CALCULATION COVER SHEET

INEEL V-Tank Remediation Project Number of Sheets:

1 of5 Site:

INEEL Test Area North, Idaho Falls, Idaho

Calculation Work Order Number: ABQOG - CEO02 Number: 12393.002.001

Subject: Excavation - Estimated Excavated Soil Volume/Storage Requirements

Rev #: Date: Revision: 1 Calculated by: 1 Checked by: Approved:

5/31/01

6/27/O 1

9/27/o 1

60% Rob Ederer

90% Rob Ederer Berg Keshian Berg Keshian

90% Polish Berg Keshian D. Brennecke 9. Keshian /

Draft Final Berg Keshian D. Brennecke

Q:\WP\INEEL Draft FtnaKalculatmns Draft Final\ABQ06-CEO02 f?AD\ABQ06-CEO02 RAD.doc

Page 3: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,

L SHEET -, of -

CLIENT/SUBJECT W.O. NO.

TASK DESCRIPTION TASK NO.

@p-W~A PREPAREDBY, DEPT DATES ‘3’ ‘1 I 1 APPROVED BY

MATH CHECK BY DEPT DATE ir

METHOD REV. BY DEPT DATE

Problem Statement: Estimate the volume of excavated soil, soil container capacity, and quantity of containers.

Method of Solution: 1. Estimate the weight of soil and compare to weight capacity of the bags. 2. Estimate the volume of soil to be excavated. 3. Estimate the number of bags required.

Assumptions: Average dry soil density if 95.5 pcf. Average total density is 111 pcf. @ Soil bag capacity is 258+3&k c&k c&, .

Sourc F

f Formulas and References: INEEL-BBWtEngineering Data - Soils test results (see Calculation ABQ05 - CEOOI) LiftBag Product Literature Design Drawings

Calculation:

Page 4: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,

SHEET - of -

CLIENT/SUBJECT W.O. NO.

TASK DESCRIPTION TASK NO.

PREPARED BY DEPT

MATH CHECK BY DEPT

METHOD REV. BY DEPT

Page 5: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,

4&T SHEET - of -

CLIENT/SUBJECT W.O. NO.

TASK DESCRIPTION

PREPAREDBY,

MATH CHECK BY

METHOD REV. BY

DEPT

DEPT

DEPT

TASK NO.

G=V~'10-05-003~A-~~85 r. ;. li

Page 6: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,

Toc5 SHEET -~ of -

CLIENT/SUBJECT W.O. NO.

TASK DESCRIPTION TASK NO.

PREPAREDBY

MATH CHECK BY

METHOD REV. BY

DEPT

DEPT

DEPT

Page 7: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,

SHEET - of -

CLIENT/SUBJECT W.O. NO.

TASK DESCRIPTION TASK NO.

% kEstl[M DEPT PREPAREDBY

MATH CHECK BY DEPT

METHOD REV. BY DEPT

~~

7kc *da 4 a pok+L&~ +w yQ~e0 pa+&

l3m bhJk tAs- PO c W-J iqJ*-

A* ca3~ 4

RFW 1 O-05-003/A-5’85 r_r C‘“’

Page 8: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,
Page 9: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,

CALCULATION COVER SHEET

Project: INEEL V-Tank Remediation Project

Number of Sheets:

1 of9 Site:

INEEL Test Area North, Idaho Falls, Idaho

Calculation Work Order Number: ABQ07 - CEO03 Number: 12393.002.001

Subject: Lifting Requirements

Rev #: Date: Revision: Calculated by: Checked by: Approved:

4/l l/O1

6/l/01

60%

90%

R. Ederer

R. Ederer

N/A

D. Bennecke

N/A

B.Keshian

RAC

RAD

6/27/O 1

912710 1

90% Polish D. Brennecke

Draft Final D. Brennecke

B. Keshian

B. Keshian

B. Keshian /7

/

Q:\WP\INEEL Drafl Ftnal\Calculations Draft FinaMBQ07-CEO03 RAD\ABQ07-CEO03 FtAD.doc

Page 10: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,

Client/Subject: INEEL-BBWI / V-tank Removal Proiect W.O. No.:l2393.002.001 Task Description: Lifting Requirements Task: 90% Design Calc Prepared by: R. Ederer

Problem Statement: Evaluate the lifting requirements of the V-l, 2, 3, and V-9 tanks. Consider lifting of shipping casks, concrete rad-vault, and soil bags.

Method of Solution: 1. Estimate the tank surface area. 2. Estimate thickness of the steel. 3. Estimate the tank weight.

1. The tanks are stainless steel (type 304 for this analysis) 2. The V-l, 2, 3 tanks are 10 ft. diameter and 19.5 ft. long. 3. The V-9 tanks is 3.5 ft diameter by 5.5 ft to top of cone section, cone is 1.75’ long.

Sources of Formulas and References: l Grove Hydraulic Crane Product literature l Design Drawings l Duratek shipping container and vault literature 0 “Lift Liner” system product literature

Calculation:

A. Calculate the expected weight of V-l, V-2, and V-3 Tanks

1. Determine the surface area of the tanks.

Dia tank := 10 L tank := 19.5

2 Area := (Dia D1a tank

surface \ tankBxmL tank + 2’7[‘~

Assume the tank thickness: ._ 0.25 t shell ‘-12

2. Determine the tank weight

Steel volume is: voi sst ‘= t shell ‘Area surface

Assume the density of Type 304 stainless steel is: _

vol sst 16.35 cf

sg ss. := 8.04 p ss, := sg ,,,62.4 Psst 501.7 Pcf

Page 11: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,

The tank weight is:

w tank ‘= p ssteVol sst I w,k 8203 lbs

Assume approximately 2” of liquid or sludge left in the tank when lifted.

2 S s I- .- .-- r .- 5 a :=- a=O.O33

12 r

W liquid := !0.5.r2a- sin( a) ) .L tank-( 62.4.1.2) ’ W =601 Ibs

y tank weight for fittings, flanges, and miscellaeous piping (1,000 Ibs).

AAj*

w tank * ‘= ‘w tank + w liquid + lOOO\ ,i w,,k:=9804 Ibs

B. Estimate the weight of the V-9 tank. To be conservative and simplify the calculation, assume the cone section is a cylinder.

Dia tank.v9 ‘= 4 L mksv9 :=5 + 1.5

i Area surface.v9

2 x\ := [ Dia tank-v9 ‘y / + L. i 7th tank-v9 area := 101.71 sf \ /

Assume the tank thickness: .-0.25 t shell ‘-12

2. Determine the tank weight

Steel volume is: Vol sst.v9 ‘= t shell ‘Area surface.v9 Vol sst.v9 = ’ 2.11 cf

Assume the density of Type 304 stainless steel is:

sg ss. :=8.04 p sst := sg ,,,*62.4

The tank weight is:

psst 501.7 pcf

w tank.v9 ‘= p sst’vol sst.v9 Wtankv9 = no1063 lbs .

Adujst tank weight for fittings, flanges, and miscellaeous piping (500 Ibs).

w tank.v9 := w tank.v9 + 5oo 1563 Ibs

Page 12: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,

C. Evaluate the lifting requirements for the tanks. Design lifting for V-l, 2, & 3 tanks

1. In summary, the weight of each tanks is:

V-l, V-2, and V-3 (each): W.tank =9804 ibs

v-9: w tank.v9 = I 1563 Ibs

2. Assume the tanks are placed in granular fill material (cohesion = 0), with no groundwater therefore neglect the suction required to overcome the capillary forces.

c :=o c a :=c*o.9

3. Add the force to overcome soil friction. Assume the soil rises to the springline of the tank (5’).

a. Determine the active soil force on the tank

ysoil :=lll pcf H :=5 Q :=32edeg

K, := 1 - sin( $)

1 + SW+) Ka = 0.307

P vertical ‘=Y soileH = I 555

P active ‘= K a’p vertical P active = ’ 172 psf

b. Determine the skin friction coefficient on the tank.

6 :=17*deg Ca 1~0.9 f, :=ca+Pactivemtan(G) f, = 1 53.5 psf

c. Estimate the surface area of the tank in contact with soil.

LllD (19.5 XrMO) 2

s tank = I 0306 Sf

d. Estimate the breaking force to overcome the soil friction

‘break ‘=fo’S tank P break = I 016,387 lbs

4. Estimate the lifting requiremen

Lift capacity ‘= (w tank+ Pbreak

9804 + 16387

t for removing the largest tank.

‘I Lift capacity := 26191 Ibs or 13.1 tons

Page 13: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,

Discussion Summary of talcs:

. weight of each V-l, V-2, and V-3 tanks (tons): W ea.tank=4.9 tons

weight of V-9 tank (tons): w tank.v9 0.781 tons

Tank lifting capacity required (tons)

lcvA

Lift capacity 13.1 tons

Select a Grove RT650E &Rough Terrrain Hydraulic Crane or equal. A cut sheet is included as Attachment 1. This crane will be adequate for other lifting requirements on the job such as the “Rad Vault 8-120” with loaded HIC (66,700 Ibs + 7,500 Ibs = 74,200 Ibs), DURATEK CNS 8-120B Type B shipping casks (49,300 Ibs, empty; 63,980 Ibs w/maximum payload) and soil bags (24,000 Ibs).

Page 14: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,

. __.I ‘_ . . - i4 . -- _. -.

: , _ _ .^., -

Page 15: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,

Dimensions

-

. T ISI El5

- -

I I *-- I I

, #

Note: ( ) Reference dimensions in mm

RTGOOE Series

Page 16: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,

RT650E RATED LIFTING CAPACITIES IN POUNDS 33 FT. - 105 FT. BOOM

ON OUTRIGGERS FULLY EXTENDED - 360” #OOOl

in Main Boom Length in Feet Feet 33 40 50 60 70 80 90

10 100,000 80,550 67,250 (69.5) (73.5) m

.r% 87,100 79,150 64,200 l 56,100 IL (65.5) (70.5) (75) (78) 15 69,050 69,550 59,950 51,800 45,200

(59.5) (65.5) (71) (75) (77.5) 20 50,500 50,950 51,400 44,500 38,550 34,450 l 31,4W

(47.51 1571 (64.5) (69.5) (73) (75.5) (78) nr 38,300 1 38,850 1 39,350 1 39,650 1 37,100 1 29,850 1 27,250

40

45 17,100 17,350 17,300 17,300 (381 (48.51 (60)

50 13,950 14,150 14,200 14,200 (28) (42.5) (50.5) (56)

55 11,700 11,750 11,850 (35) (45.5) (52)

60 9,730 9,870 9,980 (26) (39.5) (47.5)

65 8,300 8,440 w (42.5)

70 6,960 7,170 (24.5) (37.5)

-- 6.080 13 (31)

80 5,130 (231

85

90

loo

21,000 (76.5)

21,000 (73.5) 19,150

(70) 16,650

(67) 14,650

VW 13,000 (60.5) 11,900

0 10,100 (53.5) 8,600 (49.5) 7,340 (45.5) 6,290 (40.5) 5,380 (35.5) 4,580 (29.5) 3,880 (22)

Minimum boom angle (O) for indicated length(no load) Maximum boomlength(ft.)atO” boom angle(rto load) NOTE: ( ) Boom angles ara in degrees. #LMI operating code. Refer to LMI manual for operating insttuciions. This capacity is based on maximum boom angle.

105

=I -I

(62.5) 12,000

(59) / 10,150 (55.5) 8,680 (52)

7,430 (48.5) 6,390 w-5)_ 5,490 WV .

4,720 (35) ,

4,020 (29)

3,400 (21.5)

0 105

Lifting Capacities at Zero Degree Boom Angle On Outriggers Fully Extended - 360”

Boom MainBoomLengthinFeet Angie 33 40 50 60 70 80 90 100

0” 16,250 12,500 8,780 6,290 4,510 3,160 2,110 1,260 (28.2) (35) (45) (55) (65) (75) (85) (95)

NOTE: ( ) Reference radii in feet. A6-829-100936

RTWOE Series

Page 17: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,

RTGOOE SERIES ON RUBBER CAPACITIES

STATIONARY CAPACITIES 360"

Radius ##9005

in Main Boom Length in Feet Feet 33 40 50 60 70

10 38,550 38,550 (69.5) (73.5)

12 32,550 32,550 32,550 (65.5) (70.5) (74.5)

15 23,700 23,700 23,700 23,700 (59.5) (65.5) (71) (75.5)

20 14,450 14,450 14,450 14,450 14,450 (47.5) (57) (64.5) (70) (73.5)

25 9,640 9,640 9,640 9,640 9,640 (32) (47) (58) (65) (69.5)

30 6,840 6,840 6,840 6,840 P-5) tw (5% W-5)

4,850 4,850 4,850 (41.5) (53) (60)

40 3,450 3,450 3,450 (30.5) (46.5) (54.5)

NOTE: ( ) Boom angles are in degrees. #LMI operating code. Refer to LMI manual for operating instructions.

I Lifting Capacities at Zero Degree Boom Angle On Rubber - 360”

Boom Main Boom Length in Feet Angle 33 40 50

0” 7,580 4,850 2,410 (28.2) (35) (45)

NOTE: ( ) Reference radii in feet. A6-829-100836A

STATIONARY CAPACITIES DEFINED ARC OVER FRONT (See Note 3)

25 18,200 18,200 18,200 18,200 18,200 (32) (47) (58) (65) (69.5) 1

30 13,100 13,100 13,100 13,100 (34.5) (50) (59) (64.5)

35 10,050 10,050 10,050 (41.5) (53) (60)

40 7,900 7,900 7,900 (30.5) (46.5) (54.5)

45 6,290 6,290 (38.5) (49)

50 5,050 5,050 (28.5) (43)

55 4,060 (35.5)

60 3,260 (26.5)

Ain. boom angle (“) for indicated length (no load) 0 Aax boom length (ft.) at 0” boom angle (no toad) 70

NOTE: ( ) Boom angles are in degrees. #LMI operating code. Refer to LMI manual for operating instructions.

Lifting Capacities at Zero Degree Boom Angle On Rubber - Defined Arc Over Front

NOTE: ( ) Reference radii in feet. A6-829-100835A

RTGOOE Series

Page 18: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,
Page 19: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,

CALCULATION COVER SHEET

Project:

Site:

INEEL V-Tank Remediation Project

INEEL Test Area North, Idaho Falls, Idaho

Number of Sheets:

/t9fg

Calculation Work Order Number: ABQ08 - CEO04 Number: 12393.002.001

Subject: Drum Storage/Water Storage/Decontamination Area Secondary Containment Requirements

Rev #:

RAB

RAC

RAD

RAE

Date:

5/31/01

6/29/O 1

9/27/o 1

1 O/23/0 1

Revision: Calculated by:

60% R. Ederer

90% R. Ederer

90% Polish D. Brennecke

Draft Final D. Brennecke

Draft Final D. Brennecke Polish

Checked by:

B. Keshian

B. Keshian

B. Keshian

B. Keshian

Approved:

B. Keshian

B. Keshian

Jim Lockhart n

L:\WP\INEEL Draft Fir&DRAFT FINAL INEEL 10~0l%alwlations Draft FinaMBQO&CEO04 RAE\ABQO&CEOO4 RAE.doc

Page 20: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,

SHEET~A of q -_ CLIENT/SUBJECT

TASK DESCRIPTION

PREPAREDBY

MATH CHECK BY

DEPT

DEPT

W.O. NO.

TASK NO.

METHOD REV. BY DEPT DATE 1 DEPT -DATE

F?FW 10-05-003/A-5185 512-%x:?

Page 21: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,

DETERMINATION OF WATER fjowc~

Item Sources of water

V-l v-2 VA3 v-9 Decon Runoff Rinse

Total water volume

Value Units - -

1164 gallons 1076 gallons 7648 gallons

70 gallons 2000 gallons

15000 gallons 500 gallons

27458 gallons

Page 22: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,

SHEET + of 8 P - CLIENT/SUBJECT W.O. NO.

TASK DESCRIPTION TASK NO.

PREPAREDBY DEPT

MATH CHECK BY DEPT

METHOD REV. BY DEPT

RFW 1 O-05003’A-5’85 512-5643

Page 23: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,

CLIENT/SUBJECT

TASK DESCRIPTION

PREPAREDBY

MATH CHECK BY

METHOD REV. BY

ehLJ/d ?+7s*

I// 0 umr u/= -4hrru;,WQ &I-

L&Q* Pm-Ir 53J33

A m= D rr49 /I? mr .f?

P = (& - CLZ.~)

(P+Oa8$)

s= /duo - ru =>

zz

P 25 d - 2.0

4 a 522 /b ,’

Page 24: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,

Oc t-23-01 01 : 54pm From-Roy F. Weston, inc. 9702567100 T-908 P. ’ - t

W W @ (2 2 SHEET - of _

CLIENT/W BJ ECT /-d&d +7xl’/uir W.O. NO. _

TASK DESCRIPTION &c~ccv- J’= *- &-+’ sn&@a d- TASK NO.

PREPARED BY /x

MATH CHECK BY

DEPT

DEPT

DATE /* ef

DATE w

METHOD REV. BY DEPT DATE . .“. .” “, _ _. ..--. . ~..I” ,.. . . , -. e-_,. .+’ . . . .a . ,...“. . a.. --~w.“.I T’ . . . . .,. --,a A, . .“._ . -.- -,.......*. : . - - - - .” ?’ . , -. ._

i i

APPROVED BY I

DEPT DATE .I” . . .._.. .,..-- _._.._ “d_,, . . . . . pe -^.._....._. . . . .-_. i”.‘“..

Page 25: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,

- _. 7

117 116 11s 114 113 112 111 1 -t

10 0 10 20 30 40

OS/3 l/200 1

Page 26: CALCULATION COVER SHEET - US Department of Energy · PDF fileCALCULATION COVER SHEET INEEL V-Tank Remediation Project Number of Sheets: 1 of5 Site: INEEL Test Area North, Idaho Falls,

112

-.

4:

Sf

http://www.wrcc.dri.edu/pcpnfreq/id25y24.gif 05/3 l/200 1