Page 1 CCS presentation April 2009 Copyright © Siemens AG 2009. All rights reserved. Capture Ready – Retrofit Solutions for Steam Power Plants Siemens Energy Sector Capture Ready – Retrofit Solutions for Steam Power Plants Siemens Energy Sector

Capture Ready – Retrofit Solutions for Steam Power Plants · 2009-10-12 · Raw wa ter & c oling wa supply / W aste w ter ... pipe racks Sufficient space for installation of

Embed Size (px)

Citation preview

Page 1: Capture Ready – Retrofit Solutions for Steam Power Plants · 2009-10-12 · Raw wa ter & c oling wa supply / W aste w ter ... pipe racks Sufficient space for installation of

Page 1 CCS presentation April 2009 Copyright © Siemens AG 2009. All rights reserved.

Capture Ready –

Retrofit Solutions for Steam Power Plants

Siemens Energy Sector

Capture Ready –

Retrofit Solutions for Steam Power Plants

Siemens Energy Sector

Page 2: Capture Ready – Retrofit Solutions for Steam Power Plants · 2009-10-12 · Raw wa ter & c oling wa supply / W aste w ter ... pipe racks Sufficient space for installation of

Page 2 CCS presentation April 2009 Copyright © Siemens AG 2009. All rights reserved.

EU Directive 2009/31/EC published 5th

June 2009 Capture Ready Assessment Mandatory

for New Fossil Power Plants >300 MW

Indication and evaluation of potential storage sites reasonably accessible to the project.

Evaluation of viable transportation options.

CO2

Transportation & Storage

Reservation of sufficient area on the site for the later retrofit of the CO2 capture unit with CO2 compression, for all plant integration measures and for retrofit-construction period.

Assessment of the economic and technical aspects for the later retrofit and integration of the CO2 capture unit – different options for the respective retrofit strategies.

Selection of “best-available-capture-technology”, capture ready concepts for technology routes are deviant.

Delivering capture readiness should not result in a plDelivering capture readiness should not result in a plant operating ant operating inefficiently until CCinefficiently until CCS is fitted.S is fitted.

Carbon Capture technology

Page 3: Capture Ready – Retrofit Solutions for Steam Power Plants · 2009-10-12 · Raw wa ter & c oling wa supply / W aste w ter ... pipe racks Sufficient space for installation of

Page 3 CCS presentation April 2009 Copyright © Siemens AG 2009. All rights reserved.

Capture Ready Requirements All measures defined -

reference Siemens steam power plant layout SSP5-6000

Steam turbines•

extraction of approx. 40 % of LP cross over steam

options for modification of turbines depend on operation modes

(part load, full load capability w/o CO2 capture, other plant and site conditions)

Steam turbine buildingsufficient space/foundation for:• modification of turbines• steam and condensate pipes• installation of heat exchangers

Our offer proposal:

Integration of carbon capture unit into thepower plant

“Capture Ready / Retrofit Solutions”

FGD•

either consider capacity extension in column design

or provide space for enlarged FGD unit

Air heatingOptional: space for installation of heat exchanger(s) for lowest grade heat utilization

Exhaust ducts•

consider Δp from CO2

absorption unit •

later flue gas connection to capture unit (T-branch)

Flue gas fan•

upgradeable design•

or additional space for installation of second fan downstream of FGD

Electrical auxiliary loadsufficient space for:•

additional auxiliary transformer(s)•

switchyard•

cable routes

Condensate system,sufficient space for:•

heat exchangers for low grade heat utilization

additional piping routes with supporting structure / racks

Cooling systemsufficient space for:•

additional circulation pumps•

service water system•

sufficient cooling capacity of cooling tower

Raw water & cooling water supply / Waste water treatment• sufficient space for enlargement• secure water utilization rights

Page 4: Capture Ready – Retrofit Solutions for Steam Power Plants · 2009-10-12 · Raw wa ter & c oling wa supply / W aste w ter ... pipe racks Sufficient space for installation of

Page 4 CCS presentation April 2009 Copyright © Siemens AG 2009. All rights reserved.

Steam Turbine

Civil design with sufficient space forrespective equipment installation

either with first installationor later with retrofit of capture plant

Rebuild of steam turbine necessary,depending on:

site conditions (especially capability of final heat sink)required operating modes (part load importance, full load capability w/o capture etc.)

Capture ready measuresto be considered in capture ready design

Additional recommendation forpre-investment:Prepared cross-over pipe for tee branch and control valve

Steam turbine capable to be adapted for

steam extraction of approx. 40 % of low pressure steam;e.g. from cross-over pipe

Page 5: Capture Ready – Retrofit Solutions for Steam Power Plants · 2009-10-12 · Raw wa ter & c oling wa supply / W aste w ter ... pipe racks Sufficient space for installation of

Page 5 CCS presentation April 2009 Copyright © Siemens AG 2009. All rights reserved.

Turbine Building

Space for process steam / condensate pipe routing inside turbine building including necessary supporting structures, drains etc.

Adaption of height of turbine building:caused by additional height of cross-

over pipe due to required tee-branch and control valve (sufficient height for crane hook)

Space for de-superheating of process steam

heat exchangerspiping etc.

Space for installation of heat exchangers for low grade heat utilization including necessary piping

Capture ready measuresto be considered in capture ready design

Page 6: Capture Ready – Retrofit Solutions for Steam Power Plants · 2009-10-12 · Raw wa ter & c oling wa supply / W aste w ter ... pipe racks Sufficient space for installation of

Page 6 CCS presentation April 2009 Copyright © Siemens AG 2009. All rights reserved.

Process Steam And Condensate Piping Condensate preheating

Sufficient space for:process steam/ condensate pipe routing in-/& outside of turbine buildingadditional equipment (e.g. for de-superheating of extracted steam, drains etc.)necessary supporting structures and pipe racks

Sufficient space for installation of equipment for low grade heat utilization (mainly from CO2

compressor intercoolers)

Process steam / condensate piping

Condensate preheating

Capture ready measuresto be considered in capture ready design

Page 7: Capture Ready – Retrofit Solutions for Steam Power Plants · 2009-10-12 · Raw wa ter & c oling wa supply / W aste w ter ... pipe racks Sufficient space for installation of

Page 7 CCS presentation April 2009 Copyright © Siemens AG 2009. All rights reserved.

Electric Power Supply

Adaptation of auxiliary power supply

Sufficient space for:additional auxiliary transformer(s)switchyard sufficient cable ways

Capture ready measuresto be considered in capture ready design

Page 8: Capture Ready – Retrofit Solutions for Steam Power Plants · 2009-10-12 · Raw wa ter & c oling wa supply / W aste w ter ... pipe racks Sufficient space for installation of

Page 8 CCS presentation April 2009 Copyright © Siemens AG 2009. All rights reserved.

Combustion Air Intake Induced Draft Fan

Optional: Sufficient space for installation of heat exchanger(s) for lowest grade heat utilization.--> Option (under evaluation)

1

Capture ready measuresto be considered in capture ready design

Combustion air intake

Induced draft fan

To overcome additional pressure drop from capture plant:

Either upgradeable induced draft fan (limited by ∆p of Carbon Capture Plant)

Or space for installation of a second fan (booster) downstream of FGD

Optional: Sufficient space for installation of heat exchanger(s) for lowest grade heat utilization.--> Option (under evaluation)

Page 9: Capture Ready – Retrofit Solutions for Steam Power Plants · 2009-10-12 · Raw wa ter & c oling wa supply / W aste w ter ... pipe racks Sufficient space for installation of

Page 9 CCS presentation April 2009 Copyright © Siemens AG 2009. All rights reserved.

Flue Gas Desulphurization

Either from first beginning installation of an advanced FGD plant capable of fulfilling future requirements of capture plant (SO2 outlet FGD 5 to 30 mg/Nm3, current EU level 200 mg/Nm3)

Or larger FGD design for later capacity extension

Or space for later enlargement of the desulphurization unit

Recommendation for pre-investment:Larger main FGD at first installation prepared for adding additional absorption spray stages.

Capture ready measuresto be considered in capture ready design

Page 10: Capture Ready – Retrofit Solutions for Steam Power Plants · 2009-10-12 · Raw wa ter & c oling wa supply / W aste w ter ... pipe racks Sufficient space for installation of

Page 10 CCS presentation April 2009 Copyright © Siemens AG 2009. All rights reserved.

Flue Gas Ducts Downstream FGD

Later installation of a flue gas connection (tee-branch) with diverter damper for flue gas routing to the capture plant

Later installation of additional FGD equipment

Later installation of a flue gas fan to overcome the pressure drop of the capture plant

3

Additional recommendation forpre-investment:Design pressure for flue gas ducts ready to accept additional Δp from future capture plant.

Sufficient space and a flue gas duct routing prepared for:

Capture ready measuresto be considered in capture ready design

Later installation of a flue gas fan to overcome the pressure drop of the capture plant

Page 11: Capture Ready – Retrofit Solutions for Steam Power Plants · 2009-10-12 · Raw wa ter & c oling wa supply / W aste w ter ... pipe racks Sufficient space for installation of

Page 11 CCS presentation April 2009 Copyright © Siemens AG 2009. All rights reserved.

Cooling System

For once through cooling

consider:up to two more intake structures for additional circulating water pumps / pipingenlarged discharge natural draught cooling tower depending on site conditions.

For wet cooling tower plants

assure:that higher heat loads during capture operation can be processedconsider interface measures within the cooling tower

adaption of water utilization rightsto capture operation requirements

1

Additional recommendation forpre-investment:Intake / outfall structure(s)pump housing(s) for additional cooling water pump(s)

Site specific heat sink needs different measures:

sufficient space for extension of either service water system or circulating water system with pumps and heat exchangers for capture plant cooling service

4

Capture ready measuresto be considered in capture ready design

For once through cooling

consider:up to two more intake structures for additional circulating water pumps / pipingenlarged discharge natural draught cooling tower depending on site conditions.

sufficient space for extension of either service water system or circulating water system with pumps and heat exchangers for capture plant cooling service

Page 12: Capture Ready – Retrofit Solutions for Steam Power Plants · 2009-10-12 · Raw wa ter & c oling wa supply / W aste w ter ... pipe racks Sufficient space for installation of

Page 12 CCS presentation April 2009 Copyright © Siemens AG 2009. All rights reserved.

Make Up Water and Waste Water Treatment Plants

Sufficient space for enlargement of:raw water inlet systempre-treatmentdemineralization

Sufficient space for enlargement of:waste water treatment plantwaste water disposal

Additional recommendation forpre-investment:Enlarged demineralization plantAdaption of water utilization rights

to capture operation requirements3

Capture ready measuresto be considered in capture ready design

Adaption of water utilization rightsto capture operation requirements

Page 13: Capture Ready – Retrofit Solutions for Steam Power Plants · 2009-10-12 · Raw wa ter & c oling wa supply / W aste w ter ... pipe racks Sufficient space for installation of

Page 13 CCS presentation April 2009 Copyright © Siemens AG 2009. All rights reserved.

General Plant Layout

Rearrangement of main components according to technological requirements from capture process

“Stack-in-tower flue gas exhausting”

(Wet cooling tower w/o flue gas stack)Option 1 Option 2

“Once through cooling and flue gas stack”(Circulating water cooled with flue gas stack)

Capture ready measuresto be considered in capture ready design

Optional discharge natural draught cooling

tower (fan assisted)

Page 14: Capture Ready – Retrofit Solutions for Steam Power Plants · 2009-10-12 · Raw wa ter & c oling wa supply / W aste w ter ... pipe racks Sufficient space for installation of

Page 14 CCS presentation April 2009 Copyright © Siemens AG 2009. All rights reserved.

Disclaimer

This document contains forward-looking statements and information –

that is, statements related to future, not past, events. These statements may be identified either orally or in writing by words as “expects”, “anticipates”, “intends”, “plans”, “believes”, “seeks”, “estimates”, “will”

or words of similar meaning. Such statements are based on our current expectations and certain assumptions, and are, therefore, subject to certain risks and uncertainties. A variety of factors, many of which are beyond Siemens’

control, affect its operations, performance, business strategy and results and could cause the actual results, performance or achievements of Siemens worldwide to be materially different from any future results, performance or achievements that may be expressed or implied by such forward-looking statements. For us, particular uncertainties arise, among others, from changes in general economic and business conditions, changes in currency exchange rates and interest rates, introduction of competing products or technologies by other companies, lack of acceptance of new products or services by customers targeted by Siemens worldwide, changes in business strategy and various other factors. More detailed information about certain of these factors is contained in Siemens’

filings with the SEC, which are available on the Siemens website, www.siemens.com

and on the SEC’s website, www.sec.gov. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in the relevant forward-looking statement as anticipated, believed, estimated, expected, intended, planned or projected. Siemens does not intend or assume any obligation to update or revise these forward-looking statements in light of developments which differ from those anticipated.

Trademarks mentioned in this document are the property of Siemens AG, it's affiliates or their respective owners.