Regional Rapid Transit System in National Capital Region (NCR)
National Capital Region Transport Corporation Limited (NCRTC)National Capital Region Transport Corporation Limited (NCRTC)
Outline
1
2
3
RRTS and Its Benefits
About NCRTC
Way Forward
National Capital Region Transport Corporation
What is RRTS (Regional Rapid Transit System)• RRTS is a new, dedicated, high speed,
high capacity, comfortable commuter service connecting regional nodes in NCR
• RRTS will have stations spaced at an average distance of 5-10 km.
• RRTS will travel at an average speed 3 times of metro system with higher acceleration/ deceleration
National Capital Region Transport Corporation
Integrated Transport Plan for NCR 2032• National Capital Region Planning Board
prepared Integrated Transport Plan for NCR 2032
• The Plan recommended diverting majority of future growth to rest of NCR areas for ensuring balanced development.
• To support this strategy, development of multi modal transport system for NCR with special emphasis on RRTS connecting regional centers was recommended.
Rest of NCR
Rest of NCR
Traffic Movement pattern from GNCTD to NCR
National Capital Region Transport Corporation
RAJASTHAN
SONEPAT
GURGAON
BULANDSHAHR
REWARI
ALWAR
NH24
NH 2
TO K
ARNA
LNH
1
TO S
HAM
LI
NH 5
8TO
MUZ
AFFA
RNAG
AR
TO MURADABAD
TO M
ATHURA
NH 8
TO JA
IPUR
TO NARNAUL
TO BHIWANI
TO HANSI
NH 10
AGRA
CAN
AL
EAST
YAM
UNA
CANA
L
HIN
DAN
RIV
ER
YAM
UN
A RI
VER
SAHIBI RIVER
GAN
GA
RIVE
R
TO ALIG
ARHN
H 91
BAHADURGARH
South-West
PANIPAT
GAUTAMBUDHNAGAR
NOIDA
KHURJA
HAPUR
BHIWADI
GHAZIABAD
FARIDABAD
NH 71ANH 71
TO JIND
NH
71
TO JA
IPU
R
NH 71B
KUNDLIROHTAK
BAGHPAT
PALWAL
BALLABGARH
TO MAHENDRAGARH
HARYANA UTTAR PRADESH
DELHI
NCR RRTS PlanGOHANA
NARAH
GULAOTHI
HODAL
JHAJJAR
MEERUT
BARAUT
1.1 Million Passenger vehicles cross Delhi Borders in a day (2007 data)
Sl. No. RRTS Corridors
Prioritised Corridors Identified
Delhi – Sonipat – Panipat : 111 km
Delhi - Ghaziabad -Meerut : 90 km
Delhi - Gurgaon – Rewari - Alwar : 180 km
For Second Phase4 Delhi – Faridabad – Ballabgarh - Palwal
Ghaziabad – Khurja
Delhi - Bahadurgarh - Rohtak
Ghaziabad-Hapur
Delhi-Shahadra-Baraut
1
3
2
4
7
6
5
National Capital Region (NCR)
• Multi-state region with National Capital as Centre• Area of about 35,000 Sq Km• With 4.6 Crore population, most populated
metropolitan area in the country.
8
National Capital Region Transport Corporation
23
1
4
5
6
7
8
What RRTS will offer to users
High Speed connectivity High Frequency5 to 10 minutes
frequency
High Capacity 12 coach train provision
Comfortable journey AC coaches , Airline
type seating
Affordable FaresOff Board Fare Collection
Reduced Land use for same throughput User Friendly Information
SystemMultimodal Integration
1 2 3 4 5
6 7 8
Safe Travel
9
National Capital Region Transport Corporation
Impact of RRTS • Increased Economic Activity• Balanced Economic Development in the Region• Improved Access to Jobs and Facilities• Savings in Travel Cost and Time• Reduced Energy Use• Lower Emissions• Easing of Road Congestion• Improved Safety
Leading to Sustainable Urban Development
National Capital Region Transport Corporation
NCRTC Institutional Structure• NCRTC incorporated on 21st August 2013• It has one Nominated Director from each State• Corporate Office setup and started functioning since July’16• Organization development in progress• Finalization of DPRs of various corridors in progress
National Capital Region Transport Corporation
Institutional Structure for implementation of RRTS• Government has approved setting up High Powered Committee ( HPC) for
each State under the Chairmanship of the Chief Secretary of the respective States with other Secretaries concerned as members.
• This is to assist the NCRTC in taking expeditious decisions during the implementation phase relating to the matters of land acquisition, diversion of utilities and other structures, R&R, integration, TOD, enactment of new statutes etc.
• At National level, important decision of the RRTS related to funding & implementation would be overseen by the Empowered Committee (EC) chaired by Cabinet Secretary
National Capital Region Transport Corporation
NCRTC Legal Framework• RRTS would be taken up under the Metro Railway
(Construction of Works) Act 1978, and Metro Railways (Operation & Maintenance ) Act 2002 as amended through Metro Railway ( Amendment) Act, 2009
• Land acquisition and R&R required for the Project will be undertaken by respective State Governments
National Capital Region Transport Corporation
S. No Station Name Inter-station Distance (KM)
Distance(Cumulative)
1 ISBT (Kashmere Gate) 0.0
2 New Delhi RS 3.50 3.50
3 Sarai Kale Khan (NZM) 7.00 10.50
4 INA 5.00 15.50
5 Dhaula Kuan 4.50 20.00
6 Mahipalpur 6.50 26.50
7 Cyber City 7.50 34.00
8 IFFCO Chowk 3.20 37.20
9 Kherki Dhaula 12.3 49.50
10 Manesar 6.00 55.50
11 Panchgaon 8.50 64.00
12 Dharuhera 13.00 77.00
13 BTK 9.00 86.00
14 MBIR 15.00 101.00
15 Rewari 5.50 106.50
16 Bawal 12.50 119.00
17 SNB 7.00 126.00
18 Khairthal 29.50 155.50
19 Alwar 24.50 180.00
Distances are approximate
LegendUnderground(39 kms)Elevated(141 kms)
Proposed Alignment: Delhi-Alwar Corridor
KHERKI DHAULA
ISBT KASHMERE GATE
IFFCO CHOWK
DHARUHERAREWARI
ALWAR
Proposed Alignment:: Delhi-Panipat Corridor
Legend
Elevated
Underground ISBT KASHMERE GATE
NARELA
GANNAUR
PANIPAT
Sr. No
Stations KM from Previous station
Total KM
1 Kashmere Gate Terminus
2 Mukarba Chowk 13.8 13.803 Narela MMTC 8.8 22.604 Kundli Border 5.8 28.405 KMP Expressway interchange 7.9
36.306 Rajeev Gandhi Education City
(Rai)1.9
38.207 Murthal (Sonepat) 9.8 48.008 Gannaur Depot (along the
spur)*7.5 106.5
9 Gannaur (at NH1)* 14.5 62.5010 Samalkha 9.6 72.1011 Panipat City 17.8 89.9012 IOCL Panipat 9.1 99.00
Additional Length at ends 4.70
Total Length 111.2
14
Guldhar
Anand Vihar
S.Kalekhan/Nizamuddin
Sahibabad
Mohannagar
Ghaziabad
Duhai
Muradnagar
Modinagar
Meerut South
Shatabdi nagr
HRS Chowk
Begam Pul
Meerut North
Modipuram
Shastri Nagr/Med College
Nauchandi/Hapur Rd
Length = 90 kmsNumber of Main Line Stations =15Station on Spur - 2Elevated length = 60 kmsUnderground = 30 kms
Stations Elevated Underground
Total
Project Start 0.000 0.200 0.2001 Sarai Kale Khan – Anand Vihar 0.000 9.700 9.70
2 Anand Vihar – Sahibabad 3.240 3.460 6.700
3 Sahibabad – Mohan Nagar 2.400 0.000 2.4004 Mohan Nagar – 2.500 0.000 2.5005 – Guldhar 3.300 0.000 3.3006 Guldhar – Duhai 4.100 0.000 4.1007 Duhai – Muradnagar 7.300 0.000 7.3008 Muradnagar – Modinagar 9.400 0.000 9.4009 Modinagar – South 7.600 0.000 7.60010 South – Shatabadi Nagar 6.480 1.420 7.90011 Shatabadi Nagar – HRS Chowk 0.000 3.100 3.10
12 HRS Chowk – Begumpul 0.00 3.400 3.400
13 Begumpul – North 5.634 1.420 7.05414 North- Modipuram 3.746 0.000 3.746
Ends 1.405 0.000 1.405Spur Line
15 Shatabadi Nagar – (Spur) 0.00 4.800 4.80016 – Shastri Nagar (Spur) 2.380 2.620 5.000
Spur Ends 0.600 0.000 0.600Total 60.085 30.120 90.205
LegendUnderground
Elevated
Approved Alignment: Delhi-Meerut Corridor
Financial Feasibility: Capital Cost Summary Project IRR & Economic IRR
Components Delhi - Panipat
Delhi - Meerut
Delhi - Alwar
Total
Total Base Project Cost including land (without Taxes)
14,638 16,592 24,595 55,825
Total Base Project Cost including land (with central and State Taxes)
16,552 19,084 27,206 62,842
Total Project cost including escalation and IDC (with central and State Taxes)
18,755 21,274 32,141 72,170
Project IRR (post Tax) 10.66% 5.78% 4.25%Economic IRR 18.5% 22.31% 24.10%
Rs Crores --2012
Comparison with DMRC Phase 3 (with Central tax)Project IRR – 0.08%Economic IRR – 15.70%