Overview of the Project
December 2015
Yutaka Kokufu, Ph.D.
LiDAR Survey Project
PROJECT TEAM MEMBERS
Name Position Qualification
Dr. Yutaka KOKUFU ・Team Leader
・Ph.D
・Registered Geodetic Surveyor
(Japan)
Mr. Kouichi KAMIMURA ・Deputy Team Leader・Registered Geodetic Surveyor
(Japan)
Mr. Reynaldo Adorador ・LiDAR Data Processing・Professional Geodetic Engineer
(Philippines)
Mr. Masanobu Kondo
・LiDAR Survey Planning,
Specifications & Technology
Transfer
・Registered Geodetic Surveyor
(Japan)
Mr. Kiyofumi Tamari ・GCP Survey・Registered Geodetic Surveyor
(Japan)
LiDAR Survey Project
PROJECT TEAM MEMBERS
Name Position Qualification
Mr. Hideyuki Haijima・LiDAR Survey & Technology
Transfer
・Registered Geodetic Surveyor
(Japan)
Dr. Akihiro Furuta・Thematic Mapping & technology
Transfer・Dr. (Geo-Information System)
Mr. Kazunobu Kamimura・Practical Use of Data &
Technology Transfer Planning
・Certified Planner (USA)
・Certified System Administrator
(Japan)
Ms. Mary Grace Desusa ・Project Coordinator ・MBA
The Project has been implemented under
an official request of the Government of
the Democratic Socialist Republic of Sri
Lanka to Government of Japan as a JICA
Technical Assistance
BACKGROUND OF THE PROJECT
LiDAR Survey Project
1. Overview of Project 2. Overall Work Schedule 3. LiDAR Data Utilization
Presentation Outline
LiDAR Survey Project
LiDAR Survey Project
1. Overview of Project
LiDAR Survey Project
1) Preparation of DEM Data
2)Technical Transfer on DEM preparation
and thematic map preparation
(1) Objectives
LiDAR Survey Project
Locality
LiDAR Survey Area
DEM
Processing Area
LiDAR Point
Density
Vertical
Accuracy
Ground Pixel
Size on Ortho image
Colombo and
Gampaha Districts
2,400 km2 2,200 km2 1 x 1 meter mesh ±30 cm 30 cm
Other than above 5,400 km2 800 km2 2 x 2 meter
mesh ±50 cm-100
cm 50 cm
1)DEM Data Production Area
(2) Scope of Project
LiDAR Survey Project
2)Technical Transfer The Survey Department of the Ministry of
Land and Land Development (C/P)
LiDAR Survey Project
24 months from January 2015 to December 2016
(3) Project Period
(1) Collection and Examination of Existing Documents and Information
(2) Preparation of Inception Report and Discussion
(3) Preparation of Technology Transfer Plan and Implementation of the Plan
(4) Seminar – Practical Uses of the DEM Products
(5) Discussion on Specifications
(6) Preparation of LiDAR Survey Plan
(7) Installing GPS Stations and Control Point for Adjustment
(8) Implementation of LiDAR Survey
(9) Preparation of Progress Report and Discussion
(10) Preparation of Ortho-photo Data
(11) Preparation and Inspection of 3D Survey Data
(12) Preparation of the Original Data and Inspection
(13) Ground Data Preparation
(14) DEM Data Preparation
(15) Preparation of Interim Report and Discussion
(16) Training in Japan
(17) Preparation of Draft Final Report and Discussion
(18) Preparation of the Manuals
(19) Preparation of the Final Report
Report
IC/R IT/R DF/R F/R
: Work in Sri Lanka
: Work in Japan
Item Period1 2 3 4 5 7 8 9 10 11 12
2015 2016
6 7 8 9 10 1156 12 1 2 3 4
LiDAR Survey Project
(4) Project Implementation Structure Org
an
izatio
n S
ettin
g a
nd
Pro
ject
Im
ple
men
tatio
n S
tru
ctu
re
LiDAR Survey Project
2. Overall Work Schedule
LiDAR Survey Project
Work Flow
Year Month Work in Japan Work in Sri Lanka Report & Discussion Output
1
IC/R
2
3
4
5
6
7
8
9
10
11
12
1
2
3
IT/R
4
5
6
7
8
9 DF
/R
10
11
12
F
/R
2015
2016
(2) Discussion of IC/R
(1) Review of Existing Data
(2) Preparation of IC/R
(7 ) I n stalling GPS Station and GCP for Adjustment
(6 ) Preparation of LiDAR Survey Plan
(8 ) LiDAR Survey (Subletting)
(8) L
iDAR
Surve
y (Subc
ontrac
t)
(3) Preparation of Technology Transfer PLan
(15) Discussion of IT/R
(17) Preparation of DF/R
(3) T
echn
ology Tran
sfer
(15) Preparation of IT/R
(17) Discussion of DF/R
(19) Preparation of F/R
(16) Training in Japan
(17) Preparation of DF/R
(5) Discussion of Specification
(17) Preparation of DF/R
(10) Ortho-Image Data Preparation(11) Preparation & Inspectionof 3D Measurment Data
(12) Original Data Preparation and Inspection(13) Grand Data Preparation(14) DEM Data Preparation
(15) Preparation of IT/R
(16) Training in Japan
(17) Preparation of DF/R
(3) T
echnolo
gy
(4) Seminar
(4) Seminar
PRESENT
LiDAR Survey Project
(2) Work In Japan
(1) Collection and Examination of Existing Documents and Information
(2) Preparation of Inception Report and Discussion
(10) Preparation of Ortho-photo Data
(11) Preparation and Inspection of 3D Measurment Data
(12) The Original Data Preparation and Inspection
(13) Ground Data Preparation
(14) DEM Data Preparation
(15) Preparation of Interim Report and Discussion
(16) Training in Japan
(17) Preparation of Draft Final Report and Discussion
(18) Preparation of the Manuals
(19) Preparation of the Final Report
(20) Outputs
LiDAR Survey Project
(1) Collection and
Examination of
Existing
Documents and
Information
(January, 2015)
Year Month Work in Japan Work in Sri Lanka Report & Discussion Output
1
IC/R
2
3
4
5
6
7
8
9
10
11
12
1
2
3
IT/R
4
5
6
7
8
9 DF
/R
10
11
12
F
/R
2015
2016
(2) Discussion of IC/R
(1) Review of Existing Data
(2) Preparation of IC/R
(7 ) I n stalling GPS Station and GCP for Adjustment
(6 ) Preparation of LiDAR Survey Plan
(8 ) LiDAR Survey (Subletting)
(8) L
iDAR
Surve
y (Subc
ontrac
t)
(3) Preparation of Technology Transfer PLan
(15) Discussion of IT/R
(17) Preparation of DF/R
(3) T
echn
ology Tran
sfer
(15) Preparation of IT/R
(17) Discussion of DF/R
(19) Preparation of F/R
(16) Training in Japan
(17) Preparation of DF/R
(5) Discussion of Specification
(17) Preparation of DF/R
(10) Ortho-Image Data Preparation(11) Preparation & Inspectionof 3D Measurment Data
(12) Original Data Preparation and Inspection(13) Grand Data Preparation(14) DEM Data Preparation
(15) Preparation of IT/R
(16) Training in Japan
(17) Preparation of DF/R
(3) T
echnolo
gy
(4) Seminar
(4) Seminar
PRESENT
LiDAR Survey Project
(2) Preparation of
Inception Report
(January, 2015)
Year Month Work in Japan Work in Sri Lanka Report & Discussion Output
1
IC/R
2
3
4
5
6
7
8
9
10
11
12
1
2
3
IT/R
4
5
6
7
8
9 DF
/R
10
11
12
F
/R
2015
2016
(2) Discussion of IC/R
(1) Review of Existing Data
(2) Preparation of IC/R
(7 ) I n stalling GPS Station and GCP for Adjustment
(6 ) Preparation of LiDAR Survey Plan
(8 ) LiDAR Survey (Subletting)
(8) L
iDAR
Surve
y (Subc
ontrac
t)
(3) Preparation of Technology Transfer PLan
(15) Discussion of IT/R
(17) Preparation of DF/R
(3) T
echn
ology Tran
sfer
(15) Preparation of IT/R
(17) Discussion of DF/R
(19) Preparation of F/R
(16) Training in Japan
(17) Preparation of DF/R
(5) Discussion of Specification
(17) Preparation of DF/R
(10) Ortho-Image Data Preparation(11) Preparation & Inspectionof 3D Measurment Data
(12) Original Data Preparation and Inspection(13) Grand Data Preparation(14) DEM Data Preparation
(15) Preparation of IT/R
(16) Training in Japan
(17) Preparation of DF/R
(3) T
echnolo
gy
(4) Seminar
(4) Seminar
PRESENT
LiDAR Survey Project
(10) Preparation of
Ortho-Image Data
Year Month Work in Japan Work in Sri Lanka Report & Discussion Output
1
IC/R
2
3
4
5
6
7
8
9
10
11
12
1
2
3
IT/R
4
5
6
7
8
9 DF
/R
10
11
12
F
/R
2015
2016
(2) Discussion of IC/R
(1) Review of Existing Data
(2) Preparation of IC/R
(7 ) I n stalling GPS Station and GCP for Adjustment
(6 ) Preparation of LiDAR Survey Plan
(8 ) LiDAR Survey (Subletting)
(8) L
iDAR
Surve
y (Subc
ontrac
t)
(3) Preparation of Technology Transfer PLan
(15) Discussion of IT/R
(17) Preparation of DF/R
(3) T
echn
ology Tran
sfer
(15) Preparation of IT/R
(17) Discussion of DF/R
(19) Preparation of F/R
(16) Training in Japan
(17) Preparation of DF/R
(5) Discussion of Specification
(17) Preparation of DF/R
(10) Ortho-Image Data Preparation(11) Preparation & Inspectionof 3D Measurment Data
(12) Original Data Preparation and Inspection(13) Grand Data Preparation(14) DEM Data Preparation
(15) Preparation of IT/R
(16) Training in Japan
(17) Preparation of DF/R
(3) T
echnolo
gy
(4) Seminar
(4) Seminar
PRESENT
LiDAR Survey Project
(11) Preparation and
Inspection of 3D
Measurement Data
Year Month Work in Japan Work in Sri Lanka Report & Discussion Output
1
IC/R
2
3
4
5
6
7
8
9
10
11
12
1
2
3
IT/R
4
5
6
7
8
9 DF
/R
10
11
12
F
/R
2015
2016
(2) Discussion of IC/R
(1) Review of Existing Data
(2) Preparation of IC/R
(7 ) I n stalling GPS Station and GCP for Adjustment
(6 ) Preparation of LiDAR Survey Plan
(8 ) LiDAR Survey (Subletting)
(8) L
iDAR
Surve
y (Subc
ontrac
t)
(3) Preparation of Technology Transfer PLan
(15) Discussion of IT/R
(17) Preparation of DF/R
(3) T
echn
ology Tran
sfer
(15) Preparation of IT/R
(17) Discussion of DF/R
(19) Preparation of F/R
(16) Training in Japan
(17) Preparation of DF/R
(5) Discussion of Specification
(17) Preparation of DF/R
(10) Ortho-Image Data Preparation(11) Preparation & Inspectionof 3D Measurment Data
(12) Original Data Preparation and Inspection(13) Grand Data Preparation(14) DEM Data Preparation
(15) Preparation of IT/R
(16) Training in Japan
(17) Preparation of DF/R
(3) T
echnolo
gy
(4) Seminar
(4) Seminar
PRESENT
LiDAR Survey Project
(12) The Original Data
Preparation and
Inspection
Year Month Work in Japan Work in Sri Lanka Report & Discussion Output
1
IC/R
2
3
4
5
6
7
8
9
10
11
12
1
2
3
IT/R
4
5
6
7
8
9 DF
/R
10
11
12
F
/R
2015
2016
(2) Discussion of IC/R
(1) Review of Existing Data
(2) Preparation of IC/R
(7 ) I n stalling GPS Station and GCP for Adjustment
(6 ) Preparation of LiDAR Survey Plan
(8 ) LiDAR Survey (Subletting)
(8) L
iDAR
Surve
y (Subc
ontrac
t)
(3) Preparation of Technology Transfer PLan
(15) Discussion of IT/R
(17) Preparation of DF/R
(3) T
echn
ology Tran
sfer
(15) Preparation of IT/R
(17) Discussion of DF/R
(19) Preparation of F/R
(16) Training in Japan
(17) Preparation of DF/R
(5) Discussion of Specification
(17) Preparation of DF/R
(10) Ortho-Image Data Preparation(11) Preparation & Inspectionof 3D Measurment Data
(12) Original Data Preparation and Inspection(13) Grand Data Preparation(14) DEM Data Preparation
(15) Preparation of IT/R
(16) Training in Japan
(17) Preparation of DF/R
(3) T
echnolo
gy
(4) Seminar
(4) Seminar
PRESENT
LiDAR Survey Project
(13) Ground Data
Preparation
Year Month Work in Japan Work in Sri Lanka Report & Discussion Output
1
IC/R
2
3
4
5
6
7
8
9
10
11
12
1
2
3
IT/R
4
5
6
7
8
9 DF
/R
10
11
12
F
/R
2015
2016
(2) Discussion of IC/R
(1) Review of Existing Data
(2) Preparation of IC/R
(7 ) I n stalling GPS Station and GCP for Adjustment
(6 ) Preparation of LiDAR Survey Plan
(8 ) LiDAR Survey (Subletting)
(8) L
iDAR
Surve
y (Subc
ontrac
t)
(3) Preparation of Technology Transfer PLan
(15) Discussion of IT/R
(17) Preparation of DF/R
(3) T
echn
ology Tran
sfer
(15) Preparation of IT/R
(17) Discussion of DF/R
(19) Preparation of F/R
(16) Training in Japan
(17) Preparation of DF/R
(5) Discussion of Specification
(17) Preparation of DF/R
(10) Ortho-Image Data Preparation(11) Preparation & Inspectionof 3D Measurment Data
(12) Original Data Preparation and Inspection(13) Grand Data Preparation(14) DEM Data Preparation
(15) Preparation of IT/R
(16) Training in Japan
(17) Preparation of DF/R
(3) T
echnolo
gy
(4) Seminar
(4) Seminar
PRESENT
Ground
Vegetation
LiDAR Survey Project
(14) DEM Data
Preparation
Year Month Work in Japan Work in Sri Lanka Report & Discussion Output
1
IC/R
2
3
4
5
6
7
8
9
10
11
12
1
2
3
IT/R
4
5
6
7
8
9 DF
/R
10
11
12
F
/R
2015
2016
(2) Discussion of IC/R
(1) Review of Existing Data
(2) Preparation of IC/R
(7 ) I n stalling GPS Station and GCP for Adjustment
(6 ) Preparation of LiDAR Survey Plan
(8 ) LiDAR Survey (Subletting)
(8) L
iDAR
Surve
y (Subc
ontrac
t)
(3) Preparation of Technology Transfer PLan
(15) Discussion of IT/R
(17) Preparation of DF/R
(3) T
echn
ology Tran
sfer
(15) Preparation of IT/R
(17) Discussion of DF/R
(19) Preparation of F/R
(16) Training in Japan
(17) Preparation of DF/R
(5) Discussion of Specification
(17) Preparation of DF/R
(10) Ortho-Image Data Preparation(11) Preparation & Inspectionof 3D Measurment Data
(12) Original Data Preparation and Inspection(13) Grand Data Preparation(14) DEM Data Preparation
(15) Preparation of IT/R
(16) Training in Japan
(17) Preparation of DF/R
(3) T
echnolo
gy
(4) Seminar
(4) Seminar
PRESENT
LiDAR Survey Project
(15) Preparation of
Interim Report
(Febuary,2016)
Year Month Work in Japan Work in Sri Lanka Report & Discussion Output
1
IC/R
2
3
4
5
6
7
8
9
10
11
12
1
2
3
IT/R
4
5
6
7
8
9 DF
/R
10
11
12
F
/R
2015
2016
(2) Discussion of IC/R
(1) Review of Existing Data
(2) Preparation of IC/R
(7 ) I n stalling GPS Station and GCP for Adjustment
(6 ) Preparation of LiDAR Survey Plan
(8 ) LiDAR Survey (Subletting)
(8) L
iDAR
Surve
y (Subc
ontrac
t)
(3) Preparation of Technology Transfer PLan
(15) Discussion of IT/R
(17) Preparation of DF/R
(3) T
echn
ology Tran
sfer
(15) Preparation of IT/R
(17) Discussion of DF/R
(19) Preparation of F/R
(16) Training in Japan
(17) Preparation of DF/R
(5) Discussion of Specification
(17) Preparation of DF/R
(10) Ortho-Image Data Preparation(11) Preparation & Inspectionof 3D Measurment Data
(12) Original Data Preparation and Inspection(13) Grand Data Preparation(14) DEM Data Preparation
(15) Preparation of IT/R
(16) Training in Japan
(17) Preparation of DF/R
(3) T
echnolo
gy
(4) Seminar
(4) Seminar
PRESENT
LiDAR Survey Project
(16) Training in Japan
(April,2016)
Year Month Work in Japan Work in Sri Lanka Report & Discussion Output
1
IC/R
2
3
4
5
6
7
8
9
10
11
12
1
2
3
IT/R
4
5
6
7
8
9 DF
/R
10
11
12
F
/R
2015
2016
(2) Discussion of IC/R
(1) Review of Existing Data
(2) Preparation of IC/R
(7 ) I n stalling GPS Station and GCP for Adjustment
(6 ) Preparation of LiDAR Survey Plan
(8 ) LiDAR Survey (Subletting)
(8) L
iDAR
Surve
y (Subc
ontrac
t)
(3) Preparation of Technology Transfer PLan
(15) Discussion of IT/R
(17) Preparation of DF/R
(3) T
echn
ology Tran
sfer
(15) Preparation of IT/R
(17) Discussion of DF/R
(19) Preparation of F/R
(16) Training in Japan
(17) Preparation of DF/R
(5) Discussion of Specification
(17) Preparation of DF/R
(10) Ortho-Image Data Preparation(11) Preparation & Inspectionof 3D Measurment Data
(12) Original Data Preparation and Inspection(13) Grand Data Preparation(14) DEM Data Preparation
(15) Preparation of IT/R
(16) Training in Japan
(17) Preparation of DF/R
(3) T
echnolo
gy
(4) Seminar
(4) Seminar
PRESENT
LiDAR Survey Project
(17) Preparation of
Draft Final Report
(18) Preparation of the
Manuals
(20) Outputs
(September, 2016)
Year Month Work in Japan Work in Sri Lanka Report & Discussion Output
1
IC/R
2
3
4
5
6
7
8
9
10
11
12
1
2
3
IT/R
4
5
6
7
8
9 DF
/R
10
11
12
F
/R
2015
2016
(2) Discussion of IC/R
(1) Review of Existing Data
(2) Preparation of IC/R
(7 ) I n stalling GPS Station and GCP for Adjustment
(6 ) Preparation of LiDAR Survey Plan
(8 ) LiDAR Survey (Subletting)
(8) L
iDAR
Surve
y (Subc
ontrac
t)
(3) Preparation of Technology Transfer PLan
(15) Discussion of IT/R
(17) Preparation of DF/R
(3) T
echn
ology Tran
sfer
(15) Preparation of IT/R
(17) Discussion of DF/R
(19) Preparation of F/R
(16) Training in Japan
(17) Preparation of DF/R
(5) Discussion of Specification
(17) Preparation of DF/R
(10) Ortho-Image Data Preparation(11) Preparation & Inspectionof 3D Measurment Data
(12) Original Data Preparation and Inspection(13) Grand Data Preparation(14) DEM Data Preparation
(15) Preparation of IT/R
(16) Training in Japan
(17) Preparation of DF/R
(3) T
echnolo
gy
(4) Seminar
(4) Seminar
PRESENT
LiDAR Survey Project
(19) Preparation of the
Final Report
(November,2016)
Year Month Work in Japan Work in Sri Lanka Report & Discussion Output
1
IC/R
2
3
4
5
6
7
8
9
10
11
12
1
2
3
IT/R
4
5
6
7
8
9 DF
/R
10
11
12
F
/R
2015
2016
(2) Discussion of IC/R
(1) Review of Existing Data
(2) Preparation of IC/R
(7 ) I n stalling GPS Station and GCP for Adjustment
(6 ) Preparation of LiDAR Survey Plan
(8 ) LiDAR Survey (Subletting)
(8) L
iDAR
Surve
y (Subc
ontrac
t)
(3) Preparation of Technology Transfer PLan
(15) Discussion of IT/R
(17) Preparation of DF/R
(3) T
echn
ology Tran
sfer
(15) Preparation of IT/R
(17) Discussion of DF/R
(19) Preparation of F/R
(16) Training in Japan
(17) Preparation of DF/R
(5) Discussion of Specification
(17) Preparation of DF/R
(10) Ortho-Image Data Preparation(11) Preparation & Inspectionof 3D Measurment Data
(12) Original Data Preparation and Inspection(13) Grand Data Preparation(14) DEM Data Preparation
(15) Preparation of IT/R
(16) Training in Japan
(17) Preparation of DF/R
(3) T
echnolo
gy
(4) Seminar
(4) Seminar
PRESENT
LiDAR Survey Project
(2) Work In Sri Lanka
(2) Discussion of Inception Report
(3) Preparation of Technology Transfer Plan and Implementation of the Plan
(4) Seminar – Practical Uses of the DEM Products
(5) Discussion on Specifications
(6) Preparation of LiDAR Survey Plan
(7) Installing GPS Stations and Control Point for Adjustment
(8) Implementation of LiDAR Survey
(9) Discussion of Progress Report
(15) Discussion of Interim Report
(17) Discussion of Draft Final Report
LiDAR Survey Project
(2) Discussion of
Inception Report
(March, 2015)
Year Month Work in Japan Work in Sri Lanka Report & Discussion Output
1
IC/R
2
3
4
5
6
7
8
9
10
11
12
1
2
3
IT/R
4
5
6
7
8
9 DF
/R
10
11
12
F
/R
2015
2016
(2) Discussion of IC/R
(1) Review of Existing Data
(2) Preparation of IC/R
(7 ) I n stalling GPS Station and GCP for Adjustment
(6 ) Preparation of LiDAR Survey Plan
(8 ) LiDAR Survey (Subletting)
(8) L
iDAR
Surve
y (Subc
ontrac
t)
(3) Preparation of Technology Transfer PLan
(15) Discussion of IT/R
(17) Preparation of DF/R
(3) T
echn
ology Tran
sfer
(15) Preparation of IT/R
(17) Discussion of DF/R
(19) Preparation of F/R
(16) Training in Japan
(17) Preparation of DF/R
(5) Discussion of Specification
(17) Preparation of DF/R
(10) Ortho-Image Data Preparation(11) Preparation & Inspectionof 3D Measurment Data
(12) Original Data Preparation and Inspection(13) Grand Data Preparation(14) DEM Data Preparation
(15) Preparation of IT/R
(16) Training in Japan
(17) Preparation of DF/R
(3) T
echnolo
gy
(4) Seminar
(4) Seminar
PRESENT
LiDAR Survey Project
Comparison Table for LiDAR Survey Schedule
Alternative A
Alternative B
Alternative C
8 9 10 11 122 3 4 5 6 78 9 10 11 12 1Item Period
2015 2016
6 71 2 3 4 5
Work Item Period 1. Bidding works April 1 – April 15
↓ 2 Implementation of project (1) Mobilization November 23 – 27 (2) Inspection and clearance November 28 - 30
Preparation Stage for LiDAR Survey
(3) Survey Periods Survey during the Rainy Seasons(April to May, October to November) not recommended
Colombo Nuwara Eliya
Source:http://www.weather2travel.com/
Colombo Colombo Nuwara Eliya Kurunegala
Source:http://www.climatemaps.com/
雨季月間
300~400mm
雨季月間
200弱~250mm
Wet Days (rainy day)
LiDAR Survey Project
(1) Collection and Examination of Existing Documents and Information
(2) Preparation of Inception Report and Discussion
(3) Preparation of Technology Transfer Plan and Implementation of the Plan
(4) Seminar – Practical Uses of the DEM Products
(5) Discussion on Specifications
(6) Preparation of LiDAR Survey Plan
(7) Installing GPS Stations and Control Point for Adjustment
(8) Implementation of LiDAR Survey
(9) Preparation of Progress Report and Discussion
(10) Preparation of Ortho-photo Data
(11) Preparation and Inspection of 3D Survey Data
(12) Preparation of the Original Data and Inspection
(13) Ground Data Preparation
(14) DEM Data Preparation
(15) Preparation of Interim Report and Discussion
(16) Training in Japan
(17) Preparation of Draft Final Report and Discussion
(18) Preparation of the Manuals
(19) Preparation of the Final Report
Report
IC/R IT/R DF/R F/R
: Work in Sri Lanka
: Work in Japan
Item Period1 2 3 4 5 7 8 9 10 11 12
2015 2016
6 7 8 9 10 1156 12 1 2 3 4
LiDAR Survey Project
Assignment Schedule of Project Team Members
S J
Team Leader/DEM Preparation Planning Dr. Yutaka Kokufu Pacific Consultants Co. Ltd.45 45 15 15 15 15 15
5.50
GPS Station/Control Point for Adjustment 2 Mr. Koichi Kamimura DMS Co., Ltd.45 60 60 15 15 15
7.00
LiDAR Data ProcessingMr. Reynaldo R.
AdoradorOriental Consultants Global Co., Ltd. (CERTEZA)
20 20 20 20 103.00
LiDAR Survey Planning/Survey Specifications/Technology
Transfer 1Mr. Masanobu Kondo Nakanihon Air Service Co. Ltd.
30 60 15 45 155.50
GPS Station/Control Point for Adjustment 1 Mr. Kiyofumi Tamari DMS Co., Ltd.60 45
3.50
LiDAR Survey/Technology Transfer 2 Mr. Hideyuki Haijima Nakanihon Air Service Co. Ltd.30 60 60 45 15
7.00
LiDAR Survey/Technology Transfer 3 Mr. Hajime Nakasha Nakanihon Air Service Co. Ltd.
Thematic Mapping/Technology Transfer Dr. Akihiro Furuta Oriental Consultants Global Co., Ltd.15 15
1.00
Data Use Promotion/Technology Transfer Planning Mr. Kazunobu KamimuraPacific Consultants Co. Ltd. (Japan International
Cooperation Information Services Co., Ltd.)30 30 30 15 30 15
5.00
Project Coordinator/LiDAR Data Processing Assistant Ms. Mary Grace Desusa DMS Co., Ltd. (MGD GENERAL SERVICES )15 15 15 15 15
2.50
Project Assistant Mr. Kazushi Kitani Nakanihon Air Service Co. Ltd.
40.00
Team Leader/DEM Preparation Planning Dr. Yutaka Kokufu Pacific Consultants Co. Ltd.3 3 6 3
0.75
LiDAR Survey Planning/Survey Specifications/Technology
Transfer 1Mr. Masanobu Kondo Nakanihon Air Service Co. Ltd.
100.50
LiDAR Survey/Technology Transfer 2 Mr. Hideyuki Haijima Nakanihon Air Service Co. Ltd.10
0.50
1.75
Report
(Report Name) IC/R IT/R DF/R F/R
Work in Sri Lanka
Work in Japan
Assignment by JV
6 7 8 7Assignment Name
1 2 12Affiliation
Man Month
1 2 3 4 5 89 10
Wo
rk in
Sri L
an
ka
Total (Work in Sri Lanka)
3 4 5 611 12
Wo
rk in
Ja
pa
n
Total (Work in Japan)
Total 41.75
2015 2016
9 10 11
LiDAR Survey Project
(3) Preparation of
Technology Transfer
Plan (March 2015) and
Implementation of the
Plan (Nov, 2015 to July
2016 )
Year Month Work in Japan Work in Sri Lanka Report & Discussion Output
1
IC/R
2
3
4
5
6
7
8
9
10
11
12
1
2
3
IT/R
4
5
6
7
8
9 DF
/R
10
11
12
F
/R
2015
2016
(2) Discussion of IC/R
(1) Review of Existing Data
(2) Preparation of IC/R
(7 ) I n stalling GPS Station and GCP for Adjustment
(6 ) Preparation of LiDAR Survey Plan
(8 ) LiDAR Survey (Subletting)
(8) L
iDAR
Surve
y (Subc
ontrac
t)
(3) Preparation of Technology Transfer PLan
(15) Discussion of IT/R
(17) Preparation of DF/R
(3) T
echn
ology Tran
sfer
(15) Preparation of IT/R
(17) Discussion of DF/R
(19) Preparation of F/R
(16) Training in Japan
(17) Preparation of DF/R
(5) Discussion of Specification
(17) Preparation of DF/R
(10) Ortho-Image Data Preparation(11) Preparation & Inspectionof 3D Measurment Data
(12) Original Data Preparation and Inspection(13) Grand Data Preparation(14) DEM Data Preparation
(15) Preparation of IT/R
(16) Training in Japan
(17) Preparation of DF/R
(3) T
echnolo
gy
(4) Seminar
(4) Seminar
PRESENT
LiDAR Survey Project
(4) Seminar –
Practical Uses of the
DEM Products
(Dec 2015 & Oct 2016)
Year Month Work in Japan Work in Sri Lanka Report & Discussion Output
1
IC/R
2
3
4
5
6
7
8
9
10
11
12
1
2
3
IT/R
4
5
6
7
8
9 DF
/R
10
11
12
F
/R
2015
2016
(2) Discussion of IC/R
(1) Review of Existing Data
(2) Preparation of IC/R
(7 ) I n stalling GPS Station and GCP for Adjustment
(6 ) Preparation of LiDAR Survey Plan
(8 ) LiDAR Survey (Subletting)
(8) L
iDAR
Surve
y (Subc
ontrac
t)
(3) Preparation of Technology Transfer PLan
(15) Discussion of IT/R
(17) Preparation of DF/R
(3) T
echn
ology Tran
sfer
(15) Preparation of IT/R
(17) Discussion of DF/R
(19) Preparation of F/R
(16) Training in Japan
(17) Preparation of DF/R
(5) Discussion of Specification
(17) Preparation of DF/R
(10) Ortho-Image Data Preparation(11) Preparation & Inspectionof 3D Measurment Data
(12) Original Data Preparation and Inspection(13) Grand Data Preparation(14) DEM Data Preparation
(15) Preparation of IT/R
(16) Training in Japan
(17) Preparation of DF/R
(3) T
echnolo
gy
(4) Seminar
(4) Seminar
PRESENT
LiDAR Survey Project
(5) Discussion on
Specifications
(March, 2015)
Year Month Work in Japan Work in Sri Lanka Report & Discussion Output
1
IC/R
2
3
4
5
6
7
8
9
10
11
12
1
2
3
IT/R
4
5
6
7
8
9 DF
/R
10
11
12
F
/R
2015
2016
(2) Discussion of IC/R
(1) Review of Existing Data
(2) Preparation of IC/R
(7 ) I n stalling GPS Station and GCP for Adjustment
(6 ) Preparation of LiDAR Survey Plan
(8 ) LiDAR Survey (Subletting)
(8) L
iDAR
Surve
y (Subc
ontrac
t)
(3) Preparation of Technology Transfer PLan
(15) Discussion of IT/R
(17) Preparation of DF/R
(3) T
echn
ology Tran
sfer
(15) Preparation of IT/R
(17) Discussion of DF/R
(19) Preparation of F/R
(16) Training in Japan
(17) Preparation of DF/R
(5) Discussion of Specification
(17) Preparation of DF/R
(10) Ortho-Image Data Preparation(11) Preparation & Inspectionof 3D Measurment Data
(12) Original Data Preparation and Inspection(13) Grand Data Preparation(14) DEM Data Preparation
(15) Preparation of IT/R
(16) Training in Japan
(17) Preparation of DF/R
(3) T
echnolo
gy
(4) Seminar
(4) Seminar
PRESENT
LiDAR Survey Project
(6)Preparation of
LiDAR Survey Plan
(March, 2015)
Year Month Work in Japan Work in Sri Lanka Report & Discussion Output
1
IC/R
2
3
4
5
6
7
8
9
10
11
12
1
2
3
IT/R
4
5
6
7
8
9 DF
/R
10
11
12
F
/R
2015
2016
(2) Discussion of IC/R
(1) Review of Existing Data
(2) Preparation of IC/R
(7 ) I n stalling GPS Station and GCP for Adjustment
(6 ) Preparation of LiDAR Survey Plan
(8 ) LiDAR Survey (Subletting)
(8) L
iDAR
Surve
y (Subc
ontrac
t)
(3) Preparation of Technology Transfer PLan
(15) Discussion of IT/R
(17) Preparation of DF/R
(3) T
echn
ology Tran
sfer
(15) Preparation of IT/R
(17) Discussion of DF/R
(19) Preparation of F/R
(16) Training in Japan
(17) Preparation of DF/R
(5) Discussion of Specification
(17) Preparation of DF/R
(10) Ortho-Image Data Preparation(11) Preparation & Inspectionof 3D Measurment Data
(12) Original Data Preparation and Inspection(13) Grand Data Preparation(14) DEM Data Preparation
(15) Preparation of IT/R
(16) Training in Japan
(17) Preparation of DF/R
(3) T
echnolo
gy
(4) Seminar
(4) Seminar
PRESENT
LiDAR Survey Project
(7) Installing GPS
Stations and Control
Point for Adjustment
(Oct 2015 & January,
2016)
Year Month Work in Japan Work in Sri Lanka Report & Discussion Output
1
IC/R
2
3
4
5
6
7
8
9
10
11
12
1
2
3
IT/R
4
5
6
7
8
9 DF
/R
10
11
12
F
/R
2015
2016
(2) Discussion of IC/R
(1) Review of Existing Data
(2) Preparation of IC/R
(7 ) I n stalling GPS Station and GCP for Adjustment
(6 ) Preparation of LiDAR Survey Plan
(8 ) LiDAR Survey (Subletting)
(8) L
iDAR
Surve
y (Subc
ontrac
t)
(3) Preparation of Technology Transfer PLan
(15) Discussion of IT/R
(17) Preparation of DF/R
(3) T
echn
ology Tran
sfer
(15) Preparation of IT/R
(17) Discussion of DF/R
(19) Preparation of F/R
(16) Training in Japan
(17) Preparation of DF/R
(5) Discussion of Specification
(17) Preparation of DF/R
(10) Ortho-Image Data Preparation(11) Preparation & Inspectionof 3D Measurment Data
(12) Original Data Preparation and Inspection(13) Grand Data Preparation(14) DEM Data Preparation
(15) Preparation of IT/R
(16) Training in Japan
(17) Preparation of DF/R
(3) T
echnolo
gy
(4) Seminar
(4) Seminar
PRESENT
LiDAR Survey Project
(8) Implementation of
LiDAR Survey
(December, 2015 to
April , 2016)
Year Month Work in Japan Work in Sri Lanka Report & Discussion Output
1
IC/R
2
3
4
5
6
7
8
9
10
11
12
1
2
3
IT/R
4
5
6
7
8
9 DF
/R
10
11
12
F
/R
2015
2016
(2) Discussion of IC/R
(1) Review of Existing Data
(2) Preparation of IC/R
(7 ) I n stalling GPS Station and GCP for Adjustment
(6 ) Preparation of LiDAR Survey Plan
(8 ) LiDAR Survey (Subletting)
(8) L
iDAR
Surve
y (Subc
ontrac
t)
(3) Preparation of Technology Transfer PLan
(15) Discussion of IT/R
(17) Preparation of DF/R
(3) T
echn
ology Tran
sfer
(15) Preparation of IT/R
(17) Discussion of DF/R
(19) Preparation of F/R
(16) Training in Japan
(17) Preparation of DF/R
(5) Discussion of Specification
(17) Preparation of DF/R
(10) Ortho-Image Data Preparation(11) Preparation & Inspectionof 3D Measurment Data
(12) Original Data Preparation and Inspection(13) Grand Data Preparation(14) DEM Data Preparation
(15) Preparation of IT/R
(16) Training in Japan
(17) Preparation of DF/R (3
) Technolo
gy
(4) Seminar
(4) Seminar
PRESENT
(8) Arrangement of
LiDAR Survey Work
(March, 2015 )
40
AIRBORNE LiDAR SURVEY (8) Implementation of
LiDAR Survey
(December 2015 to
April 2016)
LiDAR Survey Project
(15) Discussion of
Interim Report
(March, 2016)
Year Month Work in Japan Work in Sri Lanka Report & Discussion Output
1
IC/R
2
3
4
5
6
7
8
9
10
11
12
1
2
3
IT/R
4
5
6
7
8
9 DF
/R
10
11
12
F
/R
2015
2016
(2) Discussion of IC/R
(1) Review of Existing Data
(2) Preparation of IC/R
(7 ) I n stalling GPS Station and GCP for Adjustment
(6 ) Preparation of LiDAR Survey Plan
(8 ) LiDAR Survey (Subletting)
(8) L
iDAR
Surve
y (Subc
ontrac
t)
(3) Preparation of Technology Transfer PLan
(15) Discussion of IT/R
(17) Preparation of DF/R
(3) T
echn
ology Tran
sfer
(15) Preparation of IT/R
(17) Discussion of DF/R
(19) Preparation of F/R
(16) Training in Japan
(17) Preparation of DF/R
(5) Discussion of Specification
(17) Preparation of DF/R
(10) Ortho-Image Data Preparation(11) Preparation & Inspectionof 3D Measurment Data
(12) Original Data Preparation and Inspection(13) Grand Data Preparation(14) DEM Data Preparation
(15) Preparation of IT/R
(16) Training in Japan
(17) Preparation of DF/R
(3) T
echnolo
gy
(4) Seminar
(4) Seminar
PRESENT
LiDAR Survey Project
(17) Discussion of
Draft Final Report
(September, 2016)
Year Month Work in Japan Work in Sri Lanka Report & Discussion Output
1
IC/R
2
3
4
5
6
7
8
9
10
11
12
1
2
3
IT/R
4
5
6
7
8
9 DF
/R
10
11
12
F
/R
2015
2016
(2) Discussion of IC/R
(1) Review of Existing Data
(2) Preparation of IC/R
(7 ) I n stalling GPS Station and GCP for Adjustment
(6 ) Preparation of LiDAR Survey Plan
(8 ) LiDAR Survey (Subletting)
(8) L
iDAR
Surve
y (Subc
ontrac
t)
(3) Preparation of Technology Transfer PLan
(15) Discussion of IT/R
(17) Preparation of DF/R
(3) T
echn
ology Tran
sfer
(15) Preparation of IT/R
(17) Discussion of DF/R
(19) Preparation of F/R
(16) Training in Japan
(17) Preparation of DF/R
(5) Discussion of Specification
(17) Preparation of DF/R
(10) Ortho-Image Data Preparation(11) Preparation & Inspectionof 3D Measurment Data
(12) Original Data Preparation and Inspection(13) Grand Data Preparation(14) DEM Data Preparation
(15) Preparation of IT/R
(16) Training in Japan
(17) Preparation of DF/R
(3) T
echnolo
gy
(4) Seminar
(4) Seminar
PRESENT
LiDAR Survey Project
(3) Outputs Output Submission (Deadline) Quantity
[1] Reports
1) Inception Report (IC/R) at the commencement of the project 10 copies
2) Progress Report (PR/R) Eight (8) months after the commencement
(August 2015) 10 copies
3) Interim Report (IT/R) Fifteen (15) months after the
commencement (August 2015) 10 copies
4) Draft Final Report (DF/R) Fifteen (22) months after the
commencement (August 2015) 10 copies
5) Final Report (F/R) Within one month after receiving
comments from the Sri Lanka side 15 copies
[2] Outputs of Technical Cooperation
1) LiDAR Survey Rules
at the submission of the DR/R 1 set each
2) DEM Product Specifications
3) DEM Observation Data Pre-Processing Manual for LiDAR Survey
4) DEM Data Preparation Manual
5) Quality Control Manual
6) Thematic Mapping Manual
7) Equipment Operation Management Manual
[3] Data and Other Reports
1) Results of Field Identification
at the submission of the F/R
1 set
2) Digital Data Files 1 set
I 3D Survey Data 1 set
Ii Original Data 1 set
Iii Ground Data 1 set
DEM Data 1 set
Ortho-photo Data 1 set
Specifications 1 set
Manuals for technology Transfer 1 set
Report on Quality Management 1 set
Others (Equipment Procurement Documents) at the end of the project 1 set
[4] Monthly Work Report 15th day of the following month All the copies
[5] Collected Information at the submission of the F/R 1 set
[6] Promotion Material at the submission of the F/R 150 copies
[7] Digital Image Data (to JICA) at the submission of the F/R One CD-R
[8] Others
1) Minutes of Meeting (to JICA) as soon as it is prepared All the copies
2) Letters to the Government of Sri Lanka (photocopies) (to JICA) as soon as it is prepared All the copies
LiDAR Survey Project
DEM Data
Ortho-Image Mosaic Data
CONTENTS OF LiDAR SURVEY DATA
ORIGINAL SURVEY DATA
ORIGINAL LiDAR DATA
GROUND DATA
1m x 1m DEM DATA
2m x 2m DEM DATA
LiDAR Survey Project
LiDAR DATA UTILIZATION (SAMPLE)
LiDAR Survey Project
Contour Data
LiDAR Survey Project
DEM Data Color Shading
LiDAR Survey Project
DEM Data Color Shading
LiDAR Survey Project
3D Data
LiDAR Survey Project
Thailand LiDAR Survey by JICA 2012
LiDAR Survey Project
Philippine LiDAR Survey by JICA 2015
Tsunami Hazard Map
LiDAR Survey Project
Philippine LiDAR Survey by JICA 2015
Storm Surge Hazard Map
LiDAR Survey Project
Philippine LiDAR Survey by JICA 2015
Flood Hazard Map
Thank You !!