recomended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictARROYO ELEMENTARY SCHOOL
TUSD17Q
4/5/2018Inspection Date:
A, B, C, D, E, FExterior walls and overhangs
StuccoSURFNF
N.A.GOODLOW*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A, B, C, D, E, FExterior windows
Window puttyMISCNF
N.A.GOODLOW*
No significant damage; on selected windows
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A, B, C, D, E, FUnder windows
Transite panelsMISCNF
N.A.GOOD
MOD*
Cracked panel at room 12 and one broken at room 8
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationConference room
9x9 Beige floor tileMISCNF
40 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationNurse's office
9x9 Beige floor tileMISCNF
165 SFREMOVEDN.A.*
Removed July, 2004
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationSupply room
9x9 Beige floor tileMISCNF
117 SFGOODHIGH*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictARROYO ELEMENTARY SCHOOL
TUSD17Q
4/5/2018Inspection Date:
A: AdministrationWorkroom
9x9 Beige floor tileMISCNF
154 SFGOODHIGH*
No significant damage; partially enclosed by rug
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: KindergartenExterior heater closet
Fire door insulationMISCF
1 EAENCLOSEDLOW1
Enclosed inside door
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: KindergartenOffice and north end of classroom
9x9 Beige floor tileMISCNF
350 SFENCLOSEDLOW*
Enclosed by new floor tile or removed
routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
CCustodial office
Fire door insulationTSIF
2 EAENCLOSEDLOW1
Enclosed inside doors
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C, D, E, FHeater closets
Aircell insulationTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
EWest of ramp on south side of building E
Transite drain pipeMISCNF
N.A.GOOD
MOD*
No significant damage; imbedded in asphalt
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictARROYO ELEMENTARY SCHOOL
TUSD17Q
4/5/2018Inspection Date:
FFood service
Fire door insulationTSIF
2 EAENCLOSEDLOW1
Enclosed inside doors
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Throughout except where notedHeater closets
Fire door insulationMISCNF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Inspector Signature
David Johnson Certified Site Surveillance Technician 17-5918
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictBENSON ELEMENTARY (SYCAMORE)
TUSD17R
4/5/2018Inspection Date:
A: AdministrationAbove doors
Transite panelsMISCNF
10 EAREMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationLounge above stovetop
Transite panelMISCNF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationRoof
Transite flue pipeMISCNF
10 LFREMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationRoof
Transite panelsMISCNF
305 SFREMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationThroughout
9x9 Brown floor tileMISCNF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: KindergartenMechanical room
Fire door insulationMISCF
2 EAENCLOSEDLOW1
Enclosed inside doors
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictBENSON ELEMENTARY (SYCAMORE)
TUSD17R
4/5/2018Inspection Date:
B: KindergartenWorkroom
Ceiling tile masticSURFNF
N.A.ENCLOSEDLOW*
Enclosed by ceiling tiles
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: ClassroomsCustodial and storage rooms
Fire door insulationMISCF
2 EAREMOVEDN.A.
Removed, 2006
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: ClassroomsCustodial room
Light heat shieldMISCF
1 EAGOODLOW1
Light fixture lens missing; insulation exposed
Replace missing lens
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: ClassroomsRoof
Transite flue pipesMISCNF
10 LFGOODLOW*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: ClassroomsStorage room
12x12 Yellow floor tileMISCNF
N.A.GOODLOW
Loose and missing tiles
Repair or replace
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: ClassroomsThroughout
9x9 Green floor tileMISCNF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictBENSON ELEMENTARY (SYCAMORE)
TUSD17R
4/5/2018Inspection Date:
D: ClassroomsThroughout
9x9 Green floor tileMISCNF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: ClassroomsThroughout
Cove base masticSURFNF
N.A.ENCLOSEDLOW*
Enclosed by cove base
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: ClassroomsThroughout
9x9 Green floor tileMISCNF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: ClassroomsCustodial and storage rooms
Fire door insulationMISCF
1 EAREMOVEDN.A.1
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: ClassroomsCustodial and storage rooms
Light heat shieldsMISCF
2 EAGOODLOW1
Light fixture lenses are missing; insulation exposed
Replace missing lenses
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: ClassroomsRoof
Transite flue pipeMISCNF
10 LFGOODLOW*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictBENSON ELEMENTARY (SYCAMORE)
TUSD17R
4/5/2018Inspection Date:
G: MultipurposeAttic
Drywall joint compoundMISCF
N.A.ENCLOSEDLOW1
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
G: MultipurposeMechanical room
Fire door insulationMISCF
1 EAENCLOSEDLOW1
Enclosed inside door
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
G: MultipurposeMultipurpose beams
Spray-applied fireproofingSURFF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
G: MultipurposeRestrooms
Light heat shieldsMISCF
4 EAREMOVEDN.A.
Removed, 2006
N.A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
G: MultipurposeThroughout
9x9 Green floor tileMISCNF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Restroom portableThroughout
Brown sheet vinylMISCF
N.A.REMOVEDN.A.
Removed Summer 2006; portable demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictBENSON ELEMENTARY (SYCAMORE)
TUSD17R
4/5/2018Inspection Date:
ThroughoutExterior windows
Window puttyMISCNF
N.A.GOODLOW*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutHeater closets
Paper tapeMISCF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutHeater closets
Aircell insulationTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutRoofs
Patching compoundMISCNF
N.A.GOODLOW*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Inspector Signature
David Johnson Certified Site Surveillance Technician 17-5918
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictBESWICK ELEMENTARY SCHOOL
TUSD17U
4/5/2018Inspection Date:
A - FBuilding walls and overhang
Exterior stuccoSURFNF
N.A.GOODMOD*
No significant damage
Routine Operations and Maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationCopy and storeroom
Floor tile masticSURFNF
1,500 SFENCLOSEDLOW*
Enclosed under non-ACM floor tile
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationHall and nurse
Floor tile masticSURFNF
1,000 SFENCLOSEDLOW*
Enclosed under non-ACM floor tile
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationOld furnace room
Fire door insulationTSIF
2 EAENCLOSEDLOW1
Enclosed inside doors
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationOld furnace room HWH
Pipe fitting insulationTSIF
1 EAGOODLOW4
Minor damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationThroughout except east end of teachers lounge
Green floor tile and masticMISCNF
2,800 SFENCLOSED
LOW*
Enclosed by carpet
Routine operation and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictBESWICK ELEMENTARY SCHOOL
TUSD17U
4/5/2018Inspection Date:
A: AdministrationUnder windows
Transite panelsMISCNF
300 SFGOODLOW*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: KindergartenThroughout
Green floor tile and masticMISCNF
2,000 SFENCLOSEDLOW*
Enclosed by carpet
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: KindergartenUnder windows
Transite panelsMISCNF
300 SFGOODLOW*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: Rooms A-1 to A-4Throughout
Green floor tile and masticMISCNF
4,000 SFENCLOSEDLOW*
Enclosed by carpet
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: Rooms A-1 to A-4Under windows
Transite panelsMISCNF
300 SFGOODLOW*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
D: Rooms C-1 to C-3Throughout
Green floor tile and masticMISCNF
2700 SFENCLOSEDLOW*
Enclosed by carpet
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictBESWICK ELEMENTARY SCHOOL
TUSD17U
4/5/2018Inspection Date:
D: Rooms C-1 to C-3Under windows
Transite panelsMISCNF
300 SFGOODLOW*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: Rooms E-1 to E-2Throughout
Green floor tile and masticMISCNF
1800 SFENCLOSEDLOW*
Enclosed by carpet
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: Rooms E-1 to E-2Under windows
Transite panelsMISCNF
300 SFGOODLOW*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: Rooms B-1 to B-4Throughout
Brown floor tile and masticMISCNF
2700 SFENCLOSEDLOW*
Enclosed by carpet
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: Rooms B-1 to B-4Under windows
Transite panelsMISCNF
300 SFGOODLOW*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
G: Rooms D-1 to D-4Throughout
Green floor tile and masticMISCNF
2700 SFENCLOSEDLOW*
Enclosed by carpet
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictBESWICK ELEMENTARY SCHOOL
TUSD17U
4/5/2018Inspection Date:
G: Rooms D-1 to D-4Under windows
Transite panelsMISCNF
300 SFGOODLOW*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: Rooms F-1 to F-4Exterior under windows
Transite panelsMISCNF
300 SFGOODLOW*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: Rooms F1 to F-4F-1 Food service
12x12 Brown floor tile and masticMISCNF
160 SFGOODHIGH*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: Rooms F1 to F-4Furnace room between F-2 and F-3
Fire door insulationMISCF
2 EAGOODLOW1
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: Rooms F1 to F-4Furnace rooms
Duct wrapTSIF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: Rooms F1 to F-4Throughout except F-1
Floor tile and masticMISCNF
3,000 SFENCLOSEDLOW*
Enclosed by carpet
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictBESWICK ELEMENTARY SCHOOL
TUSD17U
4/5/2018Inspection Date:
J: MultipurposeAbove ceiling panels
Spray-applied fireproofingSURFF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
J: MultipurposeFurnace room
Fire door insulationMISCF
1 EAENCLOSEDLOW1
Enclosed inside door
Verify ACM; routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
J: MultipurposeFurnace room
Insulation paperTSIF
100 SFGOODLOW1
Located on old ducts; minor damage
Monitor damage
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
J: MultipurposeStage
Orange sheet vinylMISCNF
270 SFENCLOSEDN.A.*
Enclosed by 12 X 12 VFT (verify removal)
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
J: MultipurposeUnder windows
Transite panelsMISCNF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
J: MultipurposeWorkroom
Drywall tape and mudSURFF
N.A.ENCLOSEDLOW1
No significant damage; above ceiling panels
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictBESWICK ELEMENTARY SCHOOL
TUSD17U
4/5/2018Inspection Date:
Inspector Signature
David Johnson Certified Site Surveillance Technician 17-5918
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 6
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictCOLUMBUS TUSTIN MIDDLE SCHOOL
TUSD17G
4/5/2018Inspection Date:
A: AdministrationAbove furnace and HWH
Transite pipesMISCNF
12 LFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationCoat closet
12x12 White floor tile and masticMISCNF
8 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationCopy room and Nurse's office
12x12 Yellow floor tile and masticMISCNF
300 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationExterior walls and overhang
StuccoSURFNF
5,000 SFGOODMOD-
Partially removed Fall 1992
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationThroughout
Pipe fitting insulation behind walls and ceilings
TSIF
N.A.REMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard Ranking
TypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationThroughout
9x9 floor tileMISCNF
2,000 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictCOLUMBUS TUSTIN MIDDLE SCHOOL
TUSD17G
4/5/2018Inspection Date:
A: AdministrationUnder windows
Transite panelsMISCNF
170 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: B1-B2 and Teachers loungeClassroom heat registers
Aircell insulationTSIF
28 REGREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: B1-B2 and Teachers loungeClassrooms
9x9 Grey floor tileMISCNF
2,200 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: B1-B2 and Teachers loungeExterior walls and overhang
StuccoSURFNF
5,000 SFGOODMOD-
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: B1-B2 and Teachers loungeFurnace rooms
Duct tape and flex jointsMISCF
N.A.REMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: B1-B2 and Teachers loungeUnder windows
Transite panelsMISCNF
250 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictCOLUMBUS TUSTIN MIDDLE SCHOOL
TUSD17G
4/5/2018Inspection Date:
C: C1-C3Room C1
9x9 Green floor tileMISCNF
900 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: C1-C3Room C2
12x12 White floor tileMISCNF
256 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: C1-C3Room C2
9x9 Green floor tileMISCNF
644 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: C1-C3Room C3
9x9 Blue floor tileMISCNF
1,000 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: C1-C3Throughout
Cove base masticSURFNF
250 LFENCLOSEDLOW*
Enclosed by cove base; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: C1-C3Under windows
Transite panelsMISCNF
36 SFGOODMOD-
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictCOLUMBUS TUSTIN MIDDLE SCHOOL
TUSD17G
4/5/2018Inspection Date:
E: E1-E3Classroom heat registers
Aircell insulationTSIF
28 REGREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: E1-E3Heater closets
Insulating duct tapeTSIF
10 LFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: E1-E3Under windows
Transite panelsMISCNF
250 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: F1-F3Above ceiling
Pipe insulationTSIF
200 LFENCLOSEDLOW1
Exposed ends encapsulated
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: F1-F3Boiler room
Tank insulation and debrisTSIF
125 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: F1-F3Boiler room
Pipe insulationTSIF
200 LFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictCOLUMBUS TUSTIN MIDDLE SCHOOL
TUSD17G
4/5/2018Inspection Date:
F: F1-F3Throughout
9x9 Green floor tileMISCNF
900 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
G: G1-G4Classroom heat registers
Aircell insulationTSIF
28 REG.REMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
G: G1-G4Heater closets
Duct tape and flex jointsTSIF
12 LFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
G: G1-G4Under windows
Transite panelsMISCNF
250 SFGOODMOD-
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: H1-H3Heater closet
Duct tape and flex jointsTSIF
3 LFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: H1-H3Room H1
9x9 Green floor tileMISCNF
900 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictCOLUMBUS TUSTIN MIDDLE SCHOOL
TUSD17G
4/5/2018Inspection Date:
H: H1-H3Room H2
12x12 Pink floor tileMISCNF
100 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: H1-H3Room H3
9x9 Green floor tileMISCNF
900 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: H1-H3Under windows
Transite panelsMISCNF
192 SFGOODMOD-
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
I: I1-I4Classroom heat registers
Aircell insulationTSIF
24 REG.REMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
I: I1-I4Classrooms
Floor tileMISCNF
3,300 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
I: I1-I4Exterior walls and overhang
StuccoSURFF
5,000 SFGOODMOD-
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 6
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictCOLUMBUS TUSTIN MIDDLE SCHOOL
TUSD17G
4/5/2018Inspection Date:
I: I1-I4Under windows
Transite panelsMISCNF
300 SFGOODLOW-
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
J: J1-J4Classroom heat registers
Aircell insulationTSIF
28 REG.REMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
J: J1-J4Heater closets
Insulating duct tapeTSIF
6 LF EAREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
J: J1-J4Under windows
Transite panelsMISCNF
250 SFGOODMOD-
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: K1-K2Heater closet
Aircell duct wrapTSIF
12 LFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: K1-K2Kiln (east side of K2)
Transite panelsMISCNF
300 SFGOODMOD-
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 7
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictCOLUMBUS TUSTIN MIDDLE SCHOOL
TUSD17G
4/5/2018Inspection Date:
K: K1-K2Throughout
9x9 Grey floor tileMISCNF
2,200 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: K1-K2Under windows
Transite panelsMISCNF
192 SFGOODMOD-
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
L: LibraryFurnace room - east side
Duct tape and flex jointsMISCF
N.A.REMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
L: LibraryLibrary workroom
12x12 Yellow floor tileMISCNF
200 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
L: LibraryUnder windows
Transite panelsMISCNF
25 SFGOODMOD-
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
MultipurposeAbove windows
Transite panelsMISCNF
27 SFGOODMOD-
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 8
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictCOLUMBUS TUSTIN MIDDLE SCHOOL
TUSD17G
4/5/2018Inspection Date:
MultipurposeAttic
Drywall joint compoundSURFF
N.A.ENCLOSEDLOW1
In attic and under ceiling tiles
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
MultipurposeAttic
Pipe fitting insulationTSIF
16REMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
MultipurposeAttic
Flex jointMISCNF
3REMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
MultipurposeBand room M5
Floor tileMISCNF
364 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
MultipurposeCustodial closet
9x9 Grey floor tileMISCNF
24 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
MultipurposeExterior walls and overhang
StuccoSURFNF
10,000 SFGOODMOD-
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 9
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictCOLUMBUS TUSTIN MIDDLE SCHOOL
TUSD17G
4/5/2018Inspection Date:
MultipurposeHeater room at north side of kitchen
Transite flue pipeMISCNF
3 LFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
MultipurposeHeater room at north side of kitchen
Pipe insulationTSIF
8 LFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
MultipurposeKitchen
12x12 Beige floor tileMISCNF
1,000 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
MultipurposeKitchen furnace room
Flex jointMISCF
1 EAREMOVEDN.A.-
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
MultipurposeKitchen, pantry, serving and auditorium
12x12 Brown floor tileMISCNF
2,000 SFREMOVED
N.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
MultipurposeMain room
9x9 Green floor tileMISCNF
2,000 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 10
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictCOLUMBUS TUSTIN MIDDLE SCHOOL
TUSD17G
4/5/2018Inspection Date:
MultipurposeStaff restrooms and kitchen
Ceiling tile masticSURNF
1,800 SFENCLOSED
LOW-
Removed in restrooms; enclosed under ceiling tiles in kitchen
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
MultipurposeStage
12x12 White floor tileMISCNF
550 SFREMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutFurnace rooms
Transite pipesMISCNF
N.A.REMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutFurnace rooms
Fire door insulationMISCNF
N.A.REMOVEDN.A.-
Removed Fall 1992
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Inspector Signature
David Johnson Certified Site Surveillance Technician 17-5918
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 11
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictCURRIE MIDDLE SCHOOL
TUSD17C
4/5/2018Inspection Date:
400Boiler room
Pipe InsulationTSIF
20 LFREMOVEDN.A.*
Removed Summer 2012
N.A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
400Entries and workrooms
Ceiling tile masticSURFNF
2,800 SFREMOVEDN.A.*
Removed Summer 2012
N.A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
400Restrooms
Ceiling tile masticSURFNF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
400Room 405
Transite lab counterMISCNF
1 EAREMOVEDN.A.*
Removed June 2006
N.A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
500Boiler room
Pipe insulationTSIF
20 LFREMOVEDN.A.*
Removed Summer 2012
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
500Entries and workrooms
Ceiling tile masticSURFNF
3,000 SFREMOVEDN.A.*
Remmoved Summer 2012
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictCURRIE MIDDLE SCHOOL
TUSD17C
4/5/2018Inspection Date:
500Rooms 502 and 512
Transite lab counterMISCNF
2 EAREMOVEDN.A.*
Removed June 2006
N.A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
600Boiler room
Pipe injsulationTSIF
15 LFREMOVEDN.A.*
Removed Summer 2012
N.A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
600Entries and workrooms
Ceiling tile masticSURFNF
2,800 SFREMOVEDN.A.*
Removed Summer 2012
N.A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
600Restrooms
Ceiling tile masticSURFNF
N.A.REMOVEDN.A*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
600Room 605
Transite lab counterMISCNF
1REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
700Boys' Coaches' Office
12x12 Olive floor tileMISCNF
210 SFENCLOSEDLOW*
Enclosed by carpet
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictCURRIE MIDDLE SCHOOL
TUSD17C
4/5/2018Inspection Date:
700Girls' Coaches' Office
12x12 Olive floor tileMISCNF
210 SFGOODHIGH*
Minor damage at door
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
700Locker rooms
Ceiling tile masticSURFNF
2,000 SFENCLOSEDLOW*
Enclosed by 1x1 ceiling tiles
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
700Mechanical room
GasketsMISCF
5 SFENCLOSEDLOW1
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
700Mechanical room
Boiler insulationTSIF
N.A.GOODMOD4
Boiler plate detached from boiler
Monitor for damage
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
700Mechanical room
Tank insulationTSIF
N.A.ENCLOSEDLOW1
Enclosed by fiberglass and wrap
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
800Above Ceiling
Pipe InsulationTSIF
20 EAGOODLOW1
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictCURRIE MIDDLE SCHOOL
TUSD17C
4/5/2018Inspection Date:
800Art storage by kiln
Transite panelsMISCNF
N.A.REMOVEDN.A.*
Removed summer 1997
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
800Boiler Room
Pipe InsulationTSIF
8 EAGOODLOW1
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
800Kitchen
Oven insulationMISCF
4 SFREMOVEDN.A.1
Removed (new appliance in place)
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
800Kitchen hall and office
Ceiling tile masticSURFNF
1,500 SFENCLOSEDLOW*
Enclosed by 1x1 ceiling tile, one missing tile
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
800Kitchen office
12x12 Grey floor tileMISCNF
300 SFGOODHIGH*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
800Kitchen restroom
Tan sheet vinylMISCNF
30 SFREMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictCURRIE MIDDLE SCHOOL
TUSD17C
4/5/2018Inspection Date:
800Kitchen storeroom and hall
12x12 Olive floor tileMISCNF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
800Multipurpose
Ceiling tile masticSURFNF
5,000 SFENCLOSEDLOW*
Enclosed by 1x1 ceiling tile
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
800Multipurpose and 4 closets
12x12 Beige floor tileMISCNF
3,000 SFGOODHIGH*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
800Multipurpose stage door
Fire door insulationMISCF
1 EAREMOVEDN.A*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
800Room 802 Music
12x12 Olive floor tileMISCNF
1,124 SFENCLOSEDLOW*
Enclosed by carpet
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
800Room 802 Music
Wall tile masticSURFNF
400 SFENCLOSEDLOW*
Enclosed by 1x1 wall tile
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictCURRIE MIDDLE SCHOOL
TUSD17C
4/5/2018Inspection Date:
800Room 803
Fire door insulationMISCF
1 EAREMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
800Room 803
12x12 Olive floor tileMISCNF
1,124 SFENCLOSEDLOW*
Enclosed by carpet
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
800Room 804
12x12 Olive floor tileMISCNF
980 SFENCLOSEDLOW*
Enclosed by carpet
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
800Room 805
12x12 Olive floor tileMISCNF
1,109 SFGOODHIGH*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
800Room 808 Home Ec
12x12 Tan floor tileMISCNF
1,300 SFGOODHIGH*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
800Room 809
12x12 Beige floor tileMISCNF
1,109 SFENCLOSEDLOW*
Enclosed by carpet except at entry, torn
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 6
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictCURRIE MIDDLE SCHOOL
TUSD17C
4/5/2018Inspection Date:
AdministrationFaculty women's restroom
Brown sheet vinylMISCNF
100 SFREMOVEDN.A*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
AdministrationHealth office restroom
Brown sheet vinylMISCNF
300 SFREMOVEDN.A*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
AdministrationOffice workroom
12x12 Beige floor tileMISCNF
55 SFGOODHIGH*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
AdministrationThorman health office restroom
Brown sheet vinylMISCNF
25 SFGOODHIGH*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutExterior window panels
Transite panelsMISCNF
381 SFGOODMOD*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutRoof mansard
Transite shinglesMISCNF
N.A.REMOVEDN.A.*
Removed summer 2008
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 7
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictCURRIE MIDDLE SCHOOL
TUSD17C
4/5/2018Inspection Date:
ThroughoutRoof patches and penetrations
MasticSURFNF
N.A.REMOVEDN.A.*
Removed summer 2008
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutRoof walkways
Black composition roofingMISCNF
N.A.REMOVEDN.A.*
Removed summer 2008
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Inspector Signature
David Johnson Certified Site Surveillance Technician 17-5918
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 8
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictDISTRICT ADMINISTRATION
TUSD17H
4/5/2018Inspection Date:
Building AMain entrance phone closet (NE)
12x12 Brown floor tileMISCNF
200 SFGOODHIGH*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building AMain entrance vault closet (SE)
9x9 Beige and Grey floor tileMISCNF
50 SFGOODHIGH*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building APayroll room closet
12x12 Red floor tileMISCNF
100 SFGOODHIGH*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building APrint shop and offices
12x12 Brown and Beige floor tileMISCNF
600 SFGOOD
HIGH*
No significant damage; one office enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building APrint shop hall
12x12 Brown and Beige floor tileMISCNF
425 SFGOODHIGH*
Minor damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building APrint shop health storage closet
12x12 Brown floor tileMISCNF
180 SFGOODHIGH*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictDISTRICT ADMINISTRATION
TUSD17H
4/5/2018Inspection Date:
Building APrint shop paper storage
12x12 Brown and Beige floor tileMISCNF
1,800 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building APrint shop woman's restroom
12x12 White floor tileMISC
NF
45 SFENCLOSEDLOW*
Enclosed by sheet vinyl or removed
Verify presence; routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingType
Friable Non-Friable
Comments
Recommended Response Action
Building ARoof access closet
9x9 Beige floor tileMISCNF
60 SFGOODHIGH*
No significant damage; near interior restrooms
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building AThroughout
Wall plasterSURFNF
16,000 SFGOODMOD*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building AThroughout under carpet
9x9 Beige and Grey floor tileMISCNF
12,000 SFENCLOSEDLOW*
200 SF exposed in three closets
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictDISTRICT ADMINISTRATION
TUSD17H
4/5/2018Inspection Date:
Building CBoiler room and A/C room - Left door
Pipe insulationTSIF
20 LFREMOVED
N.A.*
Removed Summer 2012
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building CBoiler room and A/C room - Left door
Fire door insulationMISCF
1 EADAMAGED
LOW1
Damaged
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building CBoiler room and A/C room - Right door
Pipe fitting insulationTSIF
55 EAREMOVED
N.A.*
Removed Summer 2012
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building CExterior restrooms
12x12 Brown floor tileMISCNF
120 SFGOODHIGH*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building CMechanical Room
Transite pipeMISCNF
10 LFGOODN.A.*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictDISTRICT ADMINISTRATION
TUSD17H
4/5/2018Inspection Date:
Building DCommunication Room
Linoliumn FlooringMISCNF
100 SFREMOVEDN.A.*
Removed Summer 2011
Routine Operations And Maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building DRoof
Roof MasticSURFNF
50 SFREMOVEDN.A.*
Removed Summer 2011
Routine Operations And Maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building ERoof
Roof MasticSURFNF
50 SFREMOVEDN.A.*
Removed Summer 2011
Routine Operations And Maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Inspector Signature
David Johnson Certified Site Surveillance Technician 17-5918
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictESTOCK ELEMENTARY SCHOOL
TUSD17M
4/5/2018Inspection Date:
A: Rooms A1 to A6Classrooms
9x9 Tan floor tileMISCNF
36,00 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: Rooms A1 to A6Exterior walls and overhangs
StuccoSURFNF
10,000 SFGOODMOD*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: Rooms A1 to A6Heater rooms
Aircell duct wrapTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: Rooms A1 to A6Under windows
Transite panelsMISCNF
600 SFGOODMOD*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
AdministrationExterior walls and overhangs
StuccoSURFNF
5,000 SFGOODMOD*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
AdministrationNurse's office
9x9 Beige floor tileMISCNF
200 SFENCLOSEDLOW*
Enclosed by carpet except in storage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictESTOCK ELEMENTARY SCHOOL
TUSD17M
4/5/2018Inspection Date:
AdministrationTeachers lounge
Floor tile masticSURFNF
800 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
AdministrationUnder windows
Transite panelsMISCNF
400 SFGOODMOD*
No significant damage; some are metal
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
AdministrationWorkroom and storage
9x9 Beige floor tileMISCNF
287 SFGOODHIGH*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: Rooms B1 to B5Classrooms
9x9 Green floor tileMISCNF
3,600 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: Rooms B1 to B5Exterior walls and overhangs
StuccoSURFNF
8,000 SFGOODMOD*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: Rooms B1 to B5Exterior windows
Window puttyMISCF
500 SFGOODLOW*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictESTOCK ELEMENTARY SCHOOL
TUSD17M
4/5/2018Inspection Date:
B: Rooms B1 to B5Food service
Fire door insulationMISCF
2 EAENCLOSEDLOW*
Enclosed inside doors
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: Rooms B1 to B5Heater rooms
Aircell duct wrapTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: Rooms B1 to B5Under windows
Transite panelsMISCNF
500 SFGOODMOD*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: Rooms C1 to C6Classrooms
9x9 Green floor tileMISCNF
3,600 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: Rooms C1 to C6Exterior walls and overhangs
StuccoSURFNF
8,000 SFGOODMOD*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: Rooms C1 to C6Heater rooms
Aircell duct wrapTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictESTOCK ELEMENTARY SCHOOL
TUSD17M
4/5/2018Inspection Date:
C: Rooms C1 to C6Under windows
Transite panelsMISCNF
600 SFGOODMOD*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
D: Rooms D1 to D4Exterior walls and overhangs
StuccoSURFNF
5,000 SFGOODMOD*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
D: Rooms D1 to D4Exterior windows
Window puttyMISCNF
400 SFGOODLOW*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
D: Rooms D1 to D4Heater rooms
Aircell duct wrapTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
D: Rooms D1 to D4Under windows
Transite panelsMISCNF
600 SFGOODMOD*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: Rooms D1 to D4Classrooms
9x9 Green floor tileMISCNF
3,600 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictESTOCK ELEMENTARY SCHOOL
TUSD17M
4/5/2018Inspection Date:
E: Rooms E1 to E4Classrooms
9x9 Green floor tileMISCNF
3,600 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: Rooms E1 to E4Custodial office
Fire door insulationMISCF
2 EAENCLOSEDLOW1
Enclosed inside doors
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: Rooms E1 to E4Exterior walls and overhangs
StuccoSURFNF
5,000 SFGOODMOD*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: Rooms E1 to E4Exterior windows
Window puttyMISCNF
300 SFGOODLOW*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: Rooms E1 to E4Heater rooms
Aircell duct wrapTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: Rooms E1 to E4Under windows
Transite panelsMISCNF
578 SFGOODMOD*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictESTOCK ELEMENTARY SCHOOL
TUSD17M
4/5/2018Inspection Date:
Kindergarten K1Exterior windows
Window puttyMISCNF
300 SFGOODLOW*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Kindergarten K1Mechanical room
Fire door insulationMISCF
1 EAENCLOSEDLOW1
Enclosed inside door
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Kindergarten K1Room K1
9x9 floor tileMISCNF
400 SFGOODHIGH*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Kindergarten K1Under windows
Transite panelsMISCNF
400 SFGOODMOD*
No significant damage; some are metal
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
MultipurposeCeiling beams
Spray-applied fireproofingSURFF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
MultipurposeExterior walls and overhangs
StuccoSURFNF
10,000 SFGOODMOD*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 6
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictESTOCK ELEMENTARY SCHOOL
TUSD17M
4/5/2018Inspection Date:
MultipurposeMechanical room
Fire door insulationMISCF
1 EAREMOVEDN.A.1
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
MultipurposeUnder windows
Transite panelsMISCNF
400 SFGOODMOD*
No significant damage; some are metal
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutClassroom heater closets
Fire door insulationMISCF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutHeater rooms
Flex jointsMISCNF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Inspector Signature
David Johnson Certified Site Surveillance Technician 17-5918
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 7
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
500: HorticultureThroughout
12x12 Green floor tileMISCNF
2,700 SFREMOVEDN.A.*
Removed 1998; building demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sAir conditioning room
Pipe fitting insulationTSIF
N.A.REMOVEDN.A.*
Removed 1993BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sFaculty restroom hall
Grey floor tile and masticMISCNF
50 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sFaculty restrooms
Grey floor tile and masticMISCNF
406 SFENCLOSEDN.A.*
Removed June, 2004BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sFaculty restrooms and hall
Light heat shieldsMISCF
4 EAREMOVEDN.A.*
Removed June, 2004
N/A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sHallways
Mastic under Black and Gold floor tile
MISCNF
5,700 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard Ranking
TypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
A: 100'sLibrary history storage
9x9 Grey floor tile and masticMISCNF
288 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sLibrary office
9x9 Grey floor tile and masticMISCNF
216 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sLibrary storage - northeast end
9x9 Grey floor tile and masticMISCNF
280 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sLibrary workroom
9x9 Grey floor tile and masticMISCNF
216 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sPsychologist
9x9 Grey floor tile and masticMISCNF
160 SFENCLOSEDHIGH*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sRoom 101
9x9 Grey floor tile and masticMISCNF
840 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
A: 100'sRoom 102
9x9 Grey floor tile and masticMISCNF
840 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sRoom 103
9x9 Grey floor tile and masticMISCNF
840 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sRoom 104
9x9 Grey floor tile and masticMISCNF
840 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sRoom 105
9x9 Grey floor tile and masticMISCNF
840 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sRoom 106
9x9 Grey floor tile and masticMISCNF
840 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sRoom 107
9x9 Grey floor tile and masticMISCNF
840 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
A: 100'sRoom 108
9x9 Grey floor tile and masticMISCNF
840 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sRoom 109
9x9 Grey floor tile and masticMISCNF
840 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sRoom 110
9x9 Grey floor tile and masticMISCNF
840 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sRoom 111
9x9 Grey floor tile and masticMISCNF
840 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sRoom 112 and "Knightlife"
9x9 Grey floor tile and masticMISCNF
900 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sRoom 113
9x9 Grey floor tile and masticMISCNF
840 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
A: 100'sRoom 114
9x9 Grey floor tile and masticMISCNF
840 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sRoom 115 (north)
9x9 Grey floor tile and masticMISCNF
400 SFENCLOSEDHIGH*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sRoom 115 (south) and storage
9x9 Beige floor tile and masticMISCNF
840 SFENCLOSEDHIGH*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sRoom 115 (south) storage
Light heat shieldsMISCNF
1 EAENCLOSEDLOW*
Enclosed inside light fixture
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sRoom 116
9x9 Grey floor tile and masticMISCNF
840 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sRoom 117
9x9 Grey floor tile and masticMISCNF
840 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
A: 100'sRoom 118
9x9 Grey floor tile and masticMISCNF
840 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sRoom 119
9x9 Grey floor tile and masticMISCNF
900 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sRoom 120
9x9 Grey floor tile and masticMISCNF
840 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sRoom 121
9x9 Grey floor tile and masticMISCNF
840 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sRoom 122
9x9 Grey floor tile and masticMISCNF
840 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sRoom 123
9x9 Grey floor tile and masticMISCNF
840 SFENCLOSEDLOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 6
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
A: 100'sStage area
9x9 Grey floor tile and masticMISCNF
500 SFENCLOSEDHIGH*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 100'sVideo production lab (S. of room 115)
9x9 Grey floor tile and masticMISCNF
600 SFENCLOSED
LOW*
Carpet replace 2015. Mastic and VFT remain.
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: 300'sAir conditioning room
Pipe fitting insulationTSIF
25 EAREMOVEDN.A.*
Removed 1993
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: 300'sAir conditioning room
Pipe insulationTSI
75 LFREMOVEDN.A.*
Removed 1993
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: 300'sArt Gallery and offices above ceiling panels
FireproofingSURF
3,000 SFREMOVED
N.A.*
Removed 1993
N.A.
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 7
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
B: 300'sInside walls between rooms
FireproofingSURFF
N.A.ENCLOSED
LOW1
Minor quantities in inaccessible areas after summer '93 abatement
Use caution during renovations
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: 300'sNorth hallway
Yellow floor tile masticMISCNF
1,300 SFENCLOSEDLOW*
Enclosed under gold floor tile
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: 300'sNorth hallway above ceiling panels
FireproofingSURFF
N.A.REMOVEDN.A.*
Removed 1993
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: 300'sRoom 301
9x9 White floor tileMISCNF
812 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: 300'sRoom 302
9x9 White floor tileMISCNF
812 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: 300'sRoom 303
9x9 White floor tileMISCNF
812 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 8
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
B: 300'sRoom 304
9x9 White floor tileMISCNF
812 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: 300'sRoom 305
9x9 White floor tileMISCNF
840 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: 300'sRoom 306
9x9 Beige floor tileMISCNF
840 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: 300'sRoom 307
9x9 White floor tileMISCNF
837 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: 300'sRoom 308
9x9 White floor tileMISCNF
840 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: 300'sRoom 309
9x9 White floor tileMISCNF
783 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 9
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
B: 300'sRoom 310
9x9 White floor tileMISCNF
810 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: 300'sRoom 311 and office
9x9 White floor tileMISCNF
810 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: 300'sRoom 312
9x9 White floor tileMISCNF
810 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: 300'sRoom 313 and 313A
9x9 White floor tileMISCNF
1,404 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: 300'sRoom 314
9x9 White floor tileMISCNF
900 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: 300'sStaff restrooms
Light heat shieldsMISCNF
2 EAREMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 10
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
B: 300'sThroughout
2x4 "Daisy" ceiling panelsMISCF
N.A.REMOVEDN.A.*
Removed 1993
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: AdministrationAttendance hall storage
9x9 White floor tileMISCNF
20 SFENCLOSEDLOW*
Enclosed by carpet; SW corner of attendance
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: AdministrationAttendance paper storage
9x9 White floor tileMISCNF
75 SFENCLOSEDLOW*
No significant damage; NW corner of attendance
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: AdministrationAttendance photocopy room
9x9 White floor tileMISCNF
100 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: AdministrationFaculty resource (near 305)
9x9 White floor tileMISCNF
260 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: AdministrationFaculty resource (near 305) storage
Light heat shieldMISCF
1 EAENCLOSEDLOW1
Enclosed inside light fixture
Verify ACM; routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 11
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
B: AdministrationNurse
9x9 White floor tileMISCNF
370 SFREMOVEDN.A.*
Removed July, 2005
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: AdministrationOffice attic
Pipe fitting insulationTSIF
5 EAENCLOSEDLOW1
Enclosed in attic; entry in custodial closet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: AdministrationOffice attic
Fireproofing on beamsSURFF
N.A.ENCLOSED
LOW1
Enclosed in attic; entry in custodial closet. Clean-up and encapsulation was done on 2009.
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: AdministrationOffice supply room
9x9 White floor tileMISCNF
68 SFGOODHIGH*
No significant damage; behind reception desk.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C1: 200'sCentral workroom
Transite counter, sink and under autoclave (oven) at kitchen
MISCNF
10 EAGOODLOW*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard Ranking
TypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 12
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
C1: 200'sCentral workroom
Transite lab cartMISCNF
2 EAGOODLOW*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C1: 200'sCentral workroom storage
Light heat shieldMISCF
1 EAENCLOSEDLOW1
Enclosed inside light fixture
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C1: 200'sCentral workroom storage and under most cabinets
9x9 Tan floor tile and masticMISCNF
10 SFGOOD
LOW*
No significant damage
Routine Operations And Maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C1: 200'sExterior walls
StuccoSURFNF
8,000 SFGOODLOW*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C1: 200'sGeneral science lab
9x9 Beige floor tile and masticMISCNF
600 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C1: 200'sRoom 201
9x9 White floor tile and masticMISCNF
812 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 13
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
C1: 200'sRoom 202
9x9 White floor tile and masticMISCNF
812 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C1: 200'sRoom 203
9x9 White floor tile and masticMISCNF
812 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C1: 200'sRoom 204
9x9 White floor tile and masticMISCNF
812 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C1: 200'sRoom 205
9x9 White floor tile and masticMISCNF
812 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C1: 200'sRoom 206
9x9 White floor tile and masticMISCNF
812 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C1: 200'sRoom 207
9x9 White floor tile and masticMISCNF
812 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 14
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
C1: 200'sRoom 208
Transite counters and sinksMISCNF
10 EAGOODLOW*
Sinks removed, counters remaining
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C1: 200'sRoom 208
Transite panels on fume hoodMISCNF
200 SFREMOVEDN.A.*
Hood removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C1: 200'sRoom 208-215, halls and workrooms
9x9 White floor tile and masticMISCNF
N.A.REMOVED
N.A.*
Removed 7/03
N.A.
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C1: 200'sRoom 209
Transite counter and sinkMISCNF
32 SFGOODLOW*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C1: 200'sRoom 215
Transite counters and sinksMISCNF
10 EAGOODLOW*
No significant damage, only one sink remaining
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C1: 200'sRoom 215
Transite panels on fume hoodMISCNF
200 SFREMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 15
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
C1: 200'sRoom 215 storage
Light heat shieldMISCNF
1 EAENCLOSEDLOW*
Enclosed inside light fixture
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C1: 200'sRooms 213 & 214 under cabinets
9x9 floor tile and masticMISCNF
2,200 SFENCLOSEDHIGH*
In some areas is expose and loose and broken
Routine Operations and Maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C1: 200'sZone #1 Air conditioning and boiler room
Fire door insulationMISCF
2 EAENCLOSED
LOW1
No significant damage
Encapsulate exposed insulation
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C1: 200'sZone #1 Air conditioning and boiler room
Pipe insulationTSIF
142 LFREMOVED
N.A.*
Removed 1993
N.A.
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C1: 200'sZone #1 Air conditioning and mechanical room
Pipe fitting insulationTSI
N.A.REMOVED
N.A.*
Removed 1993
N.A.
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 16
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
C2: 200'sFaculty resource
Ceiling panelsMISCF
200 SFREMOVEDN.A.1
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C2: 200'sFaculty resource
9x9 White floor tile and masticMISCNF
200 SFREMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C2: 200'sRoom 216 storage
9x9 White floor tile and masticMISCNF
1,172 SFREMOVEDN.A.*
Removed
N/A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C2: 200'sRoom 216 storage
Light heat shieldMISCNF
2 EAENCLOSEDLOW*
One enclosed in light fixture
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C2: 200'sRoom 216-220
2x4 "Daisy" ceiling panelsMISCF
N.A.REMOVEDN.A.*
Removed Spring 1993
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C2: 200'sRoom 217
Transite panelsMISCNF
12 SFREMOVEDN.A.*
Removed Summer 1997
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 17
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
C2: 200'sRoom 217 and storage
9x9 White floor tile and masticMISCNF
1,178 SFGOODHIGH*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C2: 200'sRoom 217 storage
Light heat shieldMISCNF
2 EAENCLOSEDLOW*
Enclosed in light fixture
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C2: 200'sRoom 218 and pantry
9x9 White floor tile and masticMISCNF
1,178 SFREMOVEDN.A.*
Removed
N/A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C2: 200'sRoom 219
9x9 White floor tile and masticMISCNF
812 SFREMOVEDN.A.*
Removed 7/03
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C2: 200'sRoom 220
9x9 White floor tile and masticMISCNF
840 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C2: 200'sZone #4 Air conditioning room
3" pipe insulationTSIF
N.A.REMOVEDN.A.*
Removed 1993
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 18
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
C2: 200'sZone #4 Air conditioning room
Pipe fitting insulationTSIF
N.A.REMOVEDN.A.*
Removed 1993
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: Snack barRestroom
Light heat shieldMISCNF
2 EAGOODLOW*
Light fixture is new, verify presence
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: CafeteriaCafeteria
9x9 Green floor tile and masticMISCNF
3,000 SFGOOD
HIGH*
Minor damage throughout several missing, broken and lifting
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: CafeteriaCafeteria storage rooms
Light heat shieldMISCNF
6 EAGOODLOW*
One enclosed in light fixture
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: CafeteriaFood service area
9x9 White floor tile and masticMISCNF
754 SFREMOVEDN.A.*
Removed 12/99
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: CafeteriaFurnace rooms (4)
FireproofingSURFF
225 SFGOODLOW1
No significant damage; NW room
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 19
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
F: CafeteriaFurnace rooms (SW)
Pipe fitting insulationTSIF
3 EAREMOVEDN.A.1
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: CafeteriaKitchen office and storage
9x9 White floor tile and masticMISCNF
150 SFGOODHIGH*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: CafeteriaKitchen restroom and hall
9x9 White floor tile and masticMISCNF
100 SFREMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: CafeteriaKitchen restroom, hall and storage
Light heat shieldMISCNF
4 EAREMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: CafeteriaStudent restrooms
Light heat shieldMISCNF
5 EAREMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: CafeteriaTeachers cafeteria
9x9 White floor tile and masticMISCNF
144 SFENCLOSEDLOW*
Partially removed 12/99
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 20
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
G: Boys P.E.Equipment room
9x9 Tan floor tile and masticMISCNF
100 SFREMOVEDN.A.*
Removed 2010
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
G: Boys P.E.Roof parapet wall
Capsheet roofingMISCNF
N.A.REMOVEDN.A.*
Removed 2010
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
G: Boys P.E.Training room
Floor tile masticMISCNF
200 SFREMOVEDN.A.*
Removed 2010
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
G: Boys P.E.Various
Glue spotsSURFNF
N.A.REMOVEDN.A.*
Removed 2010
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: GymBetween foyer and student store; above overhang
FireproofingSURFF
N.A.ENCLOSED
LOW1
Small quantities remain enclosed in inaccessible areas
Use caution during renovations
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: GymElectric room
9x9 Tan floor tile and masticMISCNF
50 SFGOODLOW*
Missing pieces
Repair or replace
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 21
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
H: GymFoyer and student store
2x4 "Daisy" ceiling panelsMISCF
1,097 SFREMOVEDN.A.*
Removed Summer 1993
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: GymFoyer and student store attic
FireproofingSURFF
2,193 SFREMOVEDN.A.*
Removed Summer 1993
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: GymFoyer, student store, and restrooms
Floor tile masticMISCNF
1,097 SFENCLOSED
LOW*
Enclosed under carpet and tile; removed in restrooms
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: GymStudent restrooms
Light heat shieldMISCNF
4 EAREMOVEDN.A.*
Removed 7/04
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
J: Girls P.E.Halls, restrooms, offices, and equipment storage
9x9 Grey floor tile and masticMISCNF
1,000 SFREMOVED
N.A.*
Removed 2010
N.A.
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 22
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
J: Girls P.E.Mechanical room
FireproofingSURFF
900 SFREMOVEDN.A.*
Removed Summer 1993
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
J: Girls P.E.Mechanical room
Tank insulationTSIF
160 SFREMOVEDN.A.*
Removed 2010
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
J: Girls P.E.Mechanical room
Pipe fitting insulationTSIF
15 EAREMOVEDN.A.*
Removed Summer 1993
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: 400'sMain dark room
FireproofingMISCF
N.A.REMOVEDN.A.*
Removed Summer 1993
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: 400'sMechanical room
Pipe insulationTSIF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: 400'sMechanical room (north)
FireproofingSURFF
360 SFGOODLOW1
Minor damage at penetration
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 23
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
K: 400'sMechanical room (north)
Fire door insulationMISCF
2 EAENCLOSEDLOW1
Enclosed inside doors
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: 400'sMechanical room (north)
Pipe fitting insulationTSIF
6 EAGOODLOW1
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: 400'sMechanical room (southeast)
FireproofingSURFF
360 SFGOODLOW1
Minor delamination
Monitor damage
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: 400'sMechanical room (southwest)
Fire door insulationMISCF
2 EAENCLOSEDMOD2
Enclosed inside door
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: 400'sRoom 402
9x9 Brown floor tile and masticMISCNF
1,500 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: 400'sRoom 402 duplicating office
9x9 Tan floor tile and masticMISCNF
50 SFGOODHIGH*
Minor damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 24
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
K: 400'sRoom 402 duplicating office
Light heat shieldMISCF
1 EAENCLOSEDLOW1
Enclosed inside light fixture
routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: 400'sRoom 402 storage
9x9 Brown floor tile and masticMISCNF
50 SFGOODHIGH*
No significant damage.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: 400'sRoom 403 wood shop
Pipe fitting insulationTSIF
15 EAGOODLOW1
No significant damage; at ceiling
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: 400'sRoom 403 wood shop (gym room)
9x9 Tan floor tile and masticMISCNF
600 SFGOOD
HIGH*
No visible damage but maybe missing tiles under equipment
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: 400'sRoom 403 wood shop finishing room
Fire door insulationMISCF
1 EAENCLOSED
LOW1
Enclosed inside door
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 25
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
K: 400'sRoom 403 wood shop storages (2) and finishing room
Light heat shieldsMISCF
3 EAENCLOSED
LOW1
Enclosed inside light fixtures
Verify ACM; routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: 400'sRoom 404 welding booth walls
Transite panelsMISCNF
N.A.REMOVEDN.A.*
Removed 1997
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: 400'sRoom 405, 408, storage and darkroom
9x9 Tan floor tile and masticMISCNF
N.A.REMOVED
N.A.*
Removed 7/03
N.A.
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: 400'sRoom 405-408 and main darkroom
2x4 ceiling panelsMISCF
N.A.REMOVEDN.A.*
Removed 1993
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: 400'sRoom 405-408 office
9x9 Tan floor tile and masticMISCNF
80 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 26
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
K: 400'sRoom 406 choir, hall, storages, and restrooms
9x9 Tan floor tile and masticMISCNF
2,100 SFGOOD
LOW*
No significant damage; removed in restrooms and robe storage
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: 400'sRoom 406 dressing, restroom, and robe storage
Light heat shieldsMISCNF
11 EAREMOVED
N.A.*
Removed
N.A.
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: 400'sRoom 407 Band
9x9 Tan floor tile and masticMISCNF
2,000 SFENCLOSEDLOW*
Enclosed by carpet; exposed in storage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: 400'sRoom 408 Photo, on work table
Transite panelsMISCNF
2x3GOODHIGH*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutAdjacent to windows
Transite panelsMISCNF
N.A.GOOD
MOD*
No significant damage, removed in Boy's and Girl's Locker Rooms
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 27
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictFOOTHILL HIGH SCHOOL
TUSD17B
4/5/2018Inspection Date:
ThroughoutHeater closets
Fire door insulationMISCF
40 EAENCLOSEDLOW1
Enclosed inside doors
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutRoofs
Patching masticSURFNF
N.A.GOODMOD*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Inspector Signature
David Johnson Certified Site Surveillance Technician 17-5918
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 28
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictGUIN FOSS SCHOOL
TUSD17J
4/5/2018Inspection Date:
Building A: AdministrationThroughout
9x9 Brown floor tile and/or masticMISCNF
5,000 SFENCLOSEDLOW*
Enclosed by carpet and new floor tile
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building B: KindergartenRestrooms
12x12 Orange floor tile and masticMISCNF
N.A.REMOVEDN.A.*
Removed 6/04
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building B: KindergartenRoom A2 heater room
Fire door insulationTSIF
1 EAENCLOSEDLOW1
Enclosed inside door
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building B: KindergartenThroughout except A2 restrooms
Floor tile masticSURFF
1,000 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building C: Rooms B1 - B4Exterior windows
Window puttyMISCNF
300 SFGOODLOW*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building C: Rooms B1 - B4Throughout
Cove baseMISCNF
N.A.REMOVEDN.A.*
Removed 1996-97
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictGUIN FOSS SCHOOL
TUSD17J
4/5/2018Inspection Date:
Building C: Rooms B1 - B4Throughout
Floor tile masticSURFF
3,600 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building D1: Rooms C1 - C4Custodial room
Transite panelMISCNF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building D1: Rooms C1 - C4Exterior windows
Window puttyMISCNF
300 SFGOODLOW*
Minor damage: <1% ACM, some loose @ room 4
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building D1: Rooms C1 - C4Throughout
Cove baseMISCNF
N.A.REMOVEDN.A.*
Removed Summer 1997
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building D1: Rooms C1 - C4Throughout
9x9 Brown floor tile and masticMISCNF
3,600 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building D2: Rooms D1 - D4Exterior windows
Window puttyMISCNF
300 SFGOODLOW*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictGUIN FOSS SCHOOL
TUSD17J
4/5/2018Inspection Date:
Building D2: Rooms D1 - D4Food service
Floor tile masticSURFF
200 SFENCLOSEDLOW*
Enclosed by Tan 12x12 floor tile
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building D2: Rooms D1 - D4Throughout
9x9 Brown floor tile and masticMISCNF
3,400 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building E: MultipurposeAbove windows
Transite panelsMISCNF
32 SFGOODLOW*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building E: MultipurposeLibrary
Floor tile masticSURFF
2,500 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building E: MultipurposeLibrary restroom
9x9 Tan floor tile and masticMISCNF
45 SFENCLOSEDLOW*
Enclosed by new sheet vinyl
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building E: MultipurposeMain room walls
Spray-applied wall plasterSURFF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictGUIN FOSS SCHOOL
TUSD17J
4/5/2018Inspection Date:
Building E: MultipurposeMechanical room
Straight run pipe insulationTSIF
2 LFREMOVEDN.A.1
Removed; may remain inside walls
Verify presence
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building E: MultipurposeMechanical room
Fire door insulationMISCF
2 EAENCLOSEDLOW1
Enclosed inside door
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building E: MultipurposeMechanical room
Transite flue pipeMISCNF
3 LFREMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building E: MultipurposeMechanical room
GasketMISCNF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building F: Rooms E1 - E4Throughout
9x9 Brown floor tile and masticMISCNF
3,600 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building F: Rooms E1 - E4Under windows
Transite panelsMISCNF
300 SFGOODLOW*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictGUIN FOSS SCHOOL
TUSD17J
4/5/2018Inspection Date:
Inspector Signature
David Johnson Certified Site Surveillance Technician 17-5918
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictHEIDEMAN ELEMENTARY SCHOOL
TUSD17O
4/5/2018Inspection Date:
AFaculty lounge
12x12 Green floor tileMISCNF
N.A.REMOVEDN.A.*
Removed; building demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
AThroughout
Floor tile and linoleumMISCNF
N.A.REMOVEDN.A.*
Removed; building demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
BExterior walls and overhangs
StuccoSURFNF
8,000 SFGOODLOW*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
BKindergarten room 1
9x9 Beige floor tileMISCNF
500 SFGOODHIGH*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
BKindergarten workroom
Transite panelMISCNF
12 SFREMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
BRoom B5
9x9 Beige floor tileMISCNF
324 SFREMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictHEIDEMAN ELEMENTARY SCHOOL
TUSD17O
4/5/2018Inspection Date:
BUnder windows
Transite panelsMISCNF
44 SFGOODMOD*
No significant damage; some are metal
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutRoofs
Patching masticSURFNF
500 SFGOODLOW*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutThroughout
Fire door insulationMISCF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Inspector Signature
David Johnson Certified Site Surveillance Technician 17-5918
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictHEWES MIDDLE SCHOOL
TUSD17E
4/5/2018Inspection Date:
A: AdministrationHealth office and restrooms
9x9 Beige floor tileMISCNF
189 SFREMOVEDN.A.*
Remove 09/00
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationInterior restroom
Fire door insulationMISCF
1REMOVEDN.A.
Removed 7/07
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationOffice area
9x9 Beige floor tileMISCNF
5,000 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenanc
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationOffices and workroom
Fire door insulationMISCF
4 EAENCLOSEDLOW1
Enclosed inside doors
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationWorkroom
9x9 Beige floor tileMISCNF
205 SFENCLOSED
N.A.*
New carpeting over tile. New lounge area. Observed 2018
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: ClassroomsRoom 08, 10
9x9 Beige floor tileMISCNF
2,400 SFREMOVEDN.A.*
REMOVED 7/14
N.A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictHEWES MIDDLE SCHOOL
TUSD17E
4/5/2018Inspection Date:
B: ClassroomsRoom 09
9x9 Beige floor tileMISCNF
1,200 SFREMOVEDN.A.*
REMOVED 7/14
N.A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: ClassroomsRoom 09 at Kiln
Transite panelsMISCNF
300 SFREMOVEDN.A.*
REMOVED 7/14
N.A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: ClassroomsRoom 10
Transite counters and sinksMISCNF
10 EAREMOVEDN.A.*
REMOVED 7/14
N.A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: ClassroomsRoom 11
9x9 Green floor tileMISCNF
1,200 SFREMOVEDN.A.*
REMOVED 7/14
N.A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: ClassroomsRoom 11
Transite counters and sinksMISCNF
8 EAREMOVEDN.A.*
REMOVED 7/14
N.A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: ClassroomsRoom 11-12 Prep room
9x9 Green floor tileMISCNF
2,400 SFREMOVEDN.A.*
REMOVED 7/14
N.A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictHEWES MIDDLE SCHOOL
TUSD17E
4/5/2018Inspection Date:
B: ClassroomsRoom 11-12 Prep room
Fire door insulationMISCF
2 EAREMOVEDLOW1
REMOVED
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: ClassroomsRoom 11-12 Prep room
Transite counters and sinksMISCNF
5 EAREMOVEDN.A.*
REMOVED 7/14
N.A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: ClassroomsRoom 12
Transite counters and sinksMISCNF
10 EAREMOVEDN.A.*
REMOVED 7/14
N.A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: classroomsRoom 12
9x9 Green floor tileMISCNF
1,000 SFREMOVEDN.A.*
REMOVED 7/14
N.A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: LibraryLibrary storage room/custodian
9x9 Beige floor tileMISCNF
50 SFGOODMOD*
Minor damage; obscured
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: LibraryLibrary workroom
9x9 Beige floor tileMISCNF
240 SFGOODHIGH*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictHEWES MIDDLE SCHOOL
TUSD17E
4/5/2018Inspection Date:
E: LibraryLibrary, workroom, and computer room
9x9 Beige floor tileMISCNF
4,800 SFENCLOSED
LOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: ClassroomsRoom F-1, pantry, and storeroom
9x9 Beige floor tileMISCNF
2,200 SFREMOVEDN.A.*
REMOVED 7/14
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: ClassroomsRoom F-2 and F-4
9x9 Beige floor tileMISCNF
3,600 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: ClassroomsRoom F-3 wood shop storage
Fire door insulationMISCF
1 EAREMOVEDN.A.1
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
G: Locker roomsBoys coaches' office
9x9 Green floor tileMISCNF
305 SFENCLOSEDHIGH*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
G: Locker roomsCourtyard furnace room
GasketsTSIF
16 LFENCLOSEDLOW1
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictHEWES MIDDLE SCHOOL
TUSD17E
4/5/2018Inspection Date:
G: Locker roomsCourtyard furnace room
Pipe fitting insulationTSIF
33 EAGOODLOW1
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
G: Locker roomsCourtyard furnace room
Tank insulationTSIF
400 SFGOODLOW1
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
G: Locker roomsCustodial room
Fire door insulationMISCF
2 EAENCLOSEDLOW1
Enclosed inside door
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
G: Locker roomsGirls coaches' office
9x9 Green floor tileMISCNF
700 SFGOODHIGH*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: MultipurposeMultipurpose
9x9 Beige floor tileMISCNF
3,500 SFGOODHIGH*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: MultipurposeMultipurpose stage and two storage rooms
9x9 Beige floor tileMISCNF
300 SFGOOD
HIGH*
Minor damage, many replaced @ stage
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictHEWES MIDDLE SCHOOL
TUSD17E
4/5/2018Inspection Date:
H: MultipurposeMultipurpose stage storage rooms
Fire door insulationMISCF
2 EAGOODLOW1
West storage door removed
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: MultipurposeRoom H-1
9x9 Beige floor tileMISCNF
900 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: MultipurposeRoom H-2 Band
9x9 Beige floor tileMISCNF
1,000 SFGOODHIGH*
No significant damage, some replaced
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutExterior walls
StuccoSURFNF
N.A.GOODMOD*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutExterior windows
Window puttyMISCNF
N.A.GOODLOW*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutHeater closets
Fire door insulationMISC
F
N.A.ENCLOSEDLOW1
Enclosed inside doors; some have been removed
Verify presence; routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingType
Friable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 6
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictHEWES MIDDLE SCHOOL
TUSD17E
4/5/2018Inspection Date:
ThroughoutRoofs
Patching masticSURFNF
N.A.REMOVEDN.A.*
Removed 7/04
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutUnder windows
Transite panelsMISCNF
1,600 SFGOODMOD*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Inspector Signature
David Johnson Certified Site Surveillance Technician 17-5918
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 7
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictHILLVIEW HIGH SCHOOL
TUSD17F
4/5/2018Inspection Date:
BClassroom B-1
Floor Tile MasticMISCF
1000 SFREMOVEDN.A.*
Removed during Tennis Court Renovation ProjectBuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
BFurnace room
Flex collarMISCF
1 EAREMOVEDN.A.1
No significant damageBuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
BKiln room outside B-1
Fire door insulationMISCF
2 EAREMOVEDN.A.1
Enclosed inside doorsBuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
BKiln room outside B-1
Asbestos gloveMISCF
REMOVEDN.A.*
Removed Prior to Sept. 2011BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
BKiln room outside B-1
Transite panelsMISCNF
35 SFREMOVEDN.A.*
At walls around kiln (not attach)BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
BWood shop student store
9x9 Green floor tile and masticMISCNF
575 SFREMOVEDLOW*
Removed 8/10BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictHILLVIEW HIGH SCHOOL
TUSD17F
4/5/2018Inspection Date:
B and CExterior walls and overhang
StuccoSURF
NF
6,000 SFGOOD
MOD*
Minor damage; <1% ACM. Some cracks and peeling off
Bldg B- Removed during demolitionRoutine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingType
Friable Non-Friable
Comments
Recommended Response Action
B and CUnder and over windows
Transite panelsMISC
NF
110 SFGOODMOD*
No significant damage
Bldg B- Removed prior to demolitionRoutine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingType
Friable Non-Friable
Comments
Recommended Response Action
CAttic above ceilings panels
Pipe insulationTSI
F
200 LFENCLOSEDLOW1
Seen above ceiling panels in rooms C-6 and C-4
10 LF Removed during renovation Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingType
Friable Non-Friable
Comments
Recommended Response Action
CMechanical room
Pipe insulationTSIF
35 LFREMOVEDLOW1
Removed between 8/13 & 1/14BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
CMechanical room
Pipe fitting insulationTSIF
28 LFREMOVEDLOW1
Removed between 8/13 & 1/14BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictHILLVIEW HIGH SCHOOL
TUSD17F
4/5/2018Inspection Date:
Inspector Signature
David Johnson Certified Site Surveillance Technician 17-5918
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictLAMBERT SCHOOL
TUSD17W
4/5/2018Inspection Date:
A: AdministrationHeater room
Transite flue pipeMISCNF
1 EAGOODLOW*
Verify presence
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationHeater room
Flex jointMISCNF
1 EAREMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationHeater room
Aircell duct insulationTSIF
8 LFREMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationNurse's office
9x9 Beige floor tileMISCNF
150 SFREMOVEDN.A.*
Removed 7/04
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationUnder windows
Transite panelsMISCNF
200 SFGOODLOW*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationWorkroom
9x9 Beige floor tileMISCNF
175 SFENCLOSEDLOW*
Enclosed by carpet.
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictLAMBERT SCHOOL
TUSD17W
4/5/2018Inspection Date:
B: Room 32Heater room
Aircell duct insulationMISCF
6 LFREMOVEDN.A.*
Removed Spring, 1997
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: Room 32Room 32
9x9 Beige floor tileMISCNF
1,160 SFENCLOSEDLOW*
Enclosed by carpet
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: Room 32Room 32 office
9x9 Beige floor tileMISCNF
80 SFGOODHIGH*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: Classrooms 1-6Heater room
Pipe fitting insulationTSIF
10 EAGOODLOW1
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: Classrooms 1-6Heater room
Aircell duct insulationTSIF
10 LFGOODLOW1
Minor Damage
Monitor damage
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: Classrooms 1-6Room 4 workroom
Floor tile masticMISCNF
200 SFENCLOSEDLOW*
Enclosed under beige floor tile
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictLAMBERT SCHOOL
TUSD17W
4/5/2018Inspection Date:
C: Classrooms 1-6Throughout
Floor tile masticMISCNF
6,000 SFENCLOSEDLOW*
Enclosed under carpet and floor tile
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: Classrooms 1-6Under windows
Transite panelsMISCNF
200 SFGOODMOD*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
D: Classrooms 13-18Heater room
Pipe fitting insulationTSIF
13 EAGOODLOW1
No significant damage.
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
D: Classrooms 13-18Heater room
Aircell duct insulationTSIF
6 LFGOOD
LOW1
Minor damage, whole piece is on ground on side of equipment.
Remove
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
D: Classrooms 13-18Over and under windows
Transite window panelsMISCNF
200 SFGOODMOD*
Cracked panels at rooms 13 and 14
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: Classrooms 19-26Heater room
Aircell duct insulationTSIF
6 LFGOODLOW1
Deteriorating
Monitor damage
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictLAMBERT SCHOOL
TUSD17W
4/5/2018Inspection Date:
E: Classrooms 19-26Heater room
Pipe fitting insulationTSIF
12 EAGOODLOW1
Old water damage
Monitor damage
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: Classrooms 19-26Over and under windows
Transite panelsMISCNF
200 SFGOODMOD*
No significant damage.
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutHeater rooms
Fire door insulationTSIF
10 EAENCLOSEDLOW1
Enclosed inside doors
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Inspector Signature
David Johnson Certified Site Surveillance Technician 17-5918
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictLOMA VISTA ELEMENTARY SCHOOL
TUSD17N
4/5/2018Inspection Date:
AdministrationExterior walls and overhang
StuccoSURFNF
8,000 SFGOODLOW*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
AdministrationNurse's office
Floor tile masticMISCNF
1,200 SFENCLOSEDLOW*
Enclosed by floor tile
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
AdministrationSupply room
9x9 Brown floor tileMISCNF
200 SFGOODHIGH*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
AdministrationTeachers' workroom
Transite wall panelMISCNF
9 SFREMOVEDN.A.
Removed 1998
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
AdministrationTeachers' workroom - under kiln
Transite panelMISCNF
20 SFREMOVEDN.A.*
No longer present
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
AdministrationThroughout
9x9 Grey floor tileMISCNF
4,500 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictLOMA VISTA ELEMENTARY SCHOOL
TUSD17N
4/5/2018Inspection Date:
AdministrationUnder windows
Transite panelsMISCNF
400 SFREMOVEDN.A.*
Removed 7/04
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
AdministrationWater heater closet
Transite flue pipeMISCNF
20 LFENCLOSEDLOW*
No significant damage; enclosed in attic
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
AdministrationWater heater closet
Pipe insulationTSIF
16 LFGOODLOW1
Exposed ends and minor tearing
Encapsulate exposed ends
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
AdministrationWater heater closet
Fire door insulationTSIF
2 EAENCLOSEDLOW1
Enclosed inside doors
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
BExterior walls and overhang
StuccoSURFNF
8,000 SFGOODLOW*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
BExterior windows
Window puttyMISCNF
500 SFGOODLOW*
Minor damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictLOMA VISTA ELEMENTARY SCHOOL
TUSD17N
4/5/2018Inspection Date:
BMain field roof
Tar and gravel roofingMISCNF
3,000 SFGOODLOW*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
BRooms B1 to B4
9x9 Green floor tileMISCNF
3,600 SFENCLOSED
LOW*
Loose and missing tiles in closets; enclosed in classrooms
Repair or remove in closets
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
CCustodial room
Transite flue pipeTSINF
20 LFENCLOSEDLOW
Enclosed in attic above HWH
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
CExterior walls and overhang
StuccoSURFNF
8,000 SFGOODLOW*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
CFood service C-1
Floor tile masticMISCNF
200 SFENCLOSEDLOW*
Enclosed by 12 X 12 white floor tile
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
CHeater room
Pipe wrapTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictLOMA VISTA ELEMENTARY SCHOOL
TUSD17N
4/5/2018Inspection Date:
CRooms C1 to C4
9x9 Green floor tileMISCNF
3,600 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C, D, MultiUnder windows
Transite panelsMISCNF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
DHeater room
Pipe wrapTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
DRooms D1 to D5
9x9 Green floor tileMISCNF
3,600 SFENCLOSEDLOW
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
EHeater rooms
8" pipe insulationTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
EHWH Closet (behind E1-E2)
3" pipe insulationTSIF
8 LFGOODLOW1
Exposed ends and minor tearing
Encapsulate exposed ends
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictLOMA VISTA ELEMENTARY SCHOOL
TUSD17N
4/5/2018Inspection Date:
ERoom E1
9x9 Tan floor tileMISCNF
950 SFGOOD
HIGH*
120 SF exposed one is broken; rest enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ERoom E2
9x9 Tan floor tileMISCNF
950 SFGOODHIGH*
240 SF exposed; rest enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ERooms E1- E2 workroom
9x9 Tan floor tileMISCNF
80GOODHIGH*
Minor damage at doorway
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ERooms E3 to E7
9x9 Tan floor tileMISCNF
4,500 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
EUnder windows
Transite panelsMISCNF
200 SFGOODMOD*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: KindergartenMechanical room
Pipe insulationTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictLOMA VISTA ELEMENTARY SCHOOL
TUSD17N
4/5/2018Inspection Date:
F: KindergartenMechanical room
Fire door insulationTSINF
2 EAENCLOSEDLOW*
Enclosed inside doors
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: KindergartenThroughout
9x9 Grey floor tileMISCNF
2,200 SFENCLOSEDLOW*
Enclosed by carpet and new floor tile
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: KindergartenUnder windows
Transite panelsMISCNF
192 SFGOODMOD*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
G: MultipurposeExterior walls and overhang
StuccoSURFNF
10,000 SFGOODMOD*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
G: MultipurposeFurnace room
Fire door insulationMISCF
1 EAENCLOSEDLOW1
Enclosed inside door
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
G: MultipurposeFurnace room
Insulating paperTSIF
13 SFGOODLOW1
No significant damage; located on old ducts
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 6
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictLOMA VISTA ELEMENTARY SCHOOL
TUSD17N
4/5/2018Inspection Date:
G: MultipurposeThroughout
Spray-applied floor tileSURFF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
G: MultipurposeThroughout
9x9 Grey floor tileMISC
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutFurnace rooms
Expansion jointsTSINF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Inspector Signature
David Johnson Certified Site Surveillance Technician 17-5918
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 7
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictNELSON ELEMENTARY SCHOOL
TUSD17V
4/5/2018Inspection Date:
Building A: AdministrationMechanical room
Straight run pipe insulationTSIF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building A: AdministrationMechanical room
Firedoor insulationTSIF
2 EAENCLOSEDLOW1
Enclosed inside doors
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building A: AdministrationNurse's office
9x9 Beige floor tileMISCNF
120 SFREMOVEDN.A.*
Removed 6/04
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building A: AdministrationUnder windows
Transite panelsMISCNF
69 SFGOODMOD*
No significant damage; some are metal
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building A: AdministrationWorkroom
9x9 Beige floor tileMISCNF
150 SFGOODHIGH*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building CMechanical room
Pipe elbow insulationTSIF
9 EAGOODLOW1
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictNELSON ELEMENTARY SCHOOL
TUSD17V
4/5/2018Inspection Date:
Building CMechanical room
Aircell duct insulationTSI
F
7 LF 6"DGOODLOW1
Deteriorating
Monitor damage; do not store objects against insulation
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingType
Friable Non-Friable
Comments
Recommended Response Action
Building CUnder windows
Transite panelsMISCNF
24 SFGOODMOD*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building DMechanical room
Pipe elbow insulationTSIF
20 EAGOODLOW1
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building DMechanical room
Aircell duct insulationTSIF
5 LF 6"DDAMAGEDLOW1
Deteriorating
Repair or replace
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building DUnder windows
Transit panelsMISCNF
147 SFGOODMOD*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building EExterior windows
Window puttyMISCNF
200 SFGOODLOW*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictNELSON ELEMENTARY SCHOOL
TUSD17V
4/5/2018Inspection Date:
Building EMechanical room
Pipe elbow insulationTSIF
20 EAGOODLOW1
Minor water damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building EMechanical room
Aircell duct insulationTSIF
6 LF 6"DDAMAGEDLOW4
Torn; deteriorating, debris
Repair or remove
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building EUnder windows
Transite panelsMISCNF
132 SFGOODMOD*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building FExterior storage rooms
Firedoor insulationMISCF
3 EAENCLOSEDLOW1
Enclosed inside doors
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building FRoom 19
9x9 Beige floor tileMISCNF
300 SFENCLOSEDLOW*
Enclosed by carpet
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building FRoom 19 mechanical room
Flex jointTSIF
2 EAGOODLOW1
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictNELSON ELEMENTARY SCHOOL
TUSD17V
4/5/2018Inspection Date:
Building FRoom 19 mechanical room
Aircell duct insulationTSIF
4 LFREMOVEDN.A.1
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building FRoom 19-20 workroom and storage
9x9 Beige floor tileMISCNF
160 SFGOODHIGH*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building FRoom 20
9x9 Beige floor tileMISCNF
300SFENCLOSEDLOW*
Removed or enclosed by new floor tile
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building FRoom 20 mechanical room
Aircell duct insulationTSIF
7 LFREMOVEDN.A.4
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building FRoom 20 mechanical room
Flex jointTSIF
2 EAGOODLOW1
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building FRoom 21 and office
9x9 Beige floor tileMISCNF
400 SFENCLOSEDLOW*
Enclosed
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictNELSON ELEMENTARY SCHOOL
TUSD17V
4/5/2018Inspection Date:
Building FRoom 21 mechanical room
Flex jointTSIF
N.A.REMOVEDN.A.*
Removed Summer, 1997
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building FRoom 21 mechanical room
Aircell duct insulationTSIF
N.A.REMOVEDN.A.*
Removed Summer, 1997
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutHeater closets
Firedoor insulationMISCF
10 EAENCLOSEDLOW1
Enclosed inside door
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Inspector Signature
David Johnson Certified Site Surveillance Technician 17-5918
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictSUPPORT SERVICES FACILITY
TUSD17P
4/5/2018Inspection Date:
Support servicesA.V. shop and closet
12x12 Beige floor tileMISCNF
525 SFGOODHIGH*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Support servicesCustodial office
12x12 Beige floor tileMISCNF
40 SFGOODHIGH*
Minor damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Support servicesEntrance and offices
12x12 Beige floor tileMISCNF
400 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Support servicesHall to transportation
12x12 Beige floor tileMISCNF
720 SFGOODHIGH*
Cracks and bubbling
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Support servicesHall to warehouse
12x12 Beige floor tileMISCNF
113 SFGOODHIGH*
Minor damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Support servicesLocksmith
12x12 Beige floor tileMISCNF
300 SFGOODHIGH*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictSUPPORT SERVICES FACILITY
TUSD17P
4/5/2018Inspection Date:
Support servicesLounge
12x12 Beige floor tileMISCNF
480 SFGOODHIGH*
Minor damage at patio doors
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Support servicesPlan room
12x12 Beige floor tileMISCNF
120 SFGOODHIGH*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Support servicesPlan vault room
12x12 Beige floor tileMISCNF
120 SFGOODHIGH*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Support servicesWarehouse office
12x12 Beige floor tileMISCNF
150 SFGOODHIGH*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Inspector Signature
David Johnson Certified Site Surveillance Technician 17-5918
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTHORMAN ELEMENTARY SCHOOL
TUSD17D
4/5/2018Inspection Date:
Building A: 30'sThroughout
Baseboard masticMISCNF
740 LFENCLOSEDLOW*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building B: 20'sKitchen
Mastic under red floor tileSURFNF
450 SFENCLOSEDLOW*
Enclosed by 12x12 red floor tile
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Building C: 10'sWorkroom 314 under kiln
Transite panelMISCNF
40 SFREMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutExterior walls
StuccoSURFNF
N.A.GOODMOD*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutExterior window panels
Transite panelsMISCNF
200 SFGOODMOD*
No significant damage
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutRoof mansard
Transite shinglesMISCNF
N.A.REMOVEDN.A.*
Removed Summer 2008
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTHORMAN ELEMENTARY SCHOOL
TUSD17D
4/5/2018Inspection Date:
ThroughoutRoof patches and penetrations
MasticSURFNF
N.A.REMOVEDN.A.
Removed Summer 2008
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutRoof walkways
Black composition roofingMISCNF
N.A.REMOVEDN.A.
Removed Summer 2008
Routine operation and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Inspector Signature
David Johnson Certified Site Surveillance Technician 17-5918
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN HIGH SCHOOL
TUSD17A
4/5/2018Inspection Date:
A: 210-213Exterior walls
StuccoSURFNF
N.A.GOODMOD*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: 210-213Interior walls
Drywall mudSURFF
N.A.REMOVEDN.A.1
Removed, Summer 2010 Mod.
N.A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Athletic director's trailerOffice, restroom, storage
9x9 Beige floor tile and masticMISCNF
264 SFREMOVEDN.A.*
Removed 8/02; trailer demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: 110-113Exterior walls
StuccoSURFNF
5,000 SFGOODMOD*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: 110-113Interior walls
Drywall mudSURFF
N.A.REMOVEDN.A.1
Removed, Summer 2010 Mod.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: 220-227Custodial office
Fire door insulationMISCF
2 EAENCLOSEDLOW1
Enclosed inside door
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN HIGH SCHOOL
TUSD17A
4/5/2018Inspection Date:
C: 220-227Exterior walls
StuccoSURFNF
10,000 SFGOODMOD*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: 220-227Interior walls
Drywall mudSURFF
N.A.GOODLOW1
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
CustodialBoiler room
Aircell duct insulationTSIF
4 LFREMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
CustodialRestroom
Ceiling plasterSURFNF
820 SFGOODLOW*
No significant damage, innacc. 7/2011
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
CustodialRoom 110 Audio visual
9x9 Brown floor tileMISCNF
1,000 SFREMOVEDHIGH*
Removed 2016 (DEMOLISHED)
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
D: 120-125Attic walls
Drywall mudSURFF
N.A.ENCLOSED
LOW1
No significant damage; enclosed in attic, innaccessible 07/2011
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN HIGH SCHOOL
TUSD17A
4/5/2018Inspection Date:
D: 120-125Exterior walls
StuccoSURFNF
5,000 SFGOODMOD*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
D: 120-125Room 120 dressing rooms, storage and ticket office
9x9 Tan floor tile and masticMISCNF
1,500 SFGOOD
HIGH*
Minor damage in dressing rooms, innaccessible 07/2011
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
D: 120-125Room 120 stage
Spot light wire insulationMISCF
N.A.GOODMOD3
No significant damage, innaccessible 07/2011
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: AdministrationAttic
Pipe fitting insulationTSIF
38 EAREMOVEDLOW1
Removed summer 2015
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: AdministrationCloset near resources
9x9 Green floor tile and masticMISCNF
20 SFREMOVEDMOD*
Removed summer 2015
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: AdministrationClosets across from nurse (2)
9x9 Beige floor tile and masticMISCNF
180 SFREMOVEDHIGH*
Removed summer 2015
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN HIGH SCHOOL
TUSD17A
4/5/2018Inspection Date:
E: AdministrationCopy room
9x9 Brown floor tile and masticMISCNF
204 SFREMOVEDHIGH*
Removed summer 2015
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: AdministrationExterior windows
Window puttyMISCNF
300 SFREMOVEDMOD*
Removed summer 2015
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: AdministrationKitchenette
9x9 Brown floor tile and masticMISCNF
65 SFREMOVEDHIGH*
Removed summer 2015
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: AdministrationMail room (near principals office)
9x9 Brown floor tile and masticMISCNF
150 SFREMOVEDHIGH*
Removed summer 2015
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: AdministrationMail room heater closet
Transite flue pipeMISCNF
10LFGOODLOW*
No significant damage
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: AdministrationMail room heater closet
Fire door insulationTSIF
1 EAREMOVEDLOW1
Removed summer 2015
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN HIGH SCHOOL
TUSD17A
4/5/2018Inspection Date:
E: AdministrationMechanical room 5
Duct insulationTSIF
N.A.REMOVEDN.A.*
Removed summer 2015
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: AdministrationMechanical room 5
Pipe fitting insulationTSIF
N.A.REMOVEDN.A.*
Removed summer 2015
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: AdministrationNurse's offices
9x9 Brown floor tile and masticMISCNF
634 SFREMOVEDN.A.*
Removed 6/04
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: AdministrationPaper storage
9x9 Green floor tile and masticMISCNF
87 SFREMOVEDHIGH*
Removed summer 2015
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: AdministrationPhone system and electric room
9x9 Green floor tile and masticMISCNF
100 SFREMOVEDHIGH*
Removed summer 2015
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: AdministrationSecurity room
9x9 Brown floor tile and masticMISCNF
98 SFREMOVEDHIGH*
Removed summer 2015
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN HIGH SCHOOL
TUSD17A
4/5/2018Inspection Date:
E: AdministrationThroughout except as noted
9x9 Brown floor tile and masticMISCNF
10,000 SFREMOVEDLOW*
Removed summer 2015
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: AdministrationVault
9x9 Brown floor tile and masticMISCNF
100 SFGOODHIGH*
Removed summer 2015
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: 230-234Exterior walls
StuccoSURFNF
5,000 SFGOODMOD*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: 230-234Room 232 exterior kilns
Transite panelsMISCNF
300 SFGOODMOD*
No significant damage, one broken. Inacc. 07/2011
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
G: 130-138Exterior walls
StuccoSURFNF
10,000 SFGOODMOD*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
G: 130-138Room 133 and restroom
Spray-applied acoustic ceiling plaster
SURFF
10,000 SFGOODLOW1
No significant damage, innacc. 07/2011
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard Ranking
TypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 6
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN HIGH SCHOOL
TUSD17A
4/5/2018Inspection Date:
G: 130-138Room 136
Spray-applied acoustic ceiling plaster
SURFF
85 SFGOODLOW1
No significant damage; inacc. 07/2011
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard Ranking
TypeFriable Non-Friable
Comments
Recommended Response Action
G: Custodial RoomCustodial Room
Transite panelMISCNF
30 SFGOODLOW*
No significant damage
Routine Operations And Maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: 604-609Exterior walls
StuccoSURFNF
5,000 SFGOODMOD*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: 604-609Inside walls
Pipe fitting insulationTSI
F
20 EAENCLOSEDLOW1
No significant damage
Verify presence; routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingType
Friable Non-Friable
Comments
Recommended Response Action
I: CafeteriaAttic
Pipe fitting insulationTSIF
10 EAENCLOSEDLOW1
No significant damage; enclosed in attic
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 7
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN HIGH SCHOOL
TUSD17A
4/5/2018Inspection Date:
I: CafeteriaCafeteria
9x9 Green floor tile and masticMISCNF
7,200 SFREMOVEDN.A.*
Removed 12/2009, except in closets (lifting)
N/A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
I: CafeteriaCafeteria stage classroom & steps
9x9 Green floor tile and masticMISCNF
2,000 SFREMOVEDN.A.*
Removed
N/A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
I: CafeteriaCustodial office
9x9 Beige floor tile and masticMISCNF
36 SFREMOVEDN.A.*
Removed
N/A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
I: CafeteriaExterior mechanical room
Transite flue pipeMISCNF
8 LFENCLOSEDLOW*
Enclosed in attic
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
I: CafeteriaExterior windows
Window puttyMISCNF
500 SFREMOVEDN.A.*
Removed
N/A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
I: CafeteriaFaculty dining (north side)
9x9 Beige floor tile and masticMISCNF
350 SFREMOVEDN.A.*
Removed
N/A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 8
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN HIGH SCHOOL
TUSD17A
4/5/2018Inspection Date:
I: CafeteriaFaculty dining (south side)
Floor tile and masticMISCNF
500 SFREMOVEDN.A.*
Removed
N/A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
I: CafeteriaHall to faculty dining
9x9 Beige floor tile and masticMISCNF
50 SFREMOVEDN.A.*
Removed
N/A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
I: CafeteriaKitchen office
9x9 Brown floor tile and masticMISCNF
50 SFREMOVEDN.A.*
Removed
N/A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
I: CafeteriaKitchen restrooms, locker room and hall
9x9 Beige floor tile and masticMISCNF
250 SFREMOVED
N.A.*
Removed
N/A
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
I: CafeteriaServing area
9x9 Green floor tile and masticMISCNF
1,000 SFREMOVEDN.A.*
Removed
N/A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
J: Boy's locker room and gymBoiler and locker room
Pipe fitting insulationTSIF
45 EAGOODMOD5
Some removed; likely inside walls also.
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 9
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN HIGH SCHOOL
TUSD17A
4/5/2018Inspection Date:
J: Boy's locker room and gymBoiler room
Tank insulationTSIF
180 SFGOODMOD2
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
J: Boy's locker room and gymCoaches office
9x9 Beige floor tile and masticMISCNF
304 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
J: Boy's locker room and gymExterior walls
StuccoSURFNF
15,000 SFGOODMOD*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
J: Boy's locker room and gymGym storage and custodial
Fire door insulationMISCF
2 EAENCLOSEDLOW1
Enclosed inside doors
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
J: Boy's locker room and gymGym vestibule
9x9 Beige floor tile and masticMISCNF
293 SFREMOVEDN.A.*
Removed 11/00
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
J: Boy's locker room and gymLocker room
Ceiling tile masticSURFNF
5,000 SFENCLOSEDLOW*
Enclosed by ceiling tiles, one tile is missing
Verify ACM; routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 10
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN HIGH SCHOOL
TUSD17A
4/5/2018Inspection Date:
J1: Girl's locker roomBoiler room
Tank insulationTSIF
180 SFGOODMOD1
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
J1: Girl's locker roomBoiler room and attic
Pipe fitting insulationTSIF
39 EAGOODLOW1
13 in boiler room; rest enclosed in attic
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
J1: Girl's locker roomCoaches offices and first aid
9x9 Grey floor tile and masticMISCNF
900 SFREMOVEDN.A.*
Removed
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
J1: Girl's locker roomLocker room
Ceiling tile masticSURFNF
5,000 SFENCLOSEDLOW*
Enclosed by ceiling tiles, some exposed.
Verify ACM; routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: 400'sAll classrooms except 415 storage and office
9x9 Grey floor tile and masticMISCNF
N.A.REMOVED
N.A.*
Removed during Summer 2010 Mod.
N/A
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K: 400'sExterior heater rooms
Fire door insulationMISCF
N.A.REMOVEDN.A.1
Removed during Summer 2010 Mod.
N/A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 11
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN HIGH SCHOOL
TUSD17A
4/5/2018Inspection Date:
K: 400'sThroughout
Pipe insulationTSIF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K1 - K4: 300'sExterior walls and overhang
StuccoSURFNF
5,000 SFGOOD
MOD*
Minor damage; <1% ACM, some cracking and peeling at overhang
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K1 - K4: 300'sExterior windows
Window puttyMISCNF
200 SFREMOVEDN.A.*
Removed summer 2014
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K1 - K4: 300'sRoom 321 heater closet
Pipe insulationTSI
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K1 - K4: 300'sThroughout
9x9 floor tile and/or masticMISCNF
N.A.REMOVEDN.A.*
Removed summer 2014
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
K1 - K4: 300'sThroughout
Duct wrapTSIF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 12
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN HIGH SCHOOL
TUSD17A
4/5/2018Inspection Date:
L: LibraryExterior heater room
Flex jointTSIF
1 EAGOODLOW1
No significant damage. Innaccessible 07/2011
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
L: LibraryExterior heater room
Aircell insulationTSIF
8 LFGOODLOW1
Minor damage, innaccessible 07/2011
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
L: LibraryExterior windows
Window puttyMISCNF
500 SFGOOD
LOW*
No significant damage; <1% ACM, broken & loose in back
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
L: LibraryLibrary storeroom
Floor tile masticSURFNF
736 SFENCLOSEDLOW*
Enclosed by red floor tile
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
L: LibraryStudent store
9x9 Tan floor tile and masticMISCNF
2,500 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
L: LibraryThroughout
Pipe insulationTSIF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 13
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN HIGH SCHOOL
TUSD17A
4/5/2018Inspection Date:
L: LibraryThroughout except storeroom
9x9 green floor tile and masticMISCNF
2,500 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
N: StadiumAttic boiler room
Boiler insulationTSIF
100 SFENCLOSEDLOW1
Debris under boiler is not ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
N: StadiumAttic boiler room
Flex jointsTSIF
5 SFENCLOSEDLOW1
Inside fan cabinet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
N: StadiumAttic boiler room
Tank insulationTSIF
150 SFGOODLOW1
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
N: StadiumAttic boiler room
Pipe insulationTSIF
130 SFGOODLOW1
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
N: StadiumAttic boiler room
Pipe fitting insulationTSIF
15 EAGOODLOW1
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 14
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN HIGH SCHOOL
TUSD17A
4/5/2018Inspection Date:
P: 600'sMechanical room
Aircell insulation on exhaust ductTSIF
6 LFGOODLOW1
No significant damage, innacc. 07/2011
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
P: 600'sRoom 600 and storages (2)
9x9 Brown floor tile and masticMISCNF
1,421 SFREMOVEDN.A.*
Removed
N/A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
P: 600'sRoom 601 and office
9x9 Brown floor tile and masticMISCNF
1,116 SFREMOVEDN.A.*
Removed
N/A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
P: 600'sRoom 602
9x9 Brown floor tile and masticMISCNF
1,116 SFREMOVEDN.A.*
Removed
N/A
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
P: 600'sRoom 603 dressing and uniform storage
9x9 Brown floor tile and masticMISCNF
1,500 SFREMOVED
N.A.*
Removed
N/A
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
P: 600'sRoom 604
Fire door insulationMISCF
2 EAREMOVEDN.A.1
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 15
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN HIGH SCHOOL
TUSD17A
4/5/2018Inspection Date:
ThroughoutHeater closets
Fire door insulationMISCF
2 EAENCLOSEDLOW1
Enclosed inside doors, innacc. 07/2011
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutUnder windows
Transite window panelsMISCNF
500 SFGOODMOD*
No significant damage; 3 broken @ room # 232
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sCentral area
9x9 Beige floor tileMISCNF
300 SFREMOVEDN.A.*
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sCentral area attic (near 525)
Fire door insulationMISCF
1 EAREMOVEDN.A.1
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sCentral area attic (near 525)
Pipe insulationTSIF
6 inchREMOVEDN.A.1
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sCentral area attic (near 525)
Pipe fitting insulationTSIF
32 EAREMOVEDN.A.1
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 16
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN HIGH SCHOOL
TUSD17A
4/5/2018Inspection Date:
X: 500'sExterior walls and overhang
StuccoSURFNF
1,800 SFREMOVEDN.A.*
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sRoom 520
9x9 Beige floor tileMISCNF
1,669 SFREMOVEDN.A.*
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sRoom 520 ceiling and upper walls
Spray-applied plasterSURFF
2,000 SFREMOVEDN.A.1
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sRoom 520 conference room
Spray-applied plasterSURFNF
180 SFREMOVEDN.A.1
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sRoom 520 conference room
9x9 Beige floor tileMISCNF
180 SFREMOVEDN.A.*
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sRoom 521 ceiling and upper walls
Spray-applied plasterSURFF
2,000 SFREMOVEDN.A.1
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 17
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN HIGH SCHOOL
TUSD17A
4/5/2018Inspection Date:
X: 500'sRoom 521, prep, and custodial room
9x9 Beige floor tileMISCNF
1,769 SFREMOVED
N.A.*
Removed July 2011, bldg. demoloshed
N.A.
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sRoom 521-522 oxidizer storage
9x9 Beige floor tileMISCNF
80 SFREMOVEDN.A.*
Removed July 2011, bldg. demoloshed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sRoom 522
9x9 Beige floor tileMISCNF
1,200 SFREMOVEDN.A.*
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sRoom 522 ceiling and upper walls
Spray-applied plasterSURFF
1,500 SFREMOVEDN.A.1
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sRoom 522-523 prep
9x9 Beige floor tileMISCNF
120 SFREMOVEDN.A.*
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sRoom 523
9x9 Beige floor tileMISCNF
1,200 SFREMOVEDN.A.*
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 18
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN HIGH SCHOOL
TUSD17A
4/5/2018Inspection Date:
X: 500'sRoom 523 ceiling and upper walls
Spray-applied plasterSURFF
1,500 SFREMOVEDN.A.1
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sRoom 523-524 storage
9x9 Beige floor tileMISCNF
50 SFREMOVEDN.A.*
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sRoom 523-524 storage attic
Flex jointsTSIF
2 EAREMOVEDN.A.1
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sRoom 523-524 storage attic
Aircell and paper tape insulationTSIF
N.A.REMOVEDN.A.*
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sRoom 524
9x9 Beige floor tileMISCNF
1,669 SFREMOVEDN.A.*
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sRoom 524 ceiling and upper walls
Spray-applied plasterSURFF
2,000 SFREMOVEDN.A.*
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 19
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN HIGH SCHOOL
TUSD17A
4/5/2018Inspection Date:
X: 500'sRoom 524 prep (off center)
Spray-applied plasterSURFF
300 SFREMOVEDN.A.*
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sRoom 524 prep (off center)
9x9 Beige floor tileMISCNF
300 SFREMOVEDN.A.*
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sRoom 525
9x9 Beige floor tileMISCNF
1,669 SFREMOVEDN.A.*
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sRoom 525 ceiling and upper walls
Spray-applied plasterSURFF
2,000 SFREMOVEDN.A.*
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sRoom 525-526 prep
9x9 Beige floor tileMISCNF
300 SFREMOVEDN.A.*
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sRoom 525-526 storage and closet
9x9 Beige floor tileMISCNF
300 SFREMOVEDN.A.*
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 20
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN HIGH SCHOOL
TUSD17A
4/5/2018Inspection Date:
X: 500'sRoom 526
9x9 Beige floor tileMISCNF
1,669 SFREMOVEDN.A.*
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sRoom 526 ceiling and upper walls
Spray-applied plasterSURFF
2,000 SFREMOVEDN.A.*
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
X: 500'sThroughout
Base board masticSURFNF
N.A.REMOVEDN.A.*
Removed July 2011, bldg. demolished
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Inspector Signature
David Johnson Certified Site Surveillance Technician 17-5918
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 21
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN MEMORIAL ELEMENTARY SCHOOL
TUSD17S
4/5/2018Inspection Date:
A: AdministrationOffices
12x12 White floor tileMISCNF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: ClassroomsAttic
Duct insulationTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: ClassroomsRoom 5 sink counter
Brown sheet vinylMISCF
15 SFREMOVEDN.A.
Removed, 2006
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: ClassroomsRooms 5-7
9x9 Brown floor tile and masticMISCNF
3,000 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: ClassroomsRooms 8-10
9x9 brown floor tile and masticMISCNF
3,000 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: ClassroomsRooms 11 and 13 storage
Fire door insulationMISCF
2 EAENCLOSEDLOW1
Enclosed inside doors
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN MEMORIAL ELEMENTARY SCHOOL
TUSD17S
4/5/2018Inspection Date:
B: ClassroomsRooms 11-14
Brown floor tile and masticMISCNF
3,000 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
B: ClassroomsRooms 15-18
Brown floor tile and masticMISCNF
3,000 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: KindergartenCustodial storage
Fire door insulationMISCF
2 EASIGNIFICANT DAMAGELOW6
Door is coming apart to reveal interior insulation
Repair or Replace
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: KindergartenCustodial storage above HWH
Pipe fitting insulationTSIF
5 EAGOODMOD2
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: KindergartenRoof - west end
Tar and gravel roofingMISCNF
N.A.REMOVEDN.A.*
Removed Summer, 2011
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: KindergartenThroughout
Cove base masticSURFNF
N.A.ENCLOSEDLOW*
Enclosed by cove base; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN MEMORIAL ELEMENTARY SCHOOL
TUSD17S
4/5/2018Inspection Date:
C: KindergartenThroughout
9x9 Grey floor tile and masticMISCNF
2,500 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: KindergartenUnder exterior windows
Transite panelsMISCNF
45 SFGOODMOD*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
D: MultipurposeElectric room
Black masticSURFNF
600 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
D: MultipurposeHeater closet - North side
Transite flue pipeMISCNF
3 LFGOODLOW*
No significant damage, visible on roof
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
D: MultipurposeInside walls
Pipe insulationTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
D: MultipurposeMain room
Spray-applied acoustic ceiling and wall plaster
SURFF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard Ranking
TypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN MEMORIAL ELEMENTARY SCHOOL
TUSD17S
4/5/2018Inspection Date:
D: MultipurposeMultipurpose
9x9 Green floor tile and masticMISCNF
5,000 SFENCLOSEDMOD*
No significant damage, under stage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
D: MultipurposeSpeech above ceiling
Pipe insulationTSIF
N.A.ENCLOSEDLOW1
Enclosed above ceiling; removed inside walls
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: ClassroomsRooms 20-22 under windows
Transite panelsMISCNF
54 SFGOODLOW*
Panels cracked at rooms 20 and 22
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: ClassroomsRooms 20-24
9x9 Green floor tile and masticMISCNF
4,500 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: ClassroomsThroughout
Cove base masticSURFNF
1,000 LFENCLOSEDLOW*
Enclosed by cove base; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutAll buildings except C and E
Transite panelsMISCNF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictTUSTIN MEMORIAL ELEMENTARY SCHOOL
TUSD17S
4/5/2018Inspection Date:
ThroughoutExterior windows
Window puttyMISCNF
1,000 SFGOODLOW*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutRoofs
Grey patching masticSURFNF
N.A.REMOVEDN.A.*
Removed summer, 2011
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
WalkwaysRoofs
Roofing feltMISCNF
N.A.REMOVEDN.A.*
Removed summer, 2011
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Inspector Signature
David Johnson Certified Site Surveillance Technician 17-5918
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictUTT INTERMEDIATE SCHOOL
TUSD17I
4/5/2018Inspection Date:
ACafeteria
LinoleumMISCF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ACounseling
Fire door insulationMISCF
5 EAENCLOSEDLOW1
Enclosed inside heater and custodial room doors
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
AHeater Room
GasketsTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
AHeater Room
Pipe wrapTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
AHeater Room
Pipe fitting insulationTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
AMultipurpose
Drywall joint compoundSURFF
N.A.ENCLOSEDLOW1
Enclosed under ceiling tiles
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictUTT INTERMEDIATE SCHOOL
TUSD17I
4/5/2018Inspection Date:
AMultipurpose restrooms
Light insulationMISCF
5REMOVEDN.A.
Removed 2006
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
AMultipurpose stage
Fire door insulationMISCF
5 EAENCLOSED
LOW1
Enclosed inside doors; three on stage, two in storage
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
AThroughout
9x9 Beige floor tileMISCNF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
BHeater rooms
12" pipe insulationTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
BThroughout
Floor tileMISCNF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
CBoiler room
6" pipe fitting insulationTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictUTT INTERMEDIATE SCHOOL
TUSD17I
4/5/2018Inspection Date:
CBoiler room
Tank insulationTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
CThroughout
9x9 Beige floor tileMISCNF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
DHeater room
12" pipe insulationTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
DThroughout
Cove base masticSURFNF
1,000 LFENCLOSEDLOW*
Enclosed by cove base
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
DThroughout
Brown floor tileMISCNF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
EHeater room
12" pipe insulationTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictUTT INTERMEDIATE SCHOOL
TUSD17I
4/5/2018Inspection Date:
EThroughout
9x9 Brown floor tileMISCNF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
FHeater room
12" pipe insulationTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
FThroughout
Floor tileMISCNF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
GHeater room
Pipe insulationTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
GThroughout
Beige floor tileMISCNF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
HHeater room
Pipe insulationTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictUTT INTERMEDIATE SCHOOL
TUSD17I
4/5/2018Inspection Date:
HThroughout
9x9 Brown floor tileMISCNF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
KThroughout
9x9 Brown floor tileMISCNF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutHeater rooms
Flex jointsTSIF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutHeater rooms
Fire door insulationMISCF
N.A.REMOVEDN.A.
Removed except building A
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutRoof
Patching masticMISCNF
N.A.REMOVEDN.A.
Removed Summer, 2005
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutUnder exterior windows
Transite panelsMISCNF
N.A.REMOVEDN.A.
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictUTT INTERMEDIATE SCHOOL
TUSD17I
4/5/2018Inspection Date:
ThroughoutWalls and overhangs
StuccoSURFNF
N.A.GOODLOW*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutWindows
Window puttyMISCNF
N.A.GOODLOW*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
Inspector Signature
David Johnson Certified Site Surveillance Technician 17-5918
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 6
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictVEEH ELEMENTARY SCHOOL
TUSD17T
4/5/2018Inspection Date:
A: AdministrationExterior walls and overhang
StuccoSURFNF
5,000 SFGOODLOW*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationHealth office, workroom and storage
12x12 Beige floor tileMISCNF
277 SFGOOD
LOW*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationHealth storage
9x9 Grey floor tileMISCNF
42 SFGOODLOW*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationTeachers lounge heater closet
Aircell duct wrapTSIF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
A: AdministrationThroughout except health office, workroom and storage
9x9 Grey floor tileMISCNF
3,500 SFENCLOSED
LOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 1
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictVEEH ELEMENTARY SCHOOL
TUSD17T
4/5/2018Inspection Date:
B: KindergartenKindergarten
9x9 Tan floor tileMISCNF
2,000 SFENCLOSEDHIGH*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: Rooms 2-5Exterior walls and overhangs
StuccoSURFNF
2,500 SFGOODMOD*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: Rooms 2-5Food service
Fire door insulationMISCF
2 EAENCLOSEDLOW1
Enclosed inside doors
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: Rooms 2-5Food service
Transite flue pipeMISCNF
1 EAGOODLOW*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
C: Rooms 2-5Rooms 2-5
9x9 Tan floor tileMISCNF
3,000 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
D: Rooms 6-11Exterior walls and overhang
StuccoSURFNF
5,000 SFGOODMOD*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 2
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictVEEH ELEMENTARY SCHOOL
TUSD17T
4/5/2018Inspection Date:
D: Rooms 6-11Rooms 6-11
9x9 Tan floor tileMISCNF
5,000 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: Rooms 12-17Exterior walls and overhang
StuccoSURFNF
7,500 SFGOODMOD*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
E: Rooms 12-17Rooms 12-17
9x9 Tan floor tileMISCNF
5,000 SFENCLOSEDLOW*
Enclose by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: Rooms 18-21Custodial office
Transite flue pipeMISCNF
1 EAENCLOSEDLOW*
No significant damage; enclosed in attic
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: Rooms 18-21Custodial office
Fire door insulationTSIF
2 EAENCLOSEDLOW1
Enclosed inside doors; exposed in one door
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
F: Rooms 18-21Exterior walls and overhang
StuccoSURFNF
2,500 SFGOODMOD*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 3
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictVEEH ELEMENTARY SCHOOL
TUSD17T
4/5/2018Inspection Date:
F: Rooms 18-21Rooms 18-21
9x9 Tan floor tileMISCNF
3,000 SFENCLOSEDLOW*
Enclosed by carpet
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: MultipurposeExterior walls and overhang
StuccoSURFNF
10,000 SF.GOODMOD*
No significant damage; <1% ACM
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: MultipurposeExterior windows
Window puttyMISCNF
300 SFGOODLOW*
No significant damage
Routine operations and maintenance
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: MultipurposeFurnace room
Fire door insulationMISCNF
1REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: MultipurposeFurnace room
Duct tapeTSIF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: MultipurposeFurnace room
Furnace gasketsTSIF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 4
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictVEEH ELEMENTARY SCHOOL
TUSD17T
4/5/2018Inspection Date:
H: MultipurposeMultipurpose ceiling beams
Spray-applied fireproofingSURFF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
H: MultipurposeNortheast exterior doors
Fire door insulationTSIF
2REMOVEDN.A.1
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutHeater rooms
Flex jointsMISCNF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutHeater rooms
Aircell duct insulationTSIF
N.A.REMOVEDN.A.*
Removed
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutUnder windows
Transite panelsMISCNF
834 SFGOOD
MOD*
No significant damage; one cracked panel at room 5
Routine operations and maintenance
BuildingLocation
Description
QuantityCondition
Potential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
ThroughoutWalkway roofs
Patching masticSURFNF
N.A.REMOVEDLOW*
Removed Summer 2011
N.A.
BuildingLocation
Description
QuantityConditionPotential for DisturbanceHazard RankingTypeFriable Non-Friable
Comments
Recommended Response Action
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 5
Thursday, April 05, 2018
AHERA: SIX-MONTH SURVEILLANCE OF ASBESTOS-CONTAINING MATERIALS -
Tustin Unified School DistrictVEEH ELEMENTARY SCHOOL
TUSD17T
4/5/2018Inspection Date:
Inspector Signature
David Johnson Certified Site Surveillance Technician 17-5918
* Hazard Ranking is a function of condition and potential for disturbance (1=lowest, 7=highest). Applies only to friable materials.
"Verify ACM" = Possible asbestos-containing material not yet sampled.Page 6
Thursday, April 05, 2018