    I have tested the same scenario but I have not got the error.

  • 7/25/2019 Capacity LeCapacity levelling error_reply.docxvelling Error_reply

    2/2

    The below are my observations for the error causing:

    Please check with remaining available capacity for work center at CM01

    Capacity is not available on particular date on which system is showing overload. As in finite scheduling system will

    not allow you overload so why that you are getting this error.

    Select the correct strategy profile so that system to reschedule in the forward direction at capacity planning table.