California Energy Commission Energy Commission Review of Power Plants – Southern California Reliability 2015 Integrated Energy Policy Report Workshop on Southern California Electricity Reliability University of California, Irvine August 17, 2015 Roger Johnson Siting, Transmission and Environmental Protection Division [email protected] / (916) 654-5100

California Energy Commission Energy Commission Review of Power Plants – Southern California Reliability 2015 Integrated Energy Policy Report Workshop on

Embed Size (px)

Citation preview

Page 1: California Energy Commission Energy Commission Review of Power Plants – Southern California Reliability 2015 Integrated Energy Policy Report Workshop on

California Energy Commission

Energy Commission Review of Power Plants –

Southern California Reliability

2015 Integrated Energy Policy Report Workshopon Southern California Electricity Reliability

University of California, IrvineAugust 17, 2015

Roger JohnsonSiting, Transmission and Environmental Protection Division

[email protected] / (916) 654-5100

Page 2: California Energy Commission Energy Commission Review of Power Plants – Southern California Reliability 2015 Integrated Energy Policy Report Workshop on

California Energy Commission

Southern California Power Plants

May 20, 2015 2

Page 3: California Energy Commission Energy Commission Review of Power Plants – Southern California Reliability 2015 Integrated Energy Policy Report Workshop on

California Energy Commission

NRG PuenteMandalay Generating Station replacement of Units 1&2 with

262 MW GE Frame 7HA CTG

City of Oxnard

Information Hearing 8/27/2015

CEC Decision expected 6/2016

OTC compliance date 12/31/2020

PPA - Yes

Page 4: California Energy Commission Energy Commission Review of Power Plants – Southern California Reliability 2015 Integrated Energy Policy Report Workshop on

California Energy Commission

AES AlamitosAlamitos Generating Station Replacement

640 MW air-cooled combined cycle

[400 MW LMS 100 simple cycle]

City of Long Beach

AFC supplement expected 2015

CEC Decision 2016

OTC compliance date 12/31/2020

PPA – Yes (640 MW)

Page 5: California Energy Commission Energy Commission Review of Power Plants – Southern California Reliability 2015 Integrated Energy Policy Report Workshop on

California Energy Commission

NRG El SegundoEl Segundo Units 1&2 replaced on 8/2013

with 560 MW fast-start combined cycle.

City of El Segundo

El Segundo Units 3&4 Replacement

449 MW (1 fast-start air-cooled combined

cycle and 2 simple cycle peakers)

Final Staff Assessment 8/2015

CEC Decision expected late 2015

OTC compliance date 12/31/2015

PPA - No

Page 6: California Energy Commission Energy Commission Review of Power Plants – Southern California Reliability 2015 Integrated Energy Policy Report Workshop on

California Energy Commission

AES Redondo BeachRedondo Beach Generating Station

Replacement

496 MW (3-on-1 air-cooled combined cycle)

City of Redondo Beach

PSA workshops 5/2015

CEC Decision 2016

OTC compliance date 12/31/2020

PPA - No

Page 7: California Energy Commission Energy Commission Review of Power Plants – Southern California Reliability 2015 Integrated Energy Policy Report Workshop on

California Energy Commission

AES Huntington BeachHuntington Beach Generating Station Replacement

644 MW air-cooled combined cycle

[200 MW LMS 100 simple cycle]

City of Huntington Beach

Amendment to CEC Decision expected 9/2015

OTC compliance date 12/31/2020

PPA- Yes (644 MW)

Page 8: California Energy Commission Energy Commission Review of Power Plants – Southern California Reliability 2015 Integrated Energy Policy Report Workshop on

California Energy Commission

NRG CarlsbadEncina Power Station Replacement

City of Carlsbad

Petition to Amend filed 4/23/2013 for 632 MW (6 LMS 100 simple cycle) and removal of Encina Generating Station

CEC Decision 7/2015

Storage tank demolition underway

Start of Construction TBD

OTC compliance date 12/31/2017

PPA – Yes (500 MW)

Page 9: California Energy Commission Energy Commission Review of Power Plants – Southern California Reliability 2015 Integrated Energy Policy Report Workshop on

California Energy Commission

Pio Pico300 MW simple cycle project approved by CEC 9/12/2012

San Diego County (Otay Mesa)

Project construction started 2/2015

Operation expected 9/2016

Page 10: California Energy Commission Energy Commission Review of Power Plants – Southern California Reliability 2015 Integrated Energy Policy Report Workshop on

California Energy Commission

Wellhead

Wellhead

98 MW (2 LM 6000)

City of Stanton

AFC expected in 2015 after CPUC approves PPA

PPA - Yes

Page 11: California Energy Commission Energy Commission Review of Power Plants – Southern California Reliability 2015 Integrated Energy Policy Report Workshop on

California Energy Commission

Status of Southern California Power Plants

May 20, 2015 11

Project Capacity Development Status ScheduleOTC

Compliance Date

Puente 262 MW Info Hrng 8/2015 CEC Decision 2016 12/31/2020

El Segundo 1El Segundo 2

560 MW449 MW

Operational 8/2013FSA 8/2015

N/ACEC Decision 2015

N/A12/31/2015

Redondo 496 MW PSA wkshps 5/2015 CEC Decision 2016 12/31/2020

Alamitos 640 MW +400MW

AFC supplement expected 2015

Unknown 12/31/2020

Huntington Beach

644 MW +200MW

Amendment to CEC Decision expected 9/2015

Unknown 12/31/2020

Carlsbad 632 MW CEC Decision 7/2015 Const. start TBD 12/31/2017

Wellhead 98 MWAFC expected 2015 after PPA approved

Unknown N/A

Pio Pico 300 MW Const. started 2/2015 Operation 9/2016 N/A