Camp Return StrategySHELTER CLUSTER – LEOGANE
CCCM Pilot Programme
Identification of Beneficiaries
•Global registration•Call for return•Advantage for CM agency
Return Package
•Shelter•Livelihoods (CFW, etc.)•WASH, NFIs, etc.
Shelter
•Organization of family information Name Size Locality of Return Contact information
Shelter
•Coordination with Shelter Cluster/Shelter Agency according to map
Evaluation of other needs
•Livelihoods▫CFW▫FFW▫Agriculture▫Fishery
•WASH•Health•Education•NFI
Final Product
Nb NoAbri Name Family Size Tel IP Current
LocationLocalite
of Return
Corresponding
Shelter Agency
Needs Upon Return (Y/N)
Shelter WASH CFW/FFW
1 131 LOUIS Erlande 4 3622-8116 ACTEDParc Gerard Christophe Chatuley ACTED N Y Y
2 105JACQUES Rose
Daniel 8 3662-1329 SASHParc Gerard Christophe
Rue d'Autant CARE N N Y
3 104 EXILAS Sirilia 7 3768-2103 IntersosParc Gerard Christophe Cada ? Y Y Y
ACTED Case Study
•Parc Gerard Christophe•Imol Camp•Marche Chatuley
Chatuley
• Partnership in Chatuley with Samaritan’s Purse because of material pipeline challenges
Nb NoAbri Name Family Size Tel IP Current
LocationLocalite
of Return
Corresponding
Shelter Agency
Needs Upon Return (Y/N)
Shelter WASH CFW/FFW
1 131 LOUIS Erlande 4 3622-8116 ACTEDParc Gerard Christophe Chatuley ACTED N Y Y
2 105JACQUES Rose
Daniel 8 3662-1329 SASHParc Gerard Christophe
Rue d'Autant CARE N N Y
3 104 EXILAS Sirilia 7 3768-2103 IntersosParc Gerard Christophe Cada ? Y Y Y
Process
•Evaluation•Delivery•Construction•Post-construction evaluation
Evaluation
•Terrain of origin•T-shelter criteria•Land Title
▫ Landowner information▫ Explanation▫ Neighbors▫ ASEC▫ CASEC▫ Mayor’s Office
Delivery/Construction•Beneficiaries sign contract
Agreement to leave the camp 48 hrs after installation
Volunteer to work for the day Preparation of terrain
•ACTED truck picks up materials at SP warehouse
•Camp volunteers unload, SP teams build T-shelter
•Reception receipt•Sensitization on anchors
Post-construction evaluation
•SP questionnaire•Anchors•T-shelter constructed•T-shelter inhabited•Camp site evacuated
Challenges
•Aid activities focused within camps•Families refuse to leave camp site
▫Camp still serves as a pull factor for families
▫Need to direct interventions towards localities of return Inter-cluster support critical
•Global subscription to return strategy•Hurricane season
Way forward• Coordination with local government to
understand and contribute to return strategy while strengthening capacity at return sites▫ Land titles, evaluations, camp decongestion support
• Advocacy at inter-cluster level▫ CCCM Agencies, IOM, OCHA
• Support from IPs• Realization of return of pilot population
▫ Develop lessons learnt▫ Prove the return process works
• Scale up
Thank you