 Camp    

 Banksia   Port Sorell 

 

 

  Master Plan    

  Options Report 

  

DRAFT Issue 

June 2018 

Page 2: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   1 

 

 

 

CLIENT     

Latrobe Council 

170 Gilbert Street 

Latrobe, Tasmania 

 

 

 

 

 

 

CONSULTANT   

LANGE Design  

Suite 8 

46‐48 George Street 

Launceston Tasmania 

 

 

 

 

 

 

 

 

 

 

 

 

 

Disclaimer 

This  report  has  been  prepared  in  accordance with  the  scope  of  services  described  in  the  contract  between  Lange  Design  and  Latrobe 

Council.  The report relies upon data, surveys and other information specified herein.  Any findings, conclusions or recommendations only 

apply to the aforementioned circumstances and no greater reliance should be assumed or drawn by the client.  Furthermore, this report has 

been prepared solely for the use of Latrobe Council.  Lange Design accepts no responsibility for its use by others. 

Page 3: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   2 

 

Contents  

1.0  INTRODUCTION ............................................................................................................................ 1 

2.0  CAMP BANKSIA MASTER PLAN OPTION ONE ................................................................................ 2 

2.1  KEY ISSUES ................................................................................................................................. 2 

2.2  BUILT FORMS ............................................................................................................................. 4 

2.2.1  Camp Banksia Administration and Main Hall Building ....................................................... 4 

2.2.2  Camp Banksia Group Cabins ............................................................................................... 5 

2.2.3  Self Catering Kitchen .......................................................................................................... 5 

2.2.4  Beachside Cabins ................................................................................................................ 6 

2.2.5  Manager’s Residence ......................................................................................................... 6 

2.2.6  Camp Banksia Maintenance Facility ................................................................................... 6 

2.2.7  Kayak Storage Facility and Observation Deck .................................................................... 6 

2.2.8  Picnic Shelter ...................................................................................................................... 7 

2.3  HARDSTAND .......................................................................................................................... 7 

2.3.1  Camp Banksia Entry and Carpark ....................................................................................... 7 

2.3.2  Concrete Pavements and Pathways ................................................................................... 7 

2.3.3  Basketball / Netball Court .................................................................................................. 7 

2.3.4  Concrete Causeway ............................................................................................................ 8 

2.3.5  Banksia Centre Additional Carpark ..................................................................................... 8 

2.4  RECREATION ACTIVITIES ............................................................................................................ 8 

2.4.1  Oval ..................................................................................................................................... 8 

2.4.2  Bocce Court ........................................................................................................................ 8 

2.4.3  Beach Volleyball Court ....................................................................................................... 9 

2.4.4  Multi‐Purpose Track ........................................................................................................... 9 

2.4.5  Group Fire Pit ..................................................................................................................... 9 

2.4.6  Post and Ropes Challenge Course ...................................................................................... 9 

2.4.7  Ultimate Challenge Tower ................................................................................................ 10 

2.4.8  Large Log Challenge Course.............................................................................................. 10 

2.4.9  Tennis Courts .................................................................................................................... 10 

2.5  ENVIRONMENTAL .................................................................................................................... 10 

2.5.1  Deep Water Wetland ....................................................................................................... 11 

2.5.2  Overland Flow Swale ........................................................................................................ 11 

2.5.3  Landscape ......................................................................................................................... 11 

2.6  FUTURE WORKS ................................................................................................................... 11 

Page 4: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   3 

 

2.6.1  Building Envelope ............................................................................................................. 11 

3.0  CAMP BANKSIA MASTER PLAN OPTION TWO ........................................................................... 12 

3.1  KEY ISSUES ............................................................................................................................... 12 

3.2  BUILT FORMS ........................................................................................................................... 14 

3.2.1  Camp Banksia Administration and Main Hall Building ..................................................... 14 

3.2.2  Camp Banksia Group Cabins ............................................................................................. 14 

3.2.3  Self Catering Kitchen ........................................................................................................ 15 

3.2.4  Beachside Cabins .............................................................................................................. 15 

3.2.5  Manager’s Residence ....................................................................................................... 15 

3.2.6  Camp Banksia Maintenance Facility ................................................................................. 15 

3.2.7  Kayak Storage Facility and Observation Deck .................................................................. 16 

3.2.8  Picnic Shelter .................................................................................................................... 16 

3.3  HARDSTAND ........................................................................................................................ 16 

3.3.1  Camp Banksia Entry and Carpark ..................................................................................... 16 

3.3.2  Concrete Pavements and Pathways ................................................................................. 16 

3.3.3  Basketball / Netball Court ................................................................................................ 16 

3.3.4  Banksia Centre Additional Carpark ................................................................................... 17 

3.4  RECREATION ACTIVITIES .......................................................................................................... 17 

3.4.1  Oval ................................................................................................................................... 17 

3.4.2  Bocce Court ...................................................................................................................... 17 

3.4.3  Beach Volleyball Court ..................................................................................................... 17 

3.4.4  Multi‐Purpose Track ......................................................................................................... 17 

3.4.5  Group Fire Pit ................................................................................................................... 18 

3.4.6  Post and Ropes Challenge Course .................................................................................... 18 

3.4.7  Ultimate Challenge Tower ................................................................................................ 18 

3.4.8  Large Log Challenge Course.............................................................................................. 18 

3.4.9  Tennis Courts .................................................................................................................... 18 

3.5  ENVIRONMENTAL .................................................................................................................... 18 

3.5.1  Deep Water Wetland ....................................................................................................... 19 

3.5.2  Overland Flow Swale ........................................................................................................ 19 

3.5.3  Landscape ......................................................................................................................... 19 

3.6  FUTURE WORKS ....................................................................................................................... 19 

3.6.1  Building Envelope ............................................................................................................. 19 

4.0  CAMP BANKSIA MASTER PLAN OPTION THREE ........................................................................ 20 

4.1  KEY ISSUES ............................................................................................................................... 20 

4.2  BUILT FORMS ........................................................................................................................... 21 

Page 5: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   4 

 

4.2.1  Camp Banksia Buildings and Associated Infrastructure ................................................... 21 

4.2.2  Soccer Clubhouse ............................................................................................................. 21 

4.2.3  Picnic Shelters .................................................................................................................. 21 

4.3  HARDSTAND ........................................................................................................................ 21 

4.3.1  Car Parking ....................................................................................................................... 21 

4.3.2  Banksia Centre Forecourt ................................................................................................. 22 

4.3.3  Anderson Street Car Park ................................................................................................. 22 

4.3.4  Community Pathway Network ......................................................................................... 22 

4.4  RECREATION ACTIVITIES ...................................................................................................... 22 

4.4.1  Soccer Field ....................................................................................................................... 22 

4.4.2  Recreational Open Space ................................................................................................. 22 

4.5  ENVIRONMENTAL ................................................................................................................ 23 

4.5.1  Deep Water Wetland ....................................................................................................... 23 

4.5.2  Overland Flow Swale ........................................................................................................ 23 

4.5.3  Landscape ......................................................................................................................... 23 

4.6  FUTURE WORKS ................................................................................................................... 23 

4.6.1  Building Envelope ............................................................................................................. 23 

5.0  CAMP BANKSIA MASTER PLAN OPTION FOUR .......................................................................... 24 

5.1  KEY ISSUES ............................................................................................................................... 24 

5.2  BUILT FORMS ........................................................................................................................... 25 

5.2.1  Camp Banksia Buildings and Associated Infrastructure ................................................... 25 

5.2.2  Cricket and AFL Clubhouse ............................................................................................... 25 

5.2.3  Picnic Shelters .................................................................................................................. 25 

5.3  HARDSTAND ........................................................................................................................ 26 

5.3.1  Car Parking ....................................................................................................................... 26 

5.3.2  Banksia Centre Forecourt ................................................................................................. 26 

5.3.3  Anderson Street Car Park ................................................................................................. 26 

5.3.4  Community Pathway Network ......................................................................................... 26 

5.4  RECREATION ACTIVITIES ...................................................................................................... 27 

5.4.1  Cricket and AFL Oval ......................................................................................................... 27 

5.4.2  Cricket Practice Nets ........................................................................................................ 27 

5.4.3  Playground........................................................................................................................ 27 

5.5  ENVIRONMENTAL ................................................................................................................ 27 

5.5.1  Deep Water Wetland ....................................................................................................... 27 

5.5.2  Overland Flow Swale ........................................................................................................ 28 

5.5.3  Landscape ......................................................................................................................... 28 

Page 6: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   5 

 

5.6  FUTURE WORKS ................................................................................................................... 28 

5.6.1  Building Envelope ............................................................................................................. 28 

6.0  QUANTITY SURVEYOR COSTINGS .............................................................................................. 29 

7.0  PROGRESSING THE PROJECT FORWARD .................................................................................... 34 

8.0  APPENDICES ................................................................................................................................ 35 

8.1  Appendix 1 – Illustrated Master Plan – Option 1 .................................................................... 35 

8.2  Appendix 2 – Illustrated Master Plan – Option 2 .................................................................... 37 

8.3  Appendix 3 – Illustrated Master Plan – Option 3 .................................................................... 39 

8.4  Appendix 4 – Illustrated Master Plan – Option 4 .................................................................... 41 

8.5  Appendix 5 – Quantity Surveyor’s Report ............................................................................... 43 

8.6  Appendix 6 – Master Plan Option Feasibility Assessment Report .......................................... 50 

 

Page 7: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   1 

 

1.0  INTRODUCTION  

This  report  shall  be  read  in  conjunction  with  each  of  the  four  illustrated  master  plans  that  offer 

alternative  options  for  the  Camp  Banksia  site.    It  follows  on  from  the  previous  ‘Camp  Banksia 

Investigation Report’, and is a significant part of the overall strategy for Latrobe Council to understand 

the options available for either retaining Camp Banksia as Council owned business or to redevelop the 

site for recreational community use.   

There are many opportunities and design options for the Camp Banksia site. To provide Council with a 

benchmark,  four master plan options were developed to  illustrate the use of space either retaining 

Camp Banksia, or by creating a sport orientated community asset for formalised club activities and for 

informal recreation.   

The following sections provide detailed information on each of the four master plan options with the 

first two options retaining Camp Banksia as the primary use of the site.  Options one and two focus on 

upgrading building infrastructure and activities to twenty‐first century standards and to promote the 

facility as a leading destination camp in northern Tasmania.  

The two other master plan options explore the complete removal of Camp Banksia and all associated 

infrastructure to make way for a designated Port Sorell recreation ground for either soccer, or cricket 

and AFL.  Options three and four are very similar in that they both provide public open space for the 

community  including  picnic  shelters  and  concrete  pathway  network,  but  differ  with  option  three 

accommodating soccer and option four accommodating cricket and AFL.  

 

   

Page 8: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   2 

 

2.0  CAMP BANKSIA MASTER PLAN OPTION ONE  

Option One focuses on the retention of Camp Banksia and the revitalisation of the appearance and 

accessibility of all buildings, replacement of damaged and failed pavements, and the inclusion of more 

recreational activities and infrastructure. Initial investigations indicate that the facility is no longer as 

popular  as  it  once  was,  and  that  the  appearance,  lack  of  maintenance  and  accessibility  may  be 

primary contributors to the camp’s decline. 

Accessibility  is a significant component of providing a diverse suite of accommodation for the wider 

community. The Disability Discrimination Act (DDA) establishes a benchmark for providing access and 

usability for all abilities for not only buildings but also pathways.  

Other  than  upgrading  the  existing  buildings,  some  of  the  key  components  of  Option  One  include 

demolishing the existing beachside cabins to make way for six new self‐contained cabins, construction 

of  a  three  bedroom  caretakers  residence  to  provide  a  24 hour,  365 day  presence  on‐site,  and  the 

addition of a series of challenge structures aimed at school aged children, right through to middle age 

mature adults. 

The following key points form the basis for proposed works associated with Option One. 

 

2.1  KEY ISSUES 

 The following items are shown on the illustrated Master Plan ‐ Option One (refer to appendix 1). The 

items are arranged  into  the  key  issues with dot points under  each  issue  for quick  reference.    Each 

item will be extrapolated and explained in greater detail in the following sections.  

BUILT FORMS 

a. Retain office, toilet, laundry and main hall building. 

b. Extend both ends of the main hall building to increase seating capacity. 

c. Retain all cabin clusters. 

d. Retain self catering outdoor kitchen. 

e. Refurbish all buildings with new cladding.  

f. Retrofit all buildings with DDA compliant door handles, light switches, etc. 

g. Retrofit one cabin in each cluster to be fully DDA compliant and accessible for all. 

h. Retrofit Sheoak cabin cluster to be fully DDA compliant and accessible for all. 

i. Demolish beachside cabin buildings. 

j. Construct six new self‐contained beachside cabins. 

k. Construct new three bedroom manager’s residence. 

l. Demolish maintenance buildings. 

m. Construct new three bay maintenance shed and office. 

n. Reconstruct kayak storage and observation deck. 

o. Provision of a picnic shelter. 

Page 9: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   3 

 

HARDSTAND 

a. Demolish existing driveways, car park and turn around area off Anderson Street. 

b. Construct new driveway, car park and bus turn around area off Anderson Street. 

c. Construct new car park for beachside cabin guests. 

d. Demolish and reconstruct all existing concrete pathways. 

e. Demolish half of basketball/netball court. 

f. Construct causeway between billabong and canoe pond. 

g. Construct new driveway and carpark off Pitcairn Street. 

h. Construct bus turn around area and hardstand to front of maintenance shed. 

i. Extend pathway along Anderson Street to Freers Beach access. 

RECREATION 

a. Construct a levelled oval area. 

b. Construct a full size bocce court. 

c. Construct a full size beach volleyball court. 

d. Construct a multi‐purpose track for bikes, scooters and skateboards. 

e. Construct a group fire pit. 

f. Construct a post and rope challenge course. 

g. Construct an ultimate challenge tower. 

h. Construct a large log challenge course. 

i. Resurface tennis courts. 

ENVIRONMENTAL 

a. Construct a deep water wetland and extraction pump facility. 

b. Modify overland flow swale to accommodate all year traffic. 

c. Landscape buffer to the corner area of Pitcairn Street and Anderson Street. 

d. Remove low vegetation along Anderson Street frontage. 

e. Provide more tree planting throughout the site. 

FUTURE WORKS 

a. Building envelope for future buildings. 

 

 

 

Page 10: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   4 

 

2.2  BUILT FORMS 

 Option  One  proposes  that  all  Camp  Banksia  buildings  are  retained  and  refurbished  to  not  only 

enhance  their  appearance, but  also  to  accommodate access  for  all.    By  revitalising  the appearance 

and providing more accessible buildings and  infrastructure,  the camp can be rebranded to attract a 

greater number of guests from a wider and more diverse market. 

Enhancing  the  appearance  of  all  the  buildings  to  a  consistent  theme  would  not  only  lift  the 

marketability of the camp, but also extend the life of the built forms.  As the current external cladding 

is  deteriorating  and  requiring  greater  financial  resources  for  maintenance,  it  would  be  more 

economical to replace the cladding with a sustainable and durable material such as external plywood 

cladding. 

There are numerous external plywood cladding products available on the market today.  By using an 

external  plywood  panel  with  a  selected  finish  and  colour,  the  built  forms  of  Camp  Banksia  will 

maintain the original vision of providing a camp within a natural setting.  To add to this setting, more 

Tasmanian native shade trees scattered throughout the built forms will strengthen this vision, which 

in turn will enrich the natural beauty of the camp. 

In  addition  to  the  enhancement  of  the  appearance,  the  function  and  accessibility  of  each  building 

should also be refurbished.  Typical to all buildings, all door furniture, tap furniture, light switches and 

power points  should be  replaced with  furniture  that complies with  the Disability Discrimination Act 

(DDA).   

Furthermore, access and doorway openings to buildings should also be addressed to provide greater 

accommodation  options  for  potential  guests.    Providing  ramps,  landings  and  wider  doorways  to 

buildings provides a far greater option for attracting not only individuals but also groups that rely on 

DDA compliant facilities.   

Upgrading  bathroom  facilities  should  also  accompany  the  refurbishment  of  the  buildings.  One  all 

abilities  accessible  bathroom  should  be provided  for  every  10 beds,  and  two  all  abilities  accessible 

bathrooms provided for 11 to 40 beds. 

By enhancing the buildings, guests from a diverse market will enjoy their stay in a camp that openly 

accommodates the needs of all abilities.   The following sub‐sections provide detailed information on 

each of the built forms that exist within Camp Banksia.  

 

2.2.1  Camp Banksia Administration and Main Hall Building Other than the Banksia Centre, the administration and main hall building  is the  largest of the Camp 

Banksia buildings as it is the hub for all activities and administration requirements associated with the 

camp.  Included within  this building  is  a  commercial  kitchen  that  services  the main hall,  four unisex 

toilets, two electrical switchboards for the camp, a cleaning storage room and a food storage room. 

The administration section of the building is a separate structure linked to the other sections of the 

building  by  a  covered  decked walkway.  The  area  consists  of  a  reception  and  general  office  room, 

sporting equipment storage room and a kitchenette. A disabled unisex toilet  is also attached to this 

section of the building.  This toilet requires upgrading to comply with AS1428.1. 

 

 

Page 11: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   5 

 

From the car park immediately in front of the building, access to the administration area is via a small 

flight  of  stairs  or  a  wheelchair  accessible  ramp.    The  ramp  requires  modification  as  the  current 

arrangement  is  too  narrow  and  is  not  fitted with  handrails.    Handrails  to  the  front  steps  are  also 

required in order to comply with current access codes. 

Between the main hall and the administration area are three more unisex toilets, a cleaner’s chemical 

storage  room,  a  storage  room  for  house‐keeping  products,  and  a  storage  room  for  food.  The 

configuration of these rooms and toilets satisfies expected uses.  

It  is  proposed  that  the main  hall  be  extended  at  each  end  to  increase  the  capacity  for  dining  and 

indoor  activities.    The  extensions  would  require  the  demolition  of  the  existing  triangular  covered 

decks at each end, which are currently used  for BBQs and wash down  facilities.    In addition  to  the 

extensions,  the  straw ceiling within  the main hall does not  comply with current building codes and 

should be replaced with a more suitable fire rated material. 

 

2.2.2  Camp Banksia Group Cabins The  appearance  and  enjoyment  of  each  cabin  cluster  can  be  greatly  enhanced  by  replacing  the 

exterior  finish  and  providing  accessible  everyday  items  that  cater  for  all  abilities.    Current  door 

handles for example are domed in shape which can be very difficult to open not only for children, but 

for people with disabilities as well as the elderly. 

Option one proposes that one cabin in each cluster, other than the Sheoak cluster, is refurbished to 

cater  for  all  abilities.  Ease  of  access,  door  handles,  light  switches  and  lower  bunk  beds  should  be 

modified to accommodate everyone regardless of the user’s abilities. 

It  is  also  proposed  in  Option  One  that  every  cabin  and  bathroom  facility  within  the  Sheoak  cabin 

cluster  be modified  to  accommodate  all  abilities.  By  having  one  cluster  designated  for  all  abilities 

access, Camp Banksia can market the facility to a wider audience, not only in Tasmania, but from the 

mainland, and potentially overseas as well. 

In addition to the buildings, every cabin cluster should have accessible picnic tables, to ensure people 

in wheelchairs are included in all activities. 

 

2.2.3  Self Catering Kitchen The  self  catering  kitchen  is  an asset  to Camp Banksia, however,  it  only  accommodates able bodied 

people,  including  the undercover  tables.    By modifying  the  kitchen  and undercover  outdoor  dining 

area,  the option  for catering  for all abilities greatly  increases  the marketing opportunities  for Camp 

Banksia.   

The self catering kitchen hardstand area should also be refurbished by applying a consistent surface 

treatment.    The  treatment  could  either  be  patterned,  plain  or  include  game  indicators  such  as 

hopscotch, target drops or distance jumping. 

  

 

 

Page 12: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   6 

 

2.2.4  Beachside Cabins Replacing  the  existing  beachside  cabins  with  six  self‐catering  cabins  increases  the  variety  of 

accommodation at Camp Banksia. Two bedroom cabins provide accommodation for families, groups 

or couples.  Two of the cabins, as illustrated on the master plan, should be joined so that two cabins 

can become one by opening up interconnecting doorways. 

The cabins can provide temporary accommodation during the low periods of the year, to help sustain 

the financial income, whether the guests utilise the additional facilities of Camp Banksia or not.  

 

2.2.5  Manager’s Residence During the initial consultations with Camp Banksia staff, it was raised that there is no on‐site manager, 

and  that  the  facilities  are  not  secure  24  hours  a  day.    It  was  also  made  apparent  that  having  a 

manager’s  residence  on‐site,  would  enable  greater  flexibility  in  managing  the  camp  as  well  as 

providing quick assistance, surveillance and action when needed. 

Option  One  includes  a  manager’s  residence  for  this  purpose.    The  long  term  financial  benefits  of 

having  an  on‐site  presence  could  be  managed  through  job  descriptions  and  agreements  between 

Council and the resident manager. 

 

2.2.6  Camp Banksia Maintenance Facility Maintenance is a key function of camp operations. Currently the location of the maintenance facility 

provides a visual obstruction between the administration building and the open space area adjoining 

the  foredune.    The  facility  itself  consists  of  an  aging  building  with  ‘add‐ons’  for  storage  and  is 

positioned where it detracts from the setting of the open space area. 

As illustrated on the master plan, it is proposed to relocate and construct a new maintenance facility 

next to the existing basketball / netball court hardstand area.  The new facility would be placed on the 

Pitcairn Street side of the existing masonry wall, with the construction of a new access driveway off 

Pitcairn Street. 

The  facility would  consist  of  a  large  prefabricated metal  shed with  a  textured plywood  cladding  to 

match the refurbished buildings of Camp Banksia.  The size of the shed will accommodate three bays 

with roller door access, plus an office and workshop space.  Power, water and sewer services should 

also be provided to ensure compliance with work place health and safety requirements. 

  

2.2.7  Kayak Storage Facility and Observation Deck The existing kayak / canoe storage structure should also be upgraded during the redevelopment by 

replacing failed materials and applying a stained finish to suit the surrounding landscape.  To create a 

more  enjoyable  experience  for  all  users,  a  ramp  could  be  included  to  provide  access  to  the 

observation deck overlooking the pond.   

An additional  level  could also be constructed as an observation  tower overlooking  the  redeveloped 

oval.   This additional  level would  feature a  roof  to provide protection  from the sun during  informal 

sporting or community events.    

 

Page 13: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   7 

 

2.2.8  Picnic Shelter Adjoining the proposed beach volleyball court  is a picnic shelter.   The  intention for this shelter  is to 

provide  protection  from  the  sun  for  people  watching  either  the  beach  volleyball  activities  or 

supervising activities on  the multi‐function bike track. Seating would consist of bench seating and a 

stand up table.  

 

2.3  HARDSTAND  

2.3.1  Camp Banksia Entry and Carpark Option One  proposes  that  the  entire  entry,  driveway  and  car  parking  area  off  Anderson  Street  be 

reconfigured to provide better access, more defined parking, and a loop return.   

The entry driveway would  consist  of  a  structured  crossover with  clear  signage  and  coastal  themed 

landscaping  to  create  an  uplifting,  welcoming  statement  for  those  entering  Camp  Banksia.    Car 

parking will be line‐marked for clarity and the number of bays increased to cater for staff and guests.  

The loop return provides an area where cars, delivery trucks and buses can safely return back to the 

single entry/exit point to Anderson Street.   The  loop also provides adequate space for two buses to 

drop‐off or pick‐up passengers with direct access to the main hall or onto the open lawn area, without 

obstructing the driveway loop. 

The loop also provides access for the beachside cabin guest parking area.  This separate parking area 

allows guests to access their car close to their cabin. 

 

2.3.2  Concrete Pavements and Pathways The  site  investigation  revealed  that  almost every pathway around Camp Banksia  is  lifting or  failing, 

which  is  a  liability  for  Council  and  a  financial  burden  regarding  ongoing  maintenance  costs.    It  is 

recommended  that  all  pathways  be  removed  and  reinstalled  with  appropriate  joints  and 

reinforcement products to eliminate these defects occurring in the future.  

By replacing all concrete pavements, there is the opportunity to reconsider the connections between 

buildings  and  activity  areas.    A  2m  wide  pathway  could  link  the  eastern  side  of  the  camp  to  the 

western side, with a small 1.4m wide pathway branching off to cabin clusters.  

In addition to the pathways mentioned above, the existing pathway along Anderson Street should be 

extended to join the access path to Freers Beach. 

 

2.3.3  Basketball / Netball Court Option One proposes to demolish half of the existing basketball/netball hardstand area, and resurface 

the  area  to  provide  activity  patterns  such  as  hopscotch,  throw  targets,  twister  and  a  maze  or 

labyrinth.   The existing masonry wall  should be retained  for ball games and to provide a screen  for 

movies or projections.  

 

Page 14: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   8 

 

2.3.4  Concrete Causeway To maintain access from the new maintenance facility  location to the oval, a concrete causeway for 

vehicle  access  between  the  billabong  and  the  canoe  pond  should  be  constructed  to  provide  all 

weather access. 

Two options would be to provide a causeway which allows water  to flow over, or  install culverts  to 

increase the height of the crossing to provide a dry crossing for pedestrians as well. 

 

2.3.5  Banksia Centre Additional Carpark The current car park for the Banksia Centre  is too small to cater for  large events.   By relocating the 

Camp  Banksia maintenance  facility,  the  opportunity  arises  to  provide  additional  parking  along  the 

western boundary  to  service  the Banksia Centre  and any  additional  buildings  such  as  a  Performing 

Arts Centre.  The capacity would also provide parking for community events held on the oval. 

The driveway for the new maintenance facility would also provide a temporary bus parking area for 

Camp  Banksia  guests,  with  the  hardstand  area  fronting  the maintenance  facility  allowing  a  bus  to 

manoeuvre into a parking position. 

To prevent unauthorised access to the car park area and maintenance facility, a swing gate and a line 

of bollards along the property boundary would provide sufficient security for the site. 

 

 

2.4  RECREATION ACTIVITIES 

 There  are  currently  a  limited  amount  of  structured  activities  at  Camp  Banksia.    The  inclusion  of 

additional  all  year  round  activities  can  increase  the options  for  future  guests  and  school  groups  to 

choose Camp Banksia as their destination.  The following activities have been included in Option One 

to add to the adventure, excitement and experiences of Camp Banksia. 

 

2.4.1  Oval Redeveloping the open space area requires a large quantity of fill to be imported to provide a levelled 

oval  surface.    This would  increase  the  useable  levelled  area  to  a  diameter  of  approximately  115m.  

This  size  oval will  accommodate  community,  club,  open  age  cricket  games,  junior  AFL  games,  and 

junior soccer games. 

A  levelled oval area also provides valuable community open space for events such as motor shows, 

boat  shows  and  fairs.    By  providing  three  phase  power  to  the  oval,  large  festivals  could  also  take 

place, therefore providing greater utilisation of the Camp Banksia site.  

 

2.4.2  Bocce Court Bocce  is a game that any age group can participate  in, at any  time of  the day. Providing a  full  size, 

non‐championship court at Camp Banksia allows guests to engage in a game that individuals or teams 

can play.   

  

Page 15: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   9 

 

2.4.3  Beach Volleyball Court Beach  volleyball  is  another  game  that  any  age  group  can  play  either  socially  or  competitively.  As 

illustrated on  the master  plan,  a  full  size beach  volleyball  court  located near  the  corner of  Pitcairn 

Street  and  Anderson  Street  provides  an  activity  that  can  be  seen  from  the  street,  which  in  turn 

provides a feature within the camp that advertises fun and excitement. 

Being close to the Banksia Centre also allows the court to be utilised by the community.  The addition 

of lighting would provide evening activities for both camp guests and the community. 

 

2.4.4  Multi‐Purpose Track Also positioned near the corner of Pitcairn Street and Anderson Street, is the proposed multi‐purpose 

bike track.  This element provides a circuit for bicycles, scooters, skateboards and roller blades.   

It differs  from a skate park, as  it provides greater opportunities  for activities  for people confined to 

wheelchairs who cannot participate on an actual  skate park.    By providing  this multi‐purpose  track 

within  the  grounds  of  the  camp,  this  element  can  be  used  exclusively  for  Camp  Banksia  guests  or 

participants in structured events associated with the Banksia Centre.  

The multi‐purpose track provides another activity that distinguishes Camp Banksia from other camps 

and provides activities for a wider audience.  

 

2.4.5  Group Fire Pit A  camp  fire  is  an  activity  that  creates  lasting memories,  and as  such,  should be  a  feature  included 

within the natural setting of the camp.  The group fire pit as illustrated on the master plan provides a 

structured area where groups can gather around a camp fire in a safe and practical manner.   

The group  fire pit would consist of a concrete pavement with an earth coloured  finish  to provide a 

safety  area  between  the  fire  and  the  adjoining  vegetation.    Shade  trees  would  also  surround  the 

circular hardstand area to provide shade during the day, but also to add to the intimacy of the camp 

fire experience. 

The fire pit itself would be surrounded by a low wall to restrict the size of the fire and to provide camp 

fire cooking opportunities such as swing away grills and hooks.  Located nearby would be a fire hose 

for added safety.  

 

2.4.6  Post and Ropes Challenge Course For  the  success  of  the  redevelopment  of  Camp Banksia,  as mentioned  earlier,  activities  for  all  age 

groups must be offered. Such activities synonymous to camps of this nature, are challenge courses. 

Currently  Camp  Banksia  does  not  have  a  structured  challenge  course  and  this  factor  may  be 

contributing to the camp’s decline in use. 

An  integral  component  of  the  challenge  course  proposed  for  Camp  Banksia  is  the  post  and  ropes 

course.  This course can be used for informal play or linked as part of a challenge course with other 

elements.    Linking  elements  together  would  provide  opportunities  for  team‐building  activities  not 

only for school groups, but also for university students, families, corporations or sporting teams.   

 

Page 16: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   10 

 

2.4.7  Ultimate Challenge Tower The central structure of a challenge course as mentioned in the previous sub‐section, is the ultimate 

challenge  tower.  This  structure  would  include  a  rock  climbing  wall  consisting  of  textured  plywood 

panels and hand holds of various sizes arranged in easy, medium and hard climbing routes.   

To  provide  a  safe  experience,  automatic  belay  systems would  be  installed  above  the wall,  and  an 

organic softfall material would be provided at the base of the wall.  To prevent unauthorised use, the 

lower climbing wall section would be on a swivel panel, which can be turned around and locked. 

Above the climbing wall would be an observation deck where climbers can disembark from the wall 

and return via an  internal staircase or hook up to the 70m long double flying fox that flies over the 

canoe  pond.  The  users  of  the  flying  fox  would  be  supervised  by  an  adult  and  fitted with  a  safety 

harness.  A safety gate would provide controlled take off procedures.   

At the landing end of the flying fox would be an automatic breaking system and organic softfall pad 

where users can safely and comfortably disembark. 

Also attached to the ultimate tower challenge is a large scramble net elevated 2m above the ground 

where users can utilise the underside or top of the net for various challenge exercises.  The net would 

be suspended over an organic softfall layer for safety. 

 

2.4.8  Large Log Challenge Course Another component of the challenge activities is the large log challenge course.  This element consists 

of  logs of varying diameters,  lengths and spacings where groups need to work together to get from 

one end of the course to the other through a variety of means and challenges. 

Linked with the other challenge elements, Camp Banksia will become a front runner in the industry by 

providing fun and challenging activities in a safe environment, as part of the overall camp experience.  

 

2.4.9  Tennis Courts The  existing  tennis  courts  require  resurfacing  to  reinvigorate  the  appearance  and  usability  of  the 

courts.  Fencing and gated access should also be refurbished to provide more appealing assets. 

 

 

2.5  ENVIRONMENTAL 

 The biggest asset to Camp Banksia is the close proximity of the beach and the adjoining bushland, and 

the opportunities for additional coastal landscape works to be included within the camp.  

The following sub sections describe the enhancement of the environmental aspects of Camp Banksia, 

and how they will benefit the enjoyment and usability of the site.  

 

 

Page 17: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   11 

 

2.5.1  Deep Water Wetland The Camp Banksia site is a low‐lying area and is prone to flooding during minor storm events. In the 

north east corner of the site is a connection pipe that allows water to flow out onto Freers Beach via a 

one way valve.  Unfortunately, this pipe is broken which allows high tide water to flow back through 

and into the Camp Banksia site.  

It is proposed to create a deep water wetland where stormwater can be contained, and pumped into 

a  better  one‐way  flow  system.    The  construction  of  the  wetland  would  include  rock  filled  gabion 

baskets lining the full extent of the wetland, and a 1.6m high pool style safety fence and locked access 

gate surrounding the water body.  

The wetland will be planted out with local wetland species to reduce the visual impact of the wetlands 

and to provide habitats for local fauna species and aquatic life. 

 

2.5.2  Overland Flow Swale The existing overland  flow swale  that  links  the existing billabong with  the new deep water wetland 

would also be modified with a low flow french drain to reduce the water logged surface that restricts 

access to the oval area. 

At a designated point, an all‐weather access crossing should be  installed  for pedestrian and vehicle 

access which consists of grass cells within the surface that provide a stable base for access.  

 

2.5.3  Landscape  As mentioned earlier, the biggest asset to Camp Banksia  is the surrounding bushland, foredune and 

beach areas.   With  the selection of appropriate species,  the  landscape within Camp Banksia can be 

greatly  enhanced  with more  shade  trees  and  low  level  planting  to  reduce  the  visual  and  physical 

impact of the built forms. 

Currently on site there are dead standing trees, tree stumps,  large gum trees,  isolated tussocks and 

scrambling  vegetation,  all  of  which  require  removal.    Appropriate  species  around  buildings  would 

include  Blackwoods,  Casuarinas  and Banksias, with  low  level  planting  in  large  clumps  concentrated 

around the main buildings  for visual aesthetics, and also  to the Pitcairn Street and Anderson Street 

corner frontage. 

 

2.6  FUTURE WORKS  

2.6.1  Building Envelope As illustrated on the master plan, the area to the west of the Banksia Centre is designated to future 

works.  This area is specifically set aside for future buildings works such as a Performing Arts Centre or 

buildings associated with community health and wellbeing. 

The existing Banksia Centre is a significant structure due to its bulk size and height. Additional building 

works must address this form by providing features that bring the height down to a scale that suits 

the surrounding residential and natural landscape. 

   

Page 18: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   12 

 

3.0  CAMP BANKSIA MASTER PLAN OPTION TWO  

Option One  and  Two master  plans  are  very  similar  in  the  approach of  retaining Camp Banksia  and 

focusing on revitalising the appearance and accessibility through refurbishing buildings and associated 

infrastructure,  replacing  deteriorating,  damaged  and  failed  surfaces,  and  the  inclusion  of  more 

recreational activities. The main difference between Option One and Option Two is the removal of the 

canoe pond, increasing the size of the oval, repositioning the Boobyalla cabin cluster, and including an 

additional cabin cluster.  

Both options propose the upgrading of existing buildings, demolishing the existing beachside cabins to 

make way for new self‐contained cabins, construction of a three bedroom caretakers residence, and 

the  addition  of  a  series  of  challenge  structures  aimed  at  all  ages  from  school  aged  children  right 

through to middle age mature adults. 

 

3.1  KEY ISSUES 

 The following items are shown on the illustrated Master Plan ‐ Option Two (refer to appendix 2). The 

items are arranged into the key issues with dot points under each issue for quick reference.  

BUILT FORMS 

a. Retain office, toilet, laundry and main hall building. 

b. Extend both ends of the main hall building to increase seating capacity. 

c. Retain Willow, Sheoak and Blackwood cabin clusters. 

d. Relocate Boobyalla cabin cluster. 

e. Construct new fully DDA compliant and accessible for all cabin cluster. 

f. Retain self catering outdoor kitchen. 

g. Refurbish all buildings with new cladding.  

h. Retrofit all buildings with DDA compliant door handles, light switches, etc. 

i. Retrofit one cabin in each cluster to be fully DDA compliant and accessible for all. 

j. Demolish beachside cabin buildings. 

k. Construct five new self‐contained beachside cabins. 

l. Construct new three bedroom manager’s residence. 

m. Demolish maintenance buildings. 

n. Construct new three bay maintenance shed and office. 

o. Provision of picnic shelters. 

 

 

 

 

Page 19: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   13 

 

HARDSTAND 

a. Demolish existing driveways, car park and turn around area off Anderson Street. 

b. Construct new driveway, car park and bus turn around area off Anderson Street. 

c. Construct new car park for beachside cabin guests. 

d. Demolish and reconstruct all existing concrete pathways. 

e. Demolish basketball/netball court hardstand and wall. 

f. Construct new driveway and carpark off Pitcairn Street. 

g. Construct bus turn around area and hardstand to front of maintenance shed. 

h. Extend pathway along Anderson Street to Freers Beach access. 

RECREATION 

a. Fill in canoe pond and overland flow swale. 

b. Construct a levelled oval area. 

c. Construct a full size bocce court. 

d. Construct a full size beach volleyball court. 

e. Construct a multi‐purpose track for bikes, scooters and skateboards. 

f. Construct a group fire pit. 

g. Construct a post and rope challenge course. 

h. Construct an ultimate challenge tower. 

i. Construct a large log challenge course. 

j. Remove tennis courts. 

ENVIRONMENTAL 

a. Construct a deep water wetland and extraction pump facility. 

b. Landscape buffer to the corner area of Pitcairn Street and Anderson Street. 

c. Remove low vegetation along Anderson Street frontage. 

d. Provide more tree planting throughout the site. 

FUTURE WORKS 

a. Building envelope for future buildings. 

 

 

 

 

Page 20: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   14 

 

3.2  BUILT FORMS 

 Option  Two,  in  similarity  to Option One,  proposes  that  all  Camp Banksia buildings  be  retained and 

refurbished to not only enhance their appearance, but also  to accommodate access  for all abilities.  

Revitalising the appearance and providing more accessible buildings and infrastructure, will make the 

camp an attractive destination to a greater number of guests from a wider and more diverse market. 

Enhancing  the  appearance  of  all  the  buildings  to  a  consistent  theme  would  not  only  lift  the 

marketability of the camp, but also extend the life of the built forms.  As the current external cladding 

is  deteriorating  and  requiring  greater  financial  resources  for  maintenance,  it  would  be  more 

economical to replace the cladding with a sustainable and durable material such as external plywood 

cladding. 

As  shown  in Option One,  there  are numerous external  plywood  cladding products  available on  the 

market today.  The cladding, along with finishes, colour and inclusion of more Tasmanian native shade 

trees will strengthen the natural setting vision provided by Camp Banksia. 

As with Option One, refurbishment of the buildings should also include replacement of all fixtures to 

comply  with  DDA  standards.    Providing  ramps,  landings  and  wider  doorways  to  buildings  will  also 

assist in attracting groups that rely on DDA compliant facilities.   

Upgrading  bathroom  facilities  should  also  accompany  the  refurbishment  of  the  buildings.  One  all 

abilities  accessible  bathroom  should  be provided  for  every  10 beds,  and  two  all  abilities  accessible 

bathrooms provided for 11 to 40 beds. 

By enhancing the buildings, guests from a diverse market will enjoy their stay in a camp that openly 

accommodates the needs of all abilities.   The following sub‐sections provide detailed information on 

each of the built forms that exist within Camp Banksia.  

 

3.2.1  Camp Banksia Administration and Main Hall Building The administration and main hall building  is  the  largest of  the camp buildings and  is  the hub for all 

activities and administration requirements associated with the camp.  

As detailed in Option One, item 2.2.1, it is proposed that the existing facilities servicing these buildings 

be upgraded to satisfy all abilities standards and compliances. 

It  is  proposed  that  the main  hall  be  extended  at  each  end  to  increase  the  capacity  for  dining  and 

indoor  activities.    The  extensions  would  require  the  demolition  of  the  existing  triangular  covered 

decks at each end, which are currently used  for BBQs and wash down  facilities.    In addition  to  the 

extensions,  the  straw ceiling within  the main hall does not  comply with current building codes and 

should be replaced with a more suitable fire rated material. 

 

3.2.2  Camp Banksia Group Cabins The  appearance  and  enjoyment  of  each  cabin  cluster  can  be  greatly  enhanced  by  replacing  the 

exterior  finish and providing accessible everyday  items that cater  for all  abilities.   The existing door 

handles can be quite difficult to open not only for children, but also for people with disabilities and 

the elderly. 

 

Page 21: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   15 

 

Option Two proposes that the  ‘Boobyalla’ cluster of cabins be relocated to the opposite side of the 

kitchen  to  allow  for  the  oval  size  increase.    One  cabin  in  each  of  the  existing  clusters  should  be 

refurbished to cater for all abilities.  Ease of access, door handles, light switches and lower bunk beds 

should be modified to accommodate everyone regardless of a guest’s abilities. 

It  is also proposed  in Option Two that a new cabin cluster be constructed close to the main hall,  in 

which  every  cabin  and  bathroom  facility will  accommodate  all  abilities.  By  having  one  cluster  as  a 

designated ‘access for all’ accommodation option, Camp Banksia can market their facility to a wider 

audience, not only in Tasmania, but from the mainland, and potentially overseas as well. 

In addition to the buildings, every cabin cluster should have accessible picnic tables, to ensure people 

in wheelchairs are included in all activities. 

 

3.2.3  Self Catering Kitchen The  self  catering  kitchen  is  an asset  to Camp Banksia, however,  it  only  accommodates able bodied 

people,  including  the undercover  tables.    By modifying  the  kitchen  and undercover  outdoor  dining 

area,  the option  for catering  for all abilities greatly  increases  the marketing opportunities  for Camp 

Banksia.   

The self catering kitchen hardstand area should also be refurbished by applying a consistent surface 

treatment.    The  treatment  could  either  be  patterned,  plain  or  include  game  indicators  such  as 

hopscotch, target drops, or distance jumping. 

 

3.2.4  Beachside Cabins Replacing the existing beachside cabins with five self‐catering, two‐bedroom cabins will increase the 

accommodation potential for families, groups or couples. 

The cabins can also provide  temporary accommodation during  the  low periods of  the year,  to help 

sustain  the  financial  income, whether  the  guests utilise  the  additional  facilities of Camp Banksia or 

not.  

 

3.2.5  Manager’s Residence As  mentioned  in  Option  One,  greater  security  benefits  can  be  achieved  by  having  a  manager’s 

residence on‐site.   This would also allow flexibility  in managing  the camp as well as providing quick 

assistance or surveillance 24 hours a day, all year round. 

 

3.2.6  Camp Banksia Maintenance Facility As illustrated on the master plan, it is proposed to relocate and construct a new maintenance facility 

on  the  Pitcairn  Street  side  of  the  site  between  the  proposed  bus  turn  around  and  the  proposed 

challenge tower, with the construction of a new access driveway off Pitcairn Street. 

The  facility would  consist  of  a  large  prefabricated metal  shed with  a  textured plywood  cladding  to 

match the refurbished buildings of Camp Banksia.  The size of the shed will accommodate three bays 

with roller door access, plus an office and workshop space.  Power, water and sewer services should 

also be provided to ensure compliance with work place health and safety requirements. 

Page 22: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   16 

 

3.2.7  Kayak Storage Facility and Observation Deck With the construction of a larger oval area, the existing canoe pond, kayak / canoe storage structure 

and overland flow swale will be removed and filled in. 

 

3.2.8  Picnic Shelter As shown on the master plan, three picnic shelters will be included on the site. One picnic shelter will 

be  located  adjoining  the  beach  volleyball  activities  as  described  in Option One,  and  the  other  two 

located at  the end of Anderson Street near  the edge of  the oval  for  the  local  community  to utilise 

when the camp in not in use.  

 

 

3.3  HARDSTAND  

3.3.1  Camp Banksia Entry and Carpark Option Two also proposes that the entire entry, driveway and car parking area off Anderson Street be 

reconfigured  to  provide  better  access,  more  defined  parking,  and  a  loop  return  as  previously 

recommended in Option One.   

In  addition  to  the  entry  car  park,  Option  Two  also  proposes  another  car  park  be  installed  to  the 

northern  end of  Anderson  Street  to  service  the  oval  and beach  access  areas.    This  car  park would 

include a one‐way entry and exit and would include 24 car spaces. 

 

3.3.2  Concrete Pavements and Pathways As  noted  in  Option  One,  the  site  investigation  revealed  that  almost  every  pathway  around  Camp 

Banksia  is  lifting  or  failing, which  is  a  liability  for  Council  and  a  financial  burden  regarding  ongoing 

maintenance costs.  Option Two also recommends that all pathways be removed and reinstalled with 

appropriate joints and reinforcement products to eliminate these defects occurring in the future.  

Replacement of these concrete pavements, will allow the opportunity to reconsider the connections 

between buildings and activity areas.  As previously recommended, a 2m wide pathway could link the 

eastern side of the camp to the western side, with a small 1.4m wide pathway branching off to the 

cabin clusters.  

In addition to the pathways mentioned above, the existing pathway along Anderson Street should be 

extended to join the access path to Freers Beach. 

 

3.3.3  Basketball / Netball Court Option  Two  proposes  the  full  demolition  and  removal  of  the  hardstand  area  and  the  masonry 

retaining wall to make way for new activities. 

 

Page 23: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   17 

 

3.3.4  Banksia Centre Additional Carpark As mentioned in Option One, the current car park for the Banksia Centre is too small to cater for large 

events.    Therefore,  Option  Two  proposes  to  extend  the  existing  car  park  as  well  as  providing 

additional parking along the driveway servicing the new maintenance facility. 

The driveway for the new maintenance facility would also provide a temporary bus parking area for 

Camp  Banksia  guests,  with  the  hardstand  area  fronting  the maintenance  facility  allowing  a  bus  to 

manoeuvre into a parking position. 

To prevent unauthorised access to the car park area and maintenance facility, a swing gate and a line 

of bollards along the property boundary would provide sufficient security for the site. 

 

3.4  RECREATION ACTIVITIES 

 

3.4.1  Oval Option Two proposes a larger oval area than Option One at the expense of the existing canoe pond 

and overland flow swale.  Although the size of the proposed oval (145m diameter),  is at the smaller 

end of the preferred Australian Rules Football oval size regulations, it is adequate for open age cricket 

games and division two AFL games.  

As described in Option One, the levelled oval will provide valuable community open space for events 

such  as  motor  shows,  boat  shows  and  fairs.    By  providing  three  phase  power  to  the  oval,  large 

festivals could also take place, therefore providing greater utilisation of the Camp Banksia site.  

 

3.4.2  Bocce Court Provision of a full size, non‐championship bocce court will allow individual or team guests to engage in 

an activity suitable for any age group, at any time of the day.   

 

3.4.3  Beach Volleyball Court Beach  volleyball  is  another  game  that  any  age  group  can  play  either  socially  or  competitively.  As 

illustrated on the master plan and as per Option One, a full size beach volleyball court  located near 

the  corner  of  Pitcairn  Street  and  Anderson  Street  provides  an  activity  that  can  be  seen  from  the 

street, promoting the fun and excitement of Camp Banksia.   The court could also be utilised by the 

community and the addition of lighting to the area would highlight the court as an evening activity as 

well. 

 

3.4.4  Multi‐Purpose Track As detailed in Option One and also positioned near the corner of Pitcairn Street and Anderson Street, 

is  the  proposed  multi‐purpose  bike  track.    This  element  provides  a  circuit  for  bicycles,  scooters, 

skateboards  and  roller blades.    It  differs  from a  skate park,  as  it  provides greater opportunities  for 

activities for people confined to wheelchairs who cannot participate on an actual skate park.   

By  providing  this  multi‐purpose  track  within  the  grounds  of  the  camp,  this  element  can  be  used 

exclusively for Camp Banksia guests or participants  in structured events associated with the Banksia 

Centre.  

Page 24: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   18 

 

The multi‐purpose track provides another activity that distinguishes Camp Banksia from other camps 

and provides activities for a wider audience.  

 

3.4.5  Group Fire Pit The group fire pit as illustrated on the master plan and as per Option One, provides a structured area 

where groups can gather around a camp fire in a safe and practical manner.   

The group  fire pit would consist of a concrete pavement with an earth coloured  finish  to provide a 

safety  area  between  the  fire  and  the  adjoining  vegetation.    Shade  trees  would  also  surround  the 

circular hardstand area to provide shade during the day, but also to add to the intimacy of the camp 

fire experience. 

The fire pit itself would be surrounded by a low wall to restrict the size of the fire and to provide camp 

fire cooking opportunities such as swing away grills and hooks.  Located nearby would be a fire hose 

for added safety.  

 

3.4.6  Post and Ropes Challenge Course As discussed  in Option One,  the need  for  the  inclusion of challenging activities,  suitable  to all ages, 

cannot  be  underestimated  and  as  such,  these  activities  have  been  included  in  the  Option  Two 

proposal.    Please  refer  to Option One,  item 2.4.6  for  a  detailed  description  of  the  Post  and  Ropes 

Challenge Course. 

 

3.4.7  Ultimate Challenge Tower Please refer to Option One, item 2.4.7 for a detailed description of the Ultimate Challenge Tower. 

 

3.4.8  Large Log Challenge Course Please refer to Option One, item 2.4.8 for a detailed description of the Large Log Challenge Course. 

 

3.4.9  Tennis Courts To make way for the larger oval area, the existing tennis courts require demolition.  Guests of Camp 

Banksia could be directed to the nearby Port Sorell Tennis Club in Meredith Street. 

 

 

3.5  ENVIRONMENTAL 

 As detailed in Option One, the close proximity of the beach and natural bushland is a huge attraction 

for Camp Banksia  and provides  significant  opportunities  for  enhancement of  the  natural  landscape 

within and surrounding the site.  

The following sub sections describe the enhancement of the environmental aspects of Camp Banksia, 

and how they will benefit the enjoyment and usability of the site.  

Page 25: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   19 

 

3.5.1  Deep Water Wetland As  specified  in  Option  One,  creation  of  a  deep  water  wetland  area  where  stormwater  can  be 

contained and pumped into a one‐way flow system is proposed to alleviate flood prone areas.   This 

wetland area would  include rock  filled gabion baskets  lining the extent of  the wetland, a 1.6m high 

pool style safety fence with locked access gate and planted out with local wetland flora. 

 

3.5.2  Overland Flow Swale To make way for the larger oval, the existing swale will be filled in. To address the site’s stormwater 

issues,  a  large  diameter  pipe would  be  installed  between  the  existing  billabong  and  the  new deep 

water wetland. 

The oval would be filled to finish slightly higher than the outer perimetre to allow major flooding to 

still flow around the oval towards the new wetlands. 

  

3.5.3  Landscape  The  landscape within  Camp Banksia  can be  greatly  enhanced with more  shade  trees  and  low  level 

planting of appropriate species, which in turn, will greatly reduce the visual and physical impact of the 

built forms. 

Currently on site there are dead standing trees, tree stumps,  large gum trees,  isolated tussocks and 

scrambling  vegetation,  all  of  which  require  removal.    Appropriate  species  around  buildings  would 

include  Blackwoods,  Casuarinas  and Banksias, with  low  level  planting  in  large  clumps  concentrated 

around the main buildings  for visual aesthetics, and also  to the Pitcairn Street and Anderson Street 

corner frontage. 

 

3.6  FUTURE WORKS 

 

3.6.1  Building Envelope As illustrated on the master plan, the area to the west of the Banksia Centre is designated for future 

works.  This area is specifically set aside for future building works such as a Performing Arts Centre or 

buildings associated with community health and wellbeing. 

The existing Banksia Centre is a significant structure due to its bulk size and height. Additional building 

works must address this form by providing features that bring the height down to a scale that suits 

the surrounding residential and natural landscape.   

Page 26: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   20 

 

4.0  CAMP BANKSIA MASTER PLAN OPTION THREE  

The  first  two  options  for  Camp  Banksia  include  retaining  the  camp  and  refurbishing  the  site  for 

continued use well  into the future.   The next two options provide a different approach  in that they 

address  the  potential  of  the  site  as  a  designated  sporting  ground  surrounded  by  community  open 

space.  

 

4.1  KEY ISSUES 

 The following items are shown on the illustrated Master Plan ‐ Option Three (refer to appendix 3). The 

items are arranged  into  the  key  issues with dot points under  each  issue  for quick  reference.    Each 

item will be extrapolated and explained in greater detail in the following sections. 

 

BUILT FORMS 

a. Demolish all Camp Banksia buildings and associated infrastructure. 

b. Construct a full size soccer clubhouse. 

c. Provision of community picnic shelters. 

HARDSTAND 

a. Demolish all existing hardstand surfaces associated with Camp Banksia. 

b. Demolish Banksia Centre car park and create new forecourt area. 

c. Construct new car park off Anderson Street. 

d. Construct new car park at the northern end of Anderson Street. 

e. Construct new driveway and car park off Pitcairn Street. 

f. Construct concrete pathway network around the site. 

RECREATION 

a. Fill in canoe pond and overland flow swale. 

b. Construct a levelled area for two full size soccer fields. 

ENVIRONMENTAL 

a. Construct a deep water wetland and extraction pump facility. 

b. Tree planting throughout the site. 

FUTURE WORKS 

a.  Building envelope for future buildings.   

Page 27: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   21 

 

4.2  BUILT FORMS 

 

4.2.1  Camp Banksia Buildings and Associated Infrastructure Option Three requires the demolition and full  removal of all Camp Banksia buildings and associated 

infrastructure to make way for the two new soccer fields, car parks and clubhouse.   

Existing services that could be utilised within the new clubhouse infrastructure would be retained and 

redirected where possible. 

 

4.2.2  Soccer Clubhouse The option of including a clubhouse allows for Port Sorell and the surrounding areas to establish their 

own soccer club, that would provide an additional club to Devonport and Ulverstone. 

The proposed clubhouse for the soccer field would consist of the following: 

‐ Club function room and amenities overlooking the soccer fields. 

‐ Kiosk for players and spectators. 

‐ Two male change rooms for club and visitors. 

‐ Two female change rooms for club and visitors. 

‐ Change room for male and female umpires. 

‐ First aid room. 

‐ Massage room. 

‐ One vehicle bay for grounds maintenance requirements. 

‐ One storage bay for maintenance workshop requirements. 

‐ One storage bay for club storage. 

‐ Public toilet with external access. 

 

4.2.3  Picnic Shelters Adjoining the soccer fields are three picnic shelters.  The picnic shelters are positioned to overlook the 

eastern soccer field.  They also provide shelter for general use.  The picnic shelters will consist of a 4 x 

5m skillion roof structure over a concrete pad, with a picnic table setting and one bench seat under. 

 

 

4.3  HARDSTAND 

 

4.3.1  Car Parking Option Three provides two 48 bay car parking areas for the site, with access off Pitcairn Street for the 

western side of the site, and off Anderson Street for the eastern side of the site. 

 

Page 28: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   22 

 

Both car parks amounting to 96 bays, which provides parking for approximately 200 people.  There is 

also additional parking at the end of Anderson Street, and across the road at the school.   Access to 

the western car park requires a constructed road intersection with kerb and channelling off Pitcairn 

Street directly opposite the school exit. 

 

4.3.2  Banksia Centre Forecourt The master plan illustrates the removal of the existing car park fronting the Banksia Centre to make 

way  for  the building envelope  for  future works.   This allows  the construction of a  larger pedestrian 

orientated  forecourt  for  the  Banksia  Centre  including  any  additional  buildings  associated  with  the 

existing building. 

The forecourt will provide better street address with the inclusion of trees and low landscape planting 

to help reduce, but not hide, the visual impact of the building. 

 

4.3.3  Anderson Street Car Park At the end of Anderson Street  is a small structured car park that accommodates 12 cars  for people 

either watching soccer games, accessing the pathway network or accessing Freers Beach. 

 

4.3.4  Community Pathway Network With the full removal of Camp Banksia, the site should be made more accessible to the community. A 

concrete pathway network as  illustrated on the master plan, will provide all‐weather access around 

the site for informal recreation activities, such as riding, jogging and walking. 

The pathway will  link up with the existing pathway that runs through Pitcairn Reserve to the south, 

and the esplanade pathway along Freers Beach.    

 

 

4.4  RECREATION ACTIVITIES 

 

4.4.1  Soccer Field By  removing  all  infrastructure  associated  with  Camp  Banksia,  the  site  can  be  utilised  for  sporting 

activities.  Option Three focuses on providing two full size soccer fields side by side that will cater for 

junior  and  senior  games.    The  layout  of  the  area  designated  for  the  two  full  size  fields  can  also 

accommodate  four  junior  fields.  The  area  designated  for  the  two  fields  will  consist  of  a  pop‐up 

irrigation system and a herringbone drainage pattern to eliminate water‐logging and to ensure high 

quality turf cover.  

 

4.4.2  Recreational Open Space An area for informal recreation has been provided between the foredune and the northern boundary 

of  the  soccer  fields.    This  space  provides  a warm up  area  for  teams  as well  as  a  kick  about  space 

separate to the fields. 

Page 29: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   23 

 

4.5  ENVIRONMENTAL 

 

4.5.1  Deep Water Wetland To  alleviate  flood water  remaining  on  the  site  after  heavy  storm events,  it  is  proposed  to  create  a 

deep water wetland  to  the  north  east  corner  of  the  site where  stormwater  can  be  contained  and 

pumped out to Freers Beach via the existing stormwater system.  

The wetland would include rock filled gabion baskets lining the full extent of the wetland, and a 1.6m 

high pool style safety fence and locked access gate surrounding the water body. The wetland will be 

planted out with  local wetland  species  to  reduce  the  visual  impact of  the wetlands  and  to  provide 

habitats for local fauna species and aquatic life. 

 

4.5.2  Overland Flow Swale To allow for  the construction of  the soccer  fields,  the existing canoe pond and overland  flow swale 

require  filling  in, however, a diversion swale  to  the new deep water wetland will be created  to  the 

west and north around the soccer field to connect the billabong to the Freers Beach outlet. 

In addition to the overland flow swale, a  large diameter stormwater pipe will be installed under the 

soccer field to connect the billabong to the new deep water wetland. 

 

4.5.3  Landscape  Shade  trees  and  low  level  planting  of  local  native  plant  species  planted  throughout  the  site  will 

provide a physical connection to the foredune and adjoining bushland areas. The informal planting of 

trees  with  mown  grass  underneath  along  the  Anderson  Street  frontage  will  provide  shade  for 

spectators and a pleasant outlook from the residential properties across the street.   

Suitable  shade  trees will  also  be  provided  throughout  the  car  parking  areas,  around  buildings  and 

along the pathway network to strengthen the connection with the adjoining bushland. 

 

 

4.6  FUTURE WORKS  

4.6.1  Building Envelope The Option Three master plan illustrates areas adjoining the east and west of the Banksia Centre to be 

designated for  future building works.   The two areas have been specifically set aside for a potential 

Performing Arts Centre to the west and an indoor lawn bowls facility to the east. 

As mentioned previously, the existing Banksia Centre is a significant structure due to its bulk size and 

height. Any additional building works should be consistent in materials but of a lower building form to 

bring the height down to a scale that suits the surrounding residential and natural landscape. 

   

Page 30: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   24 

 

5.0  CAMP BANKSIA MASTER PLAN OPTION FOUR  

Similar  to Option  Three, Option  Four  provides  a  different  approach  than Options One  and  Two  by 

providing a designated sporting ground surrounded by community open space.  Option Four focuses 

on Cricket and AFL, whereas Option Three only focused on soccer.  

 

5.1  KEY ISSUES 

 The following items are shown on the illustrated Master Plan ‐ Option Four (refer to appendix 4). The 

items are arranged  into  the  key  issues with dot points under  each  issue  for quick  reference.    Each 

item will be extrapolated and explained in greater detail in the following sections. 

 

BUILT FORMS 

a. Demolish all Camp Banksia buildings and associated infrastructure. 

b. Construct a cricket / AFL clubhouse. 

c. Fill and prepare areas for future buildings.  

d. Provision of community picnic shelters. 

HARDSTAND 

a. Demolish all existing hardstand surfaces associated with Camp Banksia. 

b. Demolish Banksia Centre car park and create new forecourt area. 

c. Construct new car park off Anderson Street. 

d. Construct new car park at the end of Anderson Street. 

e. Construct new intersection, road and car park off Pitcairn Street. 

f. Construct concrete pathway network around the site. 

g. Extend pathway along Anderson Street to Freers Beach access. 

RECREATION 

a. Fill in canoe pond and overland flow swale. 

b. Construct a levelled area for full size cricket / AFL oval. 

c. Provision of cricket practice nets. 

d. Provision of a medium sized playground. 

ENVIRONMENTAL 

a. Construct a deep water wetland and extraction pump facility. 

b. Provide more tree planting throughout the site. 

Page 31: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   25 

 

FUTURE WORKS 

a. Building envelope for future buildings. 

 

5.2  BUILT FORMS  

5.2.1  Camp Banksia Buildings and Associated Infrastructure To  redevelop  the  site  into  a  full  size  cricket  and  AFL  oval  and  clubhouse,  the  full  demolition  and 

removal of all Camp Banksia buildings and associated infrastructure is required.   

Existing services that could be utilised within the new clubhouse infrastructure would be retained and 

redirected where possible. 

 

5.2.2  Cricket and AFL Clubhouse The proposed clubhouse for Cricket and AFL teams would consist of the following: 

‐ Small covered grandstand above the clubhouse. 

‐ Club function room with amenities overlooking oval. 

‐ Kiosk for players and spectators. 

‐ Two female change rooms for club and visitors. 

‐ Two male change rooms for club and visitors. 

‐ Change room for male and female umpires. 

‐ First aid room. 

‐ Massage room. 

‐ One vehicle bay for grounds maintenance requirements. 

‐ One storage bay for maintenance workshop requirements. 

‐ One storage bay for the cricket club. 

‐ One storage bay for the AFL club. 

‐ Public toilet with external access. 

 

5.2.3  Picnic Shelters With  the  site  dominated  by  cricket  and  AFL  activities,  a  greater  number  of  spectators  would  be 

expected, therefore, five picnic shelters are provided for the site, with four along the eastern side of 

the oval, and one adjoining the proposed playground. 

The  four  shelters  along  the  eastern  boundary will  also  provide  shelter  for  general  use  during  non‐

game days.  The picnic shelters will consist of a 4 x 5m skillion roof structure over a concrete pad, with 

a picnic table setting and one bench seat under. 

 

Page 32: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   26 

 

 

5.3  HARDSTAND 

 

5.3.1  Car Parking Option  Four  provides  two  car  parking  areas  for  the  site, with  the primary  parking  area  off  Pitcairn 

Street for the clubhouse and Banksia Centre. The other car parking is provided off Anderson Street for 

the eastern side of the site. 

The western car park requires a constructed road intersection with kerb and channelling off Pitcairn 

Street directly opposite the school exit. The road would extend up to the clubhouse where it would 

split to provide one way access for vehicle and bus pick‐up and drop‐off area directly in front of the 

clubhouse. The main access to the car park will be provided off this new road and central to the car 

park.  This car park accommodates 96 bays providing parking for approximately 200 people. 

The new road construction off Pitcairn Street would be within the existing designated road reserve.  

This provides for the potential to extend the road towards Shearwater Esplanade where the road will 

need  to deviate  around  the end  residential  property, or  over  crown  land and  link up with Princess 

Crescent. 

The  car  park  off  Anderson  Street  accommodates  54  bays  providing  parking  for  approximately  115 

people.    This  car  park  includes  a  pick‐up  and  drop‐off  area  which  is  linked  to  the  clubhouse  and 

Banksia Centre by a wide concrete pathway network. 

 

5.3.2  Banksia Centre Forecourt As proposed in Option Three, Option Four also proposes to demolish the existing car park fronting the 

Banksia Centre to make way for  future building works and to provide a more pedestrian orientated 

forecourt and street address. 

 

5.3.3  Anderson Street Car Park At the end of Anderson Street  is a small structured car park that accommodates 12 cars  for people 

either watching cricket or football games, accessing the pathway network or accessing Freers Beach. 

 

5.3.4  Community Pathway Network With the full removal of Camp Banksia, the site should be made more accessible to the community. A 

concrete pathway network as illustrated on the master plan, provides all‐weather access around the 

site with  potential  links  to  the  adjoining  bushland  for  informal  recreation  activities,  such  as  riding, 

jogging and walking. 

The pathway will  link up Shearwater Esplanade with the existing pathway that runs through Pitcairn 

Reserve to the south.    

 

 

Page 33: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   27 

 

5.4  RECREATION ACTIVITIES 

 

5.4.1  Cricket and AFL Oval By  removing  all  infrastructure  associated with  Camp  Banksia,  the  site  can  be  utilised  for  ‘A’  grade 

sporting  activities.    Option  Four  focuses  on  providing  one  full  size  cricket  and  AFL  oval measuring 

150m across x 165m long.   

This  size  oval  will  accommodate  Tasmanian  division  one  cricket  and  AFL  games.  The  oval  would 

consist  of  a  synthetic  turf  cricket wicket over  concrete  slab  in  the  centre of  the oval, with  a north 

south orientation. A traditional white picket fence will also be installed to enclose the oval. 

As  the oval will  be designed  to a division one playing  surface,  the grounds will  consist of  a pop‐up 

irrigation system and a herringbone drainage pattern to eliminate water‐logging and to ensure high 

quality turf cover.   

 

5.4.2  Cricket Practice Nets The proposed  cricket practice nets  as  illustrated on  the master plan  shall  consist  of  two 3.6 metre 

wide nets with 27 metre long side panels, and a chainmesh roof to cover a 6 metre long area over the 

batting crease  in accordance with Cricket Australia’s design guidelines.    Ideally, one practice wicket 

should be gated for club use only, with the other allocated for club and public use. 

 

5.4.3  Playground Option Four proposes a medium size playground to provide a  favourable space for  families utilising 

either the clubhouse or the Banksia Centre.  The playground would ideally consist of play equipment 

manufactured from timber and steel in colours that complement the adjoining bushland area.  

Play  equipment would  include  an  all  abilities  basket  swing,  a  climbing  cubby  structure with  slides, 

balance beams and climbing nets, and a look out structure also with climbing nets and a climbing wall. 

The play equipment would be surrounded by organic softfall with the exception of the basket swing 

which would include wet pour rubber surfacing for wheelchair access.    

 

5.5  ENVIRONMENTAL 

 

5.5.1  Deep Water Wetland Included in all four options is a deep water wetland where stormwater can be contained, and pumped 

into  a  better  one‐way  flow  system  out  to  Freers  Beach.    The  construction  of  the  wetland  would 

include  rock  filled  gabion  baskets  lining  the  full  extent  of  the wetland,  and  a  1.6m high  pool  style 

safety fence and locked access gate surrounding the water body.  

The wetland will be planted out with local wetland species to reduce the visual impact of the wetlands 

and to provide habitats for local fauna species and aquatic life. 

 

 

Page 34: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   28 

 

5.5.2  Overland Flow Swale For  the  construction  of  the  full  size  oval,  a  large  diameter  pipe  would  be  installed  between  the 

existing  billabong  and  the new deep water wetland.    In  addition,  the oval would  be  filled  to  finish 

slightly higher than the outer perimetre with the outer area to the west and north of the oval profiled 

to allow major flooding to flow around the oval towards the new wetlands. 

 

5.5.3  Landscape  To provide comfort and amenity for spectators and the community, shade trees and low level planting 

of  local  native  plant  species  will  greatly  enhance  the  enjoyment  and  aesthetics  of  the  site.    An 

informal planting of trees along the Anderson Street frontage will provide a backdrop for the sports 

oval as well as a pleasant outlook from the residential properties across the street, while small trees 

would be included along the Pitcairn Street frontage. 

Suitable shade trees scattered throughout the open space areas, car parks and around the built forms 

will provide a physical connection with the adjoining bushland and the overall appearance of the site. 

 

 

5.6  FUTURE WORKS  

5.6.1  Building Envelope The Option Four master plan illustrates areas adjoining the east and west of the Banksia Centre to be 

designated for  future building works.   The two areas have been specifically set aside for a potential 

Performing Arts Centre to the west and an indoor lawn bowls facility to the east. 

As mentioned previously, the existing Banksia Centre is a significant structure due to its bulk size and 

height. Any additional building works should be consistent in materials but of a lower building form to 

bring the height down to a scale that suits the surrounding residential and natural landscape. 

   

Page 35: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   29 

 

6.0  QUANTITY SURVEYOR COSTINGS  

This  section  applies  costings  established  by  the  project’s  Quantity  Surveyor  ‘Lifecycle  Cost 

Management’  (refer  appendix  5  for  Quantity  Surveyor’s  report),  for  the  implementation  of  each 

master plan option.   

The  following  pages  itemise  the  key  components  of  each  option  and  their  estimated  costs.    Each 

option has the potential to be staged over five to ten years, as well as reducing the extent of works 

currently illustrated. 

The costings shown are based upon a master plan approach.   A refined design will  result  in refined 

costings. 

 

 

   

Page 36: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   30 

 

Costings for Master Plan Option One 

DESCRIPTION OF WORKS  TOTAL 

Demolition ‐ Demolition of maintenance shed and Banksia beachside cabins ‐ Demolish existing main hall ends to allow for extensions ‐ Demolish concrete pathways, half of basketball/netball hardstand ‐ Demolish driveway and car park 

‐ Full removal of trees and scrub vegetation 

$ 115,200 

Earthworks ‐ Excavation of new deep water wetlands ‐ Import fill for construction of a levelled oval ‐ Import fill for new cabins, manager’s residence and car park area 

‐ Fill south‐eastern corner of site 

$ 305,640 

Buildings ‐ Re‐clad each cabin with 'Shadowclad' external plywood ‐ Refurbish each cabin and toilets to DDA compliance ‐ Increase size of Sheoak access bathroom to DDA compliance ‐ Refurbish and extend main hall including DDA compliance ‐ Refurbish admin building to DDA compliance ‐ Refurbish self‐catering kitchen ‐ New two bedroom beach side units (40m2 each unit) ‐ New two bedroom duplex beach side unit (2 joined units) ‐ New three bedroom care takers unit (150m2 + carport) ‐ New four bay maintenance shed (prefabricated) 

‐ New picnic shelter adjoining beach volley ball court (4 x 5m) 

$ 1,607,050 

Hardscape ‐ Pump and housing for wetland overflow to beach ‐ New wetland fence (1600 wallaby proof fence) ‐ New fence to existing billabong (1600 wallaby proof fence) ‐ Footbridge access over overland flow swale (8 x 2m) ‐ New concrete pathways linking built forms  ‐ New asphalt driveway and car park and unit car park  ‐ New asphalt car park and maintenance shed access to road reserve ‐ Privacy fence to caretakers private open space  ‐ Prepare and re‐paint tennis courts ‐ Resurface self catered kitchen pavement area ‐ Beach volley ball court (300mm sand) ‐ Bike/skate/scooter track ‐ Camp fire pit and surrounding pavement ‐ Concrete causeway between kayak pond and adjoining billabong ‐ New constructed kayak storage shed and observation deck ‐ Climbing wall (8m h), flying fox take off deck, and scramble net element ‐ Post and rope challenge element ‐ Log and balance challenge element ‐ New bocce court (24 x 4m) ‐ Irrigation tractor for oval 

‐ Irrigation (pop up) for lawn areas adjoining buildings 

$ 720,280 

Landscape Works ‐ Wetland planting to northeast corner of site ‐ Shade tree planting (300mm pot + steel mesh tree guards) 

‐ Detailed landscape planting 

$ 48,450 

GRAND TOTAL  $ 2,796,620 

 

Page 37: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   31 

 

Costings for Master Plan Option Two 

DESCRIPTION OF WORKS  TOTAL 

Demolition ‐ Demolition of maintenance shed and Banksia beachside cabins ‐ Demolish existing main hall ends to allow for extensions ‐ Demolish concrete pathways, basketball/netball hardstand, and tennis court ‐ Demolish driveway and car park ‐ Demolish canoe / kayak storage and observation deck ‐ Full removal of trees and scrub vegetation 

$ 182,000 

Earthworks ‐ Excavation of new deep water wetlands ‐ Fill in canoe / kayak pond and overland flow swale ‐ Import fill for construction of a levelled oval ‐ Import fill for new cabins, manager’s residence, driveways and car parking areas 

‐ Fill north‐eastern corner of site 

$ 559,920 

Buildings ‐ Relocate Boobyalla cabin cluster ‐ Re‐clad each cabin with 'Shadowclad' external plywood ‐ Refurbish each cabin and toilets to DDA compliance ‐ Increase size of Sheoak access bathroom to DDA compliance ‐ Construct new fully DDA compliant cabin cluster including amenities ‐ Refurbish and extend main hall including DDA compliance ‐ Refurbish admin building to DDA compliance ‐ Refurbish self‐catering kitchen ‐ New two bedroom beach side units (40m2 each unit) ‐ New two bedroom duplex beach side unit (2 joined units) ‐ New three bedroom care takers unit (150m2 + carport) ‐ New four bay maintenance shed (prefabricated) 

‐ New picnic shelter adjoining beach volley ball court (4 x 5m) 

$ 1,921,050 

Hardscape ‐ Pump and housing for wetland overflow to beach ‐ New wetland fence (1600 wallaby proof fence) ‐ New fence to existing billabong (1600 wallaby proof fence) ‐ New concrete pavement under relocated and new cabin clusters ‐ New concrete pathways linking built forms ‐ New asphalt driveway and car park at entry ‐ New asphalt car park and maintenance shed access to road reserve. ‐ New asphalt carpark extension to Banksia Centre car park ‐ New asphalt car park at the end of Anderson Street ‐ Privacy fence to manager’s private open space ‐ Resurface self‐catered kitchen pavement area ‐ Beach volleyball court (300mm sand) ‐ Bike/skate/scooter track ‐ Camp fire pit and surrounding pavement ‐ Stormwater connection pipe (300mm) between billabong and new wetland ‐ Irrigation tractor for oval ‐ Irrigation (pop up) for lawn areas adjoining buildings ‐ Climbing wall (8m h), flying fox take off deck, and scramble net element ‐ Post and rope challenge element ‐ Log and balance challenge element 

‐ New bocce court 

$ 865,075 

Landscape Works ‐ Wetland planting to northeast corner of site ‐ Shade tree planting (300mm pot + steel mesh tree guards) 

‐ Detailed landscape planting 

$ 51,000 

GRAND TOTAL  $ 3,579,045 

Page 38: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   32 

 

Costings for Master Plan Option Three 

DESCRIPTION OF WORKS  TOTAL 

Demolition ‐ Demolition of all buildings associated infrastructure and hardstand areas ‐ Full removal of trees and scrub vegetation 

$ 291,900 

Earthworks ‐ Excavation of wetlands to northeast corner ‐ Fill required to level existing open space area ‐ Fill in canoe / kayak pond and overland flow swale 

‐ Fill required to raise level for new clubhouse 

$ 305,640 

Buildings ‐ New soccer clubhouse 

‐ New picnic shelter 

$ 1,707,000 

Hardscape ‐ Pump and housing for wetland overflow to beach ‐ New wetland fence (1600 wallaby proof fence) ‐ New fence to existing billabong (1600 wallaby proof fence) ‐ New concrete pathways (2m wide) ‐ New asphalt car park (48) off Anderson Street ‐ New asphalt car park (12) at end of Anderson Street ‐ New asphalt car park (48) and access off Pitcairn Street ‐ New asphalt car park extension to Banksia Centre car park ‐ New asphalt car park at the end of Anderson Street ‐ Stormwater connection pipe (300mm) between billabong and new wetland ‐ Irrigation tractor for ovals 

‐ Irrigation (pop up) for lawn areas around clubhouse 

$ 1,288,650 

Landscape Works ‐ Wetland planting to northeast corner of site ‐ Shade tree planting (300mm pot + steel mesh tree guards) 

‐ Detailed landscape planting 

$ 39,250 

GRAND TOTAL  $ 3,632,440 

 

Page 39: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   33 

 

Costings for Master Plan Option Four 

DESCRIPTION OF WORKS  TOTAL 

Demolition ‐ Demolition of all buildings associated infrastructure and hardstand areas ‐ Full removal of trees and scrub vegetation 

$ 306,900 

Earthworks ‐ Excavation of wetlands to northeast corner ‐ Fill in canoe / kayak pond and overland flow swale ‐ Fill required to level existing open space area for full size AFL and Cricket oval 

‐ Fill required to raise level for new clubhouse ‐ Partially fill billabong for new works 

$ 875,400 

Buildings ‐ New AFL and Cricket clubhouse with grandstand. 

‐ New picnic shelters 

$ 5,025,000 

Hardscape ‐ Pump and housing for wetland overflow to beach ‐ New wetland fence (1600 wallaby proof fence) ‐ New concrete pavement area fronting new clubhouse ‐ New concrete pathways (2m wide) ‐ New asphalt car park (54) off Anderson Street ‐ New asphalt car park (12) at end of Anderson Street ‐ New asphalt car park (96) adjoining new road off Pitcairn Street ‐ New asphalt car park at the end of Anderson Street ‐ New road connecting Princess Crescent to Pitcairn Street ‐ Stormwater connection pipe (300mm) between billabong and new wetland ‐ Irrigation tractor for oval ‐ Irrigation (pop up) for lawn areas around clubhouse ‐ New three bay cricket practice nets 

‐ New playground 

$ 1,393,450 

Landscape Works ‐ Wetland planting to northeast corner of site ‐ Shade tree planting (300mm pot + steel mesh tree guards) 

‐ Detailed landscape planting 

$ 59,500 

GRAND TOTAL  $ 7,660,250 

 

 

   

Page 40: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   34 

 

7.0  PROGRESSING THE PROJECT FORWARD  

The four master plans described in this report have been developed to provide Latrobe Council with 

redevelopment  options  for  the  future  of  the  Camp  Banksia  site.    Each  option  has  been  carefully 

produced  to  incorporate  the  outcomes  of  the  community  consultation  event  and  ideas  and 

suggestions from Council and Camp Banksia staff. 

Each  option  has  their  own  merit,  with  one  and  two  retaining  Camp  Banksia  as  a  Council  owned 

business with more open space designated for community use, while options three and four shift the 

focus  of  the  site  to  structured  sporting  activities  including  purpose  built  playing  surfaces  and 

clubhouse facilities. 

If  Camp Banksia  is  retained and  refurbished, Council  have  the potential  to  re‐brand  the  education, 

activity  and accommodation business  and  re‐establish  the  facility  as  a market  leader.   A  revitalised 

Council and community asset has the potential to attract greater use of the camp, increase revenue 

for the business, employ more local residents and acquire services from local businesses.   

Options one and two also have the opportunity to hold large community events and festivals on the 

grounds  as  the  proposed  ovals  are  not  specifically  designed  for  sports,  therefore  allowing  greater 

flexibility in usage. 

Options three and four, however, shift the primary use of the site from a Council owned business to a 

community asset with a dominant use of either soccer, or cricket and AFL.  Sporting clubs provide a 

very important role in developing a healthy, active and social community, and by providing a sporting 

club on the same site as the Banksia Centre, the site becomes a hub for community recreation events. 

The master plan option feasibility assessment report by Moore Consulting  (appendix 6) provides an 

assessment of the feasibility of three of the master plan options.  Option three, which focused on the 

site being developed for soccer, was excluded from the feasibility study at Council’s request. 

In conclusion, Council and the community, must consider the financial benefits of all options, and the 

social benefits that all options will provide the community.  Refurbishing Camp Banksia has a cost, but 

it is a cost that can be reclaimed over time as detailed in the master plan option feasibility assessment 

report.   

 

   

Page 41: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   35 

 

8.0  APPENDICES  

8.1  Appendix 1 – Illustrated Master Plan – Option 1  

   

Page 42: Camp Banksia Master Plan Report 120618 FINAL
Page 43: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   37 

 

8.2  Appendix 2 – Illustrated Master Plan – Option 2  

 

   

Page 44: Camp Banksia Master Plan Report 120618 FINAL
Page 45: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   39 

 

8.3  Appendix 3 – Illustrated Master Plan – Option 3  

 

   

Page 46: Camp Banksia Master Plan Report 120618 FINAL
Page 47: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   41 

 

8.4  Appendix 4 – Illustrated Master Plan – Option 4  

 

 

   

Page 48: Camp Banksia Master Plan Report 120618 FINAL
Page 49: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   43 

 

8.5  Appendix 5 – Quantity Surveyor’s Report  

   

Page 50: Camp Banksia Master Plan Report 120618 FINAL

Camp Banksia Redevelopment Summary

Ref. Description % BC Quantity Unit Rate Total

A Notes, Inclusions and Exclusions 0.00 0

B Option 1 Calculation details 36.34 218,600

C Option 2 Additional Calculation details 62.17 374,000

D Option 3 Additional Calculation details 1.50 9,000

GFA: 0.00 m2 100.00 601,600

9/10/2017 7:39:38 PM Lifecycle Cost Management Pty Ltd Page 1 of 1

Page 51: Camp Banksia Master Plan Report 120618 FINAL

Camp Banksia Redevelopment Report Details

Ref. Description % BC Quantity Unit Rate Total

Notes, Inclusions and Exclusions

Generally

A.1 For the purposes of comparison of Options 1-4, we have included a proportionof builder's preliminaries (6%) and design and construction contingencies(10%) in our rates

0.00 1 note INCL

A.2 Since potential commencement date of any Option is unknown, we have notincluded any Building Price Escalation. If this is required for future fundingsubmissions, this should be factored in at 3% PA

0.00 1 note EXCL

A.3 We have not included any professional design fees. However, for fundingapplication purposes, these can be factored in at 10%

0.00 1 note EXCL

A.4 No geotechnical investigation has been undertaken, and no allowance hasbeen made for potential adverse site conditions/foundation problems requiringpiling under structures

0.00 1 note EXCL

A.5 No allowance has been made for land subdivision costs, legal or marketingfees

0.00 1 note EXCL

A.6 No allowance has been made for loose or special equipment, furniture orfurnishings

0.00 1 note EXCL

A.7 No allowance has been made for major external services infrastructure, whichis unknown and outside the scope of comparison of the various Options

0.00 1 note EXCL

A.8 No asbestos register has been provided, however, for the purposes of thisreport, an allowance for removal of asbestos eaves lining in the older 12 Nocabins, and wall linings to Banksia Beachside Cabins & Manager's residence isincluded

0.00 1 note INCL

A.9 Capacity of the existing site services infrastructure is unknown, however, forthe purposes of this report it has been assumed that there is sufficient capacityin the existing electrical and water supply, and no new electrical substation isrequired

0.00 1 note EXCL

A.10 It is further assumed that the existing fire services ring main has sufficientpressure, and no major upgrades of sewer and stormwater drainageinfrastructure would be required for any Option

0.00 1 note EXCL

Assumed scope

A.11 Assumed $10,000 to remove asbestos from beachside cabins 0.00 1 note INCL

A.12 Basketball hardstand demolition allowed as asphalt based on site photos 0.00 1 note INCL

A.13 2 grades of fill assumed: Type 1 under open spaces to be local sand won fromsite or surplus from other local civils works. Type 2 under buildings to becompacted structural fill from quarry or other local civils works

0.00 1 note INCL

A.14 Reclad cabins with Shadowclad includes for removal of existing cladding andnew insulation

0.00 1 note INCL

A.15 Refurbish and extend main hall. Our rate includes for extension, only minorinternal refurbishment work and DDA compliance work

0.00 1 note INCL

A.16 Refurbish self catering kitchen. Our rate includes for DDA compliance work,minor upgrades to fittings and new finishes internally, minor electricalupgrades. Assume reused kitchen equipment and appliances

0.00 1 note INCL

A.17 New two bedroom duplex beach side unit (2 joined units). Assume 40m2 eachUnit

1 note

A.18 Prefabricated sheds to be Ranbuilt type or similar but for Options 3 and 4, withply external cladding, each bay 3.5 x 7 metres

0.00 1 note INCL

9/10/2017 7:42:10 PM Lifecycle Cost Management Pty Ltd Page 1 of 5

Page 52: Camp Banksia Master Plan Report 120618 FINAL

Camp Banksia Redevelopment Report Details

Ref. Description % BC Quantity Unit Rate Total

Notes, Inclusions and Exclusions (Continued)

A.19 Footbridge access over overland flow swale assumed to be timber construction 0.00 1 note INCL

A.20 New ashphalt driveway, carpark, access road rates include for some kerbs anddrainage

0.00 1 note INCL

A.21 Bike/skate/scooter track assumed good quality or coloured asphalt or plainconcrete

0.00 1 note INCL

A.22 Concrete causeway between kayak pond and adjoining billabong assumed tobe partially elevated for drainage under

0.00 1 note INCL

A.23 Irrigation tractor for oval is unknown $5,000 Provisional Sum allowed 0.00 1 note INCL

A.24 Re-locate Boobyala cabin cluster includes for disconnection and making safeall services, extension of all services, new raised concrete plinths, new 50m2covered area, protection, cranage, labour

0.00 1 note INCL

A.25 Soccer Clubhouse to be standard construction single storey including first aid,function room and 4 changerooms

0.00 1 note INCL

A.26 Stadium to be standard precast concrete construction elevated grandstandseating plats, DDA lift to spectator area, steel framed roof construction,clubrooms, four changerooms and 3 no. maintenance bays below

0.00 1 note INCL

BCA Compliance Report

A.27 Assume accessibe bathrooms to She Oak cluster to be gutted, increased insize and all new finishes, fittings and fixtures

0.00 1 note INCL

A.28 Existing Hot Water to be checked if tempered - no allowance made fortempering

0.00 1 note EXCL

A.29 Change indoor BBQ sliding door to swing door, landing/handrail and guttersand downpipe issues included in rate to Refurbish Self-catering kitchen inOption 1 & 2

0.00 1 note INCL

A.30 No allowance for fencing dams on site 0.00 1 note EXCL

A.31 Allowances have been made in Option 1 for Accessible paths to netball, tenniscourts and from Admin to Community building

0.00 1 note INCL

A.32 No allowance to replace glazing to all buildings suspected to be generallynon-conforming (other than Community building, which is 2-3 years old)

0.00 1 note EXCL

A.33 Allowance has been made to reline Dining room ceiling with plasterboard tomitigate fire hazard

0.00 1 note INCL

A.34 Energy efficiency of all existing buildings except Community building has onlybeen considered insofar as recladding cabins with Shadowclad (Options 1 & 2)includes for new R2.5 wall insulation batts

0.00 1 note INCL

A.35 Energy efficiency studies e.g. replacing glazing with sealed double glazedunits, upgraded roof & floor insulation, energy-efficient lighting, heating andcooling, solar panels, solar hot water, passive solar, sunshades are beyond thescope of this report

0.00 1 note EXCL

A.36 There would be opportunities to select water efficient appliances and implementwater harvesting as part of BCA bathroom upgrades and roof stormwaterdisposal in Options 1 & 2

0.00 1 note NA

A.37 Although it is not an item of building works and is beyond the scope of thisreport, Evacuation Plans should be updated, provided and displayed by themanagement of Camp Banksia

0.00 1 note NA

9/10/2017 7:42:10 PM Lifecycle Cost Management Pty Ltd Page 2 of 5

Page 53: Camp Banksia Master Plan Report 120618 FINAL

Camp Banksia Redevelopment Report Details

Ref. Description % BC Quantity Unit Rate Total

Option 1 Calculation details (Continued)

B.1 Re-clad each cabin with 'Shadowclad' external plywood - assumed average2700 high

1,696 m2

Refurbish each cabin to DDA compliance

B.2 Form landing outside door minimum 750mm long then 250mm min step ifrequired

0.21 1 no 1,250.00 1,250

B.3 Widen door to 920mm door size to provide 850mm clear opening to eachcluster

0.22 1 no 1,300.00 1,300

B.4 Upgrade door furniture to accessible lever handles 0.05 1 no 300.00 300

B.5 Upgrade to rocker type access switches/power points 0.05 1 no 300.00 300

B.6 Connect roof stormwater to drainage system 0.17 1 no 1,000.00 1,000

B.7 Fire detection 0.05 1 no 300.00 300

Sub-total 4,450

Refurbish She Oak cabin to DDA compliance

B.8 Bathroom needs to be increase in size if building permit is required for upgradework

4.16 1 no 25,000.00 25,000

B.9 Widen door to obtain 850mm clear opening 0.00 1 note INCL

Sub-total 25,000

Refurbish each cabin toilets to DDA compliance

B.10 Relocate gas bottles and instantaneous hot water unit to be 500mm belowopenings and 1m horizontally

0.09 1 no 500.00 500

B.11 Ambulant toilet facility for male and female required where located in block oftoilets with access toilet

1.00 2 no 3,000.00 6,000

B.12 Form landing outside door minimum 750mm long then 250mm min step ifrequired

0.21 1 no 1,250.00 1,250

B.13 Install minimum two sets of mixing valves to access bathroom facilities 0.34 1 no 2,000.00 2,000

B.14 Tempered Hot Water to be checked 0.00 1 note EXCL

B.15 Connect roof stormwater to drainage system 0.17 1 no 1,000.00 1,000

B.16 Fire detection 0.05 1 no 300.00 300

Sub-total 11,050

Refurbish Hall to DDA compliance (included in m2 rate for refurb and extend)

B.17 Install minimum two sets of mixing valves to access bathroom facilities 0.34 1 no 2,000.00 2,000

B.18 Upgrade to rocker type access switches/power points 0.17 1 no 1,000.00 1,000

B.19 Round handrails to each side of ramp required to conform to AS1428.1including hand and kerb rail each side and tactile indicators

1.83 1 no 11,000.00 11,000

B.20 contrasting non slip nosings to steps 0.34 1 no 2,000.00 2,000

B.21 Fire detection 0.59 350 m2 10.00 3,500

9/10/2017 7:42:10 PM Lifecycle Cost Management Pty Ltd Page 3 of 5

Page 54: Camp Banksia Master Plan Report 120618 FINAL

Camp Banksia Redevelopment Report Details

Ref. Description % BC Quantity Unit Rate Total

Option 1 Calculation details (Continued)

B.22 Replace or reline hall ceiling 4.21 253 m2 100.00 25,300

B.23 Emergency lighting 1.38 550 m2 15.00 8,250

Sub-total 8.82 53,050

Refurbish Admin Building to DDA compliance

B.24 Upgrade Accessible toilet administration building non-compliant 2.50 1 item 15,000.00 15,000

B.25 Ambulant toilet facility for male and female required where located in block oftoilets with access toilet

1.00 2 no 3,000.00 6,000

B.26 Upgrade door furniture to accessible lever handles. In toilets accessibleengaged latch

0.09 1 no 500.00 500

B.27 Round handrails to each side of ramp required to conform to AS1428.1including hand and kerb rail each side and tactile indicators

1.00 1 no 6,000.00 6,000

B.28 contrasting non slip nosings to steps 0.17 1 no 1,000.00 1,000

B.29 Fire detection 0.34 200 m2 10.00 2,000

Sub-total 30,500

Accessible path to DDA compliance

B.30 Sealed paving to Basketball Court 1.00 60 m2 100.00 6,000

B.31 Sealed paving to Tennis Court 3.33 200 m2 100.00 20,000

B.32 Sealed paving Admin to Community Centre 1.67 100 m2 100.00 10,000

Sub-total 36,000

Community Building DDA compliance

B.33 Timber decking boards to be replaced to DDA 0.44 11 m2 240.00 2,640

B.34 Handrail to stairs 0.12 6 m 120.00 720

B.35 Nosings to stairs 0.26 22 m 70.00 1,540

B.36 Tactiles 0.10 2 m2 300.00 600

Sub-total 5,500

Option 2 Additional Calculation details

Re-locate Boobyala cabin cluster behind self-catered kitchen

C.1 Disconnect and remove water, FHRs, sewer plumbing 0.25 1 cluster 1,500.00 1,500

C.2 Disconnect and make safe electrical supply 0.25 1 cluster 1,500.00 1,500

C.3 Mobile crane hire 0.40 8 units 300.00 2,400

C.4 Labour for cranage 0.32 32 hrs 60.00 1,920

C.5 Allow for protection/making good damage in cranage 0.67 8 units 500.00 4,000

C.6 Allow for new stumps or raised plinths 2.66 8 units 2,000.00 16,000

C.7 Assume steps/ramps part of DDA compliance work 0.00 1 note EXCL

C.8 Allow to disconnect and relocate gas bottles and supply 0.34 2 sets 1,000.00 2,000

9/10/2017 7:42:10 PM Lifecycle Cost Management Pty Ltd Page 4 of 5

Page 55: Camp Banksia Master Plan Report 120618 FINAL

Camp Banksia Redevelopment Report Details

Ref. Description % BC Quantity Unit Rate Total

Option 2 Additional Calculation details (Continued)

C.9 New water supply to 2 bathrooms 0.40 40 m 60.00 2,400

C.10 New hose reel supply 0.25 25 m 60.00 1,500

C.11 New sewer supply and connect to existing fixtures 0.84 25 m 200.00 5,000

C.12 New stormwater supply to downpipes - incl in BCA issues 0.00 60 m incl 0

C.13 New canopy area 4.58 50 m2 550.00 27,500

C.14 New power supply underground 2.50 150 m 100.00 15,000

C.15 Prelims 6% 0.80 1 item 4,800.00 4,800

C.16 Continigencies 10% 1.42 1 item 8,500.00 8,500

C.17 rounding 0.00 1 -20.00 -20

94,000

Construct new 6 cabin cluster including Amenities

C.18 Area of cabins and amenities 44.89 216 m2 1,250.00 270,000

Accessible path to DDA compliance

C.19 Sealed paving Admin to Community Centre 1.67 100 m2 100.00 10,000

Sub-total 10,000

Option 3 Additional Calculation details

D.1 asbestos removal from 12 no older cabins eaves 1.50 90 m2 100.00 9,000

GFA: 0.00 m2 100.00 601,600

9/10/2017 7:42:10 PM Lifecycle Cost Management Pty Ltd Page 5 of 5

Page 56: Camp Banksia Master Plan Report 120618 FINAL

  

 Camp Banksia Master Plan Options Report                         DRAFT   50 

 

8.6  Appendix 6 – Master Plan Option Feasibility Assessment Report  

 

   

Page 57: Camp Banksia Master Plan Report 120618 FINAL

[DOCUMENT

TITLE]

CAMP BANKSIA Master Plan Option Feasibility

Assessment Report

Moore Consulting March 2018

Page 58: Camp Banksia Master Plan Report 120618 FINAL

1 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Contents

Document Description ............................................................................................................................ 2

Project Rationale ..................................................................................................................................... 2

Option One .......................................................................................................................................... 2

Option Two ......................................................................................................................................... 3

Option Three ....................................................................................................................................... 3

Option Four ......................................................................................................................................... 3

Project Methodology .............................................................................................................................. 3

Project Findings ....................................................................................................................................... 4

Research Analysis ................................................................................................................................ 4

Financial Assumptions Underlying the Forecasts ............................................................................... 6

Conclusions ........................................................................................................................................... 13

Recommendations ................................................................................................................................ 13

Appendix A ............................................................................................................................................ 15

Option Cashflow Projections by Funding Scenario ........................................................................... 15

Appendix B ............................................................................................................................................ 28

Option Two Cashflow Projections by Revenue Scenario .................................................................. 28

Page 59: Camp Banksia Master Plan Report 120618 FINAL

2 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Document Description 1. This document is a report to the Latrobe Council regarding an assessment of the feasibility of

three development options for Camp Banksia, at Banksia Park, Port Sorell.

2. This report has been prepared by Warren Moore from Moore Consulting and has the

following structure:

a. Document Description

b. Project Rationale

c. Project Methodology

d. Project Findings

e. Conclusions and Recommendations

Project Rationale 1. The issues, opportunities and future development of Camp Banksia has been the subject of a

number of reports and studies including those undertaken in 2005, 2010 and 2017.

2. The Investigation Report prepared by Lange Design in June 2017 led to Lange Design

preparing a Master Plan Options Report in October 2017. This Master Plan provided details

relating to four potential development options for Camp Banksia.

3. Since the preparation of the Master Plan Options Report, the four development options

have been reduced to three.

4. It is in relation to each of the three development options that Moore Consulting has been

requested to undertake a feasibility assessment, the subject of this report.

5. The three development options are summarised below and are taken directly from the

Camp Banksia Master Report prepared by Lange Design in October 2017.

6. Continuing the current operations of Camp Banksia without any modifications is not

considered a viable option from the following points of view:

a. The limited and declining propensity for Camp Banksia to cover operating costs from

operating revenues;

b. Th growing gap between the demands of institutions that have used Camp Banksia

in the past and the capacity of Camp Banksia, as it currently operates, to meet these

demands, particularly as they relate to managing risk;

c. The capacity of Camp Banksia to successfully compete in the market for mainly

institutional and group based social and recreation activities; and,

d. The accumulating and increasing costs of both repairs and maintenance based on

the existing infrastructure available comprising Camp Banksia.

Option One ‘Option One focuses on the retention of Camp Banksia and the revitalisation of the appearance and accessibility of all buildings, replacement of damaged and failed pavements, and the inclusion of

Page 60: Camp Banksia Master Plan Report 120618 FINAL

3 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

more recreational activities and infrastructure. Initial investigations indicate that the facility is no longer as popular as it once was, and that the appearance, lack of maintenance and accessibility may be primary contributors to the camp’s decline. Accessibility is a significant component of providing a diverse suite of accommodation for the wider community. The Disability Discrimination Act (DDA) establishes a benchmark for providing access and usability for all abilities for not only buildings but also pathways. Other than upgrading the existing buildings, some of the key components of Option One include demolishing the existing beachside cabins to make way for six new self‐contained cabins, construction of a three bedroom caretakers residence to provide a 24 hour, 365 day presence onsite, and the addition of a series of challenge structures aimed at school aged children, right through to middle age mature adults.’

Option Two ‘Option One and Two master plans are very similar in the approach of retaining Camp Banksia and focusing on revitalising the appearance and accessibility through refurbishing buildings and associated infrastructure, replacing deteriorating, damaged and failed surfaces, and the inclusion of more recreational activities. The main difference between Option One and Option Two is the removal of the canoe pond, increasing the size of the oval, repositioning the Boobyalla cabin cluster, and including an additional cabin cluster. Both options propose the upgrading of existing buildings, demolishing the existing beachside cabins to make way for new self‐contained cabins, construction of a three bedroom caretakers residence, and the addition of a series of challenge structures aimed at all ages from school aged children right through to middle age mature adults.’

Option Three (Has been eliminated)

Option Four ‘The first two options for Camp Banksia include retaining the camp and refurbishing the site for continued use well into the future. Option Four provides a different approach in that it addresses the potential of the site as a designated sporting ground surrounded by community open space. Option Four focuses on Cricket and AFL, whereas Option Three only focused on soccer.’

Project Methodology 1. Work in this project involved a number of discussions with Leon Lange from Lange Design

regarding the development options for Camp Banksia and relevant background material.

This also included reviewing the most recent reports regarding Camp Banksia particularly the

Camp Banksia Investigation Report (Lange Design, June 2017) and the Camp Banksia Master

Plan Options Report (Lange Design, October 2017).

2. Moore Consulting then undertook desk research regarding participation by members of the

public in sport and recreation activities throughout Australia. This work included reviewing

reports and data from the Australian Sports Commission and the Australian Bureau of

Statistics. This work was undertaken with a view to establishing the nature of potential

Page 61: Camp Banksia Master Plan Report 120618 FINAL

4 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

demand for sport and recreation facilities such as those identified by Lange Design in the

Camp Banksia Master Plan Options Report.

3. Further research was undertaken regarding the revenues, charges and costs of operating

sporting ovals and associated facilities operated by local governments in north west

Tasmania.

4. Interviews were also held with a representative of the Tasmanian government’s division of

Sport and Recreation and with an outdoor education teacher who has used Camp Banksia.

5. Moore Consulting reviewed and analysed financial reports relating to the revenues and costs

associated with the operation of Camp Banksia from the years 2012 to 2016 and part of

2017.

6. From this information and the detailed costings of the three development options provided

by Lange Design, Moore Consulting has prepared profit and cash forecasts for each of the

three proposed development options.

7. In relation to the forecasts for each development option, Moore Consulting has provided

forecasts for four funding outcomes relating to the establishment costs of each of the three

options.

8. The four funding outcomes comprises:

a. 100% external funding (no contribution from the Latrobe Council)

b. 90% external funding (10% contribution from the Latrobe Council)

c. 80% external funding (20% contribution from the Latrobe Council)

d. 70% external funding (30% contribution from the Latrobe Council)

9. Moore Consulting has also undertaken a sensitivity analysis on the most feasible option. The

sensitivity analysis is represented in the form of worst case, likely case and best case

scenarios.

Project Findings

Research Analysis 1. From the analysis of the data from the Australian Sports Commission and the Australian

Bureau of Statistics the following summary can be made.

2. Over 80% of people who participate in sport and recreation activities, participate on an

unorganised basis (non club) with only 20% (and declining) of people participating in sport

and recreation on an organised basis. Table One outlines the top five activities undertaken

on an unorganised basis.

Page 62: Camp Banksia Master Plan Report 120618 FINAL

5 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Table One Participation in Unorganised Sport and Recreation

Activity Percentage (%) of Participants

Walking 42.6%

Fitness/gym 32.1%

Jogging/running 15.8%

Swimming 14.5%

Cycling 11.7%

3. Table Two outlines the top five activities undertaken on an organised basis.

Table Two Participation in Organised Sport and Recreation

Activity Percentage (%) of Participants

Fitness/gym 42.6%

Swimming 8.1%

Golf 4.5%

Football 4.2%

Yoga 3.3%

4. Participation in sport and recreation activities on an unorganised basis is trending upwards

with participation in sport and recreation activities on an organised basis trending

downward. This data and trend has been confirmed with the Division of Sport and

Recreation in Tasmania.

5. A review of the proposed development options for Camp Banksia with an outdoor education

teacher, further confirmed a clear preference for Option One and Two.

6. Upgrading the overall amenity as outlined in Options One and Two is welcome with any

water-based activities (eg kayaking) seen as high risk and can act to discourage participation

by the education sector.

7. Lack of high level risk management at Camp Banksia (now and in the future) is seen as a

major barrier to participation by the education sector. This is together with reductions in

school budgets for sport and recreation activities and, a fall in the number of qualified and

experienced outdoor education teachers.

Page 63: Camp Banksia Master Plan Report 120618 FINAL

6 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

8. Moore Consulting’s experience with providers of services to people with disability (Family

Based Care and Multicap) indicate a growing opportunity for Camp Banksia to provide

services for people with disability, particularly through National Disability Insurance Scheme

(NDIS) funding.

9. With regard to Option Four, research indicated that annual use charges by Devonport City

Council and Burnie City Council for the use of Devonport Oval (and associated facilities) and

West Park Oval (and associated facilities) are in a range between $5,000 - $6,000 annually

each for both AFL and cricket clubs.

10. Research was not able to indicate any unmet demand for AFL/cricket facilities in north west

Tasmania.

11. The potential use of a facility as described in Option Four by mainland-based AFL clubs in the

off season was considered outside the scope of this project.

12. Scenarios were prepared for each of the three options whereby the Latrobe Council are

required to contribute between 0% and 30% of the establishment costs.

Financial Assumptions Underlying the Forecasts

1. The forecasts for Options One and Two are based on the following assumptions.

a. In general, these forecasts present a conservative approach in that forecast revenues

have been slightly underestimated and expenditure slightly over estimated.

b. Operating revenues are based on the existing Camp Banksia revenues but with an

increase in forecast annual revenues to reflect the improved amenity.

c. Revenues from group accommodation, cabin accommodation and catering have been

increased initially to reflect the improved quality of the overall facility, the increase in

the number of cabins for rent, and an increase in the hire charges when compared with

the current charges.

d. Operating costs are based on existing Camp Banksia costs but with an increase to reflect

the increased levels of activity.

e. GST inclusive direct costs are calculated to be 22% of associated revenues. This is based

on historical costs of Camp Banksia. GST free direct costs (associated with labour

component) are calculated to be 11% of associated revenues.

f. Over the ten period from 2018/19 to 2027/28 revenues are forecast to increase 2% each

year but with group and cabin accommodation increasing at a rate of 5% each year.

These revenue increases are considered conservative.

g. Over the forecast period, fixed costs are forecast to increase by 2.5%. Each year in line

with the Reserve Bank of Australia’s 2-3% inflation target.

Page 64: Camp Banksia Master Plan Report 120618 FINAL

7 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

h. Depreciation has been calculated on a 40 year straight line basis, but excludes the

establishment costs associated with earthworks and demolition. However, depreciation

amounts will need further work.

i. Depreciation has been treated as a cashflow item and has been forecast to increase at

2.5% annually.

j. Option Two forecast revenues for group accommodation is higher than in Option One to

reflect the increase in the number of beds available in group accommodation associated

with Option Two.

k. These baseline assumptions provide only a broad indication as to likely future revenues

and costs and, are outlined in the following table. These assumptions apply to Options

Two and Three and are based the current revenues and expenditures associated with

Camp Banksia.

Page 65: Camp Banksia Master Plan Report 120618 FINAL

8 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Table Three Revenue and Expense Assumptions

Revenue, Variable Cost and Overhead Assumptions

The following assumptions are based on the operating revenues and expenses for Camp Banksia for 2015/16

This financial performance information has been taken from reports provided by the Latrobe Council

Revenue 2015/16 (rounded) 2018/19 (estiimate)

Venue Hire 9,000$ 9,450$

Sundry Income 800$ 840$

Reimbursements 10$ 11$

Linen Hire 1,700$ 1,785$

Equipment Hire 400$ 420$

Crockery Hire 6,300$ 6,615$

Commission 120$ 126$

Catering 166,000$ 174,300$

Camp Banksia ‐ User Charges 23,000$ 24,150$

Activities ‐ User Charges 3,200$ 3,360$

Accommodation ‐ User Charges 140,000$ 171,520$

Total Revenue 350,530$ 392,577$

Expenditure 2015/16 (rounded) 2018/19 (estimate)

Water & Sewerage 7,886$ 10,508$

Waste Disposal 582$ 776$

Training Costs ‐ Camp 600$ 800$

Telephone ‐ Materials 1,361$ 1,814$

Support Staff ‐ 30,684$ 40,886$

Sundry Expenses 1,120$ 1,492$

Staff Uniforms ‐ Camp 566$ 754$

Repairs & Maintenance 7,454$ 9,932$

Rates Remitted 3,056$ 4,072$

Printing & Stationery 119$ 159$

Power ‐ Materials 10,539$ 14,043$

Postage ‐ Materials 113$ 151$

Overheads Allocated 15,391$ 20,509$

Minor Operating 1,000$ 1,333$

Minor Equipment 5,805$ 7,735$

Marketing & Promotion 5,179$ 6,901$

Manager ‐ Inside 38,673$ 51,532$

Maintenance Staff 20,925$ 27,883$

Linen Hire 200$ 267$

Insurance 317$ 422$

Grounds Maintenance 1,000$ 1,333$

Food ‐ Ingredients 34,968$ 46,595$

Fire System 3,266$ 4,352$

Facsimile Costs 305$ 406$

Directors ‐ Inside 3,095$ 4,124$

Depn Expense ‐ Plant 1,100$ 1,466$

Depn Expense ‐ Minor 1,953$ 2,602$

Depn Expense ‐ Land 711$ 947$

Depn Expense 38,538$ 51,352$

Consumables ‐ Gas 1,552$ 2,068$

Consumables 7,380$ 9,834$

Consultancy 750$ 999$

Cleaning Staff 22,152$ 29,518$

Administrative 16,439$ 21,905$

Activity Staff 537$ 716$

285,316$ 380,184$

% Revenue

Variable Costs GST Free 41,602$ 11%

Variable Costs GST Inclusive 87,130$ 22%

Total Variable Cost 128,731$ 33%

Total Fixed Costs 251,452$

Total Costs 380,184$

Camp Banksia Re-Development Options

Page 66: Camp Banksia Master Plan Report 120618 FINAL

9 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

2. Forecasts for Option Four are based on the following assumptions:

a. Revenue forecasts for Option Four comprise those associated with leasing the facility to

a local cricket club and a local AFL club. Based on market rates, these revenues are

forecast to be in the vicinity of $13,200 for the first year including GST.

b. Depreciation has been calculated on a 40 year straight line basis, but excludes the

establishment costs associated with earthworks and demolition.

c. Fixed costs are based on known benchmarks and some information based on the fixed

costs for the Latrobe recreation ground.

d. Variable costs, including lighting and promotion have been assumed to be the

responsibility of the lessee in Option Four.

3. The following table (Table Four) provides a summary of the likely cashflow over a ten-year

period for each of the three development options based on the four funding scenarios (0%, 10%,

20%, 30% contribution by Council). Further detail regarding these cashflows is provided in

Appendix A.

4. Table Four provides a summary of forecast cash flows for each of the options. This is distinct

from a summary of forecast profitability. Forecast profitability does not take into account the

timing of cash flows nor does it account for any cash contributions (say for establishment costs)

made by the Council.

5. Regarding the Caretaker and the Caretaker’s Residence, the likely scenario would be that the

Camp Manager lives on site and not an additional employee. The assumption is that the

Manager has rent free accommodation in return for additional work hours that arise from being

on the facility 24/7. Salary projections remain as per the current Assessment.

Page 67: Camp Banksia Master Plan Report 120618 FINAL

10 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Table Four Option Cashflow Projections by Funding Scenario

Option 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028

Closing

Balance

Option 1

100% Funded 10,157- 8,998- 3,908- 1,521 7,367 13,636 20,388 27,634 35,403 58,854 141,739

90% Funded 194,511- 78,882- 3,908- 1,521 7,367 13,636 20,388 27,634 35,403 58,854 112,499-

80% Funded 378,865- 148,767- 3,908- 1,521 7,367 13,636 20,388 27,634 35,403 58,854 366,737-

70% Funded 563,218- 218,652- 3,908- 1,521 7,367 13,636 20,388 27,634 35,403 58,854 620,976-

Option 2

100% Funded 500 2,172 8,094 14,397 21,167 28,411 36,198 44,537 53,461 79,679 288,615

90% Funded 241,588- 81,107- 8,094 14,397 21,167 28,411 36,198 44,537 53,461 79,679 36,753-

80% Funded 483,677- 164,387- 8,094 14,397 21,167 28,411 36,198 44,537 53,461 79,679 362,121-

70% Funded 725,765- 247,666- 8,094 14,397 21,167 28,411 36,198 44,537 53,461 79,679 687,489-

Option 4

100% Funded 235,608- 235,941- 241,781- 247,887- 254,145- 260,539- 267,111- 273,844- 280,744- 252,398- 2,549,996-

90% Funded 343,090- 824,845- 241,781- 247,887- 254,145- 260,539- 267,111- 273,844- 280,744- 252,398- 3,246,382-

80% Funded 450,572- 1,413,750- 241,781- 247,887- 254,145- 260,539- 267,111- 273,844- 280,744- 252,398- 3,942,768-

70% Funded 558,054- 2,002,654- 241,781- 247,887- 254,145- 260,539- 2,667,111- 273,844- 280,744- 252,398- 4,639,155-

Page 68: Camp Banksia Master Plan Report 120618 FINAL

11 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

6. Option One, even when establishment costs are fully funded, still commences with small

negative cash balances for the first three years to reflect the slower growth in income levels

relative to fixed costs, particularly in the earlier years. Slower growth in forecast income for

Option One is likely due to the fact that a significant source of forecast revenue (group

accommodation and catering) is from institutional buyers (schools, larger community

groups), who, traditionally, take a longer period of time to change purchasing decisions,

particularly when compared with buyers who are individuals (for example, users of

accommodation cabins).

7. Option Two has a more favourable cashflow than Option One due to the higher revenue

streams expected to be derived from increased group accommodation over the 10 year

forecast period. Option Two is forecast to be cash positive in each of the forecast years if the

establishment costs of Option Two are fully funded from external sources.

8. Option Four, due to both the high establishment costs and low revenue forecasts, is

expected to deliver unfavourable cashflows over the forecast period.

9. Moore Consulting has prepared a sensitivity analysis for the most favourable option (Option

Two). This analysis provides forecasts for:

a. worst case (revenues 25% less than forecasts with fixed costs remaining the same);

b. likely case (revenues and costs as forecast); and

c. best case (revenues 15% higher than forecast with fixed costs remaining the same)

scenarios.

10. The following table summarises the forecast cashflows for Option Two, for each scenario

over a ten year period. Further detail regarding these cashflows is provided in Appendix B.

Page 69: Camp Banksia Master Plan Report 120618 FINAL

12 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Table Five Option Two Cashflow Projections by Revenue Scenario

As expected, Option Two is only cash positive throughout each year of the 10 year forecast period under the best case and likely case revenue scenarios

and, when the project receives 100% funding from external sources. If Option Two obtains 90% or 80% external funding, and revenues follow the best case

scenarios, then, over the 10 year forecast period, projected cash flow for these two funding scenarios, is also positive.

Option 2 - 100% Funded 2018/2019 2019/2020 2020/2021 2021/2022 2022/2023 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028

Closing

Balance

Best Case 39,679 42,145 49,936 58,201 67,028 76,423 86,471 97,182 108,593 137,414 763,071

Likely Case 500 2,172 8,094 14,397 21,167 28,411 36,198 44,537 53,461 79,679 288,615

Worst Case 64,800- 64,448- 61,644- 58,610- 55,267- 51,608- 47,591- 43,205- 38,427- 16,546- 502,147-

Option 2 - 90% Funded

Best Case 202,409- 41,135- 49,936 58,201 67,028 76,423 86,471 97,182 108,593 137,414 437,704

Likely Case 241,588- 81,107- 8,094 14,397 21,167 28,411 36,198 44,537 53,461 79,679 36,753-

Worst Case 306,888- 147,728- 61,644- 58,610- 55,267- 51,608- 47,591- 43,205- 38,427- 16,546- 827,514-

Option 2 - 80% Funded

Best Case 444,497- 124,414- 49,936 58,201 67,028 76,423 86,471 97,182 108,593 137,414 112,336

Likely Case 483,677- 164,387- 8,094 14,397 21,167 28,411 36,198 44,537 53,461 79,679 362,121-

Worst Case 548,976- 231,008- 61,644- 58,610- 55,267- 51,608- 47,591- 43,205- 38,427- 16,546- 1,152,882-

Option 2 - 70% Funded

Best Case 686,585- 207,694- 49,936 58,201 67,028 76,423 86,471 97,182 108,593 137,414 213,032-

Likely Case 725,765- 247,666- 8,094 14,397 21,167 28,411 36,198 44,537 53,461 79,679 687,489-

Worst Case 791,064- 314,287- 61,644- 58,610- 55,267- 51,608- 47,591- 43,205- 38,427- 16,546- 1,478,250-

Page 70: Camp Banksia Master Plan Report 120618 FINAL

13 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Conclusions a. Continuing the current operations of Camp Banksia without any modifications is not

considered a viable option from the following points of view:

a. The limited and declining propensity for Camp Banksia to cover operating costs from

operating revenues;

b. Th growing gap between the demands of institutions that have used Camp Banksia

in the past and the capacity of Camp Banksia, as it currently operates, to meet these

demands, particularly as they relate to managing risk;

c. The capacity of Camp Banksia to successfully compete in the market for mainly

institutional and group based social and recreation activities; and,

d. The accumulating and increasing costs of both repairs and maintenance based on

the existing infrastructure available comprising Camp Banksia.

b. The future and increased demand for sport and recreation facilities is likely to be derived

significantly more from people participating in sport and recreation activities on an

unorganised basis rather than on an organised basis.

c. Active participation in club-based cricket and Australian Rules football is likely to continue to

fall over the forecast period.

d. Continued demand for and usage of Camp Banksia by the education sector is highly

dependent on the degree to which risks to students are avoided, minimised or managed in

an acceptable manner. Upgrading the quality of the amenity as described in the Master Plan

prepared by Lange Design, in terms of both functionality and compliance, is likely to assist in

this regard.

e. Upgrading the amenity as described in the Master Plan prepared by Lange Design, (Options

One and Two) to improve disability access to a larger number of people is likely to increase

the attractiveness of Camp Banksia to people with disabilities, their support providers and

carers. There may be the opportunity for family-based functions (such as family reunions)

with the potential for both accommodation and catering needs.

f. Trend increases in holiday visitor numbers to Port Sorell, in addition to the increasing size of

Port Sorell permanent population (increase in the visiting friends and relatives visitor

market), is likely to increase the demand for holiday cabin accommodation at Banksia Park.

g. Only Option One and Option Two funded fully through external funding and using the likely

case scenario are forecast to generate a positive cashflow over the ten-year forecast period.

h. Best case scenarios for Option Two with 100%, 90% and 80% external funding also develop

positive cashflows over the ten-year forecast period.

Recommendations a. That Option Four not be considered as the preferred development option for Camp Banksia.

Page 71: Camp Banksia Master Plan Report 120618 FINAL

14 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

b. That Option Two be considered as the preferred development option for Camp Banksia.

c. That the Latrobe Council pursue all options to secure 100% external funding for the

redevelopment of Camp Banksia.

d. That the Latrobe Council undertake investigations to determine a preferred legal and

operating structure for Camp Banksia including:

a. A Latrobe Council in-house business unit;

b. A corporation/trading enterprise owned by Latrobe Council;

c. Outsource to an external service provider;

d. Privatisation.

Page 72: Camp Banksia Master Plan Report 120618 FINAL

15 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Appendix A

Option Cashflow Projections by Funding Scenario

Page 73: Camp Banksia Master Plan Report 120618 FINAL

16 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Banksia Park - Option One - 100% Funding

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Venue Hire sales 9,450 9,639 9,832 10,028 10,229 10,433 10,642 10,854 11,072 11,292 103,471

Other Income sales 840 857 874 891 909 927 946 965 984 1,004 9,197

Reimbursements sales 11 11 11 12 12 12 12 13 13 13 120

Linen Hire sales 1,785 1,821 1,857 1,894 1,932 1,971 2,010 2,050 2,091 2,133 19,545

Equipment Hire sales 420 428 437 446 455 464 473 482 492 502 4,599

Crockery Hire sales 6,615 6,747 6,882 7,020 7,160 7,303 7,449 7,598 7,750 7,905 72,430

Commissions sales 125 128 130 133 135 138 141 144 146 149 1,369

Catering sales 174,300 183,015 192,166 201,774 211,863 222,427 233,548 245,226 257,487 270,326 2,192,132

Banksia Retreat sales 24,150 24,633 25,126 25,628 26,141 26,662 27,195 27,739 28,294 28,858 264,427

Activities sales 3,360 3,427 3,496 3,566 3,637 3,710 3,784 3,859 3,937 4,015 36,790

Group Accommodation sales 70,000 73,500 77,175 81,034 85,085 89,328 93,794 98,484 103,408 108,565 880,374

Cabin Accommodation sales 101,520 106,596 111,926 117,522 123,398 129,551 136,029 142,830 149,972 157,450 1,276,794

Total Revenue(inc GST) 392,576 410,802 429,911 449,948 470,957 492,926 516,024 540,245 565,646 592,212 4,861,247

Less GST Collectable 35,689 37,346 39,083 40,904 42,814 44,811 46,911 49,113 51,422 53,837 441,932

Total Revenue(exc GST) 356,887 373,456 390,829 409,043 428,142 448,114 469,112 491,132 514,224 538,375 4,419,316

Gross Profit 233,489 244,325 255,686 267,598 280,089 293,150 306,882 321,282 336,383 352,176

Net Profit After Tax -13,816 -9,163 -4,139 1,277 7,110 13,365 20,102 27,333 35,085 58,143

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 -10,157 -19,155 -23,063 -21,542 -14,176 -540 19,848 47,482 82,885

Cash Receipts 392,576 410,802 429,911 449,948 470,957 492,926 516,024 540,245 565,646 592,212

Cash Payments 402,733 419,800 433,819 448,427 463,590 479,290 495,636 512,611 530,243 533,359

Nett Cash Movement -10,157 -8,998 -3,908 1,521 7,367 13,636 20,388 27,634 35,403 58,854

Closing Bank Balance -10,157 -19,155 -23,063 -21,542 -14,176 -540 19,848 47,482 82,885 141,739

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 378,006 387,462 397,155 407,091 417,275 427,685 438,383 449,350 460,590 449,492

Net Cost of sales 130,700 133,974 137,330 140,770 144,296 147,900 151,604 155,401 159,292 155,458

Gross Margin 247,306 253,488 259,826 266,321 272,979 279,785 286,780 293,949 301,298 294,034

LESS EXPENSES (incl GST)

Sales & Marketing 6,900 7,073 7,249 7,431 7,616 7,806 8,001 8,201 8,406 8,616

Admin & Overhead 251,226 257,507 263,945 270,543 277,307 284,221 291,326 298,609 306,074 297,452

Total Expenses (inc GST) 258,126 264,579 271,194 277,974 284,923 292,027 299,327 306,811 314,481 306,068

Less GST payable 10,821 11,091 11,368 11,653 11,944 12,242 12,548 12,861 13,183 12,034

Total Expenses (exc GST) 247,306 253,488 259,826 266,321 272,979 279,785 286,780 293,949 301,298 294,034

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 96.3% 94.3% 92.4% 90.5% 88.6% 86.8% 85.0% 83.2% 81.4% 75.9%

as a % of sales budget

TOTAL REVENUE

Page 74: Camp Banksia Master Plan Report 120618 FINAL

17 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Banksia Park - Option One - 90% Funding

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Venue Hire sales 9,450 9,639 9,832 10,028 10,229 10,433 10,642 10,854 11,072 11,292 103,471

Other Income sales 840 857 874 891 909 927 946 965 984 1,004 9,197

Reimbursements sales 11 11 11 12 12 12 12 13 13 13 120

Linen Hire sales 1,785 1,821 1,857 1,894 1,932 1,971 2,010 2,050 2,091 2,133 19,545

Equipment Hire sales 420 428 437 446 455 464 473 482 492 502 4,599

Crockery Hire sales 6,615 6,747 6,882 7,020 7,160 7,303 7,449 7,598 7,750 7,905 72,430

Commissions sales 125 128 130 133 135 138 141 144 146 149 1,369

Catering sales 174,300 183,015 192,166 201,774 211,863 222,427 233,548 245,226 257,487 270,326 2,192,132

Banksia Retreat sales 24,150 24,633 25,126 25,628 26,141 26,662 27,195 27,739 28,294 28,858 264,427

Activities sales 3,360 3,427 3,496 3,566 3,637 3,710 3,784 3,859 3,937 4,015 36,790

Group Accommodation sales 70,000 73,500 77,175 81,034 85,085 89,328 93,794 98,484 103,408 108,565 880,374

Cabin Accommodation sales 101,520 106,596 111,926 117,522 123,398 129,551 136,029 142,830 149,972 157,450 1,276,794

Total Revenue(inc GST) 392,576 410,802 429,911 449,948 470,957 492,926 516,024 540,245 565,646 592,212 4,861,247

Less GST Collectable 35,689 37,346 39,083 40,904 42,814 44,811 46,911 49,113 51,422 53,837 441,932

Total Revenue(exc GST) 356,887 373,456 390,829 409,043 428,142 448,114 469,112 491,132 514,224 538,375 4,419,316

Gross Profit 233,489 244,325 255,686 267,598 280,089 293,150 306,882 321,282 336,383 352,176

Net Profit After Tax -13,816 -9,163 -4,139 1,277 7,110 13,365 20,102 27,333 35,085 58,143

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 -194,511 -273,394 -277,302 -275,780 -268,414 -254,778 -234,390 -206,756 -171,353

Cash Receipts 392,576 410,802 429,911 449,948 470,957 492,926 516,024 540,245 565,646 592,212

Cash Payments 587,087 489,685 433,819 448,427 463,590 479,290 495,636 512,611 530,243 533,359

Nett Cash Movement -194,511 -78,882 -3,908 1,521 7,367 13,636 20,388 27,634 35,403 58,854

Closing Bank Balance -194,511 -273,394 -277,302 -275,780 -268,414 -254,778 -234,390 -206,756 -171,353 -112,499

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 378,006 387,462 397,155 407,091 417,275 427,685 438,383 449,350 460,590 449,492

Net Cost of sales 130,700 133,974 137,330 140,770 144,296 147,900 151,604 155,401 159,292 155,458

Gross Margin 247,306 253,488 259,826 266,321 272,979 279,785 286,780 293,949 301,298 294,034

LESS EXPENSES (incl GST)

Sales & Marketing 6,900 7,073 7,249 7,431 7,616 7,806 8,001 8,201 8,406 8,616

Admin & Overhead 251,226 257,507 263,945 270,543 277,307 284,221 291,326 298,609 306,074 297,452

Total Expenses (inc GST) 258,126 264,579 271,194 277,974 284,923 292,027 299,327 306,811 314,481 306,068

Less GST payable 10,821 11,091 11,368 11,653 11,944 12,242 12,548 12,861 13,183 12,034

Total Expenses (exc GST) 247,306 253,488 259,826 266,321 272,979 279,785 286,780 293,949 301,298 294,034

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 96.3% 94.3% 92.4% 90.5% 88.6% 86.8% 85.0% 83.2% 81.4% 75.9%

as a % of sales budget

TOTAL REVENUE

Page 75: Camp Banksia Master Plan Report 120618 FINAL

18 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Banksia Park - Option One - 80% Funding

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Venue Hire sales 9,450 9,639 9,832 10,028 10,229 10,433 10,642 10,854 11,072 11,292 103,471

Other Income sales 840 857 874 891 909 927 946 965 984 1,004 9,197

Reimbursements sales 11 11 11 12 12 12 12 13 13 13 120

Linen Hire sales 1,785 1,821 1,857 1,894 1,932 1,971 2,010 2,050 2,091 2,133 19,545

Equipment Hire sales 420 428 437 446 455 464 473 482 492 502 4,599

Crockery Hire sales 6,615 6,747 6,882 7,020 7,160 7,303 7,449 7,598 7,750 7,905 72,430

Commissions sales 125 128 130 133 135 138 141 144 146 149 1,369

Catering sales 174,300 183,015 192,166 201,774 211,863 222,427 233,548 245,226 257,487 270,326 2,192,132

Banksia Retreat sales 24,150 24,633 25,126 25,628 26,141 26,662 27,195 27,739 28,294 28,858 264,427

Activities sales 3,360 3,427 3,496 3,566 3,637 3,710 3,784 3,859 3,937 4,015 36,790

Group Accommodation sales 70,000 73,500 77,175 81,034 85,085 89,328 93,794 98,484 103,408 108,565 880,374

Cabin Accommodation sales 101,520 106,596 111,926 117,522 123,398 129,551 136,029 142,830 149,972 157,450 1,276,794

Total Revenue(inc GST) 392,576 410,802 429,911 449,948 470,957 492,926 516,024 540,245 565,646 592,212 4,861,247

Less GST Collectable 35,689 37,346 39,083 40,904 42,814 44,811 46,911 49,113 51,422 53,837 441,932

Total Revenue(exc GST) 356,887 373,456 390,829 409,043 428,142 448,114 469,112 491,132 514,224 538,375 4,419,316

Gross Profit 233,489 244,325 255,686 267,598 280,089 293,150 306,882 321,282 336,383 352,176

Net Profit After Tax -13,816 -9,163 -4,139 1,277 7,110 13,365 20,102 27,333 35,085 58,143

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 -378,865 -527,632 -531,540 -530,019 -522,652 -509,016 -488,628 -460,994 -425,591

Cash Receipts 392,576 410,802 429,911 449,948 470,957 492,926 516,024 540,245 565,646 592,212

Cash Payments 771,441 559,569 433,819 448,427 463,590 479,290 495,636 512,611 530,243 533,359

Nett Cash Movement -378,865 -148,767 -3,908 1,521 7,367 13,636 20,388 27,634 35,403 58,854

Closing Bank Balance -378,865 -527,632 -531,540 -530,019 -522,652 -509,016 -488,628 -460,994 -425,591 -366,737

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 378,006 387,462 397,155 407,091 417,275 427,685 438,383 449,350 460,590 449,492

Net Cost of sales 130,700 133,974 137,330 140,770 144,296 147,900 151,604 155,401 159,292 155,458

Gross Margin 247,306 253,488 259,826 266,321 272,979 279,785 286,780 293,949 301,298 294,034

LESS EXPENSES (incl GST)

Sales & Marketing 6,900 7,073 7,249 7,431 7,616 7,806 8,001 8,201 8,406 8,616

Admin & Overhead 251,226 257,507 263,945 270,543 277,307 284,221 291,326 298,609 306,074 297,452

Total Expenses (inc GST) 258,126 264,579 271,194 277,974 284,923 292,027 299,327 306,811 314,481 306,068

Less GST payable 10,821 11,091 11,368 11,653 11,944 12,242 12,548 12,861 13,183 12,034

Total Expenses (exc GST) 247,306 253,488 259,826 266,321 272,979 279,785 286,780 293,949 301,298 294,034

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 96.3% 94.3% 92.4% 90.5% 88.6% 86.8% 85.0% 83.2% 81.4% 75.9%

as a % of sales budget

TOTAL REVENUE

Page 76: Camp Banksia Master Plan Report 120618 FINAL

19 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Banksia Park - Option One - 70% Funding

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Venue Hire sales 9,450 9,639 9,832 10,028 10,229 10,433 10,642 10,854 11,072 11,292 103,471

Other Income sales 840 857 874 891 909 927 946 965 984 1,004 9,197

Reimbursements sales 11 11 11 12 12 12 12 13 13 13 120

Linen Hire sales 1,785 1,821 1,857 1,894 1,932 1,971 2,010 2,050 2,091 2,133 19,545

Equipment Hire sales 420 428 437 446 455 464 473 482 492 502 4,599

Crockery Hire sales 6,615 6,747 6,882 7,020 7,160 7,303 7,449 7,598 7,750 7,905 72,430

Commissions sales 125 128 130 133 135 138 141 144 146 149 1,369

Catering sales 174,300 183,015 192,166 201,774 211,863 222,427 233,548 245,226 257,487 270,326 2,192,132

Banksia Retreat sales 24,150 24,633 25,126 25,628 26,141 26,662 27,195 27,739 28,294 28,858 264,427

Activities sales 3,360 3,427 3,496 3,566 3,637 3,710 3,784 3,859 3,937 4,015 36,790

Group Accommodation sales 70,000 73,500 77,175 81,034 85,085 89,328 93,794 98,484 103,408 108,565 880,374

Cabin Accommodation sales 101,520 106,596 111,926 117,522 123,398 129,551 136,029 142,830 149,972 157,450 1,276,794

Total Revenue(inc GST) 392,576 410,802 429,911 449,948 470,957 492,926 516,024 540,245 565,646 592,212 4,861,247

Less GST Collectable 35,689 37,346 39,083 40,904 42,814 44,811 46,911 49,113 51,422 53,837 441,932

Total Revenue(exc GST) 356,887 373,456 390,829 409,043 428,142 448,114 469,112 491,132 514,224 538,375 4,419,316

Gross Profit 233,489 244,325 255,686 267,598 280,089 293,150 306,882 321,282 336,383 352,176

Net Profit After Tax -13,816 -9,163 -4,139 1,277 7,110 13,365 20,102 27,333 35,085 58,143

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 -563,218 -781,870 -785,778 -784,257 -776,890 -763,255 -742,867 -715,232 -679,830

Cash Receipts 392,576 410,802 429,911 449,948 470,957 492,926 516,024 540,245 565,646 592,212

Cash Payments 955,794 629,454 433,819 448,427 463,590 479,290 495,636 512,611 530,243 533,359

Nett Cash Movement -563,218 -218,652 -3,908 1,521 7,367 13,636 20,388 27,634 35,403 58,854

Closing Bank Balance -563,218 -781,870 -785,778 -784,257 -776,890 -763,255 -742,867 -715,232 -679,830 -620,976

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 378,006 387,462 397,155 407,091 417,275 427,685 438,383 449,350 460,590 449,492

Net Cost of sales 130,700 133,974 137,330 140,770 144,296 147,900 151,604 155,401 159,292 155,458

Gross Margin 247,306 253,488 259,826 266,321 272,979 279,785 286,780 293,949 301,298 294,034

LESS EXPENSES (incl GST)

Sales & Marketing 6,900 7,073 7,249 7,431 7,616 7,806 8,001 8,201 8,406 8,616

Admin & Overhead 251,226 257,507 263,945 270,543 277,307 284,221 291,326 298,609 306,074 297,452

Total Expenses (inc GST) 258,126 264,579 271,194 277,974 284,923 292,027 299,327 306,811 314,481 306,068

Less GST payable 10,821 11,091 11,368 11,653 11,944 12,242 12,548 12,861 13,183 12,034

Total Expenses (exc GST) 247,306 253,488 259,826 266,321 272,979 279,785 286,780 293,949 301,298 294,034

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 96.3% 94.3% 92.4% 90.5% 88.6% 86.8% 85.0% 83.2% 81.4% 75.9%

as a % of sales budget

TOTAL REVENUE

Page 77: Camp Banksia Master Plan Report 120618 FINAL

20 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Banksia Park - Option Two - 100% Funding

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Venue Hire sales 9,450 9,639 9,832 10,028 10,229 10,433 10,642 10,854 11,072 11,292 103,471

Other Income sales 840 857 874 891 909 927 946 965 984 1,004 9,197

Reimbursements sales 11 11 11 12 12 12 12 13 13 13 120

Linen Hire sales 1,785 1,821 1,857 1,894 1,932 1,971 2,010 2,050 2,091 2,133 19,545

Equipment Hire sales 420 428 437 446 455 464 473 482 492 502 4,599

Crockery Hire sales 6,615 6,747 6,882 7,020 7,160 7,303 7,449 7,598 7,750 7,905 72,430

Commissions sales 125 128 130 133 135 138 141 144 146 149 1,369

Catering sales 174,300 183,015 192,166 201,774 211,863 222,427 233,548 245,226 257,487 270,326 2,192,132

Banksia Retreat sales 24,150 24,633 25,126 25,628 26,141 26,662 27,195 27,739 28,294 28,858 264,427

Activities sales 3,360 3,427 3,496 3,566 3,637 3,710 3,784 3,859 3,937 4,015 36,790

Group Accommodation sales 105,000 110,250 115,763 121,551 127,628 133,992 140,692 147,726 155,113 162,847 1,320,561

Cabin Accommodation sales 101,520 106,596 111,926 117,522 123,398 129,551 136,029 142,830 149,972 157,450 1,276,794

Total Revenue(inc GST) 427,576 447,552 468,499 490,465 513,499 537,590 562,921 589,487 617,351 646,495 5,301,435

Less GST Collectable 38,871 40,687 42,591 44,588 46,682 48,872 51,175 53,590 56,123 58,772 481,949

Total Revenue(exc GST) 388,705 406,866 425,908 445,877 466,818 488,718 511,746 535,898 561,228 587,723 4,819,486

Gross Profit 254,292 266,168 278,621 291,680 305,375 319,697 334,756 350,549 367,114 384,440

Net Profit After Tax -3,441 1,992 7,841 14,130 20,886 28,115 35,885 44,206 53,112 78,897

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 500 2,672 10,766 25,163 46,330 74,741 110,938 155,475 208,936

Cash Receipts 427,576 447,552 468,499 490,465 513,499 537,590 562,921 589,487 617,351 646,495

Cash Payments 427,076 445,380 460,405 476,068 492,332 509,179 526,723 544,951 563,890 566,816

Nett Cash Movement 500 2,172 8,094 14,397 21,167 28,411 36,198 44,537 53,461 79,679

Closing Bank Balance 500 2,672 10,766 25,163 46,330 74,741 110,938 155,475 208,936 288,615

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 393,965 403,821 413,922 424,277 434,890 445,739 456,889 468,318 480,032 467,106

Net Cost of sales 136,232 139,644 143,142 146,727 150,401 154,157 158,018 161,975 166,030 161,564

Gross Margin 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

LESS EXPENSES (incl GST)

Sales & Marketing 6,900 7,073 7,249 7,431 7,616 7,806 8,001 8,201 8,406 8,616

Admin & Overhead 262,696 269,264 275,995 282,895 289,967 297,197 304,627 312,242 320,048 310,112

Total Expenses (inc GST) 269,596 276,336 283,244 290,326 297,584 305,003 312,628 320,444 328,455 318,728

Less GST payable 11,863 12,160 12,464 12,775 13,095 13,421 13,757 14,101 14,453 13,185

Total Expenses (exc GST) 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 92.1% 90.2% 88.4% 86.5% 84.7% 82.9% 81.2% 79.4% 77.8% 72.3%

as a % of sales budget

TOTAL REVENUE

Page 78: Camp Banksia Master Plan Report 120618 FINAL

21 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Banksia Park - Option Two - 90% Funding

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Venue Hire sales 9,450 9,639 9,832 10,028 10,229 10,433 10,642 10,854 11,072 11,292 103,471

Other Income sales 840 857 874 891 909 927 946 965 984 1,004 9,197

Reimbursements sales 11 11 11 12 12 12 12 13 13 13 120

Linen Hire sales 1,785 1,821 1,857 1,894 1,932 1,971 2,010 2,050 2,091 2,133 19,545

Equipment Hire sales 420 428 437 446 455 464 473 482 492 502 4,599

Crockery Hire sales 6,615 6,747 6,882 7,020 7,160 7,303 7,449 7,598 7,750 7,905 72,430

Commissions sales 125 128 130 133 135 138 141 144 146 149 1,369

Catering sales 174,300 183,015 192,166 201,774 211,863 222,427 233,548 245,226 257,487 270,326 2,192,132

Banksia Retreat sales 24,150 24,633 25,126 25,628 26,141 26,662 27,195 27,739 28,294 28,858 264,427

Activities sales 3,360 3,427 3,496 3,566 3,637 3,710 3,784 3,859 3,937 4,015 36,790

Group Accommodation sales 105,000 110,250 115,763 121,551 127,628 133,992 140,692 147,726 155,113 162,847 1,320,561

Cabin Accommodation sales 101,520 106,596 111,926 117,522 123,398 129,551 136,029 142,830 149,972 157,450 1,276,794

Total Revenue(inc GST) 427,576 447,552 468,499 490,465 513,499 537,590 562,921 589,487 617,351 646,495 5,301,435

Less GST Collectable 38,871 40,687 42,591 44,588 46,682 48,872 51,175 53,590 56,123 58,772 481,949

Total Revenue(exc GST) 388,705 406,866 425,908 445,877 466,818 488,718 511,746 535,898 561,228 587,723 4,819,486

Gross Profit 254,292 266,168 278,621 291,680 305,375 319,697 334,756 350,549 367,114 384,440

Net Profit After Tax -3,441 1,992 7,841 14,130 20,886 28,115 35,885 44,206 53,112 78,897

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 -241,588 -322,696 -314,602 -300,205 -279,038 -250,627 -214,429 -169,893 -116,432

Cash Receipts 427,576 447,552 468,499 490,465 513,499 537,590 562,921 589,487 617,351 646,495

Cash Payments 669,164 528,659 460,405 476,068 492,332 509,179 526,723 544,951 563,890 566,816

Nett Cash Movement -241,588 -81,107 8,094 14,397 21,167 28,411 36,198 44,537 53,461 79,679

Closing Bank Balance -241,588 -322,696 -314,602 -300,205 -279,038 -250,627 -214,429 -169,893 -116,432 -36,753

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 393,965 403,821 413,922 424,277 434,890 445,739 456,889 468,318 480,032 467,106

Net Cost of sales 136,232 139,644 143,142 146,727 150,401 154,157 158,018 161,975 166,030 161,564

Gross Margin 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

LESS EXPENSES (incl GST)

Sales & Marketing 6,900 7,073 7,249 7,431 7,616 7,806 8,001 8,201 8,406 8,616

Admin & Overhead 262,696 269,264 275,995 282,895 289,967 297,197 304,627 312,242 320,048 310,112

Total Expenses (inc GST) 269,596 276,336 283,244 290,326 297,584 305,003 312,628 320,444 328,455 318,728

Less GST payable 11,863 12,160 12,464 12,775 13,095 13,421 13,757 14,101 14,453 13,185

Total Expenses (exc GST) 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 92.1% 90.2% 88.4% 86.5% 84.7% 82.9% 81.2% 79.4% 77.8% 72.3%

as a % of sales budget

TOTAL REVENUE

Page 79: Camp Banksia Master Plan Report 120618 FINAL

22 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Banksia Park - Option Two - 80% Funding

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Venue Hire sales 9,450 9,639 9,832 10,028 10,229 10,433 10,642 10,854 11,072 11,292 103,471

Other Income sales 840 857 874 891 909 927 946 965 984 1,004 9,197

Reimbursements sales 11 11 11 12 12 12 12 13 13 13 120

Linen Hire sales 1,785 1,821 1,857 1,894 1,932 1,971 2,010 2,050 2,091 2,133 19,545

Equipment Hire sales 420 428 437 446 455 464 473 482 492 502 4,599

Crockery Hire sales 6,615 6,747 6,882 7,020 7,160 7,303 7,449 7,598 7,750 7,905 72,430

Commissions sales 125 128 130 133 135 138 141 144 146 149 1,369

Catering sales 174,300 183,015 192,166 201,774 211,863 222,427 233,548 245,226 257,487 270,326 2,192,132

Banksia Retreat sales 24,150 24,633 25,126 25,628 26,141 26,662 27,195 27,739 28,294 28,858 264,427

Activities sales 3,360 3,427 3,496 3,566 3,637 3,710 3,784 3,859 3,937 4,015 36,790

Group Accommodation sales 105,000 110,250 115,763 121,551 127,628 133,992 140,692 147,726 155,113 162,847 1,320,561

Cabin Accommodation sales 101,520 106,596 111,926 117,522 123,398 129,551 136,029 142,830 149,972 157,450 1,276,794

Total Revenue(inc GST) 427,576 447,552 468,499 490,465 513,499 537,590 562,921 589,487 617,351 646,495 5,301,435

Less GST Collectable 38,871 40,687 42,591 44,588 46,682 48,872 51,175 53,590 56,123 58,772 481,949

Total Revenue(exc GST) 388,705 406,866 425,908 445,877 466,818 488,718 511,746 535,898 561,228 587,723 4,819,486

Gross Profit 254,292 266,168 278,621 291,680 305,375 319,697 334,756 350,549 367,114 384,440

Net Profit After Tax -3,441 1,992 7,841 14,130 20,886 28,115 35,885 44,206 53,112 78,897

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 -483,677 -648,063 -639,970 -625,573 -604,406 -575,995 -539,797 -495,260 -441,800

Cash Receipts 427,576 447,552 468,499 490,465 513,499 537,590 562,921 589,487 617,351 646,495

Cash Payments 911,253 611,939 460,405 476,068 492,332 509,179 526,723 544,951 563,890 566,816

Nett Cash Movement -483,677 -164,387 8,094 14,397 21,167 28,411 36,198 44,537 53,461 79,679

Closing Bank Balance -483,677 -648,063 -639,970 -625,573 -604,406 -575,995 -539,797 -495,260 -441,800 -362,121

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 393,965 403,821 413,922 424,277 434,890 445,739 456,889 468,318 480,032 467,106

Net Cost of sales 136,232 139,644 143,142 146,727 150,401 154,157 158,018 161,975 166,030 161,564

Gross Margin 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

LESS EXPENSES (incl GST)

Sales & Marketing 6,900 7,073 7,249 7,431 7,616 7,806 8,001 8,201 8,406 8,616

Admin & Overhead 262,696 269,264 275,995 282,895 289,967 297,197 304,627 312,242 320,048 310,112

Total Expenses (inc GST) 269,596 276,336 283,244 290,326 297,584 305,003 312,628 320,444 328,455 318,728

Less GST payable 11,863 12,160 12,464 12,775 13,095 13,421 13,757 14,101 14,453 13,185

Total Expenses (exc GST) 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 92.1% 90.2% 88.4% 86.5% 84.7% 82.9% 81.2% 79.4% 77.8% 72.3%

as a % of sales budget

TOTAL REVENUE

Page 80: Camp Banksia Master Plan Report 120618 FINAL

23 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Banksia Park - Option Two - 70% Funding

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Venue Hire sales 9,450 9,639 9,832 10,028 10,229 10,433 10,642 10,854 11,072 11,292 103,471

Other Income sales 840 857 874 891 909 927 946 965 984 1,004 9,197

Reimbursements sales 11 11 11 12 12 12 12 13 13 13 120

Linen Hire sales 1,785 1,821 1,857 1,894 1,932 1,971 2,010 2,050 2,091 2,133 19,545

Equipment Hire sales 420 428 437 446 455 464 473 482 492 502 4,599

Crockery Hire sales 6,615 6,747 6,882 7,020 7,160 7,303 7,449 7,598 7,750 7,905 72,430

Commissions sales 125 128 130 133 135 138 141 144 146 149 1,369

Catering sales 174,300 183,015 192,166 201,774 211,863 222,427 233,548 245,226 257,487 270,326 2,192,132

Banksia Retreat sales 24,150 24,633 25,126 25,628 26,141 26,662 27,195 27,739 28,294 28,858 264,427

Activities sales 3,360 3,427 3,496 3,566 3,637 3,710 3,784 3,859 3,937 4,015 36,790

Group Accommodation sales 105,000 110,250 115,763 121,551 127,628 133,992 140,692 147,726 155,113 162,847 1,320,561

Cabin Accommodation sales 101,520 106,596 111,926 117,522 123,398 129,551 136,029 142,830 149,972 157,450 1,276,794

Total Revenue(inc GST) 427,576 447,552 468,499 490,465 513,499 537,590 562,921 589,487 617,351 646,495 5,301,435

Less GST Collectable 38,871 40,687 42,591 44,588 46,682 48,872 51,175 53,590 56,123 58,772 481,949

Total Revenue(exc GST) 388,705 406,866 425,908 445,877 466,818 488,718 511,746 535,898 561,228 587,723 4,819,486

Gross Profit 254,292 266,168 278,621 291,680 305,375 319,697 334,756 350,549 367,114 384,440

Net Profit After Tax -3,441 1,992 7,841 14,130 20,886 28,115 35,885 44,206 53,112 78,897

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 -725,765 -973,431 -965,338 -950,941 -929,773 -901,362 -865,165 -820,628 -767,167

Cash Receipts 427,576 447,552 468,499 490,465 513,499 537,590 562,921 589,487 617,351 646,495

Cash Payments 1,153,341 695,218 460,405 476,068 492,332 509,179 526,723 544,951 563,890 566,816

Nett Cash Movement -725,765 -247,666 8,094 14,397 21,167 28,411 36,198 44,537 53,461 79,679

Closing Bank Balance -725,765 -973,431 -965,338 -950,941 -929,773 -901,362 -865,165 -820,628 -767,167 -687,489

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 393,965 403,821 413,922 424,277 434,890 445,739 456,889 468,318 480,032 467,106

Net Cost of sales 136,232 139,644 143,142 146,727 150,401 154,157 158,018 161,975 166,030 161,564

Gross Margin 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

LESS EXPENSES (incl GST)

Sales & Marketing 6,900 7,073 7,249 7,431 7,616 7,806 8,001 8,201 8,406 8,616

Admin & Overhead 262,696 269,264 275,995 282,895 289,967 297,197 304,627 312,242 320,048 310,112

Total Expenses (inc GST) 269,596 276,336 283,244 290,326 297,584 305,003 312,628 320,444 328,455 318,728

Less GST payable 11,863 12,160 12,464 12,775 13,095 13,421 13,757 14,101 14,453 13,185

Total Expenses (exc GST) 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 92.1% 90.2% 88.4% 86.5% 84.7% 82.9% 81.2% 79.4% 77.8% 72.3%

as a % of sales budget

TOTAL REVENUE

Page 81: Camp Banksia Master Plan Report 120618 FINAL

24 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Camp Banksia - Option Four 100% Funding

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

AFL Lease sales 6,600 6,765 6,934 7,107 7,285 7,467 7,653 7,845 8,041 8,241 73,939

Cricket Lease sales 7,260 7,260 7,260 7,260 7,260 7,260 7,260 7,260 7,260 7,260 72,600

Total Revenue(inc GST) 13,860 14,025 14,194 14,367 14,545 14,727 14,913 15,105 15,301 15,501 146,539

Less GST Collectable 1,260 1,275 1,290 1,306 1,322 1,339 1,356 1,373 1,391 1,409 13,322

Total Revenue(exc GST) 12,600 12,750 12,904 13,061 13,223 13,388 13,558 13,732 13,910 14,092 133,217

Gross Profit 12,600 12,750 12,904 13,061 13,223 13,388 13,558 13,732 13,910 14,092

Net Profit After Tax -229,862 -235,673 -241,629 -247,731 -253,985 -260,376 -266,943 -273,672 -280,568 -253,098

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 -235,608 -471,549 -713,330 -961,217 -1,215,361 -1,475,900 -1,743,011 -2,016,854 -2,297,598

Cash Receipts 13,860 14,025 14,194 14,367 14,545 14,727 14,913 15,105 15,301 15,501

Cash Payments 249,468 249,966 255,975 262,255 268,690 275,266 282,024 288,948 296,045 267,899

Nett Cash Movement -235,608 -235,941 -241,781 -247,887 -254,145 -260,539 -267,111 -273,844 -280,744 -252,398

Closing Bank Balance -235,608 -471,549 -713,330 -961,217 -1,215,361 -1,475,900 -1,743,011 -2,016,854 -2,297,598 -2,549,996

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 242,462 248,423 254,532 260,793 267,208 273,764 280,500 287,404 294,478 267,190

Net Cost of sales 0 0 0 0 0 0 0 0 0 0

Gross Margin 242,462 248,423 254,532 260,793 267,208 273,764 280,500 287,404 294,478 267,190

LESS EXPENSES (incl GST)

Sales & Marketing 0 0 0 0 0 0 0 0 0 0

Admin & Overhead 266,708 273,266 279,986 286,872 293,929 301,140 308,551 316,144 323,926 293,910

Total Expenses (inc GST) 266,708 273,266 279,986 286,872 293,929 301,140 308,551 316,144 323,926 293,910

Less GST payable 24,246 24,842 25,453 26,079 26,721 27,376 28,050 28,740 29,448 26,719

Total Expenses (exc GST) 242,462 248,423 254,532 260,793 267,208 273,764 280,500 287,404 294,478 267,190

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 1749.4% 1771.3% 1793.2% 1815.2% 1837.1% 1859.0% 1880.9% 1902.7% 1924.6% 1723.7%

as a % of sales budget

TOTAL REVENUE

Page 82: Camp Banksia Master Plan Report 120618 FINAL

25 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Camp Banksia - Option Four 90% funded

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

AFL Lease sales 6,600 6,765 6,934 7,107 7,285 7,467 7,653 7,845 8,041 8,241 73,939

Cricket Lease sales 7,260 7,260 7,260 7,260 7,260 7,260 7,260 7,260 7,260 7,260 72,600

Total Revenue(inc GST) 13,860 14,025 14,194 14,367 14,545 14,727 14,913 15,105 15,301 15,501 146,539

Less GST Collectable 1,260 1,275 1,290 1,306 1,322 1,339 1,356 1,373 1,391 1,409 13,322

Total Revenue(exc GST) 12,600 12,750 12,904 13,061 13,223 13,388 13,558 13,732 13,910 14,092 133,217

Gross Profit 12,600 12,750 12,904 13,061 13,223 13,388 13,558 13,732 13,910 14,092

Net Profit After Tax -229,862 -235,673 -241,629 -247,731 -253,985 -260,376 -266,943 -273,672 -280,568 -253,098

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 -343,090 -1,167,935 -1,409,716 -1,657,603 -1,911,748 -2,172,286 -2,439,397 -2,713,241 -2,993,984

Cash Receipts 13,860 14,025 14,194 14,367 14,545 14,727 14,913 15,105 15,301 15,501

Cash Payments 356,950 838,870 255,975 262,255 268,690 275,266 282,024 288,948 296,045 267,899

Nett Cash Movement -343,090 -824,845 -241,781 -247,887 -254,145 -260,539 -267,111 -273,844 -280,744 -252,398

Closing Bank Balance -343,090 -1,167,935 -1,409,716 -1,657,603 -1,911,748 -2,172,286 -2,439,397 -2,713,241 -2,993,984 -3,246,382

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 242,462 248,423 254,532 260,793 267,208 273,764 280,500 287,404 294,478 267,190

Net Cost of sales 0 0 0 0 0 0 0 0 0 0

Gross Margin 242,462 248,423 254,532 260,793 267,208 273,764 280,500 287,404 294,478 267,190

LESS EXPENSES (incl GST)

Sales & Marketing 0 0 0 0 0 0 0 0 0 0

Admin & Overhead 266,708 273,266 279,986 286,872 293,929 301,140 308,551 316,144 323,926 293,910

Total Expenses (inc GST) 266,708 273,266 279,986 286,872 293,929 301,140 308,551 316,144 323,926 293,910

Less GST payable 24,246 24,842 25,453 26,079 26,721 27,376 28,050 28,740 29,448 26,719

Total Expenses (exc GST) 242,462 248,423 254,532 260,793 267,208 273,764 280,500 287,404 294,478 267,190

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 1749.4% 1771.3% 1793.2% 1815.2% 1837.1% 1859.0% 1880.9% 1902.7% 1924.6% 1723.7%

as a % of sales budget

TOTAL REVENUE

Page 83: Camp Banksia Master Plan Report 120618 FINAL

26 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Camp Banksia - Option Four 80% funded

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

AFL Lease sales 6,600 6,765 6,934 7,107 7,285 7,467 7,653 7,845 8,041 8,241 73,939

Cricket Lease sales 7,260 7,260 7,260 7,260 7,260 7,260 7,260 7,260 7,260 7,260 72,600

Total Revenue(inc GST) 13,860 14,025 14,194 14,367 14,545 14,727 14,913 15,105 15,301 15,501 146,539

Less GST Collectable 1,260 1,275 1,290 1,306 1,322 1,339 1,356 1,373 1,391 1,409 13,322

Total Revenue(exc GST) 12,600 12,750 12,904 13,061 13,223 13,388 13,558 13,732 13,910 14,092 133,217

Gross Profit 12,600 12,750 12,904 13,061 13,223 13,388 13,558 13,732 13,910 14,092

Net Profit After Tax -229,862 -235,673 -241,629 -247,731 -253,985 -260,376 -266,943 -273,672 -280,568 -253,098

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 -450,572 -1,864,322 -2,106,102 -2,353,989 -2,608,134 -2,868,673 -3,135,783 -3,409,627 -3,690,371

Cash Receipts 13,860 14,025 14,194 14,367 14,545 14,727 14,913 15,105 15,301 15,501

Cash Payments 464,432 1,427,775 255,975 262,255 268,690 275,266 282,024 288,948 296,045 267,899

Nett Cash Movement -450,572 -1,413,750 -241,781 -247,887 -254,145 -260,539 -267,111 -273,844 -280,744 -252,398

Closing Bank Balance -450,572 -1,864,322 -2,106,102 -2,353,989 -2,608,134 -2,868,673 -3,135,783 -3,409,627 -3,690,371 -3,942,768

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 242,462 248,423 254,532 260,793 267,208 273,764 280,500 287,404 294,478 267,190

Net Cost of sales 0 0 0 0 0 0 0 0 0 0

Gross Margin 242,462 248,423 254,532 260,793 267,208 273,764 280,500 287,404 294,478 267,190

LESS EXPENSES (incl GST)

Sales & Marketing 0 0 0 0 0 0 0 0 0 0

Admin & Overhead 266,708 273,266 279,986 286,872 293,929 301,140 308,551 316,144 323,926 293,910

Total Expenses (inc GST) 266,708 273,266 279,986 286,872 293,929 301,140 308,551 316,144 323,926 293,910

Less GST payable 24,246 24,842 25,453 26,079 26,721 27,376 28,050 28,740 29,448 26,719

Total Expenses (exc GST) 242,462 248,423 254,532 260,793 267,208 273,764 280,500 287,404 294,478 267,190

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 1749.4% 1771.3% 1793.2% 1815.2% 1837.1% 1859.0% 1880.9% 1902.7% 1924.6% 1723.7%

as a % of sales budget

TOTAL REVENUE

Page 84: Camp Banksia Master Plan Report 120618 FINAL

27 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Camp Banksia - Option Four 70% funded

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

AFL Lease sales 6,600 6,765 6,934 7,107 7,285 7,467 7,653 7,845 8,041 8,241 73,939

Cricket Lease sales 7,260 7,260 7,260 7,260 7,260 7,260 7,260 7,260 7,260 7,260 72,600

Total Revenue(inc GST) 13,860 14,025 14,194 14,367 14,545 14,727 14,913 15,105 15,301 15,501 146,539

Less GST Collectable 1,260 1,275 1,290 1,306 1,322 1,339 1,356 1,373 1,391 1,409 13,322

Total Revenue(exc GST) 12,600 12,750 12,904 13,061 13,223 13,388 13,558 13,732 13,910 14,092 133,217

Gross Profit 12,600 12,750 12,904 13,061 13,223 13,388 13,558 13,732 13,910 14,092

Net Profit After Tax -229,862 -235,673 -241,629 -247,731 -253,985 -260,376 -266,943 -273,672 -280,568 -253,098

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 -558,054 -2,560,708 -2,802,489 -3,050,376 -3,304,520 -3,565,059 -3,832,170 -4,106,013 -4,386,757

Cash Receipts 13,860 14,025 14,194 14,367 14,545 14,727 14,913 15,105 15,301 15,501

Cash Payments 571,914 2,016,679 255,975 262,255 268,690 275,266 282,024 288,948 296,045 267,899

Nett Cash Movement -558,054 -2,002,654 -241,781 -247,887 -254,145 -260,539 -267,111 -273,844 -280,744 -252,398

Closing Bank Balance -558,054 -2,560,708 -2,802,489 -3,050,376 -3,304,520 -3,565,059 -3,832,170 -4,106,013 -4,386,757 -4,639,155

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 242,462 248,423 254,532 260,793 267,208 273,764 280,500 287,404 294,478 267,190

Net Cost of sales 0 0 0 0 0 0 0 0 0 0

Gross Margin 242,462 248,423 254,532 260,793 267,208 273,764 280,500 287,404 294,478 267,190

LESS EXPENSES (incl GST)

Sales & Marketing 0 0 0 0 0 0 0 0 0 0

Admin & Overhead 266,708 273,266 279,986 286,872 293,929 301,140 308,551 316,144 323,926 293,910

Total Expenses (inc GST) 266,708 273,266 279,986 286,872 293,929 301,140 308,551 316,144 323,926 293,910

Less GST payable 24,246 24,842 25,453 26,079 26,721 27,376 28,050 28,740 29,448 26,719

Total Expenses (exc GST) 242,462 248,423 254,532 260,793 267,208 273,764 280,500 287,404 294,478 267,190

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 1749.4% 1771.3% 1793.2% 1815.2% 1837.1% 1859.0% 1880.9% 1902.7% 1924.6% 1723.7%

as a % of sales budget

TOTAL REVENUE

Page 85: Camp Banksia Master Plan Report 120618 FINAL

28 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Appendix B

Option Two Cashflow Projections by Revenue Scenario

Page 86: Camp Banksia Master Plan Report 120618 FINAL

29 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Banksia Park - Option Two - 100% Funding - Best Case

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Venue Hire sales 10,868 11,085 11,307 11,533 11,763 11,998 12,238 12,483 12,732 12,986 118,992

Other Income sales 966 985 1,005 1,025 1,046 1,066 1,088 1,110 1,132 1,154 10,577

Reimbursements sales 13 13 13 13 14 14 14 15 15 15 139

Linen Hire sales 2,053 2,094 2,136 2,178 2,222 2,266 2,312 2,358 2,405 2,453 22,476

Equipment Hire sales 483 493 503 513 523 533 544 555 566 577 5,289

Crockery Hire sales 7,607 7,759 7,915 8,073 8,234 8,399 8,567 8,738 8,913 9,090 83,294

Commissions sales 144 147 150 153 156 159 162 165 168 172 1,574

Catering sales 200,445 210,467 220,991 232,040 243,642 255,791 268,581 282,010 296,110 310,875 2,520,951

Banksia Retreat sales 27,773 28,328 28,895 29,472 30,062 30,661 31,275 31,900 32,538 33,187 304,091

Activities sales 3,864 3,941 4,020 4,101 4,183 4,266 4,351 4,438 4,527 4,617 42,308

Group Accommodation sales 120,750 126,788 133,127 139,783 146,772 154,091 161,795 169,885 178,380 187,274 1,518,645

Cabin Accommodation sales 116,748 122,585 128,715 135,150 141,908 148,984 156,433 164,255 172,468 181,067 1,468,313

Total Revenue(inc GST) 491,712 514,685 538,774 564,034 590,524 618,228 647,359 677,910 709,953 743,469 6,096,650

Less GST Collectable 44,701 46,790 48,979 51,276 53,684 56,203 58,851 61,628 64,541 67,588 554,241

Total Revenue(exc GST) 447,011 467,895 489,794 512,758 536,840 562,026 588,508 616,282 645,412 675,881 5,542,409

Gross Profit 292,436 306,093 320,415 335,432 351,181 367,651 384,969 403,132 422,181 442,106

Net Profit After Tax 34,703 41,917 49,634 57,882 66,692 76,069 86,098 96,789 108,179 136,563

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 39,679 81,824 131,761 189,962 256,989 333,412 419,882 517,064 625,658

Cash Receipts 491,712 514,685 538,774 564,034 590,524 618,228 647,359 677,910 709,953 743,469

Cash Payments 452,033 472,540 488,837 505,833 523,496 541,806 560,888 580,729 601,360 606,055

Nett Cash Movement 39,679 42,145 49,936 58,201 67,028 76,423 86,471 97,182 108,593 137,414

Closing Bank Balance 39,679 81,824 131,761 189,962 256,989 333,412 419,882 517,064 625,658 763,071

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 393,965 403,821 413,922 424,277 434,890 445,739 456,889 468,318 480,032 467,106

Net Cost of sales 136,232 139,644 143,142 146,727 150,401 154,157 158,018 161,975 166,030 161,564

Gross Margin 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

LESS EXPENSES (incl GST)

Sales & Marketing 6,900 7,073 7,249 7,431 7,616 7,806 8,001 8,201 8,406 8,616

Admin & Overhead 262,696 269,264 275,995 282,895 289,967 297,197 304,627 312,242 320,048 310,112

Total Expenses (inc GST) 269,596 276,336 283,244 290,326 297,584 305,003 312,628 320,444 328,455 318,728

Less GST payable 11,863 12,160 12,464 12,775 13,095 13,421 13,757 14,101 14,453 13,185

Total Expenses (exc GST) 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 80.1% 78.5% 76.8% 75.2% 73.6% 72.1% 70.6% 69.1% 67.6% 62.8%

as a % of sales budget

TOTAL REVENUE

Page 87: Camp Banksia Master Plan Report 120618 FINAL

30 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Banksia Park - Option Two - 100% Funding

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Venue Hire sales 9,450 9,639 9,832 10,028 10,229 10,433 10,642 10,854 11,072 11,292 103,471

Other Income sales 840 857 874 891 909 927 946 965 984 1,004 9,197

Reimbursements sales 11 11 11 12 12 12 12 13 13 13 120

Linen Hire sales 1,785 1,821 1,857 1,894 1,932 1,971 2,010 2,050 2,091 2,133 19,545

Equipment Hire sales 420 428 437 446 455 464 473 482 492 502 4,599

Crockery Hire sales 6,615 6,747 6,882 7,020 7,160 7,303 7,449 7,598 7,750 7,905 72,430

Commissions sales 125 128 130 133 135 138 141 144 146 149 1,369

Catering sales 174,300 183,015 192,166 201,774 211,863 222,427 233,548 245,226 257,487 270,326 2,192,132

Banksia Retreat sales 24,150 24,633 25,126 25,628 26,141 26,662 27,195 27,739 28,294 28,858 264,427

Activities sales 3,360 3,427 3,496 3,566 3,637 3,710 3,784 3,859 3,937 4,015 36,790

Group Accommodation sales 105,000 110,250 115,763 121,551 127,628 133,992 140,692 147,726 155,113 162,847 1,320,561

Cabin Accommodation sales 101,520 106,596 111,926 117,522 123,398 129,551 136,029 142,830 149,972 157,450 1,276,794

Total Revenue(inc GST) 427,576 447,552 468,499 490,465 513,499 537,590 562,921 589,487 617,351 646,495 5,301,435

Less GST Collectable 38,871 40,687 42,591 44,588 46,682 48,872 51,175 53,590 56,123 58,772 481,949

Total Revenue(exc GST) 388,705 406,866 425,908 445,877 466,818 488,718 511,746 535,898 561,228 587,723 4,819,486

Gross Profit 254,292 266,168 278,621 291,680 305,375 319,697 334,756 350,549 367,114 384,440

Net Profit After Tax -3,441 1,992 7,841 14,130 20,886 28,115 35,885 44,206 53,112 78,897

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 500 2,672 10,766 25,163 46,330 74,741 110,938 155,475 208,936

Cash Receipts 427,576 447,552 468,499 490,465 513,499 537,590 562,921 589,487 617,351 646,495

Cash Payments 427,076 445,380 460,405 476,068 492,332 509,179 526,723 544,951 563,890 566,816

Nett Cash Movement 500 2,172 8,094 14,397 21,167 28,411 36,198 44,537 53,461 79,679

Closing Bank Balance 500 2,672 10,766 25,163 46,330 74,741 110,938 155,475 208,936 288,615

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 393,965 403,821 413,922 424,277 434,890 445,739 456,889 468,318 480,032 467,106

Net Cost of sales 136,232 139,644 143,142 146,727 150,401 154,157 158,018 161,975 166,030 161,564

Gross Margin 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

LESS EXPENSES (incl GST)

Sales & Marketing 6,900 7,073 7,249 7,431 7,616 7,806 8,001 8,201 8,406 8,616

Admin & Overhead 262,696 269,264 275,995 282,895 289,967 297,197 304,627 312,242 320,048 310,112

Total Expenses (inc GST) 269,596 276,336 283,244 290,326 297,584 305,003 312,628 320,444 328,455 318,728

Less GST payable 11,863 12,160 12,464 12,775 13,095 13,421 13,757 14,101 14,453 13,185

Total Expenses (exc GST) 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 92.1% 90.2% 88.4% 86.5% 84.7% 82.9% 81.2% 79.4% 77.8% 72.3%

as a % of sales budget

TOTAL REVENUE

Page 88: Camp Banksia Master Plan Report 120618 FINAL

31 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Banksia Park - Option Two - 100% Funding - Worst Case

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Venue Hire sales 7,088 7,229 7,374 7,521 7,672 7,825 7,981 8,141 8,304 8,469 77,604

Other Income sales 630 643 655 669 682 696 709 724 738 753 6,898

Reimbursements sales 8 8 9 9 9 9 9 9 10 10 90

Linen Hire sales 1,339 1,366 1,393 1,421 1,449 1,478 1,508 1,538 1,568 1,600 14,658

Equipment Hire sales 315 321 328 334 341 348 355 362 369 376 3,449

Crockery Hire sales 4,961 5,060 5,162 5,265 5,370 5,477 5,587 5,699 5,813 5,929 54,322

Commissions sales 94 96 98 99 101 104 106 108 110 112 1,027

Catering sales 130,725 137,261 144,124 151,331 158,897 166,820 175,161 183,919 193,115 202,745 1,644,099

Banksia Retreat sales 18,113 18,475 18,844 19,221 19,606 19,997 20,397 20,804 21,221 21,644 198,320

Activities sales 2,520 2,570 2,622 2,674 2,728 2,782 2,838 2,895 2,952 3,011 27,592

Group Accommodation sales 78,750 82,688 86,822 91,163 95,721 100,494 105,519 110,795 116,334 122,135 990,421

Cabin Accommodation sales 76,140 79,947 83,944 88,142 92,549 97,163 102,022 107,123 112,479 118,087 957,596

Total Revenue(inc GST) 320,682 335,664 351,374 367,848 385,124 403,192 422,191 442,116 463,013 484,871 3,976,076

Less GST Collectable 29,153 30,515 31,943 33,441 35,011 36,654 38,381 40,192 42,092 44,079 361,461

Total Revenue(exc GST) 291,529 305,149 319,431 334,408 350,113 366,539 383,810 401,923 420,921 440,792 3,614,614

Gross Profit 190,719 199,626 208,966 218,760 229,031 239,772 251,067 262,912 275,335 288,330

Net Profit After Tax -67,014 -64,550 -61,814 -58,790 -55,458 -51,809 -47,804 -43,431 -38,666 -17,213

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 -64,800 -129,248 -190,893 -249,502 -304,770 -356,377 -403,968 -447,174 -485,601

Cash Receipts 320,682 335,664 351,374 367,848 385,124 403,192 422,191 442,116 463,013 484,871

Cash Payments 385,482 400,113 413,019 426,458 440,392 454,800 469,782 485,321 501,440 501,417

Nett Cash Movement -64,800 -64,448 -61,644 -58,610 -55,267 -51,608 -47,591 -43,205 -38,427 -16,546

Closing Bank Balance -64,800 -129,248 -190,893 -249,502 -304,770 -356,377 -403,968 -447,174 -485,601 -502,147

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 393,965 403,821 413,922 424,277 434,890 445,739 456,889 468,318 480,032 467,106

Net Cost of sales 136,232 139,644 143,142 146,727 150,401 154,157 158,018 161,975 166,030 161,564

Gross Margin 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

LESS EXPENSES (incl GST)

Sales & Marketing 6,900 7,073 7,249 7,431 7,616 7,806 8,001 8,201 8,406 8,616

Admin & Overhead 262,696 269,264 275,995 282,895 289,967 297,197 304,627 312,242 320,048 310,112

Total Expenses (inc GST) 269,596 276,336 283,244 290,326 297,584 305,003 312,628 320,444 328,455 318,728

Less GST payable 11,863 12,160 12,464 12,775 13,095 13,421 13,757 14,101 14,453 13,185

Total Expenses (exc GST) 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 122.9% 120.3% 117.8% 115.3% 112.9% 110.6% 108.2% 105.9% 103.7% 96.3%

as a % of sales budget

TOTAL REVENUE

Page 89: Camp Banksia Master Plan Report 120618 FINAL

32 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Banksia Park - Option Two - 90% Funding Best Case

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Venue Hire sales 10,868 11,085 11,307 11,533 11,763 11,998 12,238 12,483 12,732 12,986 118,992

Other Income sales 966 985 1,005 1,025 1,046 1,066 1,088 1,110 1,132 1,154 10,577

Reimbursements sales 13 13 13 13 14 14 14 15 15 15 139

Linen Hire sales 2,053 2,094 2,136 2,178 2,222 2,266 2,312 2,358 2,405 2,453 22,476

Equipment Hire sales 483 493 503 513 523 533 544 555 566 577 5,289

Crockery Hire sales 7,607 7,759 7,915 8,073 8,234 8,399 8,567 8,738 8,913 9,090 83,294

Commissions sales 144 147 150 153 156 159 162 165 168 172 1,574

Catering sales 200,445 210,467 220,991 232,040 243,642 255,791 268,581 282,010 296,110 310,875 2,520,951

Banksia Retreat sales 27,773 28,328 28,895 29,472 30,062 30,661 31,275 31,900 32,538 33,187 304,091

Activities sales 3,864 3,941 4,020 4,101 4,183 4,266 4,351 4,438 4,527 4,617 42,308

Group Accommodation sales 120,750 126,788 133,127 139,783 146,772 154,091 161,795 169,885 178,380 187,274 1,518,645

Cabin Accommodation sales 116,748 122,585 128,715 135,150 141,908 148,984 156,433 164,255 172,468 181,067 1,468,313

Total Revenue(inc GST) 491,712 514,685 538,774 564,034 590,524 618,228 647,359 677,910 709,953 743,469 6,096,650

Less GST Collectable 44,701 46,790 48,979 51,276 53,684 56,203 58,851 61,628 64,541 67,588 554,241

Total Revenue(exc GST) 447,011 467,895 489,794 512,758 536,840 562,026 588,508 616,282 645,412 675,881 5,542,409

Gross Profit 292,436 306,093 320,415 335,432 351,181 367,651 384,969 403,132 422,181 442,106

Net Profit After Tax 34,703 41,917 49,634 57,882 66,692 76,069 86,098 96,789 108,179 136,563

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 -202,409 -243,543 -193,607 -135,406 -68,378 8,044 94,515 191,697 300,290

Cash Receipts 491,712 514,685 538,774 564,034 590,524 618,228 647,359 677,910 709,953 743,469

Cash Payments 694,121 555,820 488,837 505,833 523,496 541,806 560,888 580,729 601,360 606,055

Nett Cash Movement -202,409 -41,135 49,936 58,201 67,028 76,423 86,471 97,182 108,593 137,414

Closing Bank Balance -202,409 -243,543 -193,607 -135,406 -68,378 8,044 94,515 191,697 300,290 437,704

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 393,965 403,821 413,922 424,277 434,890 445,739 456,889 468,318 480,032 467,106

Net Cost of sales 136,232 139,644 143,142 146,727 150,401 154,157 158,018 161,975 166,030 161,564

Gross Margin 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

LESS EXPENSES (incl GST)

Sales & Marketing 6,900 7,073 7,249 7,431 7,616 7,806 8,001 8,201 8,406 8,616

Admin & Overhead 262,696 269,264 275,995 282,895 289,967 297,197 304,627 312,242 320,048 310,112

Total Expenses (inc GST) 269,596 276,336 283,244 290,326 297,584 305,003 312,628 320,444 328,455 318,728

Less GST payable 11,863 12,160 12,464 12,775 13,095 13,421 13,757 14,101 14,453 13,185

Total Expenses (exc GST) 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 80.1% 78.5% 76.8% 75.2% 73.6% 72.1% 70.6% 69.1% 67.6% 62.8%

as a % of sales budget

TOTAL REVENUE

Page 90: Camp Banksia Master Plan Report 120618 FINAL

33 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Banksia Park - Option Two - 90% Funding

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Venue Hire sales 9,450 9,639 9,832 10,028 10,229 10,433 10,642 10,854 11,072 11,292 103,471

Other Income sales 840 857 874 891 909 927 946 965 984 1,004 9,197

Reimbursements sales 11 11 11 12 12 12 12 13 13 13 120

Linen Hire sales 1,785 1,821 1,857 1,894 1,932 1,971 2,010 2,050 2,091 2,133 19,545

Equipment Hire sales 420 428 437 446 455 464 473 482 492 502 4,599

Crockery Hire sales 6,615 6,747 6,882 7,020 7,160 7,303 7,449 7,598 7,750 7,905 72,430

Commissions sales 125 128 130 133 135 138 141 144 146 149 1,369

Catering sales 174,300 183,015 192,166 201,774 211,863 222,427 233,548 245,226 257,487 270,326 2,192,132

Banksia Retreat sales 24,150 24,633 25,126 25,628 26,141 26,662 27,195 27,739 28,294 28,858 264,427

Activities sales 3,360 3,427 3,496 3,566 3,637 3,710 3,784 3,859 3,937 4,015 36,790

Group Accommodation sales 105,000 110,250 115,763 121,551 127,628 133,992 140,692 147,726 155,113 162,847 1,320,561

Cabin Accommodation sales 101,520 106,596 111,926 117,522 123,398 129,551 136,029 142,830 149,972 157,450 1,276,794

Total Revenue(inc GST) 427,576 447,552 468,499 490,465 513,499 537,590 562,921 589,487 617,351 646,495 5,301,435

Less GST Collectable 38,871 40,687 42,591 44,588 46,682 48,872 51,175 53,590 56,123 58,772 481,949

Total Revenue(exc GST) 388,705 406,866 425,908 445,877 466,818 488,718 511,746 535,898 561,228 587,723 4,819,486

Gross Profit 254,292 266,168 278,621 291,680 305,375 319,697 334,756 350,549 367,114 384,440

Net Profit After Tax -3,441 1,992 7,841 14,130 20,886 28,115 35,885 44,206 53,112 78,897

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 -241,588 -322,696 -314,602 -300,205 -279,038 -250,627 -214,429 -169,893 -116,432

Cash Receipts 427,576 447,552 468,499 490,465 513,499 537,590 562,921 589,487 617,351 646,495

Cash Payments 669,164 528,659 460,405 476,068 492,332 509,179 526,723 544,951 563,890 566,816

Nett Cash Movement -241,588 -81,107 8,094 14,397 21,167 28,411 36,198 44,537 53,461 79,679

Closing Bank Balance -241,588 -322,696 -314,602 -300,205 -279,038 -250,627 -214,429 -169,893 -116,432 -36,753

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 393,965 403,821 413,922 424,277 434,890 445,739 456,889 468,318 480,032 467,106

Net Cost of sales 136,232 139,644 143,142 146,727 150,401 154,157 158,018 161,975 166,030 161,564

Gross Margin 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

LESS EXPENSES (incl GST)

Sales & Marketing 6,900 7,073 7,249 7,431 7,616 7,806 8,001 8,201 8,406 8,616

Admin & Overhead 262,696 269,264 275,995 282,895 289,967 297,197 304,627 312,242 320,048 310,112

Total Expenses (inc GST) 269,596 276,336 283,244 290,326 297,584 305,003 312,628 320,444 328,455 318,728

Less GST payable 11,863 12,160 12,464 12,775 13,095 13,421 13,757 14,101 14,453 13,185

Total Expenses (exc GST) 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 92.1% 90.2% 88.4% 86.5% 84.7% 82.9% 81.2% 79.4% 77.8% 72.3%

as a % of sales budget

TOTAL REVENUE

Page 91: Camp Banksia Master Plan Report 120618 FINAL

34 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Banksia Park - Option Two - 90% Funding Worst Case

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Venue Hire sales 7,088 7,229 7,374 7,521 7,672 7,825 7,981 8,141 8,304 8,469 77,604

Other Income sales 630 643 655 669 682 696 709 724 738 753 6,898

Reimbursements sales 8 8 9 9 9 9 9 9 10 10 90

Linen Hire sales 1,339 1,366 1,393 1,421 1,449 1,478 1,508 1,538 1,568 1,600 14,658

Equipment Hire sales 315 321 328 334 341 348 355 362 369 376 3,449

Crockery Hire sales 4,961 5,060 5,162 5,265 5,370 5,477 5,587 5,699 5,813 5,929 54,322

Commissions sales 94 96 98 99 101 104 106 108 110 112 1,027

Catering sales 130,725 137,261 144,124 151,331 158,897 166,820 175,161 183,919 193,115 202,745 1,644,099

Banksia Retreat sales 18,113 18,475 18,844 19,221 19,606 19,997 20,397 20,804 21,221 21,644 198,320

Activities sales 2,520 2,570 2,622 2,674 2,728 2,782 2,838 2,895 2,952 3,011 27,592

Group Accommodation sales 78,750 82,688 86,822 91,163 95,721 100,494 105,519 110,795 116,334 122,135 990,421

Cabin Accommodation sales 76,140 79,947 83,944 88,142 92,549 97,163 102,022 107,123 112,479 118,087 957,596

Total Revenue(inc GST) 320,682 335,664 351,374 367,848 385,124 403,192 422,191 442,116 463,013 484,871 3,976,076

Less GST Collectable 29,153 30,515 31,943 33,441 35,011 36,654 38,381 40,192 42,092 44,079 361,461

Total Revenue(exc GST) 291,529 305,149 319,431 334,408 350,113 366,539 383,810 401,923 420,921 440,792 3,614,614

Gross Profit 190,719 199,626 208,966 218,760 229,031 239,772 251,067 262,912 275,335 288,330

Net Profit After Tax -67,014 -64,550 -61,814 -58,790 -55,458 -51,809 -47,804 -43,431 -38,666 -17,213

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 -306,888 -454,616 -516,260 -574,870 -630,137 -681,745 -729,336 -772,541 -810,969

Cash Receipts 320,682 335,664 351,374 367,848 385,124 403,192 422,191 442,116 463,013 484,871

Cash Payments 627,570 483,392 413,019 426,458 440,392 454,800 469,782 485,321 501,440 501,417

Nett Cash Movement -306,888 -147,728 -61,644 -58,610 -55,267 -51,608 -47,591 -43,205 -38,427 -16,546

Closing Bank Balance -306,888 -454,616 -516,260 -574,870 -630,137 -681,745 -729,336 -772,541 -810,969 -827,514

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 393,965 403,821 413,922 424,277 434,890 445,739 456,889 468,318 480,032 467,106

Net Cost of sales 136,232 139,644 143,142 146,727 150,401 154,157 158,018 161,975 166,030 161,564

Gross Margin 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

LESS EXPENSES (incl GST)

Sales & Marketing 6,900 7,073 7,249 7,431 7,616 7,806 8,001 8,201 8,406 8,616

Admin & Overhead 262,696 269,264 275,995 282,895 289,967 297,197 304,627 312,242 320,048 310,112

Total Expenses (inc GST) 269,596 276,336 283,244 290,326 297,584 305,003 312,628 320,444 328,455 318,728

Less GST payable 11,863 12,160 12,464 12,775 13,095 13,421 13,757 14,101 14,453 13,185

Total Expenses (exc GST) 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 122.9% 120.3% 117.8% 115.3% 112.9% 110.6% 108.2% 105.9% 103.7% 96.3%

as a % of sales budget

TOTAL REVENUE

Page 92: Camp Banksia Master Plan Report 120618 FINAL

35 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Banksia Park - Option Two - 80% Funding Best Case

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Venue Hire sales 10,868 11,085 11,307 11,533 11,763 11,998 12,238 12,483 12,732 12,986 118,992

Other Income sales 966 985 1,005 1,025 1,046 1,066 1,088 1,110 1,132 1,154 10,577

Reimbursements sales 13 13 13 13 14 14 14 15 15 15 139

Linen Hire sales 2,053 2,094 2,136 2,178 2,222 2,266 2,312 2,358 2,405 2,453 22,476

Equipment Hire sales 483 493 503 513 523 533 544 555 566 577 5,289

Crockery Hire sales 7,607 7,759 7,915 8,073 8,234 8,399 8,567 8,738 8,913 9,090 83,294

Commissions sales 144 147 150 153 156 159 162 165 168 172 1,574

Catering sales 200,445 210,467 220,991 232,040 243,642 255,791 268,581 282,010 296,110 310,875 2,520,951

Banksia Retreat sales 27,773 28,328 28,895 29,472 30,062 30,661 31,275 31,900 32,538 33,187 304,091

Activities sales 3,864 3,941 4,020 4,101 4,183 4,266 4,351 4,438 4,527 4,617 42,308

Group Accommodation sales 120,750 126,788 133,127 139,783 146,772 154,091 161,795 169,885 178,380 187,274 1,518,645

Cabin Accommodation sales 116,748 122,585 128,715 135,150 141,908 148,984 156,433 164,255 172,468 181,067 1,468,313

Total Revenue(inc GST) 491,712 514,685 538,774 564,034 590,524 618,228 647,359 677,910 709,953 743,469 6,096,650

Less GST Collectable 44,701 46,790 48,979 51,276 53,684 56,203 58,851 61,628 64,541 67,588 554,241

Total Revenue(exc GST) 447,011 467,895 489,794 512,758 536,840 562,026 588,508 616,282 645,412 675,881 5,542,409

Gross Profit 292,436 306,093 320,415 335,432 351,181 367,651 384,969 403,132 422,181 442,106

Net Profit After Tax 34,703 41,917 49,634 57,882 66,692 76,069 86,098 96,789 108,179 136,563

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 -444,497 -568,911 -518,975 -460,774 -393,746 -317,324 -230,853 -133,671 -25,078

Cash Receipts 491,712 514,685 538,774 564,034 590,524 618,228 647,359 677,910 709,953 743,469

Cash Payments 936,209 639,099 488,837 505,833 523,496 541,806 560,888 580,729 601,360 606,055

Nett Cash Movement -444,497 -124,414 49,936 58,201 67,028 76,423 86,471 97,182 108,593 137,414

Closing Bank Balance -444,497 -568,911 -518,975 -460,774 -393,746 -317,324 -230,853 -133,671 -25,078 112,336

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 393,965 403,821 413,922 424,277 434,890 445,739 456,889 468,318 480,032 467,106

Net Cost of sales 136,232 139,644 143,142 146,727 150,401 154,157 158,018 161,975 166,030 161,564

Gross Margin 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

LESS EXPENSES (incl GST)

Sales & Marketing 6,900 7,073 7,249 7,431 7,616 7,806 8,001 8,201 8,406 8,616

Admin & Overhead 262,696 269,264 275,995 282,895 289,967 297,197 304,627 312,242 320,048 310,112

Total Expenses (inc GST) 269,596 276,336 283,244 290,326 297,584 305,003 312,628 320,444 328,455 318,728

Less GST payable 11,863 12,160 12,464 12,775 13,095 13,421 13,757 14,101 14,453 13,185

Total Expenses (exc GST) 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 80.1% 78.5% 76.8% 75.2% 73.6% 72.1% 70.6% 69.1% 67.6% 62.8%

as a % of sales budget

TOTAL REVENUE

Page 93: Camp Banksia Master Plan Report 120618 FINAL

36 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Banksia Park - Option Two - 80% Funding

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Venue Hire sales 9,450 9,639 9,832 10,028 10,229 10,433 10,642 10,854 11,072 11,292 103,471

Other Income sales 840 857 874 891 909 927 946 965 984 1,004 9,197

Reimbursements sales 11 11 11 12 12 12 12 13 13 13 120

Linen Hire sales 1,785 1,821 1,857 1,894 1,932 1,971 2,010 2,050 2,091 2,133 19,545

Equipment Hire sales 420 428 437 446 455 464 473 482 492 502 4,599

Crockery Hire sales 6,615 6,747 6,882 7,020 7,160 7,303 7,449 7,598 7,750 7,905 72,430

Commissions sales 125 128 130 133 135 138 141 144 146 149 1,369

Catering sales 174,300 183,015 192,166 201,774 211,863 222,427 233,548 245,226 257,487 270,326 2,192,132

Banksia Retreat sales 24,150 24,633 25,126 25,628 26,141 26,662 27,195 27,739 28,294 28,858 264,427

Activities sales 3,360 3,427 3,496 3,566 3,637 3,710 3,784 3,859 3,937 4,015 36,790

Group Accommodation sales 105,000 110,250 115,763 121,551 127,628 133,992 140,692 147,726 155,113 162,847 1,320,561

Cabin Accommodation sales 101,520 106,596 111,926 117,522 123,398 129,551 136,029 142,830 149,972 157,450 1,276,794

Total Revenue(inc GST) 427,576 447,552 468,499 490,465 513,499 537,590 562,921 589,487 617,351 646,495 5,301,435

Less GST Collectable 38,871 40,687 42,591 44,588 46,682 48,872 51,175 53,590 56,123 58,772 481,949

Total Revenue(exc GST) 388,705 406,866 425,908 445,877 466,818 488,718 511,746 535,898 561,228 587,723 4,819,486

Gross Profit 254,292 266,168 278,621 291,680 305,375 319,697 334,756 350,549 367,114 384,440

Net Profit After Tax -3,441 1,992 7,841 14,130 20,886 28,115 35,885 44,206 53,112 78,897

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 -483,677 -648,063 -639,970 -625,573 -604,406 -575,995 -539,797 -495,260 -441,800

Cash Receipts 427,576 447,552 468,499 490,465 513,499 537,590 562,921 589,487 617,351 646,495

Cash Payments 911,253 611,939 460,405 476,068 492,332 509,179 526,723 544,951 563,890 566,816

Nett Cash Movement -483,677 -164,387 8,094 14,397 21,167 28,411 36,198 44,537 53,461 79,679

Closing Bank Balance -483,677 -648,063 -639,970 -625,573 -604,406 -575,995 -539,797 -495,260 -441,800 -362,121

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 393,965 403,821 413,922 424,277 434,890 445,739 456,889 468,318 480,032 467,106

Net Cost of sales 136,232 139,644 143,142 146,727 150,401 154,157 158,018 161,975 166,030 161,564

Gross Margin 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

LESS EXPENSES (incl GST)

Sales & Marketing 6,900 7,073 7,249 7,431 7,616 7,806 8,001 8,201 8,406 8,616

Admin & Overhead 262,696 269,264 275,995 282,895 289,967 297,197 304,627 312,242 320,048 310,112

Total Expenses (inc GST) 269,596 276,336 283,244 290,326 297,584 305,003 312,628 320,444 328,455 318,728

Less GST payable 11,863 12,160 12,464 12,775 13,095 13,421 13,757 14,101 14,453 13,185

Total Expenses (exc GST) 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 92.1% 90.2% 88.4% 86.5% 84.7% 82.9% 81.2% 79.4% 77.8% 72.3%

as a % of sales budget

TOTAL REVENUE

Page 94: Camp Banksia Master Plan Report 120618 FINAL

37 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Banksia Park - Option Two - 80% Funding Worst Case

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Venue Hire sales 7,088 7,229 7,374 7,521 7,672 7,825 7,981 8,141 8,304 8,469 77,604

Other Income sales 630 643 655 669 682 696 709 724 738 753 6,898

Reimbursements sales 8 8 9 9 9 9 9 9 10 10 90

Linen Hire sales 1,339 1,366 1,393 1,421 1,449 1,478 1,508 1,538 1,568 1,600 14,658

Equipment Hire sales 315 321 328 334 341 348 355 362 369 376 3,449

Crockery Hire sales 4,961 5,060 5,162 5,265 5,370 5,477 5,587 5,699 5,813 5,929 54,322

Commissions sales 94 96 98 99 101 104 106 108 110 112 1,027

Catering sales 130,725 137,261 144,124 151,331 158,897 166,820 175,161 183,919 193,115 202,745 1,644,099

Banksia Retreat sales 18,113 18,475 18,844 19,221 19,606 19,997 20,397 20,804 21,221 21,644 198,320

Activities sales 2,520 2,570 2,622 2,674 2,728 2,782 2,838 2,895 2,952 3,011 27,592

Group Accommodation sales 78,750 82,688 86,822 91,163 95,721 100,494 105,519 110,795 116,334 122,135 990,421

Cabin Accommodation sales 76,140 79,947 83,944 88,142 92,549 97,163 102,022 107,123 112,479 118,087 957,596

Total Revenue(inc GST) 320,682 335,664 351,374 367,848 385,124 403,192 422,191 442,116 463,013 484,871 3,976,076

Less GST Collectable 29,153 30,515 31,943 33,441 35,011 36,654 38,381 40,192 42,092 44,079 361,461

Total Revenue(exc GST) 291,529 305,149 319,431 334,408 350,113 366,539 383,810 401,923 420,921 440,792 3,614,614

Gross Profit 190,719 199,626 208,966 218,760 229,031 239,772 251,067 262,912 275,335 288,330

Net Profit After Tax -67,014 -64,550 -61,814 -58,790 -55,458 -51,809 -47,804 -43,431 -38,666 -17,213

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 -548,976 -779,984 -841,628 -900,238 -955,505 -1,007,113 -1,054,704 -1,097,909 -1,136,336

Cash Receipts 320,682 335,664 351,374 367,848 385,124 403,192 422,191 442,116 463,013 484,871

Cash Payments 869,658 566,672 413,019 426,458 440,392 454,800 469,782 485,321 501,440 501,417

Nett Cash Movement -548,976 -231,008 -61,644 -58,610 -55,267 -51,608 -47,591 -43,205 -38,427 -16,546

Closing Bank Balance -548,976 -779,984 -841,628 -900,238 -955,505 -1,007,113 -1,054,704 -1,097,909 -1,136,336 -1,152,882

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 393,965 403,821 413,922 424,277 434,890 445,739 456,889 468,318 480,032 467,106

Net Cost of sales 136,232 139,644 143,142 146,727 150,401 154,157 158,018 161,975 166,030 161,564

Gross Margin 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

LESS EXPENSES (incl GST)

Sales & Marketing 6,900 7,073 7,249 7,431 7,616 7,806 8,001 8,201 8,406 8,616

Admin & Overhead 262,696 269,264 275,995 282,895 289,967 297,197 304,627 312,242 320,048 310,112

Total Expenses (inc GST) 269,596 276,336 283,244 290,326 297,584 305,003 312,628 320,444 328,455 318,728

Less GST payable 11,863 12,160 12,464 12,775 13,095 13,421 13,757 14,101 14,453 13,185

Total Expenses (exc GST) 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 122.9% 120.3% 117.8% 115.3% 112.9% 110.6% 108.2% 105.9% 103.7% 96.3%

as a % of sales budget

TOTAL REVENUE

Page 95: Camp Banksia Master Plan Report 120618 FINAL

38 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Banksia Park - Option Two - 70% Funding Best Case

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Venue Hire sales 10,868 11,085 11,307 11,533 11,763 11,998 12,238 12,483 12,732 12,986 118,992

Other Income sales 966 985 1,005 1,025 1,046 1,066 1,088 1,110 1,132 1,154 10,577

Reimbursements sales 13 13 13 13 14 14 14 15 15 15 139

Linen Hire sales 2,053 2,094 2,136 2,178 2,222 2,266 2,312 2,358 2,405 2,453 22,476

Equipment Hire sales 483 493 503 513 523 533 544 555 566 577 5,289

Crockery Hire sales 7,607 7,759 7,915 8,073 8,234 8,399 8,567 8,738 8,913 9,090 83,294

Commissions sales 144 147 150 153 156 159 162 165 168 172 1,574

Catering sales 200,445 210,467 220,991 232,040 243,642 255,791 268,581 282,010 296,110 310,875 2,520,951

Banksia Retreat sales 27,773 28,328 28,895 29,472 30,062 30,661 31,275 31,900 32,538 33,187 304,091

Activities sales 3,864 3,941 4,020 4,101 4,183 4,266 4,351 4,438 4,527 4,617 42,308

Group Accommodation sales 120,750 126,788 133,127 139,783 146,772 154,091 161,795 169,885 178,380 187,274 1,518,645

Cabin Accommodation sales 116,748 122,585 128,715 135,150 141,908 148,984 156,433 164,255 172,468 181,067 1,468,313

Total Revenue(inc GST) 491,712 514,685 538,774 564,034 590,524 618,228 647,359 677,910 709,953 743,469 6,096,650

Less GST Collectable 44,701 46,790 48,979 51,276 53,684 56,203 58,851 61,628 64,541 67,588 554,241

Total Revenue(exc GST) 447,011 467,895 489,794 512,758 536,840 562,026 588,508 616,282 645,412 675,881 5,542,409

Gross Profit 292,436 306,093 320,415 335,432 351,181 367,651 384,969 403,132 422,181 442,106

Net Profit After Tax 34,703 41,917 49,634 57,882 66,692 76,069 86,098 96,789 108,179 136,563

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 -686,585 -894,279 -844,343 -786,142 -719,114 -642,691 -556,221 -459,039 -350,445

Cash Receipts 491,712 514,685 538,774 564,034 590,524 618,228 647,359 677,910 709,953 743,469

Cash Payments 1,178,297 722,379 488,837 505,833 523,496 541,806 560,888 580,729 601,360 606,055

Nett Cash Movement -686,585 -207,694 49,936 58,201 67,028 76,423 86,471 97,182 108,593 137,414

Closing Bank Balance -686,585 -894,279 -844,343 -786,142 -719,114 -642,691 -556,221 -459,039 -350,445 -213,032

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 393,965 403,821 413,922 424,277 434,890 445,739 456,889 468,318 480,032 467,106

Net Cost of sales 136,232 139,644 143,142 146,727 150,401 154,157 158,018 161,975 166,030 161,564

Gross Margin 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

LESS EXPENSES (incl GST)

Sales & Marketing 6,900 7,073 7,249 7,431 7,616 7,806 8,001 8,201 8,406 8,616

Admin & Overhead 262,696 269,264 275,995 282,895 289,967 297,197 304,627 312,242 320,048 310,112

Total Expenses (inc GST) 269,596 276,336 283,244 290,326 297,584 305,003 312,628 320,444 328,455 318,728

Less GST payable 11,863 12,160 12,464 12,775 13,095 13,421 13,757 14,101 14,453 13,185

Total Expenses (exc GST) 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 80.1% 78.5% 76.8% 75.2% 73.6% 72.1% 70.6% 69.1% 67.6% 62.8%

as a % of sales budget

TOTAL REVENUE

Page 96: Camp Banksia Master Plan Report 120618 FINAL

39 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Banksia Park - Option Two - 70% Funding

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Venue Hire sales 9,450 9,639 9,832 10,028 10,229 10,433 10,642 10,854 11,072 11,292 103,471

Other Income sales 840 857 874 891 909 927 946 965 984 1,004 9,197

Reimbursements sales 11 11 11 12 12 12 12 13 13 13 120

Linen Hire sales 1,785 1,821 1,857 1,894 1,932 1,971 2,010 2,050 2,091 2,133 19,545

Equipment Hire sales 420 428 437 446 455 464 473 482 492 502 4,599

Crockery Hire sales 6,615 6,747 6,882 7,020 7,160 7,303 7,449 7,598 7,750 7,905 72,430

Commissions sales 125 128 130 133 135 138 141 144 146 149 1,369

Catering sales 174,300 183,015 192,166 201,774 211,863 222,427 233,548 245,226 257,487 270,326 2,192,132

Banksia Retreat sales 24,150 24,633 25,126 25,628 26,141 26,662 27,195 27,739 28,294 28,858 264,427

Activities sales 3,360 3,427 3,496 3,566 3,637 3,710 3,784 3,859 3,937 4,015 36,790

Group Accommodation sales 105,000 110,250 115,763 121,551 127,628 133,992 140,692 147,726 155,113 162,847 1,320,561

Cabin Accommodation sales 101,520 106,596 111,926 117,522 123,398 129,551 136,029 142,830 149,972 157,450 1,276,794

Total Revenue(inc GST) 427,576 447,552 468,499 490,465 513,499 537,590 562,921 589,487 617,351 646,495 5,301,435

Less GST Collectable 38,871 40,687 42,591 44,588 46,682 48,872 51,175 53,590 56,123 58,772 481,949

Total Revenue(exc GST) 388,705 406,866 425,908 445,877 466,818 488,718 511,746 535,898 561,228 587,723 4,819,486

Gross Profit 254,292 266,168 278,621 291,680 305,375 319,697 334,756 350,549 367,114 384,440

Net Profit After Tax -3,441 1,992 7,841 14,130 20,886 28,115 35,885 44,206 53,112 78,897

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 -725,765 -973,431 -965,338 -950,941 -929,773 -901,362 -865,165 -820,628 -767,167

Cash Receipts 427,576 447,552 468,499 490,465 513,499 537,590 562,921 589,487 617,351 646,495

Cash Payments 1,153,341 695,218 460,405 476,068 492,332 509,179 526,723 544,951 563,890 566,816

Nett Cash Movement -725,765 -247,666 8,094 14,397 21,167 28,411 36,198 44,537 53,461 79,679

Closing Bank Balance -725,765 -973,431 -965,338 -950,941 -929,773 -901,362 -865,165 -820,628 -767,167 -687,489

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 393,965 403,821 413,922 424,277 434,890 445,739 456,889 468,318 480,032 467,106

Net Cost of sales 136,232 139,644 143,142 146,727 150,401 154,157 158,018 161,975 166,030 161,564

Gross Margin 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

LESS EXPENSES (incl GST)

Sales & Marketing 6,900 7,073 7,249 7,431 7,616 7,806 8,001 8,201 8,406 8,616

Admin & Overhead 262,696 269,264 275,995 282,895 289,967 297,197 304,627 312,242 320,048 310,112

Total Expenses (inc GST) 269,596 276,336 283,244 290,326 297,584 305,003 312,628 320,444 328,455 318,728

Less GST payable 11,863 12,160 12,464 12,775 13,095 13,421 13,757 14,101 14,453 13,185

Total Expenses (exc GST) 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 92.1% 90.2% 88.4% 86.5% 84.7% 82.9% 81.2% 79.4% 77.8% 72.3%

as a % of sales budget

TOTAL REVENUE

Page 97: Camp Banksia Master Plan Report 120618 FINAL

40 | P a g e Camp Banksia Master Plan Feasibility Assessment Report

Moore Consulting Ten Year Profit and Cash Forecasts for Banksia Park - Option Two - 70% Funding Worst Case

10 YEAR SALES FORECAST (inc GST)

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Venue Hire sales 7,088 7,229 7,374 7,521 7,672 7,825 7,981 8,141 8,304 8,469 77,604

Other Income sales 630 643 655 669 682 696 709 724 738 753 6,898

Reimbursements sales 8 8 9 9 9 9 9 9 10 10 90

Linen Hire sales 1,339 1,366 1,393 1,421 1,449 1,478 1,508 1,538 1,568 1,600 14,658

Equipment Hire sales 315 321 328 334 341 348 355 362 369 376 3,449

Crockery Hire sales 4,961 5,060 5,162 5,265 5,370 5,477 5,587 5,699 5,813 5,929 54,322

Commissions sales 94 96 98 99 101 104 106 108 110 112 1,027

Catering sales 130,725 137,261 144,124 151,331 158,897 166,820 175,161 183,919 193,115 202,745 1,644,099

Banksia Retreat sales 18,113 18,475 18,844 19,221 19,606 19,997 20,397 20,804 21,221 21,644 198,320

Activities sales 2,520 2,570 2,622 2,674 2,728 2,782 2,838 2,895 2,952 3,011 27,592

Group Accommodation sales 78,750 82,688 86,822 91,163 95,721 100,494 105,519 110,795 116,334 122,135 990,421

Cabin Accommodation sales 76,140 79,947 83,944 88,142 92,549 97,163 102,022 107,123 112,479 118,087 957,596

Total Revenue(inc GST) 320,682 335,664 351,374 367,848 385,124 403,192 422,191 442,116 463,013 484,871 3,976,076

Less GST Collectable 29,153 30,515 31,943 33,441 35,011 36,654 38,381 40,192 42,092 44,079 361,461

Total Revenue(exc GST) 291,529 305,149 319,431 334,408 350,113 366,539 383,810 401,923 420,921 440,792 3,614,614

Gross Profit 190,719 199,626 208,966 218,760 229,031 239,772 251,067 262,912 275,335 288,330

Net Profit After Tax -67,014 -64,550 -61,814 -58,790 -55,458 -51,809 -47,804 -43,431 -38,666 -17,213

10 YEAR CASH FORECAST

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

Opening Bank Balance 0 -791,064 -1,105,352 -1,166,996 -1,225,606 -1,280,873 -1,332,481 -1,380,072 -1,423,277 -1,461,704

Cash Receipts 320,682 335,664 351,374 367,848 385,124 403,192 422,191 442,116 463,013 484,871

Cash Payments 1,111,746 649,951 413,019 426,458 440,392 454,800 469,782 485,321 501,440 501,417

Nett Cash Movement -791,064 -314,287 -61,644 -58,610 -55,267 -51,608 -47,591 -43,205 -38,427 -16,546

Closing Bank Balance -791,064 -1,105,352 -1,166,996 -1,225,606 -1,280,873 -1,332,481 -1,380,072 -1,423,277 -1,461,704 -1,478,250

10 YEAR BREAK-EVEN ANALYSIS

2018/ 2019 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 2024/ 2025 2025/ 2026 2026/ 2027 2027/ 2028

SALES (incl GST) 393,965 403,821 413,922 424,277 434,890 445,739 456,889 468,318 480,032 467,106

Net Cost of sales 136,232 139,644 143,142 146,727 150,401 154,157 158,018 161,975 166,030 161,564

Gross Margin 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

LESS EXPENSES (incl GST)

Sales & Marketing 6,900 7,073 7,249 7,431 7,616 7,806 8,001 8,201 8,406 8,616

Admin & Overhead 262,696 269,264 275,995 282,895 289,967 297,197 304,627 312,242 320,048 310,112

Total Expenses (inc GST) 269,596 276,336 283,244 290,326 297,584 305,003 312,628 320,444 328,455 318,728

Less GST payable 11,863 12,160 12,464 12,775 13,095 13,421 13,757 14,101 14,453 13,185

Total Expenses (exc GST) 257,733 264,176 270,781 277,550 284,489 291,582 298,871 306,343 314,002 305,543

Nett Profit 0 0 0 0 0 0 0 0 0 0

Break-even point 122.9% 120.3% 117.8% 115.3% 112.9% 110.6% 108.2% 105.9% 103.7% 96.3%

as a % of sales budget

TOTAL REVENUE