Calculating Bulk Earth Works Simpson's Rule

Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between

Embed Size (px)

DESCRIPTION

Simpson’s Rule Simpson's Rule attempts to allow for the natural shape of the land.

Citation preview

Page 1: Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between

Calculating Bulk Earth Works

Simpson's Rule

Page 2: Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between

Simpson’s Rule• Sum of Grids Method• Trapezoidal MethodAll assume that the land is a straight line

between the spot heights

Page 3: Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between

Simpson’s Rule

• Simpson's Rule attempts to allow for the natural shape of the land.

Page 4: Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between

Simpson’s Rule

Page 5: Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between

Using Simpson’s Rule

Page 6: Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between

Page 2

NOTE - Must be an odd Number of Spot Heights

Page 7: Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between

Formation Ht Grid R.L. Cut or Fill

Mul

tiplie

r

Cut or Fill x Multiplier

Total Cross Section

x (Grid ÷ 3)

Mul

tiplie

r

A 1 100.500 100.950 -0.450 1 -0.450 B 1 100.500 100.800 -0.300 4 -1.200 C 1 100.500 100.730 -0.230 2 -0.460 D 1 100.500 100.735 -0.235 4 -0.940 E 1 100.500 100.724 -0.224 2 -0.448 F 1 100.500 100.680 -0.180 4 -0.720 G 1 100.500 100.830 -0.330 1 -0.330 -4.548 1.66667 1

A 2 100.500 1B 2 100.500 4C 2 100.500 2D 2 100.500 4E 2 100.500 2F 2 100.500 4G 2 100.500 1 4

A 3 100.500 1B 3 100.500 4C 3 100.500 2D 3 100.500 4E 3 100.500 2F 3 100.500 4G 3 100.500 1 2

A 4 100.500 1B 4 100.500 4C 4 100.500 2D 4 100.500 4E 4 100.500 2F 4 100.500 4G 4 100.500 1 4

A 5 100.500 1B 5 100.500 4C 5 100.500 2D 5 100.500 4E 5 100.500 2F 5 100.500 4G 5 100.500 1 1

Totalx Grid ÷ 3

Answer

Add

Grid

A5

to G

5 An

swer

Bel

ow

Grid

Assesment 3 Simpsons Rule Answer Sheet

-7.5

80

Add

Grid

A1

to G

1 An

swer

Bel

owAd

d G

rid A

2 to

G2

Answ

er B

elow

Add

Grid

A3

to G

3 An

swer

Bel

owAd

d Gr

id A

4 to

G4

Answ

er B

elow

Page 8: Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between

Page 3

Page 9: Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between

Page 3

Page 10: Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between
Page 11: Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between

Formation Ht Grid R.L. Cut or Fill

Mul

tiplie

r

Cut or Fill x Multiplier

Total Cross Section

x (Grid ÷ 3)

Mul

tiplie

r

A 1 100.500 100.950 -0.450 1 -0.450 B 1 100.500 100.800 -0.300 4 -1.200 C 1 100.500 100.730 -0.230 2 -0.460 D 1 100.500 100.735 -0.235 4 -0.940 E 1 100.500 100.724 -0.224 2 -0.448 F 1 100.500 100.680 -0.180 4 -0.720 G 1 100.500 100.830 -0.330 1 -0.330 -4.548 1.66667 1

A 2 100.500 100.900 -0.400 1 -0.400 B 2 100.500 100.830 -0.330 4 -1.320 C 2 100.500 100.720 -0.220 2 -0.440 D 2 100.500 100.700 -0.200 4 -0.800 E 2 100.500 100.650 -0.150 2 -0.300 F 2 100.500 100.650 -0.150 4 -0.600 G 2 100.500 100.600 -0.100 1 -0.100 -3.960 1.66667 4

A 3 100.500 1B 3 100.500 4C 3 100.500 2D 3 100.500 4E 3 100.500 2F 3 100.500 4G 3 100.500 1 2

A 4 100.500 1B 4 100.500 4C 4 100.500 2D 4 100.500 4E 4 100.500 2F 4 100.500 4G 4 100.500 1 4

A 5 100.500 1B 5 100.500 4C 5 100.500 2D 5 100.500 4E 5 100.500 2F 5 100.500 4G 5 100.500 1 1

Totalx Grid ÷ 3

Answer

Add

Grid

A1

to G

1 An

swer

Bel

owAd

d G

rid A

2 to

G2

Answ

er B

elow

Add

Grid

A3

to G

3 An

swer

Bel

owAd

d Gr

id A

4 to

G4

Answ

er B

elow

Grid

Assesment 3 Simpsons Rule Answer Sheet

-7.5

80

-6.6

00

Add

Grid

A5

to G

5 An

swer

Bel

ow

Page 12: Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between
Page 13: Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between

Formation Ht Grid R.L. Cut or Fill

Mul

tiplie

r

Cut or Fill x Multiplier

Total Cross Section

x (Grid ÷ 3)

Mul

tiplie

r

A 1 100.500 100.950 -0.450 1 -0.450 B 1 100.500 100.800 -0.300 4 -1.200 C 1 100.500 100.730 -0.230 2 -0.460 D 1 100.500 100.735 -0.235 4 -0.940 E 1 100.500 100.724 -0.224 2 -0.448 F 1 100.500 100.680 -0.180 4 -0.720 G 1 100.500 100.830 -0.330 1 -0.330 -4.548 1.66667 1

A 2 100.500 100.900 -0.400 1 -0.400 B 2 100.500 100.830 -0.330 4 -1.320 C 2 100.500 100.720 -0.220 2 -0.440 D 2 100.500 100.700 -0.200 4 -0.800 E 2 100.500 100.650 -0.150 2 -0.300 F 2 100.500 100.650 -0.150 4 -0.600 G 2 100.500 100.600 -0.100 1 -0.100 -3.960 1.66667 4

A 3 100.500 100.750 -0.250 1 -0.250 B 3 100.500 100.730 -0.230 4 -0.920 C 3 100.500 100.690 -0.190 2 -0.380 D 3 100.500 100.550 -0.050 4 -0.200 E 3 100.500 100.530 -0.030 2 -0.060 F 3 100.500 100.450 0.050 4 0.200G 3 100.500 100.400 0.100 1 0.100 -1.510 1.66667 2

A 4 100.500 1B 4 100.500 4C 4 100.500 2D 4 100.500 4E 4 100.500 2F 4 100.500 4G 4 100.500 1 4

A 5 100.500 1B 5 100.500 4C 5 100.500 2D 5 100.500 4E 5 100.500 2F 5 100.500 4G 5 100.500 1 1

Totalx Grid ÷ 3

Answer

Add

Grid

A5

to G

5 An

swer

Bel

ow

Grid

Assesment 3 Simpsons Rule Answer Sheet

-7.5

80

-6.6

00

-2.5

17

Add

Grid

A1

to G

1 An

swer

Bel

owAd

d G

rid A

2 to

G2

Answ

er B

elow

Add

Grid

A3

to G

3 An

swer

Bel

owAd

d Gr

id A

4 to

G4

Answ

er B

elow

Page 14: Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between
Page 15: Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between

Formation Ht Grid R.L. Cut or Fill

Mul

tiplie

r

Cut or Fill x Multiplier

Total Cross Section

x (Grid ÷ 3)

Mul

tiplie

r

A 1 100.500 100.950 -0.450 1 -0.450 B 1 100.500 100.800 -0.300 4 -1.200 C 1 100.500 100.730 -0.230 2 -0.460 D 1 100.500 100.735 -0.235 4 -0.940 E 1 100.500 100.724 -0.224 2 -0.448 F 1 100.500 100.680 -0.180 4 -0.720 G 1 100.500 100.830 -0.330 1 -0.330 -4.548 1.66667 1

A 2 100.500 100.900 -0.400 1 -0.400 B 2 100.500 100.830 -0.330 4 -1.320 C 2 100.500 100.720 -0.220 2 -0.440 D 2 100.500 100.700 -0.200 4 -0.800 E 2 100.500 100.650 -0.150 2 -0.300 F 2 100.500 100.650 -0.150 4 -0.600 G 2 100.500 100.600 -0.100 1 -0.100 -3.960 1.66667 4

A 3 100.500 100.750 -0.250 1 -0.250 B 3 100.500 100.730 -0.230 4 -0.920 C 3 100.500 100.690 -0.190 2 -0.380 D 3 100.500 100.550 -0.050 4 -0.200 E 3 100.500 100.530 -0.030 2 -0.060 F 3 100.500 100.450 0.050 4 0.200G 3 100.500 100.400 0.100 1 0.100 -1.510 1.66667 2

A 4 100.500 100.550 -0.050 1 -0.050 B 4 100.500 100.470 0.030 4 0.120C 4 100.500 100.330 0.170 2 0.340D 4 100.500 100.320 0.180 4 0.720E 4 100.500 100.350 0.150 2 0.300F 4 100.500 100.600 -0.100 4 -0.400 G 4 100.500 100.290 0.210 1 0.210 1.240 1.66667 4

A 5 100.500 1B 5 100.500 4C 5 100.500 2D 5 100.500 4E 5 100.500 2F 5 100.500 4G 5 100.500 1 1

Totalx Grid ÷ 3

Answer

Add

Grid

A1

to G

1 An

swer

Bel

owAd

d G

rid A

2 to

G2

Answ

er B

elow

Add

Grid

A3

to G

3 An

swer

Bel

owAd

d Gr

id A

4 to

G4

Answ

er B

elow

Grid

Assesment 3 Simpsons Rule Answer Sheet

-7.5

80

-6.6

00

-2.5

17

2.06

7

Add

Grid

A5

to G

5 An

swer

Bel

ow

Page 16: Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between
Page 17: Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between

B 1 100.500 100.800 -0.300 4 -1.200 C 1 100.500 100.730 -0.230 2 -0.460 D 1 100.500 100.735 -0.235 4 -0.940 E 1 100.500 100.724 -0.224 2 -0.448 F 1 100.500 100.680 -0.180 4 -0.720 G 1 100.500 100.830 -0.330 1 -0.330 -4.548 1.66667 1

A 2 100.500 100.900 -0.400 1 -0.400 B 2 100.500 100.830 -0.330 4 -1.320 C 2 100.500 100.720 -0.220 2 -0.440 D 2 100.500 100.700 -0.200 4 -0.800 E 2 100.500 100.650 -0.150 2 -0.300 F 2 100.500 100.650 -0.150 4 -0.600 G 2 100.500 100.600 -0.100 1 -0.100 -3.960 1.66667 4

A 3 100.500 100.750 -0.250 1 -0.250 B 3 100.500 100.730 -0.230 4 -0.920 C 3 100.500 100.690 -0.190 2 -0.380 D 3 100.500 100.550 -0.050 4 -0.200 E 3 100.500 100.530 -0.030 2 -0.060 F 3 100.500 100.450 0.050 4 0.200G 3 100.500 100.400 0.100 1 0.100 -1.510 1.66667 2

A 4 100.500 100.550 -0.050 1 -0.050 B 4 100.500 100.470 0.030 4 0.120C 4 100.500 100.330 0.170 2 0.340D 4 100.500 100.320 0.180 4 0.720E 4 100.500 100.350 0.150 2 0.300F 4 100.500 100.600 -0.100 4 -0.400 G 4 100.500 100.290 0.210 1 0.210 1.240 1.66667 4

A 5 100.500 100.394 0.106 1 0.106B 5 100.500 100.330 0.170 4 0.680C 5 100.500 100.300 0.200 2 0.400D 5 100.500 100.200 0.300 4 1.200E 5 100.500 100.190 0.310 2 0.620F 5 100.500 100.140 0.360 4 1.440G 5 100.500 100.040 0.460 1 0.460 4.906 1.66667 1

Totalx Grid ÷ 3

Answer

Add

Grid

A5

to G

5 An

swer

Bel

ow

8.17

7 -7

.580

-6

.600

-2

.517

2.

067

Add

Grid

A1

to G

1 An

swer

Bel

owAd

d Gr

id A

2 to

G2

Answ

er B

elow

Add

Grid

A3

to G

3 An

swer

Bel

owAd

d Gr

id A

4 to

G4

Answ

er B

elow

Page 18: Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between

CUT 7.580 CUT 6.600

CUT 2.517 FILL 2.067

FILL 8.177

Page 19: Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between

A B C D E F G1 -0.450 -0.300 -0.230 -0.235 -0.224 -0.180 -0.3302 -0.400 -0.330 -0.220 -0.200 -0.150 -0.150 -0.1003 -0.250 -0.230 -0.190 -0.050 -0.030 0.050 0.1004 -0.050 0.030 0.170 0.180 0.150 -0.100 0.2105 0.106 0.170 0.200 0.300 0.310 0.360 0.460

Cross Sectional Area-7.580-6.600-2.5172.0678.177

AN ISOMETRIC VIEW

Page 20: Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between
Page 21: Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between

B 1 100.500 100.800 -0.300 4 -1.200 C 1 100.500 100.730 -0.230 2 -0.460 D 1 100.500 100.735 -0.235 4 -0.940 E 1 100.500 100.724 -0.224 2 -0.448 F 1 100.500 100.680 -0.180 4 -0.720 G 1 100.500 100.830 -0.330 1 -0.330 -4.548 1.66667 1

A 2 100.500 100.900 -0.400 1 -0.400 B 2 100.500 100.830 -0.330 4 -1.320 C 2 100.500 100.720 -0.220 2 -0.440 D 2 100.500 100.700 -0.200 4 -0.800 E 2 100.500 100.650 -0.150 2 -0.300 F 2 100.500 100.650 -0.150 4 -0.600 G 2 100.500 100.600 -0.100 1 -0.100 -3.960 1.66667 4

A 3 100.500 100.750 -0.250 1 -0.250 B 3 100.500 100.730 -0.230 4 -0.920 C 3 100.500 100.690 -0.190 2 -0.380 D 3 100.500 100.550 -0.050 4 -0.200 E 3 100.500 100.530 -0.030 2 -0.060 F 3 100.500 100.450 0.050 4 0.200G 3 100.500 100.400 0.100 1 0.100 -1.510 1.66667 2

A 4 100.500 100.550 -0.050 1 -0.050 B 4 100.500 100.470 0.030 4 0.120C 4 100.500 100.330 0.170 2 0.340D 4 100.500 100.320 0.180 4 0.720E 4 100.500 100.350 0.150 2 0.300F 4 100.500 100.600 -0.100 4 -0.400 G 4 100.500 100.290 0.210 1 0.210 1.240 1.66667 4

A 5 100.500 100.394 0.106 1 0.106B 5 100.500 100.330 0.170 4 0.680C 5 100.500 100.300 0.200 2 0.400D 5 100.500 100.200 0.300 4 1.200E 5 100.500 100.190 0.310 2 0.620F 5 100.500 100.140 0.360 4 1.440G 5 100.500 100.040 0.460 1 0.460 4.906 1.66667 1

Totalx Grid ÷ 3

Answer

Add

Grid

A1

to G

1 An

swer

Bel

owAd

d Gr

id A

2 to

G2

Answ

er B

elow

Add

Grid

A3

to G

3 An

swer

Bel

owAd

d Gr

id A

4 to

G4

Answ

er B

elow

-37.617

-7.5

80

-6.6

00

-2.5

17

2.06

7

Add

Grid

A5

to G

5 An

swer

Bel

ow-22.570 1.667

8.17

7

Page 22: Calculating Bulk Earth Works Simpson's Rule. Simpsons Rule Sum of Grids Method Trapezoidal Method All assume that the land is a straight line between

Trapezoid Rule

• If there were an even amount of spot heights the next best options would be to use the Trapezoid rule to finish of the calculation as show on the next page.