Capital Programs Manual
October 2018
Office of Finance and Development www.nyshcr.org
38-40 State Street/Hampton Plaza Albany, NY 12207
Andrew M. Cuomo, Governor RuthAnne Visnauskas, Commissioner/CEO
Office of Finance and Development*
Capital Programs Manual
Page 1 of 11
*Please Note that the Capital Programs Manual does not apply to bond financed transactions
Blue text is used to indicate substantive revisions
incorporated since the February 2017 edition
of the Capital Programs Manual. Prospective
applicants are encouraged to review the entire
document to note all changes.
Office of Finance and Development*
Capital Programs Manual
Page 2 of 11
*Please Note that the Capital Programs Manual does not apply to bond financed transactions
1.00 INTRODUCTION
1.01 About This Manual .......................................................................................... 1
1.02 Office of Finance & Development - Capital Programs ................................... 3
1.02.01 HCR Units Administering Capital Programs ................................................... 3
1.02.02 Housing Trust Fund Corporation ..................................................................... 4
1.02.03 Administration of Federal Programs by OF&D............................................... 5
1.03 Regional Offices .............................................................................................. 6
1.04 Waivers ............................................................................................................ 7
2.00 PROGRAM DESCRIPTIONS
2.01 Low-Income Housing Trust Fund Program ..................................................... 1
2.01.01 Summary .......................................................................................................... 1
2.01.02 Statutory Provisions ......................................................................................... 2
2.01.02.A Purpose ............................................................................................................. 2
2.01.02.B Definitions........................................................................................................ 2
2.01.03 Eligibility Requirements .................................................................................. 2
2.01.03.A Eligible Applicants......................................................................................... ..2
2.01.03.B Eligible Projects ............................................................................................... 4
2.01.03.C Eligibility Requirements for Homesteading Projects ...................................... 5
2.01.03.D Requirements for Cooperative and Condominium Projects ............................ 5
2.01.03.E Eligible Areas................................................................................................... 6
2.01.03.F Eligible Occupants ........................................................................................... 7
2.01.03.G Eligible Project Costs ....................................................................................... 8
2.01.03.H Eligible Predevelopment Costs ........................................................................ 9
2.01.04 Program Requirements................................................................................... 10
2.01.04.A Private Developer Minimum Equity Requirements ....................................... 10
2.01.04.B Real Estate Contributions .............................................................................. 10
2.01.04.C Payment of Equity.......................................................................................... 11
2.01.04.D Return on Equity ............................................................................................ 11
2.01.04.E Regulatory Period ........................................................................................ ..12
2.01.04.F Accessibility and Adaptation of Units ........................................................... 13
2.02 Housing Development Fund Program ........................................................... 14
2.02.01 Summary ........................................................................................................ 14
2.02.02 Statutory Provisions ....................................................................................... 15
2.02.02.A Purpose ........................................................................................................... 15
2.02.02.B Definitions...................................................................................................... 15
2.02.03 Eligibility Requirements ................................................................................ 15
2.02.03.A Eligible Applicants......................................................................................... 15
Office of Finance and Development*
Capital Programs Manual
Page 3 of 11
*Please Note that the Capital Programs Manual does not apply to bond financed transactions
2.00 PROGRAM DESCRIPTIONS (continued)
2.02.03.B Eligible Projects ............................................................................................. 16
2.02.03.C Eligible Areas................................................................................................. 16
2.02.03.D Eligible Occupants ......................................................................................... 16
2.02.03.E Eligible Loan Costs ........................................................................................ 16
2.02.04 Program Requirements................................................................................... 17
2.02.04.A HDF Loan Requirements ............................................................................... 17
2.02.04.B HDFC Incorporation ...................................................................................... 17
2.02.05 Farmworker Housing Program ...................................................................... 21
2.03 Low-Income Housing Credit (LIHC) Program .............................................. 23
2.03.01 Summary ........................................................................................................ 23
2.03.02 Statutory Provisions ....................................................................................... 23
2.03.02.A Purpose ........................................................................................................... 23
2.03.02.B Definitions...................................................................................................... 24
2.03.03 Eligibility Requirements ................................................................................ 24
2.03.03.A Eligible Applicants......................................................................................... 24
2.03.03.B Eligible Projects ............................................................................................. 25
2.03.03.C Eligible Areas................................................................................................. 27
2.03.03.D Eligible Occupants ......................................................................................... 27
2.03.03.E Eligible Project Costs ..................................................................................... 27
2.03.04 Program Requirements................................................................................... 27
2.03.04.A LIHC Ceiling Allocation................................................................................ 27
2.03.04.B DHCR Credit Allocation Process .................................................................. 28
2.03.05 LIHC Processing Documents ......................................................................... 29
2.03.05.A Reservation Letter .......................................................................................... 29
2.03.05.B Binding Agreement ........................................................................................ 31
2.03.05.C Carryover Allocation ..................................................................................... 31
2.03.05.D Notice of Satisfaction of Conditions and Binding Commitment ................... 32
2.03.05.E Extended Use Period/Final Credit Allocation ................................................ 33
2.03.05.F 8609 Issuance ................................................................................................. 34
2.03.06 Projects Financed by Private Activity Bonds ................................................ 34
2.04 New York State HOME Program .................................................................. 35
2.04.01 Summary ........................................................................................................ 35
2.04.02 Statutory Provisions ....................................................................................... 36
2.04.02.A Purpose ........................................................................................................... 36
2.04.02.B Definitions...................................................................................................... 36
2.04.03 Eligibility Requirements ................................................................................ 36
2.04.03.A Eligible Applicants......................................................................................... 36
2.04.03.B Eligibility Requirements for Community Housing Development
Organizations (CHDOs)................................................................................. 36
2.04.03.C Eligible Projects ............................................................................................ 37
2.04.03.D Eligible Areas................................................................................................. 38
Office of Finance and Development*
Capital Programs Manual
Page 4 of 11
*Please Note that the Capital Programs Manual does not apply to bond financed transactions
2.00 PROGRAM DESCRIPTIONS (continued)
2.04.03.E Eligible Occupants ........................................................................................ 38
2.04.03.F Eligible Project Costs ..................................................................................... 38
2.04.03.G Eligible Activities .......................................................................................... 39
2.04.04 Relocation ...................................................................................................... 39
2.04.04.A Notice ............................................................................................................. 40
2.04.04.B Voluntary Acquisition .................................................................................... 41
2.04.04.C Displaced vs. Non-Displaced Tenant ............................................................. 43
2.04.04.D Comparable Decent, Safe, and Sanitary Replacement Housing .................... 43
2.04.04.E One-to-One Replacement of Units................................................................. 46
2.04.04.F Certification of Legal Residency ................................................................... 48
2.04.04.G Basic Recordkeeping Requirements .............................................................. 49
2.04.04.H Advisory Services .......................................................................................... 50
2.04.04.I Calculating Housing Replacement Costs and Moving Expenses .................. 50
2.04.04.J Moving Related Expenses.............................................................................. 51
2.04.04.K Replacement Housing Payments.................................................................... 51
2.04.04.L Businesses, Farms, and Nonprofit Organizations .......................................... 52
2.04.04.M Lower-Income Persons .................................................................................. 53
2.04.04.N Appeals .......................................................................................................... 53
2.04.05 Rental Project Requirements.......................................................................... 54
2.04.05.A General Requirements for Rental Projects ..................................................... 54
2.04.05.B Eligible Rental Properties .............................................................................. 55
2.04.05.C Eligible Tenants/Rents ................................................................................... 55
2.04.05.D Regulatory Periods for Rental Projects .......................................................... 56
2.04.05.E Regulatory Restrictions of HOME Rental Projects ....................................... 56
2.04.05.F CHDO Multi-family Rental Projects ............................................................. 56
2.04.06 Other Federal Requirements .......................................................................... 57
2.04.06.A Section 3......................................................................................................... 57
2.05 New York State Low-Income Housing Credit (SLIHC) Program................. 58
2.05.01 Summary ........................................................................................................ 58
2.05.02 Additional Definitions ................................................................................... 58
2.05.03 Eligibility Requirements ................................................................................ 59
2.05.03.A Eligible Applicants/Owners ........................................................................... 59
2.05.03.B Eligible Projects ............................................................................................. 59
2.05.04 Project Scoring and Ranking Criteria ............................................................ 59
2.05.05 Additional State Tax Credit Exceptions to LIHC .......................................... 59
2.06 Urban Initiatives (UI) Program ...................................................................... 61
2.06.01 Summary ........................................................................................................ 61
2.06.02 Eligible Applicants......................................................................................... 61
2.06.03 Eligible Projects ............................................................................................. 61
2.06.04 Eligible Areas................................................................................................. 61
Office of Finance and Development*
Capital Programs Manual
Page 5 of 11
*Please Note that the Capital Programs Manual does not apply to bond financed transactions
2.00 PROGRAM DESCRIPTIONS (continued)
2.06.05 Eligible Occupants/Beneficiaries ................................................................... 62
2.06.06 Eligible Project Costs ..................................................................................... 62
2.06.07 Ineligible Project Costs .................................................................................. 62
2.06.08 Regulatory Term ............................................................................................ 62
2.07 Rural Area Revitalization Program (RARP) .................................................. 64
2.07.01 Summary ........................................................................................................ 64
2.07.02 Eligible Applicants......................................................................................... 64
2.07.03 Eligible Projects ............................................................................................. 64
2.07.04 Eligible Areas................................................................................................. 65
2.07.05 Eligible Occupants/Beneficiaries ................................................................... 65
2.07.06 Eligible Project Costs ..................................................................................... 65
2.07.07 Ineligible Project Costs .................................................................................. 65
2.07.08 Regulatory Term ............................................................................................ 66
2.08 Rural and Urban Community Investment Fund (CIF) Program .................... 67
2.08.01 Summary ........................................................................................................ 67
2.08.02 Statutory Provisions ....................................................................................... 67
2.08.03 Eligible Applicants......................................................................................... 67
2.08.04 Eligible Areas................................................................................................. 68
2.08.05 Fund Allocation ............................................................................................. 68
2.08.06 Eligible Occupants/Beneficiaries ................................................................... 68
2.08.07 Match Requirements ...................................................................................... 68
2.08.08 Allowable Developer Fee .............................................................................. 69
3.00 UNIFIED FUNDING PROCESS
3.01 Introduction ...................................................................................................... 1
3.02 Application Review and Funding Process ....................................................... 2
3.02.01 Eligibility Review ........................................................................................... 2
3.02.02 Rating and Ranking.......................................................................................... 2
3.02.03 Project Review ................................................................................................. 3
3.02.04 Project Recommendations ............................................................................... 3
3.02.05 Outcome Letters ............................................................................................... 4
3.03 Technical Assistance for Capital Projects........................................................ 6
Office of Finance and Development*
Capital Programs Manual
Page 6 of 11
*Please Note that the Capital Programs Manual does not apply to bond financed transactions
4.00 M/WBE AND FAIR HOUSING AND EQUAL OPPORTUNITY
REQUIREMENTS
4.01 Introduction ...................................................................................................... 1
4.02 M/WBE Requirements ..................................................................................... 2
4.02.01 Utilization Plan ................................................................................................ 2
4.02.02 Methods for the Participation of M/WBEs ...................................................... 3
4.03 Equal Employment Opportunity ...................................................................... 4
4.04 Fair Housing Requirements ............................................................................. 6
4.04.01 Fair Housing Laws ........................................................................................... 6
4.04.02 Affirmative Fair Housing Marketing Plans ..................................................... 7
5.00 DEVELOPMENT REQUIREMENTS
5.01 Introduction ...................................................................................................... 1
5.02 Environmental Requirements........................................................................... 2
5.02.01 HCR Environmental Review Summary ........................................................... 2
5.02.02 General Scope of Review ................................................................................. 3
5.02.03 Historic Review ............................................................................................... 4
5.02.04 Compliance with Other Specific Environmental Regulations ......................... 4
5.02.05 Site Contamination........................................................................................... 5
5.02.06 Schedule of Submissions ................................................................................. 6
5.02.07 Completion of Environmental Review ............................................................ 7
5.03 Site Requirements ............................................................................................ 8
5.03.01 Site Control ...................................................................................................... 9
5.03.02 Site Acquisition .............................................................................................. 10
5.03.03 Appraisals ...................................................................................................... 12
5.03.04 Physical Needs Assessment ........................................................................... 14
5.04 Design Requirements ..................................................................................... 15
5.05 Project Costs .................................................................................................. 16
5.06 Preservation Projects ...................................................................................... 24
5.07 Underwriting Standards ................................................................................. 27
5.08 Subsidy Layering Review Process ................................................................. 42
5.08.01 Purpose of Subsidy Layering Reviews .......................................................... 42
Office of Finance and Development*
Capital Programs Manual
Page 7 of 11
*Please Note that the Capital Programs Manual does not apply to bond financed transactions
5.00 DEVELOPMENT REQUIREMENTS (continued)
5.08.02 Timing of Reviews ......................................................................................... 42
5.08.03 Guidelines for Conducting Subsidy Layering Reviews ................................. 43
5.08.04 Basis of Review ............................................................................................. 45
5.08.05 Completion of Review ................................................................................... 46
5.09 Construction Monitoring Requirements ........................................................ 47
5.10 Financing Requirements ................................................................................ 49
5.11 Insurance Requirements ................................................................................. 51
5.11.01 Insurance Requirements for Applicants ......................................................... 51
5.11.02 Insurance Requirements for Builders Under Direct Contract with
Applicants ...................................................................................................... 53
5.11.03 Project Architect's Insurance ......................................................................... 54
5.12 Real Property Tax Exemption ........................................................................ 56
5.13 Professional Service Contract Requirements ................................................. 57
5.13.01 Selection of an Architect/Engineer ................................................................ 57
5.13.02 Selection of a Housing Consultant ................................................................. 57
5.13.03 Selection of Attorneys.................................................................................... 58
5.13.04 Selection of a Builder..................................................................................... 58
5.13.05 Construction Contracting Requirements ........................................................ 60
5.13.06 Selection of a Managing Agent ...................................................................... 62
5.14 Private Developer Requirements ................................................................... 63
5.14.01 Guarantee of Construction Contract Costs .................................................... 63
5.14.02 Construction Financing using HCR Funds .................................................... 63
5.15 Special Needs and Supportive Housing ......................................................... 64
5.15.01 Projects Serving Persons with Special Needs ................................................ 64
5.15.02 Supportive Housing Projects.......................................................................... 66
5.15.03 Housing Services Agreement ......................................................................... 68
5.15.04 Identification of Senior Housing Project ....................................................... 68
5.15.05 Most Integrated Setting .................................................................................. 69
5.16 Federal Labor Standards Regulatory Requirements ...................................... 70
5.16.01 Davis-Bacon Related Acts ............................................................................. 70
5.16.02 Requirements Prior to Submitting an Application ......................................... 70
5.16.03 Requirements Prior to Executing Any Construction Contract or Starting
Any Work....................................................................................................... 71
5.16.04 Awarded Projects Subject to Davis-Bacon Requirements ............................. 71
5.16.05 Additional Resources ..................................................................................... 71
Office of Finance and Development*
Capital Programs Manual
Page 8 of 11
*Please Note that the Capital Programs Manual does not apply to bond financed transactions
6.00 ADMINISTRATIVE PROCESSING REQUIREMENTS
6.01 Introduction ...................................................................................................... 1
6.01.01 Summary .......................................................................................................... 1
6.02 Administrative Procedures and Requirements ................................................. 2
6.02.01 Project Development Meeting ......................................................................... 2
6.02.02 Funding Commitment Letter (FCL)................................................................. 2
6.03 Funding Increase Under HCR Programs ......................................................... 4
6.03.01 Evaluation Milestones ...................................................................................... 5
6.03.02 Underwriting Parameters ................................................................................. 6
6.03.03 Methodologies for Determining Cost Sharing ................................................. 8
6.03.04 Process for Requesting Additional Allocations ............................................... 9
6.04 Assignment and Transfer of Awards and Commitments ............................... 11
6.05 CHDO Determination Process ....................................................................... 13
6.06 Development Team Member Change ............................................................ 15
6.06 Project Development Tracks .......................................................................... 16
6.06.01 Development Track One Process (HTF/HOME Permanent Financing
Only) .............................................................................................................. 16
6.06.02 Development Track One Process (HTF/HOME Permanent Financing with
LIHC/SLIHC) ................................................................................................ 17
6.06.03 Development Track Two Process (LIHC/SLIHC Alone) .............................. 18
6.06.04 Development Track Three Process (HCR Construction Loan) ..................... 19
6.07 Construction Processing Requirements ......................................................... 21
6.07.01 Pre-Construction Meeting Requirements ....................................................... 21
6.07.02 Roles/Responsibilities of the Project Owner/Awardee .................................. 22
6.07.03 Roles/Responsibilities of the Project Architect ............................................. 23
6.07.04 Roles/Responsibilities of the Builder............................................................. 24
6.07.05 Roles/Responsibilities of the OF&D Project Manager .................................. 25
6.07.06 Roles/Responsibilities of the A&E Construction Monitor ............................ 26
6.07.07 Roles/Responsibilities of the A&E Architect ................................................ 26
6.07.08 Responsibilities for Construction Documents ............................................... 27
6.07.09 Schedule of Values ........................................................................................ 27
6.07.10 Payment for Stored Materials ........................................................................ 28
6.07.11 Disputes, Claims, Delays and Time Extensions ............................................ 29
6.08 Change Orders/Budget Modifications/Escrow Accounts .............................. 30
6.08.01 Change Orders ............................................................................................... 30
Office of Finance and Development*
Capital Programs Manual
Page 9 of 11
*Please Note that the Capital Programs Manual does not apply to bond financed transactions
6.00 ADMINISTRATIVE PROCESSING REQUIREMENTS (continued)
6.08.02 Emergency Change Order Requests .............................................................. 31
6.08.03 Escrow Accounts ........................................................................................... 31
6.09 HCR Disbursement Procedures ..................................................................... 33
6.09.01 Construction Loan Progress Payment Requests ............................................ 33
6.09.02 Required Forms and Documentation for Construction Progress Payment
Requests ......................................................................................................... 34
6.09.03 Construction Progress Payment Requests for Multi-Site Projects ................. 35
6.09.04 Punchlist Inspection ....................................................................................... 35
6.09.05 Final Inspection .............................................................................................. 35
6.09.06 Final Inspection Conference .......................................................................... 36
6.09.07 Permanent Loan Closing Payment Requests ................................................. 37
6.09.08 Required Forms and Documentation for Permanent Closing Payment
Requests ......................................................................................................... 37
6.09.09 Permanent Loan Final Payment Requests with a Holdback .......................... 38
6.09.10 Permanent Loan Final Payment Requests with No Holdback ....................... 38
6.10 Permanent Loan Closing Procedures ............................................................. 39
6.10.01 Permanent Loan Closing ................................................................................ 39
6.11 Cost Certification ........................................................................................... 40
7.00 PROJECT OPERATING AND MANAGEMENT REQUIREMENTS
7.01 Introduction ...................................................................................................... 1
7.02 Required Operating Accounts .......................................................................... 2
7.02.01 Establishing Bank Accounts ............................................................................ 2
7.02.02 General Operating Account ............................................................................. 3
7.02.03 Working Capital Fund Account ....................................................................... 3
7.02.04 Reserve Fund Accounts ................................................................................... 3
7.02.05 Operating Reserve Account ............................................................................. 5
7.02.06 Replacement Reserve Account ........................................................................ 6
7.02.07 Real Estate Tax and Insurance Escrow Account ............................................. 6
7.02.08 Tenant Security Deposit Account .................................................................... 6
7.03 Insurance Requirements for Owners ................................................................ 8
7.03.01 For Homesteading Owners .............................................................................. 9
7.03.02 Notification Required for Insurance Claims .................................................... 9
7.04 Annual Reporting Requirements.................................................................... 10
7.04.01 Performance Report ....................................................................................... 10
Office of Finance and Development*
Capital Programs Manual
Page 10 of 11
*Please Note that the Capital Programs Manual does not apply to bond financed transactions
7.00 PROJECT OPERATING AND MANAGEMENT REQUIREMENTS (continued)
7.04.02 Operating Budget ........................................................................................... 11
7.04.03 HOME Monitoring Checklist ........................................................................ 11
7.05 Tenant Management Requirements ............................................................... 13
7.05.01 General Tenant Selection Process .................................................................. 13
7.05.02 Tenant Affordability Requirements ............................................................... 18
7.05.03 Establishing and Adjusting Project Rents ...................................................... 18
7.05.04 Initial Project Rents in Areas Subject to the Rent Stabilization Law (RSL) or
Emergency Tenant Protection Act (ETPA) ................................................... 21
7.05.05 Tenant Income Verification ........................................................................... 21
7.05.06 HTF Tenant Income Recertification Waiver ................................................. 21
7.06 Tenant Lease Agreements .............................................................................. 23
7.07 Managing Agent/Tenant Management Services ............................................ 24
7.08 Asset Management Performance Reviews..................................................... 25
7.09 HTF/Turnkey/LIHC Blended Projects ........................................................... 26
7.09.01 Maximum Income Limits – LIHC Projects ................................................... 26
7.09.02 Restricted Rent Limit ..................................................................................... 26
7.09.03 Increases in Tenant Income – Next Available Unit Rule (NAUR) ............... 26
7.09.04 Tenant Income Certification .......................................................................... 27
7.09.05 Students .......................................................................................................... 27
8.00 GLOSSARY
Office of Finance and Development
Capital Programs Manual Page 1 of 7
Section: 1.00 INTRODUCTION
Sub Section: 1.01 About This Manual
This manual is designed to provide program participants with a comprehensive handbook which
explains the processes, procedures, and requirements of the Office of Finance & Development's Capital
Programs (OF&D). It supersedes Capital Programs Manual (CPM) issued September 2018. Please note that
the CPM does not apply to bond financed transactions. The provisions of this document take effect for all
OF&D immediately.
The manual is organized under the following headings:
Section 1.00: Introduction
Section 2.00: Program Descriptions
Section 3.00: Unified Funding Process
Section 4.00: Fair Housing and Equal Opportunity Requirements
Section 5.00: Development Requirements
Section 6.00: Administrative Processing Requirements
Section 7.00: Project Operating and Management Requirements
Section 8.00: Glossary
Please also note that the Housing Trust Fund Corporation (HTFC) Design Handbook is published
separately. Design requirements must be addressed in the design of projects by most program participants.
Applicants are strongly urged to consult the Design Handbook before completing an application. The
current version is available online at: www.nyshcr.org/Publications/DesignHandbook/.
This Manual describes the requirements and procedures for the following capital programs:
Division of Housing and Community Renewal-Administered Programs
Housing Development Fund (HDF)
Low Income Housing Credit (LIHC)
New York State Low Income Housing Tax Credit Program (SLIHC)
Farmworker Housing Program
Housing Trust Fund Corporation-Administered Programs
Low Income Housing Trust Fund (HTF)
New York State HOME Program (HOME)
Urban Initiatives (UI)
Office of Finance and Development
Capital Programs Manual Page 2 of 7
Rural Area Revitalization Projects Program (RARP)
Community Investment Fund (CIF)
Office of Finance and Development
Capital Programs Manual Page 3 of 7
Section: 1.00 INTRODUCTION
Sub Section: 1.02 Office of Finance & Development - Capital Programs
The OF&D an administrative office located within New York State Homes and Community
Renewal (HCR) and also serves as staff for the Housing Trust Fund Corporation (HTFC), a public benefit
corporation. OF&D is responsible for both DHCR and HTFC administered programs. References to OF&D
administrative policy shall refer to all programs covered in this manual while references to HTFC
administrative policy pertains exclusively to programs funded through HTFC (see Sub-Section 1.01 for a
list of all capital programs).
1.02.01 HCR Units Administering Capital Programs
Within OF&D, the following units are involved in the processes described herein:
The Regional Offices (Capital District, Buffalo, New York City, and Syracuse) are responsible for
implementing the policies and programs of OF&D. This includes application review, project planning,
project monitoring (from concept to completion of the construction/rehabilitation phase), working with
community groups and outreach to needy communities. See Section 1.03 for regional office coverage areas
and contact information.
Program Management staff is responsible for oversight of the individual OF&D programs. This
includes ensuring that rules, regulations, and program guidelines are consistent with the statutory intent of
the Legislature as well as monitoring to ensure that all applicants and program participants are treated
consistently according to standardized, clearly communicated program policies including policies on project
underwriting.
The Underwriting Unit is responsible for assessing the financial plans of projects requesting funding
from HCR. This includes analyzing project applications to ensure sufficient and appropriate financing to
complete a project, evaluating market demand, and considering rent structures and long-term operating costs
of projects. In addition, underwriting staff work with regional office staff on funded projects from the time
of award until project completion, providing any required underwriting analysis of the project.
The Management Systems and Research Unit (MSR) provides research and analytical support to
OF&D's staff. The unit has responsibility for maintaining the Statewide Housing Activity Reporting System
(SHARS) and other databases, preparing and updating all Legislative reports, and compiling program data
into reports, manuals and other information pieces.
Office of Finance and Development
Capital Programs Manual Page 4 of 7
In addition to units within OF&D, other units within HCR are involved in the processes described in
this Manual. These include:
The Architecture & Engineering Bureau (A&E) reviews and approves all plans and specifications
plus provides on-site construction monitoring during the building phase of projects. Since Design reviews
are a critical component of the application review process, A&E staff participates in Project Development
Meetings with the applicant's development team and provides technical assistance on design issues to both
HCR staff and program participants. The A&E has one additional component:
The Environmental Analysis Unit (EAU) conducts environmental reviews for housing
construction and rehabilitation projects funded by the Housing Trust Fund Corporation
(HTFC). The environmental review is conducted according to regulations under the State
Environmental Quality Review Act (SEQR) at 6 NYCRR Part 617. Additionally, for HOME
projects, environmental reviews must be conducted according to the National Environmental
Policy Act (NEPA), as interpreted by HUD regulations at 24 CFR Part 58.
The Office of Fair and Equitable Housing (FHEO) oversees compliance with all affirmative action,
equal employment opportunity, and fair housing guidelines. FHEO works hand-in-hand with OF&D to
ensure that the issues identified in Section 4 ("Fair Housing and Equal Opportunity Requirements") of this
Manual are addressed by every participant in the capital programs.
The Office of Legal Affairs (OLA) provides comprehensive legal oversight for all of OF&D's
programs. OLA staff review all legal documentation submitted by applicants and project sponsors, supervise
all closings, and prepare all contracts and formal documents utilized by OF&D in its administration of these
programs.
The Asset Management Unit (AMU) reviews and supervises projects when the project is complete
and the property is occupied. AMU also reviews and approves the Project Management Plans and
management agent contracts prior to the closing on DHCR/HTFC financing. In addition, compliance with
the requirements described in Section 7.0 ("Project Operating and Management Requirements") is overseen
by the AMU.
1.02.02 Housing Trust Fund Corporation
The Housing Trust Fund Corporation (HTFC), a public benefit corporation established by Article 18
of the Private Housing Finance Law, was created to facilitate the development of low-income housing by
providing funding and technical assistance to eligible projects. Although technically a subsidiary of the New
Office of Finance and Development
Capital Programs Manual Page 5 of 7
York State Housing Finance Agency, the staff who administer the programs discussed in this manual are
employed by the Division of Housing and Community Renewal. As a public benefit corporation, HTFC is
governed by a Board of Directors, chaired by the Commissioner of HCR.
All programs administered by HTFC are implemented by OF&D staff in accordance with the
directives of the HTFC Board. This includes project selection (subject to Board approval),
construction/rehabilitation monitoring, technical assistance, and daily administration. The fiscal aspects of
the HTFC programs are managed by HCR's Office of Professional Services in accordance with the
directives of the HTFC Board. This includes disbursement of funds and tracking statutory provisions on
allocation of funds by region and type of applicant. The legal aspects of the programs are addressed by
HCR's OLA including a document review and project closings. HCR's AMU oversees post-construction
project management.
1.02.03 Administration of Federal Programs by OF&D
OF&D administers several housing programs funded by the federal government. Currently, the Low-
Income Housing Credit (LIHC) is part of OF&D 's Unified Funding Process (described in Section 3.0 of this
Manual), although a separate Notice of Credit Availability and application review are conducted for this
program. The precise nature of OF&D's involvement with these programs is defined by federal regulations
but to the extent there is discretion, these programs are administered in a manner similar to HCR processes
described above (Sub-Section 1.02.01).
Office of Finance and Development
Capital Programs Manual Page 6 of 7
Section: 1.00 INTRODUCTION
Sub Section: 1.03 Regional Offices
The regional offices are responsible for implementing the policies and programs of OF&D. This
includes marketing and outreach to communities, providing technical assistance to project sponsors,
conducting application clinics, application review, and other aspects of the State's housing delivery system.
The appropriate regional office is the first point of contact for anyone interested in the capital programs of
OF&D and should be contacted for information on:
the application process;
submission deadlines;
program eligibility; or,
availability of funds.
Following are the Regional Offices and the counties they serve:
Capital District Regional Office
Hampton Plaza, 38-40 State Street, Albany, New York 12207 (518) 486-5044
Counties Served: Albany, Clinton, Columbia, Delaware, Dutchess, Essex, Fulton, Greene, Hamilton,
Montgomery, Orange, Otsego, Putnam, Rensselaer, Saratoga, Schenectady,
Schoharie, Sullivan, Ulster, Warren, Washington
Buffalo Regional Office
Electric Building, Suite 105, 535 Washington Avenue, Buffalo, New York 14203 (716) 847-7955
Counties Served: Allegany, Cattaraugus, Chautauqua, Chemung, Erie, Genesee, Livingston, Monroe,
Niagara, Ontario, Orleans, Schuyler, Seneca, Steuben, Wayne, Wyoming, and Yates
New York City Regional Office
25 Beaver St., 6th Floor, New York, NY 10004 (212) 480-7165
Counties Served: Bronx, Kings, New York, Queens, Richmond, Nassau, Suffolk, Rockland and
Westchester
Syracuse Regional Office
620 Erie Blvd. West, Suite 312, Syracuse, NY 13204 (315) 478-7179
Counties Served: Broome, Cayuga, Chenango, Cortland, Franklin, Herkimer, Jefferson, Lewis,
Madison, Oneida, Onondaga, Oswego, St. Lawrence, Tioga, Tompkins
Office of Finance and Development
Capital Programs Manual Page 7 of 7
Section: 1.00 INTRODUCTION
Sub Section: 1.04 Waivers
In certain circumstances, applicants may wish to request a waiver of one or more of the requirements
described in Section 3.0 ("Unified Funding Process"), Section 5.0 ("Development Requirements") or
Section 6.0 (“Administrative Processing Requirements") of this Manual. This can be done by placing a
request in writing to the President of OF&D and/or his or her designee at least 60 days prior to submitting
an application. Waiver requests will be considered on an individual basis, based on the rationale provided in
the request. Applicants must receive written approval of a requested waiver prior to incorporating the terms
of the waiver into an application. Documentation of any approved waiver(s) must be included in the
application to which the waiver applies.
Please note: No requirement mandated by statute may be waived under any circumstance.
Office of Finance and Development
Capital Programs Manual
Page 1 of 69
Section: 2.00 PROGRAM DESCRIPTIONS
Sub Section: 2.01 Low-Income Housing Trust Fund Program
2.01.01 Summary
The Low-Income Housing Trust Fund Program ("HTF Program") provides payments,
grants, and loans to eligible applicants to develop and complete housing projects for occupancy
by persons of low income in eligible areas. The HTF Program was established under Article 18
of the Private Housing Financing Law (PHFL) and is administered by HCR on behalf of the
NYS HTFC. A copy of the PHFL can be found at www.ny.gov.
Eligible applicants may receive up to $125,000 per unit per project to pay for eligible
costs that include: site acquisition; constructing, rehabilitating, or converting an eligible project;
and soft costs. HTF Program funds may be used as bridge or permanent financing for
predevelopment costs, construction costs, working capital, and replacement reserves.
Through the Unified Funding (UF) process, an eligible applicant may participate in the
HTF Program as a direct project recipient, in which the applicant develops projects on its own.
Applicants who participate in the HTF Program as private developers, as defined in the PHFL
Article 18, Section 1102.1, are required to make an equity contribution equal to two and one-half
percent of the total project cost or five percent of the total project cost less all grants, whichever
is greater. A portion of the equity contribution, equal to the lesser of one percent of the total
development cost or 50% of project gross rent, must be made as a cash deposit to the project's
Operating Reserve Account.
Per statute, allocations of HTF cannot exceed the following limits based on the total
program appropriation in any fiscal year:
• 50 percent allocated to projects located within any single municipality.
In addition, Section 1102.8 of the PHFL requires preference in the awarding of funds to
be given to economically feasible projects which contain a substantial number of persons whose
income does not exceed 50 percent of Area Median Income (AMI).
Applicants, who plan to use HTF Program funds in conjunction with the Low Income
Housing Credit (LIHC) Program (Section 2.03), should be familiar with the eligibility
requirements of both programs. Applicants and owners of projects involving the construction or
Office of Finance and Development
Capital Programs Manual
Page 2 of 69
rehabilitation of four or more HCR assisted housing units including LIHC Program projects are
required to submit affirmative marketing plans before rent-up, detailing specific actions to be
taken to provide information and outreach to eligible persons of all racial, ethnic, gender and
disabled groups from the housing market area.
2.01.02 Statutory Provisions
2.01.02.A Purpose
The HTF Program was created by Article 18 of the PHFL for the purpose of making
payments, grants, or loans available to subsidize the cost of rehabilitating and constructing
housing for persons of low income. The Legislature's intent in creating the HTF Program was to
increase the housing opportunities of persons of low income by expanding the supply of
affordable housing. The HTF Program is administered by the HTFC, a public benefit corporation
established under Section 45-a, of the PHFL. The specific legislative findings on which the HTF
Program is based are found in Article 18, Section 1100 of the PHFL.
2.01.02.B Definitions
Definitions and program specific terms can be found in Article 18 of the PHFL, Section
1101.
2.01.03 Eligibility Requirements
This Section describes the eligibility requirements that are specific to the HTF Program.
2.01.03.A Eligible Applicants
As set forth in Article 18 of the PHFL, eligible applicants for the HTF Program include
municipalities, counties, municipal housing authorities, not-for-profit corporations, charitable
organizations, wholly-owned subsidiaries of not-for-profit corporations or charitable
organizations, partnerships, certain private developers, and HDFCs. To be considered a not-for-
profit project under the HTF Program requirements, a not-for-profit corporation or its wholly
owned subsidiary must have an ownership interest in the project ownership entity equal to at
least 50% of the controlling interest in the project and have a defined role in project
Office of Finance and Development
Capital Programs Manual
Page 3 of 69
management, evidenced by an equal say in the selection, hiring, and firing of the management
agent for the project, and in other decisions regarding the management of the project. The non-
profit must also have an equal say in the management of the partnership as demonstrated by the
partnership agreement.
Except in cases of not-for-profit organizations, which are at the time of application
engaged in multiple activities, and HTFC has given its consent to those activities continuing, the
project must be and remain the sole asset and business purpose of the project recipient. Persons
of low income may not be direct recipients of payments, grants or loans from the Corporation,
but may receive such funds from another eligible applicant.
With the exception of municipalities, counties, and private developers, an applicant must
have been in existence as a bona fide organization for at least one year prior to submission of an
application, and must have the improvement of housing for persons of low income as a primary
purpose, as evidenced in their articles of incorporation or by-laws. Municipalities, counties, and
private developers must demonstrate prior experience in the production of affordable or low
income housing.
A partnership's term of existence is determined by that of the partner with controlling
interest. The term of existence for wholly-owned subsidiaries of not-for-profit corporations or
charitable organizations is determined by that of the parent corporation.
Applicants must have the experience and capacity to develop and complete a project of
the size and type proposed in a timely and cost-effective manner. They also need to be capable of
maintaining financial records in accordance with Generally Accepted Accounting Principles.
Applicants must also be able to secure any additional financing that may be necessary to
complete the project as proposed. Additionally, applicants must be able to assume responsibility
for providing management of the HTF Program units during the regulatory period. An applicant
may apply directly to the HTF Program as a project recipient, in which case HTFC administers
funding.
Office of Finance and Development
Capital Programs Manual
Page 4 of 69
2.01.03.B Eligible Projects
Newly constructed and rehabilitated rental, cooperative, condominium, and homesteading
projects are eligible projects under Article 18 of the PHFL. The HTF Statute and HCR policy set
forth the following criteria with regard to rehabilitation projects:
• An occupied residential property is eligible for HTF if the property is distressed. HCR
will consider an occupied residential property distressed if:
a. The occupancy rate by lawful occupants is less than 60% (otherwise known as
under-occupied);
b. The residential portion of a mixed use property has an occupancy rate by lawful
occupants of less than 60% (under-occupied);
c. A property consisting of one or two residential units prior to rehabilitation will
subsequent to rehabilitation contain at least one additional residential unit; and,
d. The rehabilitation of the property would preserve affordable housing currently
serving a population whose housing need would justify its replacement if it
ceased to be available.
• An occupied non-residential property is eligible for conversion with HTF if the property
is underutilized. HCR will consider the following factors in determining whether a non-
residential property is underutilized:
a. Revenue from the leased space compared to the cost to operate the property;
b. Whether the owner provided the occupant with a plan acceptable to HCR for the
occupant’s relocation;
c. The percentage of leased space compared to the total amount of space available
for lease;
d. Whether the current occupant of the non-residential space provides a critical
service to the community which would be left unmet if the current occupant was
displaced by the proposed project; and,
e. Whether the land, building(s), and/or structure(s) are currently not used or used
at a lower density than the local land use plan permits and may potentially be
developed, recycled, or converted into a higher density residential, commercial,
or mixed-use development as defined in a local land use plan.
Office of Finance and Development
Capital Programs Manual
Page 5 of 69
Per HCR policy, a property is classified as residential property if 50 percent or more of
its gross floor space is residential prior to rehabilitation. A property is classified as non-
residential property if less than 50 percent of the gross floor space is residential prior to
construction.
HCR will consider a structure to be vacant if the applicant can demonstrate that the
occupancy is temporary in nature and that the occupant does not have a statutory or contractual
right to occupy the property at the anticipated time for commencement of activities. A property
will not be considered vacant if the occupant's obligation to vacate is conditioned upon the
applicant securing funding from New York State. While there are no project size restrictions,
factors such as site characteristics, community need, and project feasibility must be considered
when determining project scope. Projects should be primarily for residential use, but other space
may be included if it is determined by the Corporation to be appurtenant or incidental to the
residential dwelling accommodations, and is intended for the exclusive use of project occupants.
Depending on the nature of the project, such other space may include: community space, on-site
management offices, common laundry rooms, social service space, dining and cooking areas, and
recreational areas.
The use of HTF Program funds with tax exempt bonds and 4% LIHC is not permitted.
Applicants interested in using tax exempt bonds and 4% LIHC for a project should consider
requesting funding from the Homes for Working Families Program.
2.01.03.C Eligibility Requirements for Homesteading Projects
It is HTFC’s policy that applicants requesting funds for 1-4 family owner-occupied
properties seek funds from a source other than HTF.
2.01.03.D Requirements For Cooperative and Condominium Projects
For applicants seeking HTF funds for cooperative or condominium projects, HTFC will
expect that the applicant will assume and retain the role of monitor over the management and
operation of the cooperative or condominium to ensure that all HTF requirements are complied
with for the duration of the HTF regulatory agreement.
Office of Finance and Development
Capital Programs Manual
Page 6 of 69
2.01.03.E Eligible Areas
Article 18, Section 1102.3(h) of the PHFL provides the criteria of areas eligible for HTF
funding. In addition, areas which have been designated by any Federal, State, or local law, rule,
or regulation as blighted, deteriorated or deteriorating or as having a blighting influence on the
surrounding area or as being in danger of becoming a slum or blighted area are eligible for HTF
Program funds. Designations that meet these criteria include, but are not limited, to the
following:
(i) Federal Designation
a. Areas which are designated by the Secretary of the Department of
Housing and Urban Development (HUD) of the United States as areas in
which concentrated housing, physical development, and public service
activities are being or will be carried out in a coordinated manner,
pursuant to a locally developed strategy for neighborhood improvement,
conservation and preservation;
b. Areas which have been proposed by the locality and approved by HUD as
Community Development Block Grant (CDBG) target areas;
c. Areas which have been proposed by the locality and approved by HUD as
Rental Rehabilitation target areas; and,
d. Neighborhoods in which Community Housing Development
Organizations are carrying out activities pursuant to Title II of the
National Affordable Housing Act.
(ii) State Designation
a. Areas which are designated under Articles 15 and 16 of the General
Municipal Law (The Urban Renewal Law and the Urban Development
Action Area Act);
b. Census tracts in which at least 70 percent of the families have incomes
which are 80 percent or less than the Statewide median income;
c. Areas of chronic economic distress as designated by the State and as
approved by the Secretary of the Treasury and the Secretary of HUD;
Office of Finance and Development
Capital Programs Manual
Page 7 of 69
d. Neighborhoods in which neighborhood preservation activities are being
carried out pursuant to Article 16 of the PHFL;
e. Rural preservation and revitalization regions in which preservation
activities are being carried out pursuant to the provisions of Article 17 of
the PHFL;
f. Neighborhoods where median income does not exceed 80 percent of the
median income of the MSA in which the neighborhood is located, or that
does not exceed 80 percent of the median income of the county, if the
county is not part of a MSA (for purposes of this section, "Neighborhood"
means an area that surrounds a project and tends to determine, along with
the condition and quality of the project, selling prices and/or rent levels of
housing units);
g. State designated Economic Development Zones; and,
h. Or areas that will assist in the deconcentration of poverty.
(iii) Local Designation
a. An area designated by the chief executive officer or the appropriate
legislative body as blighted, deteriorated or deteriorating, or as having a
blighting influence on the surrounding area, or as being in danger of
becoming a slum or a blighted area because of the existence of
substandard, unsanitary, deteriorating or deteriorated conditions, an aged
housing stock, or vacant non-residential property, or other factors
indicating an inability or unwillingness on the part of the private sector,
unaided, to undertake the activities mandated under Article 18.
2.01.03.F Eligible Occupants
To be eligible for funding, HTF housing projects must serve persons of low income,
defined in PHFL Article 18, Section 1101.10. For rehabilitation or conversion projects, Article
18 of the PHFL provides that legal occupants who remain in possession of their unit, or who are
temporarily relocated during rehabilitation or conversion, are entitled to continue occupancy
after project completion. All additional occupants who move into the project subsequent to
Office of Finance and Development
Capital Programs Manual
Page 8 of 69
rehabilitation or conversion must be persons of low income, as defined above. Only temporary
relocation expenses are eligible costs under the HTF Program.
2.01.03.G Eligible Project Costs
Pursuant to Article 18 of the PHFL, the HTF Program cost may not exceed $125,000 per
unit per project per funding round. Eligible project costs shall consist of the actual and necessary
cost of rehabilitation, construction, or conversion, including, but not limited to, the following:
(i) construction or rehabilitation costs;
(i) architectural, engineering or professional services fees;
(ii) financing costs;
(iii) fees charged for disbursement of funds by lenders;
(iv) temporary relocation costs;
(v) property acquisition costs (not to exceed 50 percent of the HTF Program award);
(vi) carrying costs during construction;
(vii) Working Capital Fund;
(viii) a Replacement Reserve;
(ix) LPA fees for technical services rendered on behalf of the sub recipient (by policy,
HTF program has preferred LPA projects to be accomplished through the Office
of Community Renewal);
(x) fees for construction audit;
(xi) Developer's Allowance, if applicable; and,
(xiii) Community Service Facility costs (not to exceed 10% of the HTF award amount,
with the total HTF request not exceeding the per unit funding cap).
HTF Program funds may not be used for the administration costs of the applicant, to
capitalize an operating reserve, or for the construction, conversion or rehabilitation of units,
which, upon project completion, are to be occupied by other than persons of low income. By
statute, no more than 50 percent of any HTFC payments, grants or loans provided for the project
may be used for acquisition costs (including closing costs).
For HTF projects with non-residential/commercial space which qualifies as a Community
Service Facility (CSF), these costs may be eligible for HTF funding. A CSF is a non-residential
Office of Finance and Development
Capital Programs Manual
Page 9 of 69
facility within a HTF-eligible project which provides services to the low-income residents of the
neighborhood/area in which the project is located. Up to 10 percent of the HTF award amount
may be used to finance costs associated with the development of the CSF. Please see Section
5.09 for further guidance on using HTF for a CSF.
2.01.03.H Eligible Predevelopment Costs
NOTE: Predevelopment awards will only be made if the RFP for a particular UF round
states that such an award will be available for that funding round.
Once a Funding Commitment has been issued, a not-for-profit applicant may request
funds for predevelopment expenses. By policy, the HTF Program will not fund more than $5,000
per unit in predevelopment expenses, though other sources may be used to fund additional
predevelopment costs. Predevelopment funds are included in the amount of the Funding
Commitment, and any predevelopment funds awarded are included in the maximum funding
amounts discussed above. The use of predevelopment funds is restricted to non-construction
expenses, including, but not limited to:
(i) site option costs and site carrying charges;
(ii) architectural and engineering fees;
(iii) appraisal fees;
(iv) fees for title search and survey;
(v) planning and consultant fees;
(vi) demolition and clean out expenses necessary to complete the design of the
project;
(vii) legal and organizational expenses;
(viii) accounting and application fees;
(ix) market and environmental studies;
(x) feasibility studies; and,
(xi) site option expenses.
Office of Finance and Development
Capital Programs Manual
Page 10 of 69
2.01.04 Program Requirements
This section describes private developer and regulatory period requirements specific to
the HTF Program. Utilization of LIHC may have an effect on certain requirements set forth in
this section.
2.01.04.A Private Developer Minimum Equity Requirements
Article 18 requires that HTF applicants who are acting as private developers must make a
minimum equity contribution to the project equal to either: (a) two and one-half percent of the
total project cost; or (b) five percent of the total project cost minus all grants, whichever is
greater. For the purposes of the HTF Program, a grant is defined as financing which does not
require payment of principal or interest during the project's regulatory period. Balloon mortgages
which do not require amortization of principal or payment of interest during the loan period are
considered grants.
Program policy requires that a portion of the equity contribution be in the form of cash,
with a minimum of the lesser of one percent of the total development cost or 50 percent of
project gross rents made as a cash deposit to the project's Operating Reserve Account.
Any equity above and beyond the required one percent cash contribution must be in the
form of cash, land, or real property unless there is an identity of interest between the applicant
and the builder. In this case, a portion of the builder's profits, up to ten percent of the actual cost
of construction, may be waived or treated as equity subject to the approval of the Corporation.
Not-for-profit organizations wishing to receive a return on equity for a project will be treated as
private developers if they make the minimum required equity investment. The return on equity
that a private developer is permitted to receive on its qualified equity investment is described in
Section 2.01.04.D.
2.01.04.B Real Estate Contributions
Any land or real property contributed as equity must be owned by the applicant and must
be free and clear of liens. Real property acquired pursuant to public funding shall have no equity
value for the purpose of satisfying the HTF Program's equity requirement. The value of property
acquired two years or less before submission of a UF application that is counted as equity shall
Office of Finance and Development
Capital Programs Manual
Page 11 of 69
be calculated as the lesser of either the preconstruction appraised value or the purchase price.
The value of property acquired more than two years prior to submission of a UF application that
may be counted as equity shall be the property's pre-construction appraised value. HTF Program
funds used to acquire the property on which the project is located shall be deducted from its
value when calculating the equity investment.
2.01.04.C Payment of Equity
A private developer's equity investment must be made at or prior to the project's
Construction Closing. If the private developer has syndicated the project and is to receive future
syndication proceeds, the amount of such future proceeds must be funded by some other source,
without encumbering the project.
Cash equity contributions must be in the form of a certified check equal to the amount of
equity to be invested in the project. In lieu of a certified check, an irrevocable letter of credit
(LOC) may be submitted. The certified check or LOC must be submitted at or prior to the
Construction Closing. The LOC should cover the term of the construction phase of the project. If
the construction phase of the project takes longer than expected, the term of the LOC must be
extended within 30 days of its expiration date to cover the extended period of the construction
phase. It is the developer's responsibility to extend the LOC, if necessary. HTFC will deposit all
cash equity contributions into interest-bearing accounts, and any interest earned will be returned
to, or credited to, the developer.
2.01.04.D Return on Equity
If, after providing for all expenses, taxes and deposits to the reserve funds, there are funds
available, an annual portion of the project earnings will be paid to the private developer as a
return on equity. In order to receive a return on equity, there must be a cash surplus in the
project's General Operating Account after payment of all expenses for the applicable fiscal year.
The annual return on equity is limited to six percent of the total qualified equity contributions.
If unpaid, payment will accrue for return on equity and shall be made at such time as a
cash surplus is available in the General Operating Account or in the Operating Reserve Account
(subject to the conditions previously described). The maximum payment of return on equity in
Office of Finance and Development
Capital Programs Manual
Page 12 of 69
any one fiscal year is limited to the current year's return on equity and one prior year's accrued
amount. Return on equity payments will be made following the end of each fiscal year.
Payments from the General Operating Account for return on equity require prior approval
of the Asset Management Unit (AMU). Payments from the Operating Reserve Account also
require prior approval of AMU. AMU and HTFC Finance staffs review the annual audit report
to ensure that return on equity is paid properly. Payments will not be approved if it is determined
that the project is not in compliance with HTFC regulations and applicable housing occupancy
and maintenance laws, codes, and regulations.
2.01.04.E Regulatory Period
HTF Program projects must be operated in accordance with a Regulatory Agreement for
the duration of the applicable regulatory period described below:
(i) for homesteading projects, the regulatory period is the greater of:
a. the 15-year period following the date of final disbursement for the project
during which the resale, rental, and occupancy restrictions specified in the
Regulatory Agreement are applicable; or,
b. the period, not to exceed 30 years, during which any loan or indebtedness
incurred pursuant to Article 18 of the PHFL is outstanding.
(ii) for rental, condominium or cooperative projects, the regulatory period is the
greater of:
a. the 20-year period following the date of final disbursement for the project
in which the resale, rental and occupancy restrictions specified in the
Regulatory Agreement are applicable; or,
b. the period, not to exceed 30 years, during which any loan or indebtedness
incurred pursuant to Article 18 of the PHFL is outstanding.
HTF projects may not be sold during the regulatory period except, with HTFC approval,
to another eligible applicant who agrees to carry out the provisions of the Regulatory Agreement.
During the regulatory period, the resale price will be established based on the value of the HTFC
loan, project sponsor’s equity and other relevant considerations.
Office of Finance and Development
Capital Programs Manual
Page 13 of 69
At the end of the regulatory period, the project may be resold or refinanced. Except for
those projects financed under Grant Enforcement Mortgages, projects which are resold or
refinanced, and which will not continue to provide housing units for persons of low income,
must repay the amount of the outstanding mortgage principal and accrued interest, if not
previously paid to HTFC. If the project is to be sold or refinanced, but will continue to provide
units for persons of low income, a new mortgage and regulatory period can be negotiated and
HTF Program funds will not have to be repaid to HTFC. These provisions apply to all housing
types - rental, homesteading, cooperative and condominium.
2.01.04.F Accessibility and Adaptation of Units
HTF projects must meet all applicable code, Fair Housing Act, and any other applicable
requirements for accessibility and adaptability. All reasonable accommodations and reasonable
modifications, including modifying adaptable dwelling units to the accessibility needs of the
tenant, must be at the owner’s expense.
Office of Finance and Development
Capital Programs Manual
Page 14 of 69
Section: 2.00 PROGRAM DESCRIPTIONS
Sub Section: 2.02 Housing Development Fund Program
2.02.01 Summary
The Housing Development Fund (HDF) is a revolving loan fund program established in
1966 under Article XI of the PHFL and administered by HCR. The primary purpose of the HDF
program as currently administered by HCR is to provide construction loans to eligible applicants
who will construct or rehabilitate housing projects for low-income households and to review
requests to provide the Commissioner’s Consent to the incorporation of Housing Development
Fund Corporations, as set forth in Section 2.02.04B below. HDF loans provide temporary,
interim, or bridge financing and are generally repaid from permanent financing provided by
another public or private funding source or the equity proceeds contributed by the investor in
low-income housing credit projects. A copy of the PHFL can be found at http://www.ny.gov/.
HDF construction loans may be used for the costs of rehabilitation or construction of an
eligible project including: site improvement; demolition and/or site preparation; infrastructure;
professional and legal fees during construction; labor; materials; equipment; approved developer
fees and builders' overhead; project carrying costs and working capital; and the development of
non-residential facilities, provided such space is incidental or appurtenant to the residential
property, and allowed and reimbursable under the project's permanent financing. HDF
construction loans may be paid at zero percent interest rate and are repaid from the first receipts
of the project’s permanent financing. These loans are usually of three years duration, but may be
longer based on the financing necessities and construction timetables of specific projects. HDF
loan funds have been used to provide construction financing for projects receiving permanent
financing through the NYS HOME program.
HDF construction loans may also be used to provide interim financing for longer periods
for projects funded through the LIHC program. These HDF loans are called equity or bridge
loans, because they bridge the period during the project's development and/or initial operating
years until sufficient equity proceeds become available to repay the HDF loan. HDF equity loans
are generally made at a zero or one percent interest rate based upon the project’s financing needs,
and may have terms longer terms than HDF construction loans since they may be repaid
Office of Finance and Development
Capital Programs Manual
Page 15 of 69
subsequent to the receipt of permanent financing. HDF equity loans may be used to pay for any
mortgageable project costs (i.e., costs reimbursable from the source of permanent financing).
In addition to construction loans, HDF financing may also be utilized to establish sub-
recipient, revolving loan programs. Under this financing structure, HCR may enter into a HDF
loan contract with an eligible non-profit corporation as borrower. Using loan origination and
servicing parameters approved by HCR, the borrower provides HDF loans to sub-recipients to
cover mortgageable costs associated with property acquisition and/or construction of HDF-
eligible projects. Upon completion, the sub-recipient repays the full loan amount to the
borrower, generally from permanent financing proceeds. The repaid loan funds then revolve and
are utilized to finance another sub-recipient loan.
2.02.02 Statutory Provisions
2.02.02.A Purpose
The HDF program was created under Article 11 (Sections 570 through 582) of the PHFL
for the purpose of establishing a revolving loan fund to provide temporary loans to eligible
applicants to facilitate the development of housing for low-income households. The statutory
purpose of the HDF Program is further elaborated upon in Section 571 of PHFL.
2.02.02.B Definitions
Pertinent program-specific terms are defined in Section 572 of the PHFL.
2.02.03 Eligibility Requirements
This Section describes the eligibility requirements that are specific to HDF.
2.02.03.A Eligible Applicants
Eligible HDF applicants include HDFC’s incorporated pursuant to Section 573 of the
PHFL and other not-for-profit and charitable corporations, and their wholly-owned subsidiaries,
as set forth in Section 571 of the PHFL, which have the improvement of housing for persons of
low income as a primary corporate purpose. Prospective project sponsors do not have to be
HDFC’s to be eligible for HDF funding. However, applicants may sponsor the incorporation of
Office of Finance and Development
Capital Programs Manual
Page 16 of 69
an HDFC as a single-asset vehicle to develop and/or own a low-income housing development,
reduce corporate liability and potentially qualify for a state real property tax-exemption.
Applicants must have the experience and capacity to develop, rehabilitate and/or
construct a project of the size and type proposed in a timely and cost-effective manner and
demonstrate that the permanent financing needed to complete the project and repay the HDF loan
has been firmly committed. Generally, a completed project must be and remain the sole asset
and business purpose of the HDFC.
2.02.03.B Eligible Projects
Eligible HDF projects are defined in Section 572 of the PHFL. Restrictions on project
size, scope, and the income levels of the project’s low-income occupants are generally
determined by the permanent funding source.
2.02.03.C Eligible Areas
All areas of the State are eligible for HDF financing.
2.02.03.D Eligible Occupants
HDF projects must be occupied by low-income individuals or households. Generally, the
permanent funding provider regulates tenant eligibility, project rents, sale prices and/or
disposition of property. If permanent financing is not provided by a governmental source, HCR
may regulate the project subsequent to repayment of the HDF loan. Further, Section 576 of the
PHFL restricts project occupancy to households with incomes not exceeding six times the total
housing cost (rent plus utilities), except that for households with three or more dependents, the
income must not exceed seven times the total housing cost.
2.02.03.E Eligible Loan Costs
Eligible loan costs are defined in Section 572 of the PHFL.
Office of Finance and Development
Capital Programs Manual
Page 17 of 69
2.02.04 Program Requirements
This Section describes the loan and incorporation requirements specific to HDF.
2.02.04.A HDF Loan Requirements
HDF construction loans are evidenced by a promissory note and/or mortgage note which,
among other things, requires that the temporary loan will be due and payable on demand if HCR
determines that permanent financing may not be obtained for the project, or if the HDF loan is in
jeopardy of not being repaid. In general, no HDF loan repayment term can be extended beyond
the last receipts of the permanent financing, or in the case of HDF equity loans for LIHC
projects, the last installment of syndication proceeds paid to the project owner pursuant to a
syndication or partnership agreement. A closing is usually required prior to, or concurrent with,
the disbursement of loan proceeds for construction. HDF loans are generally interest-free
although HDF equity loans may have a one percent interest rate. An interest rate of up to six
percent may be charged in the event of default on repayment.
Contracts for HDF construction loans may not be authorized until firm commitments are
in place from all project funding sources, including the source of repayment for the loan.
Generally, projects utilizing HDF loans must meet all eligibility requirements and design, legal
and underwriting specifications of the public or private funding source providing permanent
financing.
Prior to authorizing a contract and disbursing HDF loan funds, HCR must make findings
pursuant to Section 573 of the PHFL. All HDF loan funding commitments are subject to the
availability of funds in the HDF revolving loan fund, as well as to an annual authorization by the
Legislature to use such funds. All applicants must enter into an HDF Regulatory Agreement and
Loan Contract. HDF contracts must be executed by the applicant and HCR, and approved by the
State Attorney General's Office and the Office of the State Comptroller prior to disbursement of
the HDF loan proceeds.
2.02.04.B HDFC Incorporation
A Housing Development Fund Corporation (HDFC) must be incorporated pursuant to the
provisions of Section 573 of the PHFL and the provisions of either Section 402 of Not-For-Profit
Office of Finance and Development
Capital Programs Manual
Page 18 of 69
Corporation Law, or, in the case of low-income cooperatives, Section 402 of the Business
Corporation Law. An HDFC Incorporation package may be obtained by contacting the HDF
Program Manager at HCR, 38-40 State Street, 6th Floor, Albany, New York 12207. Section 573
of the PHFL provides that a sponsor seeking to establish a HDFC must obtain the approval or
consent of the Commissioner of HCR or certain officials within a locality, prior to filing a
certificate of incorporation to incorporate an HDFC with the New York State Department of
State. The agency which provides this consent or approval serves as the supervising agency of
the HDFC which is incorporated.
The statute requires that the provision of the consent to the filing of the certificate of
incorporation of the HDFC shall be based upon findings by the Commissioner or supervising
agency as to the character and competence of the sponsor.
An applicant seeking financing from HCR must obtain the consent of the Commissioner
to the creation of an HDFC to be used in that project. An applicant must obtain the consent of the
NYC Department of Housing Preservation and Development (HPD) if financing is not being
sought from HCR and the project is located in New York City. An applicant may seek consent of
either the Commissioner or the supervising agency if the project is not in New York City and is
not seeking financing from HCR.
In order to obtain the Commissioner’s consent for the formation of a HDFC, the
documentation cited below must be submitted by the sponsor or its legal representative to HCR
at the above-cited address. This documentation will be reviewed by HCR’s legal and program
staff to determine consistency with statute at the sole discretion of the Commissioner. A
sponsor that has previously incorporated an HDFC with the consent of the Commissioner or a
supervising agency must still submit a complete package of the documentation requested below,
regardless of the timeframe of the last approved submission.
The Commissioner reserves the right to deny provision of a consent to incorporate if
HCR determines in its sole discretion that the sponsor has not satisfactorily demonstrated its
character and competence. The following documentation must be submitted with each such
request:
Office of Finance and Development
Capital Programs Manual
Page 19 of 69
1) An executed original of the proposed HDFC Certificate of Incorporation containing
the address of the incorporator, which demonstrates to the satisfaction of the
Commissioner that the HDFC complies with the not-for-profit corporation law and
Section 573 of the PFHL. A recommended format for an HDFC Certificate of
Incorporation is available at Housing Development Fund (HDF);
2) A copy of the sponsor's Certificate of Incorporation, or, if unincorporated, a copy of
the sponsor's by-laws;
3) Proof of the sponsor corporation's good standing in the form of a Certificate of Good
Standing from the Secretary of New York State, or an attorney's opinion letter (the form
may not be dated more than 60 days prior to submission of the HDFC incorporation
package);
4) A copy of the board resolution (with appropriate notarized signature) authorizing the
sponsor to organize the proposed HDFC;
5) An executed Omnibus Certification (current format available at Housing Development
Fund (HDF)) with separate forms completed for the sponsor, its Board
Chairperson/President and Executive Director/CEO. Please note that responses to these
Certifications will be compared to any issues/findings reflected on a Lexis/Nexis search
of public records pertaining to the sponsor. Any such issues reflected in the Lexis/Nexis
search will be brought to the attention of the sponsor for further explanation if not
previously addressed. Further, inconsistencies raised by a comparison of the search to the
responses in the Certifications will require the sponsor’s explanation/justification. Any
such items which are not addressed to the satisfaction of HCR may result in the
Commissioner’s denial to provide the requested consent to the incorporation;
6) The sponsor's current financial statement indicating the sponsor’s assets and liabilities
(an explanation will be required for any such statement which is dated more than one
year past the end of the most recently completed calendar year);
Office of Finance and Development
Capital Programs Manual
Page 20 of 69
7) An Organization's Relevant Experience exhibit (current format available at Housing
Development Fund (HDF)) which is completed for the sponsor. If the sponsor does not
have prior housing experience, the form must be submitted for other pertinent members
of the project development team. Corporate resumes which outline specific housing
development projects completed and experience will be accepted in lieu of this form.
Sponsors must be able to demonstrate their wherewithal to complete the proposed project
based on their previous track record or that of the development team;
8) A narrative which describes and details the proposed housing project, its proposed
scope, use, and tenure, income levels of the households served, ownership structure,
financing, and the sponsor. This project summary must also include the proposed housing
project’s plan of finance regardless of the HDFC’s proposed term of duration. The plan
of finance should identify the governmental agencies which are anticipated to be involved
in the financing of the proposed housing project. Preliminary plans of finance that rely on
proposed HCR funding from the NYS Housing Finance Agency (HFA) must first be
submitted to HFA, accompanied by a project concept summary, prior to submission of a
request for HCR’s consent to the incorporation of an HDFC. This information will be
reviewed for consistency with Statute;
9) Evidence of permanent firm funding commitment(s), if the HDFC term is proposed as
perpetual. The sponsor may request an HDFC term of three (3) years, as reflected in the
proposed HDFC Certificate of Incorporation, if all such project permanent funding
commitments have not been obtained (such certificates may be amended at a later date to
provide for perpetual duration if funding commitments are subsequently received). HCR
reserves the discretionary authority to contact other project funding sources in regard to
the provision of Consent to the incorporation of the proposed HDFC; and,
10) A completed federal tax return (IRS Form 990 for a non-profit organization) for the
sponsor, whether a non-profit or for-profit entity, for the last applicable calendar year
completed (new submission requirement). If this form is not available, the sponsor must
provide a written explanation.
Office of Finance and Development
Capital Programs Manual
Page 21 of 69
Once HCR has consented to incorporation, the Certificate of Incorporation is returned to the
sponsor or its legal representative for the sponsor to continue its processing. The following steps
must be taken to complete the filing of the Certificate of Incorporation:
1) the certificate of incorporation must be filed with the Secretary of State; and,
2) a certified copy of the filed Certificate of Incorporation must be submitted to the HDF
Program Manager, together with a copy of the filing receipt from the Secretary of State.
2.02.05 Farmworker Housing Program
The Farmworker Housing Program was authorized in 1995 through an amendment to
Article 11 of the PHFL, which made HDF program funds available for this new statutory
purpose. The Farmworker Housing Program is a low-cost revolving loan program to assist
agricultural producers in improving existing housing or constructing replacement housing for
seasonal and year-round farmworkers so that the housing will comply with applicable code (such
as the New York State Sanitary Code and/or the Building Codes of New York State). The loans
are also used for the new construction of farmworker housing and the expansion of existing
facilities.
The Farmworker Housing Program is administered by HCR and participating local farm
credit institution(s) with the cooperation of the New York State Department of Health and/or
county health departments which conduct inspections and provide permits for seasonal
farmworker housing. HCR contracts with a farm credit institution(s) to serve as a Local Loan
Administrator (LLA). The LLA originates and services loans to agricultural producers, utilizing
their underwriting standards. Upon completion of LLA review, the application packages are
forwarded to HCR for environmental approval, authorization, and the disbursement of loan
funds.
Under the program, an agricultural producer (a producer or entity which owns or operates
land eligible for an agricultural assessment under Sections 305 and 306 of the Agriculture and
Markets Law and which produces food by the tillage of the soil, or raises, shears, feeds or
manages animals or other dairying processes) can apply to borrow up to $100,000 per year for a
project. If more than $100,000 in loan funds is needed to satisfactorily complete the construction,
repair or improvement of one farmworker housing project, the agricultural producer can seek
Office of Finance and Development
Capital Programs Manual
Page 22 of 69
funds from other sources, including a blended loan (i.e., a combination of a program loan and a
conventional loan).
LLAs may require a one-time servicing fee from the borrower at the time of loan closing
of no more than five percent (5%) of the loan amount. There are no interest or inspection fees.
All loans to borrowers must be repaid in equal annual payments of principal; the term of the loan
may not exceed ten (10) years.
Office of Finance and Development
Capital Programs Manual
Page 23 of 69
Section: 2.00 PROGRAM DESCRIPTIONS
Sub Section: 2.03 Low-Income Housing Credit (LIHC) Program
2.03.01 Summary
The Low-Income Housing Credit Program (LIHC or the Credit) involves the allocation of
a federal tax credit which provides a dollar-for-dollar reduction in federal income tax liability for
eligible applicants/owners who develop qualified low income rental housing projects pursuant to
the statutory requirements of Section 42 of the Internal Revenue Code (IRC or the Code).
LIHC is available to project owners who acquire, construct, and/or rehabilitate rental
housing reserved for low-income households. The amount of Credit allocated to a project is
directly related to the costs associated with the acquisition, construction, and/or rehabilitation of
rental housing that is reserved for low-income households (i.e., those earning 60% or less of
AMI) and the allocation level necessary to ensure the project’s completion and continued
operation through the project’s regulatory term. The amount of Credit allocated to an owner
represents the annual Credit amount the owner may claim and receive for each of the next ten
years subsequent to the Credit allocation.
In addition, the amount of Credit a project may receive is determined by applying the
applicable federal credit percentage to the project; in general, approximately 9% (or the
percentage which will yield 70% present value) is applied to the cost of new construction or
rehabilitation for non-federally financed projects and approximately 4% (or the percentage which
will yield 30% present value) is applied to the cost of building acquisition or development costs
for projects which receive federal financing (such as tax-exempt bond financing). It should be
noted that the New York State Housing Finance Agency (HFA) administers the State’s credit
allocations for tax-exempt bond financed projects (also termed “4% LIHC projects”) and the
information contained herein does not address these projects.
2.03.02 Statutory Provisions
2.03.02.A Purpose
The Federal Tax Reform Act of 1986, as amended (the Act), established the LIHC
Program to be administered by state housing agencies for the purpose of promoting investment in
Office of Finance and Development
Capital Programs Manual
Page 24 of 69
the production and retention of rental housing units which are reserved for low-income
households. The LIHC Program replaced other tax incentives that existed prior to the passage of
the Act in 1986.
The Act authorized the governor of each state to allocate the low-income housing tax
credit ceiling among governmental units and other issuing authorities in the state with a single
Housing Credit Agency (HCA) coordinating the allocation of Credit to owners of low income
housing. In New York, the Governor’s Executive Order #11 of 2011 designated DHCR as the
State’s lead HCA. The Executive Order authorized DHCR to allocate Credit in a manner which
maximizes the public benefit by addressing the State’s need for low-income housing and
community revitalization incentives and to sub-allocate the Credit Ceiling among State and local
entities involved with housing subject to an application requesting Credit authority. The
information provided below is specific to the Credit allocated by DHCR directly to projects it
selects for funding, as a component of HCR.
The Act further required each agency allocating Credit to adopt a Qualified Allocation
Plan (QAP) to provide for the effective coordination of the State’s LIHC Program with Section
42 of the Internal Revenue Code (the Code). The DHCR QAP sets forth the threshold eligibility,
scoring criteria and preferences by which LIHC will be awarded, and allocated to projects by
DHCR, as well as other important program provisions establishing the parameters by which
DHCR administers the program.
2.03.02.B Definitions
LIHC Program definitions are set forth in the Code and Section 2040.2 of the QAP.
2.03.03 Eligibility Requirements
This Section describes the eligibility requirements that are specific to the LIHC Program.
2.03.03.A Eligible Applicants
Eligible applicants under LIHC include for-profit developers, not-for-profit developers,
individuals, corporations, limited partnerships, and limited liability corporations which will own
Office of Finance and Development
Capital Programs Manual
Page 25 of 69
rent-restricted rental housing after the project is acquired and improved, rehabilitated or
constructed.
2.03.03.B Eligible Projects
Credit allocations may only be made to qualified low-income housing projects which
meet the minimum set-aside requirements set forth in Section 42(g)(l) of the Code. To be
eligible, the project’s low-income units must be rent-restricted, so that the low-income
households occupying the LIHC-regulated units do not pay rent (including tenant-paid utilities)
greater than 30 percent of the AMI imputed for the unit based on the number of bedrooms the
unit contains. Eligible project activities under the LIHC Program include new construction,
building acquisition with rehabilitation, and rehabilitation. The QAP sets forth additional
eligibility requirements which must be met by Credit projects. These eligibility requirements are
set forth in Section 2040.3(e) of the QAP.
In addition, while Credit projects may contain commercial space and market-rate or
otherwise un-regulated residential units, credit can only be claimed and utilized for the financing
of the project’s low-income residential units. One important exception to the above is in the case
of a residential project containing a CSF. A CSF is any facility within a residential project
located in a HUD-designated Qualified Census Tract (QCT) designed to serve primarily
individuals who reside in the Credit project and persons in the immediate
community/neighborhood.
Although not specifically defined in the Code, a CSF may include space for such
activities as Head Start, child care, job training, primary health care, youth recreation, and
support services for seniors. Pursuant to the Code, the allowable percentage of development
costs of the CSF portion of the qualified low-income project which can be included in qualified
basis is 25 percent. Credit applicants must describe and clearly document the programmatic
relationship between the occupant(s) of the CSF and the project tenants and community residents
served by the CSF, carefully apportioning all project development costs, hard and soft, and real
estate expenses between the CSF and the residential units of the project.
Credit allocations may not be used for projects which will be used for transient housing,
defined as units with an initial lease of less than six months. However, an exception is permitted
Office of Finance and Development
Capital Programs Manual
Page 26 of 69
for single room occupancy (SRO) projects, which are eligible for Credit. Further, transitional
housing projects for homeless persons and/or families are eligible for Credit. Credit allocations
may not be used for rental dwelling units that are or will be part of a health facility, nursing
home, mobile home park, or student dormitory.
In addition to eligibility standards, the QAP sets forth project scoring and ranking criteria
(Section 2040.3(f) of the QAP), which incorporate both Code-mandated project selection criteria
and HCR project preferences. LIHC scoring provisions are described in detail in the QAP and
the annual HCR Multi-Family Programs RFP issued under HCR’s UF application process.
Subject to the annual availability of Credit, and the issuance of a Notice of Credit Availability
and RFP, DHCR may choose to provide one or more set-asides of Credit on an annual basis for
additional types of projects, which are specified in the annual UF Request for Proposals.
In addition, Section 42(h)(5) of the Code requires that state housing credit agencies set-
aside 10% of its annual Credit Ceiling (see 2.03.04.A below) for qualified non-profit
organizations which own an interest in the project and materially participate in the development
and operation of the project throughout the project’s regulatory term.
In regard to multiple-building developments, DHCR will treat these as one project
provided it is consistent with Section 42(g)(7) of the Code, the QAP, and meets the following
parameters:
Buildings on Adjacent Sites:
- on same or adjacent tracts of land.
- have the same ownership entity and common construction/permanent financing
sources.
Buildings on Scattered Sites:
- in non-metropolitan counties, such projects must be located in the same
municipality (i.e., town, city or village).
- in metropolitan counties, such projects must be located in the same neighborhood,
or if recognized neighborhood boundaries do not exist, in no more than two
adjacent census tracts.
- have the same ownership entity and common construction/permanent financing
sources.
Office of Finance and Development
Capital Programs Manual
Page 27 of 69
2.03.03.C Eligible Areas
All areas of New York State are eligible.
2.03.03.D Eligible Occupants
Eligible occupants are low-income households earning up to 60% of area median income,
as adjusted for household size. LIHC may only be utilized on units that are occupied at the time
of initial occupancy by eligible occupants. To be eligible for LIHC, project occupancy must meet
Code minimum set-aside requirements. Units must be available for use by the general public
pursuant to Section 42(g)(9) of the Code. Project owners may, however, give preference in
renting units, or limit occupancy to, certain categories of persons with special needs as defined in
Section 2040.2(p) of the QAP or to persons as otherwise determined by HCR’s Office of Fair
and Equitable Housing. Further, according to federal statute, projects which would otherwise
meet the general public use requirement may have occupancy preferences that favor tenants who
are involved in artistic and literary activities. Projects must also comply with all Federal and
State fair housing laws, regulations and applicable policies.
2.03.03.E Eligible Project Costs
See Section 5.05 of the CPM.
2.03.04 Program Requirements
This section describes the Ceiling Allocation, DHCR Credit Allocation Process and the
LIHC Extended Use Period.
2.03.04.A LIHC Ceiling Allocation
New York State receives an annual allocation of Credit called the Low-Income Housing
Tax Credit Ceiling based on a formula set forth in Section 42(h)(3) of the Code (the Ceiling).
This Credit is also referred to as “9% LIHC” and is awarded to projects on a competitive basis
pursuant to HCR’s annual Unified Funding Request For Proposals (UF RFP) and the QAP.
Office of Finance and Development
Capital Programs Manual
Page 28 of 69
Ceiling Allocation to HCAs
DHCR may sub-allocate a portion of the Ceiling, and/or the authority to allocate 4%
LIHC (per Section 42(h)(4) of the Code), to other State and Local HCA’s, which in turn makes
allocations to eligible projects.
DHCR’s Credit Allocation Authority
The portion of the Ceiling which is not allocated to other State and local HCA’s
represents DHCR Allocation Authority. DHCR allocates Credit (i.e., 9% LIHC) on a competitive
basis as defined in DHCR’s QAP to projects which utilize Credit on a standalone basis (i.e.,
projects not receiving HCR capital financing assistance) or in conjunction with HCR’s other
capital financing programs as specified in the annual UF RFP.
2.03.04.B DHCR Credit Allocation Process
The process for the allocation of Credit to projects conforms to Section 42(h) of the
Code, as further detailed in Section 2040.3 of the QAP. This section of the QAP references the
following:
LIHC application and funding cycle;
LIHC application, binding agreement and allocation fees;
Requirements for issuance of Credit reservations, binding agreement, carryover
allocations and the Internal Revenue Form 8609 (explained in more detail below);
threshold eligibility review criteria;
project scoring and rating criteria;
other important project review factors such as site suitability and location,
architectural design, consistency with underwriting standards, and whether a
project advances the State’s housing goals and objectives, including any goals set
forth by a Regional Economic Development Council strategic plan applicable to
the area in which a project is located; and,
other factors involved in the determination of the Credit allocation amount for a
project.
Office of Finance and Development
Capital Programs Manual
Page 29 of 69
The LIHC Notice of Credit Availability and the RFP which are issued on an annual basis
provide additional detailed parameters and criteria of Credit application review, the maximum
per unit and per project annual Credit allocation amounts which may be requested, HCR’s
specific housing goals, objectives, and project preferences, as well as notification of the outcome
of HCR’s review.
One exception to the above Credit Allocation process exists for Credit projects financed
under the Preservation Initiative Program (PIP). PIP provides LIHC and/or other HCR financing
to existing occupied buildings in HCR’s portfolio that HCR’s AMU has determined require
refinancing, rehabilitation, and/or other improvements. This process is further explained at:
http://www.nyshcr.org/Programs/LIHC/PIP-FINDINGS-MEMO.pdf
2.03.05 LIHC Processing Documents
2.03.05.A Reservation Letter
The Reservation letter (the Reservation) serves as HCR’s initial commitment of Credit to
a project approved for a Credit award. The Credit Reservation includes the following significant
sections:
1) The first section, the Reservation letter itself, contains the terms, conditions, and
specific documentation submission timeframes and requirements which the project
sponsor must provide and meet in order for DHCR to approve the issuance of a binding
agreement and/or carryover allocation to the project. This section further sets forth the
maximum dollar amount of Credit to be provided pursuant to the Reservation, the
Reservation expiration date (i.e., the date by which the project must meet the terms and
conditions of the Reservation and close on construction financing) and the dates by which
the project must start construction and submit carryover eligibility documentation. This
section also provides programmatic advisories in regard to notification requirements
pertaining to changes in project scope, design or budget, and the prohibition against the
use of contractors and sub-contractors listed on federal or state debarment lists. Requests
to extend the Reservation expiration date or otherwise amend the terms of the
Reservation are subject to HCR review and may be approved by HCR, in its sole
discretion. Failure to meet the deadlines or any other terms and conditions of the
Office of Finance and Development
Capital Programs Manual
Page 30 of 69
Reservation, or changes to project scope which will adversely impact the scoring and
competitiveness of application submitted by the project sponsor in future application
rounds and/or may result in termination of the Reservation, at HCR’s sole discretion.
2) The second section of the Reservation, the Reservation Addendum, contains
additional project specific issues and submission requirements which the project sponsor
must address prior to the Reservation expiration date and construction financing closing.
Generally, these include open items that were not sufficiently explained or resolved in the
initial UF application which was submitted to HCR. The section reflects the
documentation submissions required by the HCR technical units involved in project
review, such as Underwriting, A&E, Program Management, FHEO, Special Needs, EAU,
and AMU. The Reservation Addendum, in the Underwriting Issues section, sets forth the
project’s anticipated credit equity conversion factor (i.e., the credit equity pay-in per
dollar which the Credit investor will provide to purchase the ownership interest in the
project). Should a project sponsor obtain a higher credit equity pay-in at any time prior
to project completion and issuance of the IRS Form 8609 Credit allocation, such an
increase is subject to the provisions of DHCR’s LIHC Equity Increase Policy. The
specific guidelines are set forth at the following website address:
http://www.nyshcr.org/Programs/LIHC/LIHCEquityIncreasePolicy.pdf. However, note
that the Reservation Addendum does not provide a comprehensive list of all requirements
a project sponsor must meet to proceed to construction financing closing, which may be
transmitted under separate correspondence or documentation.
3) The third section of the Reservation, Attachment A, cites the specific provisions which
will be incorporated in the project’s Regulatory Agreement (see Section 2.03.05.E). The
provisions are based on those project amenities, population targets, and other features
proposed in the initial funding application, and for which the project may have been
mandated to provide under threshold eligibility (Section 2040.3(e) of the QAP) and/or
received scoring points (Section 2040.3(f)). This includes but is not limited to
requirements for operating the completed project based on standards for green buildings;
energy efficiency; special needs and supportive housing; income and affordability targets;
not-for-profit participation in the project’s ownership and/or right of first refusal; tenant
Office of Finance and Development
Capital Programs Manual
Page 31 of 69
buy-out; prohibitions against using debarred contractors on an ongoing basis; project unit
visitability, accessibility and adaptability for persons with physical disabilities; and
treatment of additional rental income received by the project through collection of rent
subsidized by Section 8 Tenant Based Vouchers (or similar tenant based subsidy).
Attachment A further provides that the project awardee, by executing the Reservation,
agrees to waive the right to request a Qualified Contract to purchase the project at the end
of the credit compliance period (see Section 2.03.05.E).
2.03.05.B Binding Agreement
Projects which meet the terms and conditions of their Reservation may request a Binding
Agreement letter. Issuance of a Binding Agreement is not required by HCR; rather it is often
requested by the project sponsor or their tax credit investor as confirmation that the project has
met the terms and conditions of the LIHC/SLIHC reservation letter and to facilitate the closing
on construction financing. In order to secure a Binding Agreement, the project sponsor must
submit evidence that all local approvals necessary to proceed to construction have been obtained,
and commitments from all sources of construction and permanent financing cited in the project’s
approved development budget to complete the project. The Binding Agreement may only be
issued and released upon completion of the projects second HCR underwrite, as mandated by the
Code, and review and approval of the above-referenced documentation by HCR’s OLA. A
summary of HCR’s second underwrite of the project’s development and operating budgets is
incorporated in the Binding Agreement.
The Binding Agreement also provides instructions for submission of carryover
certification documentation, and an invoice for payment of pertinent Credit application (if not
previously paid) and allocation fees.
2.03.05.C Carryover Allocation
Projects which meet the terms and conditions of their Reservation and/or Binding
Agreement may request a Carryover Allocation, which DHCR will issue pursuant to Section
42(h)(1)(E)/(F) of the Code. The Carryover Allocation represents an actual allocation of Credit
from that specific year’s Credit Ceiling to the project though it is not binding upon the IRS until
Office of Finance and Development
Capital Programs Manual
Page 32 of 69
HCR issues the IRS Form 8609 Certification (i.e., the final credit allocation) subsequent to a
final underwrite of project costs. Receipt of a Carryover Allocation provides the project owner
with up to two years from the last day of the calendar year in which the allocation was issued to
place the project in service (pursuant to IRS Notice 88-116).
In order to qualify for a Carryover Allocation, the project’s second underwrite must be
completed. DHCR also mandates that the project sponsor must obtain approval from the Office
of Legal Affairs based on a review of all construction closing documentation, commitments of
permanent financing, and evidence of construction start, remit all application and allocation fees
owed and submit a completed “Attachment B – Carryover Allocation Information Form” and
“Attachment C – LIHC Basis and Site Control Opinion and Certification.” These forms, which
are provided to the project sponsor in the Reservation Letter and Binding Agreement, contain the
specific-project related information to be completed by the project owner, their attorney and/or
accountant, as required by the IRS rules for the LIHC Program (CFR 1.42.1 to 1.42.14), for
preparation of the Carryover Allocation.
These completed forms include, but are not limited to, the project owner’s identification
of the project address, anticipated placed in service date and provision of a legal opinion
certifying that site control has been obtained and that more than 10% of reasonably expected
basis in the project has been incurred (pursuant to 26 CFR 1.42-6(c) of the IRS Credit
Regulation). DHCR will not issue a Carryover Allocation until this 10% test has been met and
certified.
2.03.05.D Notice of Satisfaction of Conditions and Binding Commitment
Projects which meet the terms and conditions of their Reservation and/or Binding
Agreement and have submitted all documentation necessary to qualify for a Carryover
Allocation (see 2.03.05.C above) may receive a Notice of Satisfaction of Conditions and Binding
Commitment letter pursuant to Section 42(h)(1)(C) of the Code. Issued by HCR with the
consent of the project owner, the Binding Commitment provides the project owner with
confirmation that the project has qualified for a carryover allocation, but that issuance of that
allocation will be provided from a future year’s Credit Ceiling. This provides HCR with the
administrative flexibility to better manage its portfolio of open Credit projects and provide Credit
Office of Finance and Development
Capital Programs Manual
Page 33 of 69
to projects from the Credit allocation year best suited to that project’s investor needs and
construction completion timeframe. Provision of the Binding Commitment no later than the year
a project is placed in service holds the project owner harmless should they receive a carryover
allocation in a future taxable year (which would otherwise be prohibited by the Code).
2.03.05.E Extended Use Period/Final Credit Allocation
Pursuant to the Code and Section 2040.5 of the QAP, the owner of a Credit project must
execute an Extended Use Agreement (also referred to as a LIHC Regulatory Agreement) which
requires that a building’s Credit-assisted units be available for low-income households for an
Extended Use Period, as specified in the project’s Reservation Letter. Section 2040.3(e)(17) of
the QAP indicates that the regulatory term will be minimum term of 30 years, and provides that
the minimum term may be increased as set forth in the annual RFP. (Note: The most recent UF
RFP’s have required a 50 year minimum project regulatory term, unless otherwise indicated).
The Regulatory Agreement (as described in QAP Section 2040.5), is binding on all
successors, provides an enforcement mechanism for HCR (which performs a compliance
monitoring function), and residents to assure that the Credit-assisted units will be maintained as a
qualified low-income housing project (per Section 42(g) of the Code) through the Extended Use
Period. The Extended Use Period may terminate early if the building is acquired by foreclosure,
or if DHCR, as HCA, cannot find a qualified buyer for the building within one year of the
owner’s written request to do so (i.e., by qualified contract). The owner cannot make such a
request until the end of the fourteenth year of the 15-year Compliance Period. As noted in
Section 2.03.05.A, Attachment A of the Reservation further provides that the project awardee, by
executing the Reservation, agrees to waive the right to request a Qualified Contract to purchase
the project at the end of the credit compliance period.
In general, HCR requires that the Regulatory Agreement be executed by the project
sponsor at or prior to the construction financing closing date set forth in the Reservation.
However, HCR may consider requests to defer this requirement based on submission of an
explanation for the delay. In such instances, HCR will condition carryover allocation and
issuance upon receipt of an executed and filed Regulatory Agreement, with evidence of
recording by the locality in which the Regulatory Agreement was filed.
Office of Finance and Development
Capital Programs Manual
Page 34 of 69
To initiate the process of requesting, preparing and executing the LIHC Regulatory
Agreement, HCR encourages project sponsors to review the LIHC/SLIHC Regulatory
Agreement Document Submission List, which is available at HCR’s website at:
http://www.nyshcr.org/Programs/LIHC/. In addition, a boilerplate copy of the LIHC Regulatory
Agreement is available on HCR’s website at the following address:
http://www.nyshcr.org/Programs/LIHC/RegAgreementBoilerPlate.pdf
DHCR’s responsibilities and requirements for Credit project monitoring; the tenant
income certification process and compliance inspections are set forth in Sections 2040.7 -
2040.10 of the QAP.
2.03.05.F 8609 Issuance
The IRS Form 8609 Low-Income Housing Credit Allocation and Certification (the 8609)
serves as the final allocation of Credit to the project, subsequent to the project’s building(s) being
placed in service and completion of the third statutorily required underwrite of the project.
Specific review parameters and guidelines and requirements for the third underwriting are set
forth in Section 5.00. To initiate HCR’s issuance of the 8609, HCR encourages project owners to
review Section 5.00 of the CPM and the 8609 submission document checklist, which are
available, at the following two HCR web address: http://www.nyshcr.org/Programs/LIHC/.
2.03.06 Projects Financed by Private Activity Bonds
Pursuant to Section 2040.4(f) of the QAP, as of March 1, 2008, HCR accepts applications
for 4% Credit for projects financed by private activity tax-exempt bonds through HFA. HFA
serves as the State HCA with the responsibility for the review of all such 4% Credit applications
and the issuance of allocations for such projects on a statewide basis. Such allocations are made
by HFA pursuant to its QAP and its 4% Credit requirements and standards. DHCR does not
accept applications for 4% Credit for projects financed by private activity bonds.
Office of Finance and Development
Capital Programs Manual
Page 35 of 69
Section: 2.00 PROGRAM DESCRIPTIONS
Sub Section: 2.04 The New York State HOME Program
2.04.01 Summary
The New York State HOME Program (HOME) provides loans and grants to eligible
applicants to undertake eligible rental activities. See 24 CFR Part 92.205 for eligible activities.
Please also refer to the New York State Action Plan for further information on the HOME
Program.
PLEASE NOTE: The HOME Program is currently administered in two parts by HCR.
This manual should only be used for Rental projects receiving Capital funding from HCR’s
OF&D. All other HOME activities are administered by HCR’s Office of Community Renewal
(OCR).
All of the units in site-specific projects seeking HOME under the Unified Funding
process must serve households at or below 60 percent of AMI. Rental projects which are assisted
by the HOME Program are required to remain affordable to low-income households for the
applicable regulatory period, the term of which is based on several factors, including the amount
of the HOME subsidy and the type of activity funded.
The New York State HOME Program is administered by HTFC. However, HTFC's
degree of involvement varies depending on the type of activity proposed. Site-specific (or single-
site) projects, which may involve acquisition, new construction, or substantial rehabilitation of
low-income housing on a site or sites under common ownership may be undertaken by all
eligible applicants, and are administered directly by the HTFC.
New York State is required to reserve a minimum of 15 percent of HOME funds for
locally-based non-profit entities that qualify as Community Housing Development Organizations
(CHDO’s) (See 24 CFR 92.300-303). All areas of the State are eligible for HOME projects;
however, in addition to the 15 percent CHDO set-aside, at least 80 percent of the State's HOME
allocation must be spent on projects that are not in localities designated by HUD as participating
jurisdictions.
Office of Finance and Development
Capital Programs Manual
Page 36 of 69
2.04.02 Statutory Provisions
2.04.02.A Purpose
The HOME Program was authorized by Title II of the National Affordable Housing Act
(NAHA) of 1990, for the purposes of increasing the number of families served with affordable
housing and to expand the supply of such housing. The Final Rule for the program was originally
published by HUD on September 16, 1996, at 24 CFR Part 92. The Final Rule has been amended
and was published on July 24, 2013.
2.04.02.B Definitions
Definitions for the HOME Program can be found at 24 CFR Part 92.2 Definitions.
2.04.03 Eligibility Requirements
This Section describes the eligibility requirements that are specific to the HOME
Program. Sub-section 2.04.03.C sets forth in detail the specific requirements of the various types
of HOME projects that may be undertaken.
2.04.03.A Eligible Applicants
Eligible applicants for the New York State HOME Program include individuals and
private for profit and non-profit organizations with a demonstrated capacity to develop feasible
projects. Additionally, units of local government which are not participating jurisdictions, either
directly or as part of a HOME consortium, are also eligible applicants, as are agencies under their
control. Except in cases of not-for-profit organizations, which are at the time of application
engaged in multiple activities, and HTFC has given its consent to those activities continuing, the
project must be and remain the sole asset and business purpose of the project recipient.
2.04.03.B Eligibility Requirements for Community Housing Development Organizations
(CHDO’s)
New York State is required to reserve at least 15 percent of its HOME funds for housing
that will be developed, sponsored, or owned by CHDO’s which are community based, non-profit
organizations with experience in providing low-income housing assistance. The HOME Program
Office of Finance and Development
Capital Programs Manual
Page 37 of 69
provides for some exceptions to its requirements and eligibility standards when an entity is a
CHDO. These special circumstances are discussed below.
While CHDO’s may undertake any of the activities eligible under the HOME Program,
only those projects developed, owned, or sponsored by qualified CHDO’s count towards the 15
percent CHDO set-aside requirement. CHDO operating costs do not count toward the 15 percent
set aside. CHDO’s are required to develop and follow a plan for tenant participation in
management decisions and must adhere to a fair lease and grievance procedure for any housing
developed with HOME Program funds.
CHDO’s must meet the following certification requirements to be considered and/or
remain an eligible HCR CHDO:
(i) CHDO’s must demonstrate their ability to meet the HUD HOME criteria to be
certified as a CHDO and successfully administer a HOME funded project.
CHDO’s applying to receive HOME capital funds will be certified by HCR on a
per project basis. CHDO applicants may provide documentation to their HCR
regional representative at any time. HCR will review submittal information, as
prescribed by the HOME regulations, including organizational and financial
documents, verification of staff capacity and experience, project underwriting,
and market need. HCR will notify the CHDO of its approval specific to the
development of a particular project. HCR does not accept certifications of other
participating jurisdictions.
(ii) CHDO certification material must include the name of each NYS county in which
the applicant has or will have eligible CHDO status.
See Section 6.05 for the CHDO Determination Process.
2.04.03.C Eligible Projects
Certain activities undertaken with HOME Program funds are termed site-specific
projects, which may be undertaken by any eligible applicant. While site-specific projects may
involve more than one site, all sites comprising a site-specific project must be under common
ownership, management and financing, and are to be assisted with HOME funds as a single
Office of Finance and Development
Capital Programs Manual
Page 38 of 69
undertaking. Site-specific projects may involve new construction, substantial rehabilitation, or
acquisition of low-income housing only.
2.04.03.D Eligible Areas
While all areas of the State are eligible for HOME Program funding, New York State
requires that, in addition to the 15 percent CHDO set-aside, 80 percent of the State's HOME
funds must be spent on projects located outside of HUD-designated Participating Jurisdictions
(PJs). A list of current New York State PJs may be obtained from HTFC upon request.
2.04.03.E Eligible Occupants
HOME Program funds may only be used to assist low-income households, defined as
those with incomes at or below 80 percent of AMI. In addition, the federal HOME regulations
require that HOME rental projects must primarily serve households with incomes at or below 60
percent of AMI. All of the units in site-specific projects seeking HOME under the Unified
Funding process must serve households at or below 60 percent of AMI.
2.04.03.F Eligible Project Costs
HOME Program funds may be used to pay for the eligible project costs set forth below,
subject to the per-unit cost limitations published for the HOME Program which is available from
HTFC upon request or from HCR’s website http://www.nyshcr.org/. Federal HOME regulations
also require a minimum per-unit investment of $1,000, excluding any matching funds.
HOME Program funds may be made available as grants, no-interest loans, or interest-
bearing loans, depending upon the economics of the project and the type of assistance requested.
HOME Program funds may not be used to capitalize a replacement reserve account or an
operating reserve account; nor may HOME Program funds be used to provide project-based
rental assistance. HOME funds may not be used for the new construction or rehabilitation of a
free-standing community building in a multi-building project. HCR will not allow HOME funds
to be used for the purchase of furniture and equipment. See 24 Part 92.206 for eligible project
costs. The NYS Consolidated Plan and Action Plan should also be reviewed for additional
Office of Finance and Development
Capital Programs Manual
Page 39 of 69
information on the HOME Program in New York State
(www.nyshcr.org/Publications/ConsolidatedPlan/). Also see Section 5.06 Underwriting Criteria.
2.04.03.G Eligible Activities
Under HCR’s HOME capital project financing available through the annual UF process,
there are a number of eligible uses for HOME funds. Generally these include: acquisition of land
or buildings, demolition, new construction and substantial rehabilitation of rental housing, and
conversion of a commercial or retail space to a low-income residential housing use (see 24 CFR
92.205). HOME funds are also prohibited from being used in certain activities (see Section 24
CFR 92.214) and Section 5.06 Underwriting Standards.
2.04.04 Relocation
The HOME Program has a stated goal to take all reasonable steps to minimize
displacement as a result of program activities. A displaced person is an individual, family,
partnership, association, corporation, or organization which moves from their home, business or
farm, or moves their personal property as a direct result of acquisition, demolition, or rehab for a
federally funded project. All displaced persons, regardless of income, are entitled to relocation
assistance under the Uniform Relocation Assistance and Real Property Acquisition Policies Act
of 1970 (the URA).
For projects involving demolition of units or the conversion of low income units to a use
other than low income housing, the use of HOME funds would also trigger Section 104(d) of the
Housing and Community Development Act. Low income units are those with a rent and average
monthly utility cost equal to or less than the HUD Fair Market Rate (FMR) for the locality.
When low income tenants are displaced in a HOME project as a result of the demolition of any
unit or the conversion of a low income unit to another use, they may be entitled to additional
protections pursuant to Section 104(d). Benefit calculations for such tenants would be done for
both URA and Section 104(d), and the tenant would be allowed to choose which benefit is more
beneficial to them. As with URA, tenants displaced by 104(d) are entitled to receive notice that
federal funds have been applied for and awarded (if applicable); notice of displacement or non-
displacement; and financial assistance in the event of temporary or permanent physical
Office of Finance and Development
Capital Programs Manual
Page 40 of 69
relocation, or economic displacement (in accordance with HOME funds as applicable). NOTE:
the State may be required to replace low income units lost as a result of demolition or conversion
within 3 years of demolition. Please see the Section 2.04.04E “One-to-One Replacement of
Units” for guidance on how the State will make this determination.
Permanent relocation and associated benefits are not considered likely under owner-
occupied rehabilitation, although temporary relocation may be needed in some circumstances. In
such programs, tenants must be provided temporary relocation benefits but homeowner
occupants are not eligible for such unless there is a State approved Optional Relocation Plan
created (NYS does not currently have an Optional Relocation Plan). HOME funds may be used
to pay all required costs of relocation under the Uniform Relocation Act and Section 104(d), and
any additional benefits that a jurisdiction or recipient determines reasonable to pay. HOME funds
may also be used to pay interim relocation costs.
2.04.04.A Notice
An application considering acquiring, rehabilitating, or demolishing an occupied
(residential and/or non-residential) property with HOME funds must provide a General
Information Notice to all occupants at the time the application for funding is made, which must
be prior to the date of the Initiation of Negotiations (ION) (defined as the date of the execution of
the agreement covering the acquisition, rehabilitation, or demolition). Examples of the required
General Information Notices can be found in HUD Handbook 1378, Tenant Assistance,
Relocation, and Real Property Acquisition (Appendix 2 – 3B as applicable). Multiple General
Information Notices may be required once it is determined which tenants will be displaced and
those who will not be displaced. Multi-phased projects must carefully consider the requirements
of the URA, in particular the definition of the ION.
If a proposed project involving acquisition, rehabilitation, or demolition is awarded
HOME funding, all occupants of the affected properties must receive a notice of eligibility or
notice of non-displacement at or shortly after the ION date. Examples of the required notices can
be found in HUD Handbook 1378 (Appendix 4-7 for URA and appendices 25-26 for 104(d) as
applicable).
Office of Finance and Development
Capital Programs Manual
Page 41 of 69
Tenants of properties receiving HOME funds and involving acquisition, rehabilitation, or
demolition must also receive a 90-day notice to vacate for those persons who will be displaced.
Tenants cannot be required to move unless they have received at least 90 days written notice of
the earliest move out date, and such notices cannot be given until the tenant has been provided
with at least one comparable replacement unit. The notice must state either the exact move out
date or the earliest possible date followed by a 30-day notice with the exact move out date.
Tenants can only be required to move in less than 90 days for extreme health and safety reasons.
Under such circumstances, they would have to be temporarily relocated while the required
relocation processing is completed.
It is the sub recipient’s responsibility to determine which notices are applicable and to
notify the correct occupants. (NOTE: if 104(d) is triggered so is URA and both Notices must be
given or the notices must be adjusted to cover both situations.) All notices must be hand
delivered or sent certified mail, return receipt requested; written in plain, easy to read format;
understandable by the tenant (this may require translation into another language, Braille or sign
language; notices must be read to illiterate tenants); and notices must include a phone number for
tenants to call for assistance.
2.04.04.B Voluntary Acquisition
For the State HOME program, the following requirements must be documented for a
purchase to qualify as voluntary in accordance with the URA requirements (See HUD Handbook
Appendix 23). For entities with Eminent Domain Authority that wish to document that an
acquisition is voluntary, all of the following conditions noted in the URA regulations at
24.10(b)(1)(i) through (iv) must be met:
(i) No specific site or property needs to acquired;
(ii) The property to be acquired is not part of an intended, planned or designated project area
where all or substantially all of the property within the area is to be acquired within
specific time limits;
(iii)The project developer will not acquire the property if negotiations fail to result in an
amicable agreement, and the owner is so informed in writing prior to the project
developer making an offer; and,
Office of Finance and Development
Capital Programs Manual
Page 42 of 69
(iv) Inform the owner in writing of what the project developer believes the market value of
the property to be (See sample letter to owner in HUD Handbook 1378, Appendix 32);
For acquisitions for programs or projects undertaken by an Agency or person that received
Federal financial assistance but does not have authority to acquire property by eminent domain,
the following requirements as noted in URA regulations 24.102(b)(2)(i) and (ii) must be
documented:
(i) Prior to making an offer for the property, clearly advise the owner that it is unable to
acquire the property if negotiations fail to result in an agreement; and,
(ii) Inform the owner in writing of what it believes to be the market value of the property
(See Appendix A, Section 24.101(b)(1)(iv) and (2)(ii)). (See sample letter to owner in
HUD Handbook 1378, Appendix 31).
Other acquisition which may be deemed voluntary include:
• the acquisition of real property form a Federal Agency, State, or State Agency, it
the project developer desiring to make the purchase does not have authority to
acquire the property through condemnation; and
• the acquisition of real property by a cooperative from a person who, as a
condition of membership in the cooperative, has agreed to provide without charge
any real property that is needed by the cooperative.
A third-party appraisal is required to support the finding that the purchase price is a fair
price prior to sale. Examples of the acquisition checklist can be found in HUD Handbook 1378
(Appendix 24). If you are operating a home buyer program, bear in mind that even the owner
occupant or tenant of the house being purchase with HOME funds is entitled to a notice that
Federal funds are being used in the purchase transaction. The required notice must note the
buyer’s estimate of Fair Market Value, the voluntary nature of the acquisition and that owner
occupants, if any, are ineligible for relocation benefits. NOTE: tenants in such houses must be
provided relocation benefits if they are displaced. Examples of the required notice can be found
in HUD Handbook 1378 (Appendix 31).
Office of Finance and Development
Capital Programs Manual
Page 43 of 69
2.04.04.C Displaced vs. Non-Displaced Tenant
If a new tenant is interested in occupying a unit after the date of ION and the General
Information Notices have been issued, a Move in Notice must be signed by the new tenants prior
to the new tenants signing a lease for the unit which will potentially receive HOME funds. The
Move in Notice provides notice to the new tenant they are not eligible for relocation assistance
should the project be awarded HOME funds. If the notice is not provided and the new tenants are
displaced due to HOME funding, they are eligible for relocation assistance. Examples of this
notice can be found in HUD Handbook (Appendix 29).
A permanently displaced tenant must be offered at least one (1) comparable unit prior to
the 90 day notice to vacate. If Section 8 vouchers are available, the permanently displaced tenant
may be offered Section 8 assistance in lieu of a 104(d) cash payment if Section 104(d) is
triggered and if the tenant is income qualified. Examples of the notices can be found in HUD
Handbook 1378 (Appendix 25 – 26 as applicable). If only URA is triggered and/or tenants are
not currently subsidized, they can refuse the offer of a Section 8 voucher and receive a cash
payment in accordance with URA calculations instead.
At no point can a sub recipient compel any of the displaced tenants to sign releases
constituting a waiver of rights and benefits. This is prohibited by statute.
2.04.04.D Comparable Decent, Safe, and Sanitary Replacement Housing
A displaced person has the right to a comparable decent, safe, and sanitary (DSS)
replacement dwelling. According to the URA regulations at 24.2(a)(6), comparable means a
dwelling which is:
(i) Decent, safe and sanitary as described in paragraph 24.2(a)(8) of this section;
(ii) Functionally equivalent to the displacement dwelling. The term functionally equivalent
means that it performs the same function, and provides the same utility. While a
comparable replacement dwelling need not possess every feature of the displacement
dwelling, the principal features must be present. Generally, functional equivalency is an
objective standard, reflecting the range of purposes for which the various physical
features of a dwelling may be used. However, in determining whether a replacement
dwelling is functionally equivalent to the displacement dwelling, the Agency may
Office of Finance and Development
Capital Programs Manual
Page 44 of 69
consider reasonable trade-offs for specific features when the replacement unit is equal to
or better than the displacement dwelling (See appendix A, Sec. 24.2(a)(6));
(iii)Adequate in size to accommodate the occupants;
(iv) In an area not subject to unreasonable adverse environmental conditions;
(v) In a location generally not less desirable than the location of the displaced person's
dwelling with respect to public utilities and commercial and public facilities, and
reasonably accessible to the person's place of employment;
(vi) On a site that is typical in size for residential development with normal site
improvements, including customary landscaping. The site need not include special
improvements such as outbuildings, swimming pools, or greenhouses. (See also Sec.
24.403(a)(2));
(vii) Currently available to the displaced person on the private market except as provided in
paragraph (a)(6)(ix) of this section (See appendix A, Sec. 24.2(a)(6)(vii)); and,
(viii) Within the financial means of the displaced person:
(A) A replacement dwelling purchased by a homeowner in occupancy at the
displacement dwelling for at least 180 days prior to initiation of negotiations (180-day
homeowner) is considered to be within the homeowner's financial means if the
homeowner will receive the full price differential as described in Sec. 24.401(c), all
increased mortgage interest costs as described at Sec. 24.401(d) and all incidental
expenses as described at Sec. 24.401(e), plus any additional amount required to be paid
under Sec. 24.404, Replacement housing of last resort.
(B) A replacement dwelling rented by an eligible displaced person is considered to be
within his or her financial means if, after receiving rental assistance under this part, the
person's monthly rent and estimated average monthly utility costs for the replacement
dwelling do not exceed the person's base monthly rental for the displacement dwelling as
described at Sec. 24.402(b)(2).
(C) For a displaced person who is not eligible to receive a replacement housing payment
because of the person's failure to meet length-of-occupancy requirements, comparable
replacement rental housing is considered to be within the person's financial means if an
Agency pays that portion of the monthly housing costs of a replacement dwelling which
Office of Finance and Development
Capital Programs Manual
Page 45 of 69
exceeds the person's base monthly rent for the displacement dwelling as described in Sec.
24.402(b)(2). Such rental assistance must be paid under Sec. 24.404, Replacement
housing of last resort.
(ix) For a person receiving government housing assistance before displacement, a dwelling
that may reflect similar government housing assistance. In such cases any requirements of the
government housing assistance program relating to the size of the replacement dwelling shall
apply. (See appendix A, Sec. 24.2(a)(6)(ix).)
For NYS’s HOME program decent, safe and sanitary means that the dwelling must meet
local housing and occupancy codes and HUD Housing Quality Standards (HQS). HQS requires,
at a minimum that the dwelling be structurally sound and in good repair; have safe electrical
wiring; have a heating system capable of sustaining a healthful temperature; be of adequate size
with respect to the number of rooms and living space required by the displaced person; have a
separate, private, lighted and ventilated bathroom; working kitchen area; has an unobstructed
egress to open space at level ground; and meet other Housing Quality Standards (HUD Form
52580 or HQS Inspection Form at:
http://portal.hud.gov/hudportal/documents/huddoc?id=DOC_11775.pdf).
In the case of a displaced person with a disability, the dwelling should be free of any
barriers which would preclude reasonable ingress, egress, or use (see URA 49 CFR Parts 24.205
and 24.403.). The dwelling shall be inspected prior to it being made available for use to ensure
that it is decent, safe, and sanitary as described above. A staff member from the Architecture and
Engineering Bureau or a staff member from the Asset Management Unit of HCR may conduct
the dwelling inspection.
A potential HOME applicant must contact their HCR regional representative when a
replacement dwelling is considered for a person who may be displaced by a HOME project. The
regional representative will contact the appropriate HCR staff member and the potential
applicant to schedule the inspection. HOME applicants should be familiar with the requirements
of URA 49 CFR 24 before contemplating any HOME project in which displacement may occur.
Office of Finance and Development
Capital Programs Manual
Page 46 of 69
2.04.04.E One-to-One Replacement of Units
All occupied and vacant inhabitable lower-income dwelling units that are demolished or
converted to a use other than a lower-income dwelling units in connection with an assisted
activity must be replaced with comparable lower-income dwelling units (see 24 CFR Part
42.375). Lower-income dwelling units may be provided by any governmental agency or private
developer and must meet the following requirements:
1) The units must be located within the recipients’ jurisdiction. To the extent feasible and
consistent with other statutory priorities, the units shall be located within the same
neighborhood as the units replaced.
2) The units must be sufficient in number and size to house no fewer than the number of
occupants who could have been housed in the units that are demolished or converted. The
number of occupants who could have been housed in the units shall be determined in
accordance with applicable local housing occupancy codes. The recipients may not
replace those units with smaller units (e.g., a two (2) bedroom unit with two one (1)
bedroom units), unless the recipient has provided the information required.
3) The units must be provided in standard condition. Replacement lower-income dwelling
units may include units that have been raised to standard from substandard condition if:
(i) No person was displaced from the unit, and,
(ii) The unit was vacant for at least three (3) months before execution of the
agreement between the recipient and the property owner.
4) The units must initially be made available for occupancy at any time during the period
beginning one (1) year before the recipient makes public the information required under
paragraph (d) of this section and ending three (3) years after the commencement of the
demolition or rehabilitation related to the conversion.
5) The units must be designed to remain lower-income dwelling units for at least 10 years
from the date of initial occupancy. Replacement lower-income dwelling units may
include, but are not limited to, public housing or existing housing receiving Section 8
project-based assistance.
6) Before the State enters into a contract in which HOME funds will directly result
in the demolition of lower-income dwelling units or the conversion of lower-income
Office of Finance and Development
Capital Programs Manual
Page 47 of 69
dwelling units to another use, the State will make public and submit in writing to
the HUD field office the following information (in the case of a Unit of General
Local Government (UGLG) funded by the State and with a State approved RARP
of its own, the UGLG will make public and submit in writing to the State, the same
information).
1) A description of the proposed assisted activity;
2) The location on a map and number of dwelling units by size (number of
bedrooms) that will be demolished or converted to a use other than for lower-
income dwelling units as a direct result of the assisted activity;
3) A time schedule for the commencement and completion of the demolition or
conversion;
4) The location on a map and the number of dwelling units by size (number of
bedrooms) that will be provided as replacement dwelling units. If such data are
not available at the time of the general submission, the submission shall identify
the general location on an area map and the approximate number of dwelling units
by size, and information identifying the specific location and number of dwelling
units by size shall be submitted and disclosed to the public as soon as it is
available;
5) The source of funding and a time schedule for the provision of replacement
dwelling units;
6) The basis for concluding that each replacement dwelling unit will remain a
lower-income dwelling unit for at least 10 years from the date of initial
occupancy; and,
7) Information demonstrating that any proposed replacement of dwelling units
with smaller dwelling units (e.g., a two (2)-bedroom unit with two one (1)-
bedroom units) is consistent with the needs assessment contained in its HUD-
approved consolidated plan. A unit of general local government funded by the
State that is not required to submit a consolidated plan to HUD must make public
Office of Finance and Development
Capital Programs Manual
Page 48 of 69
information demonstrating that the proposed replacement is consistent with the
housing needs of lower-income households in the jurisdiction.
Replacement is not required under the one-for-one replacement requirement to the extent
the HUD field office determines, based upon objective data, that there is an adequate supply of
vacant lower-income dwelling units in standard condition available on a nondiscriminatory basis
within the area. In order to obtain such non replacement approval, the developer will submit a
waiver request directly the State, requesting determination that the one-for-one replacement
requirement does not apply. The State will then submit the request with supporting
documentation to directly to the HUD field office. Simultaneously with the submission of the
request, the State will make the submission public and inform interested persons that they have
three (3) days from the date of submission to provide to the State any additional information
supporting or opposing the request.
If, however, the awardee of the funding is a unit of general local government, then the
request for determination should be submitted to the State. Simultaneously with the submission
of the request, the unit of general local government must make the submission public and inform
interested persons that they have 30 days from the date of submission to provide to the State
additional information supporting or opposing the request. If the State, after considering the
submission and the additional data, agrees with the request, the State must provide its
recommendation with supporting information to the HUD field office.
2.04.04.F Certification of Legal Residency
Applicants for HOME funding should note that each person seeking relocation payments
or relocation advisory assistance must, as a condition of eligibility, certify: (i) in the case of an
individual, that he or she is either a citizen or national of the United States, or an alien who is
lawfully present in the United States; (ii) if a family, each family member is a citizen or national
of the U.S., or an alien who is lawfully present in the U.S. – the certification may be made by the
head of the household; (iii) if an unincorporated business, farm, or non-profit organization, each
owner is a citizen or national of the U.S, or lawfully present alien in the U.S, and (iv) in the case
of an incorporated business, farm, or nonprofit organization, that the corporation is authorized to
conduct business within the U.S. The certification may be made by the principal owner,
Office of Finance and Development
Capital Programs Manual
Page 49 of 69
manager, or operating officer on behalf of other persons with an ownership interest, and that the
entity is authorized to conduct business within the U.S.
No relocation payments or relocation advisory assistance shall be provided to a person
who has not provided the certification described above or who has been determined to be not
lawfully present in the U.S., unless the person can demonstrate to the HOME recipient that the
denial of relocation assistance will result in an exceptional and extremely unusual hardship to the
person’s spouse, parent, or child who is a citizen of the U.S or is an alien lawfully admitted for
permanent residence in the U.S. Additional certification of residency requirements are listed in
the URA 49 CFR 24.208. HUD claim forms found in HUD Handbook 1378 include a
certification of legal residency that must be completed by the displacee. See Appendices 11
through 17 for samples of various claim forms which can be used.
2.04.04.G Basic Recordkeeping Requirements
A record of contacts with affected persons must be maintained. All records to
demonstrate compliance with applicable laws, regulations, local housing, and occupancy codes
must be maintained. The awardees of the HOME funding must maintain all records regarding
acquisition and relocation actions and such records must be available for inspection by HCR or a
HUD regional representative. All pertinent records shall be retained for the period specified in
the applicable program regulations, but no less than three (3) years after the latest of:
1) The date by which all payments have been received by persons displaced for the
project and all payments for the acquisition of the real property have been received;
2) The date the project has been completed;
3) The date by which all issues resulting from litigation, negotiation, audit, or other
action (e.g., civil rights compliance) have been resolved and final action taken; or,
4) For real property acquired with HUD funds, the date of final disposition (see 24 CFR
84.53 and 85.42).
A list of minimum records to be maintained may be found in HUD Handbook 1378
Chapter 6. All records maintained are confidential and shall not be made available as public
information unless required by applicable law. Only authorized staff or HUD shall have access to
the records. However, if an appeal is made the person or the persons representative may have
Office of Finance and Development
Capital Programs Manual
Page 50 of 69
access to, all records pertinent to his or her case except materials classified as confidential by
Awardees. For more information see subsection IX “Appeals” below.
2.04.04.H Advisory Services
Awardees of federal HOME funds or CDBG funds must assess their proposed projects in
a manner that recognizes the problems associated with the displacement of individuals, families,
businesses, farms and non-profit organizations (displaced persons) and develop solutions and
provide advisory services to minimize the adverse impacts of displacement.
Displaced persons will be advised of his or her rights under the Fair Housing Act. If a
comparable replacement dwelling to be provided to a minority person is located in an area of
minority concentration (as may be identified in the HCR Consolidated Plan) the minority person
will also be given, if possible, referrals to comparable and suitable decent, safe and sanitary
replacement dwellings not located in such areas. (See 24 CFR 42.350(a)).
Providing the required written notice or series of notices is not sufficient to assure a
displaced person affected by the project understands his/her rights and responsibilities. As soon
as feasible, awardees must contact each person affected by the project to discuss his/her
individual needs, preferences, and concerns. Whenever feasible, this contact should be face-to-
face. A list of minimum relocation advisory services expected of all awardees may be found in
49 CFR 24.205(c).
2.04.04.I Calculating Housing Replacement Costs and Moving Expenses
Relocation assistance counts toward the per unit HOME subsidy calculation, and is
distributed across the assisted units. Relocation assistance can be treated as a project cost that
need not be mortgaged to the assisted owner. All displaced persons, regardless of income, are
eligible for relocation assistance under the URA, which includes offering the displaced person a
decent, safe, and sanitary comparable unit, a 90 day notice to vacate, and assistance with moving
expenses. (NOTE: In a voluntary acquisition, only tenants meet the definition of displaced
persons; homeowner occupants are only eligible for relocation benefits if the acquisition triggers
the Involuntary Acquisitions requirements.) Calculating this assistance requires caution to avoid
overpayment or underpayment of benefits. HCR strongly recommends referring to the
Office of Finance and Development
Capital Programs Manual
Page 51 of 69
regulations (CFR 49 CFR 24) and utilizing HUD Handbook 1378 (Chapters 3 and 4) as a
reference and making use of the claim forms included therein when calculating benefits.
2.04.04.J Moving Related Expenses
Any qualified displaced owner-occupant or tenant-occupant is entitled to payment of
moving related expenses. Generally, the displaced person may select between actual reasonable
moving related expenses or a fixed payment for such expenses. Persons displaced from public
housing units into comparable public housing units may be moved by the PHA at the option and
expense of the PHA, and special rules apply.
Form HUD-40054 “Residential Claim for Moving and Related Expenses” is found in
HUD Handbook 1378 Appendix 11. The form is optional, but HCR strongly recommends using
it. If the form is not used, documentation must be included in the Awardee’s files to support any
amounts claimed and paid. See HUD Handbook Chapters 3 and 4 for guidance on moving cost
calculations as well as the URA regulations at 49 CFR part 24.301-306 as appropriate.
2.04.04.K Replacement Housing Payments
The URA allows for 42 months of replacement housing payments, to be paid in
installments unless used for down payment assistance. If used for down payment assistance, such
assistance must be escrowed until the closing on the acquisition. Replacement housing payments
are based upon the cost of a comparable dwelling, with at least three dwellings being examined
to assure decent, safe, and sanitary conditions. The upper limit of a replacement housing
payment is established on the basis of cost for the comparable dwelling that is decent, safe, and
sanitary and most representative of, and equal to, or better than, the displacement dwelling.
Additional rules apply to homeowners and persons who have been in occupancy for less than 90
days and special conditions apply to those persons displaced from mobile homes. Consultation
with HUD Handbook 1378, Chapter 1 to 3 is advised. If Section 104(d) is triggered, low income
tenants must be offered the choice of URA or 104(d) benefit calculations.
Renters – Whether an Acquisition is Voluntary or Involuntary, tenants are always eligible
for replacement housing payments. The replacement housing payment for renters is calculated as
the difference between the rent at the displacement unit and the rent at either a comparable unit or
Office of Finance and Development
Capital Programs Manual
Page 52 of 69
the actual replacement unit, whichever is lower for forty-two months. For persons who meet the
HUD low to moderate income limit, an additional calculation is made based on the difference
between thirty percent of the household’s gross income and the rent at a comparable unit or the
actual replacement unit, whichever is lower, for a forty-two month period. If this latter calculation
is greater than the rent to rent calculation, the low-income tenant would receive the larger payment.
HUD Handbook 1378, Chapter 3 and Appendix 14 provide detailed information on calculating the
URA Replacement Housing Payment. For Low/Moderate Income tenants subject to 104(d), both
the URA and 104(d) calculations must be made and the tenant given the choice of benefits. (See
Section of this manual discussing 104(d) and Chapter 7 and appendices 25-27 of HUD Relocation
Handbook 1378.1 for more information regarding 104(d) benefits.)
Under Section 104(d), replacement housing payments for displaced persons are paid to low
and moderate income families for a 60-month period of time.
For Section 104(d), the replacement housing payment is based on the difference between
the Total Tenant Payment, as defined in HUD Section 8 regulations at 24 CFR Part 813, and the
rent for a comparable unit or the actual rent at the replacement unit, whichever is less.
Moving and related expenses are paid either at a fixed rate, according to the Dept. of
Transportation Fixed Moving Schedule, or displaced persons are reimbursed for reasonable, actual
moving costs.
Security deposits and credit checks are also eligible costs for displaced persons under
Section 104(d).
Unlike the Uniform Relocation Act which prohibits the payment of Relocation benefits to
illegal aliens, eligibility for relocation assistance under Section 104(d) does not require legal
residency in the United States. Some projects may trigger compliance with both Section 104(d)
and the URA. In the case of relocation payments, the displaced person eligible for 104(d) may
choose under which Act they will be compensated.
2.04.04.L Businesses, Farms, and Nonprofit Organizations
Businesses, farms, and nonprofits qualify as “displaced persons” and are entitled to
relocation benefits as defined in the URA at 24 CFR 24.2(9). Calculation of relocation benefits
for these types of entities are discussed in HUD Handbook 1378, Chapter 4 and the URA
Office of Finance and Development
Capital Programs Manual
Page 53 of 69
regulations at Section 24.205(c) (advisory services) and at Section 24.301 and Section 24.303
(moving expenses). See also Handbook 1378, Appendices 2A, 3A, 7, 8, 16 and 17.
2.04.04.M Lower-Income Persons
If a HOME assisted activity displaces low income tenants and includes the demolition of
any unit or the conversion of a low-income unit to another use, the low-income tenant is also
protected under Section 104(d) of the Housing and Community Development Act of 1974. Low
income persons have the option of receiving benefits pursuant to 104(d) or URA. The program
differences are listed below:
1) 104(d) allows security deposit payments at the new unit. URA does not cover security
deposits.
2) 104(d) housing replacement costs must be paid for 60 months. The URA pays for 42
months.
3) 104(d) housing replacement costs are calculated using HUD’s Total Tenant Payment.
4) All or a portion of the 104(d) assistance may be offered through a voucher for rental
assistance provided under Section 8 if the tenant is eligible. Unsubsidized tenants
eligible only for URA benefits may refuse the offer of a voucher and receive a URA
replacement housing payment instead.
2.04.04.N Appeals
Any aggrieved person may file a written appeal with the State or UGLG as applicable in
any case in which the person believed that the awardee failed to property consider the person’s
application for eligibility of relocation benefits and moving costs under URA and/or Section
104(d). HCR has set a reasonable time of 60 days to appeal after the persons received written
notification of the awardee’s determination of the person’s eligibility. A person has a right to be
resented by legal counsel, or other representative in connection with his or her appeal, but solely
as the person’s expense. The person may inspect and copy all materials pertinent to his or her
appeal except materials which are classified as confidential by the awardee and/or HCR.
However, reasonable conditions may be imposed on the person’s right to inspect non
confidential materials.
Office of Finance and Development
Capital Programs Manual
Page 54 of 69
All pertinent justification and other materials submitted by the person and all other
available information that is needed to ensure a fair and full review of appeal shall be considered.
Written determination of the appeal will be promptly provided to the person and the State or
UGLG as applicable will include an explanation of the basis on which the decision was made.
Such will also advise the person filing the appeal of their right to seek judicial review of the
decision. In addition, a low- or moderate-income household that has been displaced from a
dwelling in a HOME or CDBG project may file a written request for review of the grantee’s
decision to the HUD Field Office.
2.04.05 Rental Project Requirements
This Section describes the eligibility and other general requirements that are specific to
HOME Program projects involving rental housing units.
2.04.05.A General Requirements for Rental Projects
Applicants may use HOME Program funds to assist rental housing in site-specific
projects. Site-specific rental projects may involve acquisition, new construction, or rehabilitation.
Applicants for HOME funds involving rental projects may assume a number of different roles.
They may retain ownership of completed projects, or transfer ownership to another entity which
agrees to meet the HOME Program's long-term affordability and monitoring requirements. The
applicant is responsible for ensuring compliance with all rental project requirements set forth
herein for the duration of the period of affordability.
All housing assisted with HOME funds must, at a minimum, meet Federal Housing
Quality Standards (HQS). Newly constructed or substantially rehabilitated HOME projects must
meet all applicable local codes, rehabilitation standards, and zoning ordinances. Local programs
providing rehabilitation assistance for rental housing must comply with HUD Regulations at 24
CFR Part 35 for Lead Based Paint Hazard Reduction. In addition, projects funded with HOME
funds must comply with HCR’s Design Handbook
(www.nyshcr.org/Publications/DesignHandbook/).
Office of Finance and Development
Capital Programs Manual
Page 55 of 69
2.04.05.B Eligible Rental Properties
Eligible HOME project rental properties include the following:
(i) residential buildings that are in need of rehabilitation in order to meet the
rehabilitation standards set forth in the HCR Design Handbook;
(ii) residential properties acquired to provide rental housing for eligible occupants;
(iii) non-residential properties that can be converted into residential rental housing for
eligible occupants; and,
(iv) mixed-income and mixed-use properties are eligible, provided that all units
receiving HOME funds meet all rental project requirements set forth herein.
2.04.05.C Eligible Tenants/Rents
HOME assisted rental units in site-specific projects must be occupied by low-income
households with incomes at or below 60 percent of AMI. Multi-family projects (projects with
five or more units) must reserve 20 percent of the units in the project for occupancy by very low-
income families (those with incomes at or below 50 percent of AMI). No tenant may be
excluded from leasing a HOME rental project because they hold a certificate, voucher, or
comparable document from any rental assistance program.
Rents for HOME assisted units may not exceed the rent published by HUD for the
applicable unit size, adjusted for any applicable utility allowance (known as the "High HOME
Rent"). See 24 CFR 92.252(a)(1)(2). Please see Section 5.07 of the CPM for utility allowance
requirements in HOME-funded units. Additionally, for projects with five or more units, at least
20 percent of the project's units must either be occupied by very low-income households paying
30 percent or less of their monthly adjusted gross income for rent, or must bear rents which are
not greater than 30 percent of the annual income of a family whose income equals 50 percent of
the AMI (known as the "Low HOME Rent"). See 24 CFR 92.252(b)(1)(2).
If a unit receives federal or state project-based rental subsidy and the very low-income
family pays no more than 30% of the family’s adjusted income as a contribution toward rent,
then the maximum rent (i.e., tenant contribution plus project-based rental subsidy) is the rent
allowable under the federal or state project-based rental subsidy program. Tenants whose
Office of Finance and Development
Capital Programs Manual
Page 56 of 69
incomes increase to more than 80 percent of AMI may continue to occupy their HOME-assisted
unit provided they meet the requirements of 24 CFR 92.252(h)(i)(2).
2.04.05.D Regulatory Periods for Rental Projects
See 24 CFR 92.252(e) for information on the regulatory periods for rental projects.
2.04.05.E Regulatory Restrictions of HOME Rental Projects
Rental projects assisted with HOME funds must remain affordable for a period of
between five and twenty years, and must meet all applicable requirements of 24 CFR 92.252 and
253. These sections require recipients to secure assistance provided to rental housing by means
of a deed restriction or other similar mechanism that runs with the land.
Recipients should regularly review the management and financial condition of projects so
that they can intervene before projects reach the point of default and foreclosure. In the event
that a project is found to be encountering financial difficulties, or if a recipient is notified that
foreclosure proceedings have been initiated against an assisted rental project, the recipient must
notify their HCR regional office immediately, and must work with the project owner and the
primary lenders to maintain the project as affordable housing for the remaining affordability
period, or repay the full amount of HOME funds invested in the project to HTFC. Re-
subordination of HOME financing to permit refinancing of the primary mortgage is generally not
permitted in assisted rental projects.
2.04.05.F CHDO Multi-Family Rental Projects
In order for a HOME multi-family rental project to be considered a CHDO project, the
project ownership structure must comply with the terms of 24 CFR 92.300. This section states
that funds may be provided to a CHDO, its subsidiary or a partnership or a limited liability
company of which the CHDO or its subsidiary is the sole general partner or sole managing
member. If a CHDO owns the project in partnership, it or its wholly owned for-profit or non-
profit subsidiary must be the sole general partner. In acting in any of the capacities specified, the
community housing development organization must have effective project control. A CHDO
Office of Finance and Development
Capital Programs Manual
Page 57 of 69
applicant must state in its application and document in the project owner’s organizational
documents that the CHDO has effective project control.
2.04.06 Other Federal Requirements
A complete description of all other applicable federal regulations can be found within the
Electronic Code of Federal regulations at: www.ecfr.gov (Title 24, Part 92, Subpart H).
2.04.06.A Section 3
Section 3 is a provision of the Housing and Urban Development Act of 1968 (see 24 CFR
Part 135). The purpose of Section 3 is to ensure that employment and other economic
opportunities generated by certain HUD financial assistance, including the HOME Program and
HCR issued Project Based Vouchers, shall to the greatest extent feasible, and consistent with
Federal, State and local laws and regulations, be directed to low- and very low income persons,
particularly those who are recipients of government assistance for housing, and to business
concerns which provide economic opportunities to low- and very low-income persons.
Office of Finance and Development
Capital Programs Manual
Page 58 of 69
Section: 2.00 PROGRAM DESCRIPTIONS
Sub Section: 2.05 New York State Low-Income Housing Tax Credit (SLIHC) Program
2.05.01 Summary
The New York State Low-Income Housing Tax Credit (SLIHC or State Tax Credit) was
created in 2000 by Article 2-A of the Public Housing Law (The Law). The Law authorizes the
Commissioner of DHCR to administer the SLIHC Program according to procedures established
in 9 NYCRR Part 2040.14 (the SLIHC regulation) and in the same manner as the federal LIHC
Program, as authorized by Section 42 of the U. S. Internal Revenue Code (the Code).
Owners/investors can receive a dollar-for-dollar reduction in certain New York State tax liability
to be taken over a 10-year period in return for building and maintaining affordable housing for
income eligible tenants for the number of years the project is subject to an HCR Regulatory
Agreement (generally 50 years).
The SLIHC Program differs from the federal 9% LIHC Program by serving tenants
having an income level of up to 90% of AMI, as opposed to the federal LIHC limit of 60% of
AMI. SLIHC may therefore assist low-income households in those housing markets where the
rents of conventionally financed rental housing are not affordable. SLIHC Program scoring
includes the provision of points for those projects that propose serving households in multiple
income bands and leverage the most non-HCR funding, among other scoring items.
All processes, policies, and procedures applicable to the 9% LIHC Program pursuant to
the Code and the QAP, apply to the SLIHC Program except those provisions modified by the
Law and the SLIHC Regulations. Therefore, the guidance provided in Section 2.03 pertaining to
LIHC applies to SLIHC except as noted below.
2.05.02 Additional Definitions
LIHC Program definitions, which are applicable to SLIHC, are set forth in the Code and
Section 2040.2 of the QAP. Additional definitions pertaining to SLIHC alone are set forth in the
Law and Section 2040.14(b) of the Regulation. SLIHC is also subject to federal LIHC
Regulations and other IRS and HUD guidance pertaining to the LIHC Program.
Office of Finance and Development
Capital Programs Manual
Page 59 of 69
2.05.03 Eligibility Requirements
This Section describes only specific SLIHC eligibility requirements that differ from the
LIHC Program. Unless otherwise specified below, LIHC program eligibility requirements (see
Section 2.03.03 of the CPM and the QAP) are fully applicable to SLIHC.
2.05.03.A Eligible Applicants/Owners
The same requirements under the LIHC Program apply to SLIHC (see Section
2.03.03.A), except that the owner must also have New York State tax liability in order to utilize
the State Tax Credit.
2.05.03.B Eligible Projects
The same requirements under the LIHC Program apply to SLIHC (see Section 2.03.03.B
of the CPM), except in the following manners:
(i) Qualified low-income housing projects under SLIHC must meet a minimum set-
aside of low-income units as set forth in Section 2014.14(b)(2) of the Regulation.
Any 9% LIHC set-asides specified in the annual UF RFP which may be made
available under 9% LIHC do not apply to SLIHC unless otherwise specified in the
UF RFP.
(ii) State Tax Credit allocations are not subject to the Code requirement that 10% of the
annual SLIHC allocations made be set-aside for qualified non-profit
organizations.
2.05.04 Project Scoring and Ranking Criteria
SLIHC project applications are scored subject to criteria set forth in Section 2040.14(d)
of the regulation.
2.05.05 Additional State Tax Credit Exceptions to 9% LIHC
The 9% LIHC Program Requirements set forth in Section 2.03.04.A of the CPM
pertaining to the Ceiling Allocation do not pertain to SLIHC.
Office of Finance and Development
Capital Programs Manual
Page 60 of 69
Section 2.03.06 of the CPM, in regard to 4% LIHC projects financed by Private Activity
Bonds does not pertain to SLIHC.
All references to the IRS Form 8609 Final Credit allocation, including those in Section
2.03.05.F, should be replaced with references to the NYS DTF-625 allocation form,
which is used for the final allocation of State Tax Credit to a project.
Office of Finance and Development
Capital Programs Manual
Page 61 of 69
Section: 2.00 PROGRAM DESCRIPTIONS
Sub Section: 2.06 Urban Initiatives (UI) Program
2.06.01 Summary
PLEASE NOTE: The Urban Initiatives Program (UI) is currently administered in two
parts by HCR. This manual should only be used for UI when incorporated with other funds as
part of a larger UF Capital project proposal administered by HCR’s OF&D. All other UI
funding is administered by HCR’s OCR.
The purpose of the UI Program is to provide financial/technical grants to New York
communities for the restoration and improvement of housing, commercial areas, and
public/community facilities in urban neighborhoods.
2.06.02 Eligible Applicants
Eligible applicants include not-for-profit corporations or charitable organizations,
organized for a period of one or more years, which is either incorporated under the not-for-profit
corporation law together with any other applicable law or, if unincorporated, is not organized for
the private profit or benefit of its members.
2.06.03 Eligible Projects
1) New construction, preservation, or improvement of residential housing units in a
neighborhood.
2) New construction, preservation, or improvement of local commercial facilities and
public facilities or other aspects of the area environment when carried out in connection
with or incidental to a program of housing activities.
Applicants must have an ownership interest in a project during the contract period.
2.06.04 Eligible Areas
Eligible areas are neighborhoods within a municipality, having a population of 25,000 or
more with established boundaries consistent with a determination of neighborhood eligibility
under Article 16 of the PHFL. A substantial proportion of the residential population must be
Office of Finance and Development
Capital Programs Manual
Page 62 of 69
persons of low income, and may include populations with persons of special needs with unmet
housing needs.
2.06.05 Eligible Occupants/Beneficiaries
Occupants of UI Program projects are persons and families whose income does not
exceed 80% of the AMI for the MSA, county, or municipality in which the project is located.
Non-residential projects must benefit municipalities in which at least 50% of the population has
incomes of 80% or less of the median income of the municipality.
2.06.06 Eligible Project Costs
UI funds may be used for material expenses related to the proposed project incurred
subsequent to contract document execution including: the costs of acquisition; construction;
repair; renovation; rehabilitation; demolition; and clearance and sealing of any building or other
structure. Eligible project costs also include fees to consultants retained by the qualified
applicant to provide the eligible activities listed in Section 2.06.03.
2.06.07 Ineligible Project Costs
In no event shall program funds be used for:
1) acquisition of property unless such acquisition is in conjunction with the construction,
repair, renovation, demolition, clearance, or sealing of any building or of the structure;
2) payment of salaries and wages to employees of the qualified applicant, unless
specifically authorized and set forth in the UI Program and Regulatory Agreement, and
Grant Conditions Compliance Enforcement Mortgage; or,
3) other costs or expenses directly related to the applicant’s employees or consultants,
including office rentals, office equipment, fringe benefits, office expenses, or other
administrative expenses.
2.06.08 Regulatory Term
The regulatory term for a project with UI funds is seven years. Projects that are
awarded UI grant monies will be required to sign and record a UI Program and Regulatory
Office of Finance and Development
Capital Programs Manual
Page 63 of 69
Agreement and a Grants Conditions Compliance Enforcement Mortgage. The contract
documents must be recorded in the municipality in which the project is located.
Office of Finance and Development
Capital Programs Manual
Page 64 of 69
Section: 2.00 PROGRAM DESCRIPTIONS
Sub Section: 2.07 Rural Area Revitalization Program (RARP)
2.07.01 Summary
PLEASE NOTE: The Rural Area Revitalization Program (RARP) is currently
administered in two parts by HCR. This manual should only be used for RARP when
incorporated with other funds as part of a larger UF Capital project proposal administered by
HCR’s OF&D. All other RARP funding is administered by HCR’s OCR.
The purpose of the RARP program is to provide financial/technical grants to New York
communities for the restoration and improvement of housing, commercial areas and
public/community facilities in rural communities.
2.07.02 Eligible Applicants
Eligible applicants include not-for-profit corporations or charitable organizations,
organized for a period of one or more years, which is either incorporated under the not-for-profit
corporation law together with any other applicable law or, if unincorporated, is not organized for
the private profit or benefit of its members.
2.07.03 Eligible Projects
1) New construction, preservation or improvement of residential housing units in a
neighborhood.
2) New construction, preservation or improvement of local commercial facilities and public
facilities.
3) Other aspects of the area environment when carried out in connection with or incidental
to a program of housing activities.
Applicants must have an ownership interest in a project during the contract period.
Office of Finance and Development
Capital Programs Manual
Page 65 of 69
2.07.04 Eligible Areas
Towns and villages with populations of less than 25,000 are eligible areas. A substantial
proportion of the residential population of the region must be persons of low income and may
include population for persons with special needs with unmet housing needs requirements.
2.07.05 Eligible Occupants/Beneficiaries
Eligible occupants of RARP projects are persons and families whose income does not
exceed 90% of the AMI for the MSA or county in which the project is located. Non-residential
projects must benefit municipalities or rural area in which at least 50% of the population has
incomes of 90% or less of the MSA or county median income.
2.07.06 Eligible Project Costs
RARP funds may be used for material expenses related to the proposed project incurred
subsequent to contract execution including:
1) the costs of acquisition, construction, repair, renovation, rehabilitation, demolition,
clearance and sealing of any building or other structure; and,
2) fees to consultants retained by the qualified applicant to provide the eligible services
listed in subdivision 1) of this section.
2.07.07 Ineligible Project Costs
In no event shall program funds be used for:
1) acquisition of property unless such acquisition is in conjunction with the construction,
repair, renovation, rehabilitation, demolition, clearance, or sealing of any building or of
the structure;
2) payment of salaries and wages to employees of the qualified applicant, unless specifically
authorized and set forth in the RARP Program and Regulatory Agreement, and Grant
Conditions Compliance Enforcement Mortgage; or,
3) other costs or expenses directly related to the applicant’s employees or consultants,
including office rentals, office equipment, fringe benefits, office expenses or other
administrative expenses.
Office of Finance and Development
Capital Programs Manual
Page 66 of 69
2.07.08 Regulatory Term
The regulatory term for a project with RARP funds is seven years. Projects that are
awarded RARP grant monies will be required to sign and record a RARP Program and
Regulatory Agreement and a Grants Conditions Enforcement Mortgage. The contract documents
must be recorded in the municipality in which the project is located.
Office of Finance and Development
Capital Programs Manual
Page 67 of 69
Section: 2.00 PROGRAM DESCRIPTIONS
Sub Section: 2.08 Rural and Urban Community Investment Fund (CIF) Program
2.08.01 Summary
The Rural and Urban Community Investment Fund Program (CIF) will provide loans to
eligible applicants to develop and complete a retail, commercial, or community facility that is or
will be part of, or which is in close proximity to and clearly serves the needs of, tenants residing
in an Affordable Residential Development financed by an HCR agency. CIF funds may also be
used for the preservation of multifamily affordable housing in rural areas of the State (Rural
Preservation Projects) that may or may not have a retail, commercial, or community facility
space. Please review the latest UF or Open Window CIF RFP as applicable, for more specific
program details.
2.08.02 Statutory Provisions
The CIF Program was created by Article 27 of the PHFL. HTFC has been designated to
administer the CIF program, and within the limit of the funds available for the program, HTFC is
authorized to make payments, grants or loans available to eligible applicants to develop eligible
projects. The following are the specific legislative findings on which the CIF program is based:
1) There exists a serious need to assist communities with the creation and improvement of
affordable housing; and,
2) There exists a serious need to assist communities with the creation and improvement of
the retail, commercial, and community service facilities related to mixed use affordable
residential developments.
2.08.03 Eligible Applicants
Eligible applicants shall include a not-for-profit corporation or charitable organization, or
the wholly-owned subsidiary of such a corporation or organization, or a private for-profit
developer such as a person, corporation, partnership, or limited liability company.
Office of Finance and Development
Capital Programs Manual
Page 68 of 69
2.08.04 Eligible Areas
Rural areas of the state shall mean cities, towns, and villages having a population of less
than 25,000 as determined by the last federal decennial census. Urban areas of the state shall
mean any unit of local government within the state with a population of more than or equal to
25,000 persons as determined by the last decennial census.
2.08.05 Fund Allocation
Sixty percent of the total funds shall be awarded pursuant to this article in any fiscal year
shall be allocated to projects located in urban areas of the state. Forty percent of the total funds
awarded pursuant to this article in any fiscal year shall be allocated to projects located within
rural areas of the state.
2.08.06 Eligible Occupants/Beneficiaries
Affordable Residential Development shall include residential units that are rent restricted
and occupied by persons and families whose income does not exceed ninety percent of AMI for
the county in which the project is located as calculated by the United States Department of
Housing and Urban Development. Please review the latest CIF RFP for more specific program
details.
2.08.07 Match Requirements
A one-third match of requested CIF amount shall be required of any eligible applicant.
The match may include but is not limited to cash, developer equity, deferred developer fee,
donated property, materials, or labor, and other non-HCR/HFA resources as qualified in the
applicants development budget and supported by funding commitment documentation. The
match requirement may be reduced or eliminated for projects located within a declared disaster
area and if the proposed project clearly addresses an impact resulting from the disaster.
Applicants seeking a reduction or elimination of the CIF matching requirement must request a
waiver detailing the basis for the reduction or elimination at least 10 business days prior to the
application submission.
Office of Finance and Development
Capital Programs Manual
Page 69 of 69
2.08.08 Allowable Developer Fee
CIF funds may not be used for payment of a developer fee on the non-residential portion
of the project with the exception of non-residential space in a 9% LIHC project which qualifies
as an IRC Section 42 CSF. If the applicant is requesting a developer fee on the CSF space, HCR
will not allow for the maximum amount of CIF to be awarded to the project. The CIF award will
be reduced by the amount of the fee budgeted.
Office of Finance and Development
Capital Programs Manual
Page 1 of 6
Section: 3.00 UNIFIED FUNDING PROCESS
Sub Section: 3.01 Introduction
The Unified Funding (UF) Process has been adopted by HCR, acting through HTFC and
DHCR, to efficiently administer capital programs supporting affordable housing. The UF process
is the method by which applicants may request full or partial funding from HCR to undertake
housing projects, and by which applications for funding are evaluated. Through the UF process
applicants may apply for funding from a number of HCR administered programs. However,
application content, submission timeframes, and specific review steps will vary, depending upon
the program(s) from which funds are being requested.
Subject to availability, applications for funds from the following programs will be accepted
until the deadline date specified in the most recent HCR-issued Notice of Funding Availability
(NOFA) or Notice of Credit Availability (NOCA for LIHC/SLIHC) and Request for Proposals
(RFP), at which point they will be competitively reviewed pursuant to the criteria outlined in the
most recent RFP:
(i) Low Income Housing Trust Fund Program (HTF);
(ii) New York State HOME Program (HOME);
(iii) Low Income Housing Credit Program (LIHC);
(iv) State Low Income Housing Credit Program (SLIHC), and,
(v) other programs identified in the annual NOFA and/or RFP.
Subject to the availability of funds, additional programs may be made available through the
UF process.
Technical assistance may be requested at any time by applicants who wish to discuss a
project or program that may result in a UF application. Section 3.03 provides specific details on
the various types of technical assistance which may be provided by HCR and the process for
technical assistance.
Office of Finance and Development
Capital Programs Manual
Page 2 of 6
Section: 3.00 UNIFIED FUNDING PROCESS
Sub Section: 3.02 Application Review and Funding Process
The application review and funding process consists of the following steps, depending on
the outcome of the various reviews conducted by HCR staff:
(i) eligibility review;
(ii) rating and ranking;
(iii) project review;
(iv) project recommendations based on criteria outlined in the RFP;
(v) HTFC Board Approval (for HTFC resources only); and,
(vi) Outcome Letters.
HCR may complete additional application reviews as necessary. All Review steps are subject
to quality control and supervisory reviews which occur on an ongoing basis.
3.02.01 Eligibility Review
Applications are reviewed for eligibility to ensure that the proposed project meets all
statutory requirements of the program(s) from which funds are being requested. HCR staff must
ensure, at a minimum, that the application has demonstrated the eligibility of the:
(i) applicant/owner;
(ii) area in which the proposed project is to be located;
(iii) proposed use;
(iv) property; and,
(v) proposed occupants.
3.02.02 Rating and Ranking
All applications are rated according to the statutory, regulatory, and policy considerations
of the applicable program(s). For the purpose of rating and ranking applications, when an
applicant requests funds from two or more programs, HCR will utilize the scoring criteria for the
program which would provide the greatest amount of financial assistance to the proposed project.
Office of Finance and Development
Capital Programs Manual
Page 3 of 6
While rating and ranking of an application is a critical factor in award decisions, it is only one of
the considerations described in the annual RFP.
3.02.03 Project Review
Applications which are in the competitive scoring range will undergo a project review.
Staff members from the A&E, EAU, and Underwriting Unit (UW) will conduct technical
assessments of the project as proposed. Staff from Program Management and the OLA may also
participate, as well as other HCR staff as deemed necessary, to conduct a thorough review of
each application.
3.02.04 Project Recommendations
After all reviews have been completed, the HCR Commissioner and/or HTFC Board of
Directors will make final awards based upon the following considerations:
i) the rating/ranking of all applications;
ii) statutory and regulatory requirements, as discussed below;
iii) the state’s housing goals including but not limited to the preservation of affordable
housing, community renewal, and collaboration with other government agencies;
iv) the availability of program funds;
v) geographic distribution of funds; and,
vi) other criteria published in annual RFP.
If an applicant/developer/owner/manager and their principles are not in compliance with
existing state contracts, or have participated in a publicly assisted program or project that has
been determined to be out of compliance with statutes, rules, regulations, policies or agreements
and has not taken satisfactory steps to remedy such non-compliance, HCR reserves the right to
not award funding to such applicants.
HCR also reserves the right to award all, a portion of, or none of the program funds based
upon funding availability, feasibility of applications received, the competiveness of the
applications, the applicant’s ability to meet HCR criteria for funding, the applicant’s ability to
advance the State’s housing goals, and HCR’s assessment of cost reasonableness. HCR further
reserves the right to review an application requesting project funds as an application for funding
Office of Finance and Development
Capital Programs Manual
Page 4 of 6
under other programs, for which the project is eligible, and to change or disallow aspects of the
applications received. HCR may make such changes an express condition of its commitment to
fund the project.
The HTF Program has statutory requirements governing the distribution of program funds.
Per statute, allocations of HTF cannot exceed the following limits based on the total program
appropriation in any fiscal year:
(i) 50 percent allocated to projects located within any single municipality.
3.02.05 Outcome Letters
Once the application review process has been completed and funding decisions have been
made, Outcome Letters will be prepared and sent to all applicants informing them of one of the
three possible review statuses their application has achieved:
1) selected for funding (award letter);
2) not selected for funding (application review letters); or,
3) placed on a waiting list (It should be noted that a waiting list is not utilized every
funding round.)
Applications which are incomplete, ineligible, non-competitive, cannot satisfactorily
address HCR’s underwriting standards, and/or do not advance State housing goals will not be
selected for funding. Applicants whose applications are not selected for funding will be invited
to meet with the appropriate Regional Office to review their application through an exit
conference.
Applicants with applications which are complete, eligible, competitive, and could
satisfactorily address HCR’s underwriting standards, but for which there are insufficient funds,
may receive an Application Review Letter informing them that the application has been placed
on a waiting list. The waiting list may be established so that funded applications which do not
go forward for any reason can be replaced by another project. The waiting list will remain in
effect until the next Request for Proposals is issued, or until the waiting list is discontinued, at
which time a new waiting list may be established. It should be noted, however, that a waiting
list is not utilized every funding round and its use is subject to HCR’s determination of the need
to use this mechanism.
Office of Finance and Development
Capital Programs Manual
Page 5 of 6
Applicants, whose applications are selected for funding, will receive an Award Letter
congratulating them on their successful proposals, and notifying them that they will be
contacted by an HCR project manager to arrange the Project Development Meeting as described
in Section 6.02.01.
Office of Finance and Development
Capital Programs Manual
Page 6 of 6
Section: 3.00 UNIFIED FUNDING PROCESS
Sub Section: 3.03 Technical Assistance for Capital Projects
General technical assistance may be requested at any time from the HCR regional office
serving the area in which the applicant is considering a project. General technical assistance may
include, but is not limited to, the following:
1) guidance on HCR program requirements and policies, as they pertain to a specific
project;
2) assistance in determining the most appropriate HCR funding sources for the proposed
project;
3) guidance in establishing a HDFC for a specific project;
4) review of development and/or operating budgets for a specific project;
5) assistance with reviewing and selecting a site or sites for a specific project; and,
6) referrals to other governmental agencies for funding and/or support services for a
specific project.
Representatives of agency technical units may attend the meeting, depending on the nature of
the request. In some instances, HCR’s ability to provide technical assistance may be limited by
the timeliness of the request for assistance or other factors. Priority will be given to not-for-profit
applicants. Applications for general technical assistance will not be accepted during the
application review period immediately following the UF application deadline. Requests for
general technical assistance occurring immediately prior to the UF round deadline may not be
accommodated.
For site-specific technical assistance, please see the current RFP for technical assistance
procedures.
Office of Finance and Development
Capital Programs Manual
Page 1 of 8
Section: 4.00 M/WBE AND FAIR HOUSING AND EQUAL OPPORTUNITY
REQUIREMENTS
Sub Section: 4.01 Introduction
This Section describes the general program requirements and policies concerning
Minority/Women-Owned Business Enterprises (M/WBE), Equal Opportunity, and Fair Housing.
It is organized under the following headings:
4.02 M/WBE Requirements
4.03 Equal Opportunity Requirements
4.04 Fair Housing Requirements
Office of Finance and Development
Capital Programs Manual
Page 2 of 8
Section: 4.00 M/WBE AND FAIR HOUSING AND EQUAL OPPORTUNITY
REQUIREMENTS
Sub Section: 4.02 M/WBE Requirements
Article 15-A of the State Executive Law was promulgated to ensure that certified
M/WBEs shall be given the opportunity for meaningful participation in the performance of State-
assisted contracts, and to facilitate the award of a fair share of State-assisted contracts and
subcontracts to such enterprises. In accordance with Article 15-A, HCR requires contractors to
make good faith efforts to ensure that M/WBEs have opportunities for meaningful participation
on projects to be undertaken and financed with funds provided by HCR.
Goals for M/WBE participation are assessed and imposed on each State-assisted contract.
Participation levels are based upon the availability of certified M/WBE to perform the work in
the region in which the contract is to be performed and the total dollar value of the work to be
performed in relation to the dollar value of the components of the contract scope. Contractors on
HCR projects are required to submit quarterly reports detailing the utilization of M/WBE in
performing the contract.
Article 15-A of the Executive Law and the M/WBE Regulations requires contractors to
take affirmative steps to encourage the utilization of M/WBEs. Contractors are notified by HCR
of such requirements. A copy of the Directory of Certified Minority and Women Owned
Businesses can be downloaded from the NYS Empire State Development web site at:
www.empire.state.ny.us. Technical assistance is offered by HCR’s Office of Economic
Opportunity and Partnership Development which may be reached via email at
4.02.01 Utilization Plan
Applicants are required to submit a Utilization Plan for the participation of State-certified
M/WBEs in connection with their project. The Utilization Plan must include a list of the names
and federal identification numbers of M/WBEs which the applicant intends to use in connection
with the project, the dollar amount and the scope of work to be performed, the date when such
work will commence, and the estimated completion date for each contract.
Office of Finance and Development
Capital Programs Manual
Page 3 of 8
4.02.02 Methods for the Participation of M/WBEs
The following steps are recommended for contractors to pursue participation by M/WBEs
on State-assisted contracts. Contractors are encouraged to use these steps in drafting any policy
statements which will guide their efforts in meeting the applicable M/WBE goals.
(i) actively and affirmatively solicit bids for contracts and subcontracts from certified
M/WBE, including the marketing efforts to minority and women contractor
associations;
(ii) identify NYS Certified MWBEs by using ESD’s online MWBE directory:
https://ny.newnycontracts.com/FrontEnd/VendorSearchPublic.asp;
(iii) ensure that plans, specifications, requests for proposals and other documents used to
secure proposals for the performance of work or supply of materials will be made
available in sufficient time for review by prospective M/WBEs;
(iv) encourage, where economically and technically feasible, the formation of joint
ventures, partnerships or other similar arrangements among contractors to enhance
participation by M/WBE;
(v) partner with other governmental agencies to further outreach to M/WBE firms; and,
(vi) ensure that payments to M/WBE firms are made on a timely basis and with such
frequency that undue financial hardship is avoided and other credit requirements are
waived or appropriate alternatives developed to encourage M/WBE participation.
In compliance with the requirements of Article 15-A, applicants must provide HCR with
assurances that they will require contractors to take specific affirmative action steps, including,
but not limited to, the above-mentioned items, in the form of the Agency’s M/WBE Utilization
Plan and Utilization Agreement which may be found at www.nyshcr.org/Forms/FairHousing/
under the “M/WBE & EEO” and “M/WBE Contract Documents” sections.
Office of Finance and Development
Capital Programs Manual
Page 4 of 8
Section: 4.00 M/WBE AND FAIR HOUSING AND EQUAL OPPORTUNITY
REQUIREMENTS
Sub Section: 4.03 Equal Employment Opportunity
Equal employment opportunity (EEO) is guaranteed by Title VII of the Federal Civil
Rights Act of 1964, as amended, and the New York State Human Rights Law which prohibits
discrimination in employment on the basis of race, creed, color, disability, national origin, age,
sex, marital status, or arrest record. Affirmative action is generally defined as any positive action
that is intended to:
(i) correct the effects of past discrimination (whether such actions were intentional or
unintentional);
(ii) identify and seek to eliminate current discriminatory practices; and,
(iii) seek to prevent discrimination by actively initiating and implementing policies and
procedures designed to promote greater employment opportunities for protected class
individuals in the work force.
Affirmative action plans are written documents outlining the specific steps to be taken by
an employer to accomplish the aforementioned objectives; though they may vary in content and
design, they must be consistent with Federal and State EEO laws. The following will be required
of all HCR applicants (owners, builders and other major project participants):
(i) EEO and MWBE Policy Statements:
www.nyshcr.org/Forms/FairHousing/EEO_MWBE_PolicyStatements.pdf signed by
the organization's president, chair or CEO;
(ii) a description of the organization's personnel policies and practices for recruitment,
hiring, promotion, separations, training and grievance procedures with assurances that
such are consistent with applicable laws and affirmative action policies; and,
(iii) a description of how the organization will communicate its affirmative action and
non-discriminatory policy to contractors, subcontractors, vendors and suppliers.
Under Section 312 of Article 15-A of the New York State Executive Law, contractors
under State contract must state in all solicitations or advertisements for employees that equal
employment opportunity will be afforded to all qualified applicants. In addition, contractors
Office of Finance and Development
Capital Programs Manual
Page 5 of 8
must include in every subcontract the provisions of Article 15-A § 312.1 except as relates to
employment outside of New York State.
Office of Finance and Development
Capital Programs Manual
Page 6 of 8
Section: 4.00 M/WBE AND FAIR HOUSING AND EQUAL OPPORTUNITY
REQUIREMENTS
Sub Section: 4.04 Fair Housing Requirements
Funded applicants are required to comply with all applicable federal, state and local fair
housing and non-discrimination laws, including those listed below.
4.04.01 Fair Housing Laws
Funded applicants are required to comply with Title VIII of the Federal Civil Rights Act
of 1968, also referred to as the "Fair Housing Act," which prohibits discrimination against
applicants for and occupants of housing on the basis of race, color, religion, sex, familial status
national origin or disability. "Familial Status" refers to one or more individuals who have not
attained the age of 18 years and are domiciled with (a) a parent or another person having legal
custody of such individual(s); or (b) the designee of such parent or other person having such
custody with the written permission of such parent or other person. The protections afforded
against discrimination on the basis of familial status apply to any person who is pregnant or is in
the process of securing legal custody of anyone under the age of 18 years.
Discrimination on the basis of disability (or handicap as referred to in Federal
Regulations) is also prohibited under the provisions of Section 504 of the Federal Rehabilitation
Act of 1973 which provides that no individual with a disability shall be excluded from
participation in, the benefits of, or be subject to discrimination under any program or activity
receiving federal financial assistance. Title III of the Americans with Disabilities Act also
provides protections for individuals with disabilities in accessing public accommodations.
In addition to the federal protected classes, the New York State Human Rights Law also
makes it an unlawful practice to discriminate against any person because of creed, sexual
orientation, military status, age, marital status in the terms, conditions or privileges of sale,
rental, or lease of any housing accommodation or in the furnishing of facilities or services in
connection therewith.
Discrimination in housing is also prohibited under Section 602 of the New York State
Private Housing Finance Law, as well as in other state and local laws, which often include
Office of Finance and Development
Capital Programs Manual
Page 7 of 8
prohibitions on discrimination based on lawful source of income. Some of the localities in New
York that have these source of income protections include New York City, Nassau County,
Suffolk County, Westchester County, Buffalo, Rochester, Hamburg, West Seneca and Syracuse.
In addition, buildings funded with Low-Income Housing Tax Credits (LIHTC) are also
prohibited from discriminating people on the basis of their Section 8 Housing Choice Voucher
(26 U.S.C. § 42(h)(6)(B)(iv)).
Applicants and owners must incorporate the provisions of these laws into the
development of marketing plans, tenant selection plans, admission standards and policies, and
waiting lists for housing units to be constructed or rehabilitated with State funds.
4.04.02 Affirmative Fair Housing Marketing Plans
Applicants and owners of projects involving the construction or rehabilitation of four or
more HCR assisted housing units, including Low Income Housing Credit Program Projects, are
required to submit and obtain approval from HCR’s Fair and Equitable Housing Office (FEHO)
of (1) a Project Summary and Certification form which must be approved by HCR prior to
construction finance closing, and (2) an Affirmative Fair Housing Marketing Plan, which must
be approved before any marketing and leasing activities can begin. As part of this approval
process, FEHO reviews, among other things, any preferences in tenant selection, marketing plans
to reach those least likely to apply, tenant selection policies and lotteries, and reasonable
accommodation procedures.
Marketing plans for elderly projects should also indicate how elderly projects will be
structured, either as a “55 or over” project, where at least 80% of occupied units are occupied by
at least one person who is 55 years of age or older; OR as a “62 or older” project, where all
occupants of the project are persons 62 years of age or older. (See Section 5.15 for further
details). In HTFC projects which are jointly financed with the US Department of Agriculture
Rural Housing Services, an elderly project is required to be occupied by persons 62 years of age
or older, or by handicapped persons of any age. In either case, applicants must obtain an
exemption for the New York Division of Human Rights in order to develop housing that has age
restrictions as part of its tenant selection policy.
Office of Finance and Development
Capital Programs Manual
Page 8 of 8
Affirmative Marketing Plan Guidelines and forms may be found at Affirmative Fair
Housing Marketing Plan. NOTE: No later than 120 days prior to engaging in marketing
activities, you must register your project at www.nyhousingsearch.gov.
Please also see Section 7.05.01 General Tenant Selection Process for requirements
regarding screening household behavior and suitability for tenancy.
Please note that the "Fair/Equal Housing Opportunity" and the "Accessibility" logos must
be displayed on all affordable housing advertisements. These logos can be found at: Affirmative
Fair Housing Marketing Plan under the section titled “Logos”.
Office of Finance and Development
Capital Programs Manual
Page 1 of 71
Section: 5.00 DEVELOPMENT REQUIREMENTS
Sub Section: 5.01 Introduction
This Section describes the general development requirements of HCR for projects funded
under the UF Process. Unless otherwise noted at the top of each heading, the development
requirements apply to these programs:
(i) the Low-Income Housing Trust Fund (HTF) Program;
(ii) the Rural Area Revitalization Program (RARP) and Urban Initiatives Program (UI);
(iii) the New York State HOME Program (HOME) and projects allocated Project Based
Vouchers (PBV);
(iv) Federal Low-Income Tax Credit (LIHC) Program; and,
(v) New York State Low-Income Housing Tax Credit (SLIHC) Program.
Office of Finance and Development
Capital Programs Manual
Page 2 of 71
Section: 5.00 DEVELOPMENT REQUIREMENTS
Sub Section: 5.02 Environmental Requirements
All funded projects must undergo an environmental review, with the exception of
projects funded solely under the LIHC/SLIHC Program; or such other exceptions as described in
the annual RFP.
5.02.01 HCR Environmental Review Summary
HCR conducts an environmental review pursuant to the requirements of the State
Environmental Quality Review Act (SEQRA) and, for federally funded projects, the National
Environmental Policy Act (NEPA). Although SEQRA and NEPA have somewhat different
procedural requirements, both require HCR to complete an environmental review and issue an
environmental determination before an action commences including site acquisition (if the site
has not been acquired prior to application) and/or physical alteration of a project site, such as
construction, rehabilitation, site clearance or grading, excavation, or any change in use.
The HCR environmental review does not substitute for an environmental review which
may be required by other State agencies, municipalities, or lenders to obtain any necessary
approval, permit, or loans, and a review by another agency cannot substitute for HCR
environmental review. If a coordinated SEQRA review is conducted, HCR will not assume lead
agency status unless requested by the local municipality. Any situations where HCR might be
requested to be lead agency should be identified by the project sponsor. If another agency is
conducting a coordinated SEQRA review, HCR must be identified as an involved agency, and a
copy of the EAF must be submitted to HCR. HCR encourages developers to have the
municipality in which the project is located conduct a coordinated SEQRA review at the earliest
stage in a project’s development. As an involved agency in a coordinated SEQRA review, the
HCR SEQRA review may be expedited.
For federally funded projects, HCR classifies each project according to categories
established by SEQRA regulations at 6 NYCRR 617, and NEPA regulations at 24 CFR Part 58.
Regarding SEQRA, if the municipality or another agency has or will conduct a coordinated
SEQRA review, or in the case of a New York City Agency, a New York City Environmental
Office of Finance and Development
Capital Programs Manual
Page 3 of 71
Quality Review (CEQR) process review, HCR may be able to concur with that determination. If
the municipality or another agency has not or will not conduct a coordinated review, a
determination by the HTFC will be required for all Unlisted and Type I Actions, which adds time
to the review process.
Regarding NEPA, HCR is not able to rely upon another entity’s NEPA review, unless
HCR was included in that entity’s publication. HCR can incorporate another entity’s review into
HCR’s determination, which may significantly shorten the amount of time required to conduct
the review; however, HCR would still be required to publish a notice and receive authority from
HUD prior to providing environmental clearance. Note that no choice limiting actions shall take
place based upon another entity’s NEPA clearance.
Choice-limiting actions under 24 CFR 58.22 prohibit any activity that commit the project
to the action, including acquisition of the site, contracts, and any actual project work. This does
not include studies (such as Phase II Environmental Site Assessments, structural study borings)
or pursuing necessary permits. The prohibition commences with the application for federal
funding. The prohibition is lifted once either (a) the application is denied; or (b) the application
is awarded and there has been a complete NEPA review, including necessary publications, sign-
off from HUD, and the project receives an environmental clearance letter. The prohibition
pertains to any actions funded by any funding source, including private sources, because related
actions must be aggregated for purposes of NEPA (pursuant to 24 CFR 58.32).
HCR must conduct its own NEPA review for federal funding that it allocates to a project.
Failure to wait for HCR’s NEPA sign-off will result in the loss of the federal funds in the project.
HCR will require any significant environmental impacts identified by this assessment to be
mitigated as a condition for proceeding with project construction.
5.02.02 General Scope of Review
In general, HCR environmental review addresses the following issues:
• classification of the project according to SEQRA and, for federally funded projects,
NEPA;
• assessment, where required, of potential impacts of the proposed action on public
health or the natural environment;
Office of Finance and Development
Capital Programs Manual
Page 4 of 71
• review by the State Historic Preservation Office (SHPO) to determine the potential
impact of proposed activities on archaeological, cultural or historic resources;
• compliance with specific environmental regulations (i.e., flood plain management,
HUD noise regulations); and,
• investigation of liability associated with prior use of the site and adjacent sites which
may have involved storage, treatment or disposal of hazardous materials, along with
site contaminants such as asbestos-containing materials, lead based paint, mold and
radon.
5.02.03 Historic Review
Project sponsors must initiate the SHPO review process prior to applying for funds by
submitting an application through the Office of Parks, Recreation and Historic Preservation’s
Cultural Resource Inventory System at https://cris.parks.ny.gov/Login.aspx?ReturnUrl=%2f.
SHPO may ask the applicant for further information regarding the existing site or proposed
project design in order to make its determination. The project must be constructed in accordance
with the designs submitted to SHPO or the project may become ineligible for funding.
Projects with SHPO conditions related to the design and specifications of the project
must take into consideration the cost impacts on the project. The potential impact of SHPO
conditions on operating costs must also be addressed. For example, if satisfying SHPO
conditions results in inefficient energy conservation, excessive common areas, excessive heating
costs due to high ceilings, or increased maintenance due to special design finishes, the increase
in operating costs should be estimated, and where possible, a means of cost containment and/or
mitigation should be proposed. Project sponsors may be asked to provide a life cycle cost
analysis for rehabilitation projects which have been determined to be adversely impacted by
historic preservation costs. HCR may act as mediator between the project sponsor and the SHPO
to resolve project conditions. HCR’s mediation role is greatly diminished if federal funds are
involved.
5.02.04 Compliance With Other Specific Environmental Regulations
Office of Finance and Development
Capital Programs Manual
Page 5 of 71
In addition to obligations under SEQRA, HCR is also required to review projects
according to the following specific environmental review regulations:
Floodplain Management Criteria for State Projects (6 NYCRR Part 502);
New York State Coastal Zone Program (19 NYCRR Part 600);
Agricultural District Determination: Section 305 (4) of the Agriculture and Markets Law;
Smart Growth Public Infrastructure Policy Act; and,
For HOME and PBV projects, activities must also be reviewed according to related
environmental regulations listed at 24 CFR 58.5 and 58.6.
5.02.05 Site Contamination
A recent Phase I Environmental Site Assessment (ESA), prepared within twelve months
of application submission, must be submitted for all project applications to determine the likely
presence on the project site of hazardous materials, soil, water or vapor contamination,
underground storage tanks, PCBs, asbestos, mold, lead-based paint and radon. If a project is
approved for funding, suspected hazards must be characterized by follow-up testing and analysis.
HCR will require remediation and final clearance documentation of identified hazards in
accordance with regulations or guidance of agencies with jurisdiction over the hazard(s) present
on the site.
All relevant regulations must be adhered to concerning site contaminant assessment,
remediation and clearance. In addition, all HCR projects must address the following:
• In reference to lead paint, HCR requires compliance with HUD’s most current
edition of “Guidelines for the Evaluation and Control of Lead-Based Paint
Hazards in Housing”;
• concerning mold, regardless of site location, HCR requires compliance with New
York State Department of Labor Mold Rules; and,
• for moderate to high radon areas, radon mitigation systems must be designed in
accordance with relevant EPA or ASTM Standards.
Prospective applicants are encouraged to explore funding for hazardous materials remediation
from state and federal funding sources.
Office of Finance and Development
Capital Programs Manual
Page 6 of 71
5.02.06 Schedule of Submissions
For the project application:
The SEQRA Short EAF, Part 1, completed, dated and signed by the project sponsor,
including identification of the relevant tax lots (if a coordinated review has already
commenced, the SEAF should be the same as the SEAF (or EAS, in the case of a project
in New York City) submitted to the municipality);
A copy of the SHPO CRIS submittal form;
Phase One Environmental Site Assessment;
Evidence of compatibility with existing zoning, or request for variance;
Any prior SEQRA or NEPA environmental findings issued by a local or other State
Agency; and,
Any other existing environmental documentation or permits, i.e., environmental site
assessments, wetland investigations, State Pollution Discharge Elimination System
(SPDES) permits, etc.
If the project is funded, the Environmental Analysis Unit (EAU) will provide a detailed
letter, called a Follow-Up Letter (FUL), to awardees discussing other necessary
requirements and their scope. The FUL may include a request for the following
submissions, which must be sent to EAU if they were not included in the project
application and are applicable to the project:
(a) Zoning change or variance;
(b) Subdivision and/or Site Plan Approval;
(c) Archaeological survey;
(d) Village/Town/City Council Review/Approval;
(e) Flood Plain/ Waterfront/Coastal Zone Approval;
(f) Wetlands permits;
(g) Endangered species habitat survey;
(h) Lead Agency Designation for Coordinated Review;
(i) Full EAF;
(j) SPDES General Storm Water Permit;
Office of Finance and Development
Capital Programs Manual
Page 7 of 71
(k) For federally funded projects, HUD NEPA requirements in 24 CFR Part
58.5 & 58.6 (potentially including cost of repairs, replacement cost of
building (if rehab), Sole Source Aquifer information, a HUD Noise
analysis, a HUD thermal explosive hazard analysis);
(l) An up-to-date Phase I Environmental Site Assessment (ESA) and all
remedial reports; and,
(m) Asbestos, lead, mold surveys and removal specifications.
Technical studies or other information may be requested to satisfy concerns identified in
the application and other submissions and to develop any necessary mitigation strategies so that a
final environmental determination can be made. Awardee will be responsible for the costs
associated with any significant environmental impacts that require mitigation measures as a
condition of construction closing and proceeding with project construction.
5.02.07 Completion of Environmental Review
For projects with State funding only, environmental review for HCR projects is deemed
complete when a SEQRA determination is made by the SEQRA Officer, approved by the HTFC
Board of Directors, if necessary, and an environmental Clearance Letter has been issued by
DHCR/HTFC. The Clearance Letter will usually be accompanied by a Site Alteration Letter
(SAL), which identifies close-out items that must be submitted to EAU as construction
progresses.
For HOME and PBV funded projects, HTFC must also publish an appropriate public
notice in a newspaper of general circulation in the project area. Once environmental review for
HOME and PBV projects is complete, EAU will issue a Clearance Letter and SAL, the later
when the SEQRA process is complete or when the NEPA comment periods following public
notices have expired and HUD issues an Authority to Use Grant Funds form for the project. No
site acquisition (if the site has not been acquired prior to application) or physical alteration to the
site can occur until the project has received an environmental clearance letter from HTFC.
Office of Finance and Development
Capital Programs Manual
Page 8 of 71
Section: 5.00 DEVELOPMENT REQUIREMENTS
Sub Section: 5.03 Site Requirements
The site requirements set forth below apply to new construction and substantial
rehabilitation on all sites for all funded projects.
Applicants should select sites which are suitable for residential use. The suitability of the
site selected will be an important factor in the agency’s considerations. Low-income housing
projects located within an urban neighborhood must meet the following minimum requirements:
1) The site must be free from hazardous materials or remediation of such materials is part of
the project scope. There are no environmental conditions that significantly impair the
intended residential purposes.
2) The site has power, telephone, water and sewer connections adjacent to the site.
3) The site has local/public transportation or is within walking distance to community
services and retail establishments including a grocery store.
4) The site has adequate space to accommodate local off-street parking requirements.
5) The site is not larger than necessary to accommodate the proposed project.
6) The site grading will accommodate accessible route criteria.
7) If the site is located within one-quarter mile of a surface rail line not exclusively used for
passenger travel, documentation must be provided demonstrating that the rail line poses
little potential risk for prospective residents after considering the volume and speed of
traffic on the line; types of cargo carried; physical features in the surrounding area that
would mitigate any potential risk; and any project design features that would mitigate any
potential risk.
Low-income housing projects located in non-urban areas must meet the requirements of
Items 1, 2, 5, 6, and 7 as enumerated above; and also include the following:
1) Where public utilities are not included, the site must have the capacity to provide a cost
effective on-site water and/or septic system.
2) For family projects, the site must be within a five-mile distance of a municipality that
provides community services and retail establishments including a grocery store.
Office of Finance and Development
Capital Programs Manual
Page 9 of 71
3) The site must be accessible from a public road. For phased projects which include
common infrastructure and access, please see Section 5.05 Project Costs (iii)
Construction Costs and Soft Costs.
4) Elderly projects located within a rural community must have local public transportation
or be within walking distance, (i.e., one-half mile) of essential services including a
grocery store.
The HOME Program also has a requirement for site and neighborhood standards that is
published in the HOME Regulations at 24 CFR 92.202.
5.03.01 Site Control
HCR requires that applicants have site control for all buildings and/or sites included when
applying under any program. Single-family homes in a specific subdivision are not excluded
from HCR’s site control requirements provided they meet all tax credit eligibility requirements
(e.g. income restricted rental housing).
NOTE: SITE CONTROL DOCUMENTATION IN THE FORM OF A CONTRACT OF SALE,
OPTION, OR LEASE MUST BE IN THE NAME OF THE APPLICANT OR AN AFFILIATE
OF THE APPLICANT AND BE LEGALLY BINDING AT THE TIME OF APPLICATION.
FOR PURPOSES OF DETERMINING SITE CONTROL, AN AFFILIATE SHALL BE
DEFINED AS AN ENTITY CONTROLLED BY OR IN CONTROL OF THE APPLICANT.
THE RELATIONSHIP BETWEEN THE APPLICANT AND THE AFFILIATE MUST BE
PRECISELY DESCRIBED AND DOCUMENTED IN THE APPLICATION FOR FUNDING.
Acceptable forms of site control, in order of HCR preference, include:
A deed evidencing ownership by applicant or affiliate;
A title report not more than 90 days old at the time of submission showing that the
applicant or affiliate holds title;
A contract of sale which describes the terms and conditions for the conveyance of
title to the applicant or affiliate of the site at a designated price during a specific
period;
An option for the applicant or affiliate to purchase, which is renewable or with a
term that continues at least six months beyond the date of application. For
Office of Finance and Development
Capital Programs Manual
Page 10 of 71
HOME/PBV projects, purchase options must be conditioned on completion of
HUD environmental review prior to closing;
A local Land Disposition Agreement with the applicant or affiliate;
A letter from a public agency providing a site to the applicant or affiliate under
specified conditions within a time frame consistent with the proposed
Development Timetable;
A site control letter from the NYC Department of Housing Preservation and
Development (HPD) which specifies expiration date and clearly matches property
included in plans and project summary; or,
A lease of the site by the applicant or affiliate with a term that equals the
applicable program's regulatory period.
HCR reserves the right to accept other evidence of site control for State or Federally
owned sites, sites owned by local municipalities or those owned by entities affiliated with the
State or Federal government. If a site is owned by any governmental entity, the applicant should
describe the current status of the project site in the land disposition process. Any deed
restrictions or restrictions on use must be affirmatively declared at application submission. HCR
reserves the right to object to any restrictions which may negatively impact agency statutes, rules
or regulations.
5.03.02 Site Acquisition
If the project includes the acquisition of property, the applicant must document the
absence of encumbrances which would impair the applicant's ability to complete the project. The
applicant is required to disclose any liens on the property and/or if the seller is subject to a
bankruptcy proceeding or if the property is subject to a foreclosure proceeding. The site purchase
price must be documented in a fixed price purchase contract or a fixed price option to purchase
the property. Such contracts or options must allow for the site acquisition to occur in a timely
manner.
Only that portion of the site's value which is necessary for the project may be recognized
as a project cost. If a parcel larger than is necessary for the proposed project is to be purchased
in anticipation of future development, the acquisition cost must be apportioned between all
Office of Finance and Development
Capital Programs Manual
Page 11 of 71
potential phases. The applicant must provide a clear rationale for the basis of the apportionment.
The specific amount of the site purchase price to be recognized as a project cost is limited to the
lesser of the purchase price or the value established by an appraisal acceptable to HCR (see
Section 5.03.03). Notwithstanding the appraisal’s determination of value, HCR reserves the right
to reduce acquisition cost based upon cost containment considerations. Costs related to
acquisition which also may be eligible project costs, depending on the specific program, include:
legal fees; financing costs; mortgage recording tax; tax escrow payments; insurance premiums;
water and sewer charges prior to construction; recording and filing fees; appraisal fees; title
search and insurance costs; site surveys; and other related costs. If the seller has an identity of
interest with any participant involved with the project, then it must be disclosed in the
application. Applicants must submit evidence prior to the Construction Closing that the
following activities have occurred, regardless of whether or not the site is already owned by the
applicant or owner:
(i) all necessary site acquisition documents have been recorded and filed;
(ii) a title search has been conducted;
(iii) all required insurances have been obtained; and,
(iv) site survey-certified to the applicant/awardee, HTFC and the Title Insurance Co.
A survey of the premises prepared by a registered land surveyor in accordance
with American Land Title Association/American Congress on Surveying and
Mapping (ALTA/ACSM) Minimum Standard Detail Requirements for Land Title
Surveys and dated or re-dated not more than 30 days before the closing. The
following additional items, which should be considered government agency
survey-related requirements, shall be shown on the survey:
a. legend of all symbols and abbreviations used with statement of scale;
b. vicinity map;
c. flood zone designation;
d. all improvements with current zoning classification and setback lines;
e. parking areas and, if striped the striping and number of parking places;
f. indication of access to the public way such as curb cuts, driveways marked;
Office of Finance and Development
Capital Programs Manual
Page 12 of 71
g. location of all utilities serving the property, including manholes, catch basins,
valve vaults or other surface indications of subterranean uses;
h. all wires and cables (including their function) crossing the surveyed premises, and
the poles on or within ten feet of the surveyed premises, and the dimensions of all
cross wires or overhangs affecting the surveyed premises;
i. directionals (bearings), courses, curved data and measured distances of the
premises necessary to compute a mathematical closure;
j. observable evidence of cemeteries;
k. address(es) of improvement(s) as observed from fieldwork;
l. distance from point of beginning to nearest intersecting public street;
m. wetland delineation markers or that none were observed;
n. plottable on and off-site (appurtenant) easements or servitudes delineated; and,
o. significant fieldwork observations not otherwise disclosed by a title report or
abstract of title.
For projects requesting LIHC/SLIHC, acquisition costs of an existing building(s) to be
rehabilitated may not exceed twenty-five percent of the total development cost of the project
unless it meets the definitions of a High Acquisition Cost Project and a Preservation Project, as
set forth in Sections 2040.2(i) and 2040.2(q) of the 9% LIHC QAP, respectively, and the
threshold eligibility criteria at Section 2040.3(e)(15) of the QAP. The standards which a project
involving the acquisition of an existing building(s) must meet in order to qualify as a
Preservation Project are described in Section 5.05.01 below.
5.03.03 Appraisals
Appraisals are required for any project with a total budgeted acquisition cost of more
than $100,000. If there is an identity of interest between the seller and any project participant, or
if an applicant proposed the use of HOME funds, an appraisal must be provided even if the
acquisition cost is below $100,000.
Post award, if necessary, HCR may require a second appraisal for further documentation
of site value. In any case, the applicant should reference the types of certifications below to
Office of Finance and Development
Capital Programs Manual
Page 13 of 71
determine the minimum qualifications necessary. All appraisals should be conducted pursuant to
a contract between the applicant and the appraiser or pursuant to a contract between a lender and
an appraiser which meets HCR appraisal standards.
An acceptable appraisal must document and conclusively estimate the "as is" fair market
value of the site and provide separate evaluation for the land and structure in a rehabilitation
project. Fair market value is the price which a property will most probably bring in a competitive
and open market under all conditions requisite to a fair sale, assuming the price is not affected by
undue stimulus including special public financing amounts or terms, and that the buyer and seller
act prudently and knowledgeably.
The following are the minimum requirements for an acceptable appraisal:
1) Must be certified to NYS Division of Housing and Community Renewal/Housing Trust
Fund Corporation.
2) Must be prepared no earlier than six months prior to the date of the application.
Appraisals prepared more than six months, but less than one year, prior to the date of the
application will be accepted, if the appraiser provides a letter confirming that the
appraisal remains valid given current market conditions. In no instance, will HCR accept
an appraisal prepared one year or more prior to the date of application.
3) Appraiser must have the appropriate certification/license to undertake the scope of the
project:
a. NYS Licensed Real Estate Appraiser: non-complex, residential properties with a
transaction value of less than $1 million and non-complex, nonresidential
properties with a transaction value of less than $250,000.
b. NYS Certified Real Estate Residential Appraiser: all residential, noncomplex
properties and non-residential, non-complex properties with a transaction value of
less than $250,000.
c. NYS Certified Real Estate General Appraiser: appraisals on all types of real
property regardless of transaction value or complexity.
4) Must comply with the Uniform Standards of Professional Appraisal Practice.
5) Must use the income, market, and replacement cost approaches (see Glossary under
"Appraisal") in estimating the fair market value of the site. For vacant land, or where both
Office of Finance and Development
Capital Programs Manual
Page 14 of 71
the prior and proposed use of the property is a one to four-unit dwelling, only the market
approach is required.
6) For vacant land the “as is” value should be documented on a per acre basis (in NYC on a
per buildable square foot basis) AND on a per unit basis.
7) In selecting comparable sales, appraisers should not use prior sales of property sold to be
developed as affordable housing. Significant deviations in value from comparable sales
must be fully explained in the appraisal.
8) Must describe local economic conditions and analyze physical, demographic, economic
and governmental factors affecting the highest and best use of the site except where
transaction values for the acquisition of vacant land are less than $100,000.
9) Must provide a sales and ownership history for the last three sales, or the last 10 years,
whichever is the shorter time period.
Other comments such as extraordinary assumptions and type of transaction (i.e., arms-
length) together with a table of contents and pagination will assist in the determination of site
value.
5.03.04 Physical Needs Assessment
The goal of the design requirements is to encourage the development of housing units
that have a long-life expectancy and that are durable, accessible, adaptable, relatively
maintenance free, and provide quality living facilities. All applicants who are requesting funding
for the renovation of an existing structure(s) must complete and submit the Physical Needs
Assessment Form (PNAF), which is an attachment in the UF Project Application. The applicant
must request a site visit from HCR to enable staff to observe the building’s existing condition
and discuss proposed renovations no later than 30 days PRIOR to the application submission.
Office of Finance and Development
Capital Programs Manual
Page 15 of 71
Section: 5.00 DEVELOPMENT REQUIREMENTS
Sub Section: 5.04 Design Requirements
The design requirements contained in the HTFC Design Handbook apply to all projects,
funded with HOME or HTF or as otherwise specified in the annual RFP. The goal of the design
requirements is to encourage the development of housing units that have a long-life expectancy
and that are durable, accessible, adaptable, relatively maintenance free, and provide quality
living facilities. Housing planned for historic neighborhoods should reflect the historic and
cultural environment in size, scale and material, while housing planned for rural areas should be
developed to reflect the character of the environment. For detailed information refer to the
current HTFC Design Handbook: http://www.nyshcr.org/Publications/DesignHandbook/.
Office of Finance and Development
Capital Programs Manual
Page 16 of 71
Section: 5.00 DEVELOPMENT REQUIREMENTS
Sub Section: 5.05 Project Costs
All funded projects are subject to the project cost standards set forth below.
A project must provide housing which represents good value for the State's investment. In
making this determination, HCR reviews the total project cost (as defined in the Glossary) to ensure
that acquisition and development costs fall within established guidelines. Applicants should note the
following standards for the various costs included in the total project cost. These standards should be
used as a guide only, over or under budgeting of costs will impact the project’s underwriting
assessment, eligibility review and/or scoring. The applicant should also refer to Section 2.00 of this
Manual to determine eligible costs for the specific funding program(s).
The development costs must reflect the costs of the entire project, even if portions of the
project are not financed by HCR or are owned by an entity other than the LP/LLC owner of the
residential project. For example, a project proposing non-residential space, unfinanced by HCR, and
to be owned by a separate owner under a condominium structure, must provide a non-residential
development budget for that space. HCR must see a viable plan of finance for the entire
building/project.
(i) Acquisition Costs - The HOME and the HDF Programs are the only HCR programs
for which the total program award may be used for acquisition costs. The HTF statute
prohibits using more than fifty percent of the HTF award for site acquisition. For
projects requesting LIHC/SLIHC, acquisition costs of an existing building(s) to be
rehabilitated may not exceed twenty-five percent of the total development cost of the
project unless the project meets the definitions of a High Acquisition Cost Project and
a Preservation Project, as set forth in Sections 2040.2(i) and 2040.2(q) of the 9%
LIHC QAP, respectively, and the threshold eligibility criteria at Section
2040.3(e)(15) of the QAP. The standards which a project involving the acquisition of
an existing building(s) must meet in order to qualify as a Preservation Project are
described in Section 5.05.01 below.
Office of Finance and Development
Capital Programs Manual
Page 17 of 71
(ii) Total Development Cost (TDC) - should reflect the reasonable and necessary cost of
producing low-income housing; cost effectiveness will be an integral part of the
technical reviews.
(iii) Construction Costs and Soft Costs - generally, the ratio of construction costs to soft
costs should be eighty percent (construction costs) to twenty percent (soft costs).
PLEASE NOTE: For off-site costs, only those off-site costs directly associated with
the project will be considered eligible for funding through HCR programs. For
projects proposing future phases at the same site, which include shared infrastructure,
access roads, and/or common use facilities, only the costs attributable to the project
seeking funding will be recognized by HCR as an eligible project cost. As with land
cost associated with multi-phased project site work development, costs that will
benefit other phases must be equitably prorated. Generally, only the costs associated
with the scope of work necessary for the project being considered for funding should
be included in the development budget. If it is necessary to include costs attributable
to future phases (e.g., single contract for site work), the applicant must show those
costs being paid for by a developer/sponsor equity contribution. The applicant must
provide a summary of shared costs and explain the basis of the pro-ration of costs
among phases. Future developments and/or phases may be subject to reimbursing
site development costs to HCR, if such future development obtains a benefit from the
subject project’s development.
Office space costs included in the residential budget must be limited to the space
necessary for project management staff, and in the case of supportive housing
projects, space required to provide necessary services to residents with special needs.
Any proposed office space to be used for purposes not directly related to the project,
e.g., general administrative office space of a Public Housing Authority or a non-profit
service agency, is non-residential space, and it must be budgeted in the appropriate
non-residential budget.
General Requirements – see Glossary for definition and examples.
(iv) Builder's Fees - up to two percent of construction costs may be used for builder's
overhead; up to six percent of construction costs may be used for general conditions
Office of Finance and Development
Capital Programs Manual
Page 18 of 71
(see Glossary for definition and examples); and up to six percent of construction costs
may be used for builder's profit. To the extent allowed by other project funding
sources, HCR will allow flexibility within these three categories as long as the 14%
cap is not exceeded. Increases in builder’s fees from the time of award for projects
which have an identity of interest between the general contractor and owner/applicant
will not be allowed.
(v) Payment and Performance Bond Premium – generally one to two percent of
construction costs are allowed for a Payment and Performance Bond Premium (see
Section 5.10, Insurance Requirements). Projects utilizing HCR for construction
financing must include a Payment and Performance Bond.
(vi) Developer’s Fee – projects financed by LIHC and/or SLIHC are allowed a maximum
fee that ranges from ten percent to fifteen percent of the development cost; the
applicant should refer to the QAP (Section 2040.3 (g)(2)(ii)) for more specific
information. The following restrictions on developer fee apply:
a. Developer fee may not be earned on project contingency.
b. Developer fee may not be claimed on any units which will not be regulated by HCR.
c. In projects proposing non-residential space, developer fee will not be allowed on that
space except for IRS Section 42 qualified Community Service Facilities.
d. In preservation projects where the acquisition of a building includes the assumption
of existing debt, no developer fee may be earned on those loans.
e. In multi-phases projects where a prior phase was previously awarded tax credits, the
developer fee will be limited to no more than 10% of the developer fee eligible costs
recognized by HCR.
f. For High Cost projects that exceed the 130% of the cost region median for the
funding round, the following developer fee limits apply:
i. Costs > 130% and < 140%: median: 13% maximum
ii. Costs > 140% and < 150% median: 12% maximum
iii. Costs > 150% and < 160% median: 11% maximum
iv. Costs > 160% median: 10% maximum
Office of Finance and Development
Capital Programs Manual
Page 19 of 71
HCR many consider a higher percentage fee based upon specific project
characteristics.
The HCR approved developer fee is set at the time of the initial underwriting
assessment, and subsequent increases in fee will not be allowed. All projects that
include Project Based Section 8 vouchers, regardless of the agency providing the
vouchers, will be limited to a maximum fee of twelve percent (see Section 5.07
Subsidy Layering Review Process for detailed information).
Developer fees provide a cushion against construction, lease up risks, and other
unforeseen expenses. Therefore, at initial application review, requests for funding
which require that greater than one third of the anticipated fee be deferred will be
deemed not to have satisfied HCR’s underwriting standards, provided however, that
the agency reserves the right to award projects with deferral of fees in excess of this
standard based on an overall assessment of the financial risk and/or the availability of
funding. If the required developer fee deferral for projects with cash flow over $35
pu/pm (see Section 5.07 (iii.) Operating Budget) exceeds 1/3 of the developer fee,
HCR will allow this. For projects, involving significant financing under a program
financed by a housing agency of the City of New York, HCR will allow the deferral
of more than 1/3 of the developer fee as a permanent source of financing, if the
deferral is an underwriting requirement of the City agency. Any applicant who
proposes to defer a portion of their development fee must include a schedule of
repayment in the 15-year operating budget projection. This repayment must be made
from funds available after the payment of project expenses, all debt service (including
HCR subsidy debt), and payments to required reserves.
During the construction period, which is defined as the period from construction
financing closing through conversion to permanent financing, the amount of
developer fee that may be paid during construction is limited to a maximum of 25%.
Further, no more than 10% (for profit developers) or 15% (not-for-profit developers)
of the total budgeted developer fee may be paid prior to the issuance of a Certificate
of Occupancy (CO) or Temporary Certificate of Occupancy (TCO) for all project
units. Once a CO/TCO has been issued for all project units, up to 25% of the
Office of Finance and Development
Capital Programs Manual
Page 20 of 71
developer fee may be paid. The remainder of the fee may be paid at the time of
permanent financing conversion. Applicants must show 75% of the proposed
developer fee deferred as a construction financing source in the development budget.
These requirements must be reflected in financing commitments submitted at the time
of application, and if funded, prior to construction financing closing.
(vii) Project Contingency - up to ten percent of the sum of total soft costs and contractor's
cost (excluding builder’s fees) for projects involving the rehabilitation of a vacant
building and small non-tax credit projects, and up to five percent for new construction
projects and tenant occupied-rehabilitation/preservation projects. Please see the
glossary for the definition of Project Contingency.
(viii) Professional Fees – in general, HCR expects the project developer to perform all
work necessary to bring the project to completion. HCR may recognize fees for
professional services for highly technical and/or specific project activities which are
not traditionally performed by the project developer, including fees for the project
architect, legal counsel, engineer, surveyor, accountant, environmental monitoring,
energy efficiency modeling and testing, and green building consultant as required.
The following specific limits apply to architect’s and legal counsel fees:
a. Architecture/Engineering Fees – up to 5% of total construction cost may be
allowed for project design and 2% of total construction cost for construction
supervision, with higher fees allowed for smaller projects, historic
preservation projects or projects with other unique/difficult issues. Lower fees
are expected for projects that are large scale, new construction, multiple
buildings of the same design, and/or subsequent phases of a similar project.
b. Legal Fees – project sponsor attorney’s fees are limited to one percent of the
total development cost.
(ix) Housing Consultant Fees – This refers to fees charged by housing consultants to
perform development activities on behalf of the developer, e.g. packaging of
applications for funding; advising developer on the use of historic tax credits or
brownfield tax credits; assisting with obtaining real property tax abatement, etc.
Office of Finance and Development
Capital Programs Manual
Page 21 of 71
Housing consultant fees are not an allowable cost for projects that include
LIHC/SLIHC equity as a funding source. The maximum in total that will be allowed
for a housing consultant(s) is the lesser of five percent of the HCR requested
financing or $100,000.
(x) Developer's Allowance – projects that do not involve financing with SLIHC or LIHC
may budget a developer’s allowance as a project cost. The amount of the Developer’s
Allowance is limited to ten percent of total development costs, excluding acquisition
and project contingency. Developer’s allowance may not be claimed on any units
which not regulated by HCR. When a housing consultant’s services are used in
connection with the project, the housing consultant’s fee will be subtracted from the
Developer Allowance cap to arrive at the amount that the participant is entitled to
receive.
If HCR funds are provided during construction, which is defined as the period from
construction financing closing through conversion to permanent financing, the
maximum amount of developer allowance that may be paid during construction is
limited to 25%. For projects with a for-profit developer, no more than 10% of the
allowance may be paid prior to the issuance of a CO or TCO, for all project units. For
projects with a not-for-profit developer, the limit is 15%. Once a TCO/CO is issued
for all units the remainder of the 25% may be paid. The 75% balance must be held
back until the time of the permanent financing conversion as an incentive payment for
successfully completing the project.
(xi) Construction Manager’s Fees (CM) - this fee is only available to projects without a
builder as defined in the glossary and when the CM responsibilities include all
traditional, non-builder, administrative services. CM fees shall be limited to five
percent of total construction cost, and builder’s overhead and profit may not be
claimed. CM’s will only be recognized in this role when the developer has shown the
capacity to guarantee the completion of construction and has the sophistication to
manage multiple prime contracts on one construction project.
(xii) Working Capital - up to two percent of the total development cost is allowed for
Working Capital; escrows for taxes and insurance are generally limited to six months’
Office of Finance and Development
Capital Programs Manual
Page 22 of 71
expense, supplemental management fees should be no more than one quarter of the
monthly gross rent roll; applicants must itemize all items included in working capital
and demonstrate need; and any working capital remaining after the project has been
in operation for one year should be transferred to the operating reserve.
(xiii) Reserve Funds - an initial deposit to project reserve funds may be required under
certain programs. The applicant should review the Underwriting Criteria for
Operating Budgets (Sub-Section 5.06(iii)) and Project Operating and Management
Requirements (Section 7) of this Manual. HOME funds may not be used to provide
capitalization of either an operating or replacement reserve account. HCR funds may
be used to capitalize a replacement reserve, but may not be used to capitalize an
operating reserve.
a. Replacement Reserve (see Glossary for definition) - replacement reserves
are generally funded from an annual contribution included in the operating
budget. For HTF and HOME-funded projects which include LIHC and/or
SLIHC as a financing source, an initial capitalization of the replacement
reserve equal to $1,000 per unit is required. HOME projects must utilize a
non-HOME source, such as LIHC equity, to cover the replacement reserve
capitalization. No initial capitalization is required for HTF or HOME
projects which do not include LIHC or SLIHC as sources.
b.Operating Reserve (see Glossary for definition) - The operating reserve
may be funded with annual contributions and/or with an initial
capitalization (as reflected in the development budget). The applicant
should review specific program requirements for each program under
which the application is submitted to determine if the initial capitalization
of operating reserves is allowed and under what circumstances. Applicants
participating as private developers in the HTF and HOME Programs, and
all applicants proposing projects funded with LIHC/SLIHC, are required to
make a cash equity contribution to the Operating Reserve equal to the
lesser of one percent of the total development cost or 50% of project gross
rent. Those HTF/HOME projects which capitalize the reserve in an amount
Office of Finance and Development
Capital Programs Manual
Page 23 of 71
equal to one percent of total development cost will be required to make
annual contributions until the Operating Reserve reaches the cap of 50
percent of project gross rent.
(xiv) Adjustors – HCR must be notified of any equity adjustors to a project in the
investor/syndication letter required for 8609 submission. For any project receiving an
upward adjustor, HCR must be notified of the final upward adjustor amount within
five (5) business days of receipt of notification from the investor. The upward
adjustor must be documented in a letter from the investor confirming the final amount
of the adjustor. To the extent any amount of the adjustor exceeds the amount of the
permanent deferred developer fee identified at the final underwrite of the project, the
excess adjustor proceeds must be placed into the project replacement reserve account
no later than five (5) days of receipt. HCR must be provided with evidence of the
deposit of the funds into the replacement reserve account.
Office of Finance and Development
Capital Programs Manual
Page 24 of 71
Section: 5.00 DEVELOPMENT REQUIREMENTS
Sub Section: 5.06 Preservation Projects
In order for DHCR/HTFC to consider a project as a Preservation Project, the project must
meet the definition for a Preservation Project as set forth in Section 2020.2(q) of the DHCR 9%
LIHC QAP, as further elaborated upon herein.
Meeting the criteria for a Preservation Project is required if a project application requesting
LIHC/SLIHC includes the rehabilitation of any building(s) in which the acquisition cost of the
building(s) exceeds 25% of the project’s total development cost. Pursuant to the LIHC/SLIHC
threshold eligibility standard at Section 2040.3(e)(15) of the QAP, acquisition cost may not exceed
25% of the total development costs of the project unless it meets the QAP definition (Section
2020.2(q)) or receives a determination by the Commissioner of DHCR that the preservation of the
building(s) is in the best interest of New York State.
A Preservation Project is one in which residential property is rehabilitated to extend its useful
life to serve as affordable housing, and averts the loss of currently government regulated affordable
rental housing serving the housing needs of a population whose housing need would justify the
replacement of the housing if it ceased to be available to that population. The scope of the
rehabilitation and proposed operating budget must be sufficient for the project to function in good
repair as affordable housing for a period equal to at least 30 years from the date of issuance of the
final credit allocation. Applicants proposing a Preservation Project must demonstrate how the project
averts the loss of affordable housing, including submission of a physical needs assessment, and must
describe and document: a) any regulatory, financial and economic circumstances which impact the
project’s operating viability and could precipitate the loss of or risk the availability of the project to
low-income households; and b) a compelling rationale for preserving the existing project based
upon economic conditions including the availability of alternative affordable housing, market rents,
vacancy rates, and current and future demand.
Preservation projects that are still subject to regulatory agreements with HCR or any of its
agencies must also provide a compelling rationale explaining why it is in the State’s interests for
HCR to release the current ownership from their existing obligations to the State if a transfer of
ownership is proposed in the application. Preference in the award of Preservation projects will be
Office of Finance and Development
Capital Programs Manual
Page 25 of 71
given to applications that minimize transaction costs, including acquisition costs and developer’s
fees, and that maximize the amount of resources devoted to physical improvements and
rehabilitation.
Applicants must request a site visit from HCR to observe the building’s existing condition,
and to discuss proposed renovations PRIOR to submission of the application. Requests for site visits
must be made no later than 30 days prior to the application deadline under which the applicant
intends to submit. At a minimum, a draft physical needs assessment form utilizing application
Attachment B6 must accompany this request. Projects which are also requesting HTF or HOME
funds from HCR, shall use the HTFC physical needs assessment form, application Attachment B13,
instead. Preservation projects that propose a substantial, gut-rehabilitation, that will be replacing all
existing systems with new, are not required to submit a physical needs assessment form for this visit,
or with the application. Such proposals shall provide a preliminary set of design documents with the
site visit request. HCR reserves the right to require modifications of a proposed scope of work based
on the results of its site visit and review of the physical needs assessment.
Note: a project which includes the rehabilitation of any building(s) in which the acquisition
costs exceed 25 percent of the total development costs of the project are ineligible for funding under
Section 2040.3(e)(15) of the 9% LIHC QAP unless the project meets the Preservation project
definition or HCR has otherwise determined that the preservation of the building(s) is in the best
interest of the State.
Failure to meet the above requirements will result in exclusion from the Preservation Project
funding set-aside. As a condition of any potential award, and may result in an ineligibility
determination if acquisition exceeds 25% of the total development cost of the project. Where
project acquisition cost includes the assumption of existing loans, HCR will not allow a developer
fee to be earned on the portion of acquisition attributable to such loans.
Preservation Projects proposing the redevelopment of public housing must meet the criteria
and conditions for approvals under the New York State Public Housing Law. Such projects may
include the economic restructuring and rehabilitation of an existing public housing project.
Applicants must have a pre-application meeting with HCR’s Finance & Development and Public
Housing units regarding the review and approval of the redevelopment plan prior to submitting an
application for funding.
Office of Finance and Development
Capital Programs Manual
Page 26 of 71
For Preservation Projects, which are also High Acquisition Cost Projects, the amount of the
developer’s fee recognized by HCR shall be based on an assessment of risk assumed by the project
owner, considering factors including, but not limited to: rent subsidies or other project operating
support, location, financing sources, occupancy level, project type, and identities of interest.
Office of Finance and Development
Capital Programs Manual
Page 27 of 71
Section: 5.00 DEVELOPMENT REQUIREMENTS
Sub Section: 5.07 Underwriting Standards
All funded projects are subject to the underwriting criteria set forth below. Where federal
programs are involved (e.g. HOME, LIHC), HCR may be required to certify to the pertinent federal
agency that these projects receive only the level of funding necessary to develop the specific
affordable housing project. To comply with these requirements, applicants that propose projects
involving other federal capital funding requirements or rental/operating subsidies (i.e., CDBG or
Section 8) may be requested to provide additional information. For projects involving Project–
Based Section 8 Voucher assistance and LIHC, the Federal Housing and Economic Recovery Act of
2008 authorizes HCR, as a housing credit agency, to perform the HUD-required subsidy layering
review for such projects. Please refer to CPM Section 5.08 for detailed information on the subsidy
layering review process.
Applicants must establish the following: that there is market support for the project; in
general, the proposed rents are equal to or less than comparable rents for the area; the estimated
project income is sufficient to pay the estimated operating expenses, including any reserve fund
contribution and debt service contained in the financing plan; and the reasonableness of operating
and development budgets. In doing so, the applicant must address the following in the UF
application:
I. Market Support of Project
Applicants must firmly establish that a sufficient number of income-eligible households exist in the
proposed market area who can afford the project rents and who can be expected to live in the project.
In areas with comparable housing under development, HCR may wait until any project under
development is built and rented prior to funding an additional project in the market area. The
exception to this will be those projects that are part of a coordinated housing/community
development or neighborhood revitalization strategy or projects serving a special needs population.
To establish market, applicants must submit a market analysis or a comprehensive market study,
depending on the project type and location as indicated in the chart below.
Office of Finance and Development
Capital Programs Manual
Page 28 of 71
Comprehensive Market Study
Required
Market Analysis Required
• LIHC/SLIHC projects outside of the
New York City
• Projects located in NYC regardless of
size or type
• Non-tax credit projects of more than
15 units outside of the New York City
• Non- tax credit projects of 15 units or
less
• Non-tax credit preservation projects of
more than 15 units with average
occupancy below 90% for the 12
months prior to application submission
• Non-tax credit preservation projects of
more than 15 units with average
occupancy of 90% or higher for the 12
months prior to application
submission
(a) A comprehensive market study must be performed by a disinterested, professional
market analyst who has been pre-qualified by HCR. The study must comply with the
HCR Market Study Content Guidelines detailed below in this section. A listing of the
currently approved analysts is maintained on the agency website. Market studies
performed by an analyst not on the pre-approved list will not be accepted. The
market study must demonstrate that the proposed number and type of units meet an
existing and identified need of low-income individuals and can be readily absorbed
by existing need in the local area. Applicants proposing projects located within the
City of New York may prepare a market analysis utilizing data and housing trends
from the most current report issued by the New York City Rent Guidelines Board.
(b) A market analysis is prepared by the project applicant. The market analysis should
include:
i. surveys identifying potential tenants and/or housing studies recently
conducted by public agencies documenting need for the proposed units;
ii. information on waiting lists from other projects in the market area providing
housing of the same general type and with comparable rents; and,
Office of Finance and Development
Capital Programs Manual
Page 29 of 71
iii. commitments on leases and/or referral of households financially assisted by
social services or public health programs.
The analysis must consider the geographic area from which households are expected to be
drawn (Primary Market Area or PMA), the number of income-eligible households within that area
able to afford the required monthly housing expense, current vacancy rates, the impact of the project
on other housing stock (including other publicly assisted housing), rents of similar housing in close
proximity to the proposed project, identification of other comparable housing that is planned or
under development, and the availability of project-based rent subsidies. Applications for projects in
the City of New York must submit a market analysis utilizing data from the most current New York
City Rent Guidelines Board Report.
HCR Market Study Content Guidelines
A. Executive Summary. Each market study must include a concise summary of the data, analysis
and conclusions, including the following:
A concise description of the site, adjacent parcels and the immediately surrounding area;
A brief summary of the project including the type of construction, number of buildings,
number and type of units, proposed rents and the proposed population to be served;
Precise statement of key conclusions reached by the analyst;
Precise statement of analyst's opinion of market feasibility including the prospect for long
term performance of the property given housing and demographic trends and economic
factors;
Provide recommendations and/or suggest modifications to the proposed project; and,
Provide a summary of market related strengths and/or weaknesses which may influence the
subject development’s marketability, including compatibility with surrounding uses, the
appropriateness of the subject property’s location, unit sizes and configuration, and number
of units.
B. Project Description. The market study must include a project description to show the analyst’s
understanding of the project at the point in time the market study is undertaken. The project
description should include:
Office of Finance and Development
Capital Programs Manual
Page 30 of 71
Proposed number of units specifying the number of bedrooms and baths, income limit as a
percent of Area Median Income (AMI), unit size in square feet and utility allowances for
tenant paid utilities, proposed rents, and target population, including income restrictions, and
any special needs set-asides;
The utilities expected to be paid by tenants and energy sources for tenant paid hot water,
heat, and cooking; and,
For existing occupied properties, identification of any existing assisted housing program
under which the property is currently regulated such as Section 8, Section 202, Section 811,
Section 236, etc., as well as current occupancy levels, current rents, and proposed rents.
C. Location and Market Area Definition. The Primary Market Area (PMA) is the geographic area
from which a property is expected to draw the majority of its residents.
Define the PMA, including a map that clearly delineates the PMA, and provide a clear
explanation of the basis for the boundaries of the PMA. Identify PMA boundaries by
municipality(ies), census tracts/block groups, street/highway names, or other appropriate
geographic features (e.g., a river) forming the boundaries. Also, define the larger geographic
area in which the PMA is located (i.e., city, county, Metropolitan Statistical Area (MSA),
etc.). Projects in the City of New York should indicate the Community Board in which the
project is located. Applicants are strongly encouraged to use entire census tracts or block
groups in defining the PMA.
Provide photographs of the site and neighborhood, and a map clearly identifying the location
of the project and the closest transportation linkages, shopping, schools, medical services,
public transportation, places of worship, and other services such as libraries, community
centers, bank, etc. In situations where it is not feasible to show all the categories on a map,
the categories may be addressed in the narrative.
Describe the marketability of the proposed development.
Provide information or statistics on crime in the PMA relative to data for the overall area.
D. Population and Households
Office of Finance and Development
Capital Programs Manual
Page 31 of 71
Provide total population, age, and income target data for the PMA using the most recent US
Census, current year estimates, and a five-year projection. Data from other legitimate studies,
such as Claritas, CACI and similar demographic information companies, with detail on
household size, tenure, age, and other relevant categories may be provided. Provide the same
information for the Secondary Market Area (SMA), if one has been defined. Indicate the
source for all data and provide a methodology for estimates. Demand for the proposed units
must come from within the PMA. The SMA should not be considered in the calculation of
capture rates.
Provide a breakdown of households by tenure for most recent US Census, current year, and
five-year projection.
Provide an analysis of trends indicated by the data and include reference sources for the data
and methodology for analyzing the data.
Provide a breakdown of households by incomes in $5,000-$10,000 increments, by household
size and by tenure for the most recent US Census, current year, and five-year projection.
E. Employment and Economy.
• Provide data and analysis on the employment and economy of the PMA to give an
understanding of the overall economic health of the community in which the PMA is located.
List sources for the data and methodology for the analysis.
Provide a description of employment by industry sector for the PMA or smallest geographic
area available that includes the PMA and compare the data to the larger geographic area (e.g.,
the city, county, labor market area, or MSA).
List major employers in the PMA, the type of business, and the number employed, and
compare the data to the larger geographic area (i.e. MSA, County, etc.).
Show the historical unemployment rate for the last ten years (or other appropriate period) for
the PMA and compare to the larger geographic area (i.e., MSA, County, etc.).
Show employment trends over the same period or a more recent, shorter period (last 5 years).
Compare to the larger geographic area.
Comment on trends for employment in the PMA in relation to the subject development.
Office of Finance and Development
Capital Programs Manual
Page 32 of 71
If relevant, comment on the availability of affordable housing for employees of businesses
and industries that draw from the PMA.
Provide a breakdown of typical wages by occupation.
Provide commuting patterns for workers such as how many workers in the PMA commute
from surrounding areas outside the PMA.
F. Existing Rental Housing.
• Provide information on other multifamily rental housing in the PMA and any rental housing
proposed to be developed in the PMA. This section of the study should include:
If relevant in the market, a 10-year, or other appropriate period, history of building permits, if
available, by housing type and comments on building trends in relation to household trends.
Identify a list of existing comparable and competitive properties, including: name; location;
population served; type of design; age and condition; number of units by bedroom type; rent
levels; number of bedrooms and baths for each unit type; size in square footage of units;
kitchen equipment; type of utilities (state whether paid by tenant or owner and energy
sources for hot water, heat and cooking); and unit and site amenities included. Also, if
available, site staffing, occupancy rate, and absorption history for the property (if recently
completed). Provide the name, address and phone number of the property contact. Attach
photos of each comparable property. Include a map showing the location of each comparable
property in relation to the subject.
A comparable property is one that is representative of the rental housing choices of the PMA
and that is similar in construction, size, amenities, location, and/or age. A competitive
property is comparable to the proposed project and competes at nearly the same rent levels
and tenant profile, such as age, family, or income.
Describe the size of the overall rental market in the PMA, including the proportion of market
rate and affordable housing properties.
Provide a narrative evaluation of the subject property in relation to the comparable
properties, and identify the competitive properties, which are most similar to the proposed
development. The analyst should state why the comparables referenced have been selected,
Office of Finance and Development
Capital Programs Manual
Page 33 of 71
which are the most directly comparable, and explain why certain projects have not been
referenced.
For each comparable property, provide comparisons to the subject rents based on the
comparable property amenities, tenant paid utilities, location, parking, concessions, and rent
increase or decrease trends.
Only directly comparable projects should be used to derive the market rents in the PMA for
use in evaluating the competitive advantage of the project rents. Market rents should be
adjusted for owner paid utilities included in the rent. Including conventional projects with
superior amenities, location, design, and larger unit sizes in determining the market rent is
not acceptable. For example, the use of 1200 sq. ft. townhome style apartment units as a
comparable for a project with 850 sq. ft., two bedroom units with limited amenities is not
reasonable or acceptable.
Discuss the availability of affordable housing options, including purchase or sale of homes.
When relevant, include a list of LIHC/SLIHC, USDA RD, HUD 202, and other federal, State
or locally funded projects with allocations/awards in or near the market area that are not
placed in service, giving as much known detail as possible on estimated placed-in-service
dates, unit mix, and income to be served.
Discuss the impact of the subject development on the existing housing stock.
Describe the market vacancy rate for the PMA rental housing stock by population served
(i.e., market rate, LIHC, and Project Based Rental Assistance) and type of occupancy (i.e.,
family, seniors, and special populations) and unit size.
Identify the number of people on waiting lists for each project. Indicate if the households
have been income qualified, and when the wait list was last updated.
G. Local Perspective of Rental Housing Market and Housing Alternatives. The market study
should include a summary of the local perspective on the rental market, need for the proposed
housing, and unmet housing needs in the market. The local perspective should include:
Interviews with local planners, housing and community development officials, and market
participants to estimate proposed additions to the supply of housing that would compete with
the subject development and to evaluate the local perception of need for additional housing;
Office of Finance and Development
Capital Programs Manual
Page 34 of 71
Interview local Public Housing Authority (PHA) officials and seek comment on need for
housing and possible impact of the proposed development on their housing inventory and
waiting lists for assisted housing. Include a statement on the number and availability of
Housing Choice Vouchers and the number and types of households on the waiting lists for
Housing Choice Vouchers. Compare subject development’s proposed rents to local payments
standards or median rents; and,
The cost and availability of home ownership and mobile home living, if applicable.
H. Analysis.
Derive a market rent using appropriate comparables as discussed in Section F. above, an
achievable restricted rent given the project income limits, and then compare them to the
developer’s proposed rent. Quantify and discuss the market advantage of the proposed
development and impact on marketability.
Provide a detailed analysis of the income levels of the potential tenants for the proposed
units. Eligible households will pay no less than 30% and no more than 48% of their income
for gross rent (rent plus utilities). See Section 7 for additional information.
For projects funded under MIHP units above 60% may be rented to households paying less
than 30% of their income to rent if the project is in a HUD-designated QCT or a transitional
neighborhood. (If not located in a QCT or transitional neighborhood, the analysis must use
the minimum 30% rent burden stated above.) A transitional neighborhood is one that borders
economically vibrant and economically challenged neighborhoods. For these projects, units
above 60% may be rented to households with income levels that are up to 20% higher that
the proposed rent affordability level. For example, a MIHP unit affordable to a household at
90% AMI, may be rented to a household up to of 110% of AMI; it could not be rented to any
households over 110% AMI. The market study must limit the income eligible households
included in the demand pool for these units, accordingly.
HCR requires HCR issued Project-Based Section 8 Voucher units to be targeted to
households at or below 30% AMI, as such analysts should restrict the income eligible
households for the PBV units to a maximum of 30% AMI.
Office of Finance and Development
Capital Programs Manual
Page 35 of 71
100% of the income eligible renter households should be included in the project demand
pool; homeowners may not be included as prospective tenants in non-senior projects.
In senior projects, no more than 10% of income eligible senior homeowners may be included
in the demand pool.
Calculate a total project capture rate based upon all units.
Calculate separate capture rates for each targeted income limit by unit type in the subject
property, incorporating HCR restrictions such as age, income, renters versus home owners,
household sizes, etc. (For example, if a project has 30 one bedroom units targeted at 50% of
AMI, 10 one bedroom units targeted at 60% of AMI, and 20 two bedroom units targeted at
60% of AMI, three separate capture rates must be calculated.)
Capture rates are to be calculated as “net” capture rates which account for the existing supply
of affordable housing in the PMA in arriving at unmet demand.
The unmet demand for additional housing units must be more than 5 times the number of
units proposed. Capture rates must be twenty percent or less for each targeted income limit
by unit type as well as for the total project.
Define and justify the absorption period and absorption rate for the subject property.
Project and explain any future changes in the housing stock within the market area.
Identify risks (i.e., competitive properties which may come on line at the same time as the
subject property, declining population in the PMA, etc.) unusual conditions, and mitigating
circumstances. Evaluate the need for voucher support or HUD contracts.
Provide documentation and descriptions that show the methodology for calculations in the
analysis section and relate the conclusions to the data.
I. Other Requirements
Date report was prepared, date of inspection, and name and telephone number of analyst
preparing study.
Certification of no identity of interest between the analyst and the entity for whom the report
is prepared.
Certification that recommendations and conclusions are based solely on professional opinion
and best efforts.
Office of Finance and Development
Capital Programs Manual
Page 36 of 71
Statement of qualifications.
List of sources for data in the market study.
II. Project Income
Applicants must demonstrate that the project will generate sufficient income to cover its operating
expenses.
(a) Rent Plan/Exhibit 4 - the applicant must submit with the UF application, a rent
plan for the project estimating rental income, adjusted by a five percent
vacancy and arrears loss. The rents approved by HCR for the purposes of the
HTF, HOME or other HTFC funding commitment letter or LIHC/SLIHC
reservation letter may be increased by the annual percentage increase in the
AMI prior to initial rent up with HCR approval, subject to the receipt and
review of operating cost documentation supporting the need for the increase.
(b) Non-Residential Income - if the project building also contains non-residential
space, the operating budget for the non-residential space must be self-
sustaining and accounted for separately. Utility costs for residential and non-
residential spaces must be separated; examples include separate HVAC
systems and separate boilers/AC equipment, separate electrical systems,
separate domestic hot water systems, etc. with separate utility meters or other
measuring equipment to determine usage attributable to non-residential
spaces. Exceptions will be allowed for: water service metering where the local
utility limits the water service and metering to the building; and where a
method of sub-metering is accepted by the agency. Residential rental income
may not be used to subsidize the non-residential portions of the project. The
ability of the residential project to cover operating expenses must not be
predicated upon income from non-residential rents. Any non-residential
income to be used to support the non-residential project operations should be
conservatively estimated. Such income should be considered only on a net
basis after deduction of vacancy loss and arrears, operating and maintenance
expense, and debt service. The estimate for vacancy loss and arrears should be
Office of Finance and Development
Capital Programs Manual
Page 37 of 71
in the range of five percent for pre-leased space, to ten percent for space
which has not been leased.
III. Operating Budget
The applicant must submit an estimated project operating budget which reflects as accurately as
possible the expected rental income and operating costs of the project. Operating budgets must be
submitted for the entire project even if portions of the project are not financed by HCR or are to be
owned by an entity other than the LP/LLC owner of the residential property. For example, a project
proposing non-residential space, unfinanced by HCR, and to be owned by a separate owner under a
condominium structure, must include a non-residential operating budget for that space. HCR needs
to review a viable operating plan for the entire building/project. The accuracy of the projections will
be an important factor in the underwriting assessment of the project and its successful operation
through the funding program’s regulatory period. The operating budget should trend at a 2%
increase in annual income and a 3% increase in annual variable expenses.
The operating budget must take into account the project's design and construction, utility
configuration, and type of population to be served (i.e., elderly, family, homeless individuals, etc.).
The applicant must submit an operating budget, and supporting documentation of proposed costs at
the time of application and, if there are changes, again at Construction and Permanent Loan Closing.
Please note that the operating budget must reflect only the costs of operating and managing the
physical real estate. It may not include any cost related to the provision of social services to the
tenants.
Utility Costs
All project utility costs (i.e. heat, electric, gas, water and sewer etc.) must be documented by a utility
estimate prepared by the project architect or energy consultant. For projects participating in an
energy efficiency program, utility estimates shall be based on the projected energy usage resulting
from participating in that program. The estimates must clearly identify owner-paid utilities and
tenant paid utilities. In mixed-use projects, the estimate must breakout the non-residential utility
costs.
Office of Finance and Development
Capital Programs Manual
Page 38 of 71
HOME projects are required to use a Utility Allowance (UA) that complies with the 2013 HOME
Final Rule 24 CFR Part 92. The rule requires the Participating Jurisdiction to establish the Utility
Allowances for HOME-assisted rental units by using either the HUD Utility Schedule Model or a
project-specific methodology. (For purposes of the New York State HOME Program, the agency is
considered the Participating Jurisdiction, but will not be the calculator of utility allowances.) At the
time of application, HCR will accept a utility estimate based upon the architect’s/energy consultant’s
estimate for projects requesting HOME. If funded, the project will be required, prior to construction
start, and FCL issuance, to submit an IRS compliant Energy Consumption Model to establish the
Utility Allowance as allowed under the 2013 HOME Final Rule. Applicants must use the Utility
Allowance established by the Energy Consumption Model for all HOME funded units; Public
Housing Authority (PHA) Section 8 utility allowances may only be used for HOME-funded units
that will have project-based Section 8 rental assistance. Per IRS regulations (26 CFR 1.42-
10(b)(4)(E)), the energy and water and sewage consumption and analysis model must be prepared by
a properly licensed engineer or a qualified professional, who is independent of the property
ownership. The regulations require that the model must, at a minimum, consider specific factors
including, but not limited to, unit size, building orientation, design and materials, mechanical
systems, appliances, characteristics of the building location, and available historical data.
Insurance Costs
Insurance expenses must be documented by a written quote from an insurance broker including both
the coverage and price. In the case of a mixed-use project, the insurance quote needs to identify the
portion of insurance costs attributable to the non-residential project.
Property Taxes
Property tax expenses have a significant impact on project operating economics, as such, it is critical
that applications estimates are appropriately supported. If a project is to receive a tax exemption or
abatement, it must be documented by a counsel's letter confirming the legal basis for the exemption
or abatement. If a Payment In lieu of Taxes (PILOT) is to be provided by the municipality, the
applicant should provide as much evidence of the PILOT as is available at application, e.g. copy of
actual PILOT approval and terms, a letter from the municipality in support of a PILOT and
Office of Finance and Development
Capital Programs Manual
Page 39 of 71
indicating possible terms and timeline for approval, or information on approved PILOTs for similar
projects. For projects to be taxed utilizing Section 581-A of the Real Property Tax Law, the estimate
must be substantiated by a letter from the assessor having jurisdiction in the project location, stating
the basis for estimation, and estimated amount of the post-construction value. Where an assessor
letter is not available, a similar letter from an appraiser is acceptable. The operating budget
projections should also identify the cost of any special county or district taxes applicable to the
project. Sponsors are expected to pursue all tax exemption or abatement programs for which the
project is eligible.
As an advisory, negotiating Voluntary Payment Agreements, host community agreements or other
similar agreements, at levels that exceed what is available through tax exemption programs,
abatement programs, available PILOT programs and/or 581-A is not allowable. Further, HCR will
not permit projects to use such an instrument to pay fees at an amount beyond standard property
taxes, including special county or district taxes.
Cash Flow Limitations
In projects with a conventional permanent loan, HCR will allow initial cash flow at the greater of up
to $35 per unit per month (pu/pm) OR the amount necessary to meet the lender’s and/or mortgage
insurer’s debt service coverage requirements.
In projects without a conventional bank loan, to maintain positive cash flow through the first fifteen
years of operations, HCR will allow initial per unit cash flow to exceed $35 pu/pm. For
LIHC/SLIHC financed projects, HCR will require projects with cash flow over $35 pu/pm to defer
as a permanent financing source developer fee equal to the aggregate amount of cash flow above $35
pu/pm over the project’s initial 15 years of occupancy.
For projects financed without LIHC/SLIHC the use of any rental income remaining after the
payment of annual operating and maintenance expenses is subject to the approval of HCR’s Asset
Management Unit. See CPM Section 7.02.05. Please note that once a project is completed and
rented-up, any income from Tenant Based Vouchers that exceeds the maximum rents for the targeted
Office of Finance and Development
Capital Programs Manual
Page 40 of 71
affordability levels will go to the Replacement Reserve account pursuant to the project regulatory
agreement.
Project owners must provide for annual contributions to the Reserve Account(s) in the operating
budget as detailed below.
Replacement Reserve Contributions –
HTF and/or HOME projects that do not include LIHC and/or SLIHC as a financing source:
a. Family and non-senior projects: fixed annual contributions equal to .50
percent of total construction cost, including builder’s fees, up to a
maximum of $800 per unit.
b. Senior Projects: fixed annual contribution of $400 per unit.
All projects which include LIHC and/or SLIHC as a financing source must provide for a minimum
annual contribution of $250 per unit. If a project requires a higher annual contribution (e.g., a
preservation project), a higher per unit contribution may be allowed, if the project operating
economics can support it. While not required, HCR will allow a 3% annual increase in replacement
reserve contributions for LIHC/SLIHC financed projects.
All required replacement reserve contributions will continue throughout the term of the project’s
regulatory period with no ceiling. HTFC stand-alone projects, (i.e., projects that do not involve
LIHC or SLIHC), may be permitted to capitalize a replacement reserve if a project's operating
economics cannot support the required annual contribution. Projects permitted to capitalize the
replacement reserve must demonstrate that the initial capitalization will provide sufficient funds to
cover expenses throughout the regulatory period. All assumptions (i.e., initial cost, annual inflation
rate, life expectancy of major building systems, etc.) should be included on a spreadsheet which
shows that such capitalization will be adequate.
Operating Reserve Contributions -
Annual operating reserve contributions are required for all HTF/HOME financed projects. Unless
otherwise approved by HCR, the operating budget should provide for a minimum of three percent
(3%) of the project's gross rents to be contributed annually to the Operating Reserve account. Annual
Office of Finance and Development
Capital Programs Manual
Page 41 of 71
contributions to the Operating Reserve are required in any year that the balance in the reserve is less
than 50% of the gross rents. For projects with HCR capital financing that is not HTF or HOME, an
annual operating reserve contribution of 3% of gross rents will be allowed if project operating
economics can support it, but it is not required.
Financing Plan - the financing plan for the project must meet the following requirements:
(a) the total project cost must be financed by grants, loans, or equity, or a
combination of the three;
(b) all project financing must be contractually obligated at or before the project’s
Construction Loan Closing, or at or before the issuance of a LIHC/SLIHC
Binding Agreement/Carryover Allocation;
(c) grants and/or equity financing cannot encumber the project in a manner which
is inconsistent with the requirements of the applicable HCR program;
(d) debt service for loans must be supportable by the project's annual operating
budget;
(e) loan terms must be provided at a fixed rate of interest for a minimum of a 30-
year term;
(f) the terms and conditions of construction and/or permanent financing must be
economical and reasonable. The interest rates must be no more than the
rates/level offered in the marketplace and the conditions (i.e., requirements on
security, credit enhancement, and debt service coverage factors) must be
typical and advantageous; and,
(g) debt service coverage factors required by lenders should be documented by
the applicant at the time of application submission and again prior to
Construction Loan Closing.
Office of Finance and Development
Capital Programs Manual
Page 42 of 71
Section: 5.00 DEVELOPMENT REQUIREMENTS
Sub Section: 5.08 Subsidy Layering Review Process
The Federal Housing and Economic Recovery Act of 2008 (the Act) authorizes changes to
the Federal Low Income Housing Credit Program in order to simplify its use and enhance its value
in creating and preserving affordable housing. Among these changes, the Act states that when
Project-Based Voucher (PBV) assistance is proposed for newly constructed and rehabilitated
structures the subsidy layering review (SLR) required in accordance with Section 102(d) of the
Department of Housing and Urban Development Reform Act of 1989 shall be satisfied if a Housing
Credit Agency (HCA) conducts an SLR. This section outlines the purpose of performing SLRs, as
well as the procedures that HCR will utilize, consistent with the Department of Housing and Urban
Development (HUD) administrative guidelines issued September 26, 2014 (79 FR 57955), for
conducting these reviews.
5.08.01 Purpose of Subsidy Layering Reviews
The purpose of a subsidy layering review is to ensure that the amount of HUD assistance
shall not be greater than is necessary to provide affordable housing.
5.08.02 Timing of Reviews
An initial subsidy layering review will be performed by HCR Underwriting staff at the time
of application review in order to determine the appropriate number of PBVs, tax credits, and/or HCR
capital funding to recommend for award. Please note that HCR will apply the SLR requirements and
limits described below to all projects proposing the use of PBV assistance, even if the vouchers are
not being requested from HCR. A second, and in most cases final, SLR will be conducted prior to
construction start. The second SLR will be based upon updated development and operating budgets
submitted by the project sponsor. The Division’s Section 8 Office will not execute an Agreement to
Enter into Housing Assistance Payments (AHAP) contract until an SLR has been completed, as
evidenced by a certification from OF&D that the project is in compliance with HUD requirements.
When HCR performs the SLR for projects awarded vouchers by another PHA, a copy of the signed
Office of Finance and Development
Capital Programs Manual
Page 43 of 71
certification will be provided to the project sponsor in order to proceed to AHAP execution with the
PHA.
5.08.03 Guidelines for Conducting Subsidy Layering Reviews
In conducting SLRs, HCR Underwriting staff will utilize the administrative guidelines issued
by HUD in its notice of September 26, 2014 (79 FR 57955). The guidelines state that the required
SLR may be fulfilled by the IRC Section 42(m)(2) gap analysis review, if the review substantially
complies with the SLR requirements detailed in the HUD notice. In addition, the HUD guidelines
require the HCA to evaluate the effect of the PBV income on project operating economics in order to
assure that the amount of voucher assistance is no more than necessary. Specifically, the HUD notice
requires that certain development and operations standards be applied by the HCA in conducting the
SLR. These standards are summarized below.
1) Development Standards: Net syndication proceeds to the project must be at or above the
amount generally contributed by investors based upon current equity market conditions.
Development costs must be evaluated for reasonableness based upon HUD safe harbor
standards and maximum allowable amounts.
(a) Safe harbor: These are generally applicable development cost standards. If
project costs and fees are within the safe harbor standards, the project can move
forward without the need for additional justification. If project costs exceed the
safe harbor limits, the owner must provide additional documentation and
justification that demonstrate the need for costs that exceed the safe harbor
standards.
(b) Maximum allowable amounts: These are firm limits which cannot be exceeded
under any circumstances. Where HUD and HCR maximum allowable costs or
cash flow differ, the more stringent limit is applicable.
(c) Safe Harbor Percentage Allowances and Maximum Allowable Amounts
(i) Builder’s Fees (as a percentage of the construction contract)
1. Safe Harbor:
a. General Conditions: 6%
b. Overhead: 2%
Office of Finance and Development
Capital Programs Manual
Page 44 of 71
c. Profit: 6%
To the extent that any of the fees exceed the safe harbor limits, the excess
above the safe harbor must be justified to HCR’s satisfaction based upon
project size, characteristics, location, and risk factors. If unjustified, the
underwriter will reduce fees to the safe harbor standard, and perform the tax
credit gap analysis based upon reduced project costs.
2. Maximum:
The maximum combined costs for general conditions, overhead, and profit
cannot be more than fourteen percent of the construction contract.
(ii) Developer’s Fee: HCR will allow no more than the HUD safe harbor cost
limit as modified below. No exceptions or waivers will be allowed.
Maximum: twelve percent of soft and hard costs plus ten percent of
acquisition.
(iii) Net Syndication Proceeds: The LIHC equity raised by the project’s
syndication must be at or above the current market price average as
determined for that funding round. The safe harbor minimum for the LIHC
equity pricing will be established by HCR based upon its assessment of the
market price for similar projects reviewed under the same application funding
round. If the amount of equity raised is below the current market price, HCR
will reduce the LIHC allocation to bring the value of the tax credits to a level
at or above the minimum LIHC equity price.
(2) Operations Standards: The impact of PBV assistance on the project’s fifteen year
operating pro forma must be evaluated as part of the subsidy layering review. HUD
requires the following standards to be applied:
(a) Debt Coverage Ratio (DCR): In any year, the DCR cannot be more than 1.45 or
less than 1.10.
(b) Cash Flow: In any year, the cash flow cannot exceed 10% of the total project
operating expenses.
(c) Trending Parameters: The HCA may use the trending assumptions that it deems
appropriate and reasonable to the project market area. Generally, operating
Office of Finance and Development
Capital Programs Manual
Page 45 of 71
expenses should be trended between 3% - 7% per year, and annual rent increases
between 2% - 5%.
To the extent that the project exceeds the DCR and cash flow limits, HCR will
conduct further trending analysis of the 15-year pro forma to determine whether
the project is receiving more governmental assistance than is necessary to meet
the needs of the project. If the HCR analysis indicates this to be the case, the
project owner will be asked to re-visit the operating pro forma to bring cash flow
and/or DCR down to allowable levels. If the owner declines, the number of
vouchers proposed will be reduced or the proposed rents will be lowered as
required by the HUD guidelines.
5.08.04 Basis of Review
HCR underwriters will review the following to conduct the subsidy layering review:
(1) HCR Forms:
(a) Residential Development Budget with all proposed sources and uses of funds;
(b) Rent and Affordability Plan;
(c) Income and Operating Budget;
(d) Tax credit exhibits - Qualified Building Information and LIHC/SLIHC Project
Summary; and
(e) Updated Proposal Summary.
(2) Other Documents:
(a) Commitment letters from all financing sources disclosing significant terms;
(b) Tax credit equity investment commitment letter, or if available, limited
liability corporation operating agreement/limited partnership agreement;
(c) Letter from entity allocating PBVs authorizing/approving the PBV assistance;
and
(d) HUD-2880 Standard Disclosure and Perjury Statement Form signed by the
sponsor (https://portal.hud.gov/hudportal/documents/huddoc?id=2880.pdf).
Office of Finance and Development
Capital Programs Manual
Page 46 of 71
HCR reserves the right to request other documents as needed in performing the SLR. All
documents required for the SLR must be submitted to the Regional Office project manager. The
project manager will forward the material to the underwriter for evaluation.
5.08.05 Completion of Review
If upon completion of the SLR, the HCR underwriter finds that the project is in compliance
with HUD requirements, OF&D will issue an HCA certification that the PBV assistance awarded to
the project is not more than the amount necessary to provide affordable housing. The certification
will be sent to the HCR’s Section 8 Office and to HUD. If the underwriter finds the project to not be
in compliance with HUD Subsidy Layering guidelines, the project owner will be contacted to
discuss any necessary changes needed for the certification to be issued.
Office of Finance and Development
Capital Programs Manual
Page 47 of 71
Section: 5.00 DEVELOPMENT REQUIREMENTS
Sub Section: 5.09 Construction Monitoring Requirements
These construction monitoring requirements apply to projects funded with LIHC/SLIHC
and/or non-residential CIF financing only (i.e., no HTF or NYS HOME program financing).
LIHC/SLIHC and non-residential portions of CIF projects are not subject to the requirements
of the HTFC Design Handbook since these projects were not funded with HTF or NYS HOME
program financing. However, these projects are subject to construction monitoring by HCR to track
construction progress and to identify and resolve any potential problems or delays a project may
experience. Therefore, on a monthly basis, the owners of all LIHC/SLIHC and non-residential CIF
funds projects under construction must provide HCR with copies of the following documentation:
(i) Minutes of monthly construction progress meetings and monthly contractor
payment requisitions (AIA Forms G702 and 703) certified by the project
architect. These reports must indicate the overall percentage of project
completion achieved to date.
(ii) A narrative provided and signed by the project architect describing the general
progress and status of construction, anticipated completion date, changes in
the work and any significant issues that have arisen, which may impact project
construction and/or the timeframe for completion. The project architect’s
narrative should accompany the minutes of the monthly progress meetings.
(iii) At construction completion, a copy of the Permanent Certificate of
Occupancy, or Temporary Certificate of Occupancy (if applicable), as soon as
it has been issued, for each building in the project. For projects comprised of
multiple buildings, which will enter service as each building is completed, the
project owner must submit each Certificate of Occupancy, as part of the
monthly report. Once all such Permanent Certificates of Occupancy have been
issued without conditions, for the building(s) in the project, this reporting
requirement will be satisfied.
In addition, within 30 days of the commencement of construction, the project owner shall
submit to HCR a schedule of specific dates and times on which monthly construction inspections
Office of Finance and Development
Capital Programs Manual
Page 48 of 71
and/or progress meetings with the project owner, the general contractor and project architect will
take place. HCR staff shall attend such inspections and/or meetings at its discretion and shall also
conduct construction monitoring visits as deemed necessary.
The project owner shall submit copies of all change orders within five (5) business days of
execution by the project owner. Change orders will be reviewed for compliance with programmatic
standards and consistency with the approved project scope of work. Material changes that improve
the quality of the project, and are acceptable to HCR, will be acknowledged in writing by HCR.
Material changes that diminish the quality of the project will not be accepted. Furthermore, changes
in project design during construction which diminish project quality may result in reductions of one
of more of the HCR funding sources, as applicable, and may be considered in evaluating future
applications.
The required documentation cited above in (i) and (ii), which evidences the project’s
previous month’s construction progress, must be submitted to HCR no later than the 15th day of each
month, with the first report provided in the month following construction financing closing and
construction start. Please submit copies of the all of the above required documentation directly to
your assigned project manager via email.
Office of Finance and Development
Capital Programs Manual
Page 49 of 71
Section: 5.00 DEVELOPMENT REQUIREMENTS
Sub Section: 5.10 Financing Requirements
These financing requirements apply to all HTF and HOME funded projects.
The applicant must provide firm commitments from all sources of loan and equity financing
necessary for the project as part of the Construction and Permanent Loan Closing. Documentation of
firm financing commitments must include at least the following:
(i) identification of the applicant and other parties to the proposed financial transaction;
(ii) evidence that the commitment is legally in effect until a date which is on or after the
anticipated date of Construction or Permanent Loan Closing;
(iii) evidence that the commitment is not subject to any conditions other than the availability of
other proposed project financing and/or the implementation of the project as described in the
application submitted to HCR;
(iv) interest rate and principal repayment terms; and,
(v) identification of debt service coverage and/or income to expense ratio requirements.
HCR may request copies of superior and subordinate notes and mortgages for review and
their use must be approved before execution of the documents or such lien occurs. HCR funds will
generally be provided as permanent financing only. Applicants must consult the Request for
Proposals under which they are applying to see if construction financing is available.
HCR is permitted by statute to subordinate HTFC debt to other loans made for eligible uses,
i.e., affordable residential development and, to a limited extent, Community Service Facility
development as described in Section 2.01.03.G. With the exception of an HTF-eligible Community
Service Facility as noted above, HTFC and HOME loans may not be used to finance non-
residential/commercial projects. Recipients of HTF and HOME funds who plan to develop mixed-
use projects are advised to secure separate financing for development of the non-
residential/commercial portion of the project, which is not secured by the HTFC or HOME financed
residential portion of the project.
HCR will, however, permit an HTFC or HOME financed residential project to be
encumbered by a mortgage which also encumbers the non-residential/commercial portion of the
project if a creditworthy individual or entity, with adequate financial assets (as determined by HCR),
Office of Finance and Development
Capital Programs Manual
Page 50 of 71
provides a payment guarantee of debt service and operating expenses of the non-
residential/commercial portion of the project in the event of vacancy or default.
In some instances, a condominium will suffice to legally separate the HTFC or HOME
financed residential portion of a project from the commercial/non-residential portion of a project. If
the condominium adequately isolates the residential project, then a payment guaranty may not be
required.
Office of Finance and Development
Capital Programs Manual
Page 51 of 71
Section: 5.00 DEVELOPMENT REQUIREMENTS
Sub Section: 5.11 Insurance Requirements
The insurance requirements discussed below apply to all funded projects with the following
exceptions:
(i) with regard to HDF's Program projects, the insurance requirements set forth
here apply only to HDF interim acquisition and construction loans; and,
(ii) projects financed solely under the LIHC/SLIHC programs are not required to
comply with any of the insurance requirements set forth herein.
Applicants (and their contractors and architects) are required to maintain appropriate
insurance coverage during the development of the project as specified below. For projects using
HCR funds for construction financing, or where HCR has an existing regulatory interest in the
project, evidence of the required insurance during construction must be submitted prior to the
construction closing as part of the Construction Loan Closing submission. Please see HCR’s Legal
Documents Manual, Index XVI, Construction Loan Closing Checklist III, Insurance for further
information on the required insurance.
Owners/awardees must submit the necessary borrower insurance binders or certificates as
part of the Permanent Loan Closing submission. Please see HCR’s Legal Documents Manual, Index
XVI, Permanent Loan Closing Checklist II for further information on the required insurance.
5.11.01 Insurance Requirements for Applicants
Title Insurance
insuring DHCR/HTFC's interest as mortgagee in the maximum amount of the
DHCR/HTFC financing to be provided;
required for all projects in which a mortgage securing the DHCR/HTFC financing is
required;
property description must match a survey certified to DHCR/HTFC, the applicant and
the title insurance company (survey must plot the proposed project and all existing
easements); and,
Office of Finance and Development
Capital Programs Manual
Page 52 of 71
insurance policy must be delivered at or before closing insuring DHCR/HTFC's
interest in the property, free and clear of all liens, encumbrances and restrictions
except as may have been previously approved and including all required endorsement
which include:
o Environmental Protection Lien (for State Agencies) (8.1);
o ALTA 9 (if affirmative coverage is not available);
o Tax Parcel (for NYC projects or where more than one tax parcel is involved);
o Land Same As Survey;
o Condominium/Cooperative (if applicable);
o Leasehold (if applicable); and,
o Additional endorsement(s) deemed necessary by HTFC Office of Legal Affairs.
All Insurance, as required below, must include:
• evidence that the insurer will not modify the policy adversely to the interests of any mortgage on
the premises or cancel any policy without the minimum notice requirements set forth in Section
3426 of the NYS Insurance law; and,
• DHCR/HTFC and the State of New York to be named as additional insured and certificate
holder.
Liability Insurance
Comprehensive General Liability:
monetary limits of not less than $1,000,000 for each occurrence with Hazards
including contractual liability and completed operations, and,
contractual coverage.
Property Insurance
monetary limits commensurate with the project's 100% insurable replacement value;
and,
Builder's Risk Form - All Risk Coverage.
Automobile Liability Insurance
Office of Finance and Development
Capital Programs Manual
Page 53 of 71
Liability:
“Any Auto” automobile coverage in a minimum amount of 1 million;
to cover vehicles owned and/or operated by the applicant; or,
coverage for owned (if applicable), hired and non-owned vehicles, accompanied by a
letter on letterhead stating that if autos are purchase that insurance coverage will be
immediately changed to “any auto”.
Blanket Position Fidelity Dishonesty Bond
amount of coverage equal to the amount of the largest anticipated disbursement; and,
DHCR/HTFC and State of New York as sole/joint payee/obligee.
Workers' Compensation and Disability Benefits Insurance
Must be provided by the employer for all employees performing work related to the
project; and,
If no employees, a certification that this coverage is not presently required (form CE-
200 which can be obtained on the Workers’ Compensation Board website).
Flood Insurance
If, according to the best available data, the improvements, or any portion thereof, at the
project site are located within a Special Flood Hazard Area, flood insurance is required in an amount
equal to the replacement cost of the structure or the maximum limit of coverage made available
under the National Flood Insurance Program, whichever is less.
5.11.02 Insurance Requirements for Builders Under Direct Contract with Applicants
Liability Insurance
Comprehensive General Liability:
monetary limits of not less than $1,000,000 for each occurrence;
contractual coverage; and,
applicant to be named as additional insured.
Office of Finance and Development
Capital Programs Manual
Page 54 of 71
Builder's Risk Insurance
monetary limit to cover cash value of completed work on the project; and,
DHCR/HTFC and State of New York as mortgagee/loss payee (as applicable).
Automobile Liability Insurance
Liability:
“Any Auto” automobile coverage in a minimum amount of 1 million;
to cover vehicles owned and/or operated by the applicant; or,
coverage for owned (if applicable), hired and non-owned vehicles.
Workers' Compensation and Disability Benefits Insurance
Must be provided by the employer for all employees performing work related to the
project; and,
If no employees, a certification that this coverage is not presently required (form CE-
200 which can be obtained on the Workers’ Compensation Board website).
Performance and Payment Bond(s)
coverage for 100% of value of construction contract; and,
applicant and DHCR/HTFC and State of New York as obligees/loss payees.
5.11.03 Project Architect's Insurance
Project architects are required to meet the applicable insurance coverage parameters specified
below. The project architect must furnish HCR with Certificates of Insurance for projects receiving
construction financing from HCR. If a project architect does not carry professional liability
insurance, project professional liability insurance coverage may be carried in lieu of blanket
coverage. Coverage should extend from the date of the Owner/Architect Agreement to one year after
the substantial completion of the project. All certificates of insurance must contain evidence that the
insurer will not modify the policy adversely to the interests of any mortgagee of the premises or
cancel any policy without the minimum notice requirements set forth in Section 3426 of the NYS
Office of Finance and Development
Capital Programs Manual
Page 55 of 71
Insurance law. DHCR/HTFC and State of New York would need to be named as additional insured
for any projects with an HCR construction loan.
Comprehensive General Liability Insurance
with limits of $1,000,000 per occurrence/$2,000,000 aggregate; and,
the project architect agrees to defend, indemnify, and hold harmless the additional
insureds as stated above from damages, causes of action and legal proceedings arising
out of the operations and completed operations of the project architect to the services
provided under this contract.
Professional Liability Insurance
in the amount of $1,000,000 per claim and $1,000,000 aggregate;
the policy must include Contractual Liability coverage;
the coverage shall remain in force without diminution for three years after completion
of the project architect contract; and,
The permanent lender on HDF Program projects must certify that architect's liability
insurance is an eligible expense.
Workers Compensation and Disability Benefits
Must be provided by the employer for all employees performing work related to the
project; and,
If no employees, a certification that this coverage is not presently required (form CE-
200 which can be obtained on the Workers’ Compensation Board website).
Office of Finance and Development
Capital Programs Manual
Page 56 of 71
Section: 5.00 DEVELOPMENT REQUIREMENTS
Sub Section: 5.12 Real Property Tax Exemption
Applicants are expected to obtain tax exemptions or abatements with local municipalities for
all or a portion of the project. Applicants are encouraged to explore the benefits available under
Section 581-A of the NYS Real Property Tax Law. This tax provision provides that affordable
housing be assessed on the basis of the income approach for determining value. Applicants who
pursue tax exemptions or abatement may receive additional points in the rating and ranking of their
application(s) if tax exemptions or abatements have been obtained and documented. Any anticipated
tax exemptions or abatements should be documented as outlined in Section 5.06(iii). The operating
budget projections should also identify the cost of any special county or district taxes applicable to
the project. As an advisory, negotiating Voluntary Payment Agreements, host community
agreements or other similar agreements, at levels that exceed what is available through tax
exemption programs, abatement programs, available PILOT programs and/or 581-A is not
allowable. Further HCR will not permit projects to use such an instrument to pay fees at an amount
beyond standard property taxes, including special county or district taxes. At the time of the
submission of the Permanent Loan Closing Documents, a signed payment-in-lieu of tax agreement
must be submitted in support of this operating budget expense.
Office of Finance and Development
Capital Programs Manual
Page 57 of 71
Section: 5.00 DEVELOPMENT REQUIREMENTS
Sub Section: 5.13 Professional Service Contract Requirements
All Unified Funding applicants must comply with the provisions of this Section when
selecting project architects, engineers, attorneys, housing consultants, managing agents, or other
professionals who provide all or a portion of the professional services required to develop a project.
Professionals should be selected based on their professional and technical competence, relevant
experience and past experience, knowledge of local laws, regulations and codes, proposed cost for
services, and capacity to provide services in a timely manner consistent with the development
timeframe.
HCR requires all contracts over $25,000 to include goals for the participation of Minority
and Women-Owned Business Enterprises (M/WBE), with the exception of projects which are
financed solely under LIHC/SLIHC. Please see Section 4 for a discussion of M/WBE requirements.
In the event of inconsistencies between this Section and the federal HOME regulations, the HOME
regulations shall apply.
5.13.01 Selection of an Architect/Engineer
All agreements between applicants and project architects or engineers must reflect a fixed fee
compensation for all services required by HCR. The fixed fee should be structured so that payment
is tied to successful completion of the various phases of work proposed (i.e., preliminary design, bid
design, construction documents, etc.). All Owner/Architect agreements must be submitted to HCR
for review and may require revisions if not acceptable to HCR. See the HTFC Design Handbook for
additional information and requirements:
http://www.nyshcr.org/Publications/DesignHandbook/.
5.13.02 Selection of a Housing Consultant
This section is not applicable to projects financed solely under LIHC/SLIHC.
The applicant's agreement with a housing consultant to provide services related to the
project's planning, marketing, housing management, and/or development must reflect a fixed fee
arrangement based upon defined services to be provided by the consultant. Payment should be
Office of Finance and Development
Capital Programs Manual
Page 58 of 71
structured into phased progress payments associated with the percentage of work completed for each
phase (i.e., planning phase, marketing phase, construction phase, occupancy phase, etc.). The OF&D
project manager will review all consultant agreements for reasonableness of costs and clarity of the
scope of work to be performed. HCR reserves the right to require an amendment to the agreement
before funding is provided.
Housing consultant fees will not be recognized in the development budget for projects
funded with LIHC and/or SLIHC equity. For those non-LIHC/SLIHC funded projects receiving a
Developer’s Allowance, any housing consultant fees budgeted apart from the Developer’s
Allowance will be subtracted from the Developer’s Allowance cap to arrive at the maximum amount
that the applicant is entitled to receive.
5.13.03 Selection of Attorneys
The applicant should identify the scope of legal services to be provided throughout the
development of the project, and request that the attorney prepare and submit an agreement
specifying the legal services to be performed at a fixed fee compensation. The following legal
services may be included in the applicant/attorney agreement:
(i) preparation and review of all applicant agreements excluding services related to the
preparation and submission of applications for funding which must be treated as housing
consultant fees (except for projects financed solely under LIHC/SLIHC – See Section
5.13.02);
(ii) representation of the applicant at all closings;
(iii) title examination and curing of title defects;
(iv) preparation of legal descriptions of property; and,
(v) recording of title papers.
5.13.04 Selection of a Builder
HCR has two tracks for the contracting of construction work for its low-income housing
projects. At the time of application submission, a project sponsor must identify which method of
securing a construction contractor will be utilized. The first track is for a project sponsor seeking
Office of Finance and Development
Capital Programs Manual
Page 59 of 71
construction bids through a publicized, competitive process. The second track is for a project
sponsor to identify and select a builder at the time of application submission.
Applicants/owners which propose to act as their own Builder (see Glossary for definition)
must document the following:
(i) a minimum of five years of successful experience administering construction and
completing projects of comparable size and scope;
(ii) the in-house staff capacity and experience to negotiate and direct the functions of
both the project architect and construction activities; and,
(iii) the financial capacity to provide a 100% performance and payment bond for the
entire construction cost.
Under either track, should a project sponsor elect to produce housing through the use of a
manufactured housing company, the purchase contract and supervision of such housing must be
done as a sub-contract to the builder’s contract. The requirements for both tracks are enumerated in
the sections below.
Publicized, Competitive Bidding (Track One)
Project sponsors electing to publicly and competitively bid the construction portion of their
low-income housing projects must indicate this intent at the time of application submission. This
type of contractor selection will require the project sponsor to openly advertise in a well-known local
newspaper for a period of four days and have a minimum bidding period of four weeks before bids
are closed. M/WBE outreach requirements will be part of the bidding process. On projects subject to
Federal Labor Standards (Davis-Bacon Related Acts) regulatory requirements (see Section 5.15 for
more information) the labor standard procedures for competitive bidding must also be followed.
Upon receipt of bids, the project sponsor and architect must notify HCR of the bidding
results and the name of the selected lowest qualified bidder. The contractor's schedule of values must
also be submitted to HCR at that time. HCR reserves the right to require that the project be rebid or
negotiated or to modify the scope of work, if all bids received are higher than the project's estimated
total construction cost. The project sponsor must include the services for a detailed construction cost
estimate prepared by a cost estimator.
Office of Finance and Development
Capital Programs Manual
Page 60 of 71
Pre-Selected Builder Requirements (Track Two)
Project sponsors who elect to include a builder with their application for funding will be
required to indicate the selection criteria that was used to hire the builder, the builder’s previous
professional experience in producing low-income housing units, the role the builder will play during
the development and construction phases of the project and that the builder or owner/applicant is
capable of obtaining a 100% Payment and Performance Bond for the entire construction project.
In addition, a pre-selected builder will be responsible for providing a detailed cost estimate of
the total construction work with the project sponsor's application submission. For projects that will
be subject to Davis-Bacon wage requirements (see Section 5.15 for more information), all
construction cost estimates should be based on the most current Davis-Bacon wage rates appropriate
for the project location and type of construction. Please be advised that HCR imposes limits on
builder’s fees depending on the type of funding requested. See Section 5.05 and 5.07.
At the time of application submission, the owner/applicant must provide a guaranteed price
for the total development costs of the project. Any construction cost overruns incurred during the
development and construction phases of the project shall be borne by the owner/applicant and shall
be paid for from the developer's fee amount, unless a request is made pursuant to Section 6.03. All
MBE/WBE requirements applicable to the pre-selected contractor must be documented through the
contractor's selection process for sub-contractors and suppliers.
5.13.05 Construction Contracting Requirements
The standard AIA Owner/Contractor Agreement or AIA Owner/Construction Manager as
Constructor Agreement (current editions) should be used to execute construction contracts. For
multisite projects, the builder is to provide the construction costs on an individual site basis. Any
applicant who proposes to act as the builder or general contractor on their own projects must show
successful prior experience, bear the responsibilities, and meet the requirements of builders or
contractors. The selected builder must submit a detailed cost estimate/trade payment breakdown
prior to the start of construction, which may be reviewed for cost reasonableness. This
estimate/trade payment breakdown shall also indicate whether the trade item will be performed by
the builder or a subcontract. Subcontractors shall be identified if known at the time of this
submission. Please see Section 4.0 for M/WBE requirements.
Office of Finance and Development
Capital Programs Manual
Page 61 of 71
On projects subject to Davis-Bacon requirements (see Section 5.15 for more information),
construction contracts and all construction sub-contracts must include the appropriate Federal Labor
Standards documents and Davis-Bacon Wage Decision(s). As stated in Section 5.15, prior to signing
any construction contract, project owners must consult with OF&D for guidance and instruction
regarding the correct documents that must be included.
Builders will not be allowed to obtain a profit and overhead unless they are performing actual
construction and performing construction supervision over all Work. “Actual construction” means
“work” as defined in American Institute of Architects (AIA) documents: “....labor, materials,
equipment, and services provided by the contractor to fulfill the contractor’s obligations.” Under this
definition contractors who choose to subcontract out construction of the project to another contractor
will not obtain a builder’s fee (general overhead and profit) when:
(i) More than 50 percent of the contract sum in the construction contract is subcontracted
to one subcontractor, material supplier, or equipment lessor; and/or,
(ii) Seventy-five percent or more of the contract sum in the construction contract is
subcontracted with three or fewer subcontractors, material suppliers, and/or
equipment lessors.
Note: If two or more subcontractors have common ownership, they are considered one
subcontractor. When a construction manager as builder contract arrangement is utilized, construction
manager fees shall not exceed the total of builder’s overhead and profit limits indicated in this
chapter.
“Construction supervision” means continuous oversight, inspection, and coordination of the
Work in a timely, professional, competent manner to ensure compliance with the approved
construction documents, contract documents, applicable regulations, project schedule, and all other
applicable requirements. “The Work” refers to all such construction and services, whether
performed by the Builder’s or Subcontractor’s forces necessary to complete the project. Supervision
may be performed by an individual, or individuals. If performed by more than one individual, there
shall be one individual responsible for all supervisory tasks. Supervisory tasks shall be performed
by Site Superintendent personnel employed by the recognized Builder on a full-time basis.
Office of Finance and Development
Capital Programs Manual
Page 62 of 71
5.13.06 Selection of a Managing Agent
Owners which propose to utilize a managing agent must document that the agent holds a
New York State real estate broker’s license. Both owners which propose to utilize a managing agent
and those which are planning to manage the project with their own staff must:
(i) document that any person authorized to receive, handle, or disburse any monies of the
project, is covered by a blanket position fidelity bond which is issued by the
Superintendent of Insurance of the State of New York, which names the owner as
obligee, and an amount of coverage equal to three months’ rent role and all project
reserve funds;
(ii) document their experience in managing similar low-income housing projects of the
same size and complexity;
(iii) maintain an office or place of business within the State of New York at no cost to the
project owner;
(iv) establish a monthly fee if a managing agent is to be used for services set forth in the
Management Plan;
(v) provide an organization plan setting forth lines of responsibilities and authority
among those persons assigned to the housing project, including the owner's staff;
(vi) provide an operational plan that details the staff member(s) or agent's functions with
regards to marketing, physical maintenance, financial administration, resident
relations, and general administration; and,
(vii) provide an affirmative action plan to ensure that the staff member(s) or agent recruits,
selects, and retains employees in such a manner as to ensure equal employment
opportunities and that the agent solicits bids from minority and women-owned
business enterprises.
Office of Finance and Development
Capital Programs Manual
Page 63 of 71
Section: 5.00 DEVELOPMENT REQUIREMENTS
Sub Section: 5.14 Private Developer Requirements
The following requirements apply only to private developers of projects funded under:
(i) HTF; and,
(ii) LIHC
Please see Section 2.01 for a discussion of the private developer minimum equity
contribution requirement specific to the HTF Program.
5.14.01 Guarantee of Construction Contract Costs
Private developers will be required to adhere to the award amount in their Funding
Commitment (see Sub-Section 6.02.02). Any additional costs or cost increases must be paid for by
the developer.
5.14.02 Construction Financing using HCR Funds
Construction loans will be provided at 0% interest. Legal closing and construction
monitoring fees will be charged when HCR construction loans are used in projects financed with
LIHC or SLIHC. A construction loan closing fee of $2,500 will be charged to reimburse HCR legal
expenses. A construction monitoring fee of $15,000 will be charged to cover HCR’s inspection
costs. These fees must be paid at the time of construction loan closing and must be paid from credit
equity or non-HCR financing sources. HCR may reduce or waive some or all of these fees if it
decides that imposition of such charges would adversely impact the project’s financing.
Office of Finance and Development
Capital Programs Manual
Page 64 of 71
Section: 5.00 DEVELOPMENT REQUIREMENTS
Sub Section: 5.15 Special Needs and Supportive Housing
Supportive project units which are regulated by other NYS agencies directly or through the
supervision or licensing of the service provider introduces multiple layers of statutory and regulatory
requirements from several NYS agencies. Projects proposing DHCR and/or HTFC-assisted units
regulated by other NYS agencies will be rigorously required to demonstrate the units meet all
statutory and regulatory requirements of the pertinent HCR funding program requested prior to
application submission. As such, documents pertaining to the requirements of the units, including
any residential residency or program admissions agreements governing participation in the service
program(s) and service fee requirements charged to the tenants MUST be submitted as part of the
application in Attachment E1. HCR reserves the right to request any additional documentation
necessary to determine project consistency with pertinent program statute and regulations at any
time during the project’s development. As such, there are instances in which HCR will not finance
supportive project units which are regulated by other NYS agencies. Any project proposing a project
with supportive project units which are regulated by other NYS agencies MUST participate in a
mandatory pre-application conference with HCR staff.
5.15.01 Projects Serving Persons with Special Needs
A project is considered to serve persons with special needs if it includes a UF application
containing a proposal summary and narrative as described below and a Housing/Services Agreement
with an experienced service provider(s) which agrees to refer at least 15% of the total units in the
project to one, or more, of the following populations, as identified in the application:
• Families who are Homeless;
• Persons and Families who are in Long Term Recovery from Alcohol Abuse;
• Persons and Families who are in Long Term Recovery from Substance Abuse;
• Persons who are Frail Elderly;
• Persons who are Homeless;
• Persons with Intellectual/Developmental Disabilities;
• Persons who are Victims of Domestic Violence;
Office of Finance and Development
Capital Programs Manual
Page 65 of 71
• Persons with AIDS/HIV Related Illness;
• Persons with Physical Disability/Traumatic Brain Injury;
• Persons with Psychiatric Disabilities;
• Veterans who are Homeless;
• Veterans in Long Term Recovery from Alcohol Abuse;
• Veterans in Long Term Recovery from Substance Abuse;
• Veterans with Intellectual/Developmental Disabilities;
• Veterans who are Victims of Domestic Violence;
• Veterans with AIDS/HIV Related Illness;
• Veterans with Physical Disabilities/Traumatic Brain Injury;
• Veterans with Psychiatric Disabilities;
• Veterans who are Frail Elderly; and,
• Any other Special Needs population defined in a Request for Proposal for capital projects, as
determined by New York State.
Plan for Serving Tenants who are Persons with Special Needs
If the project proposes to serve tenants with special needs, the application submitted must
include a narrative which must provide the following:
• A description of how the need and market for housing for persons with special needs was
established, including references to, and data from, any studies or analyses of the need for the
proposed housing;
• Information about the proposed Support Agency, including but not limited to: an overview
and history of the agency, experience serving the proposed population, services offered, how
services will be funded, and service area;
• An explanation of how the Support Agency will provide services to the project, including,
who will provide services, where they will be provided, and when/how often they will be
provided;
• A description of how the eligible population will be identified and how individuals will be
referred to the project, including any specific referral process that is coordinated with a City,
County, or State Agency or local planning group; and,
Office of Finance and Development
Capital Programs Manual
Page 66 of 71
• Submit any materials tenants with special needs must sign in order to receive services.
In addition, a Housing/Services Agreement, executed between the Project Owner and the
Support Agency (and approved by HCR), with an Attachment A, completed by the Support Agency,
consisting of a full description of the services to be provided to the project is required.
5.15.02 Supportive Housing Projects
Supportive Housing shall mean projects which give preference in tenant selection to persons
with special needs as defined in a RFP. To be considered a Supportive Housing Project, a project
application must satisfactorily address the following:
1) The applicant must document the need for housing for the targeted population within
the primary market area;
2) The applicant must ensure the delivery of appropriate services, for which a documented
need exists, to the targeted population as evidenced in a comprehensive service plan
and a Housing Services Agreement in writing with an experienced service provider;
3) The applicant must include a transportation plan to ensure access to necessary services,
and access to job training and employment opportunities as appropriate for the target
population;
4) The applicant must have funding in place or identify a viable plan for the funding of
appropriate services. If funding, and/or subsidies, are supplied by a contracting state
agency, then any award letters or contracts for said funds must be submitted. Project
rental income may not be used to pay for supportive services;
5) The applicant must include provision for an ongoing rental subsidy or other form of
subsidy which will be available to ensure that rents paid by the targeted population
remain affordable (NOTE: HTFC and HOME funded projects may use master leases on
tenant units);
6) The applicant must identify, and have a written agreement with, a public agency or
experienced service provider that will refer eligible persons and families for the
targeted units;
7) The applicant must demonstrate a firm commitment for capital financing from a
governmental agency serving the proposed target population; and,
Office of Finance and Development
Capital Programs Manual
Page 67 of 71
8) The project must provide an integrated setting that enables individuals with disabilities
to live independently and without restrictive rules that limit their activities or impede
their ability to interact with individuals without disabilities.
If the project identified as a Supportive Housing project, submit a comprehensive service plan
which provides the following:
• A description of how the need and market for housing for persons with Special Needs was
established, including references to and data from any studies or analyses of the need for the
proposed housing;
• The source of capital financing from a governmental agency serving the proposed target
population and/or service and operating funding from a governmental agency serving the
proposed target population;
• The applicant must include a provision for an ongoing rental subsidy, or other form of
subsidy which will be available to ensure that rents paid by the targeted population remain
affordable;
• Information about the proposed Support Agency, including but not limited to: an overview
and history of the agency, experience serving the Special Needs population, experience
serving individuals living in Permanent Supportive Housing, services offered, a description
of the staffing of the project as it relates to the Special Needs population, how services will
be funded, and service area;
• A description of the program and how the Support Agency will provide services to the
project, including, who will provide services, where they will be provided, and when/how
often they will be provided;
• Transportation arrangements available to ensure access to necessary services;
• Description of the access to job training and employment opportunities exist for the
proposed target population;
• Include any materials that a special needs tenant must sign in order to receive services; and,
• A description of how persons with disabilities will receive services in the most integrated
setting appropriate to their needs.
In addition, a Housing/Services Agreement, executed between the Project Owner and the
Support Agency (and approved by HCR), with an Attachment A, completed by the Support Agency,
Office of Finance and Development
Capital Programs Manual
Page 68 of 71
consisting of a full description of the services to be provided to the project is required along with the
Special Needs Proposal.
5.15.03 Housing Services Agreement
In both Special Needs and Supportive Housing Projects, HCR requires that the Project
Owner and Support Agency enter into a Housing/Services Agreement to serve the special needs
population assisted by the project. Upon HCR approval of the agreement, it will be appended to the
final marketing plan and become part of the project Regulatory Agreement.
The Housing/Services Agreement requires that priority for referrals be given to persons with
special needs, as defined in Section 5.15.01, who have served in the armed services of the United
States for a period of at least six months (or any shorter period due to injury incurred in such service)
and have been thereafter discharged or released therefrom under conditions other than dishonorable.
The HCR model Housing/Services Agreement which can be found on the HCR website at
http://www.nyshcr.org/Forms/SpecialNeeds/HsgSvcsAgreement.pdf.
5.15.04 Identification of a Senior Housing Project
Applications proposing projects serving the elderly must identify whether their project will
be structured as a 55 year or older or as a 62 years or older project:
• A 55 or older project is a project in which at least 80% of the occupied units are occupied by
at least one person who is 55 years of age or older.
• A 62 or older project is a project in which ALL occupants are persons 62 years of age or
older.
Under both structures, the projects must be operated, advertised, and intended to serve a
primarily elderly population. In HCR projects which are jointly financed by the US Department of
Agriculture and Rural Housing Services, elderly projects must be occupied by persons 62 years or
older, or by handicapped persons of any age. Please note that projects which intend to restrict
tenancy for any portion of the units in the project based on age shall provide proof of receipt of an
exemption from the New York State Division of Human Rights (DHR) in accordance with N.Y.
Exec. Law § 296-2a(e) and the federal Fair Housing Act, 42 U.S.C. 3601 et seq., as a condition of
Office of Finance and Development
Capital Programs Manual
Page 69 of 71
HCR funding. Verification of this exemption must be provided directly to DHCR’s Fair and
Equitable Housing Office (FEHO) subsequent to award.
5.15.05 Most Integrated Setting
In its 1999 Olmstead v. L.C. decision, the US Supreme Court ruled, in accordance with the
American with Disabilities Act (ADA), that states have an obligation to provide services to
individuals with disabilities in the most integrated setting appropriate to their needs. Working in
collaboration with State, Federal, and/or local partners, HCR will review all proposals to assess
whether persons with disabilities will be served in the most integrated setting appropriate to their
needs.
Office of Finance and Development
Capital Programs Manual
Page 70 of 71
Section: 5.00 DEVELOPMENT REQUIREMENTS
Sub Section: 5.16 Federal Labor Standards Regulatory Requirements
5.16.01 Davis-Bacon Related Acts
Federal Labor Standards may be required for the construction of projects funded by HCR.
Information regarding the Labor Standards is available in the US Department of Labor (US DOL)
Prevailing Wage Resource Book on Tab 3; “Introduction to the Labor Standards Statutes Coverage”:
www.dol.gov/whd/recovery/pwrb/Tab3.pdf.
As explained in the US DOL document referenced above, under the Davis-Bacon Related
Acts, the requirements of the Davis-Bacon Act can be triggered by funding under certain Federal
programs to projects which meet specific threshold requirements. In nearly all instances where these
requirements are triggered on HCR funded projects, they are tied to assistance provided to the
project from HUD programs. This includes assistance directly administered by HUD, by HCR, or
any other State, County, or local entity. For detailed information regarding when Davis-Bacon
requirements apply due to assistance by HUD programs, please review the “Factors of Labor
Standards Applicability” on HUD’s website:
http://portal.hud.gov/hudportal/documents/huddoc?id=13441aII-6SECH.pdf
HCR monitors and enforces compliance with Federal Labor Standards on funded projects as
required by federal regulations and guidance issued by US DOL Wage and Hour Division and HUD
Office of Labor Relations. Contractors and project owners are directly and ultimately responsible
for knowledge of, and full compliance with all related laws and regulations. Failure to comply or
falsification of records may result in withholding of funds, investigation by US DOL, debarment,
fines, and/or criminal charges.
5.16.02 Requirements Prior to Submitting an Application
• Determine if Davis-Bacon Requirements will apply (If No, all following requirements in
5.16.03 and 5.16.04 are not applicable); and,
• Use wage rates from the most recent applicable (based on location and construction type)
Davis-Bacon Wage Decision in estimation of construction costs.
Office of Finance and Development
Capital Programs Manual
Page 71 of 71
5.16.03 Requirements Prior to Executing Any Construction Contract or Starting Any Work
• Confirm that no contractors or sub-contractors being considered for the project are on any
Federal or New York State debarment list or otherwise prohibited from bidding on or
receiving government contracts; and,
• Contact HCR OF&D for guidance and instruction regarding the correct Davis-Bacon Wage
Decision and all other requirements.
5.16.04 Awarded Projects Subject to Davis-Bacon Requirements
If an awarded project is subject to Davis-Bacon requirements and HCR has responsibility for
compliance monitoring and enforcement, the project owner and general contractor will be provided
with detailed information and requirements by OF&D Davis-Bacon staff in writing (via e-mail) after
awards are made and prior to construction start. This will include information on:
• The applicable Wage Decision(s) and Wage Decision lock-in process;
• Requirements for Construction Contracts;
• Project site signage requirements;
• Construction start; and,
• HCR requirement for General Contractors and all Subcontractors to submit Certified Payroll
Reports and other Davis-Bacon information electronically via an online system.
5.16.05 Additional Resources
• HUD Contractor's Guide to Prevailing Wage Requirements for Federally-Assisted
Construction Projects: http://portal.hud.gov/huddoc/4812-LRguide.pdf;
• US DOL: Prevailing Wage Resource Book: www.dol.gov/whd/recovery/pwrb/toc.htm; and,
• HUD: Handbook: Federal Labor Standards Compliance in Housing and Community
Development Programs (sect. 1344.1):
http://portal.hud.gov/hudportal/HUD?src=/program_offices/administration/hudclips/handboo
ks/sech/13441
Office of Finance and Development
Capital Programs Manual
Page 1 of 41
Section: 6.00 ADMINISTRATIVE PROCESSING REQUIREMENTS
Sub Section: 6.01 Introduction
6.01.01 Summary
This Section describes HCR’s general administrative and construction processing
procedures and requirements; the roles and responsibilities of the project participants; procedures
for change orders, budget modifications, award increases, and escrow accounts; HCR’s
disbursement process; and cost certification requirements, where applicable.
Office of Finance and Development
Capital Programs Manual
Page 2 of 41
Section: 6.00 ADMINISTRATIVE PROCESSING REQUIREMENTS
Sub Section: 6.02 Administrative Procedures and Requirements
6.02.01 Project Development Meeting
Once a project has received an Award Letter, the assigned HCR project manager will
contact the primary contact person identified in the application (Exhibit 1A.8) within 14
business days to schedule the Project Development Meeting. The primary contact person will be
the primary contact and coordinator for the project. The Project Development Meeting will be
held within 30 days of receipt of the Award Letter. All award conditions (if any); project
requirements, submissions, and deadlines related to the project's economics, design, and
ownership will be discussed, as will the roles and responsibilities of the various project
participants.
The discussions at the Project Development Meeting will result in a Development
Timetable Letter which will provide specific deadlines based upon the Development Track of
the project. There are three Development Tracks, each of which involves different levels of
review and DHCR/HTFC involvement, based upon the project's funding sources. The processes
for the three Development Tracks are discussed in Section 6.05. If issues at the Project
Development Meeting cannot be resolved, or if the applicant can no longer provide the project
in the application without any substantial changes, the State expects to terminate its
commitment to the project.
6.02.02 Funding Commitment Letter (FCL)
After the Project Development Meeting is held and all issues related to the FCL are resolved
to HCR’s satisfaction, a FCL will be issued to successful applicants. The FCL describes the
project, as well as defines the relationship between the State and the applicant. It will set forth,
as applicable, the following specifics on project scope:
(i) the number, configuration, and addresses of units in the project, and information
about the project owner;
(ii) income groups to be served;
(iii) project financing and equity requirements;
Office of Finance and Development
Capital Programs Manual
Page 3 of 41
(iv) operating economics;
(v) development timetable and schedule of submissions;
(vi) minority and women-owned business participation;
(vii) environmental submissions;
(viii) design requirements and construction documents;
(ix) marketing and management plans, fair housing-affirmative marketing plan;
(x) special needs requirements, if applicable;
(xi) closing requirements;
(xii) HOME project Federal requirements (if applicable); and,
(xiii) Community Housing Development Organization (CHDO) Requirements, if
applicable.
The terms of the FCL will provide for the delivery of the proposed housing product. Where
an applicant is unwilling or unable to comply with terms of the FCL, funds for the project will be
terminated, unless it is in the State's best interest to continue.
Applicants will be given 30 days from receipt of letter to review the FCL, and to return
an original signed copy of the FCL to Hampton Plaza. The signature and return of the FCL by
the applicant will indicate the acceptance of all terms and conditions set forth therein. If the
applicant is unable to sign and return the FCL within the 30-day timeframe, HCR will consider
this a failure to accept all terms and conditions contained in the FCL. This will have the effect of
terminating the FCL and all terms and conditions will have to be reconsidered.
Applicants are expected to comply with the terms of the executed FCL; failure to comply
with such terms is likely to result in its termination. In general, HCR is reluctant to consider
changes to the terms of the FCL once it has been issued. Requests for nominal or de minim is
changes in rents, or operating and development costs specified in the FCL may be considered
with a clear, detailed narrative describing the reasons for the requested changes. Significant
changes, including but not limited to changes in tenancy, ownership to unrelated parties, use,
amount of HCR financing, project timetables, sites, etc. will require a clear, detailed narrative
describing the reasons for the requested changes and the impact on project budgets etc. Any
significant revisions to conditions set forth in the FCL must be evaluated by staff, and the
applicant must receive prior approval by HCR before implementation. This reevaluation will
Office of Finance and Development
Capital Programs Manual
Page 4 of 41
ensure that no other alternatives to the requested changes(s) exist, and that the project would
have scored highly enough to merit funding given the change in project scope. HCR will not
approve changes in a FCL which affect the project's competitiveness or in other ways that would
affect the outcome of the funding competition. HTFC Board approval will be required for any
significant change(s), including any requests to increase HOME/HTF funding by more than ten
percent or more above the award amount already approved by HTFC Board.
The HTFC funding award for any project which has not progressed to a loan closing on
all sources of construction financing within 365 days of award will automatically lapse. Such
applicants will be required to submit written justifications to their project manager detailing the
reasons for the delay, the steps being taken to move the project to a construction financing
closing and the timeframe for closing. Board reauthorizations will be required for any project
with a lapsed award.
6.03 Funding Increase Under HCR Programs
HCR will, in general, not approve any requests for funding increases in an amount above
the project reservation or award amount due to costs that were not in the original development
budget or because of loss of other funding sources identified in the application development
budget. HCR expects that such cost increases or funding losses will be funded through
completion guarantees, contingency funds, developer’s fees and/or builder’s profit. In projects
where there is an identity of interest between the general contractor and the project sponsor, no
increases in builder’s fees will be recognized in HCR’s evaluation of the increase request. To
the greatest extent possible, project architects and/or engineers should review proposed changes
to ensure maximum cost efficiency have been obtained with all design changes, consistent with
HCR design requirements. Additionally, improved terms by banks, syndicators and builders
should also be considered. The owner/sponsor must demonstrate to HCR’s satisfaction that they
have explored alternatives to reduce, offset and/or fund increases in costs.
HCR may consider requests for additional funding above the amount awarded due to
unusual circumstances such as acts of God; changes in the laws applicable to low-income
housing programs; changes in building codes; changes in Davis-Bacon wage rates; changes in
local ordinances or regulations; or other circumstances that could not have been foreseen by the
Office of Finance and Development
Capital Programs Manual
Page 5 of 41
Owner/Sponsor. In the event there are circumstances that would justify additional funding, HCR
will only increase its funding when the economic viability of the project is in jeopardy and when
all the budgeted resources identified above have been exhausted.
Such a request for additional funding by the Owner/Sponsor shall be subject to a
rescoring of the application by the HCR to ensure that it would not have affected the project’s
status in the relevant funding round. When appropriate, any additional funding will also be
subject to HCR approval. HCR may consider other factors including, but not limited to:
availability of funds, the timing of requests, assessment of responsibility for cost increases,
minimizing increases, cost sharing and identity of interest between the developer and builder.
Any increases granted shall conform to the terms of the QAP and the CPM.
6.03.01 Evaluation Milestones
Applicable laws require that HCR underwrite each LIHC project three times: prior to
issuing a credit reservation, at binding agreement/carryover and at the time of submission for
IRS Form 8609. In order to enhance HCR efficiency and to eliminate redundant procedures, all
requests for additional funding should, within the limitations provided below, be coordinated
with one of the three milestone underwrites. HCR will not entertain more than one request for
additional funding for any one project unless there is a demonstrable error by HCR. Requests for
additional funding can be made in coordination with each of the aforementioned three milestones
pursuant to the following guidelines:
1) Prior to accepting a LIHC reservation – within 10 days of receipt of the reservation letter,
if the Owner/Sponsor should have any issues with the HCR recommended funding level;
a revised underwriting will be considered by HCR upon written request. The
Owner/Sponsor must demonstrate to HCR, in writing, that HCR misinterpreted
information in the application.
2) Prior to requesting a binding agreement/carryover – request for additional funding should
be made no more than 45 days and no less than 30 days prior to binding
agreement/carryover.
3) At the time of submission for IRS Form 8609 – HCR will not accept requests for
additional funding during the time period between carryover allocation and submission
Office of Finance and Development
Capital Programs Manual
Page 6 of 41
for IRS Form 8609 unless HCR determines that emergency remedial action is required.
At the time of the IRS 8609 submission, HCR will only consider for additional funding
those additional costs that resulted from events that were completely beyond the control
of the Owner/Sponsor.
6.03.02 Underwriting Parameters
HCR underwriters will employ the following review methodology for all requests for
additional funding:
1) The HCR project underwriter, in conjunction with the HCR supervising underwriter and
HCR architect, if applicable, will make recommendations to the OF&D Executive Staff
as to whether the additional expenses or loss of funding are necessary to the project and
whether the additional project costs are reasonable based on HCR experience with similar
projects. Costs not deemed essential to the project will be required to be paid for by the
Owner/Developer and will not be considered eligible for additional funding.
2) HCR staff, including the underwriter, architect, if applicable, and project manager will
make recommendations to the OF&D Executive Staff as to whether cost increases for
items deemed necessary for the project or the loss of funding resulted from events that
were within or beyond the control of the Owner/Developer using the categories below as
a guide.
Category A – Increases in costs originating with HCR such as:
a) issues which arise from staff interpretation of applications;
b) changes in plans and specifications that were requested by HCR, and that go
beyond the established requirements in the HTFC Design Handbook or the
QAP;
c) changes in wage rates arising from a decision by HCR to award funding under
a program not applied for by the Owner/Developer; and/or,
d) changes mandated by revisions in the applicable building codes, regulations,
and laws governing the construction of housing that occur after the time of
award of HCR funding.
Office of Finance and Development
Capital Programs Manual
Page 7 of 41
Category B – Increases in costs or the loss of funding that were beyond the control of the
Owner/Developer and that could not have been foreseen prior to award (e.g., the owner/sponsor
can demonstrate that the established requirements for local approval were changed after award of
funds) such as:
a) changes in plans and specifications required in connection with local approval
because the stated requirements were changed after the award of funds;
b) acts of God (flood, earthquake); and/or,
c) change in financing resulting from non-project specific factors that could not
have been foreseen by the Owner/Developer’s (i.e., change in prime rate or
bank/market failure).
Category C – Cost increases or losses in funding that could or should have been foreseen by the
Owner/Developer such as:
a) refinement or amendment of plans and specifications;
b) changes in plans and specifications required in connection with local
approvals;
c) municipal impact or recreation fees;
d) updated development cost line items;
e) addressing environmental issues that were known or should have been known
by the developer;
f) addressing site conditions that were known or should have been known by the
developer;
g) increases in costs due to work stoppage resulting from actions or inaction by
the Owner/Developer;
h) replacement of financing previously committed;
i) required increases in operating reserves to compensate for loss of operating
subsidies; and/or,
j) required increases in replacement reserves to cover inadequate warranties.
Office of Finance and Development
Capital Programs Manual
Page 8 of 41
Category D – Cost increases arising from significant, unexpected increases in mandated
Davis-Bacon Wage Rates post–award and prior to construction contract execution and wage
rate lock in.
6.03.03 Methodologies for Determining Cost Sharing
Funding increases will be treated based on the appropriate categories as described above
in the following manner:
Category A – HCR will generally allow for additional funding, if appropriate and subject
to the availability of funds, without requiring the Owner/Developer to increase, defer, or
contribute developer fees.
Category B – HCR will utilize cost sharing techniques to allocate responsibility for any
additional costs as follows:
a) any developer fees in excess of a 10% fee, based upon developer fee eligible
costs (as described in the Qualified Allocation Plan Section 2040.3(g)(2)(ii)
and CPM Section 5.05(vi)) and as recognized in the original award, will first
be contributed back to the project by the Owner/Developer to pay for cost
increases. In addition, if there is an identity of interest between the project
owner/developer and the builder, at least 50% of builder’s profit, as
recognized in the original award, will first be contributed back to the project.
Any remaining financing gap after accounting for these actions and any other
actions taken will be paid for by equal cost sharing (50/50) between HCR
through additional funding by HCR and by the Owner/Developer through
deferred developer fees or other contributions. However, HCR may elect to
require the Owner/Developer to pay a larger share of any cost increase that
HCR determined could have been mitigated by the Owner/Developer.
Category C – HCR will utilize cost sharing techniques to allocate responsibility for any
additional costs as follows:
a) any developer fees in excess of a 10% fee, based upon developer fee eligible
costs (as defined in the Qualified Allocation Plan Section 2040.3(g)(2)(ii) and
CPM Section 5.05(vi)) and as recognized in the original award, will first be
Office of Finance and Development
Capital Programs Manual
Page 9 of 41
contributed back to the project by the Owner/Developer to pay for cost
increases. In addition, if there is an identity of interest between the project
owner/developer and builder, at least 50% of builder’s profit, as recognized in
the original award, will first be contributed back to the project; and,
b) any remaining financing gap after accounting for these actions and any other
actions will be paid for by cost sharing between HCR and the
Owner/Developer. HCR may contribute up to 20% of such costs as
determined by HCR through additional allocations, and the balance of any
remaining financing gap for all cost increases shall be paid for by the
Owner/Developer or through non-HCR funds.
Category D - HCR will utilize cost sharing techniques to allocate responsibility for any
additional costs as follows:
a) the financing gap attributable to significant, unexpected increases in mandated
Davis-Bacon wage rates will be paid for by cost sharing between HCR and the
Owner/Developer. HCR may contribute up to 80% of such costs as determined by
HCR through additional allocations, and the balance of any remaining financing
gap for all cost increases shall be paid for by the Owner/Developer or through
non-HCR funds.
For purposes of additional allocations, HCR may, in its discretion, make such allocations
through LIHC, HOME, and/or HTF awards, or other resources for which the project is eligible,
or by permitting rent increases as it deems appropriate. HCR may, in its discretion, consider
additional underwriting solutions in order to efficiently facilitate project completion.
6.03.04 Process for Requesting Additional Allocations
The Owner/Developer will make a formal written request to the HCR project manager.
The request shall include:
• Original Exhibits (Development Budget, Rent Plan, Affordability Plan, and
Operating Budget) and the proposed amended Exhibits.
• Chart indicating items that changed, original cost, actual cost, change in cost, and
a concise narrative explaining the reason for each change.
Office of Finance and Development
Capital Programs Manual
Page 10 of 41
• For any cost increases resulting from events driven by forces outside the
Owner/Developer’s control, clear documentation demonstrating the need for the
change (i.e., letter from local zoning official, request from financing entity).
• For standalone tax credit projects that have not undergone design review by HCR,
additional documents may be required.
• In the case of requests for additional funds due to unexpected increases in
mandated Davis-Bacon Wage Rates, these additional requirements will also
apply:
o The cost increases must be documented to HCR’s satisfaction to be
solely attributable to the revision of the applicable Wage Rate; and,
o The owner/sponsor must document that the project has proceeded
without delay to construction contract execution, and wage rate lock-
in, consistent with the development timeline proposed in the
application for funding,
If the request for an increase is denied, the HCR project manager will notify the
Owner/Developer and all other involved parties of the action. If the request is approved, Program
Management will prepare the revised FCL exhibits with input, as necessary, from A&E and
Underwriting.
Office of Finance and Development
Capital Programs Manual
Page 11 of 41
Section: 6.00 ADMINISTRATIVE PROCESSING REQUIREMENTS
Sub Section: 6.04 Assignment and Transfer of Awards and Commitments
Funding awards or commitments may be transferred or assigned from one eligible applicant
to another eligible applicant if the following conditions pertain:
• the applicant to which the funding award or commitment is to be transferred can satisfy
the criteria for eligible applicants established by HTFC;
• the applicant to which the funding award or commitment is to be transferred can satisfy
the operational standards established by HTFC; and,
o the applicant to which the funding award or commitment is to be transferred will
be operated by substantially the same staff or staff with expertise equivalent to the
staff of the original applicant;
o governed by substantially the same board as the original applicant; or,
o a new entity that was formed to satisfy the requirements of other federal, state or
local regulations and can demonstrate that it has, or will hire, the needed expertise
to successfully complete and operate the project.
All transfers or assignments must be approved by HTFC. The assignment request should be
submitted at least 30 days prior to the project’s construction closing. It remains the project
sponsor’s responsibility to satisfy the above conditions and to request an assignment from HTFC
through the assigned project manager. The following documents are required for HTFC to
process an assignment request:
1) a letter from the applicant requesting the assignment of the award including the name of
the new entity.
2) an organizational chart, along with a narrative of the proposed ownership structure.
3) all legal documents which support the structure of the newly proposed ownership which
must establish the organizational tie-in of the original applicant (Articles of
Incorporation, Certificate of Incorporation, etc.).
No transfer or assignment can occur unless it is demonstrated that the new applicant has
sufficient development and management experience. If a project is transferred to homesteaders
or a self-managed cooperative or condominium association, HTFC will require that regulatory
Office of Finance and Development
Capital Programs Manual
Page 12 of 41
monitoring responsibilities remain with the original applicant. If an HTF or HOME award
granted to a not-for-profit or Community Housing Development Organization (CHDO) is
requested to be assigned to a private developer, the approval of the assignment is conditioned
upon HCR’s annual HTF awards being below the private developer limit per the HTF statute,
and HCR’s annual HOME awards meeting the HOME Final Rule requirement that at least 15%
of NYS HOME allocation is made to CHDO’s.
Office of Finance and Development
Capital Programs Manual
Page 13 of 41
Section: 6.00 ADMINISTRATIVE PROCESSING REQUIREMENTS
Sub Section: 6.05 CHDO Determination Process
A Community Housing Development Organization (CHDO) is a private nonprofit,
community-based organization that has staff with the capacity to develop affordable housing for
the community it serves. To qualify for designation as a CHDO, the organization must meet
certain requirements pertaining to its legal status, organizational structure, and capacity and
experience. To count towards the 15 percent CHDO set-aside required by HUD in funding site-
specific NYS HOME-financed projects, a CHDO must engage in an eligible set-aside activity.
Please see 24 CFR 92.208, 24 CFR 92.300, CFR 92.301.
A CHDO determination is made on a project specific basis. Each time NYS HOME funds
are committed to a project, the applicant’s non-profit qualifications to be a CHDO must be
certified by HCR. Required submissions to obtain a CHDO determination from HCR include the
items contained in the HUD CHDO checklist.
It is HCR’s preference and in the applicants best interest to submit the items on the HUD
CHDO checklist a minimum of 60 days prior to the funding round application deadline. The
HUD CHDO checklist items must be submitted to [email protected]. Once HCR has
completed the CHDO review and issued a determination letter based upon the applicants’
organizational characteristics, the letter must be submitted as part of the Unified Funding
application for the project the CHDO designation is being sought for. The HCR determination
letter must have been issued no more than six months prior to the pertinent Unified Funding
round application submission deadline, provided there have been no material changes to the
organizational subsequent to the determination letter issuance which would affect CHDO status.
Any such material changes to the organization must be identified and communicated to HCR
prior to application by sending an email describing the changes and appropriate documentation
to HCR through [email protected].
Applicants may also submit the HUD CHDO checklist items as part of the Unified
Funding Round project application in order for HCR to undertake a review of the project’s
qualification for designation as a CHDO. Applicants are reminded that there is a communication
blackout once the Unified Funding Round applications are submitted. Therefore, there will be no
Office of Finance and Development
Capital Programs Manual
Page 14 of 41
opportunities for HCR staff to communicate and resolve and issues surrounding the project’s
CHDO request and designation.
Office of Finance and Development
Capital Programs Manual
Page 15 of 41
Section: 6.00 ADMINISTRATIVE PROCESSING REQUIREMENTS
Sub Section: 6.06 Development Team Member Change
Should there be a change in a development team member, or if a general
contractor/builder is identified after funding, the following documents must be submitted within
five (5) business days of the change:
1) Exhibit 1;
2) Exhibit 3;
3) Exhibit 7, and any other pertinent exhibits that have been impacted by the change;
4) A written explanation of the rationale for the change and any impact to the current
budget;
5) Development Team Omnibus Certification;
6) Consent and Release for Nonpublic Personal Information; and,
7) Proposed contract or written agreement with the new proposed development team
member, such as Owner-Architect contract, Proposed Owner-GC contract, Management
Agreement, Consultant Contract, or the contract with proposed partner delineating roles
and responsibilities.
Contact your assigned project manager for the forms listed above.
Office of Finance and Development
Capital Programs Manual
Page 16 of 41
Section: 6.00 ADMINISTRATIVE PROCESSING REQUIREMENTS
Sub Section: 6.06 Project Development Tracks
Development Track One is for projects involving HTF/HOME for permanent financing.
This may also include HTF/HOME projects financed in combination with LIHC/SLIHC (See
6.05.02).
6.06.01 Development Track One Process (HOME/HTF Permanent Financing Only)
For projects following this Development Track, the following HCR technical units need
to provide approvals in order for a construction closing to be scheduled:
1) Architecture and Engineering Bureau (A&E) and Environmental: complete review of
construction drawings and final cost estimates, along with an environmental review.
A&E will not provide clearance to close unless all requirements listed in Exhibit 7
and 8 of the FCL have been met.
2) Underwriting: complete review of the financing requirements contained in Exhibits 2,
3 and 4 of the FCL in order to provide clearance to close on construction financing.
3) FHEO: all requirements contained in Exhibit 6 of the FCL must be submitted and
approved (as applicable) in order to provide clearance for construction closing.
4) AMU: all requirements contained in Exhibit 9 of the FCL must be submitted and
approved (as applicable) in order to provide clearance for construction closing.
5) Special Needs: all requirements contained in Exhibit 10 of the FCL must be
submitted and approved (as applicable) in order to provide clearance for construction
closing.
The applicant must declare to HCR if a Tri-Party or Takeout Agreement is required for
construction closing. The requirements for this agreement can be found in the Legal Documents
Manual, Index XVI, Closing Requirements Checklist, Permanent Loan Closing Checklist I. All
submissions are required to be received by HCR by the dates in the Development Timetable
Letter.
After the construction closing, the majority of the construction related correspondence
will occur through the HCR architect. At approximately 75% construction completion, the
Office of Finance and Development
Capital Programs Manual
Page 17 of 41
applicant/owner must request a Rent-Up Conference through the project manager with staff from
the Asset Management Unit of the Office of Housing Preservation. The purpose of this meeting
is to review any statutory and/or regulatory requirements regarding rent-up, tenant selection, and
occupancy requirements of the project. Please see Section 7 for all Project Operating and
Management Requirements.
The HTF/HOME permanent loan closing will occur upon satisfactory completion of the
project in accordance with the terms and conditions set forth in Exhibit 11 of the FCL. It is the
responsibility of the owner to satisfy HCR’s determination of satisfactory completion of the
project per the Closing Requirements Checklist in the Legal Documents Manual Index XVI,
Permanent Loans. The project owner will be required to enter into a HTF Regulatory Agreement,
HTF/HOME Mortgage and Security Agreement, HTF/HOME Promissory Note, HTF/HOME
Subordination Agreement (requires a request from the applicant/lending institution if provisions
of HTFC Regulatory Agreement are proposed to be waived, and HTFC’s approval), and/or
HOME Deed Restriction and Match Addendum as applicable. See Section 6.08 for the
disbursement of HTF/HOME funds from HTFC.
6.06.02 Development Track One (HTF/HOME Permanent Financing with LIHC/SLIHC)
Development Track One also includes projects involving HTF/HOME and LIHC/SLIHC,
which require permanent takeout financing with HTF/HOME and credit equity. Please see
Section 6.05.01 for the HTF/HOME requirements for construction closing. If a LIHC/SLIHC
Binding Agreement is necessary, the submission requirements are contained within the project’s
LIHC/SLIHC Reservation Letter Sections 1) and 2). The LIHC/SLIHC Reservation Letter
Section 1) deliverables are due a minimum of 60 days before the LIHC/SLIHC Reservation
Expiration date, while Section 2) deliverables are due a minimum of 30 days before the
LIHC/SLIHC Reservation Expiration date. Please note, not every project will require a
LIHC/SLIHC Binding Agreement and it is not a HCR requirement. It remains the project
owner’s responsibility to notify the assigned HCR project manager that a LIHC/SLIHC Binding
Agreement will be required prior to the submission dates. See Section 2.03 or the QAP for more
information on LIHC Binding Agreements.
Office of Finance and Development
Capital Programs Manual
Page 18 of 41
After the construction closing, the project owner must submit the required documents for
the LIHC/SLIHC Carryover Allocation. The requirements for the LIHC/SLIHC Carryover
Allocation can be found in the LIHC/SLIHC Reservation Letter Section 3) and 4). The
LIHC/SLIHC Carryover Allocation documentation must be submitted per the dates contained
within the LIHC/SLIHC Reservation Letter Section 3) and 4). The submission dates are also
contained within the Development Timeline Letter. While a Binding Agreement is optional, a
Carryover Allocation is a required for all LIHC/SLIHC allocations.
During construction, the majority of the construction related correspondence will be
through the HCR architect. At approximately 75% construction completion, the applicant/owner
must request a Rent-Up Conference through the project manager with staff from the Asset
Management Unit of the Office of Housing Preservation. The purpose of this meeting is to
review any statutory and/or regulatory requirements regarding rent-up, tenant selection, and
occupancy requirements of the project. Please see Section 7 for all Project Operating and
Management Requirements.
See Section 6.05.01 for the HTF/HOME requirements for permanent closing. After the
HTF/HOME permanent closing, the project owner must submit the 8609/DTF-625 package to
the project manager in order to claim the LIHC/SLIHC allocated to the project. The instructions
and requirements for the 8609/DTF-625 can be found at the HCR website:
http://www.nyshcr.org/Programs/LIHC/8609_Instructions.pdf.
Should the project sponsor require an 8609 to be delivered at the permanent closing table,
a written request with a detailed explanation must be provided to the project manager no later
than 60 days prior to the anticipated permanent closing date.
6.06.03 Development Track Two Process (LIHC/SLIHC Alone)
This process is followed by projects involving LIHC/SLIHC only. If a LIHC/SLIHC
Binding Agreement is necessary, the submission requirements are contained within the project’s
LIHC/SLIHC Reservation Letter Sections 1) and 2). The LIHC/SLIHC Reservation Letter
Section 1) deliverables are due a minimum of 60 days before the LIHC/SLIHC Reservation
Expiration date, while Section 2) deliverables are due a minimum of 30 days before the
LIHC/SLIHC Reservation Expiration date. Please note, not every project will require a
Office of Finance and Development
Capital Programs Manual
Page 19 of 41
LIHC/SLIHC Binding Agreement and it is not a HCR requirement. It remains the project
owner’s responsibility to notify the assigned HCR project manager that a LIHC/SLIHC Binding
Agreement will be required prior to the submission dates. See Section 2.03 or the New York
State Qualified Allocation Plan for further information on Binding Agreements.
After the construction closing, the project owner must submit the required documents for
the LIHC/SLIHC Carryover Allocation. The requirements for the LIHC/SLIHC Carryover
Allocation can be found in the LIHC/SLIHC Reservation Letter 3) and 4). The LIHC/SLIHC
Carryover Allocation documentation must be submitted per the dates contained within the
LIHC/SLIHC Reservation Letter 3) and 4). The submission dates are also contained within the
Development Timeline Letter. While a Binding Agreement is optional, a LIHC/SLIHC
Carryover Allocation is a required IRS project review point.
At construction completion, the project owner must submit the 8609/DTF-625 package to
the project manager in order to claim the LIHC/SLIHC allocated to the project. The instructions
and requirements for the 8609/DTF-625 can be found at the HCR website:
http://www.nyshcr.org/Programs/LIHC/8609_Instructions.pdf.
6.06.04 Development Track Three Process (HCR Construction Loan)
This process is followed by projects utilizing HTFC construction financing. All the
required submissions listed in the Construction Loan Closing Checklist in the Legal Documents
Manual Index XVI must also be submitted to the project manager per the dates contained in the
Development Timeline Letter. The construction loan closing will be scheduled once the assigned
project manager and OLA attorney have received approval from all HCR technical units that the
requirements of the FCL have been met. Project sponsors will be required to enter into a
construction loan agreement which can be found in the Legal Documents Manual Index IV.
After the construction closing, the HTF construction funds can be requested from HTFC
per the Construction Loan Progress Payment Request process detailed in Section 6.09.01. During
construction, most the correspondence will be through the HCR architect. At approximately 75%
construction completion, the applicant and/or owner must request a Rent-Up Conference through
the project manager with staff from the Asset Management Unit of the Office of Housing
Preservation. The purpose of this meeting is to review any statutory and/or regulatory
Office of Finance and Development
Capital Programs Manual
Page 20 of 41
requirements regarding rent-up, tenant selection, and occupancy requirements of the project.
Please see Section 7 for all Project Operating and Management Requirements.
If HOME/HTF funds are also being used for permanent financing, the HTF/HOME
permanent loan closing will occur upon satisfactory completion of the project in accordance with
the terms and conditions set forth in Exhibit 11 of the FCL. It is the responsibility of the owner to
satisfy DHCR/HTFC’s determination of satisfactory completion of the project per the Closing
Requirements Checklist in the Legal Documents Manual Index XVI, Permanent Loans. The
project sponsor will be required to enter into a HTF Regulatory Agreement, HTF/HOME
Mortgage and Security Agreement, HTF/HOME Promissory Note, HTF/HOME Subordination
Agreement, and/or HOME Deed Restriction and Match Addendum, as applicable.
Office of Finance and Development
Capital Programs Manual
Page 21 of 41
Section: 6.00 ADMINISTRATIVE REQUIREMENTS
Sub Section: 6.07 Construction Processing Requirements
6.07.01 Pre-Construction Meeting Requirements
A pre-construction meeting shall be held at the beginning of the construction period. In
requiring the pre-construction meeting, HCR’s goal is to expedite the project's construction by
setting forth program regulations, procedures, and contract requirements, as well as clearly
delineating the roles and responsibilities of each of the project participants. Preconstruction
meeting attendees should include the following, as applicable:
(i) the awardee/owner, or their representative;
(ii) the builder, or their representative;
(iii) the project architect;
(iv) the A&E construction monitor;
(v) the OF&D project manager;
(vi) the A&E staff architect;
(vii) the construction lender's representative, if applicable;
(viii) the representative of any other funding source, if applicable;
(ix) the construction manager, if applicable;
(x) the energy efficiency consultant;
(xi) the green building consultant;
(xii) the HCR Fair Housing and Equal Opportunity representative; and,
(xiii) the municipal representative.
The A&E architect will lead and facilitate the pre-construction meeting. The following
agenda sets forth the topics that will be discussed at the meeting:
(i) introduction of project participants/signing of attendance sheet;
(ii) roles and responsibilities of project participants;
(iii) review of General Conditions:
(a) permits;
(b) progress schedule;
(c) list of subcontractors and suppliers;
Office of Finance and Development
Capital Programs Manual
Page 22 of 41
(d) schedule of Values;
(e) construction supervision;
(f) shop drawings and material submissions;
(g) payments;
(h) change orders;
(i) responsibility for damage;
(j) disputes;
(k) delays;
(l) as-built/record drawings and warranties;
(m) insurance;
(n) construction start and completion dates;
(o) temporary facilities; and,
(p) project sign.
(iv) scheduling of construction meetings;
(v) scheduling of A&E site inspections;
(vi) energy efficiency site representation;
(vii) green building site representation;
(viii) environmental concerns; and,
(ix) other issues.
The awardee or their representative must prepare minutes of the meeting immediately
thereafter, summarizing items discussed and specifying agreements made. Copies of the minutes
must be distributed to each project participant, within 5 business days whether or not they
attended the meeting.
6.07.02 Roles/Responsibilities of the Project Owner/Awardee
The project owner/awardee has the following responsibilities including, but not limited
to:
(i) selection and general supervision and coordination of the builder during
construction (the actions of the builder are the responsibility of the project
owner/awardee);
Office of Finance and Development
Capital Programs Manual
Page 23 of 41
(ii) completing, within the time frame specified in the contract, a project which meets
all program requirements;
(iii) assuring compliance with all Minority and Woman Owned Business Enterprise
(M/WBE) and Equal Opportunity requirements;
(iv) if applicable, assure compliance with all Federal Labor Standards (Davis-Bacon
Related Acts) regulatory requirements;
(v) processing and delivering all required paperwork regarding disbursement requests
to the OF&D Project Manager;
(vi) notifying the builder, private lender and any other funding source(s) (if
applicable) and the A&E construction monitor of all construction work which is
incomplete or incorrect;
(vii) providing change orders for all changes in the work prior to enacting any
changes;
(viii) immediately notifying HCR if the contractor or subcontractor places a mechanic's
lien upon the project;
(ix) immediately notifying HCR if a stop work order is issued;
(x) providing HCR as-built/record drawings and project warranties at the time of
project close-out;
(xi) ensuring that all required bonding, letters of credit, and/or retainages as required
by the construction lender;
(xii) ensuring that all environmental concerns are properly addressed;
(xiii) participating in the project's final inspection; and,
(xiv) ensuring compliance with all programmatic requirements triggered by public
sources of funding.
Project owners should also review Section 6.06.08 for a list of responsibilities with
regard to construction documents.
6.07.03 Roles/Responsibilities of the Project Architect
The project architect's responsibilities include, but are not limited to:
Office of Finance and Development
Capital Programs Manual
Page 24 of 41
(i) ensuring that the project is built in accordance with HCR approved construction
documents and all applicable Federal, State, and local codes, rules and
regulations;
(ii) making periodic site visits, but no less often than once every two weeks, to
determine the quality and progress of the work, and its compliance with HCR
approved construction documents;
(iii) issuing construction site visit reports to HCR and other interested parties;
(iv) notifying the owner and A&E construction monitor of any deficiencies, and
giving written notification to the contractor to correct deficiencies;
(v) preparing and submitting any necessary reports advising the owner of problems,
delays, changes, and disputes;
(vi) preparing change orders;
(vii) reviewing and approving shop drawings;
(viii) participating in requisition meetings, punchlist, and final inspections;
(ix) identifying punchlist items and amounts to be withheld pending their correction;
(x) meet all requirements applicable to project architects under Section 5.10;
(xi) certifying that the project has been completed in accordance with the HCR
approved construction documents, including any change orders; and,
(xii) preparing as-built/record drawings, if applicable.
The project architect also has responsibilities with regard to construction documents,
which are discussed in Section 6.06.08.
6.07.04 Roles/Responsibilities of the Builder
Builder’s responsibilities include but are not limited to:
(i) performing as specified in the Owner/Contractor or Owner/CM as Constructor
Agreement;
(ii) completing the project in accordance with HCR construction documents;
(iii) complying with Davis-Bacon Related Acts requirements, if applicable;
(iv) working with the owner and the project architect to resolve construction changes,
delays, and disputes;
Office of Finance and Development
Capital Programs Manual
Page 25 of 41
(v) providing the project architect and owner with written detailed cost estimates for
changes in the scope of work;
(vi) participating in the requisition meetings, construction meetings, punchlist, and
final inspections;
(vii) providing and updating the Schedule of Values;
(viii) coordinating site construction activities;
(ix) providing on-site security;
(x) completing construction on schedule and within HCR approved construction
budget;
(xi) meeting all requirements applicable to builders outlined in Section 5.10;
(xii) immediately notifying the owner if a mechanic's lien or stop work order is placed
upon the project;
(xiii) providing adequate supervision of the work;
(xiv) supervising all subcontractors and suppliers; and,
(xiv) documenting all changes for incorporation into the as-built/record drawings.
Contractors should review Sections 6.06.08, 6.06.09, 6.06.10 for a discussion of
responsibilities with regard to construction documents, schedule of values, and stored materials.
6.07.05 Roles/Responsibilities of the OF&D Project Manager
The OF&D project manager has the following responsibilities during the project
construction period:
(i) coordinating all project correspondence with the owner and with the HCR
technical units;
(ii) explaining to the owner all general disbursement and close-out procedures at the
preconstruction meeting;
(iii) reviewing and processing all payments, budget modifications, and award increase
requests;
(iv) notifying the owner and construction lender in writing of any construction
problems that may prevent the HCR from executing its permanent take-out; and
Office of Finance and Development
Capital Programs Manual
Page 26 of 41
agreement, or approving any change order requests, which may result in the
reduction of HCR funds available for permanent take-out; and,
(v) attending the project's final inspection.
6.07.06 Roles/Responsibilities of the A&E Construction Monitor
The A&E construction monitor is responsible for:
(i) monitoring construction (HDF projects will be inspected as set forth above only if
HCR is the lead review agency, or if HDF will fund 50% or more of the
construction loan amount);
(ii) monitoring and reporting to the A&E staff architect and OF&D project manager
the progress and quality of the project construction;
(iii) making recommendations to HCR for approvals of the contractor's payment
requests, if applicable;
(iv) assisting the A&E architect in reviewing change orders;
(v) overseeing the resolution of construction problems;
(vi) attend punchlist and final inspections to ensure that the project construction is
acceptable and in compliance with all HCR accepted construction documents;
and,
(vii) assisting the A&E architect in reviewing as built/record drawing and warranty
submissions.
6.07.07 Roles/Responsibilities of the A&E Architect
The A&E architect is responsible for:
(i) lead and facilitate the pre-construction meeting;
(ii) supervising the A&E construction monitor;
(iii) overseeing the resolution of any construction issues or problems;
(iv) reviewing and accepting change orders;
(v) reviewing whether environmental concerns have been satisfactorily addressed;
(vi) attend final close-out inspections; and,
(vii) reviewing whether the project is acceptable for occupancy.
Office of Finance and Development
Capital Programs Manual
Page 27 of 41
6.07.08 Responsibilities for Construction Documents
This Section does not apply to HDF Program projects unless HCR is the lead review
agency.
The project owner/awardee has the following responsibilities with regard to construction
documents:
(i) ensuring that the project architect maintains up-to-date plans, specifications,
addenda, modifications and change orders, and that the OF&D Project Manager,
A&E architect, and construction monitor receive such documents;
(ii) ensuring that the builder or any other designated representative of the project
owner obtains all necessary building permits, local approvals, licenses, etc., prior
to starting project construction, and that the OF&D Project Manager and A&E
architect receive such documents;
(iii) ensuring that the builder’s Schedule of Values is delivered to the A&E architect
prior to the start of construction, and that it has been reviewed and approved by
the owner's project architect;
(iv) ensuring that the contractor's Schedule of Values is updated to reflect all change
orders, and is then forwarded to the A&E staff architect;
(v) providing the HCR with all change order requests for HCR review and acceptance
prior to authorizing any changes to the contractor;
(vi) submitting the final close-out payment request to the OF&D Project Manager;
and,
(vii) submitting the as-built/record drawings and product warranties to the A&E
architect, or construction monitor, as designated.
6.07.09 Schedule of Values
This Section does not apply to HDF Program projects unless HCR is the lead review
agency.
The Builder must prepare and maintain a Schedule of Values for the project. The
Schedule of Values is preferred to be written on the AIA G703 Form (Continuation Sheet), and
must be reviewed and approved by the owner/awardee and project architect. The Schedule of
Office of Finance and Development
Capital Programs Manual
Page 28 of 41
Values must be submitted to the A&E architect prior to the start of construction. Progress
payment requests will not be processed by the OF&D project manager until the A&E
construction monitor compares the progress of construction to the estimates in the Schedule of
Values, and recommends approval of the percentages of completion reflected in the schedule.
6.07.10 Payment for Stored Materials
This Section does not apply to HDF Program projects unless HCR is the lead review
agency.
HCR policy is to process progress payments only when such work is completed and
permanently installed in the project. Requests for a waiver of this policy may be considered only
when there is a clear benefit to the agency. Circumstances, such as facilitating the builder’s cash
flow, are not considered benefits to the agency. Waiver requests occurring after the project is
selected for funding must demonstrate a tangible savings to the construction cost that
corresponds to a reduction of the HCR award. Waiver requests occurring prior to or concurrent
with the application must demonstrate a tangible savings to the construction cost that correspond
to a reduction in the funding requested from HCR. If a waiver is granted, the following items
must be satisfied to process progress payments that include the payment of stored materials:
(i) a letter certifying that the builder will take responsibility for the loss of materials, and
will not seek compensation from HCR for lost or stolen materials;
(ii) a letter certifying that the builder has on/off-site security;
(iii)proof of insurance to cover theft, damage, or other loss, of the materials at the location
where they are stored;
(iv) invoices and pictures of the stored materials that are submitted with the disbursement
request;
(v) inventory of the stored materials that are submitted with the disbursement request, which
also describes the materials (e.g., product and model number) and where the materials are
to be installed in the project;
(vi) stored materials are to be listed on a separate line on the builder’s application for
payment for the amount on the invoice; and,
Office of Finance and Development
Capital Programs Manual
Page 29 of 41
(vii) materials must be suitably stored on-site, or at a nearby location at a distance
acceptable to HCR.
After the above is received in a satisfactory manner, the A&E construction monitor will
visually inspect the materials and will photograph them at the next scheduled visit to the project.
The A&E construction monitor’s report of these findings and photographs will be transmitted to
the OF&D project manager with their recommendation for payment.
6.07.11 Disputes, Claims, Delays and Time Extensions
It is the owner/awardees responsibility to resolve any disputes and claims that arise
between the project architect, contractor and subcontractors. The owner/awardee must notify the
OF&D project manager, A&E architect, and construction monitor within ten days of the
occurrence of a dispute, claim, delay, time extension, stop work order, etc. Any resolution which
proposes a change in the work, an increase in the contract, a time extension, or other substantial
change to the project or construction will be reviewed and responded to in writing by HCR.
HCR may require that a "finding of fact" be prepared and submitted by the awardee/owner and
its attorney so that HCR can review the circumstances surrounding the claim, and make an
appropriate determination.
Office of Finance and Development
Capital Programs Manual
Page 30 of 41
Section: 6.00 ADMINISTRATIVE PROCESSING REQUIREMENTS
Sub Section: 6.08 Change Orders/Budget Modifications/Escrow Accounts
6.08.01 Change Orders
This section applies to HTF/HOME projects.
Change orders are to be prepared by the project architect utilizing the AIA G701 Form, or
equivalent alternative, who will submit them to the owner/awardee for approval. Change orders
must be submitted in a timely manner to allow HCR to properly review conditions in the field. If
delays in submission prevent HCR from properly reviewing the change order in the field, the
change order may be denied. In no case will HCR recognize any change orders for consideration
of project scope changes or requests for additional funding if they are received for review after
the issuance of either a temporary or permanent certificate of occupancy. The owner should not
sign a change order until it has been accepted by HCR; otherwise the use of contingency or other
funds for this work may be in jeopardy. Change orders must be submitted to the construction
monitor and A&E architect for review and acceptance prior to the builder enacting any changes
to the work.
All change order submissions must include the following:
(i) a completed change order form containing the number of the change order, date,
detailed description of the work to be performed, and the referenced change order
drawing(s) to be added to the construction documents, if applicable;
(ii) the cost of the work (credit, debit, or no charge);
(iii) the builder’s written proposal for the cost of the work, including their labor and
material breakdown or subcontractor bids;
(iv) the signatures of the project architect and builder;
(v) an estimate of additional time required to complete the work, if applicable;
(vi) architectural drawing(s) showing the proposed change, if applicable; and,
(vii) the project architect’s narrative which describes the change from the accepted
construction documents and provides a justification for the change. Costs should
also be reviewed and commented on.
Office of Finance and Development
Capital Programs Manual
Page 31 of 41
The change order review process begins when the owner, contractor, and project architect
discuss the proposed change or work with the A&E construction monitor at the construction
meeting. The A&E construction monitor will review the change order paperwork to ensure it
contains all necessary documents and that it is indeed a change from the contract documents
accepted by the A&E architect. The A&E architect will confer with the construction monitor and
the OF&D project manager prior to accepting the change order. Upon the A&E architect's
acceptance, the change order will be returned to the owner/awardee or their representative. Such
work should not be performed by the contractor prior to the A&E architect’s acceptance of the
change order. HCR’s approval of the change order authorizes use of the available contingency
funds. Any change order which exceeds the contingency funds allocated in the FCL is the
owner/awardee’s responsibility.
6.08.02 Emergency Change Order Requests
Emergency change orders requests are for those circumstances that would force a
shutdown of the work for an unreasonable amount of time or create a life safety hazard
condition. When making an emergency change order request, the owner must obtain the
builder’s maximum price for the work, which must be agreed upon by the owner/awardee and
project architect. The owner/awardee must notify the A&E construction monitor immediately of
the need to process an emergency change order, and provide the agreed upon price. The
construction monitor will endeavor to conduct a site visit as soon as possible and will confer with
the A&E architect. Once the emergency has been addressed, the project architect shall initiate a
change order in accordance with the standard change order process.
6.08.03 Escrow Accounts
On a case-by-case basis, OF&D may permit the establishment of escrow accounts for
HCR projects which are financed in conjunction with other Federal, State, private, or municipal
agencies. For HCR projects, funds may be deposited into the project's escrow account for
disbursement during construction, in accordance with the owner's Construction Loan Agreement
and the Escrow Agreement. The Escrow Agreement is a contract between the owner, HCR, and
an escrow agent, which establishes the terms and conditions under which the escrow agent may
Office of Finance and Development
Capital Programs Manual
Page 32 of 41
disburse funds, how the funds will be held on deposit, and in some cases, the terms of the
construction loan management. Escrow account management fees are negotiated on a case-by-
case basis. All unexpended funds and interest earned on HTF/HOME or HDF project escrow
accounts must be returned to HCR within 90 days of the Escrow Agreement's termination.
All escrow accounts holding HCR funds must be insured by the FDIC, with any funds in
excess of the insured amount properly and adequately collateralized. Escrow accounts must be
interest-bearing, with the interest accruing to HCR. Escrowed HCR funds must be invested in, or
collateralized by HCR approved instruments, in accordance with HCR’s investment policies.
Office of Finance and Development
Capital Programs Manual
Page 33 of 41
Section: 6.00 ADMINISTRATIVE PROCESSING REQUIREMENTS
Sub Section: 6.09 HCR Disbursement Procedures
HCR makes HDF funds available directly to sub recipients. Therefore, the following
disbursement procedures do not apply.
For Development Track Three projects, see Section 6.09.01, Construction Loan Progress
Payment Requests. For all other Development Track projects that require HTFC funds to be
disbursed, see Section 6.09.07.
6.09.01 Construction Loan Progress Payment Requests
After executing the FCL and construction commencement, owners may request
construction loan progress payments from HTFC for the disbursement of funds to pay for
completed construction work, professional services rendered, fees paid or charges incurred with
regard to the project's soft costs, or working capital expenses as delineated in the HCR approved
Development Budget. If HTFC will be a co-construction financer with CPC or a bank lender, the
budgets for all construction lenders should be consistent. Should changes in the budget be
required, a Budget Modification Form (CD-139) must be submitted within 30 days to the OF&D
project manager. A revised Development Budget showing the new proposed use of HTFC funds
during construction must be submitted with the form. The Budget Modification Form can be
found at: http://www.nyshcr.org/forms/Disbursement-HCR-Capital/.
HCR will only entertain payment requests for predevelopment or seed money funds from those
awardees which have received a Funding Commitment, and which can document that costs have
been incurred for eligible predevelopment expenses.
At the preconstruction meeting, the owner should establish a specific date and time that
the monthly construction inspection and review of each disbursement request will take place by
the owner, contractor, project architect, and A&E construction monitor. The owner should
submit monthly progress payment requests to the OF&D project manager after each construction
inspection meeting unless otherwise agreed to by HCR. If the monthly construction inspection
meeting must be rescheduled, the owner must notify the project manager of the new date.
Office of Finance and Development
Capital Programs Manual
Page 34 of 41
Rescheduling or postponing the monthly construction inspection meeting may result in delayed
processing of the disbursement request.
Each progress payment request for completed construction work must have the required
minimum retainage of ten percent of the construction cost withheld. Depending upon the
conditions of the 100% performance bond or letter of credit, the retainage percentage may be
higher than ten percent. Installation of the HCR project sign is a requisite for approval of first
disbursement and photographic evidence of the sign must be provided.
Requests for progress payments that include change order work will only be processed if
the change order request has been accepted by the A&E architect and the work has been
completed. HCR reserves the right to stop processing progress payment requests if change order
work has not been accepted by HCR.
6.09.02 Required Forms and Documentation for Construction Progress Payment Requests
The owner/awardee must submit the following documents to the OF&D Project Manager
when making a progress payment request:
• one original Request for Disbursement Form, reflecting updated disbursement amounts
from all funding sources (http://www.nyshcr.org/forms/Disbursement-HCR-Capital/).
Disbursement requests must be for whole dollar amounts only;
• one original AIA G702 Form (Application and Certificate for Payment);
• one original AIA G703 Form (Continuation Sheet);
• for HDF projects only, one Standard State Voucher;
• copies of HCR approved change orders for which work has been completed;
• invoices for professional service fees, subcontractors, suppliers, vendors and utility
companies, acquisition expenses (when the full acquisition amount is requested),
relocation assistance expenses, and, if applicable, statements of finance charges for lines
of credit and/or interim loans which were approved in advance by HCR; and,
• receipts for eligible working capital expenses.
In addition to the above, owners of projects receiving HTF and HOME Program funds
must obtain a notice of title continuation each time a disbursement is requested (except for
predevelopment award disbursements). This assures HTFC that no liens have been placed upon
Office of Finance and Development
Capital Programs Manual
Page 35 of 41
the property since the last disbursement. Upon completion of the title update, the title company
must directly notify the HTFC Finance Officer. The notification may initially occur via
telephone, but must be confirmed in writing. The disbursement will only be released when the
HTFC Finance Officer receives verbal notification of clear title from the title company. If, by the
time the next disbursement request is submitted, the required written confirmation of clear title
has not been received for the previous disbursement, the next disbursement will be held until
written confirmation of clear title, current with the most recent disbursement request, is received
(facsimiled confirmations are acceptable). The OF&D Project Manager will notify the owner
immediately should a problem arise with the title.
6.09.03 Construction Progress Payment Requests for Multi-Site Projects
If the project has one financing plan and all sites are part of one construction contract, the
project owner may submit one Request for Disbursement Form for all of the project sites. A
separate G702/703 must be provided for each site, plus one master summary G702/703. No
project will be closed out until all closing documents and cost certifications for all sites have
been submitted and approved by HCR.
6.09.04 Punchlist Inspection
When the project's construction is at least 95% complete, the owner/awardee is to
schedule a punchlist inspection with the A&E construction monitor, builder, project architect,
and any other interested parties. Based on this inspection, the project architect is to prepare a list
of incomplete and unsatisfactory items, which includes the value of such work. This punchlist
shall be distributed to all parties listed above.
6.09.05 Final Inspection
When all items from the punch list inspection have been completed and/or corrected, and
the local jurisdiction has issued a certificate of occupancy (C of O) or temporary C of O, a final
inspection is to be scheduled by the owner/awardee. Owners must provide the OF&D project
manager and the A&E architect with notification 45 days in advance of the final inspection.
Office of Finance and Development
Capital Programs Manual
Page 36 of 41
Those who must attend the final inspection include the owner/awardee, builder, project architect,
OF&D project manager, A&E construction monitor, and A&E architect.
If the project architect is satisfied with the quality of the construction work, and degree of
completion, they may issue the AIA G704 Form (Certificate of Substantial Completion). Final
payment will not be processed by HCR until all punchlist items have been completed or
corrected, construction is 100% complete, and all other closeout procedures have been satisfied.
Depending on the condition of the completed work, status of closeout submissions, including
third party certifications, A&E may agree to allow the dwelling units to be occupied.
6.09.06 Final Inspection Conference
An inspection conference must be attended by the inspection participants immediately
following the project's final inspection. The inspection participants must reach agreement on:
(i) whether or not work has been completed in accordance with the final documents;
(ii) any incomplete or unsatisfactory work items, and when they will be completed or
corrected; and,
(iii) any outstanding or unsubmitted change order work, providing the work has not
exceeded the time frame when change orders may be submitted, and a date when
the permanent Certificate of Occupancy will be submitted for HCR review and
approval (if not already submitted).
A mutually agreed upon final inspection report will be prepared by the owner, project
architect, and A&E construction monitor based upon the results of the Inspection Conference.
The project architect will also prepare a Certificate of Substantial Completion showing the
amount of money to be withheld if any for incomplete/unsatisfactory work and/or outstanding
change order work. A Permanent Loan Closing will not be scheduled if outstanding or
unsubmitted change orders have not been received by the HCR.
A&E will be able to provide their approval for permanent closing if all parties present at
the final inspection conference agree to the incomplete/unsatisfactory work items. The
disbursement at the permanent loan closing will be reduced by a sum of two and one half times
the value of incomplete/unsatisfactory work, or 5% retainage, whichever is greater.
Office of Finance and Development
Capital Programs Manual
Page 37 of 41
6.09.07 Permanent Loan Closing Payment Requests
For Development Track One projects in which HTFC is disbursing funds at the
permanent loan closing, this section describes the process for both final payments with a
holdback and payments with no holdback. Final payment requests are made only after all close
out procedures have been satisfied. Upon substantial completion of the work, HCR may require
the holdback of up to $25,000 for administrative requirements in addition to the holdback
determined as a result of the permanent financing final inspection conference. This
administrative holdback will be added to the A&E construction holdback (if applicable) for items
missing from the list of documents contained in the Final Payment Form
(http://www.nyshcr.org/forms/Disbursement-HCR-Capital/). Final payment requests include
disbursements for construction retainage, balances remaining in the working capital fund, and
reserve funds. Requests to use contingency funds will not be recognized for items that are not
justified as acceptable project expenses. All change orders must be submitted and accepted by
the A&E architect prior to processing a final payment request. HCR reserves the right to reduce
the final award amount if the project does not justify the use of all funds.
6.09.08 Required Forms and Documentation for Permanent Closing Payment Requests
One signed original of each of the following documents must be submitted to the OF&D
project manager if the entire HTF/HOME award is being used for construction costs (Line 31 of
Exhibit 3, Development Budget):
(i) Request for Disbursement Form (http://www.nyshcr.org/forms/Disbursement-
HCR-Capital/). Disbursement requests must be for whole dollar amounts only;
(ii) Initial Occupancy Rent Status Report;
(iii) Budget Modification Form (if applicable);
(iv) Final Payment Form (for a final payment only);
(v) Final AIA G702 Form/AIA G702(Application and Certificate for Payment) Form
showing holdback for construction related items, if applicable; and,
(vi) final AIA G703 Form/AIA G703 (Continuation Sheet) Form showing holdback
for construction related items, if applicable.
Office of Finance and Development
Capital Programs Manual
Page 38 of 41
If the HTF/HOME award is being used to pay for budget line items other than
construction costs, evidence of those costs needs to be provided (e.g., acquisition costs will
require a closing statement to be submitted showing the purchase price, etc.). In addition,
applicants must either provide wire instructions (wires can be paid the day of the closing),
including the name and address of the bank receiving the HTFC wire, the electronic wire
instructions, and the ABA number; or applicants can complete the ACH/Direct Deposit
Authorization Form (paid within 2 days of the closing)
(http://www.nyshcr.org/Forms/ocdhm_directdeposit.pdf). The original ACH/Direct Deposit
Authorization Form must be received in Hampton Plaza at least 10 days prior to the scheduled
closing date.
6.09.09 Permanent Loan Final Payment Requests with a Holdback
For projects which have either a construction holdback or an administrative holdback of
$25,000 at the time of the permanent loan closing, the owner must check the progress payment
box in Request for Disbursement Form Section F, Awardee/Owner Certifications. Once the
incomplete/unsatisfactory construction items have been verified to have been completed
satisfactorily by the A&E architect, the owner may request the holdback monies. A Request for
Disbursement Form, with Section F, Awardee/Owner Certifications final payment box checked,
along with the Final Payment Form with all required documents, must be submitted to the OF&D
Project Manager. Original signatures are required on both forms. Wire instructions or the ACH
Direct Disbursement Form must accompany the Request for Disbursement and the Final
Payment Form.
6.09.10 Permanent Loan Final Payment Requests with No Holdback
For projects moving to a permanent loan closing with no holdback, the owner must check
the final payment box in Request for Disbursement Form Section F, Awardee/Owner
Certifications. The Final Payment Form with all required documents must be submitted to the
OF&D Project Manager. Original signatures are required on both forms in order for HTFC to
provide the funds at the permanent loan closing.
Office of Finance and Development
Capital Programs Manual
Page 39 of 41
Section: 6.00 ADMINISTRATIVE PROCESSING REQUIREMENTS
Sub Section: 6.10 Permanent Loan Closing Procedures
6.10.01 Permanent Loan Closing
Project owners must submit the documents listed in the Legal Documents Manual, Index
XVI, Closing Requirements Checklist, Permanent Loan Closing Checklist. In addition, all
requirements of the FCL must be satisfied before a permanent loan closing can be scheduled
with OLA. Approximately two weeks after submission of all required documents in their final
form, OLA will schedule the permanent loan closing with the project attorney. All signatories are
required to be present at the closing table, unless prior arrangements have been made. Once OLA
has scheduled the closing, the Final Payment Request may be submitted to the OF&D project
manager.
Office of Finance and Development
Capital Programs Manual
Page 40 of 41
Section: 6.00 ADMINISTRATIVE PROCESSING REQUIREMENTS
Sub Section: 6.11 Cost Certifications
This Section applies to projects funded under all HCR administered Programs, with the
exception of projects funded only with UI or RARP. The purpose of cost certification is to
establish the project's actual final total cost, including the construction cost, in order to determine
the maximum HCR award amount for the project's final closeout. HCR requires that cost
certifications be submitted so that HCR can perform the final underwrite to ensure that the
project is not over subsidized. Cost certifications must be submitted at the following times:
• LIHC/SLIHC stand-alone projects or LIHC/SLIHC with HCR subsidy funds: with the
IRS 8609/DTF 625 request package.
• Any HTF/HOME/CIF or other HCR subsidy project: with the permanent loan closing
package.
All cost certifications must be performed by an independent New York State Certified Public
Accountant (CPA). Project owners must ensure that all contingencies that were used for eligible
hard and soft costs have been allocated as such. Projects funded with LIHC and/or SLIHC must
submit a cost certification utilizing the HCR–mandated format, which is available on the Agency
website: LIHC and SLIHC Cost Certification Forms. With the 8609 submission package, the
owner must provide a letter from the syndicator of the Tax Credits certifying that it has reviewed
the cost certification and concurs with the contents. The letter should include the following
information: the final amount of credit, the final amount of gross equity provided to the project,
identification of all partnership/syndication fees, the final amount of equity net of all
syndication/partnership fees, and any applicable tax credit adjustors. Owners should be sure that
all costs have been included in the cost certification and that all information is correct prior to
submitting the cost certification to HCR. It is the project owner’s responsibility to review the
cost certification in its entirety prior to its submittal to the Agency. Once the cost certification
has been submitted in final form, the cost certification cannot be amended or supplemented
except as may be required by the HCR.
Office of Finance and Development
Capital Programs Manual
Page 41 of 41
Cost certifications for projects not funded with LIHC/SLIHC must utilize the following
format:
(i) an opinion letter prepared by the CPA, certifying that the project audit was
performed in accordance with generally accepted auditing standards and practices,
and that there is no identity or conflict of interest between the CPA, and the
owner, contractor, project architect, or any subcontractor; and,
(ii) a schedule of costs in the same line item format as HCR’s Development Budget.
HCR will review all cost certifications for compliance with the following requirements:
(i) the final AIA G702 Form (Application and Certificate for Payment) for the
project's construction, or the total payment requests if more than one prime
contractor was employed to construct the project, must equal the amount
expended by the owner and/or contractor from all funding sources;
(ii) any line item costs budgeted in the Development Budget which were not actually
expended must be deducted from the actual total project cost; and,
all non-HCR funds which were to be used in developing the project, must have
been received from the non-HCR funding source(s), and expended by the owner.
Office of Finance and Development
Capital Programs Manual
Page 1 of 27
Section: 7.00 PROJECT OPERATING AND MANAGEMENT REQUIREMENTS
Sub Section: 7.01 Introduction
This section describes the general procedures for operating and managing any property
funded by HTFC (HOME, Housing Trust Fund, and Turnkey Programs). Owners should refer to
the Regulatory Agreement for project specific obligations. Projects with LIHC are also subject to
certain post-construction operating requirements as set forth in the LIHC statute and Regulatory
Agreement. If requirements of different programs overlap, the most restrictive provisions shall
apply. Where the requirements for the LIHC, HTF, HOME, and Turnkey Programs differ, it is
noted in the text.
Local Program Administrators (LPAs) acting under the HTF Program are responsible for
enforcing all requirements in this section and for monitoring sub recipient projects in the same
manner that Office of Housing Management (OHM)/ Asset Management Unit (AMU) monitors
direct project recipients.
If you have any questions regarding compliance issues, please contact your Asset
Management Representative or call the Asset Management Unit (518) 474- 9583 or write:
NYS Division of Housing and Community Renewal
Asset Management Unit 5th Floor
38-40 State Street
Albany, NY 12207
Office of Finance and Development
Capital Programs Manual
Page 2 of 27
Section: 7.00 PROJECT OPERATING AND MANAGEMENT REQUIREMENTS
Sub Section: 7.02 Required Operating Accounts
7.02.01 Establishing Bank Accounts
Project owners must adhere to the following general requirements for establishing bank
accounts for the project:
(i) all project funds must be held in accounts with banking institutions which are
authorized to do business in New York State, which are insured by an agency of
the federal government, and which have a proven record of investment in the
community in which the project is located; project owners are responsible for
ensuring that project funds maintained in such account(s) are within the insured
amount limitations as established by the federal government;
(ii) any account offset provisions are prohibited (the bank must waive any right to
seize the account and cannot be used as collateral for other obligations);
(iii) project funds may only be used for authorized purposes as described in this
section, the Regulatory Agreement, and all attachments thereto;
(iv) project funds must be maintained separately and distinctly from any other
accounts maintained by the owner and/or managing agent for other projects or
enterprises;
(v) on demand deposit checking account must be maintained for each project; and,
(vi) the interest earned on any interest-bearing accounts must remain in such account
and may only be used for the specific purposes to which the account is dedicated.
Project owners must establish the following accounts for the operation of the project:
(i) General Operating Account;
(ii) Working Capital Fund Account;
(iii) Operating Reserve Account;
(iv) Replacement Reserve Account;
(v) Real Estate Tax and Insurance Escrow Account; and,
(vi) Tenant Security Deposit Account.
Each of the required operating accounts is described in the following sub-sections.
Office of Finance and Development
Capital Programs Manual
Page 3 of 27
7.02.02 General Operating Account
The General Operating Account is used for the deposit of all project income (including rent
receipts, housing subsidy payments, and non-residential rental income) and for the disbursement of
all necessary project expenses (including deposits to the Real Estate Tax and Insurance Escrow
Account and the Reserve Accounts). Any cash in excess of three month's rent roll which remains on
deposit in the account at the end of the project's fiscal year must be transferred to the Operating
Reserve Account. See Section 7.02.05.
7.02.03 Working Capital Fund Account
At the time of closing, funds will be deposited into the Working Capital Fund Account in an
amount deemed adequate by HTFC to cover operating expenses during the project's initial rent-up
period. Funds in this account may be used for expenses incurred in the project's first year of
occupancy, such as fidelity bond and insurance premiums, real estate taxes, debt service,
management fees, movable furnishings, and equipment which is essential for project operation and
management, utility charges, and/or other initial project-related expenses approved by HTFC.
Should any funds remain in the Working Capital Fund Account after the project has been in
operation for one year, those funds must be transferred to the Operating Reserve Account, and the
Working Capital Fund Account must be closed.
7.02.04 Reserve Fund Accounts
At the time of the permanent closing, the owner must establish an Operating Reserve
Account and a Replacement Reserve Account with an initial deposit and distribution in amounts to
be determined by HTFC on a project-by-project basis. Any withdrawals from these accounts will
require the advance approval of AMU. HTFC funded reserve accounts will be blocked and require
HFTC written consent and/or signature, as applicable, to withdraw funds. The owner will be
required to make fixed monthly deposits to the Reserve Fund Accounts by transferring funds into
them from the project's General Operating Account. The amount of such monthly deposits will be
determined by HTFC on a project-by project basis.
All Reserve Funds not currently required must be invested in insured certificates of deposit
or United States securities, or invested in a manner which is wholly secured or collateralized by such
securities. Any interest earned shall accrue to the Reserve Funds. Any HTFC-approved transfer or
Office of Finance and Development
Capital Programs Manual
Page 4 of 27
sale of the project during the Regulatory Period must include the transfer of all Reserve Funds to the
new owner. (For more information on the sale or transfer of HTF or Turnkey Program projects see
Section 2.01).
Projects funded with HTF or NYS HOME must utilize a Custodial Agreement Account if the
combined amount of operating and replacement reserves will total $100,000 or more adding together
capitalized amounts and annual contributions to reserves over the first five years of operations. The
owner may be required to deposit project reserves below $100,000 pursuant to a Custodial
Agreement Account if the owner or managing agent has one or more prior instances of fiscal
irregularities including but not limited to:
1. withdrawals without required approvals from DHCR or from any other financing source;
2. failure to pay taxes or other obligations when due; or,
3. any element of default.
The project owner must set up the Custodial Agreement Account(s) according to DHCR
requirements listed below:
All withdrawals require two party signature (one being HCR AMU staff);
The bank must waive any right to seize the account and cannot be used as collateral
for other obligations (no offset provisions);
All deposited funds are collateralized, if not in US Government Treasury Securities or
Certificates of Deposit, by HCR approved investments;
The owner/management agent shall make the required contributions as stated in the
Regulatory Agreement into a Custodial Agreement Account; and,
The reserve account(s) shall be established at a federally insured depositing
institution in New York State.
Withdrawals from Custodial Agreement Accounts will require the signatures of AMU and
the owner for release of funds. Specific requirements for each type of reserve account are given in
Sub Section 7.02.05 and 7.02.06. HCR reserves the right to require Custodial Agreement Account(s)
for problem projects at any time; request that HFA act as escrow agent for the HTFC, and/or open
Operating and Replacement reserve accounts.
Office of Finance and Development
Capital Programs Manual
Page 5 of 27
7.02.05 Operating Reserve Account
The Operating Reserve Fund Account is established to provide the project with a source of
funds in the event that the project cannot meet its monthly operating expenses. Withdrawals will not
be approved until the terms of the Operating Deficit Guarantee have been satisfied (if applicable).
An Operating Deficit Guarantee is required for LIHC and/or SLIHC projects with a developer fee
over ten percent of the acquisition and improvement cost associated with the LIHC/SLIHC portion
of the project. This guarantee must be set forth in the project owner’s organizational documents.
These documents must provide a commitment to pay any operating deficits incurred during the first
36 months after the project is placed in service. The amount of such guarantee shall not be less than
one-fifth of the developer’s fee approved by HCR. For multiple building projects, the operating
deficit guarantee period shall begin on the date the first building is placed in service and shall end
thirty-six (36) months from the date the last building is placed in service.
Owners are required to make monthly deposits to the Operating Reserve Account in an
amount to be determined by HTFC on a project-by-project basis. The monthly Operating Reserve
deposit will be made with monies withdrawn from the General Operating Account. If necessary, the
monthly deposits may be adjusted by AMU after initial project occupancy.
If, after paying the project's annual operating and maintenance expenses, there is annual
rental income over and above an amount equal to three month's rent roll; such amount must be
deposited into the Operating Reserve Account. If there are Operating Reserve Funds in excess of the
maximum reserve amount which is prescribed by the Regulatory Agreement, such excess funds may
be used subject to the approval of AMU to either:
(i) lower the current tenant rental charge(s) (provide a rent subsidy);
(ii) increase the number of Persons of Very Low Income residing in the project;
(iii) repay the HTFC loan or grant;
(iv) for HTF Program projects, pay the Return on Equity as described in Section
2.01.04.D as applicable; or,
(v) fund the purchase of furnishings or equipment essential for project operation and
management; or to improve the enjoyment of the building.
Office of Finance and Development
Capital Programs Manual
Page 6 of 27
7.02.06 Replacement Reserve Account
The Replacement Reserve Account is established to provide the project with a source of
funds to replace such items as flooring; plumbing; heating; electrical; roof and security systems;
appliances; window and door units; cabinetry; site apparatus; or other items approved, in advance,
by AMU. See www.nyshcr.org/assets/documents/1646.doc for a more complete listing of
eligible/ineligible items.
No release from the project’s Replacement Reserve Account will be permitted within the first
five years following the permanent closing of the HTFC loan. Owners must make monthly deposits
to the Replacement Reserve Account in an amount which HTFC determines is necessary to maintain
an adequate Replacement Reserve for the project. The monthly Replacement Reserve Account
deposit will be made with monies withdrawn from the General Operating Account. If necessary, the
monthly deposit established by HTFC may be adjusted by AMU after initial project occupancy.
All expenditures from the Replacement Reserve Account will require the prior approval of
AMU. The signatures of AMU and the owner are required for the release of funds from any project
account. All requests for withdrawals from the Replacement Reserve Account must be submitted in
writing to AMU. The request must include, but is not limited to, a description/scope of work or
replacement, three bids (if possible) for any expenditure exceeding $5000, the proposed bidder's
Liability Insurance Certificate, copy of existing warrantee, and a current copy of the Replacement
Reserve Account bank statement.
7.02.07 Real Estate Tax and Insurance Escrow Account
The Real Estate Tax and Insurance Escrow Account is established for the annual payment of
real estate taxes and insurance. Each month, the owner must withdraw one-twelfth of the annual
anticipated total of these obligations from the General Operating Account and deposit these funds
into the Real Estate Tax and Insurance Escrow Account. Any interest earned becomes part of the
Account. Withdrawals from the Account may only be made for the purpose of meeting real estate
tax and insurance obligations.
7.02.08 Tenant Security Deposit Account
Where tenant security deposits are required by a project's lease or are otherwise collected by
the project owner, and the project contains six or more dwelling units, the project owner must place
Office of Finance and Development
Capital Programs Manual
Page 7 of 27
the tenant security deposits into an interest-bearing account in a banking organization with a place of
business within New York State. The Account must earn interest at the prevailing rate earned by
other such deposits made with banks in the area (see General Obligations Law 7-108).
For projects with less than six units, the tenant security deposits do not have to be placed in
an interest bearing account, but must be held in a banking institution, until such time as they are
repaid to the tenant, or applied toward damages. The project owner must provide each tenant with
written notification of the name and address of the bank where the money is deposited, as well as the
amount of the tenant's deposit. If the account is interest-bearing, the project owner is entitled to an
administration expense fee equal to one percent per annum on the security money deposited. This
shall be in lieu of all other administrative and custodial expenses. The balance of the interest earned
is the property of the tenant and it must be paid annually to the tenant. If a tenant's lease terminates
at a time when the banking organization at which the security money is deposited does not regularly
pay interest, the project owner must pay the tenant any interest that it is able to collect at the time
that the lease terminates. All tenant security deposits must be considered the property of the tenant,
and may not be commingled with the personal monies, or become an asset, of the project owner.
Office of Finance and Development
Capital Programs Manual
Page 8 of 27
Section: 7.00 PROJECT OPERATING AND MANAGEMENT REQUIREMENTS
Sub Section: 7.03 Insurance Requirements for Owners
The project owner is required to maintain the following insurances throughout the project's
regulatory period. The ACORD Certificate of Liability Insurance Form should always be used. The
project’s SHARS ID MUST be on each ACORD form.
Liability Insurance
Comprehensive General Liability
monetary limits of not less than $1,000,000;
contractual coverage;
DHCR and HTFC to be named as additionally insured; and,
30-day prior written notice to HTFC of cancellation, non-renewal or change in coverage.
Fire and Casualty Insurance
Fire and Casualty Insurance with Extended Coverage
monetary limits commensurate with replacement value of the project;
HTFC as mortgagee/loss payee; and,
30-day prior written notice to HTFC of cancellation, non-renewal or change in coverage.
Flood Insurance
Flood insurance is required when a project is located in a 100-year flood plain established by
FEMA.
Automobile Liability Insurance
Liability
monetary limit of not less than $1,000,000;
coverage of owned (if applicable), hired and non-owned vehicles; and,
30-day prior written notice to HTFC of cancellation, non-renewal or change in coverage.
Office of Finance and Development
Capital Programs Manual
Page 9 of 27
Worker's Compensation and Disability Benefits
Insurance Blanket Position Fidelity Bond
amount of coverage equal to three month's rent roll and all project reserve funds;
HTFC as loss payee/oblige; and,
30-day prior written notice to HTFC of cancellation, non-renewal or change in coverage.
7.03.01 For Homesteading Owners
A homesteader is required to maintain the following insurances throughout the project's
regulatory period.
Liability Insurance
Comprehensive General Liability
monetary limits of not less than:
$300,000 for one or two units
$500,000 for three or four units
contractual coverage;
DHCR, HTFC and the LPA to be named as additionally insured; and,
30-day prior written notice to HTFC and the LPA of cancellation, non-renewal or change in
coverage.
Fire and Casualty Insurance
Fire and Casualty Insurance with Extended Coverage
monetary limits commensurate with replacement value of the project;
HTFC as mortgagee/loss payee;
30-day prior written notice to HTFC and the LPA of cancellation, non-renewal or change in
coverage; and,
DHCR or HTFC (as applicable), and the LPA to be named as additional certificate holders.
7.03.02 Notification Required for Insurance Claims
Owners are required to notify their assigned DHCR asset management representative
regarding any claim on a project’s insurance policy. Notification must be made within 15 days of
filing a claim.
Office of Finance and Development
Capital Programs Manual
Page 10 of 27
Section: 7.00 PROJECT OPERATING AND MANAGEMENT REQUIREMENTS
Sub Section: 7.04 Annual Reporting Requirements
Projects funded by the HTFC are required to provide an annual audit report to AMU. The
audit report must be prepared by a Certified Public Accountant (CPA) in accordance with accepted
audit and accounting practices, and is due no later than 120 days after the end of the project's fiscal
year. Electronic submission via email to the project’s assigned HCR Asset Management
Representative is encouraged. HTF sub recipients must submit their financial statements to LPAs
within 120 days of the end of the sub recipient's fiscal year; the LPAs, in turn, must submit those
statements received to AMU within 30 days.
Audit reports must include the status of the project's operations, income received, and
deposits and withdrawals made to all required operating accounts. The CPA must certify that the
owner has complied with all Program Rules and Regulations, the Regulatory Agreement, and any
attachments thereto, including the maintenance of information and documentation regarding
procedures for tenant selection and income verification. Mortgagors have been sent correspondence
which describes the HTFC required additional disclosures and information to be included in the
Annual Audit, as well as a notification that indicates that failure to include this information and
schedule will result in the audit report being considered incomplete upon its receipt by the HTFC.
The amount of excess income identified by your accountant is due within 30 days of the completion
of the audited financial statement – no more than 5 months from the end of the projects fiscal year.
The cost of the annual audit should be an itemized expense in the project's annual operating budget.
Owners who do not receive HCR Neighborhood or Rural Preservation Program funds, and
who own and operate HTF or Turnkey-funded projects comprised of 20 or fewer units in total, may
submit a compilation in lieu of the certified annual audit report. The compilation must be as
prescribed by the American Institute of CPAs. A certification by the owner of compliance with the
Program Rules and Regulations must be submitted with the compilation. If additional audits on the
property are prepared, copies of each report must be provided to AMU.
Office of Finance and Development
Capital Programs Manual
Page 11 of 27
7.04.01 Performance Report
HTF project recipients not receiving LIHC are required to provide an annual performance
report. The performance report is due within 120 days of the close of the project's fiscal year.
Performance reports must include a certification, signed by the owner, of the habitability of each
unit. Also included in the report will be a description of the operation of the project including, but
not limited to: marketing activities, status of waiting list, rents, vacancies, tenant or occupant
selection activities, deposits to and withdrawals from reserve accounts, extraordinary repairs,
replacements, or improvements.
An HTF sub recipient must submit its performance report to the LPA within 120 days of the
end of the sub recipient’s fiscal year; the LPA, in turn, must submit that report to AMU within 30
days. The LPA must also submit its Performance Report, which includes a certification of the
projects financial stability, income eligibility of occupants, status of sales or transfers of properties,
and an inspection report of the project.
7.04.02 Operating Budget
An annual operating budget, submitted on HCR forms is due no later than three months
before the start of the project's fiscal year. Forms can be found online at
http://www.nyshcr.org/Forms/AssetManagement/. Extensions may be granted, for good cause, upon
written request.
Debt service on loans to the owner of the project or property from any principal of the
project, general or limited partner, developer or other parties related to the project shall be payable
only from project revenues after payment of all operating expenses, scheduled reserve payments and
other approved mortgage debt service, unless otherwise provided for in the HTFC contract
documents. Any expense payment to the owner of the project or property, principal of the project, a
party related to the owner, partner or shareholder must be approved in advance by HTFC.
7.04.03 HOME Monitoring Checklist
To demonstrate on-going project compliance with HOME Program regulations, Project
Owners are required to submit annually to HCR, HUD form HOME Monitoring Checklist 6-D
entitled “Project Compliance Report: Rental Housing” (the Form), found at:
Office of Finance and Development
Capital Programs Manual
Page 12 of 27
https://www.hud.gov/sites/documents/20121_6D.PDF
The Form must be submitted to your assigned DHCR Asset Management Representative
within 120 days of the close of the project’s fiscal year.
Office of Finance and Development
Capital Programs Manual
Page 13 of 27
Section: 7.00 PROJECT OPERATING AND MANAGEMENT REQUIREMENTS
Sub Section: 7.05 Tenant Management Requirements
This Section establishes tenant management requirements which are designed to:
(i) meet the statutory provisions of the Programs;
(ii) protect the State's investment in the units;
(iii) establish a level of owner accountability which can be verified by DHCR; and,
(iv) provide a basis for ensuring the future viability of projects.
7.05.01 General Tenant Selection Process
Units shall only be made available to eligible occupants as set forth in the project regulatory
agreement.
HOME: Refer to Section 2.04.05.E
LIHC blended project: Income limits for qualifying tenants depend on the project set-aside election
and the requirements set forth in the project regulatory agreement.
The selection of tenants for all projects must comply with all federal and State Fair Housing
laws, Title VIII of the Federal Civil Rights Act of 1968, and the New York State Human Rights
Law. See Section 4.00, General Requirements, for further discussion of fair housing requirements,
including the submission of a Fair Housing Marketing Plan. Fees (i.e., application fees, apartment
prep fees, credit check fees, advance security deposits, etc.) may not be charged to prospective
tenants for admission to any HTF or HOME funded project.
The Owner should begin the tenant selection process no later than the point at which the
project's construction is 75% completed, and only after an Affirmative Fair Housing Marketing Plan
has been approved. This will ensure that there is adequate time to market, advertise, and select the
project's initial occupants. Where applicable, the owner must follow the procedures detailed in its
DHCR Approved Affirmative Fair Housing Marketing Plan.
At initial rent-up and throughout tenancy, owners of HTFC funded projects are required to
conform to the following occupancy chart:
Office of Finance and Development
Capital Programs Manual
Page 14 of 27
OCCUPANT DENSITY RANGE
NUMBER OF BEDROOMS MINIMUM MAXIMUM
0 1 2
1 1 2
2 2 4
3 3 6
4 5 8
5 7 10
It is suggested that owners establish a Transfer Policy to outline procedures for required
transfers to comply with occupancy standards above, as well as to address internal transfers.
The HTF or Turnkey-assisted unit must be the principal residence of its occupant(s). Owners
must comply with all local, State, and federal codes pertaining to accessibility for persons with
disabilities, including the Americans with Disabilities Act (ADA), Section 504 of the Rehabilitation
Act, and the New York Human Rights Law. Owners of HTFC projects with units accessible for
individuals with disabilities should include specific outreach to organizations and independent living
centers serving people with mobility, hearing and vision impairments as part of their marketing plan.
Preference for units that are accessible for individuals with disabilities ought to be given to those
with disabilities who would benefit from the unit. Owners should also identify a source of referrals
in their management plans should affirmative outreach and marketing not fill the units. Project
owners with agencies and/or group agreements for persons with special needs must adhere to their
Affirmative Fair Housing Marketing Plan.
In selection of households for admission to an Assisted Project, or to occupy a unit in an
Assisted Project, the Participating Owner is responsible for screening household behavior and
suitability for tenancy. The Participating Owner may propose relevant information and factors to
consider, which must be approved as part of the Owner’s submission of its Affirmative Fair Housing
Marketing Plan (see Section 4 for more information).
Office of Finance and Development
Capital Programs Manual
Page 15 of 27
Anti-Discrimination Policy for Criminal Convictions and Arrests
Applicant Owners may not use criminal convictions or arrests as an automatic bar to tenancy except
in two limited instances: (1) Convictions of drug-related criminal activity for manufacture or
production of methamphetamine in their home, or (2) requirement that the applicant be a lifetime
registrant on the state sex offender registry. (Other than these two instances, in the case that a
criminal background check from a reputable source indicates that a member of the household has a
past criminal conviction or has a recent pending arrest, the Owner or its agent must conduct an
individualized assessment before denying the proposed household. This assessment is not an appeal
and must be conducted as part of the eligibility review. The individualized assessment must take
into account the nature of the crime, the time elapsed, the age of the household member when the
crime was committed, the seriousness of the offence, evidence of rehabilitation, meaningful post-
incarceration employment, tenant history, volunteer work, letters of recommendation and other
relevant lifestyle and rehabilitative evidence.
Guidance and a Worksheet are available in applying New York State’s Anti-Discrimination
Policies When Assessing Applicant for State-Funded Housing Who Have Criminal Convictions.
Please see http://www.nyshcr.org/AboutUs/Offices/FairHousing/AffirmativeMarketing.htm
Totality of Circumstances in Tenant Selection
In the event of the receipt of unfavorable information when determining tenant suitability,
consideration shall be given by the Owner or its agent to the totality of the circumstances regarding
the time, nature, and extent of the applicant's conduct and to factors which might indicate a
reasonable probability of favorable future conduct or financial prospects. For example:
Evidence of rehabilitation, including:
i) any information produced by the person, or produced on his behalf, in regard to his
rehabilitation and good conduct;
ii) the person responsible for the prohibited action demonstrates successful completion of a
credible rehabilitation program; or
iii) for a violation stemming from the use or abuse of drugs or alcohol in a way that may
interfere with the health, safety, or right to peaceful enjoyment of the premises by other
Office of Finance and Development
Capital Programs Manual
Page 16 of 27
residents, the person demonstrates to the Participating Owner’s satisfaction that the person is
no longer engaging in the drug or alcohol-related activity.
Project owners should refer to the project regulatory agreement for project specific
requirements. Records must be available on site to document compliance with special needs
programs and/or special population set-asides.
NYHousingSearch Requirements
No later than 120 days prior to engaging in marketing activities, owners must register their
project with www.NYHousingSearch.gov, a FREE service provided by New York State to advertise
and search for affordable and accessible housing. The service is also available through a toll-free,
bilingual call center at 1-877-428-8844. Representatives are available to assist with listings and
searches.
HTF Projects undergoing Rehabilitation or Conversion
The following apply to HTF Program projects only:
(i) legal occupants of a property rehabilitated under the HTF Program who continue to
occupy the property during the rehabilitation are entitled to continue such occupancy
once the project is completed;
(ii) legal occupants of a property rehabilitated under the HTF Program who are
temporarily relocated during such rehabilitation may not be permanently displaced;
and,
(iii) subsequent to rehabilitation or conversion, an eligible occupant must be a person of
low-income at the time of application for occupancy of the unit.
HOME Projects undergoing Rehabilitation or Conversion
Please See Section 2.04.04 for requirements under the Uniform Relocation Assistance and
Real Property Acquisition Policies Act of 1970 (the URA).
Office of Finance and Development
Capital Programs Manual
Page 17 of 27
HTF Program Tenant Selection
The owner must give preference to eligible persons or families with the lowest possible
incomes, taking into consideration the income requirements of the project. Preferences must also be
given to persons or families whose current housing fails to meet basic standards of health and safety,
and who have little prospect of improving the condition of their housing except by living in a project
assisted by the HTF Program.
Owners must establish a waiting list for persons of low-income by following their
Affirmative Fair Housing Marketing Plan, which includes the requirement that a randomized lottery
be conducted for initial lease-up.
Turnkey Program Tenant Selection
With regard to tenant selection for the Turnkey Program project units, the owner must ensure
that, unless waived, in writing, by HTFC, at least 30 percent, but not more than 70 percent of the
tenants are persons with incomes at public assistance level or persons or families receiving benefits
pursuant to Section 131A of the Social Service Law. Furthermore, preference among the public
assistance level tenants must be given to those who are referred by hotels, motels, or shelters
operated by, or receiving direct or indirect payment from, a social services district or any other
philanthropic or charitable facility providing such accommodations. To the extent economically
feasible, the remaining tenants must be persons of low-income.
For LIHC blended projects, the previous sentence does not apply.
See Sub-Section 7.10.01.
Owners of Turnkey Program projects must establish the following three waiting lists:
(i) a waiting list for tenants with incomes at the public assistance level;
(ii) a waiting list for tenants who are persons of low-income; and,
(iii) a waiting list for tenants who are individuals with disabilities.
Office of Finance and Development
Capital Programs Manual
Page 18 of 27
General Tenant Selection from Waiting List
HTF/Turnkey Projects: During initial project rent-up, and thereafter, owners must select
applicants from the waiting list(s) which match the lowest income eligible applicant with the correct
basic rent level(s). If the income amount is the same, then the earliest dated application is selected.
HOME Projects: Applicants will be selected via a lottery at initial rent up. After initial rent
up, applicants will be selected in chronological order as they are placed on the waitlist.
7.05.02 Tenant Affordability Requirements
At initial project rent-up, no unit may be leased to a household which would be paying
housing costs (basic rent plus the allowance for tenant-paid utilities) which are less than 25 percent,
or more than 48 percent of that household's income. After initial occupancy, and as turnover of the
units occurs, vacated units may be leased in accordance with the requirements set forth above,
except that the units may not be leased to a household which, after occupancy, would be paying
housing costs which are less than 30 percent, or more than 48 percent of that household's income.
Should the owner at any time be unable to lease the project's units in accordance with the
affordability requirements set forth above, the owner may submit a written request to AMU for a
waiver of these requirements.
7.05.03 Establishing and Adjusting Project Rents
Project applicants/owners submit a rent plan with their application which sets the rental
charge for each unit based upon tenant income levels, number of bedrooms per unit, and the project's
operating budget. The HCR/HTFC approved rent plan establishes the initial basic rent for each of the
units in the project. The basic rent must be set so that project income is sufficient to support the
project's expenses.
The project owner is to use the following procedures for establishing the basic rent and the
annual changes thereto:
(i) the basic rent for tenants with incomes at the public assistance level must be set at the
Shelter Allowance level, and is not subject to an annual increase unless the Shelter
Allowance is also raised by the State of New York;
Office of Finance and Development
Capital Programs Manual
Page 19 of 27
(ii) the basic rent for tenants with income above the public assistance level, but below 90
percent of the Area Median Income (AMI), will initially be set so that the project's
rental income is sufficient to cover all projected operating and maintenance expenses,
including Reserve Fund deposits; these basic rents may be skewed so that various
segments of the target population may be reached, based upon 30 percent of tenants'
income being devoted to housing costs;
(iii) for projects in jurisdictions which are subject to the Rent Stabilization Law (RSL) or
the Emergency Tenant Protection Act (ETPA), the applicable Rent Guidelines Board
increase (see Section 7.05.04 for a discussion of initial rents for projects located in
areas subject to RSL or ETPA);
(iv) for tenants whose incomes rise above the persons of low-income level as determined
by the owner's annual income verification procedure, the rent will be adjusted to the
lesser of the market rent or 30 percent of the tenant's annual income less the
allowance for tenant paid utilities, but will not be lower than the approved basic rent
except in HOME funded projects. In these properties tenants whose income exceeds
80% of AMI must comply with Section 92.252 (i)(2) of the final HOME rule. Persons
of low income shall mean: for those cities with a population of one million or more
persons, those persons or families whose household incomes do not exceed 80% of
the median income for the metropolitan statistical area in which that project is
located. For other portions of the State: a) and within a metropolitan statistical area,
those persons and families whose household income do not exceed 90 percent of the
median income for the metropolitan statistical area in which that project is located or
90% of the median income for the State, whichever is greater; or b) and without a
metropolitan statistical area, those persons and families whose household income do
not exceed 90 % of the median income for the county in which a project is located or
90% of the median income for the State, whichever is greater. Tenants who do not
submit, or falsify their income verification documents, will pay the market rent
(described below); and,
(v) the following documents are needed to review a rent increase submission. Back-up
documentation may be requested on a case by case basis:
Office of Finance and Development
Capital Programs Manual
Page 20 of 27
a. budget supporting the proposed rent increase with explanation of line item
budget increases.
b. the schedule of current rents, proposed dollar amount of increase, proposed
rents, and utility allowance per bedroom size (if applicable).
c. a current rent roll.
d. last audit report if not previously submitted (see Sub-Section 7.04).
e. if Managing Agent is submitting request, letter from Owner indicating their
approval of the proposed rent increase.
Budget and Rent Plan forms have been developed by AMU’s Accounting Staff to streamline
the review process. These forms are found at: http://www.nyshcr.org/Forms/AssetManagement/.
These forms must be used for item a. and for the current and proposed rents in item b. above. Rent
increase submissions should include a cover letter addressed to the project’s assigned Asset
Management Representative summarizing the items in b. above so that for each unit type in the
project, there is listed the current rent; utility allowance; rent increase amount; and proposed new
rent. Project owners are responsible for ensuring requested amounts do not exceed applicable rent
limits. For LIHC Standalone or LIHC blended projects see sub-section 7.09.02(ii) and Sub-Section
7.09.03(iv).
At the time of contract closing, OF&D will establish the market rent for each unit. This is the
maximum amount of rent that can be charged for the unit if a tenant's income increases to a point
where they are no longer low-income, or if the tenant fails to submit or falsifies their income. No
tenant may be charged more than the market rent to occupy a unit. The market rent is established as
a function of the basic rent for the unit, plus an additional amount which would be payable if all
HTFC payments, grants and/or loans made to the project were treated as a 30-year amortizing
interest-bearing loan at the 30-year U.S. Treasury bond yield rate in effect at the time of the project's
contract closing. The market rent will be adjusted annually by an amount equal to the basic rent
increase; however, in jurisdictions which are subject to the RSL or ETPA, the increase may not
exceed the lawful annual increase authorized under such laws. If the project's operating budget does
not warrant it, the owner need not increase basic rents.
Office of Finance and Development
Capital Programs Manual
Page 21 of 27
7.05.04 Initial Project Rents in Areas Subject to the Rent Stabilization Law (RSL) or
Emergency Tenant Protection Act (ETPA)
Owners of projects located in areas which are subject to the RSL or ETPA are required to
register all units in the project with DHCR's Office of Rent Administration. Owners are required to
comply with the terms and conditions of a Rent Order which will be entered into between HCR's
Office of Rent Administration and HTFC at the time of Final Closing. The Rent Order establishes
the market rent and registers the basic rent as the lawful registered rent. For projects located in areas
subject to the RSL or ETPA, owners will also be required to include in all leases a Rent Rider,
specifying the terms and conditions under which the owner is permitted to make adjustments to the
basic rent in excess of the increases permitted under RSL or ETPA.
For LIHC blended projects, owners shall not charge rents which exceed the lesser of the rents
contained in the Rent Order or the applicable LIHC restricted rent.
7.05.05 Tenant Income Verification
The owner is responsible for determining the income of tenants and verifying and certifying
to HCR that such tenants are eligible for project occupancy. Tenant income verification may include
but is not limited to certification by the Department of Social Services, the Veteran's Administration,
a public assistance agency, or a written statement from the tenant's employer (third party
verification). Refer to chapter 5 of the HUD Handbook 4350.3 REV-1, CHG- 4 or its successor.
For LIHC blended projects, see Sub-Section 7.09.04 regarding tenant income certification
and Sub-Section 7.09.05 regarding student eligibility. Tenant recertification to determine continued
eligibility, to verify income, and to establish rental amounts, will be on a yearly basis.
7.05.06 HTF Tenant Income Recertification Waiver
The HTF has adopted a recertification waiver policy. HTF funded properties that (a) are not
participating in other programs requiring annual verifications of income (i.e., HOME, Turnkey,
Rural Housing, Section 8), (b) have been placed in service, (c) have completed one year of
satisfactory annual compliance with the requirements set forth in Chapter 7.00 of the CPM, (d) serve
only one AMI, and (e) are in good standing with HCR, are eligible to apply for this waiver.
Office of Finance and Development
Capital Programs Manual
Page 22 of 27
The HTF waiver relieves the property only from the obligation to perform annual income
recertifications. Still required are initial move-in certification, recertification due to changes in
household composition, and submission by owners of annual reports as required in Chapter 7.00 of
the CPM and cooperation during record inspections as required by monitoring regulations.
The waiver will take effect beginning with the compliance monitoring cycle following the
date of the letter of approval. The waiver covers all subsequent compliance monitoring cycles during
the buildings compliance period. If HCR determines at any time following the grant of the waiver
that substantial noncompliance has occurred, the waiver may be revoked and the owner must
complete full annual income recertification with third party verifications. Waiver requests must be
sent to the project’s assigned asset management representative.
Office of Finance and Development
Capital Programs Manual
Page 23 of 27
Section: 7.00 PROJECT OPERATING AND MANAGEMENT REQUIREMENTS
Sub Section: 7.06 Tenant Lease Agreements
All tenants must sign written lease agreements with the owner or the owner's managing
agent. A lease agreement is a contract which assures the tenant exclusive possession of a specific
dwelling unit and reasonable use and protection of the property in exchange for payment of rent.
Lease agreements should be written for a minimum term of two years, although one year leases are
permitted at the request of the tenant. Except where other more restrictive provisions are required by
the RSL, ETPA or other applicable law, owners will use the HTFC Lease.
Should the Owner wish to add language to the HTF lease said language must be submitted
for review and approval in the form of a Lease Addendum not later than 90 days following the date
assigned for return of the executed HTFC commitment letter. During project operation, proposed
revisions to the HTFC Lease and/or lease addenda must be submitted in the form of a Lease
Addendum for review and approval to the assigned asset management representative prior to its use.
In order to reduce processing time, review of proposed addendum/changes for compliance with
applicable laws, by owner’s counsel, is highly recommended.
Office of Finance and Development
Capital Programs Manual
Page 24 of 27
Section: 7.00 PROJECT OPERATING AND MANAGEMENT REQUIREMENTS
Sub Section: 7.07 Managing Agent/Tenant Management Services
Owners may manage their own project if they demonstrate management capacity. If,
however, the services of a management agent are required, AMU must approve managing agent
compensation and the type and frequency of the residential services to be provided by the managing
agent. The owner must determine the following:
(i) the staffing necessary to provide such services; and,
(ii) the fee for the performance of such services pursuant to a written agreement (fee may
not exceed the reasonable and customary fee for such services in the area in which the
project is located).
The managing agent must be licensed as a Real Estate Broker by NYS. Selection of a
qualified managing agent shall be subject to the approval of HCR. The owner shall solicit bids,
review bids, select a prospective agent, and submit its selection to HCR together with all bids. HCR
shall review the bids, considering primarily the qualifications and quality of the bidders, and either
approve the owner's proposed agent or disapprove the agent and direct the owner to select another
agent from among those acceptable to HCR. If there are no other bidders, or no bidder acceptable to
HCR, the owner will be directed to re-bid.
Continued eligibility to self-manage the project will be conditioned upon the satisfactory
operation of the project as determined by AMU. HTFC/AMU reserves the right to remove/replace an
owner as managing agent. HTFC/AMU also reserves the right to approve, reject, or remove/replace
an existing or proposed managing agent.
Office of Finance and Development
Capital Programs Manual
Page 25 of 27
Section: 7.00 PROJECT OPERATING AND MANAGEMENT REQUIREMENTS
Sub Section: 7.08 Asset Management Performance Reviews
Throughout the term of the HTFC funded project's regulatory period AMU will conduct
periodic reviews. These reviews may include reviewing the performance of the project recipient/sub-
recipient through site visits, audits, review of specific records and documentation, and compliance
with HCR agreements.
The following is a list of some of the items AMU will review:
Annual Audit Reports;
General Operating Accounts (checking and savings);
Reserve Accounts;
Operating Budget;
Insurance Certificates;
Performance Report;
Lottery Log;
Waiting List(s);
Rent Roll/Rent Plan/Schedule;
Records of Individualized Assessments for those applicants with Criminal
Convictions;
Lease Agreement/Addenda;
Tenant Files;
Management Agreement;
Agent's Real Estate Broker License;
On site physical inspections; and,
Other such information as HCR may require in order to determine project recipient's
compliance with the terms of recipient agreements, loan documents, and the rules and
regulations of the HTFC.
Office of Finance and Development
Capital Programs Manual
Page 26 of 27
Section: 7.00 PROJECT OPERATING AND MANAGEMENT REQUIREMENTS
Sub Section: 7.09 HTF/Turnkey/LIHC Blended Projects
The purpose of this Section is to highlight specific areas where LIHC requirements differ
from HTF/Turnkey requirements. In order to receive LIHC, the property owner and property
manager must follow the Regulatory Agreement and IRS regulations and requirements. Failure to
follow these requirements (e.g., renting a unit to an over-income tenant, charging rent in excess of
the maximum allowable, renting to ineligible students (see Section 7.09.05) or inadequately
documenting a tenant file) may result in the recapture of credit with interest and penalty.
7.09.01 Maximum Income Limits - LIHC Projects
Income limits for qualifying tenants depend on the projects set-aside election. On move-in,
qualifying tenants in 20-50 set-aside projects may not have incomes which exceed 50% of the AMI
by household size. Qualifying tenants in 40-60 and 25-60 set-aside projects may not have incomes
which exceed 60% of the AMI by household size.
7.09.02 Restricted Rent Limit
The maximum rent which a project owner can charge for a low-income unit is called the
restricted rent. If this limit is met, the unit is considered rent-restricted. Gross rent (tenant rent
payment plus utility allowance) for LIHC units may not exceed 30% of the maximum area income
limit using an assumed 1.5 persons per bedroom (1 person for units without a separate bedroom).
7.09.03 Increases in Tenant Income - Next Available Unit Rule (NAUR)
Upon initial move-in certification, a household's annual income must not exceed the
applicable area median (50% or 60%) income limit by household size. At recertification, if a tenant's
income in a LIHC unit has increased above the maximum allowable income limit, the unit continues
to qualify for tax credit purposes as long as the tenant qualified on move-in and the unit remains rent
restricted. A LIHC unit occupied by a tenant whose income rises above 140% of the current
maximum allowable income limit continues to qualify for tax credit purposes as long as the unit
Office of Finance and Development
Capital Programs Manual
Page 27 of 27
remains rent restricted and the next vacant unit of comparable or smaller size in the building is
rented to a qualified LIHC tenant.
LIHC/SLIHC blended projects with or without HTF: projects that are not 100% LIHC must
adhere to the NAUR and be able to document to the satisfaction of AMU that the project is in
compliance. SLIHC units designated for persons with incomes over 60% AMI do not qualify as
LIHC units.
7.09.04 Tenant Income Certification
On move-in (prior to occupancy) and annually thereafter, the tenant must submit to the
owner a signed Tenant Income Certification. Third party source documentation/verification must be
obtained for all income sources at initial move-in certification and at each annual recertification. The
date of third party source documentation/verification of income and assets must be within one
hundred and twenty days prior to the effective date of the tenant certification. Guidance on the types
of acceptable forms of verification and definition of assets and income to be included/excluded may
be found in HUD Handbook 4350.3 (or its successor). A copy of the entire handbook and other
HUD regulations can be obtained at www.hud.gov or at www.huduser.org. If all the low-income
buildings in the project are 100% low income buildings, owners are not required to complete annual
tenant income recertifications in projects not blended with HTF or HOME.
7.09.05 Students
Per Internal Revenue Code (IRC) full time students cannot reside in a LIHC unit unless they
meet one of the exceptions outlined in IRC §42(i)(3)(D). Student status must be verified annually
for any LIHC or LIHC blended project.
Glossary
Appraisal: The formulation and support of an opinion of value. Appraisals are usually required
when real estate is sold, financed, condemned, taxed, insured, or partitioned. An appraisal is an
estimate of value, and not a determination. The three major approaches to formulating appraisals
are listed below:
a) The Market Data Approach: The current sales prices of similar properties are
compared and analyzed after necessary adjustments are made for any differences
in the properties. This approach is used most frequently in evaluating residences,
and is also called the "direct sales comparison approach."
b) The Cost Approach: This approach involves an estimation of the value of the land
(usually determined by the market data approach), plus the cost of replacement of
any improvements to the land, minus depreciation. This approach is used
primarily to estimate the value of service-type properties, such as churches and
post offices.
c) The Income Approach: This approach, frequently used to determine the value of
income-producing properties such as apartment buildings, involves an estimation
of value based on the capitalization of income and productivity. Often called the
"income approach to value," it appraises the current worth of a property's future
benefits.
Where applicable, an appraisal reconciles information from all three approaches. The three
appraisal methods serve as checks on one another to evaluate a property. In determining the
weight to be given to each approach, consideration is given to such factors as the type of
property involved, the appraisal's purpose, and the adequacy of the compiled data.
Bid Document Review: A review of the final plans, specifications, and any addenda submitted
prior to bidding the project. Bid documents are reviewed to ensure that: the applicant complies
with conditions and scope of work included in the Funding Commitment and the documents
comply with all relevant HCR design and development requirements.
Builder: A contractor, construction manager as constructor, or other entity recognized by HCR
that is responsible to perform the work under the contract for construction and assumes the risk
for the construction. Builders are to be responsible to ensure the completion of the project in
accordance with all applicable provisions and are subject to the requirements indicated in the
Capital Programs Manual.
Construction documents: As defined by the AIA; “drawings and specifications prepared by the
architect setting forth the requirements for the construction of the project.”1
Construction manager as constructor: In accordance with standard AIA contract relationships; an
entity that serves as an advisor to the owner during the design phase of a project, including cost
estimating and constructability reviews, and as a construction contractor during the construction
phase. Construction managers as constructors shall complete the work in accordance with the
1 Hayes, R.L. (ed.) The Architect’s Handbook of Professional Practice, Fifteenth Edition. Hoboken: John Wiley & Sons, 2014. Print.
construction documents and assume the risk for construction. In this capacity, the construction
manager as contractor takes on the role of the “Builder” in accordance with the above definition.
Contractor: (Also known as "Builder" or "General Contractor") A person or corporation who
contracts with an owner or developer to supply labor and materials for a specific project. As
defined by the American Institute of Architects (AIA); “one who enters in to a
contract……responsible for performing the work under the contract for construction.”
Contractors shall complete the work in accordance with the construction documents and assume
the risk for construction2.
Dwelling Unit: A private, self-contained group of rooms rented or owned by an individual(s) for
independent living. Each dwelling unit shall contain kitchen facilities for food preparation, full
bathroom/sanitary facility(ies), living space, dining space, sleeping space(s), and associated
closet/storage spaces.
Elderly: A person 55 years of age or older as defined by the New York State Human Rights Law,
Section 296 of the Executive Law.
Elderly Project: A project which excludes non-elderly persons based on age and as prescribed by
the federal Fair Housing Act and the New York State Human Rights Law, Section 296 of the
Executive Law.
Equity and Regulatory Agreement: (HTF Program term) A document which establishes the
regulation of the operation of the project, pursuant to Article 18 of the PHFL, the regulations and
the policies and procedures of the Corporation. The Agreement also establishes the permissible
return on equity, if any.
Family Project: A project containing a majority of dwelling accommodations for families of
three or more persons.
Firm Commitment: A lender's irrevocable agreement to loan a specific sum of money at a
specified interest rate for a definite term, subject to certain conditions.
Frail Elderly: Persons age 55 or older who require assistance with one or more activities of daily
living or instrumental activities of daily living. Also persons age 55 or older who have
limitations in mental capacity or emotional strength and motivation that affect their capacity to
viably live independently; that is without assistance or intervention.
Funding Commitment: A letter sent by HCR that identifies all conditions to be met prior to
Contract Closing and sets forth the amount of the payment, grant, or loan which will be provided
for the project by HCR. Funding Commitments may be amended to adjust the funding amount
based on the HCR approved Development Budget at the time of Contract Closing.
General Conditions: Services and obligations of the builder necessary to administer and facilitate
the contract for construction. These services and obligations do not directly contribute to and are
2 Hayes, R.L. (ed.) The Architect’s Handbook of Professional Practice, Fifteenth Edition. Hoboken: John Wiley & Sons, 2014. Print.
not specific to any scope of work required for the actual construction of the project3. Where
differences in terminology occur, the following examples of General Conditions supersedes that
indicated in the Design Handbook. However, this list does not alter the responsibilities and
obligations of the Builder, or other project member, from that indicated in the Design Handbook.
Examples of services and obligations categorized under General Conditions:
o Site administrative tasks:
▪ Oversight of the various building trades, including conducting coordination
meetings and inspections necessary to ensure these trades properly and safely
perform and complete their particular scopes of work.
▪ Establishing safety procedures and protocols and providing equipment necessary
to ensure the work complies with governmental regulations for standard
construction, including OSHA, NYDOL, other jurisdictional authorities, and
industry practices for the protection of workers, other personnel on site and the
general public at large.
▪ Scheduling, reporting and tracking of the work including the cost of on-site labor
and site specific administrative tools, such as computer software used solely for
the subject project but not for the builder’s business administration tasks.
▪ Securing government approvals necessary for the completion or occupancy of the
project.
▪ Processing and reviewing various product information for compliance with the
contract documents and subsequently processing those items requested by the
architect, or owner for their approval.
▪ Project closeout, including overseeing completion of punch lists, final cleaning,
completing record documentation, including as-built drawings, other record
documents, warranties, operation manuals, etc.
o Permits/Signage:
▪ Building permit and other miscellaneous permits that may be required by the
jurisdiction or other governmental authority.
▪ Temporary project signage required by funding agencies, or other authorities.
o Site office (usually a job trailer):
▪ Includes telephone, internet, electrical utilities.
▪ Does not include temporary electricity, etc. required for the project construction.
o Labor, etc.:
▪ Site Superintendent to supervise the work.
May be more than one person on large projects.
▪ Common laborers.
To carry out general labor tasks necessary to supply the site with materials, for
daily clean-up, and other miscellaneous tasks to support the construction
activities.
▪ Labor, services and materials to correct non-conforming work.
▪ Post completion warranty period obligations.
3 Hayes, R.L. (ed.) The Architect’s Handbook of Professional Practice, Fifteenth Edition. Hoboken: John Wiley & Sons, 2014. Print.
o Facilities necessary to secure the site during construction:
▪ Temporary perimeter fencing and barricades.
▪ Basic security measures, such as locked access points and perimeter security
cameras.
▪ Fire protection.
▪ Pest control during construction for common pests and infestations.
o General facilities for the workers:
▪ First aid facilities.
▪ Sanitary facilities.
o Field measurements:
▪ Site layout to locate the building, site improvements and utilities.
o Site clean-up and maintenance:
▪ Standard trash disposal fees.
Does not include specialized trash and recycling services such as those for
green building programs.
▪ Dust control.
▪ Basic facilities required by governing authorities, such as truck wheel washing
stations for standard soils, not for specialized containment of contaminated soils.
▪ Rudimentary erosion and sedimentary controls, not heightened measures
mandated by a regulatory authority.
• Costs not recognized as General Conditions:
o Builder’s Office Overhead Expenses.
▪ Examples:
Project managers assigned to multiple projects.
Percentages of central office bills, utilities, staff, etc. pro-rated to the subject
project.
Software used to manage and track multiple projects.
o Tools and equipment necessary to build the project.
o Services and facilities necessary for the work trades to perform their particular
scope(s) of work.
o Construction bonds and insurance.
o See corresponding General Requirements list.
General Contractor: A contractor who does not personally do all construction work on a project,
but requires the use of other specialty contractors, such as electrical or plumbing contractors,
whose work the general contractor superintends. The general contractor takes on the role of the
“Builder” in accordance with the above definition.
General Requirements: Costs of tools, services and equipment that directly contribute to a
specific scope of work necessary to construction the project that are provided by the Builder and
not included in a subcontract4. Where differences in terminology occur, the following examples
4 Hayes, R.L. (ed.) The Architect’s Handbook of Professional Practice, Fifteenth Edition. Hoboken: John Wiley & Sons, 2014. Print
of General Requirements supersedes that indicated in the Design Handbook. However, this list
does not alter the responsibilities and obligations of the Builder, or other project member, from
that indicated in the Design Handbook. Examples of tools, services and equipment categorized
under General Requirements:
o Special services and obligations:
▪ Specified inspections and testing performed by the builder.
▪ Site safety plans and other enhanced safety measures, training and reporting
required by the local jurisdiction when they exceed OSHA and NYDOL
requirements for standard construction.
▪ Commissioning (testing of mechanical or other systems).
▪ Construction waste management associated with specialized trash and recycling
programs, such as those for green building programs (not for standard
construction trash removal).
▪ Field engineering for special situations (e.g. engineering the underpinning of an
existing structure).
▪ Sustainable (green) building practices, procedures, and certifications.
▪ Construction bonds and insurance.
o Temporary utilities, facilities, etc.: (those required for specific scopes of work and not
associated with the site office, or basic safety or security obligations)
▪ Temporary access roads and parking.
▪ Temporary electric.
▪ Temporary heating/cooling.
▪ Temporary lighting.
▪ Temporary protective walkways (e.g. where work blocks or endangers pedestrian
sidewalks).
▪ Temporary ventilation.
▪ Temporary water.
▪ Construction platforms.
▪ Dewatering for foundation systems.
▪ Site shoring and existing building protection.
▪ Staging areas (storage areas for materials and equipment).
o Equipment and tools:
▪ Cranes.
▪ Equipment mobilization (moving large equipment, necessary to construct the
project, to the site).
▪ Equipment rentals (large and small equipment and tools).
▪ Generators.
▪ Hazardous materials protection, equipment, containment and safety measures.
▪ Personal protective equipment (e.g. hardhats, gloves, eye protection).
▪ Safety nets.
▪ Scaffolding.
▪ Temporary elevators/hoists.
• Costs not recognized as General Requirements:
o General Conditions:
▪ See corresponding General Conditions list.
o Builder’s Office Overhead Expenses.
▪ Examples:
• Project managers assigned to multiple projects.
• Percentages of central office bills, utilities, staff, etc. pro-rated to the subject
project.
• Software used to manage and track multiple projects.
Grant Conditions Compliance Enforcement Mortgage: A document which secures the
performance of the project recipient under the Construction Loan Agreement and the Equity and
Regulatory Agreement by the placement of a mortgage on the project site in the amount of the
grant.
Homesteading Project: a) A one-to-four unit dwelling, of which one unit is occupied by the
property's owner as a primary residence (HTF Program); or, b) housing that is owned and made
available by a public agency at favorable terms to low- or moderate-income homeowners.
Identity of Interest: A condition which exists when:
a) there is any financial interest of the developer or owner in the general contractor,
subcontractor, architect, or consultant which receives compensation in regards to
the project;
b) one or more of the officers, directors or stockholders of the developer or owner is
also an officer, director, or stockholder of the general contractor, subcontractor,
architect or consultant;
c) any officer, director or stockholder of the developer or owner has any financial
interest whatsoever in the general contractor, subcontractor, architect or
consultant;
d) the general contractor, subcontractor, architect or consultant advances any funds
to the developer or owner;
e) the general contractor, subcontractor, architect or consultant provides and pays,
on behalf of the developer or owner, the cost of any architectural services or
engineering services other than those of a surveyor, general superintendent, or
engineer employed by a general contractor in connection with his/her obligations
under the construction contract;
f) the general contractor, subcontractor, architect or consultant takes stock or any
interest in the developer or owner corporation, or partnership as part of the
consideration to be paid it;
g) any relationship (e.g., family) exists which would give the developer or owner or
general contractor control or influence over the price of the contract or the price
paid to the subcontractor, material supplier or lessor of equipment; or
h) there exist (or come into being) any side deals, agreements, contracts or
undertakings entered into or contemplated, thereby altering, amending, or
cancelling any of the required closing documents, except as approved by HCR.
Inspection(s): In the context of the term “inspection(s)” referenced in this document for actions
by HCR personnel or their agents, personal visits and site observations of the subject matter.
“Inspection(s)” when referring to HCR personnel or their agents, shall not be deemed as
observations, testing, or other actions normally undertaken by authorities having regulatory
jurisdiction.
Outcome Letters: A letter which is sent to applicants after HCR’s review of a UF application,
and which notifies the applicant has achieved one of the following statuses:
1) Application Review Letters – sent to unsuccessful applicants regardless of which
program(s) funds were requested from.
2) Award Letters – sent to all successful UF applicants. This letter notifies the applicant
that the project has been selected for funding, and sets forth the number of units and
award amount(s). The Award Letter is a preliminary notification, and is issued prior
to the binding 9% LIHC/SLIHC Reservation and/or Funding Commitment Letters.
Operating Reserve: A fund into which monies are set aside at the time of initial occupancy and
each month thereafter for unanticipated operation and maintenance costs.
Person with Special Needs: Means any person who has a physical or mental impairment that
substantially limits one or more major life activities; has a record of such impairment; or is
regarded as having such impairment.
(a) Physical or mental impairment includes:
(1) Any physiological disorder or condition, cosmetic disfigurement, or
anatomical loss affecting one or more of the following body systems: Neurological;
musculoskeletal; special sense organs; respiratory, including speech organs; cardiovascular;
reproductive; digestive; genitourinary; hemic and lymphatic; skin; and endocrine; or
(2) Any mental or psychological disorder, such as mental retardation, organic
brain syndrome, emotional or mental illness, and specific learning disabilities. The term physical
or mental impairment includes, but is not limited to, such diseases and conditions as orthopedic,
visual, speech and hearing impairments, cerebral palsy, autism, epilepsy, muscular dystrophy,
multiple sclerosis, cancer, heart disease, diabetes, mental retardation, emotional illness, drug
addiction and alcoholism.
(b) Major life activities means functions such as caring for one's self, performing
manual tasks, walking, seeing, hearing, speaking, breathing, learning and working.
(c) Has a record of such an impairment means has a history of, or has been
misclassified as having, a mental or physical impairment that substantially limits one or more
major life activities.
(d) Is regarded as having an impairment means:
(1) Has a physical or mental impairment that does not substantially limit one
or more major life activities but that is treated by a recipient as constituting such a limitation;
(2) Has a physical or mental impairment that substantially limits one or more
major life activities only as a result of the attitudes of others toward such impairment; or
(3) Has none of the impairments defined in paragraph (a) of this section but is
treated by a recipient as having such an impairment.
In addition, HCR and the Housing Trust Fund may designate specific classifications of
persons who have experienced significant impediments to securing safe, decent, appropriate
affordable housing as Persons with Special Needs. Such classifications can include, but may not
be limited to domestic violence victims, homeless individuals or families, youth aging out of
foster care and Veterans with any of the previously listed Special Needs.
PHFL: Private Housing Finance Law.
Pre-Construction Meeting: A meeting held after the Contract Closing, but prior to the start of
construction, with all project participants in attendance to discuss the proposed work, set forth all
program regulations, procedures and requirements, and delineate the roles and responsibilities of
each project participant.
Predevelopment Costs Agreement: (HTF Program term) A document which sets forth the terms
for partial disbursement of a Housing Trust Fund award for costs associated with the
predevelopment stage of a project. If a project proceeds to construction, this agreement will be
superseded by the Construction Loan Agreement.
Project Contingency Budget Line: The project contingency budget line shall be for funds set
aside for unforeseen circumstances occurring after a final development budget is established at
the time of the construction loan closing. Project contingency funds may only be expended to
complete the project scope represented in the application for funding or agreed to at the time of
the construction loan closing. Project contingency funds shall not be used to otherwise expand
the project beyond the project scope agreed to by the agency, unless approved in writing by
HCR. Use of the project contingency for changes to the construction work must conform to the
applicable change order process in the CPM. HCR reserves the right to use contingency funds
remaining at the time of the permanent loan closing to reduce funding to the project from any of
the sources administered by HCR by an equivalent amount.
Project Development Meeting: A meeting held, after a successful project applicant signs and
returns its Funding Commitment letter, between the project team and OF&D staff to discuss the
following project-related topics: roles of OF&D staff, program and development requirements,
required documents, coordination with other agencies, timetables, fee arrangements, and any
issues raised by the Funding Commitment letter or as a result of HCR’s review of the project.
Replacement Reserve: The amount set aside at the time of initial occupancy, or each month
thereafter, for the future replacement of items including, but not limited to, flooring, plumbing
systems, heating systems, security systems, electrical systems, roofs, and window and door units,
as approved by HCR.
Subcontractor: A builder/contractor who performs a specific portion of the work on a project,
such as the plumbing, pursuant to an agreement with the project's developer or general
contractor.
Single Room Occupancy (SRO): A residence with single room dwelling units that are the
primary residence for up to two individuals. Each single room dwelling unit shall contain a
private full kitchen for food preparation, or a full bathroom/sanitary facility, but not both. The
residence shall include either common food preparation or sanitary facilities, when not included
in each single room dwelling unit. Each single room dwelling unit may include limited counter
space with a small sink and a small under-counter refrigerator when a common food preparation
facility is provided.
Total Project Cost (TPC): The sum of all eligible, necessary and reasonable acquisition,
construction/rehabilitation, and soft costs for a project, as well as working capital and reserve
fund capitalization costs, where applicable.