Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
CAPABILITIES S TATEMENT
EASTERNGURUMA
W E S T E R NA U S T R A L I A
Eastern Guruma Pty Ltd is a civil and mining contractor
which is 100% owned by members of the Traditional
owner group, Eastern Guruma, whose land surrounds
Tom Price in the Pilbara Region of Western Australia.
Established in 2004, Eastern Guruma has become
one the most successful Aboriginal Business in the
Western Australian Mining Industry providing Civil,
Mining, Facilities Management and Landscaping
services to some of Australia’s largest Iron Ore miners
in the delivery of over $1billion worth of projects.
With a strong focus on our core business of providing civil and mining services, our team of qualified and experienced personnel are committed to the delivery of a cost effective and flexible solution to meet our clients’ needs.
In recognition of the complexity of works required
for delivery of your project, Eastern Guruma has
the capacity and capability to provide a range of
site facilities, plant and personnel to meet your
requirements.
Ceremony for 3 million tonnes at Western Turner Syncline – NRW EG JV2
W E S T E R NA U S T R A L I A
HISTORYEastern Guruma Pty Ltd was founded in 2004 with a vision to provide employment and career opportunities for Eastern Guruma members and other Aboriginal people.
Eastern Guruma employees at Western Turner Syncline (left)
Eastern Guruma has completed large projects within
the Civil and Mining Industry both independently and
through Joint Ventures. The business capabilities
have expanded to include Civil and Mining, Facilities
Management, Landscaping, Drilling and Exploration
Works and Fibre Optics. Eastern Guruma is
committed to mentoring and creating opportunities
for other Aboriginal Businesses through Joint Ventures
and Subcontracting arrangements.
Eastern Guruma has provided a range of employment
and career pathways for Aboriginal people through its
projects whilst accommodating Cultural Obligations.
Opportunities that have been created for Aboriginal
people through Eastern Guruma projects include
Management Positions, Entry Level roles not requiring
a Driver’s License, Traineeships, Subcontracting,
Equipment Hire and Business Ownership.
Eastern Guruma is actively involved in the Community,
supporting Local Events, Aboriginal Communities,
Health and Education of Aboriginal Children & Local
Sporting Associations.
33
$16MILL
ION
The scope of work required on this Project was the upgrade and expansion of the gravel runway at Rio Tinto’s Boolgeeda Aerodrome.
Joint venture partners Eastern Guruma and NRW, carried out the works which included over 300,000 cubic metres of fill to construct a 2.2 kilometre by 45 metre wide bitumen sealed runway, complete with a new taxiway and apron, serviced by a new access road and car park.
The Eastern Guruma and NRW Joint Venture has been contracted to undertake the bulk earthworks at Rio Tinto’s Nammuldi Below Water Table (NBWT) Project.
The project consists of earthworks for the processing plant, waste fine storage facility, mine service facilities, stockyard, an explosives compound, heavy vehicle haul roads, light vehicle roads, and a rail link with a train loading facility.
Eastern Guruma in a Joint Venture with Viento and Wirlu-Murra Yindjibarndi was awarded the contract for construction of the Tailings Storage Facility at Solomon Mine. The project involved construction of a 1.9 million cubic meter compacted wall to enclose tailings in a v-shape against the existing gully landscape. A decant pipe was fitted along the base of the wall and rock amour protection installed.
Eastern Guruma partnered with NRW in a joint venture to conduct early mining works at Western Turner Syncline. The project involved mining ore which was hauled to the Western Turner ROM pad with a fleet of 785 and 777 dump trucks. The ore was then hauled to the Tom Price mine via a 15 kilometre purpose built road using a fleet of four 350 ton pit hauler off highway road trains. The JV mined approximately 500,000 BCM per month to achieve the 6 million tonne per annum target.
09 10 11 12 13 14 15 16
The Western Turner Brockman project comprised of simultaneous works in two separate locations, approximately 45 kilometres apart and was carried out by the Eastern Guruma and NRW joint venture.
The first component was the bulk earthworks required for 16 kilometres of overland conveyor from the Western Turner Syncline mine to Tom Price. The second component was the civil works at the Brockman 4 Mine which included haul roads, ROM and ROM wall construction, access roads and earthworks preparation for a conveyor to the existing crusher and load out facility.
The Solomon Pre – Mining Development Works were undertaken by a Joint Venture with NRW, Eastern Guruma and Ngarluma Yindjibarndi Foundation Limited (NYFL). The JV was initially awarded Solomon Phase 1 for works to supply labour and equipment to complete bulk earthworks, drill & blast and culvert installation at Fortescue’s Solomon Mine. In addition to the initial contract we were awarded temporary Magazine areas and construction of the LV1 access road.
Eastern Guruma in joint venture with NRW undertook the concrete and civil works at Western Turner Syncline Mine. The scope of works included the installation of approximately 21,000 cubic metres of concrete for the primary crusher, overland conveyor and plant utilities areas. The project also included the erection of a corrugated steel arch, minor earthworks, fencing and bollards.
11 July 2011 - December 2012
SOLOMON EARLY MINING WORKS» CLIENT: FORTESCUE METALS GROUP
12 May 2012 - November 2013
WESTERN TURNER BROCKMAN - CONCRETE» CLIENT: RIO TINTO
13 May 2013 - July 2015
NAMMULDI BELOW WATER TABLE EARTHWORKS» CLIENT: RIO TINTO
11June 2011 - November 2013
WESTERN TURNER BROCKMAN - CIVIL» CLIENT: RIO TINTO
12April 2012 - November 2012
BOOLGEEDA AIRSTRIP UPGRADE» CLIENT: RIO TINTO
13May 2013 - September 2013
SOLOMON TAILINGS STORAGE» CLIENT: FORTESCUE METALS GROUP
09 December 2009 - December 2013
WESTERN TURNER SYNCLINE» CLIENT: RIO TINTO
$236MILLI
ON
$93MILLION
$305MILLION
$170MILLION
$94MILLION
$25MILLION
4
$16MILL
ION
The scope of work required on this Project was the upgrade and expansion of the gravel runway at Rio Tinto’s Boolgeeda Aerodrome.
Joint venture partners Eastern Guruma and NRW, carried out the works which included over 300,000 cubic metres of fill to construct a 2.2 kilometre by 45 metre wide bitumen sealed runway, complete with a new taxiway and apron, serviced by a new access road and car park.
The Eastern Guruma and NRW Joint Venture has been contracted to undertake the bulk earthworks at Rio Tinto’s Nammuldi Below Water Table (NBWT) Project.
The project consists of earthworks for the processing plant, waste fine storage facility, mine service facilities, stockyard, an explosives compound, heavy vehicle haul roads, light vehicle roads, and a rail link with a train loading facility.
Eastern Guruma in a Joint Venture with Viento and Wirlu-Murra Yindjibarndi was awarded the contract for construction of the Tailings Storage Facility at Solomon Mine. The project involved construction of a 1.9 million cubic meter compacted wall to enclose tailings in a v-shape against the existing gully landscape. A decant pipe was fitted along the base of the wall and rock amour protection installed.
Eastern Guruma partnered with NRW in a joint venture to conduct early mining works at Western Turner Syncline. The project involved mining ore which was hauled to the Western Turner ROM pad with a fleet of 785 and 777 dump trucks. The ore was then hauled to the Tom Price mine via a 15 kilometre purpose built road using a fleet of four 350 ton pit hauler off highway road trains. The JV mined approximately 500,000 BCM per month to achieve the 6 million tonne per annum target.
09 10 11 12 13 14 15 16
The Western Turner Brockman project comprised of simultaneous works in two separate locations, approximately 45 kilometres apart and was carried out by the Eastern Guruma and NRW joint venture.
The first component was the bulk earthworks required for 16 kilometres of overland conveyor from the Western Turner Syncline mine to Tom Price. The second component was the civil works at the Brockman 4 Mine which included haul roads, ROM and ROM wall construction, access roads and earthworks preparation for a conveyor to the existing crusher and load out facility.
The Solomon Pre – Mining Development Works were undertaken by a Joint Venture with NRW, Eastern Guruma and Ngarluma Yindjibarndi Foundation Limited (NYFL). The JV was initially awarded Solomon Phase 1 for works to supply labour and equipment to complete bulk earthworks, drill & blast and culvert installation at Fortescue’s Solomon Mine. In addition to the initial contract we were awarded temporary Magazine areas and construction of the LV1 access road.
Eastern Guruma in joint venture with NRW undertook the concrete and civil works at Western Turner Syncline Mine. The scope of works included the installation of approximately 21,000 cubic metres of concrete for the primary crusher, overland conveyor and plant utilities areas. The project also included the erection of a corrugated steel arch, minor earthworks, fencing and bollards.
11 July 2011 - December 2012
SOLOMON EARLY MINING WORKS» CLIENT: FORTESCUE METALS GROUP
12 May 2012 - November 2013
WESTERN TURNER BROCKMAN - CONCRETE» CLIENT: RIO TINTO
13 May 2013 - July 2015
NAMMULDI BELOW WATER TABLE EARTHWORKS» CLIENT: RIO TINTO
11June 2011 - November 2013
WESTERN TURNER BROCKMAN - CIVIL» CLIENT: RIO TINTO
12April 2012 - November 2012
BOOLGEEDA AIRSTRIP UPGRADE» CLIENT: RIO TINTO
13May 2013 - September 2013
SOLOMON TAILINGS STORAGE» CLIENT: FORTESCUE METALS GROUP
09 December 2009 - December 2013
WESTERN TURNER SYNCLINE» CLIENT: RIO TINTO
$236MILLI
ON
$93MILLION
$305MILLION
$170MILLION
$94MILLION
$25MILLION
PAST PROJECTS5
Eastern Guruma and Compass Group ESS have a Joint Venture Agreement to provide Facilities Management Services for Rio Tinto in the Tom Price area. This Joint Venture has been in operation for 10 years and has provided employment opportunities to Aboriginal people.
05 ESS 2005 - ONGOING
FACILITIES MANAGEMENT» CLIENT: RIO TINTO
$50MILLION
$34MILLION$40
MILLION
$3MILL
ION
Eastern Guruma has been contracted to provide mining services to Brierty under the Western Turner Syncline 2 project. The scope of work involves contract mining services, ore haulage services, haul road design and construction and non-process infrastructure works.
Eastern Guruma is responsible for road maintenance of haul roads, camp roads and parking areas at Solomon Hub for client Fortescue Metals Group. This contract is delivered through the Eastern Guruma Wirlu-Murra Yindjibarndi Contracting Joint Venture.
13 14 15 16 17
Eastern Guruma’s landscaping crew established the grounds and amenities areas for Fortescue Metals Group’s Kangi camp at the Solomon Hub, and continues to provide ongoing grounds maintenance.
This project is an extension of the Eastern Guruma and Wirlu-Murra Yindjibarndi Joint Venture contract. The works include drill pad construction, the establishment and maintenance of access roads, drill sampling and rehabilitation works.
14 April 2014 - December 2017
SOLOMON KANGI CAMP LANDSCAPING» CLIENT: FORTESCUE METALS GROUP
13October 2013 - December 2017
SOLOMON RESOURCE DEVELOPMENT EARTHWORKS» CLIENT: FORTESCUE METALS GROUP
14May 2014 - May 2016
WESTERN TURNER SYNCLINE STAGE 2 MINING» CLIENT: BRIERTY / RIO TINTO
15June 2015 - December 2017
NUMMULDI BELOW WATER TABLE EARTHWORKS» CLIENT: RIO TINTO
13Morris October 2013 - ONGOING
FACILITIES MANAGEMENT» CLIENT: FORTESCUE METALS GROUP
13 March 2013 - December 2017
SOLOMON ROAD MAINTENANCE» CLIENT: FORTESCUE METALS GROUP
$15MILLION
$170MILLION
$40MIL
LION$300
MILLION
Eastern Guruma has partnered with Vision Stream to successfully train Aboriginal people in Fibre Optics Installation. This has involved both theory and practical training with an ongoing contract at Solomon Mine.
Eastern Guruma and Morris have a Joint Venture Agreement to manage facilities at Solomon Mine for Fortescue Metals Group. This contract will provide further employment opportunities for Aboriginal people within the catering and services industry.
Eastern Guruma and JSW have been awarded a contract for Reverse Circulation Grade Control and Hydrogeological Borefield Drilling Services for Fortescue Metals Group. This contract operates across Solomon, Christmas Creek and Cloudbreak Mines. The Joint Venture has sucessfully trained Aboriginal trainees to become qualified drillers.
15 June 2015 - June 2017
REVERSE CIRCULATION» CLIENT: FORTESCUE METALS GROUP
6
Eastern Guruma and Compass Group ESS have a Joint Venture Agreement to provide Facilities Management Services for Rio Tinto in the Tom Price area. This Joint Venture has been in operation for 10 years and has provided employment opportunities to Aboriginal people.
05 ESS 2005 - ONGOING
FACILITIES MANAGEMENT» CLIENT: RIO TINTO
$50MILLION
$34MILLION$40
MILLION
$3MILL
ION
Eastern Guruma has been contracted to provide mining services to Brierty under the Western Turner Syncline 2 project. The scope of work involves contract mining services, ore haulage services, haul road design and construction and non-process infrastructure works.
Eastern Guruma is responsible for road maintenance of haul roads, camp roads and parking areas at Solomon Hub for client Fortescue Metals Group. This contract is delivered through the Eastern Guruma Wirlu-Murra Yindjibarndi Contracting Joint Venture.
13 14 15 16 17
Eastern Guruma’s landscaping crew established the grounds and amenities areas for Fortescue Metals Group’s Kangi camp at the Solomon Hub, and continues to provide ongoing grounds maintenance.
This project is an extension of the Eastern Guruma and Wirlu-Murra Yindjibarndi Joint Venture contract. The works include drill pad construction, the establishment and maintenance of access roads, drill sampling and rehabilitation works.
14 April 2014 - December 2017
SOLOMON KANGI CAMP LANDSCAPING» CLIENT: FORTESCUE METALS GROUP
13October 2013 - December 2017
SOLOMON RESOURCE DEVELOPMENT EARTHWORKS» CLIENT: FORTESCUE METALS GROUP
14May 2014 - May 2016
WESTERN TURNER SYNCLINE STAGE 2 MINING» CLIENT: BRIERTY / RIO TINTO
15June 2015 - December 2017
NUMMULDI BELOW WATER TABLE EARTHWORKS» CLIENT: RIO TINTO
13Morris October 2013 - ONGOING
FACILITIES MANAGEMENT» CLIENT: FORTESCUE METALS GROUP
13 March 2013 - December 2017
SOLOMON ROAD MAINTENANCE» CLIENT: FORTESCUE METALS GROUP
$15MILLION
$170MILLION
$40MIL
LION$300
MILLION
Eastern Guruma has partnered with Vision Stream to successfully train Aboriginal people in Fibre Optics Installation. This has involved both theory and practical training with an ongoing contract at Solomon Mine.
Eastern Guruma and Morris have a Joint Venture Agreement to manage facilities at Solomon Mine for Fortescue Metals Group. This contract will provide further employment opportunities for Aboriginal people within the catering and services industry.
Eastern Guruma and JSW have been awarded a contract for Reverse Circulation Grade Control and Hydrogeological Borefield Drilling Services for Fortescue Metals Group. This contract operates across Solomon, Christmas Creek and Cloudbreak Mines. The Joint Venture has sucessfully trained Aboriginal trainees to become qualified drillers.
15 June 2015 - June 2017
REVERSE CIRCULATION» CLIENT: FORTESCUE METALS GROUP
CURRENT PROJECTS7
PROJECT CASE STUDY
April 2013 - December 2017SOLOMON ROAD MAINTENANCE & RESOURCE DEVELOPMENT EARTHWORKS» JV: EASTERN GURUMA AND WIRLU-MURRA YINDJIBARNDI
» CLIENT: FORTESCUE METALS GROUP
» VALUE: 30 MILLION/YEAR
8
Eastern Guruma and Wirlu-Murra Yindjibarndi have
created a unique Joint Venture between 2 Aboriginal
groups to deliver road maintenance and earthworks
services at Solomon Mine in the Pilbara Region of
Western Australia.
The two Aboriginal owned businesses came together
in 2013 to undertake the Solomon Road Maintenance
contract for Fortescue Metals Group. Eastern Guruma
brought with them years of experience working on similar
projects in the Civil and Mining Industry. Wirlu-Murra
Yindjibarndi was new to the Industry but shared Eastern
Guruma’s value of providing employment opportunities for
Aboriginal people.
The Joint Venture provided an opportunity for Eastern
Guruma to mentor Wirlu-Murra Yindjibarndi in building
a business with the capacity to undertake up to 50% of
the contracts at Solomon in the provision of plant and
personnel. Eastern Guruma is still the managing partner
of the Joint Venture which has expanded to include the
Resource Development Earthworks contract.
The project employs 49 people full time and approximately
40% Aboriginal employees. The scope of work for the
Solomon Road Maintenance Project is to maintain all
access roads at Solomon Mine in a safe and trafficable
manner including resurfacing, erecting signs, posts and
other safety. The Joint Venture supplies all plant and
people for the project and carries out regular maintenance
work on all equipment as required. The Resource
Development Earthworks project includes clearing and
earthworks for drill pads including access tracks and
rehabilitation works as directed by the client.
The partnership between Eastern Guruma and Wirlu
Murra Yindjibarndi has grown to become an efficient, safe
and reliable project team which is well respected by the
client and other contractors on site. This joint venture has
paved the way for further partnerships between Eastern
Guruma and other Aboriginal Groups.
9
SERVICES » Civil
» Mining
» Landscaping
» Accommodation & Catering
KEY BENEFITS OF WORKING WITH US
Excavator at Nammuldi
Eastern Guruma is Aboriginal owned and operated and
the core values of the business are to provide employment
and develop career opportunities to Aboriginal people. The
business endeavours to integrate cultural obligations of
Aboriginal people into daily activities and provide mentoring
to individuals within the workplace.
Eastern Guruma has been involved in large Civil and Mining
Projects and has a strong core business team with extensive
experience in the Civil and Mining Industry. Eastern Guruma
is dedicated to building relationships with our clients
and delivering projects on time and within budget whilst
maintaining an excellent safety record across the business.
Eastern Guruma is committed to continuously improving our
business and our systems and is currently working towards
ISO 9001.
10
COMPANY INFORMATIONCOMPANY DETAILS
COMPANY NAME Eastern Guruma Pty Ltd
ABN 68 113 717 132
ACN 113 717 132
ADDRESS Piccadilly Square - Suite 44B/7 Aberdeen Street Perth WA 6000
POSTAL ADDRESS PO Box 8454 Perth BC WA 6849
PHONE NUMBER (08) 9325 2424
FAX NUMBER (08) 9325 4819
TOM PRICE OFFICE 2/979 Stadium Road, Tom Price WA 6751
TOM PRICE PHONE (08) 9189 1120
TOM PRICE FAX (08) 9189 1343
EMAIL [email protected]
WEB www.easternguruma.com.au
11
EASTERNGURUMA www.easternguruma.com.au
For more information visit our website
#8137 jaz.com
.au