„Car CareProject feasibility study Supervisor: Prof. Dr. Ashraf Saleh Prepared by:  Amal Azab, Karim ElKot, Walid Saafan Sep., 2009

car care project feasibility study-130916161800-phpapp02

Embed Size (px)

Citation preview

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 1/31

„Car Care‟ Project feasibility studySupervisor: Prof. Dr. Ashraf Saleh

Prepared by:  Amal Azab,

Karim ElKot,

Walid Saafan

Sep., 2009

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 2/31

Topics 

Introduction

The location study

The legal study

The marketing study

The technical study

The financial study

The economical study

Conclusion

'Car Care' Project feasibility study, Sep.,20092

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 3/31

Introduction

Car-Care center is a car service center that is specialized inproviding interior and exterior car cleaning

The following services will be offered:

• Water washing,

• Steam washing,

• Car polishing,

• Carpet cleaning,

• Air condition odor cleaning

• etc..

'Car Care' Project feasibility study, Sep.,20093

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 4/31

The location study

The project will be located in Al Rehab city

 AlRehab service area has a good advantage of servingresidents of new Cairo.

The service area has other competitors providing lowservice.

The shop has the area of 100 m2.

'Car Care' Project feasibility study, Sep.,20094

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 5/31

The legal study

There is no legal constrains to establish the project, similarsmall scale project already operating in the city for longtime without obligations.

Commercial registration documents and tax file are

required.

'Car Care' Project feasibility study, Sep.,20095

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 6/31

The marketing studyTarget customers and market segmentation

Geographic segmentation:

The target customers are AlRehab city and the surroundingarea residents.

Demographic segmentation

Middle to high income level.

'Car Care' Project feasibility study, Sep.,20096

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 7/31

The marketing studyStudying the potential market/ demand

Demand Gap• Through our market observations and testing we find a demand gap >

available market capacity.

The following schedule shows a simple weekly study of

potential market /target demand:

'Car Care' Project feasibility study, Sep.,2009

Sun Mon Tue Wed Thu Fri Sat Total

12:00-15:00 1 1 1 1 1 3 3 11

15:00-18:00 2 2 2 2 2 6 6 22

18:00-21:00 2 2 2 2 2 8 8 26

21:00-00:00 4 4 3 3 3 6 6 29Total 9 8 8 8 8 23 23 88

Average served card per day 12.4 

7

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 8/31

The marketing studyStudying the potential market/ demand, cont.,

Throughout the observations and conducted market survey,we found the following:

• Long waiting time.

• Unsatisfied customers with the available service.

• Lack of service quality.• Lack of some services like steam washing machines.

'Car Care' Project feasibility study, Sep.,20098

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 9/31

The marketing studyDemand estimation/ Projection of the Market demand:

“Car Care” services: 

'Car Care' Project feasibility study, Sep.,20099

Serial Product Price

1 Inside/ outside car water wash

30

2 Motor cleaning

25

3 Sterilizing25

4 Internal car polish

75

5 Car waxing

200

Average

price 71

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 10/31

The marketing studyDemand estimation/ Projection of the Market demand, cont.,

The estimated population of AlRehab city is about 25,000families, we assume 1 person per family.

We estimate the 60% of the apartments are occupied withfull residencies.

We estimated that the target customers owns 1.5 cars inaverage.

We estimated the each customer will request the cleaning

service twice a month.

Our estimated actual target customers will be around 10%of the customer‟s pool . 

'Car Care' Project feasibility study, Sep.,200910

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 11/31

The marketing studyDemand estimation/ Projection of the Market demand, cont.,

'Car Care' Project feasibility study, Sep.,2009

Population (n) 45,000 Sample accepted the product (d) 10%

Universe (K) 4,500 

Expected demand over 1st yearD(t) = K * X' 319,500 

11

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 12/31

The marketing studyFactors affecting the demand:

1. Estimation of demand changes due to populationchanges R= 2%

2. Estimation of demand changes due to price changes: Theprice should be left constant as this is a new project.

Xp=Ep* Δp 

Where:

“Xp”: Change in demand as a result of change in price. 

“Ep”: the partial elasticity of price. 

“Δp": the % of change in relative price.

'Car Care' Project feasibility study, Sep.,200912

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 13/31

The marketing studyFactors affecting the demand, cont.,:

3. Estimation of demand changes due to income changes:Xy=Ey* Δy 

6%=2%*3%

Where:

“Xy": Change in demand as a result of change in income.

“Ey”: the partial income elasticity of demand. 

“Δy”: the % of change in income 

'Car Care' Project feasibility study, Sep.,200913

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 14/31

The marketing studyFactors affecting the demand, cont.,:

4.Estimation of demand changes due to advertisingchanges:

The Number of people attracted due to advertising will decrease astime passes.

Xa= Ea. ∆a. bt

'Car Care' Project feasibility study, Sep.,2009

Years Xa= Ea *∆a * bt  Xa

Y1 1.5%*2%*1% 3%

Y2 1.5%*2%*0.6% 1.80%

Y3 1.5%*2%*0.4% 1.20%

Y4 1.5%*2%*0.2% 0.60%

Y5 1.5%*2%*0.1% 0.30%

“Xa”: is the expected growth rate of demand caused by % change in advertising. 

“Ea”: is the partial elasticity of advertising. 

“Δa”: is the change in advertising spending. 

“bt”: is the arbitrary factor that measures the change in sales caused byadvertising over time.

14

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 15/31

The marketing studyFactors affecting the demand, cont.,:

When combining all the four Factors:

Ft= r + xy + xp + xa

'Car Care' Project feasibility study, Sep.,2009

Ft R+xy+xp+xa %

Ft1 2%+6%+0+3% 11%Ft2 2%+6%+0+1.8% 9.80%

Ft3 2%+6%+0+1.2% 9.20%

Ft4 2%+6%+0+0.6% 8.60%

Ft5 2%+6%+0+0.3% 8.30%

R: rate of growth of population.

Xp: percentage changes in demand caused by change in relative prices.

Xy: expected growth rate of demand caused by change in per capita income.

Xa: expected growth rate of demand caused by advertising spending.15

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 16/31

The marketing studyFactors affecting the demand, cont.,:

We assume that there will be no sales in Y0.

'Car Care' Project feasibility study, Sep.,2009

Years Ft Dt+1=Dt*(1+Ft)Y0 0% 319,500

Y1 11% 354,645

Y2 9.80% 389,400

Y3 9.20% 425,225

Y4 8.60% 461,794

Y5 8.30% 500,123  

16

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 17/31

The technical studyService cycle and flow chart

'Car Care' Project feasibility study, Sep.,2009

Receiving car from customer

2.Car washing (inside/

outside), 20min

1.Motor washing, 10min

3. Sterilization and removeair condition odors, 10min

4. Car polishing (inside/outside), 30min

5. Finishing

5. Waxing the car, 30min

17

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 18/31

The technical studyInitial costs:

Site internal preparationsRent

The location will be rented by 8,000 LE per month.

Payment of 3 months in advance = 3 * 8,000 = 24,000 LE.

Construction costs:

'Car Care' Project feasibility study, Sep.,2009

Item Cost

Floor preperations 10,000 

Wall painting and preperations 4,000 Electricity preperations 3,000 

Others 5,000 

Total 22,000 

18

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 19/31

The technical studyInitial costs, cont.,:

Site external preparations

 Advertising costs

Miscellaneous costs

Legal documents:

'Car Care' Project feasibility study, Sep.,2009

Item Cost

Singage 3,000 Lights 1,000 

Total 4,000 

Item Price

10000 colored Flyers 2,000 

Big Banners at the Entrance of AlRehab city 2,000 

Total 4,000 

Item Price

Fire equipments 1,000 

Workers uniform 1,000 

Miscellanous 1,500 

Total 3,500 

Item Cost

Commercial registration and tax card & licence 7,000 

others 500 

Total 7,500 

Total initial expense for Y0 254,580 

19

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 20/31

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 21/31

The technical studyOperating costs, cont.,:

Raw materials costs

Manpower structure and costs

Rent

'Car Care' Project feasibility study, Sep.,2009

Serial Job description Quantity Cost Total cost

1 Supervisor (1500 LE) 1 18000 18,000 

2 Skilled worker (750 LE) 1 9000 9,000 

3 Worker (500LE) 2 6000 12,000 

4 Social insurance 4 360 1,440 

Total cost 40,440 

Rent (8000LE per month) 96,000 

21

Raw materials costs

Serial Item Unit price Quantity Total price

1 Polishing (litre) 290 60 17,400 

2 Cleaning sprays (interior) 25 120 3,000 

3 Wax 40 36 1,440 

21,840 Total  

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 22/31

The technical studyOperating costs, cont.,:

Cost of funds

Taxes

'Car Care' Project feasibility study, Sep.,2009

Cost of funds

Bank loan 260K over 5 years 11%Principal 260,000 

interst rate (annual) 11%

Interst amount (annual) 28,600 

Duration (years) 5

Total interst 143,000 

Administrative fees (1.5%) 3,900 

Total 406,900 

The loan will be amotrized 6,782  per month

Cost of funds 81,380  per year  

Year Gross profit Tax (18%)

2009 (254,580)  - 

2010 90,237  16,243 

2011 108,880  19,598 

2012 127,061  22,871 

2013 144,302  25,974 

2014 185,456  33,382 

22

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 23/31

The technical studyTotal yearly cash flow:

'Car Care' Project feasibility study, Sep.,2009

Year Item Cash in Cash out

Cash in 354,645 

Rent (+10%) 105,600 Salaries (+10%) 40,440 

Raw materials (+5%) 22,932 

Utilities (+2%) 13,056 

Miscellaneous 1,000 

Cost of funds 81,380 

Net 354,645  264,408 

1

 

Year Item Cash in Cash out

Cash in 389,400

Rent (+10%) 116,160 

Salaries (+10%) 44,484 

Raw materials (+5%) 24,079 

Utilities (+2%) 13,317 

Miscellaneous (+10%) 1,100 

Cost of funds 81,380 

Net 389,400  280,520 

2

 

Year Item Cash in Cash out

Cash in 425,225

Rent (+10%) 127,776 Salaries (+10%) 48,932 

Raw materials (+5%) 25,283 

Utilities (+2%) 13,583 

Miscellaneous (+10%) 1,210 

Cost of funds 81,380 

Net 425,225  298,164 

3

 

Year Item Cash in Cash out

Cash in 461,794

Rent (+10%) 140,554 

Salaries (+10%) 53,826 

Raw materials (+5%) 26,547 

Utilities (+2%) 13,855 

Miscellaneous (+10%) 1,331 

Cost of funds 81,380 

Net 461,794  317,492 

4

 Year Item Cash in Cash out

Cash in 500,123

Rent (+10%) 154,609 

Salaries (+10%) 59,208 

Raw materials (+5%) 27,874 

Utilities (+2%) 14,132 

Miscellaneous (+10%) 1,464 

Rent advance payment 24,000 

Cost of funds 81,380 

Net 524,123  338,667 

5

 

23

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 24/31

The technical studyTotal yearly cash flow:

Total aggregated income and expenditures for the projectover 5 years

'Car Care' Project feasibility study, Sep.,2009

Year Cash-in Cash-out Gross profit Tax (18%) Net profit

2009 0 254,580  (254,580)  (254,580)2010 354,645  264,408  90,237  16,243  73,994 

2011 389,400  280,520  108,880  19,598  89,282 

2012 425,225  298,164  127,061  22,871  104,190 

2013 461,794  317,492  144,302  25,974  118,328 

2014 524,123  338,667  185,456  33,382  152,074 

24

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 25/31

The financial studySource of finance

The project „s economic life is planned to be extended to 5years which will be categorized as a long term project soWe will seek CIB bank for a long term loan over 5 yearsperiod amounting to 260,000 LE with annual interest rate of11% and bank administration fees of 1.5%.

'Car Care' Project feasibility study, Sep.,2009

Cost of funds

Bank loan 260K over 5 years 11%

Principal 260,000 

interst rate (annual) 11%

Interst amount (annual) 28,600 

Duration (years) 5

Total interst 143,000 

Administrative fees (1.5%) 3,900 

Total 406,900 

The loan will be amotrized 6,782  per month

Cost of funds 81,380  per year  

25

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 26/31

The financial studyInvestment profitability analysis

1. Simple rate of return – SRR

The simple rate of return is higher than the interest rate in themarket which is acceptable.

'Car Care' Project feasibility study, Sep.,2009

= ℎ  − ℎ  +   ∗ 100%

  

R0 = ( 0-254580 ) / 254580 (100.0) 

R1 = ( 354645-264408+28600 ) / 254580 46.7 

R2 = ( 389400-280519+28600 ) / 254580 54.0 R3 = ( 425225-298164+28600 ) / 254580 61.1 

R4 = ( 461794-317492+28600 ) / 254580 67.9 

R5 = ( 524123-338667+28600 ) / 254580 84.1 

26

Where R is the simple rate of return, y is the cost of fund.

Y is the bank interest

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 27/31

The financial studyInvestment profitability analysis, cont.,

2. Payback period – PBP

• The expected positive amount per day at the 3rd year = Cash out ofthe 3rd year divided by 360 = 828.23

• Remaining period = initial investment divided by expected positiveamount per day

The payback period is 2 year and 10 months which isacceptable.

'Car Care' Project feasibility study, Sep.,2009

Year Cash-in Cash-out Net profit accumulated

2009 0 254,580  (254,580) (254,580) 

2010 354,645  264,408  73,994  (180,586) 

2011 389,400  280,520  89,282  (91,304) 

2012 425,225  298,164  104,190  12,886 2013 461,794  317,492  118,328  131,214 

2014 524,123  338,667  152,074  283,288 

27

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 28/31

The financial studyInvestment profitability analysis, cont.,

3. Net present value - NPV Assume discount rate = 10%

NPV = 128,214 , NPV is positive which is acceptable

'Car Care' Project feasibility study, Sep.,2009

Year Cash-in Cash-out Gross profit Tax (18%) Net profit

2009 0 254,580  (254,580)  (254,580)

2010 354,645  264,408  90,237  16,243  73,994 

2011 389,400  280,520  108,880  19,598  89,282 

2012 425,225  298,164  127,061  22,871  104,190 

2013 461,794  317,492  144,302  25,974  118,328 

2014 524,123  338,667  185,456  33,382  152,074 

NPV = 254,580 + 73,9941.1

+ 89,2821.12

+ 104,1901.13

+ 118,3281.14

+ 152,0741.15

 

28

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 29/31

The financial studyInvestment profitability analysis, cont.,

4. Interest Rate of Return – IRR

IRR = 27% , IRR is higher than the interest rate in the marketwhich is acceptable.

'Car Care' Project feasibility study, Sep.,2009

0 = 254,580 +73,994

(1 + )+

89,282

(1 + )2+

104,190

(1 + )3+

118,328

(1 + )4+

152,074

(1 + )5 

29

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 30/31

The economical study 

the SRR is positive and greater than the interest rate foundin the market.

The payback period in the financial study is somewherebetween the second and third year,

The NET PRESENT VALUE is positive, which implies thefeasibility of the project.

The IRR ratio is equal to 27% which is higher than the

interest rate present in the market.

The project is acceptable and feasible.

'Car Care' Project feasibility study, Sep.,200930

8/12/2019 car care project feasibility study-130916161800-phpapp02

http://slidepdf.com/reader/full/car-care-project-feasibility-study-130916161800-phpapp02 31/31

THANK YOU

'Car Care' Project feasibility study, Sep.,200931