CALIBRATION TRAINING REFERENCES: 1) REFERENCE FOR QSP-4.11.2 & QSP-4.11.1 IS ISO-10012-1 (QUALITY ASSURANCE REQUIREMENTS FOR MEASURING EQUIPMENT INTERNATIONAL STANDARD) CAN BE FOUND IN THE RELIABILITY AND MAINTAINABILITY BOOK. FORMS: 1) FOR CALIBRATION RECORDS DATA BASE USE QF-03 2) FOR CALIBRATION REJECTION NOTICE USE QF-79 3) FOR CALIBRATION REJECTION W/EXCEPTION USE QF-80 4) FOR MICROMETER WORKSHEET USE QF-29 5) FOR CALIPER WORKSHEET USE QF-30 6) FOR HEIGHT GAGE WORKSHEET USE QF-31 7) FOR REJECTIONS USE QF-25 JOB PREP: 1) OPEN COMPUTER TO CALIBRATION DATA BASE 2) OPEN GAGE LOG AND PRINT LIST OF TOOLS DUE FOR PRESENT MONTH (SPECIFY PLT-1 OR 2) 3) NOTIFY CMM OPERATORS OF HEIGHT GAGES BY INSPECTION REQUEST FORM RETENTION: ALL HARD COPY DATA SHEETS TO BE RETAINED ONE YEAR IN FILE DRAWER.

Calibration Training

  • Upload
    houss

  • View
    15

  • Download
    5

Embed Size (px)

DESCRIPTION

cal

Citation preview

CALIBRATION TRAINING

REFERENCES:

REFERENCE FOR QSP-4.11.2 & QSP-4.11.1 IS ISO-10012-1

(QUALITY ASSURANCE REQUIREMENTS FOR MEASURING EQUIPMENT INTERNATIONAL STANDARD) CAN BE FOUND IN THE RELIABILITY AND MAINTAINABILITY BOOK.

FORMS:

FOR CALIBRATION RECORDS DATA BASE USE QF-03

FOR CALIBRATION REJECTION NOTICE USE QF-79

FOR CALIBRATION REJECTION W/EXCEPTION USE QF-80

FOR MICROMETER WORKSHEET USE QF-29

FOR CALIPER WORKSHEET USE QF-30

FOR HEIGHT GAGE WORKSHEET USE QF-31

FOR REJECTIONS USE QF-25

JOB PREP:

OPEN COMPUTER TO CALIBRATION DATA BASE

OPEN GAGE LOG AND PRINT LIST OF TOOLS DUE FOR PRESENT MONTH (SPECIFY PLT-1 OR 2)

NOTIFY CMM OPERATORS OF HEIGHT GAGES BY INSPECTION REQUEST FORM

RETENTION:

ALL HARD COPY DATA SHEETS TO BE RETAINED ONE YEAR IN FILE DRAWER.

CMM INSTRUCTIONS (HEIGHT GAGES)

RECEIVE INSPECTION REQUEST FORM

THE CMM OPERATOR CHECKS EACH GAGE LISTED ON THE I.R.F. PER GAGE I.D.#.

PERFORM THE FOLLOWING STEPS TO CHECK THE GAGE:

CLEAN TABLE AND BASE OF GAGE

PRESET CMM FOR HEIGHT GAGE

ZERO HEIGHT GAGE TO CMM PRESET

SET GAGE ACCORDING TO DATA SHEET

READ GAGE AS IS ( DO NOT CLEAN MORE THAN THE BASE )

IF GAGE READS BAD, CLEAN AND REREAD, IF IT READS GOOD: NOTIFY DEPARTMENT SUPERVISOR THAT THERE MAY BE SUSPECT MATERIAL WHICH WAS MEASURED BY THIS GAGE.

RECORD RESULTS ( FOR HEIGHT GAGES CHECK THE GAGE AT 7 DIFFERENT INTERVALS AND ANGLES BUMP ANGLE AT LEAST 3 TIMES ACROSS AND 3 TIMES UP)

COMPLETE WORKSHEET AND MARK OFF THE GAGE I.D. # ON I.R.F.

FILE WORKSHEET INTO CALIBRATION LOG

ATTACH NEW CERTIFICATION TAG TO GAGE

IF GAGE FAILS:

A REJECTION NOTIFICATION OR REJECTION WITH EXCEPTION MUST BE ISSUED. THE REJECTION NOTIFICATION OR REJECTION WITH EXCEPTION MUST BE SIGNED BY OWNER OR IF COMPANY OWNED THE MANAGER WILL SIGN. REFER TO QSP-4.11.2 FOR PROCESS CONCERNING PRODUCT MEASURE BY A FAIL GAGE.

MANUAL INSTRUCTIONS (MICS, CALIPERS)

1) IDENTIFY TOOLS. IF NOT PREVIOUSLY ACCOMPLISHED, ASSIGN UNIQUE I.D. NUMBER AND LOG IN RECALL SYSTEM.

2) VISUALLY INSPECT FOR DAMAGE. NICKS ON TIPS, BENT SPINDLE, ETC.

SELECT GAGE BLOCKS ACCORDING TO DATA SHEET.

READ GAGE AS IS ( DO NOT CLEAN MORE THAN THE BASE )

IF GAGE READS BAD, CLEAN AND REREAD, IF IT READS GOOD: NOTIFY DEPARTMENT SUPERVISOR THAT THERE MAY BE SUSPECT MATERIAL WHICH WAS MEASURED BY THIS GAGE.

6) CHECK ZERO ON TOOL, ADJUST AS NECESSARY. USE O/D BLADES ON CALIPERS. FOR MICS BIGGER THAN 1 OR 25 MM; ZERO ON THE APPROPRIATE GAGE BLOCK ( I.E. 1-2 MICS USE 1 GAGE BLOCK).

7) USING GAGE BLOCKS VERIFY ACCURACY OF TOOL AT INTERVALS CALLED OUT ON THE DATA SHEET. REPEAT STEPS 4&5 AS NEEDED.

8) PASS : AFFIX NEW CALIBRATION STICKER TO TOOL

FAIL: A REJECTION NOTIFICATION OR REJECTION WITH EXCEPTION MUST BE ISSUED. THE REJECTION NOTIFICATION OR REJECTION WITH EXCEPTION MUST BE SIGNED BY OWNER OR IF COMPANY OWNED THE MANAGER WILL SIGN. REFER TO QSP-4.11.2 FOR PROCESS CONCERNING PRODUCT MEASURE BY A FAIL GAGE.

TOOLS THAT ARE ON COMPANY PROPERTY BUT ARE NOT USED, MUST BE CALIBRATED, LABELED AND SEALED IN BAG.

AT NEXT CALIBRATION DUE DATE, IF BAG IS STILL SEALED, MAKE NEW LABEL AND ATTACH TO GAGE THEN RESEAL.

HAND TOOL R&R TRAINING(mic's, caliper's, hieght gage)

TOOL R&R REFERENCES:

REFERENCE TO QSP-4.11.2 & QSP-4.11.1 CAN BE FOUND IN THE Q.S. 9000 MANUAL TITLED (M.S.A.) MEASURING SYSTEM ANALYSIS.

USE QSP-4.14.1 AS REFERENCE FOR FAILURE.

TOOL R&R FORMS:

QF-18 ( GAGE REPEATABILITY AND REPRODUCIBILITY DATA SHEET) CAN BE FOUND IN THE CALIBRATION FILE.

QF-18A (GAGE REPEATABILITY AND REPRODUCIBILITY REPORT) CAN BE FOUND IN THE CALIBRATION FILE.

QF-25 (concern / matrix)

TOOL R&R INSTRUCTIONS

GATHER GAGES NEEDED:

0-1 MIC

0-6 DIGITAL CALIPER

1 DIGITAL HEIGHT GAGE

MAKE SURE ALL GAGES ARE CLEAN AND IN GOOD WORKING ORDER.

CHECK GAGES ZEROING CAPABILITIES USING APPROPRIATE GAGE BLOCKS.

GATHER 10 DIFFERENT PARTS

TECHNICIAN #1 TAKES READINGS ON ALL 10 PARTS 3 TIMES. LOG READINGS ON WORK SHEET (QF-18). THIS WILL TEST REPEATABILITY.

TECHNICIAN 2&3 WILL USE THE SAME GAGE, PARTS AND PROCESS AS TECHNICIAN 1. THIS WILL TEST REPRODUCIBILITY.

THE CALIBRATION TECHNICIAN WILL LOG ALL READINGS INTO THE COMPUTER AND PRINT OUT REPORT (QF-18A).

PASS: PLACE REPORT IN FILE LABELED GAGE R&R.

FAIL: IF FAILURE IS BY MORE THAN 20%, A CONCERN MATRIX (QF-25) MUST BE SUBMITTED TO THE INSPECTION DEPARTMENT MANAGER.

REV 5 8-22-01

CMM R&R FOR CALIBRATION TRAINING

CMM R&R REFERENCE

REFERENCE TO QSP-4.11.2 & QSP-4.11.2 CAN BE FOUND IN THE Q.S. 9000 MANUAL TITLED (M.S.A.) MEASURING SYSTEM ANALYSIS.

GAGE R&R FORMS:

QF-18 (GAGE REPEATBILITY AND REPRODUCIBILTY DATA SHEET) CAN BE FOUND IN THE CALIBRATION FILE.

QF-18A (GAGE REPEATABILITY AND REPRODUCIBILTY REPORT) CAN BE FOUND IN THE CALIBRATION FILE.

QF-25 (concern / matrix)

CMM R&R INSTRUCTIONS:

RETRIEVE CHECK AID.

GATHER 10 PARTS

FOLLOW LB506 OR GD&T FOR PINNING AND CLAMPING SEQUENCE

TECHNICIAN #1 TAKES READINGS ON 10 PARTS IN RANDOM ORDER 3 TIMES AND LOGS READINGS ON FORM QF-18. (THIS WILL TEST REPEATABILITY)

TECHNICIAN #2 & #3 WILL USE THE SAME PROCESS AS TECHNICIAN #1. (THIS WILL TEST REPRODUCIBILITY.)

THE CALIBRATION TECHNICIAN WILL LOG ALL READINGS INTO THE COMPUTER AND PRINT OUT REPORT (QF-18A.)

PASS: PLACE REPORT IN FILE LABELED GAGE R&R.

FAIL: IF FAILURE IS BY MORE THAN 20% A CORRECTIVE ACTION REPORT (QF-25) MUST BE SUBMITTED TO THE INSPECTION DEPARTMENT MANAGER.

REV 4 8-22-01