Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue DateApplication
Status
Study
Process
Ty
pe-1
Ty
pe-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal
Full Capacity,
Partial or Energy
Only (FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
17 3/18/2003 3/18/2003 Active AMEND 39 CC NG 520 520 RIVERSIDE CA SCE
Colorado River Substation 500kV
bus 1/1/2006 1/2/2018 NA Complete Complete Executed
20 8/19/2003 9/4/2003 Active AMEND 39 WT W 300 300 KERN CA SCE Antelope 12/31/2006 12/31/2017 NA Complete Complete Executed
32 5/12/2004 5/24/2004 Active Serial WT W 201 201 SAN DIEGO CA SDGE Boulevard East Substation 138kV 9/1/2007 12/31/2017 Waived Complete Complete Executed
72 4/26/2005 6/21/2005 Active Serial PS WTR 500 500 RIVERSIDE CA SDGE Proposed Lee Lake Substation 12/31/2008 12/31/2019 Waived Complete Re-Study Executed
73 6/6/2005 6/27/2005 Active Serial WT W 250 250 KERN CA Whirlwind Sub 230kV Bus 12/31/2007 12/15/2015 Waived Complete Complete Executed
84 11/22/2005 12/1/2005 Active Serial PV S 100 100 KERN CA SCE Whirlwind Sub 230kV Bus 12/31/2009 12/1/2019 Waived Complete Complete Executed
92 2/23/2006 2/23/2006 Active Serial CC NG 570 570 LOS ANGELES CA SCE Vincent Sub 230 kV Bus 7/1/2009 6/1/2019 Waived Complete Complete Executed
93 2/15/2006 3/1/2006 Active Serial WT W 220 220 KERN CA SCE Windhub Substation 220kV bus 12/31/2008 12/31/2016 Waived Complete Complete Executed
103 5/2/2006 5/2/2006 Active Serial ST B 27 27 SAN DIEGO CA SDGE Border Substation 69 kV 12/1/2008 4/30/2016 Complete Complete Complete Executed
106A 5/1/2006 6/6/2006 Active Serial WT W 160 160 SAN DIEGO CA SDGE Boulevard East Substation 138kV 6/30/2008 3/31/2018 Complete Complete Complete Executed
119 8/8/2006 8/8/2006 Active Serial WT W 500 500 KERN CA SCE Windhub Sub 230kV Bus 12/31/2013 12/31/2016 Complete Complete Complete Executed
124 8/22/2006 8/22/2006 Active Serial PV S 600 600 IMPERIAL CA SDGE Imperial Valley Substation 230kV 3/1/2011 10/31/2016 Waived Complete Complete Executed
137 10/16/2006 10/17/2006 Active Serial CC NG 211 211 SAN DIEGO CA SDGE Encina Substation 230kV 8/1/2017 8/1/2017 Complete Complete Executed
138 10/23/2006 10/23/2006 Active Serial WT W 150 150 RIVERSIDE CA SCE Devers-Vista 230kV #1 12/31/2008 9/30/2020 Complete Complete Executed
142 11/6/2006 11/6/2006 Active Serial ST S 80 80 SAN BERNARDINO CA SCE Kramer Substation 220kV 12/31/2009 12/1/2016 Complete Complete Complete Executed
159A 12/6/2006 12/22/2006 Active Serial WT W 400 400 BAJA CALIFORNIA MX SDGE
East County (ECO) Substation
230kV 6/1/2009 12/1/2017 Complete Complete Complete Executed
163 1/9/2007 1/9/2007 Active TC PV S 300 300 FC SAN BERNARDINO CA SCE Mountain Pass Substation 115kV 12/31/2010 12/31/2016 Complete Complete Executed
183 3/5/2007 3/5/2007 Active TC WT W 300 300 EO BAJA CALIFORNIA MX SDGE
East County (ECO) Substation
230kV 11/1/2009 6/30/2019 Complete Complete In Progress
189 3/30/2007 3/30/2007 Active Serial CC NG 211 211 SAN DIEGO CA SDGE Encina Substation 138kV 5/1/2010 8/1/2017 Complete Complete Executed
193 3/19/2007 4/4/2007 Active TC ST S 500 500 FC RIVERSIDE CA SCE Colorado River Substation 500kV 12/31/2010 12/31/2016 Complete Complete Executed
215 5/21/2007 5/21/2007 Active TC WT W 420 420 EO BAJA CALIFORNIA MX SDGE
East County (ECO) Substation
230kV 5/1/2011 6/30/2019 Complete Complete In Progress
219 5/7/2007 5/23/2007 Active Serial CC NG 50 50 RIVERSIDE CA SCE
Colorado River Substation 500kV
bus 6/1/2012 1/2/2018 Complete Executed
258 9/12/2007 9/12/2007 Active TC CC NG 651 651 FC CONTRA COSTA CA PGE Contra Costa Substation 230kV bus 2/1/2012 12/31/2017 Complete Complete Executed
272 11/1/2007 11/1/2007 Active TC PV S 123 123 FC KINGS CA PGE Henrietta Substation 70kV bus 6/1/2012 12/31/2016 Complete Complete Executed
294 1/15/2008 1/16/2008 Active TC PV S 485 485 FC RIVERSIDE CA SCE Colorado River Substation 500kV 6/1/2012 7/1/2017 Complete Complete Executed
356 4/28/2008 4/28/2008 Active TC PV S 40 40 FC SAN LUIS OBISPO CA PGE Taft-Cuyama #1 70kV line 4/1/2012 12/31/2018 Complete Complete Executed
365 5/6/2008 5/12/2008 Active TC ST S 500 500 FC RIVERSIDE CA SCE Red Bluff Substation 230kV 12/28/2013 11/30/2021 Complete Complete Executed
421 5/30/2008 5/30/2008 Active TC ST S 49.5 49.5 FC RIVERSIDE CA SCE Blythe-Eagle Mountain 161 kV line 2/1/2012 2/1/2012 Complete Complete In Progress
429 5/30/2008 5/30/2008 Active TC PV S 100 100 FC IMPERIAL CA SDGE Imperial Valley Substation 230kV 7/1/2014 6/30/2016 Complete Complete Executed
467 5/30/2008 6/2/2008 Active TC ST S 230 230 FC CLARK NV SCE Eldorado-Ivanpah 230kV line 8/1/2012 9/30/2016 Complete Complete Executed
502 7/28/2009 7/31/2009 Active C1 PV S 20 20 FC CLARK NV SCE Eldorado-Ivanpah 230kV line 5/1/2016 9/30/2016 Complete Complete Executed
506 7/30/2009 7/31/2009 Active C1 PV S 300 300 FC KERN CA SCE Whirlwind Substation 230kV 7/31/2015 12/1/2018 Complete Complete Executed
526 9/11/2009 9/11/2009 Active SGIP PV S 20 20 EO FRESNO CA PGE Schindler-Coalinga #2 70kV line 1/1/2012 12/1/2016 N/A Complete Executed
532 11/2/2009 11/2/2009 Active SGIP PV S 20 20 EO FRESNO CA PGE Schindler-Huron-Gates 70kV line 1/1/2012 12/1/2016 N/A Complete Executed
539 12/18/2009 12/18/2009 Active SGIP PV S 20 20 EO STANISLAUS CA PGE Salado-Newman #1 60kV line 10/31/2012 6/1/2016 N/A Complete Executed
550 12/4/2009 1/19/2010 Active SGIP PV S 20 20 EO MERCED CA PGE Merced #1 70 kV 12/15/2011 5/31/2018 N/A Complete Executed
552 10/2/2009 2/1/2010 Active C2 PV S 60 60 FC SAN BERNARDINO CA SCE Jasper Sub 3/1/2012 12/1/2020 Complete Complete Executed
574 1/29/2010 2/1/2010 Active C2 CT NG 312 312 FC SAN DIEGO CA SDGE Otay Mesa Switchyard 230kV 5/1/2013 9/1/2016 Complete Complete Executed
576 1/29/2010 2/1/2010 Active C2 PV S 224 224 FC RIVERSIDE CA SCE Colorado River Sub 230kV Bus 12/31/2013 9/30/2018 Complete Complete Executed
581 1/29/2010 2/1/2010 Active C2 PV S 100 100 FC KINGS CA PGE Henrietta-GWF 115 kV Line 5/1/2013 9/30/2016 Complete Complete Executed
593 1/30/2010 2/1/2010 Active C2 PV S 310 310 FC SAN BERNARDINO CA SCE
Mohave Generating Station 500kV
bus 7/7/2014 12/1/2019 Complete Complete In Progress
602 1/30/2010 2/1/2010 Active C2 PV S 150 150 FC KERN CA SCE Whirlwind Substation 230kV 7/1/2013 12/1/2015 Complete Complete Executed
632B 6/1/2010 6/1/2010 Active SGIP-TC PV S 20 20 FC FRESNO CA PGE Stroud switching station 70kV 12/1/2012 5/30/2017 Complete Complete Executed
643R 7/30/2010 7/31/2010 Active C3 PV S 153 153 FC KERN CA SCE Whirlwind Sub 230 kV Bus 6/1/2013 12/15/2016 Complete Complete Executed
643W 7/8/2010 7/31/2010 Active C3 PV S 100 100 FC KINGS CA PGE
Gates-Gregg 230 kV and Gates-
McCall 230 kV 6/30/2014 9/30/2016 Complete Complete Executed
643X 7/30/2010 7/31/2010 Active C3 PV S 200 200 FC FRESNO CA PGE
Helm-Panoche 230 kV and Panoche-
Kearney 230kV 6/30/2014 9/30/2016 Complete Complete Executed
643AE 7/30/2010 7/31/2010 Active C3 PV S 150 150 FC RIVERSIDE CA SCE Red Bluff Sub 230kV Bus 1/1/2014 9/1/2019 Complete Complete Executed
643AJ 7/30/2010 7/31/2010 Active C3 PV S 100 100 FC KERN CA SCE Whirlwind Sub 230 kV Bus 6/1/2013 12/15/2016 Complete Complete Executed
644A 8/17/2010 8/17/2010 Active SGIP-TC PV S 20 20 FC SAN DIEGO CA SDGE
East County (ECO) Substation
138kV 5/1/2012 12/1/2016 Complete Complete Executed
645A 8/23/2010 8/23/2010 Active SGIP-TC PV S 20 20 FC KERN CA PGE Weedpatch-Wheeler Ridge 70kV 12/1/2012 8/23/2017 Complete Complete Executed
648 8/25/2010 8/25/2010 Active SGIP-TC PV S 20 20 FC FRESNO CA PGE Panoche-Oro Loma 115kV Tap 4/30/2012 5/30/2017 Complete Complete Executed
653F 10/7/2010 10/13/2010 Active SGIP-TC PV S 12 12 FC YOLO CA PGE Woodland-Davis 115 kV 5/1/2012 6/30/2016 Complete Complete Executed
653H 10/20/2010 10/20/2010 Active SGIP-TC PV S 10 10 FC LOS ANGELES CA SCE Antelope Sub 66 kV Bus 12/31/2013 12/29/2015 Complete Complete Executed
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Active
Net MWs Location Study AvailabilityGenerating Facility Point of Interconnection
California ISO Public Page 1 of 27
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue DateApplication
Status
Study
Process
Ty
pe-1
Ty
pe-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal
Full Capacity,
Partial or Energy
Only (FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Active
Net MWs Location Study AvailabilityGenerating Facility Point of Interconnection
667 3/31/2011 3/31/2011 Active C4 PV S 150 150 FC IMPERIAL CA SDGE Imperial Valley Substation 230kV 12/31/2014 3/31/2018 Complete Complete Executed
678 3/31/2011 3/31/2011 Active C4 PV S 60 60 FC FRESNO CA PGE Panoche-Schindler #1 & #2 115kV 9/5/2013 10/1/2016 Complete Complete Executed
679 3/31/2011 3/31/2011 Active C4 PV S 20 20 FC FRESNO CA PGE Giffen substation 70 KV 9/5/2013 12/20/2016 Complete Complete Executed
702 3/31/2011 3/31/2011 Active C4 CC NG 435 435 FC LOS ANGELES CA SCE El Segundo Substation 230kV Bus 6/1/2017 3/31/2020 Complete Complete Executed
705 3/28/2011 3/31/2011 Active C4 PV S 20 20 FC KERN CA PGE Arco-Carneras 70 kV line 9/5/2013 10/30/2016 Complete Complete Executed
720 3/31/2011 3/31/2011 Active C4 H WTR 4.5 4.5 EO TEHAMA CA PGE Vota - South 60 KV 12/15/2012 10/31/2015 Complete Complete Executed
723 3/31/2011 3/31/2011 Active C4 PV S 50 50 FC MADERA CA PGE Borden Sub 230 KV Bus 7/1/2014 4/10/2016 Complete Complete Executed
744 3/31/2011 3/31/2011 Active C4 PV S 90 90 FC KERN CA PGE Lamont Sub 115 KV Bus 7/1/2014 12/31/2016 Complete Complete Executed
746 3/31/2011 3/31/2011 Active C4 PV S 175 175 FC KERN CA SCE Whirlwind Substation 220kV 12/31/2014 8/31/2016 Complete Complete Executed
768 3/31/2011 3/31/2011 Active C4 PV S 330 330 FC LOS ANGELES CA SCE Antelope Substation 230kV bus 12/31/2014 12/31/2016 Complete Complete Executed
778 3/31/2011 3/31/2011 Active C4 PV S 20 20 EO LOS ANGELES CA SCE Antelope Substation 66 kV bus 12/31/2013 12/31/2016 Complete Complete Executed
779 3/31/2011 3/31/2011 Active C4 PV S 200 200 FC MERCED CA PGE Los Banos-Panoche #1 230kV 1/6/2014 10/1/2016 Complete Complete Executed
789 3/30/2011 3/31/2011 Active C4 PV S 80 80 FC SAN DIEGO CA SDGE Boulevard East Substation 69 kV 7/31/2015 9/30/2016 Complete Complete Executed
798 12/15/2010 3/31/2011 Active C4 PV S 221 221 EO RIVERSIDE CA SCE Colorado River Substation 230kV 12/31/2014 9/30/2018 Complete Complete Executed
799 3/31/2011 3/31/2011 Active C4 PV S 0.1 0.1 FC FRESNO CA PGE Mendota-San Joaquin-Helm 70kV 12/31/2014 11/30/2015 Complete Complete In Progress
800 3/31/2011 3/31/2011 Active C4 PV S 0.1 0.1 FC FRESNO CA PGE Mendota-San Joaquin-Helm 70kV 12/31/2014 11/30/2015 Complete Complete In Progress
805 3/31/2011 3/31/2011 Active C4 PV S 0.1 0.1 FC FRESNO CA PGE Mendota-San Joaquin-Helm 69K 12/31/2014 11/30/2015 Complete Complete In Progress
806 3/31/2011 3/31/2011 Active C4 PV S 0.1 0.1 FC FRESNO CA PGE Mendota-San Joaquin-Helm 70 KV 12/31/2014 11/30/2015 Complete Complete In Progress
809 3/31/2011 3/31/2011 Active C4 PV S 0.1 0.1 FC FRESNO CA PGE Stroud switching station 70kV 12/31/2014 5/30/2017 Complete Complete In Progress
814 3/31/2011 3/31/2011 Active C4 PV S 0.1 0.1 FC FRESNO CA PGE Stroud switching station 70kV 12/31/2014 5/30/2017 Complete Complete In Progress
815 3/31/2011 3/31/2011 Active C4 PV S 0.1 0.1 FC FRESNO CA PGE Stroud switching station 70kV 12/31/2014 5/30/2017 Complete Complete In Progress
816 3/31/2011 3/31/2011 Active C4 PV S 0.1 0.1 FC FRESNO CA PGE Stroud switching station 70kV 12/31/2014 5/30/2017 Complete Complete In Progress
820 3/31/2011 3/31/2011 Active C4 PV S 0.1 0.1 FC FRESNO CA PGE Mendota Sub 115KV Bus 12/31/2014 12/31/2016 Complete Complete In Progress
823 3/31/2011 3/31/2011 Active C4 PV S 0.1 0.1 FC FRESNO CA PGE Oro Loma - Panoche 115 KV 12/31/2014 5/30/2017 Complete Complete In Progress
824 3/31/2011 3/31/2011 Active C4 PV S 20 20 EO FRESNO CA PGE Mendota Sub 115 KV Bus 12/31/2014 3/31/2018 Complete Complete Executed
825 3/31/2011 3/31/2011 Active C4 PV S 20 20 EO FRESNO CA PGE Mendota Sub 115 KV Bus 12/31/2014 3/31/2018 Complete Complete Executed
829 3/31/2011 3/31/2011 Active C4 PV S 240 240 FC SAN BENITO CA PGE
Moss-Panoche and Coburn-
Panoche 230 KV 12/30/2015 12/15/2016 Complete Complete Executed
838 3/31/2011 3/31/2011 Active C4 PV S 100 100 FC IMPERIAL CA SDGE Imperial Valley Substation 230kV 12/31/2015 12/31/2016 Complete Complete
855 3/31/2011 3/31/2011 Active C4 PV S 92 92 FC CLARK NV SDGE Merchant Substation 230kV bus 2/28/2013 9/1/2016 Complete Complete Executed
860 3/31/2011 3/31/2011 Active ISP WT W 3.1 3.1 FC CONTRA COSTA CA PGE
Lone Tree-Cayetano at the Jackson
Substation 12/1/2011 12/1/2011 Complete In Progress
877 3/23/2012 4/2/2012 Active C5 PV S 280 280 FC MONTEREY CA PGE Morro-Gates 230kV line 10/30/2015 12/1/2016 Complete Complete Executed
885 4/2/2012 4/2/2012 Active C5 PV S 10 10 FC KERN CA PGE Copus-Old River 70 kV line 1/1/2015 12/15/2015 Complete Complete Executed
893 4/2/2012 4/2/2012 Active C5 CC NG 938.61 938.61 EO ORANGE CA SCE
Huntington Beach Switching Station
230kV 6/1/2020 6/1/2020 Complete Complete Executed
897 4/2/2012 4/2/2012 Active C5 PV S 200 200 FC SAN BERNARDINO CA SCE Jasper Substation 220kV bus 12/1/2016 6/1/2021 Complete Complete Executed
900 4/2/2012 4/2/2012 Active C5 PV S 20 20 FC KERN CA PGE Midway Temblor 115 kV line 12/20/2014 11/1/2016 Complete Complete Executed
901 4/2/2012 4/2/2012 Active C5 PV S 15 15 FC KERN CA PGE Semitropic-Midway 115 kV line 12/20/2015 10/31/2016 Complete Complete Executed
945 4/18/2013 4/30/2013 Active C6 CC NG 24 24 FC SAN JOAQUIN CA PGE Lodi STIG 230 kV Substation 1/8/2014 4/30/2016 Complete Complete Executed
946 4/23/2013 4/30/2013 Active C6 PV S 100 100 FC KERN CA PGE
Midway- Wheeler Ridge - 230 kV
Line #2 12/1/2015 3/1/2019 Complete Complete Executed
952 4/29/2013 4/30/2013 Active C6 PV S 165 165 FC MARICOPA AZ SDGE
500 kV common bus @
Haasayampa switchyard 11/30/2016 11/30/2016 Complete Complete Executed
954 4/29/2013 4/30/2013 Active C6 PV S 150 150 FC FRESNO CA PGE
Gates 230kV Substations (30900
Gates 230) 7/1/2016 2/1/2019 Complete Complete Executed
955 4/30/2013 4/30/2013 Active C6 CC NG 60 60 FC FRESNO CA PGE Sanger Co-gen 115/13.8kV Sub 5/1/2014 4/1/2016 Complete Complete Executed
961 4/30/2013 4/30/2013 Active C6 PV S 200.62 200.62 FC BAJA CALIFORNIA MX SDGE Imperial Valley Substation 230kV 11/1/2015 7/21/2018 Complete Complete Executed
963 4/30/2013 4/30/2013 Active C6 CT NG 72 72 FC CONTRA COSTA CA PGE Pittsburg Substation 115 kV bus 1/3/2014 3/31/2016 Complete Complete Executed
965 4/30/2013 4/30/2013 Active C6 PV S 13.5 13.5 FC KINGS CA PGE Henrietta-GWF 115 kV Line 10/1/2016 10/1/2016 Complete Complete Executed
967 4/30/2013 4/30/2013 Active C6 PV S 60 60 EO KERN CA SCE Whirlwind 230 kV bus 3/1/2016 3/1/2016 Complete Complete
968 4/30/2013 4/30/2013 Active C6 CC NG 35 35 FC SAN DIEGO CA SDGE
SDG&E Palomar substation at
Palomar Energy Center 3/1/2015 4/15/2018 Complete Complete Executed
970 4/30/2013 4/30/2013 Active C6 PV S 150 150 EO RIVERSIDE CA SCE
Colorado River Substation 230kV
bus 12/31/2016 12/31/2016 Complete Complete
971 4/30/2013 4/30/2013 Active C6 PV S 200 200 FC KERN CA SCE Whirlwind Substation 220kV 5/30/2016 9/30/2016 Complete Complete Executed
972 4/30/2013 4/30/2013 Active C6 PV S 20 20 FC KERN CA PGE Midway-Temblor 115kV line 12/31/2016 11/23/2016 Complete Complete Executed
988 4/30/2013 4/30/2013 Active C6 PV S 20 20 EO KERN CA PGE Maricopa-Copus 70kV line 8/1/2015 2/28/2017 Complete Complete Executed
990 4/30/2013 4/30/2013 Active C6 CT NG 910 910 EO LOS ANGELES CA SCE
Loop Center-Mesa and Center-
Olinda 230kV lines 1/1/2018 8/13/2024 Complete Complete
993 4/30/2013 4/30/2013 Active C6 PV S 50 50 FC NYE NV VEA Valley Substation 138kV 12/31/2016 3/15/2019 Complete Complete
California ISO Public Page 2 of 27
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue DateApplication
Status
Study
Process
Ty
pe-1
Ty
pe-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal
Full Capacity,
Partial or Energy
Only (FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Active
Net MWs Location Study AvailabilityGenerating Facility Point of Interconnection
994 4/30/2013 4/30/2013 Active C6 PV S 50 50 FC NYE NV VEA Valley Substation 138kV 12/31/2016 3/15/2019 Complete Complete
1002 4/30/2013 4/30/2013 Active C6 H WTR 0.5 0.5 EO TEHAMA CA PGE Volta-South 60 kV Line 11/15/2015 11/15/2015 Complete Complete In Progress
1003A 8/7/2014 4/30/2013 Active C6 PV S 9.5 9.5 FC LOS ANGELES CA SCE Vincent Substation 230kV 10/1/2016 10/1/2016 Complete Executed
1010 4/28/2014 4/30/2014 Active C7 WT W 46.1 46.1 FC SAN JOAQUIN CA PGE Vasco-Herdlyn 60kV line 12/1/2015 12/31/2017 Complete Complete
1011 4/28/2014 4/30/2014 Active C7 STR BAT 30 30 FC ALAMEDA CA PGE Tesla Substation 115kV 12/1/2016 10/31/2018 Complete Complete
1014 4/30/2014 4/30/2014 Active C7 STR BAT 10 10 FC SAN JOAQUIN CA PGE Kasson-Louise 60kV Line 6/1/2016 6/1/2016 Complete Complete
1016 4/25/2014 4/30/2014 Active C7 ST Other 0.01 0 EO CONTRA COSTA CA PGE
Standard Oil Switching Station
115kV 4/30/2018 4/30/2018 Complete Complete
1021 4/30/2014 4/30/2014 Active C7 ST B 5 5 FC SAN JOAQUIN CA PGE
Stockton A #1 line 60 kV,
Cogeneration National 60 kV tap at
pole 0/9 12/31/2016 2/28/2018 Complete In Progress
1027 4/30/2014 4/30/2014 Active C7 STR BAT 20 20 FC FRESNO CA PGE Gates Substation 230kV 6/1/2016 6/15/2019 Complete Complete
1028 4/30/2014 4/30/2014 Active C7 PV S 20 20 FC FRESNO CA PGE Mendota Substation 115 kV 12/1/2016 12/1/2016 Complete Complete
1029 4/30/2014 4/30/2014 Active C7 PV S 20 20 FC FRESNO CA PGE Mendota Substation 115 kV 9/1/2018 12/1/2016 Complete Complete
1030 4/30/2014 4/30/2014 Active C7 PV STR S BAT 15 5 20 EO FRESNO CA PGE
Schindler-Huron-Gates Tap 70kV
Via New Switching Station 12/15/2016 6/1/2019 Complete Complete
1031 4/30/2014 4/30/2014 Active C7 PV S 20 20 FC FRESNO CA PGE Gates Substation 230kV 11/1/2016 7/15/2019 Complete Complete
1032 4/30/2014 4/30/2014 Active C7 STR PV BAT S 200 206.2 206.2 FC FRESNO CA PGE Tranquillity Switchyard 230kV 9/30/2016 9/30/2016 Complete Complete
1036 4/30/2014 4/30/2014 Active C7 PV STR S BAT 153.4 150 153.4 FC KINGS CA PGE Mustang Switchyard 230 kV 9/30/2016 9/30/2016 Complete Complete
1038 4/25/2014 4/30/2014 Active C7 PV S 60 60 FC KERN CA PGE Arco Substation 70kV 12/1/2017 6/1/2018 Complete Complete
1040 4/29/2014 4/30/2014 Active C7 PV S 127 127 FC MARICOPA AZ SDGE Hassayampa Substation 500 kV 1/3/2014 1/3/2014 Complete Complete
1045 4/30/2014 4/30/2014 Active C7 STR BAT 50 50 FC SAN DIEGO CA SDGE Otay Substation 69 kV 11/1/2019 11/1/2019 Complete Complete
1047 4/30/2014 4/30/2014 Active C7 STR BAT 50 50 FC SAN DIEGO CA SDGE El Cajon Substation 69kV 11/1/2019 11/1/2019 Complete Complete
1048 4/30/2014 4/30/2014 Active C7 STR BAT 50 50 FC SAN DIEGO CA SDGE Escondido Substation 69 kV 11/1/2019 11/1/2019 Complete Complete
1053 4/30/2014 4/30/2014 Active C7 PV S 370 370 FC MARICOPA AZ SDGE Hassayampa Switchyard 500kV 11/30/2019 11/30/2019 Complete Complete
1058 4/30/2014 4/30/2014 Active C7 CT NG 10 10 FC SAN DIEGO CA SDGE Otay Mesa switchyard 230kV 5/1/2016 9/1/2016 Complete Complete Executed
1061 4/29/2014 4/30/2014 Active C7 STR BAT 20 20 FC SAN DIEGO CA SDGE Melrose Substation 69kV 6/1/2016 6/1/2017 Complete Complete
1062 4/30/2014 4/30/2014 Active C7 PV S 207.3 207.3 FC YUMA AZ SDGE Hoodoo Wash Substation 500kV 12/31/2018 12/31/2018 Complete
1064 4/30/2014 4/30/2014 Active C7 STR Other 44 44 FC NYE NV VEA Gamebird Switchyard 230kV 1/1/2017 7/1/2019 Complete Complete
1065 4/29/2014 4/30/2014 Active C7 PV S 50 50 EO NYE NV VEA Vista Substation 138kV 11/1/2016 4/5/2019 Complete Complete
1066 4/29/2014 4/30/2014 Active C7 PV S 50 50 EO NYE NV VEA Vista Substation 138kV 11/1/2016 4/5/2019 Complete Complete
1069 4/30/2014 4/30/2014 Active C7 PV S 250 250 EO CLARK NV SCE SCE owned Eldorado 220 kV bus 9/15/2016 8/1/2018 Complete Complete
1070 4/25/2014 4/30/2014 Active C7 PV S 250 250 FC RIVERSIDE CA SCE Red Bluff Substation 230 kV 12/1/2017 12/1/2018 Complete Complete
1071 4/30/2014 4/30/2014 Active C7 PV S 150 150 FC RIVERSIDE CA SCE Colorado River Substation 230 kV 12/31/2016 12/1/2019 Complete Complete
1074 4/30/2014 4/30/2014 Active C7 STR PV BAT S 125 128.07 128.07 FC KERN CA SCE Whirlwind Substation 220 kV 6/30/2016 6/11/2018 Complete Complete Executed
1076 4/30/2014 4/30/2014 Active C7 PV S 50 50 FC KERN CA SCE Whirlwind Substation 230 kV 6/30/2017 12/1/2019 Complete Complete
1092 1/13/2014 8/25/2014 Active ISP PV S 50 50 FC FRESNO CA PGE Gates-Coalinga #2 70 kV Line 9/30/2015 8/30/2017 In Progress In Progress
1096 2/24/2015 4/13/2015 Active FT WT W 5 5 EO ALAMEDA CA PGE
230 kV Altamont Midway Substation
located on the 230 kV PG&E Delta
Switchyard to Tesla transmission
line 8/31/2015 8/1/2016 Executed
1097 4/29/2015 4/30/2015 Active C8 STR BAT 13.25 13 FC LAKE CA PGE
Geysers #12-Fulton 230 kV Line at
the Bear Canyon Substation via the
Geysers #16 Tap 230 kV Line and
NCPA #2 230 kV Line 1/1/2018 1/1/2018 Complete
1098 4/30/2015 4/30/2015 Active C8 WT W 1.84 1.84 FC SOLANO CA PGE Birds Landing Substation 230kV 12/1/2016 12/1/2017 In Progress
1103 4/30/2015 4/30/2015 Active C8 PV S 40 40 FC STANISLAUS CA PGE Miller Substation 115kV 8/1/2017 11/1/2017 In Progress
1106 4/30/2015 4/30/2015 Active C8 WT W 200 200 FC SHASTA CA PGE Pit1-Cottonwood 230kV line 10/15/2020 10/15/2020 In Progress
1108 4/30/2015 4/30/2015 Active C8 STR BAT 64 64 FC SUTTER CA PGE East Nicolaus 115kV Substation 12/1/2020 12/1/2020 In Progress
1109 4/30/2015 4/30/2015 Active C8 PV STR S BAT 120 30 150 P SAN JOAQUIN CA PGE Belotta Substation 115 kV 6/1/2021 6/1/2021 In Progress
1111 4/30/2015 4/30/2015 Active C8 STR BAT 200 200 FC CONTRA COSTA CA PGE Pittsburgh 230kV substation 6/1/2018 6/1/2018 Complete
1116 4/30/2015 4/30/2015 Active C8 STR BAT 10 10 FC TUOLUMNE CA PGE
Melones-Curtis 115kV line via the
existing Chinese Camp Ultra Power
Tap115 kV Line 3/31/2017 3/31/2017 In Progress
1117 4/30/2015 4/30/2015 Active C8 PV S 250 250 FC KINGS CA PGE
Gates 230 kV substation in Fresno
County 6/18/2019 12/15/2019 In Progress
1120 4/30/2015 4/30/2015 Active C8 PV S 150 150 FC KINGS CA PGE Gates 230kV Substation 4/19/2021 4/19/2021 In Progress
1121 4/29/2015 4/30/2015 Active C8 PV STR S BAT 19.75 3 19.75 FC KINGS CA PGE Waukena Switching Station 115kV 12/31/2018 12/31/2018 Complete
1122 4/30/2015 4/30/2015 Active C8 PV S 81.8 81.8 EO MERCED CA PGE
Mercy Springs 70 kV Switching
Station 12/31/2019 12/31/2019 Complete
1127 4/28/2015 4/30/2015 Active C8 PV S 20 20 FC FRESNO CA PGE Mendota Substation 115kV 8/1/2020 8/1/2020 In Progress
1128 4/28/2015 4/30/2015 Active C8 PV S 100 100 FC FRESNO CA PGE Mendota Substation 115kV 12/1/2020 12/1/2020 In Progress
1129 4/30/2015 4/30/2015 Active C8 PV S 200 200 FC FRESNO CA PGE Tranquility Substation 230kV 12/31/2018 12/31/2018 In Progress
California ISO Public Page 3 of 27
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue DateApplication
Status
Study
Process
Ty
pe-1
Ty
pe-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal
Full Capacity,
Partial or Energy
Only (FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Active
Net MWs Location Study AvailabilityGenerating Facility Point of Interconnection
1130 4/30/2015 4/30/2015 Active C8 STR BAT 19.94 19.94 FC FRESNO CA PGE Tranquility Substation 230kV 12/31/2018 12/31/2018 In Progress
1131 4/16/2015 4/30/2015 Active C8 STR FW 20 20 FC FRESNO CA PGE New Kearny Substation 70kV bus 5/1/2020 5/1/2020 Complete
1135 4/29/2015 4/30/2015 Active C8 PV STR S BAT 409.9 420 412 FC FRESNO CA PGE Tranquillity Switching Station 230kV 12/31/2018 12/31/2018 In Progress
1136 4/30/2015 4/30/2015 Active C8 PV S 20 20 FC KINGS CA PGE Kent SW STA 70 kV 11/14/2016 12/15/2017 In Progress
1137 4/30/2015 4/30/2015 Active C8 PV S 20 20 FC KINGS CA PGE Kent SW STA 70 kV 12/5/2016 12/15/2017 In Progress
1138 4/30/2015 4/30/2015 Active C8 PV S 50 50 FC KINGS CA PGE Kent SW STA 70 kV 12/19/2016 12/15/2017 In Progress
1139 4/30/2015 4/30/2015 Active C8 PV S 250 250 FC KINGS CA PGE Gates Substation 230kV 4/20/2020 4/20/2020 In Progress
1141 4/30/2015 4/30/2015 Active C8 PV S 80 80 FC KERN CA PGE Arco Substation 70kV 12/31/2018 12/31/2018 In Progress
1143 4/29/2015 4/30/2015 Active C8 STR BAT 10 10 FC TULARE CA PGE
Corcoran-Olive Switching Station
115 kV 12/31/2017 12/31/2017 Complete
1146 4/29/2015 4/30/2015 Active C8 PV STR S BAT 20 3 20 FC TULARE CA PGE
Olive switching station - Smynra 115
Kv Line 12/31/2018 12/31/2018 Complete
1154 4/30/2015 4/30/2015 Active C8 PV S 200 200 FC KERN CA PGE
New Wheeler Ridge Junction 115kV
substation 12/31/2018 3/31/2019 In Progress
1157 4/22/2015 4/30/2015 Active C8 PV S 50 50 FC KERN CA PGE Arco Substation 70kV 12/31/2018 12/31/2018 In Progress
1158 4/29/2015 4/30/2015 Active C8 PV STR S BAT 307.4 315 307.4 FC KINGS CA PGE
PG&E Mustang Switching Station
230kV 12/31/2018 12/31/2018 In Progress
1159 4/29/2015 4/30/2015 Active C8 PV S 21.7 21.7 FC KINGS CA PGE Arco-Tulare Lake 70kV line 3/31/2018 3/31/2018 Complete
1162 4/29/2015 4/30/2015 Active C8 STR BAT 10 10 FC TULARE CA PGE Olive Switching Station 115kV 12/31/2017 12/31/2017 In Progress
1163 4/30/2015 4/30/2015 Active C8 PV S 100 100 FC KERN CA PGE Lamont 115kV Substation 12/31/2018 12/31/2018 In Progress
1165 4/30/2015 4/30/2015 Active C8 STR BAT 20 20 FC SAN DIEGO CA SDGE Spring Valley substation 69 kV bus 1/1/2018 1/1/2018 In Progress
1166 4/30/2015 4/30/2015 Active C8 PV S 200 200 FC IMPERIAL CA SDGE Imperial Valley substation 6/1/2020 6/1/2020 In Progress
1169 4/30/2015 4/30/2015 Active C8 STR BAT 70 70 FC SAN DIEGO CA SDGE Avocado substation 69 kV 2/1/2020 2/1/2020 In Progress
1170 4/30/2015 4/30/2015 Active C8 STR BAT 250 250 FC SAN DIEGO CA SDGE Otay Mesa 230kV switchyard 9/1/2018 9/1/2018 In Progress
1171 4/30/2015 4/30/2015 Active C8 PV S 500 500 FC YUMA AZ SDGE Hoodoo Wash Switchyard 500 kV 12/31/2018 12/31/2018 In Progress
1174 4/30/2015 4/30/2015 Active C8 STR PV BAT S 10 50.25 60.25 FC SAN DIEGO CA SDGE ECO 138 kV Substation 6/1/2021 6/1/2021 In Progress
1175 4/29/2015 4/30/2015 Active C8 STR BAT 125 125 FC IMPERIAL CA SDGE Imperial Valley 230 kV Substation 9/1/2018 9/1/2018 In Progress
1187 4/22/2015 4/30/2015 Active C8 STR BAT 20 20 FC SAN DIEGO CA SDGE San Luis Rey Substation 69 kV 1/1/2018 1/1/2018 In Progress
1189 4/28/2015 4/30/2015 Active C8 PV S 153.6 153.6 FC MARICOPA AZ SDGE
500 kV common bus @
Hassayampa Switchyard 1/31/2020 1/31/2020 In Progress
1191 4/30/2015 4/30/2015 Active C8 PV STR S BAT 92 28 120 FC SAN DIEGO CA SDGE Valley Center Substation 69kV 10/1/2018 10/1/2018 Complete
1192 4/29/2015 4/30/2015 Active C8 PV STR S BAT 460.3 463 463 FC RIVERSIDE CA SCE Colorado River Substation 230kV 12/31/2020 12/31/2020 In Progress
1194 4/30/2015 4/30/2015 Active C8 CT NG 600 600 FC RIVERSIDE CA SCE Colorado River Substation 230kV 6/1/2020 6/1/2020 In Progress
1196 4/30/2015 4/30/2015 Active C8 PV S 409.9 409.9 FC RIVERSIDE CA SCE Colorado River Substation 230kV 7/1/2021 4/30/2022 In Progress
1197 4/30/2015 4/30/2015 Active C8 STR BAT 400 400 FC RIVERSIDE CA SCE Red Bluff Switchyard 220kV 9/1/2018 3/1/2020 In Progress
1198 4/28/2015 4/30/2015 Active C8 PV S 150 150 FC RIVERSIDE CA SCE Colorado River Substation 220kV 12/1/2020 12/1/2020 In Progress
1200 4/30/2015 4/30/2015 Active C8 PV S 200 200 FC RIVERSIDE CA SCE Red Bluff Substation 230kV 12/31/2018 3/31/2019 Complete
1204 4/30/2015 4/30/2015 Active C8 PV S 200 200 FC SAN BERNARDINO CA SCE Kramer Substation 230kV 6/1/2020 10/1/2018 In Progress
1206 4/30/2015 4/30/2015 Active C8 PV S 150 150 FC SAN BERNARDINO CA SCE Jasper Substation 230kV 12/31/2018 12/31/2018 In Progress
1207 4/30/2015 4/30/2015 Active C8 PV S 200 200 FC SAN BERNARDINO CA SCE Jasper 230kV substation 6/1/2020 6/1/2021 In Progress
1208 4/30/2015 4/30/2015 Active C8 STR PV BAT S 200 450 650 FC LOS ANGELES CA SCE Antelope Substation 220kV 12/31/2018 11/30/2019 In Progress
1209 4/29/2015 4/30/2015 Active C8 STR BAT 412 412 FC LOS ANGELES CA SCE Antelope 220kV bus 12/31/2021 12/31/2021 In Progress
1211 4/30/2015 4/30/2015 Active C8 PV S 101.7 101.7 FC KERN CA SCE Whirlwind 230kV Substation 6/30/2018 6/30/2018 In Progress
1212 4/30/2015 4/30/2015 Active C8 PV S 101.7 101.7 FC KERN CA SCE Whirlwind 230 kV Substation 6/30/2018 6/30/2018 In Progress
1214 4/30/2015 4/30/2015 Active C8 STR BAT 6 5.98 FC KERN CA SCE Whirlwind 230kV Substation 6/30/2018 6/30/2018 In Progress
1215 4/28/2015 4/30/2015 Active C8 PV S 153.73 153.73 FC KERN CA SCE Whirlwind Substation 230kV 12/31/2019 12/31/2020 Complete
1216 4/29/2015 4/30/2015 Active C8 CC NG 700 130 FC LOS ANGELES CA SCE
Vincent Substation, 230 kV bus, Los
Angeles County 6/1/2019 5/1/2021 In Progress
1217 4/28/2015 4/30/2015 Active C8 PV S 101.96 101.96 FC KERN CA SCE Whirlwind Substation 230kV 12/31/2019 12/31/2020 Complete
1218 4/28/2015 4/30/2015 Active C8 PV S 400 400 FC CLARK NV SCE
Jointly-owned Mohave Switchyard
500kV 12/1/2019 12/1/2019 In Progress
1219 4/28/2015 4/30/2015 Active C8 PV S 100 100 FC CLARK NV VEA Desert View Substation 230 kV bus 8/1/2018 6/1/2019 Complete
1221 12/29/2014 2/23/2015 Active ISP ST G 35 35 FC SONOMA CA PGE Geysers #3 - Cloverdale 115 kV Line 6/1/2018 6/1/2018 In Progress Executed
1222 3/1/2016 3/8/2016 Active ISP PV S 20 20 EO MARICOPA AZ SDGE Hoodoo Wash Switchyard 500kV 12/1/2016 12/1/2016
Legend: ● Study Process Key: Active=project is in study through Construction phases; Complete=project is in Commercial Operation, Withdrawn=project is withdrawn
● Study Process Key: A39=Amendment 39 Procedures (Appendix W), Serial=Standard Large Generator Interconnection Procedures (Appendix U), SGIP=Small Generator Interconnection Procedure (Appendix S), Numbered Clusters=Large Generator Interconnection Procedures in a Queue Cluster Window (Appendix Y), TC=Transition Cluster
(Appendix 2 to Appendix Y), ISP=Independent Study Process (Appendix Y), FT=Fast Track (Appendix Y)
California ISO Public Page 4 of 27
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue DateApplication
Status
Study
Process
Ty
pe-1
Ty
pe-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal
Full Capacity,
Partial or Energy
Only (FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Active
Net MWs Location Study AvailabilityGenerating Facility Point of Interconnection
● Generating Facility Type Key: CC=Combined Cycle, CT=Combustion Turbine, FC=Fuel Cell, H=Hydro, PS=Pump Storage, PV=Photovoltaic, RE=Reciprocating Engine, ST= Steam Turbine, STH=Solar Thermal, STR=Storage, WT=Wind Turbine
● Generating Facility Fuel Key: B=Biofuel, BAT=Battery, C=Coal, G=Geothermal, FW=Flywheel, HR=Heat Recovery, NG=Natural Gas, NU=Nuclear, O=Fuel Oil, S=Solar, W=Wind, WTR=Water
California ISO Public Page 5 of 27
Report Run Date: 6/3/2016
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue
Date
Application
Status
Study
Process
Typ
e-1
Typ
e-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal
Full Capacity,
Partial or
Energy Only
(FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Actual
On-line Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study
(FAS) or
Phase II Cluster
Study
Optional
Study
(OS)
Interconnection
Agreement
Status
1A 11/1/1999 11/1/1999 Complete Pre- Amend. 39 CC NG 550 550 SAN DIEGO CA SDGE Miguel Substation 3/1/2002 10/3/2009 N/A Complete Complete Executed IA
2 8/10/1999 2/3/2000 Complete Pre- Amend. 39 CC NG 590 590 CONTRA COSTA CA PGE
Contra Costa Power Plant 230 kV
bus 11/28/2007 1/7/2009 N/A Complete Complete Executed GSFA
3 4/21/2000 6/14/2000 Complete Serial CT NG 850 850 RIVERSIDE CA SCE Devers Substation 230kV Bus 1/1/2004 6/1/2013 Waived Complete Complete Complete Executed
4 8/8/2000 8/8/2000 Complete Pre- Amend. 39 CC NG 521 521 SAN DIEGO CA SDGE Palomar 230 kV 6/1/2001 10/15/2005 NA Complete Complete Executed
7 8/16/2000 10/6/2000 Complete Pre- Amend. 39 CC NG 570 570 LOS ANGELES CA SCE El Segundo 220 kV Bus 8/1/2009 7/10/2013 NA Complete Complete Complete Executed
11A 7/26/2002 7/26/2002 Complete Pre- Amend. 39 CC NG 520 520 FC RIVERSIDE CA SCE Julian Hinds Substation 230kV 6/1/2005 8/1/2010 Complete Complete Executed
12 12/16/2002 12/16/2002 Complete AMEND 39 WT W 150 150 SOLANO CA PGE Birds Landing Sub 230kV Bus 10/31/2005 3/30/2006 NA Complete Complete Executed GSFA
13 1/3/2003 1/3/2003 Complete AMEND 39 PS WTR 40 40 SAN DIEGO CA SDGE
Olivehain-Bernardo-Rancho Santa
Fe 69kV line 7/1/2007 8/27/2012 NA Complete Complete Executed
14 1/7/2003 1/7/2003 Complete AMEND 39 CC NG 65 65 SAN DIEGO CA SDGE Miguel-Tijuana 12/31/2004 10/3/2009 NA Complete Complete Executed
19 6/4/2003 6/18/2003 Complete AMEND 39 WT W 46 46 SAN DIEGO CA SDGE Crestwood 12/31/2005 10/1/2005 NA Complete Complete Executed
21 10/3/2003 10/23/2003 Complete AMEND 39 WT W 37.55 37.55 CONTRA COSTA CA PGE Windmaster/Buena Vista Sub 7/1/2004 12/29/2006 NA NA NA Executed
22 11/18/2003 11/18/2003 Complete AMEND 39 WT W 38 38 SOLANO CA PGE Birds Landing Sub 230 kV Bus 6/30/2005 12/31/2010 NA Complete Complete Executed GSFA
23 11/17/2003 11/24/2003 Complete AMEND 39 CC NG 72 72 SAN BERNARDINO CA SCE San Bernadino 220+M127 kV 11/1/2004 10/1/2005 NA Complete Complete Executed IFA
24 1/30/2004 1/30/2004 Complete AMEND 39 WT W 150 150 SOLANO CA PGE High Winds/Contra Costa PP 12/31/2006 1/27/2009 NA Complete Complete Executed GSFA
33 7/9/2004 7/12/2004 Complete AMEND 39 ST G 10 10 CHURCHILL NV SCE Bishop Control Sub 7/14/1988 5/31/2006 NA Complete Complete Executed
38 10/19/2004 11/11/2004 Complete AMEND 39 IC NG 146.4 146.4 HUMBOLDT CA PGE Humboldt Power Plant Substation 8/1/2008 9/30/2010 NA Complete Complete Executed
39 11/11/2004 11/11/2004 Complete AMEND 39 WT W 200 200 SOLANO CA PGE
Birds Landing Switching Station
230kV 12/31/2008 12/15/2012 NA Complete Complete Executed
45 12/1/2004 12/1/2004 Complete AMEND 39 CT NG 354 354 ALAMEDA CA PGE Eastshore Substation 230kV 7/31/2006 6/1/2013 NA Complete Re-study Complete Executed
50 12/21/2004 12/21/2004 Complete AMEND 39 CC NG 810 810 RIVERSIDE CA SCE SCE Valley Substation 5/31/2008 6/8/2010 NA Complete Complete Executed IA
51 12/20/2004 12/21/2004 Complete AMEND 39 IC NG 0.55 0.55 FRESNO CA PGE Kerman-Helm 70kV line 4/30/2005 5/31/2006 NA NA NA Executed GSFA
52 12/1/2004 12/21/2004 Complete Serial CT NG 401 401 FRESNO CA PGE Panoche Substation 6/30/2008 5/28/2009 Complete Complete Executed
54 1/12/2005 1/12/2005 Complete Serial CT NG 119.9 119.9 FRESNO CA PGE Panoche Substation 6/1/2008 5/4/2009 Waived Complete Complete Executed
57 12/1/2004 2/8/2005 Complete AMEND 39 CC NG 715 715 COLUSA CA PGE
Between Cottonwood and Vaca-
Dixon 1/1/2010 12/23/2010 NA Complete Complete Executed
61 3/28/2005 3/30/2005 Complete AMEND 39 ST NG 73.27 73.27 FRESNO CA PGE Helm-Kerman 70kV line 5/31/2006 3/29/2007 NA Complete Complete Executed
66 5/6/2005 5/6/2005 Complete AMEND 39 CT NG 500.5 500.5 LOS ANGELES CA SCE Walnut Substation 220kV 9/1/2007 3/29/2013 NA Complete Complete Executed
67 3/28/2005 5/9/2005 Complete AMEND 39 CC NG 245 245 ALAMEDA CA PGE Eastshore Substation 230kV 7/31/2008 6/1/2013 NA Complete Re-study Complete Executed
70 5/9/2005 6/14/2005 Complete AMEND 39 IC B 12.6 12.6 SAN MATEO CA PGE
Hillsdale Junction-Half Moon Bay
60 kV line 12/23/2005 4/1/2009 NA Complete Complete Executed GSFA
74 7/12/2005 7/12/2005 Complete Serial WT W 102 102 SHASTA CA PGE
Pit #3-Round Mountain 230kV
Line 12/15/2007 11/19/2010 Active Complete Complete Executed
75 4/28/2005 7/15/2005 Complete AMEND 39 ST B 10.5 10.5 MADERA CA PGE Le Grand-Chowcilla 115 kV 12/31/2005 5/20/2009 NA Complete Complete Executed GSFA
76 4/28/2005 7/15/2005 Complete AMEND 39 ST B 10.5 10.5 MERCED CA PGE Merced #1 70 kV circuit 7/1/2006 5/19/2009 NA Complete Complete Executed GSFA
81 9/13/2005 9/13/2005 Complete Serial ST G 55 55 LAKE CA PGE Geysers #17 - Fulton 230kV Line 9/1/2006 11/1/2007 Active Complete Complete Executed
95 2/10/2006 3/1/2006 Complete Serial WT W 550 550 KERN CA SCE Windhub Substation 220kV bus 12/31/2009 2/15/2012 Waived Complete Complete Executed
96 2/15/2006 3/1/2006 Complete Serial WT W 600 600 KERN CA SCE
Tehachapi Conceptual Substation
#1 12/31/2009 11/30/2011 Waived Complete Complete Executed
98 3/9/2006 3/9/2006 Complete TC ST NU 37 37 FC SAN LUIS OBISPO CA PGE
Diablo Canyon Substation Cirvuit
Breakers 532 and 632 12/8/2005 1/1/2006 Complete
99 3/29/2006 3/29/2006 Complete Serial ST NG 45 45 SAN LUIS OBISPO CA PGE
Diablo Canyon Substation Circuit
Breakers 542 and 642 6/8/2006 6/8/2006
100 4/5/2006 4/5/2006 Complete Serial WT W 120 120 KERN CA SCE Vincent Substation 230kV 12/31/2007 1/28/2012 Waived Complete Complete Executed
108 6/9/2006 6/9/2006 Complete Serial WT W 128 128 SOLANO CA PGE Lambie-Contra Costa 230 kV 3/1/2011 3/5/2012 Complete Complete Complete Complete Executed
121 8/16/2006 8/17/2006 Complete Serial CT NG 49 49 SAN DIEGO CA SDGE SDG&E Miramar GT Substation 3/31/2009 8/8/2009 Active Complete Complete Executed
125 8/22/2006 8/22/2006 Complete Serial ST S 250 250 SAN BERNARDINO CA SCE Coolwater-Kramer 230kv line 8/1/2010 12/4/2014 Complete Complete Complete Complete Executed
131 9/25/2006 9/25/2006 Complete Serial ST S 132 132 SAN BERNARDINO CA SCE
Eldorado-Baker-Cool Water-Dunn
Siding-Mountain Pass 115kV line 6/30/2010 12/30/2013 Complete Complete Complete Executed
132 9/27/2006 9/27/2006 Complete Serial WT W 162 162 KERN CA SCE Highwind Substation 230kV bus 12/31/2010 12/7/2012 Complete Complete Complete Complete Executed
146 11/16/2006 11/16/2006 Complete Serial PV S 150 150 RIVERSIDE CA SCE Red Bluff Substation 230kV 12/1/2008 12/5/2014 Complete Complete Complete Executed
147 11/16/2006 11/16/2006 Complete Serial PV S 400 400 RIVERSIDE CA SCE Red Bluff Substation 230kV 2/1/2010 12/5/2014 Complete Complete Complete Executed
162 1/5/2007 1/5/2007 Complete Serial ST S 126 126 SAN BERNARDINO CA SCE
Eldorado-Baker-Cool Water-Dunn
Siding-Mountain Pass 115kV line 6/30/2010 12/30/2013 Waived Complete Complete Executed
166 1/23/2007 1/23/2007 Complete Serial PV S 210 210 SAN LUIS OBISPO CA PGE Midway-Morrow Bay 230kV line 12/31/2010 10/27/2014 Complete Complete Complete Executed
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Completed
Study AvailabilityGenerating Facility Net MWs Location Point of Interconnection
California ISO Public Page 6 of 27
Report Run Date: 6/3/2016
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue
Date
Application
Status
Study
Process
Typ
e-1
Typ
e-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal
Full Capacity,
Partial or
Energy Only
(FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Actual
On-line Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study
(FAS) or
Phase II Cluster
Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Completed
Study AvailabilityGenerating Facility Net MWs Location Point of Interconnection
188 3/23/2007 3/23/2007 Complete TC WT W 198 198 FC KERN CA SCE Windhub Substation 230kV 12/15/2013 6/30/2015 Complete Complete Executed
194 4/5/2007 4/5/2007 Complete Serial PV S 190 190 SAN LUIS OBISPO CA PGE
Morro Bay-Midway #1 & #2 lines
230kV 12/31/2010 7/9/2014 Complete Complete Complete Executed
201 4/2/2007 4/19/2007 Complete Serial CT NG 99 99 SAN DIEGO CA SDGE Pala Substation 5/31/2008 6/17/2010 Waived Complete Complete Executed
222 5/23/2007 5/23/2007 Complete TC WT W 78 78 FC SOLANO CA PGE Birds Landing Substation 230kV 12/31/2010 1/30/2012 Complete Complete Executed
233 6/27/2007 6/27/2007 Complete Serial ST S 132 132 SAN BERNARDINO CA SCE Ivanpah Substation 230kV 6/30/2013 12/30/2013 Waived Complete Complete Executed
239 7/11/2007 7/11/2007 Complete TC PV S 250 250 FC SAN LUIS OBISPO CA PGE Midway-Morro Bay 230kV line 12/1/2010 12/26/2013 Complete Complete Executed
242 7/13/2007 7/13/2007 Complete TC PV S 150 150 FC SAN LUIS OBISPO CA PGE Morro Bay-Midway 230kV line 9/1/2012 7/10/2014 Complete Complete Executed
252 7/11/2007 8/6/2007 Complete Serial ST NG 25.96 25.96 LOS ANGELES CA SCE
Redondo Beach Generating
Station 220kV switchyard 5/23/2007 2/8/2010 Complete Complete Executed
261A 10/9/2007 10/9/2007 Complete AMEND 39 PV S 5 5 FRESNO CA PGE
Mendota-San Joaquin-Helm 70kV
line 4/15/2009 4/21/2010 Executed
267 10/23/2007 10/23/2007 Complete Serial CC NG 280 280 SAN JOAQUIN CA PGE Gold Hill-Eight Mile 230kV lines 4/16/2012 7/17/2012 Active Unexpected Complete Executed
268 10/24/2007 10/24/2007 Complete Serial ST NG 145 145 SAN JOAQUIN CA PGE
Tesla-Manteca 115kV line via
Schulte Switchyard 6/1/2012 6/1/2012 Waived Complete Complete Executed
274 11/5/2007 11/5/2007 Complete Serial CC NG 54 54 SAN DIEGO CA SDGE Palomar Substation 230kV 8/25/2008 8/25/2008 Waived Complete Complete Executed
297 1/18/2008 1/18/2008 Complete TC ST S 66 66 FC LOS ANGELES CA SCE Neenach-Bailey 66kV line 12/1/2009 1/18/2013 Complete Complete Executed
304 2/28/2008 2/28/2008 Complete TC PV S 50 50 FC TULARE CA PGE Smyrna-Alpaugh 115kV line 5/3/2010 8/1/2012 Complete Complete Executed
320 3/12/2008 3/12/2008 Complete TC CT NG 100 100 FC CONTRA COSTA CA PGE
Contra Costa Substation 230kV
switchyard 5/1/2013 5/1/2013 Complete Complete Executed
334 4/4/2008 4/4/2008 Complete TC CT NG 195.9 195.9 FC ALAMEDA CA PGE Kelso Substation 230kV bus 6/1/2012 7/1/2012 Complete Complete Executed
337 4/2/2008 4/18/2008 Complete TC PV S 26 25.75 FC SAN DIEGO CA SDGE Borrego Substation 69kV 4/1/2011 8/31/2012 Complete Complete Executed
340 4/2/2008 4/22/2008 Complete SGIP PV S 20 20 FC TULARE CA PGE Smyrna-Alpaugh 115kV line 5/1/2010 12/28/2012Agreement Tendered Active Complete Executed
378 5/28/2008 5/28/2008 Complete TC CC NG 120 120 FC SANTA CLARA CA PGE
Los Esteros Substation 115kV
bus 6/1/2011 6/1/2013 Complete Complete Executed
407 5/30/2008 5/30/2008 Complete TC PV S 310 310 FC KERN CA SCE Cottonwind-Whirlwind 230kV line 7/1/2012 6/25/2015 Complete Complete Executed
408 5/30/2008 5/30/2008 Complete TC PV S 276 276 FC KERN CA SCE Cottonwind-Whirlwind 230kV line 7/1/2012 6/19/2015 Complete Complete Executed
412 5/30/2008 5/30/2008 Complete TC PV S 250 250 FC LOS ANGELES CA SCE Whirlwind Substation 230kV 8/1/2012 12/31/2013 Complete Complete Executed
442 5/30/2008 5/30/2008 Complete TC PV S 125 125 FC IMPERIAL CA SDGE Imperial Valley Substation 230kV 10/1/2013 7/30/2014 Complete Complete Executed
468 5/30/2008 6/2/2008 Complete TC PV S 290 290 EO YUMA AZ SDGE
Hassayampa-North Gila 500 kV
line 8/1/2012 6/10/2014 Complete Complete Executed
472 11/19/2010 8/11/2008 Complete SGIP ST B 11 11 FC HUMBOLDT CA PGE Blue Lake Tap 60kV 12/20/2008 9/10/2010 Complete Executed
473 9/3/2008 9/12/2008 Complete SGIP PV S 20 20 FC TULARE CA PGE Smyrna-Alpaugh 115kV line 5/1/2010 5/1/2012 N/A Complete Executed
477 2/2/2009 2/6/2009 Complete SGIP RE B 4 4 EO BUTTE CA PGE
Centerville-Table Mountain 60kV
line 3/31/2010 5/16/2012 Complete Executed
478 2/17/2009 2/17/2009 Complete SGIP PV S 20 20 FC KINGS CA PGE
Corcoran-Kingsburg 115kV #2
line 11/1/2011 8/14/2013 N/A Complete Executed
479 3/13/2009 3/13/2009 Complete SGIP PV S 20 20 FC TULARE CA PGE Smyrna-Alpaugh 115kV line 10/1/2011 4/1/2013 N/A Complete Executed
481 4/6/2009 4/20/2009 Complete SGIP ST B 18.4 18.4 EO AMADOR CA PGE Valley Springs-Martel #2 60kV line 4/1/2010 1/31/2012 N/A Complete Executed
482 4/24/2009 4/24/2009 Complete SGIP PV S 20 20 FC TULARE CA PGE Smyrna-Alpaugh 115kV line 8/1/2012 6/11/2015 N/A Complete Executed
484 6/11/2009 6/11/2009 Complete SGIP PV S 20 20 FC SAN FRANCISCO CA PGE Arco-Carneras 70 kV Line 12/31/2013 4/2/2015 N/A Complete Executed
493 7/16/2009 7/31/2009 Complete C1 WT W 265.44 265.44 FC IMPERIAL CA SDGE Sunrise Powerlink 500 kV 12/31/2013 7/29/2013 Complete Complete Executed
495 7/24/2009 7/31/2009 Complete C1 H WTR 7.2 7.2 FC TUOLUMNE CA PGE Tulloch 115kV tap 10/1/2011 3/31/2012 Complete Complete Executed
503 7/28/2009 7/31/2009 Complete C1 PV S 155 155 FC CLARK NV SDGE Merchant Substation 230kV bus 1/1/2016 4/16/2015 Complete Complete Executed
509 7/31/2009 7/31/2009 Complete C1 CT NG 49.9 49.9 FC SAN DIEGO CA SDGE El Cajon Sub 69kV Bus 6/15/2010 11/1/2010 Complete In Progress Executed
510 7/31/2009 7/31/2009 Complete C1 PV S 130 130 FC IMPERIAL CA SDGE Imperial Valley Substation 230kV 7/1/2012 10/11/2013 Complete Complete Executed
517 8/19/2009 8/19/2009 Complete SGIP PV S 20 20 FC KERN CA PGE Kern-Old River #1 70kV line 12/31/2012 12/31/2014 N/A Complete Executed
529 10/19/2009 10/19/2009 Complete SGIP PV S 20 20 EO KINGS CA PGE
Corcoran- Kingsburg #1 115kV
line 8/1/2013 1/15/2016 N/A Complete Executed
548 11/19/2009 1/15/2010 Complete SGIP PV S 20 20 EO KINGS CA PGE Mercy Springs Substation 70kV 10/31/2011 10/31/2014 N/A Complete Executed
557 1/27/2010 2/1/2010 Complete C2 PV S 19.75 19.75 FC TULARE CA PGE Smyrna-Alpaugh 115kV line 4/1/2013 10/1/2014 Complete Complete Executed
558 1/27/2010 2/1/2010 Complete C2 PV S 19.75 19.75 FC KINGS CA PGE Corcoran-Kingsburg #2 115kV 6/1/2013 7/1/2015 Complete Complete Executed
559 1/27/2010 2/1/2010 Complete C2 PV S 60 60 FC KERN CA PGE Wheeler Ridge-Lamont 115kV 7/1/2012 11/11/2014 Complete Complete Executed
California ISO Public Page 7 of 27
Report Run Date: 6/3/2016
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue
Date
Application
Status
Study
Process
Typ
e-1
Typ
e-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal
Full Capacity,
Partial or
Energy Only
(FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Actual
On-line Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study
(FAS) or
Phase II Cluster
Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Completed
Study AvailabilityGenerating Facility Net MWs Location Point of Interconnection
568 1/28/2010 2/1/2010 Complete C2 CC NG 25 25 FC ALAMEDA CA PGE Eastshore Substation 230kV Bus 5/1/2013 6/1/2012 Complete Complete Executed
577 1/29/2010 2/1/2010 Complete C2 PV S 110 110 FC MERCED CA PGE Los Banos-Westley 230kV 12/31/2013 11/30/2015 Complete Complete Executed
590 1/29/2010 2/1/2010 Complete C2 PV S 150 150 FC IMPERIAL CA SDGE Imperial Valley Substation 230kV 12/31/2012 10/22/2013 Complete Complete Executed
606 2/1/2010 2/1/2010 Complete C2 CC NG 20 20 FC SAN JOAQUIN CA PGE
Schulte Switching Station 115kV
bus 6/1/2012 6/1/2012 Complete Complete Executed
607 2/1/2010 2/1/2010 Complete C2 PV S 60 60 FC FRESNO CA PGE Mendota Substation 115 kV bus 10/1/2012 6/20/2015 Complete Complete Executed
608 2/1/2010 2/1/2010 Complete C2 PV S 150 150 FC IMPERIAL CA SDGE Imperial Valley Substation 230kV 5/1/2013 1/21/2016 Complete Complete Executed
620 4/26/2010 4/26/2010 Complete SGIP PV S 20 20 FC KERN CA PGE Copus Road Sub 70kV bus 12/31/2014 12/12/2015 N/A Complete Executed
621A 5/5/2010 5/5/2010 Complete SGIP PV S 20 20 FC KERN CA PGE
Weedpatch - San Bernard 70 KV
line 4/2/2012 6/26/2014 N/A Complete Executed
622B 5/5/2010 5/5/2010 Complete SGIP PV S 20 20 FC KERN CA PGE Wheeler Ridge-Lamont 115 kv 3/31/2012 3/27/2014 N/A Complete Executed
625 5/14/2010 5/14/2010 Complete SGIP PV S 20 20 EO KINGS CA PGE Henrietta-Tulare Lake 70kV 12/31/2011 8/12/2015 N/A Complete Executed
632 5/25/2010 5/25/2010 Complete SGIP PV S 19 19 EO FRESNO CA PGE Wesix 70kV Tap 12/31/2012 12/12/2014 N/A Complete Executed
633 6/2/2010 6/2/2010 Complete SGIP PV S 18 18 EO FRESNO CA PGE Gates-Coalinga 70 kV Line #1 11/30/2012 2/1/2014 N/A Complete Executed
636 7/2/2010 7/6/2010 Complete SGIP PV S 20 20 FC KINGS CA PGE
Leprino Food (Lemoore) 115 kV
Tap Line 12/31/2012 12/18/2014 N/A Complete Executed
637 7/2/2010 7/6/2010 Complete SGIP PV S 20 20 EO KINGS CA PGE Henrietta-Jacobs Corner 70kV 12/31/2012 12/31/2012 N/A Active Executed
643G 7/20/2010 7/31/2010 Complete C3 ST B 27.15 27.15 FC SHASTA CA PGE Cascade-Cottonwood 115 kV 3/1/2012 5/28/2015 Complete Complete Executed
643T 7/30/2010 7/31/2010 Complete C3 PV S 165 165 FC MARICOPA AZ SDGE
500 kV common bus @
Haasayampa switchyard 10/31/2015 1/1/2014 Complete In Progress Executed
643AM 7/30/2010 7/31/2010 Complete C3 PV S 45 45 EO IMPERIAL CA SDGE Imperial Valley Substation 230kV 3/1/2014 8/15/2014 Complete Complete Executed
644 8/16/2010 8/16/2010 Complete SGIP-TC PV S 20 20 EO MADERA CA PGE Dairyland - Legrand 115 kV 1/3/2012 12/23/2015 Complete Complete Executed
650AB 9/8/2010 9/8/2010 Complete SGIP-TC PV S 20 20 EO KINGS CA PGE Henrietta-Tulare Lake 70kV 12/31/2012 12/24/2014 Complete Complete Executed
651A 9/21/2010 9/21/2010 Complete SGIP-TC PV S 20 20 EO LOS ANGELES CA SCE Antlelope Sub 66 kV Bus 6/30/2012 11/10/2014 Complete Complete Executed
653B 9/29/2010 9/29/2010 Complete SGIP-TC PV S 20 20 FC KERN CA PGE Belridge - Temblor 115 kV 5/1/2013 1/27/2015 Complete Complete Executed
653EA 9/30/2010 9/30/2010 Complete SGIP-TC PV S 20 20 FC KERN CA PGE Copus-Old River 70 kV 4/1/2012 4/7/2015 Complete Complete Executed
654 10/25/2010 10/25/2010 Complete SGIP-TC PV S 20 20 FC KERN CA PGE Semitropic-Midway #2 115kV 5/1/2013 2/19/2015 Complete Complete Executed
659 12/15/2010 12/15/2010 Complete SGIP-TC PV S 20 20 EO LOS ANGELES CA SCE Antelope Sub 66 kV Bus 12/31/2013 5/6/2016 Complete Complete Executed
660 12/15/2010 12/15/2010 Complete SGIP-TC PV S 20 20 EO LOS ANGELES CA SCE Antelope Sub 66 kV Bus 12/31/2013 11/7/2014 Complete Complete Executed
662 12/15/2010 12/15/2010 Complete SGIP-TC PV S 20 20 EO LOS ANGELES CA SCE Antelope Sub 66 kV Bus 12/31/2013 11/30/2015 Complete Complete Executed
687 3/31/2011 3/31/2011 Complete C4 PV S 20 20 FC CONTRA COSTA CA PGE
Pittsburg - Kirker - Columbia
Steel 115 KV 12/31/2012 10/21/2015 Complete Complete Executed
709 3/31/2011 3/31/2011 Complete C4 WT W 36 36 FC ALAMEDA CA PGE Tesla Sub 115 KV 12/31/2013 12/18/2015 Complete Complete Executed
737 3/31/2011 3/31/2011 Complete C4 CT NG 4.7 4.7 FC SAN DIEGO CA SDGE
North Island Metering Station 69
kV 12/1/2011 7/15/2014 Complete Complete Executed
775 3/31/2011 3/31/2011 Complete C4 PV S 15 15 FC KERN CA PGE Arco-Twisselman 70 KV 7/10/2014 11/25/2015 Complete Complete Executed
795 3/31/2011 3/31/2011 Complete C4 PV S 20 20 FC KERN CA SCE Whirlwind Substation 230 kV bus 8/30/2013 4/30/2016 Complete Complete Executed
796 3/31/2011 3/31/2011 Complete C4 PV S 20 20 FC KERN CA SCE Whirlwind Substation 230 kV bus 8/30/2013 4/30/2016 Complete Complete Executed
909 4/2/2012 4/2/2012 Complete C5 STH S 25 25 EO SAN BERNARDINO CA SCE Sandlot Substation 220kV 2/11/2014 10/23/2015 Complete Complete In Progress
911 4/2/2012 4/2/2012 Complete C5 CC NG 50 50 FC KERN CA SCE Pastoria Substation 220kV 1/1/2014 1/1/2016 Complete Complete Executed
1005 1/21/2014 3/11/2014 Complete FT ST B 0.5 0.5 EO MERCED CA PGE Merced #1 70kV Line 4/29/2014 7/31/2014 Executed
California ISO Public Page 8 of 27
Report Run Date: 6/3/2016
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue
DateApplication Status
Reason for
Withdrawal
Study
Process
Ty
pe
-1
Ty
pe
-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal Full
Capacity,
Partial or
Energy Only
(FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line
Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
5 8/9/2000 8/9/2000 Withdrawn 9/14/06 Pre- Amend. 39 CC NG 900 900 SAN DIEGO CA SDGE Encina Power Plant Switchyard 6/30/2003 6/1/2008 NA Complete In Progress
6 8/24/2007 8/23/2000 Withdrawn Serial CC NG 1156 1156 SAN JOAQUIN CA PGE Tesla Sub 230kV Bus E 6/1/2008 11/30/2014 Waived Complete Complete Complete Executed
8 11/28/2000 11/28/2000 Withdrawn 1/25/10 Pre- Amend. 39 CC NG 750 750 SAN DIEGO CA SDGE Sycamore Canyon Substation 6/1/2004 12/31/2010 NA Complete Re-Study in Progress In Progress
9 12/1/2000 12/1/2000 Withdrawn 9/20/08 Pre- Amend. 39 CC NG 1200 1200 SAN LUIS OBISPO CA PGE Morro Bay Substation 1/1/2008 1/1/2008 NA Complete Complete Executed GSFA
10 5/2/2001 5/2/2001 Withdrawn 5/24/07 Pre- Amend. 39 CC NG 620 620 KINGS CA PGE
Gates Substation (Arco - Gates 230
kV line) 1/1/2009 7/1/2009 NA Complete Complete Executed GSFA
11 10/14/2002 10/23/2002 Withdrawn 8/21/09 AMEND 39 WT W 63 63 SAN BERNARDINO CA SCE Wheaton Substation 12/1/2004 3/1/2008 NA Complete Complete Executed IFA
15 12/31/2002 1/17/2003 Withdrawn 7/13/07 AMEND 39 WT W 50 50 SAN BERNARDINO CA SCE Mountain Pass 9/1/2004 1/1/2010 NA Complete Complete
16 3/11/2003 3/11/2003 Withdrawn-7/12/2013 AMEND 39 WT W 55.5 55.5 SANTA BARBARA CA PGE Divide-Cabrillo #2 115kV line tap 6/1/2006 12/31/2015 NA Complete Complete Executed GSFA
18 4/15/2003 4/15/2003 Withdrawn 6/20/06 AMEND 39 WT W 200 200 LOS ANGELES CA SCE Antelope 12/31/2005 12/12/2007 NA Complete Complete Tendered
25 2/5/2004 2/5/2004 Withdrawn 6/11/07 AMEND 39 WT W 117 117 SAN DIEGO CA SDGE Crestwood 6/6/2005 6/1/2007 NA In Progess
26 2/12/2004 2/12/2004 Withdrawn 8/23/07 AMEND 39 WT W 36 36 SAN DIEGO CA SDGE Crestwood 4/1/2006 1/1/2008 NA In Progress
27 2/23/2004 2/23/2004 Withdrawn 10/19/07 AMEND 39 CC NG 650 650 SAN DIEGO CA SDGE
230/138/69 kV South Bay (650 MW
CC) 1/1/2010 1/1/2010 NA Complete Complete In Progress
28 2/25/2004 2/25/2004 Withdrawn 7/22/2008 AMEND 39 CT NG 145.1 145.1 SAN FRANCISCO CA PGE Potrero 115 kV Sub 12/1/2006 6/1/2008 NA Complete Complete Executed
29 3/8/2004 3/29/2004 Withdrawn 7/11/08 AMEND 39 WT W 201 201 LAKE/SONOMA CA PGE
Collector Sub at Geysers #17 Fulton
230 kV line 12/1/2006 7/1/2009 NA Complete Re-study in Progress In Progress
30 4/26/2004 4/26/2004 Withdrawn 7/22/08 AMEND 39 CT NG 48.7 48.7 SAN FRANCISCO CA PGE SF Airport Substation 6/1/2006 6/1/2008 NA Complete Complete Executed GSFA
31 4/12/2004 5/11/2004 Withdrawn 4/18/08 AMEND 39 WT W 201 201 KERN CA SCE Monolith Substation 12/31/2007 6/1/2010 NA Complete In Progress
34 7/19/2004 7/19/2004 Withdrawn 4/18/08 AMEND 39 WT W 300 300 KERN CA SCE Monolith Substation 7/1/2007 7/1/2011 NA Complete In Progress
35 10/25/2004 10/25/2004 Withdrawn 4/12/07 AMEND 39 CT NG 49.9 49.9 FRESNO CA PGE 115 KV Panoche Sub 5/31/2006 5/31/2006 NA Complete Complete Tendered
36 11/1/2004 11/1/2004 Withdrawn 2/8/07 AMEND 39 CT NG 99.9 99.9 STANISLAUS CA PGE
115 kV Tesla - Stockton Cogen
Trans. Line. 5/31/2006 5/31/2006 NA Complete Complete Tendered
37 11/8/2004 11/8/2004 Withdrawn 4/5/11 AMEND 39 CT NG 74.9 74.9 SAN JOAQUIN CA PGE Tesla Substation 1/1/2007 12/31/2011 NA Complete Complete Executed
40 10/19/2004 11/11/2004 Withdrawn 4/20/09 AMEND 39 IC NG 118 118 ALAMEDA CA PGE Eastshore Substation 5/1/2007 10/1/2009 NA Complete Complete Executed
41 11/9/2004 11/18/2004 Withdrawn AMEND 39 CT NG 157 157 KERN CA SCE Pastoria Substation 7/31/2006 6/1/2011 NA Complete Complete
42 11/24/2004 11/26/2004 Withdrawn 8/10/2011 AMEND 39 CT NG 300 300 FRESNO CA PGE McCall Substation 5/31/2007 3/31/2013 NA Complete Complete Executed
43 11/29/2004 11/29/2004 Withdrawn 6/27/06 AMEND 39 IC NG 168.7 168.7 SAN JOAQUIN CA PGE Tesla-Bellota 230 kV line 1/1/2008 10/1/2007 NA Complete Tendered
44 11/29/2004 11/29/2004 Withdrawn 3/30/06 AMEND 39 IC NG 126.5 126.5 MADERA CA PGE Borden Substation 230 kV Bus 1/1/2008 10/1/2007 NA Complete Complete
46 12/1/2004 12/1/2004 Withdrawn 5/11/07 AMEND 39 CT NG 531 531 CONTRA COSTA CA PGE
Tesla-Tracy #1 230 kV Line - Tracy
Sub 7/31/2006 7/31/2008 NA Complete Complete
47 12/1/2004 12/1/2004 Withdrawn 2/26/2008 AMEND 39 CT NG 200.6 200.6 FRESNO CA PGE Herndon - Kearney 230 kV line 6/30/2008 6/30/2008 NA Complete Complete In Progress
48 12/1/2004 12/1/2004 Withdrawn 4/6/06 AMEND 39 CT NG 590 590 CONTRA COSTA CA PGE
Contra Costa Power Plant 230 kV
Substation 1/1/2008 10/1/2008 NA Complete Complete Tendered
53 12/1/2004 12/22/2004 Withdrawn 7/24/06 AMEND 39 CT NG 116.8 116.8 PLACER CA PGE Pleasant Grove Sub Station 6/1/2008 6/1/2008 NA Complete Complete Tendered
55 12/1/2004 1/13/2005 Withdrawn 11/13/07 AMEND 39 CC NG 673 673 FRESNO CA PGE Helm substation 7/31/2008 7/31/2008 NA Re-Study Complete Tendered
56 12/21/2004 1/25/2005 Withdrawn 5/31/07 AMEND 39 CC NG 634 634 CLARK NV SCE El Dorado 230 kV Substation 6/1/2007 8/1/2009 NA Complete Complete
58 1/25/2005 2/22/2005 Withdrawn AMEND 39 ST G 62 62 MINERAL NV SCE Control 115kV Substation 10/7/2007 2/1/2012 NA Complete Complete TAS II In Progress Executed
59 3/25/2005 3/28/2005 Withdrawn 8/2/06 AMEND 39 CT NG 97.2 97.2 KINGS CA PGE Henrietta Substantion 70 kV 1/1/2008 1/1/2008 NA Complete Complete Tendered
60 3/28/2005 3/28/2005 Withdrawn 6/18/2013 AMEND 39 CT NG 94 94 KERN CA PGE Kern Oil Substation 115 kV 3/31/2007 10/31/2015 NA Complete Complete Executed
62 3/28/2005 4/13/2005 Withdrawn 2/21/06 AMEND 39 CC NG 166.5 166.5 HUMBOLDT CA PGE Humboldt Bay-Humboldt #1 115 kV 5/31/2007 6/1/2007 NA Tendered
63 3/25/2005 4/18/2005 Withdrawn 1/4/07 AMEND 39 CC NG 158 158 CONTRA COSTA CA PGE Contra Costa (230 kV) 1/1/2008 1/1/2008 NA Complete Re-study in Progress Tendered
64 3/30/2005 4/28/2005 Withdrawn 1/13/06 AMEND 39 CT NG 147 147 HUMBOLDT CA PGE Humboldt Bay Power Plant Sub 5/1/2008 3/1/2008 NA Complete
65 5/6/2005 5/6/2005 Withdrawn 4/11/07 AMEND 39 CT NG 424.8 424.8 LOS ANGELES CA SCE
Long Beach Gen Station 220kv
switchyard 1/1/2007 6/1/2010 NA Complete Complete
68 3/30/2005 5/11/2005 Withdrawn Serial PV S 850 850 SAN BERNARDINO CA SCE Pisgah Sub 230 kV Bus 12/31/2009 3/31/2013 Waived Active Complete Complete Executed
69 5/6/2005 6/7/2005 Withdrawn 5/17/06 AMEND 39 CT NG 527 527 SAN BERNARDINO CA SCE Etiwanda 230kV Substation 8/1/2008 8/1/2008 NA Complete
71 6/15/2005 Withdrawn Serial CC NG 591 591 CLARK NV SCE Eldorado 500/230kV Substation 2/28/2007 1/31/2007 Complete Active
77 12/14/2010 8/22/2005 Withdrawn TC WT W 300 300 FC KERN CA SCE TBD Bakersfield 11/30/2007 11/30/2007
78 8/31/2005 8/31/2005 Withdrawn Serial PV S 300 300 IMPERIAL CA SDGE Imperial Valley Sub 230kV Bus 12/31/2009 5/31/2012 Waived Complete Complete Executed
80 9/12/2005 9/12/2005 Withdrawn Serial CC NG 610 610 LOS ANGELES CA SCE Laguna Bell Sub 230 kV Bus 7/31/2008 5/31/2012 Complete Complete
82 6/10/2005 9/14/2005 Withdrawn Serial ST B 6.8 6.8 HUMBOLDT CA PGE Rio Dell Substation 60kV 1/1/2006 1/1/2006 Complete
83 9/16/2005 9/16/2005 Withdrawn Serial WT W 60 60 SAN BERNARDINO CA SCE Lugo-Pisgah No. 2 230 kV tran line 12/31/2008 6/1/2010 Complete Complete Active Active
85 12/28/2005 12/28/2005 Withdrawn Serial WT W 120 120 KERN CA SCE
Segment 3 230 Collector Loop
Tehachapi 12/31/2007 12/31/2009 Waived Complete Withdrawn
86A 1/20/2006 1/20/2006 Withdrawn Serial WT W 33.1 33.1 KERN CA SCE Vincent Substation 1/1/2008 1/1/2015 Waived Complete Complete In Progress
86B 1/20/2006 1/20/2006 Withdrawn Serial WT W 34 34 KERN CA SCE Canwind Substation 66kV 1/1/2008 1/1/2015 Waived Complete Complete In Progress
87 12/14/2010 2/3/2006 Withdrawn TC ST NU 28 28 FC SAN LUIS OBISPO CA PGE
Diablo Canyon Substation Circuit
Breakers 532 and 632 12/8/2005 12/8/2005
88 2/10/2006 2/10/2006 Withdrawn Serial CC NG 613.5 613.5 LOS ANGELES CA SCE Hinson Sub 230 kV bus 7/1/2011 7/1/2011 Waived Complete Active
89 2/13/2006 2/13/2006 Withdrawn Serial CC NG 570 570 SAN BERNARDINO CA SCE Victorville Substation 7/1/2009 7/1/2012 Complete Complete Complete In Progress
90 9/13/2006 2/16/2006 Withdrawn Serial CT NG 93 93 SAN DIEGO CA SDGE
Existing radial 69kV gen-tie line to
TL6929 6/1/2007 6/1/2009 Complete Complete Complete Tendered
94 2/15/2006 3/1/2006 Withdrawn Serial WT W 180 180 KERN CA SCE Highwind Sub 220kV Bus 12/31/2011 12/31/2016 Waived Complete Complete In Progress
97 2/15/2006 3/1/2006 Withdrawn Serial WT W 160 160 KERN CA SCE Whirlwind Sub 220kV bus 12/31/2013 12/31/2016 Waived Complete Complete In Progress
101 4/7/2006 4/7/2006 Withdrawn Serial CT NG 100 100 KERN CA PGE PG&E Kern Oil-Vedder 115kV line 3/1/2008 3/1/2008
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Withdrawn
Study AvailabilityGenerating Facility Net MWs Location Point of Interconnection
California ISO Public Page 9 of 27
Report Run Date: 6/3/2016
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue
DateApplication Status
Reason for
Withdrawal
Study
Process
Ty
pe
-1
Ty
pe
-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal Full
Capacity,
Partial or
Energy Only
(FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line
Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Withdrawn
Study AvailabilityGenerating Facility Net MWs Location Point of Interconnection
102 4/19/2006 4/19/2006 Withdrawn Serial WT W 210 210 MONTEREY CA PGE Coburn Sub 230 kV Bus 11/30/2008 11/30/2008 Complete Complete Complete
102A 8/5/2010 4/21/2006 Withdrawn Serial WT W 100 100 KERN CA PGE Cabrill0-Divide 115kV 12/31/2009 12/31/2009
104 4/14/2006 5/3/2006 Withdrawn Serial CC NG 304 304 LOS ANGELES CA SCE Laguna Bell Sub 230 kV Bus 7/31/2009 7/31/2009 Active Complete Complete
105 5/4/2006 5/4/2006 Withdrawn Serial WT W 100 100 HUMBOLDT CA PGE
Between Rio Del Junction and
Bridgeville 10/30/2009 10/30/2009 Active
106 5/26/2006 5/26/2006 Withdrawn Serial ST S 635 635 SAN BERNARDINO CA SCE Mohave 500 kV Switchyard 12/31/2009 12/31/2010 Complete Active
107 6/9/2006 6/9/2006 Withdrawn Serial WT W 128 128 SOLANO CA PGE Brighton-Contra Costa 115 kV 3/1/2011 3/1/2011 Complete Active
108A 6/14/2006 6/14/2006 Withdrawn Serial ST S 300 300 KERN CA PGE Morro Bay - Midway 230kV line 3/1/2010 3/1/2010
109 6/14/2006 6/16/2006 Withdrawn Serial PV S 550 550 SAN BERNARDINO CA SCE Pisgah Substation 3/1/2011 3/1/2011 Complete Active
110 6/14/2006 6/16/2006 Withdrawn Serial PV S 1400 1400 SAN BERNARDINO CA SCE Pisgah Substation 3/1/2013 3/1/2013 Complete Active
111 6/23/2006 6/26/2006 Withdrawn - 9/26/2013 AMEND 39 ST B 16 16 KERN CA PGE Tap of Chevron 70kv tran line 8/31/2009 12/31/2016 NA Complete Complete Executed GSFA
112 6/28/2006 6/28/2006 Withdrawn Serial WT W 300 300 SAN DIEGO CA SDGE
500 kV Imperial Valley-Miguel trans
line 10/31/2008 10/31/2008 Complete Complete Active
113 6/29/2006 6/30/2006 Withdrawn Serial WT W 30 30 SOLANO CA PGE
Birds Landing Switching Station
230kV bus 4/3/2009 12/31/2014 Complete Complete Executed
114 6/29/2006 7/12/2006 Withdrawn Serial WT W 150 150 SAN BERNARDINO CA SCE Victor 230 kV 7/1/2008 7/1/2008 Complete Active
115 6/29/2006 7/12/2006 Withdrawn Serial WT W 150 150 SAN BERNARDINO CA SCE Lugo-Pisgah 230kV line 7/1/2008 7/1/2008 Complete Active
116 6/29/2006 7/12/2006 Withdrawn Serial WT W 50 50 SAN BERNARDINO CA SCE Lugo-Pisgah 230kV line 7/1/2008 7/1/2008 Complete Active
117 5/4/2006 7/20/2006 Withdrawn Serial WT W 70 70 HUMBOLDT CA PGE Rio Del Junction - Bridgeville 10/30/2009 10/30/2009
118 8/2/2006 8/4/2006 Withdrawn Serial CC NG 550 550 MOHAVE AZ SCE SCE Mohave Substation 1/8/2009 1/8/2009 Complete Active
120 8/9/2006 8/9/2006 Withdrawn Serial PV S 1200 1200 SAN BERNARDINO CA SCE Mojave 500 kV Switchyard 3/1/2011 3/1/2011 Active
122 8/16/2006 8/17/2006 Withdrawn Serial CT NG 99 99 ORANGE CA SDGE SDG&E Margarita Substation 3/31/2009 6/30/2008 Waived Active
123 8/17/2006 Withdrawn Serial CT NG 99 99 SAN DIEGO CA SDGE SDG&E Pala Substation 3/31/2009 6/30/2008
126 8/31/2006 8/31/2006 Withdrawn Serial WT W 1500 1500 CLARK NV SCE Eldorado Substation 220kV bus 12/31/2011 12/31/2011 Complete Complete Re-Study
127 8/22/2006 9/1/2006 Withdrawn Serial ST HR 27.2 27.2 CONTRA COSTA CA PGE 115kV Oleum Switchyard 8/1/2008 8/1/2008 Active Complete Active
128 9/1/2006 9/1/2006 Withdrawn Serial CC NG 565 600 FRESNO CA PGE McCall Substation 12/1/2010 12/1/2012 Complete Complete Re-Study
129 9/13/2006 Withdrawn Serial WT W 400 400 SAN BERNARDINO CA SCE Pisgah 230kV Substation 3/1/2010 3/1/2010
130 9/13/2006 9/13/2006 Withdrawn Serial ST S 565 565 SAN BERNARDINO CA SCE Mohave Generating Station 12/31/2010 12/31/2010 Active
133 10/3/2006 Withdrawn Serial WT W 140 140 SAN BERNARDINO CA SCE Pisgah-Lugo 230kV 3/1/2010 3/1/2010 Active
134 10/9/2006 Withdrawn Serial CT NG 200 200 KERN CA SCE Pastoria Substation 5/31/2010 5/31/2010
135 10/10/2006 10/10/2006 Withdrawn Serial WT W 60 60 SAN BERNARDINO CA SCE Lugo-Pisgah 230kV line 9/30/2008 12/31/2015 Complete Complete Complete Complete Executed
136 10/16/2006 10/16/2006 Withdrawn Serial CT NG 300 300 SAN BERNARDINO CA SCE Etiwanda 230kV Substation 1/1/2010 1/1/2010 Waived Complete Complete In Progress
139 10/24/2006 10/24/2006 Withdrawn Serial CC NG 698 698 SAN BERNARDINO CA SCE SCE Rancho Vista 500kV Sub 6/1/2010 6/1/2013 Active Complete Complete In Progress
140 10/31/2006 10/31/2006 Withdrawn Serial ST G 75 75 INYO CA SCE Coso-Kramer 230 kV 8/18/2011 8/18/2011 Active
141 11/3/2006 11/3/2006 Withdrawn Serial CT NG 504 504 SAN BERNARDINO CA SCE Rancho Vista 500 kV Substation 6/1/2010 Active Active
143 11/6/2006 11/6/2006 Withdrawn Serial ST S 80 80 SAN BERNARDINO CA SCE Kramer Substation 12/31/2009 12/31/2009 Complete Active
144 11/6/2006 11/6/2006 Withdrawn Serial ST S 320 320 SAN BERNARDINO CA SCE Kramer Substation 12/31/2009 12/31/2009 Complete Active
145 11/8/2006 11/8/2006 Withdrawn Serial CC NG 591 591 CLARK NV SCE Eldorado 500 kV Substation 6/1/2010 6/1/2010 Complete Active Active
148 11/16/2006 Withdrawn Serial ST G 90 90 CHURCH NV SCE Oxbow 230kV Substation 10/1/2011 10/1/2011
149 11/16/2006 11/16/2006 Withdrawn Serial WT W 362 362 KERN CA SCE
SCE Highwind Sub #2 (proposed)
230 kV 12/31/2010 12/31/2010 Complete
150 11/16/2006 11/16/2006 Withdrawn IC Request Serial CT NG 47.4 47.4 SAN DIEGO CA SDGE Border Substation 69 kV 5/15/2014 11/15/2016 Complete Complete Complete Active Executed
151 11/17/2006 11/17/2006 Withdrawn Serial CT NG 510 510 SAN BERNARDINO CA SCE Chino Substation 230kV Line 5/1/2011 5/1/2011 Active
152 11/22/2006 11/22/2006 Withdrawn Serial WT W 105 105 SANTA BARBARA CA PGE Mesa-Divide #1 115kV line 12/31/2009 12/31/2009 Complete Complete Active
153 11/22/2006 11/22/2006 Withdrawn Serial WT W 100 100 KERN CA SCE Whirlwind Substation 230kV 5/30/2008 12/31/2016 Waived Complete Complete ISO Executed
154 11/28/2006 11/30/2006 Withdrawn TC PV S 250 250 FC KERN CA SCE Windhub 230 kV Substation 12/31/2009 6/1/2015 Complete Complete In Progress
155 12/1/2006 12/1/2006 Withdrawn Serial CT NG 300 300 ALAMEDA CA PGE Oakland C 115kV substation 5/31/2010 5/31/2012 Complete Complete Active
156 12/5/2006 12/5/2006 Withdrawn Serial WT W 201 201 SAN BERNARDINO CA SCE Lugo-Pisgah 230kV line 3/1/2009 3/1/2012 Active Complete Complete In Progress
157 12/15/2006 12/15/2006 Withdrawn Serial WT W 100 100 KERN CA SCE 66kV Rosamond-Antelope line 12/31/2014 12/31/2014 Active Active
158 12/15/2006 12/15/2006 Withdrawn Serial WT W 100 100 KERN CA SCE 66kV Rosamond-Delsur line 12/31/2013 12/31/2013 Active Active
159 12/15/2006 12/15/2006 Withdrawn Serial WT W 100 100 KERN CA SCE Antelope-Magunden #1 220kV line 12/31/2013 12/31/2013 Active Active
160 2/1/2007 12/29/2006 Withdrawn Serial ST S 220 220 SAN BERNARDINO CA SCE Kramer 1/1/2009 1/1/2009 Active
161 12/27/2006 1/4/2007 Withdrawn Serial CT NG 220 220 LOS ANGELES CA SCE Harborgen Substation 5/1/2009 3/1/2012 Active Complete Complete
164 1/12/2007 1/12/2007 Withdrawn Serial WT W 1000 1000 BAJA CALIFORNIA MX SDGE Imperial Valley 230kV switchyard 10/1/2010 10/1/2010 Complete Active
165 1/16/2007 1/16/2007 Withdrawn Serial ST S 400 400 SAN BERNARDINO CA SCE Pisgah 230kV Substation bus 6/30/2011 6/30/2011 Waived Complete Active
167 1/25/2007 Withdrawn Serial CC NG 700 700 RIVERSIDE CA SCE
500kV line to Midpoint Switching
Station 6/1/2012 6/1/2012
168 2/1/2007 2/2/2007 Withdrawn Serial WT W 1000 1000 BAJA CALIFORNIA MX SDGE Imperial Valley 500kV bus 12/31/2011 12/31/2011 Complete Active
169 2/1/2007 2/2/2007 Withdrawn Serial ST S 211.6 211.6 IMPERIAL CA SDGE Imperial Valley 230kV bus 12/31/2011 12/31/2011 Complete Active
170 2/2/2007 2/2/2007 Withdrawn Serial PV S 150 150 KERN CA SCE Substation 5 (aka Whirlwind) 12/31/2011 7/31/2013 Active Active
171 2/9/2007 2/9/2007 Withdrawn Serial WT W 500 500 SOLANO CA PGE Vaca-Tesla 500kV line 12/31/2011 3/31/2011 Active Active
172 2/8/2007 2/15/2007 Withdrawn Serial CC NG 508 508 SAN JOAQUIN CA PGE Tesla-Bellota 230kV lines 5/15/2011 5/1/2014 Complete Complete Complete Executed
173 2/16/2007 2/16/2007 Withdrawn Serial CT NG 49.9 49.9 SAN DIEGO CA SDGE Pala 69kV Substation 5/1/2011 5/1/2011 Waived Complete Complete In Progress
174 2/16/2007 2/16/2007 Withdrawn Serial WT W 30 30 RIVERSIDE CA SCE Devers-Venwind 115kV line 12/1/2008 12/1/2008 Active
175 2/21/2007 2/21/2007 Withdrawn IC Request TC WT W 650 650 FC KERN CA SCE Whirlwind Substation 230kV 9/30/2008 12/31/2017 Complete Complete Executed
176 2/23/2007 2/23/2007 Withdrawn Per FERC Order Serial CT NG 49.9 49.9 ORANGE CA SDGE Margarita 138kV Substation 5/1/2008 6/15/2010 Waived Complete Complete Executed
177 2/27/2007 2/28/2007 Withdrawn Serial WT W 100 100 CONTRA COSTA CA PGE Bahia Moraga 230 kV Line 12/31/2011 12/31/2011 Complete Complete Active
California ISO Public Page 10 of 27
Report Run Date: 6/3/2016
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue
DateApplication Status
Reason for
Withdrawal
Study
Process
Ty
pe
-1
Ty
pe
-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal Full
Capacity,
Partial or
Energy Only
(FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line
Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Withdrawn
Study AvailabilityGenerating Facility Net MWs Location Point of Interconnection
178 2/27/2007 2/28/2007 Withdrawn Serial WT W 100 100 MERCED CA PGE
Los Banos 230kV bus near Pacheco
Pass 12/31/2011 12/31/2011 Complete Active
178A 2/27/2007 2/28/2007 Withdrawn Serial WT W 500 500 MEXICALI/ENSENADA/TECATEMX SDGE Miguel 230kV Bus 7/1/2011 7/1/2011 Complete Active
178B 2/27/2007 2/28/2007 Withdrawn Serial WT W 500 500 MEXICALI/ENSENADA/TECATEMX SDGE Imperial Valley 230kV Substation 7/1/2010 6/15/2010 Complete Active
179 2/15/2007 3/1/2007 Withdrawn Serial ST S 300 300 RIVERSIDE CA SCE Julian Hinds 230kV Substation 12/31/2010 12/31/2010 Active
180 3/6/2007 3/2/2007 Withdrawn Serial CT NG 564 564 SAN BERNARDINO CA SCE
New 230kV Switchyard on the Mira
Loma-Vista #2 line 5/1/2011 5/1/2011 Complete Active
181 3/6/2007 3/2/2007 Withdrawn Serial CT NG 400 400 SAN BERNARDINO CA SCE
New 230kV switchyard on the
Chino-Serrano line 3/1/2010 3/1/2010 Complete Active
182 3/5/2007 3/5/2007 Withdrawn Serial PV S 500 500 KERN CA SCE Windhub Substation 12/31/2010 7/1/2015 Active
184 3/5/2007 3/5/2007 Withdrawn Serial ST G 32 32 SONOMA CA PGE Geysers #3-Cloverdale 115 kV line 1/1/2010 10/1/2015 Complete Complete Complete Executed
185 3/6/2007 3/6/2007 Withdrawn Serial ST G 150 150 MINERAL NV SCE Control Sub 8/1/2011 1/1/2011 Waived Complete Active Active
186 3/7/2007 3/7/2007 Withdrawn Serial CT NG 211 211 SAN JOAQUIN CA PGE
Stockton¿A¿-Lockeford-Bellota
115kV #1 lines & Tesla-Tracy
115kV line 12/31/2009 12/31/2009 Complete Active
187 3/14/2007 3/14/2007 Withdrawn Serial ST G 50 50 SONOMA CA PGE
Geysers-Fulton 230kV transmission
line 1/1/2011 1/1/2011 Active Complete Active
190 3/31/2007 3/30/2007 Withdrawn Serial CT NG 330 330 SAN DIEGO CA SDGE
Otay Mesa Energy Center 230kV
Substation 3/1/2011 5/1/2013 Complete Complete Complete In Progress
191 4/2/2007 4/2/2007 Withdrawn Serial CT NG 315 315 SAN DIEGO CA SDGE
Penasquistos Old Town 230kV
transmission line 3/1/2010 3/1/2010 Complete Active
192 4/2/2007 4/2/2007 Withdrawn Serial CT NG 315 315 SAN DIEGO CA SDGE
San Luis Rey¿Mission 230kV
transmission line 3/1/2010 3/1/2010 Complete
195 4/6/2007 4/6/2007 Withdrawn Serial CC NG 725 725 KERN CA SCE Springerville Mugunden 230kV Line 1/1/2013 1/1/2013 Active
196 4/13/2007 4/13/2007 Withdrawn Serial CC NG 210 210 MADERA CA PGE Borden Substation 230kV Bus 7/1/2011 6/15/2014 Complete Active
197 4/16/2007 4/16/2007 Withdrawn Serial CT NG 315 315 SAN DIEGO CA SDGE Otay Mesa 230kV switchyard 12/1/2011 12/1/2011 Complete Active
198 4/18/2007 4/18/2007 Withdrawn Serial CT NG 400 400 SAN DIEGO CA SDGE OMEC interconnection substation 2/28/2010 2/28/2010 Complete Active
199 4/19/2007 4/19/2007 Withdrawn Serial CT NG 50 50 SAN JOAQUIN CA PGE 60kV bus at Posdef QF facility 12/31/2009 12/31/2009 Active Complete Active
200 4/2/2007 4/19/2007 Withdrawn Serial CT NG 200 200 RIVERSIDE CA SCE Mira Loma Substation 5/31/2010 5/31/2010
202 4/19/2007 4/19/2007 Withdrawn Serial WT W 198.65 198.65 SAN BERNARDINO CA SCE Cool Water-Kramer #1 230kV line 11/15/2013 11/15/2013 Complete
203 4/19/2007 4/19/2007 Withdrawn Serial WT W 198.65 198.65 SAN BERNARDINO CA SCE
Cool Water-SEGS2-Tortilla 115kV
line 12/15/2013 12/15/2013 Active
204 4/19/2007 4/19/2007 Withdrawn Serial WT W 149.4 149.4 SAN BERNARDINO CA SCE Tortilla-Kramer 115 kV line 11/15/2013 11/15/2013 Active
205 4/20/2007 4/20/2007 Withdrawn TC ST S 5 5 FC CLARK NV SCE El Dorado 220kV Switchyard 12/31/2010 12/31/2014 Complete Complete In Progress
206 4/26/2007 4/23/2007 Withdrawn Serial CC S 200 200 LOS ANGELES CA SCE El Sequndo 230kV Switchyard 1/30/2013 1/30/2013
207 4/26/2007 4/26/2007 Withdrawn Serial CC NG 557.3 557.3 LOS ANGELES CA SCE Long Beach Substation 8/30/2013 Complete Active
208 4/20/2007 5/3/2007 Withdrawn 04/07/08 AMEND 39 PV S 2 2 ALAMEDA CA PGE Tracy-Herdlyn 69kV line 6/1/2008 9/1/2008 NA Waived In Progress
209 5/2/2007 5/3/2007 Withdrawn Serial WT W 400 400 BAJA CALIFORNIA MX SDGE
New 230/500kV substation near the
500kV IV-ML line 12/31/2010 12/31/2010 Complete Active Active
210 5/3/2007 5/3/2007 Withdrawn Serial PV S 500 500 RIVERSIDE CA SCE
Red Bluff Substation 230kV
switchyard 12/31/2012 12/1/2016 Active
211 5/14/2007 5/4/2007 Withdrawn Serial WT W 201 201 LASSEN CA PGE Caribou 230kV Substation 10/31/2008 10/31/2008 Active Active
212 5/9/2007 5/9/2007 Withdrawn Serial WT W 50 50 HUMBOLDT CA PGE Rio Dell Substation 60kV 10/30/2010 12/15/2013 Complete Complete Complete Executed
213 5/7/2007 5/9/2007 Withdrawn Serial WT W 180 180 SAN BERNARDINO CA SCE Coolwater 220kV bus 11/15/2010 11/15/2010 Active
214 5/10/2007 5/10/2007 Withdrawn Serial WT W 49.25 49.25 SAN BERNARDINO CA SCE Coolwater-Kramer 115 kV line 12/15/2013 12/15/2013 Complete
216 5/22/2007 5/22/2007 Withdrawn Serial CT NG 98.8 98.8 SAN DIEGO CA SDGE Otay Mesa Energy Center 3/31/2010 3/31/2010 Active
217 5/22/2007 Withdrawn Serial CT NG 98.8 98.8 SAN DIEGO CA SDGE San Luis Rey-Melrose 69kV 3/31/2010 3/31/2010 Active
218 5/22/2007 5/22/2007 Withdrawn Serial CT NG 98.8 98.8 SAN DIEGO CA SDGE Loop Talega-Escondido 230kV line 3/31/2010 3/31/2010 Active
220 5/23/2007 5/23/2007 Withdrawn Serial PV S 450 450 SAN BERNARDINO CA SCE BLM West-Kramer 230kV line 12/1/2011 10/1/2016 Active Active
221 5/23/2007 5/23/2007 Withdrawn Serial PV S 450 450 SAN BERNARDINO CA SCE Cool Water-Kramer #1 230kV line 12/1/2011 11/1/2015 Active Active
223 5/24/2007 5/29/2007 Withdrawn Serial WT W 170 170 SAN BERNARDINO CA SCE Cool Water-Kramer #1 230kV line 12/31/2010 12/31/2010
224 5/23/2007 5/30/2007 Withdrawn Serial RE NG 99 99 SAN DIEGO CA SDGE
69kV line next to Calpeak Border
site 5/1/2010 5/1/2010 Active
225 5/23/2007 6/4/2007 Withdrawn Serial CC NG 640 640 RIVERSIDE CA SCE
500kV line to the new Midpoint
switching station 6/1/2012 5/31/2015 Active
226 5/16/2007 6/5/2007 Withdrawn Serial CC NG 620 620 SAN DIEGO CA SDGE
New double circuit 230kV line into
Escondido Substation 3/30/2012 3/30/2012 Complete Active
227 6/18/2007 6/14/2007 Withdrawn Serial WT W 175 175 MARIN CA PGE Fulton-Ignacio 230kV #2 line 12/31/2010 12/31/2010 Complete Active
228 6/20/2007 6/20/2007 Withdrawn Serial CT NG 630 630 ALAMEDA CA PGE Newark Substation 230kV bus 6/1/2011 6/1/2011 Complete Active
229 6/21/2007 6/21/2007 Withdrawn Serial PV S 1000 1000 SAN BERNARDINO CA SCE Devers Substation 12/31/2013 12/31/2016 Active
230 6/21/2007 6/21/2007 Withdrawn Serial PV S 1000 1000 SAN BERNARDINO CA SCE Devers Substation 12/31/2013 12/31/2013 Active
231 6/13/2007 6/25/2007 Withdrawn Serial WT W 50 50 RIVERSIDE CA SCE
Venwind portion of Devers-Garnett-
Venwind line 12/1/2009 12/1/2009 Active
232 6/26/2007 6/26/2007 Withdrawn Serial RE NG 99 99 SAN DIEGO CA SDGE Interconnection on Site 5/15/2010 Active
234 6/27/2007 6/27/2007 Withdrawn Serial ST S 400 400 CLARK NV SCE
Proposed Eldorado-Ivanpah 230kV
line 6/30/2013 6/30/2013 Active
California ISO Public Page 11 of 27
Report Run Date: 6/3/2016
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue
DateApplication Status
Reason for
Withdrawal
Study
Process
Ty
pe
-1
Ty
pe
-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal Full
Capacity,
Partial or
Energy Only
(FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line
Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Withdrawn
Study AvailabilityGenerating Facility Net MWs Location Point of Interconnection
235 6/29/2007 6/29/2007 Withdrawn Serial CT NG 630 630 CONTRA COSTA CA PGE Tesla-Tracy #1 230kV line 6/1/2011 6/1/2011 Active Active
236 6/29/2007 6/29/2007 Withdrawn Serial CT NG 630 630 SAN JOAQUIN CA PGE Tesla Substation 230kV bus 6/1/2011 6/1/2011 Active Active
237 6/12/2007 7/2/2007 Withdrawn Serial CC NG 634 634 CLARK NV SCE Eldorado 220kV switchyard 5/1/2011 5/1/2011 Waived Active
238 7/12/2007 7/11/2007 Withdrawn Serial PV S 45 45 SAN LUIS OBISPO CA PGE
Temblor-San Luis Obispo 115kV
line 12/1/2008 12/1/2008 Active Active
240 7/12/2007 7/12/2007 Withdrawn Serial ST S 400 400 SAN BERNARDINO CA SCE Pisgah Sub 230kV 6/30/2014 1/1/2018 Waived Complete Complete In Progress
241 7/12/2007 7/12/2007 Withdrawn Serial ST S 400 400 SAN BERNARDINO CA SCE Pisgah Sub 230kV 6/30/2015 6/30/2015 Waived Complete Complete Active In Progress
243 7/16/2007 7/16/2007 Withdrawn Serial WT S 429 429 SAN BERNARDINO CA SCE Pisgah 230kV Substation 12/30/2010 12/30/2010 Active Active
244 7/16/2007 7/16/2007 Withdrawn Serial WT W 120 120 KERN/INYO CA SCE Control-Haiwee-Inyokern 115kV line 12/15/2010 12/15/2010 Active Active
245 7/16/2007 7/16/2007 Withdrawn Serial WT W 228 228 RIVERSIDE CA SCE
Devers-Mirage-Julian Hinds 230kV
line 12/15/2010 12/15/2010 Active Active
246 7/17/2007 7/17/2007 Withdrawn Serial WT W 120 120 KERN CA SCE
Kramer-Inyokern-Randsburg #3
115kV line 12/15/2010 12/15/2010 Active
247 7/30/2007 7/30/2007 Withdrawn Serial CC NG 67 67 MADERA CA PGE Borden Substation 230kV Bus 7/1/2011 4/15/2012 Active Active
248 7/30/2007 7/30/2007 Withdrawn Per FERC Order Serial CC NG 67 67 SAN JOAQUIN CA PGE Tesla-Bellota 230kV line 5/15/2011 5/1/2014 Waived Complete Complete Executed
249 7/30/2007 7/30/2007 Withdrawn Serial WT W 105 105 MONTEREY CA PGE
Moss-Linding-Salinas-Soledad
115kV #1 and #2 lines #1 line & Tap
N/O Moss Landing-Salinas-Soledad
#2 11/1/2010 11/1/2010 Complete Active
250 8/4/2007 7/30/2007 Withdrawn TC WT W 66.2 66.2 FC LAKE/COLUSA CA PGE Redbud-Cortina 115kV line 8/1/2009 8/3/2014 Complete Complete Executed
251 8/1/2007 8/1/2007 Withdrawn Serial PV S 200 200 RIVERSIDE CA SCE Eagle Mountain-Blythe 161kV line 12/15/2009 12/15/2009 Active Active
253 8/13/2007 8/13/2007 Withdrawn Serial WT W 40 40 SANTA BARBARA CA PGE Cabrillo Substation 115kV 12/31/2011 12/31/2011 Complete
254 8/21/2007 8/21/2007 Withdrawn IC Request TC CC NG 600 600 FC KINGS CA PGE Gates Substation 230kV bus 6/1/2012 6/1/2017 Complete Complete Executed
255 11/19/2010 8/23/2007 Withdrawn TC ST S 250 250 FC KERN CA SCE Inyokern Substation 12/28/2013 7/1/2013 Complete Complete
256 8/23/2007 8/23/2007 Withdrawn Serial PV S 30 30 FRESNO CA PGE Mendota Biomass Substation 4/15/2009 4/15/2009 Active
257 7/10/2007 9/10/2007 Withdrawn Serial CC NG 575 575 SOLANO CA PGE New Fairfield Substation 230kV bus 6/1/2011 6/1/2011 Re-Study Active
259 9/14/2007 9/12/2007 Withdrawn Serial CC NG 345 345 SUTTER CA PGE Rio Oso Substation 115kV bus 2/1/2012 2/1/2012 Complete Active
260 9/14/2007 9/12/2007 Withdrawn Serial CC NG 260 260 SAN JOAQUIN CA PGE
Loop Gold Hill-Eight Mile Road
230kV line 2/1/2012 2/1/2012 Complete Active
261 9/28/2007 9/28/2007 Withdrawn Serial CC NG 104 104 LOS ANGELES CA SCE Hinson Substation 220kV 10/1/2010 10/1/2010 Active
262 10/11/2007 10/10/2007 Withdrawn Serial RE NG 390.6 390.6 SOLANO CA PGE
Birds Landing Substation 230 kV
Bus 4/15/2012 4/15/2012 Active
263 10/10/2007 10/10/2007 Withdrawn Serial CC NG 634 634 CLARK NV SCE
Eldorado Switchyard 220kV & NCP
Merchant Substation 230kV 5/1/2011 5/1/2011 Waived Active
264 10/15/2007 10/15/2007 Withdrawn Serial WT W 300 300 SAN BERNARDINO CA SCE Lugo-Mohave 500kV line 12/30/2010 12/30/2010 Active Active
265 10/16/2007 10/16/2007 Withdrawn Serial PV S 25 25 RIVERSIDE CA SCE Eagle Mountain Blythe 161kV line 12/1/2009 12/1/2009 Active
266 10/19/2007 10/19/2007 Withdrawn Serial CC NG 325 325 SUTTER CA PGE Rio Oso Substation 230 kV Bus 2/1/2012 2/1/2012 Complete
269 10/30/2007 10/31/2007 Withdrawn Serial RE NG 371.3 371.3 SAN JOAQUIN CA PGE Tesla-Westley 230 KV lines 4/15/2012 5/1/2015 Complete Active Re-Study
270 11/1/2007 11/1/2007 Withdrawn Serial PV S 700 700 RIVERSIDE CA SCE
Proposed Midpoint Substation
230kV 12/1/2011 12/1/2015 Active Active
271 11/1/2007 11/1/2007 Withdrawn Serial PV S 400 400 SAN BERNARDINO CA SCE Lugo-Pisgah 230kV line 12/1/2012 9/1/2016 Active
273 11/1/2007 11/1/2007 Withdrawn Serial CC NG 99 99 KINGS CA PGE Hanford Switchyard 115kV bus 5/1/2010 5/1/2010 Waived Active
275 11/7/2007 11/7/2007 Withdrawn Serial CT NG 630 630 SOLANO CA PGE
Loop Vaca Dixon-Peabody & Vaca
Dixon-Lambie 230 kV lines 9/1/2012 5/1/2013 Active
276 11/9/2007 11/9/2007 Withdrawn Serial CC NG 650 650 CONTRA COSTA CA PGE Contra Costa Substation 1/15/2012 1/15/2012 Active
277 11/15/2007 11/15/2007 Withdrawn Serial WT W 75 75 SAN BERNARDINO CA SCE Coolwater-Dunn Siding 115kV line 11/15/2010 11/15/2010 Active
278 11/26/2007 11/26/2007 Withdrawn Serial ST S 565 565 SAN BERNARDINO CA SCE Pisgah Substation 1/1/2011 Waived Active
279 11/30/2007 11/30/2007 Withdrawn Serial H WTR 40 40 HUMBOLDT CA PGE Fairhaven Substation 60kV bus 6/1/2012 6/1/2012 Active Active
280 11/30/2007 11/30/2007 Withdrawn Serial H WTR 40 40 MENDOCINO CA PGE Fort Bragg Substation 60kV bus 6/1/2012 6/1/2012 Active
281 12/3/2007 12/3/2007 Withdrawn Serial CC NG 500 500 SAN JOAQUIN CA PGE
Loop Tesla-Stagg and Tesla-Eight
Mile 230kV lines 12/31/2010 12/31/2010 Active Active
282 12/12/2007 12/12/2007 Withdrawn TC ST B 29 29 FC MADERA CA PGE Dairyland-Mendota 115 kV line tap 5/31/2008 6/30/2011 Complete Complete Executed
283 12/12/2007 12/12/2007 Withdrawn Serial ST B 106.8 106.8 FRESNO CA PGE Gates Substation 230kV bus 3/1/2010 9/30/2012 Active
284 12/13/2007 12/13/2007 Withdrawn Serial RE NG 115 115 MENDOCINO CA PGE Ukiah Substation 115kV bus 4/15/2012 4/15/2012 Active
285 12/13/2007 12/13/2007 Withdrawn Serial WT W 150 150 SAN BERNARDINO CA SCE Pisgah Substation 230kV 12/31/2011 12/31/2011 Active
286 12/20/2007 12/20/2007 Withdrawn Serial ST S 375 375 IMPERIAL CA SDGE Southwest Power Link 500kV line 7/1/2012 7/1/2012 Active
287 12/21/2007 12/21/2007 Withdrawn Serial ST S 231 231 KERN CA SCE Antelope-Magunden 230kV 4/1/2011 4/1/2011 Waived Active
288 12/20/2007 12/21/2007 Withdrawn Serial PV S 375 375 SAN LUIS OBISPO CA PGE Morro Bay-Midway #2 230kV line 7/1/2011 7/1/2012 Active
289 12/20/2007 12/21/2007 Withdrawn Serial ST S 375 375 SAN BERNARDINO CA SCE El Dorado-Ivanpah 115kV line 7/1/2011 7/1/2011 Active
290 12/27/2007 12/27/2007 Withdrawn Serial ST S 750 750 SAN BERNARDINO CA SCE Pisgah Substation 230kV 6/1/2015 12/31/2012 Active
291 12/27/2007 12/27/2007 Withdrawn Serial ST S 250 250 SAN BERNARDINO CA SCE Ivanpah Substation 230kV 6/1/2015 6/1/2015 Active
292 12/27/2007 12/27/2007 Withdrawn Serial ST S 250 250 KERN CA SCE
SCE portion of Kramer BLM West
230kV line 6/1/2014 6/1/2014
293 12/31/2007 1/3/2008 Withdrawn Serial RE B 5.2 5.2 FRESNO CA PGE Helm-Kerman 70kV line 6/1/2009 6/1/2009 Active
295 1/17/2008 1/17/2008 Withdrawn Serial ST S 300 300 SAN BERNARDINO CA SCE Pisgah Substation 220kV 12/31/2011 12/31/2011 Active
296 1/18/2008 1/18/2008 Withdrawn Serial ST S 33 33 LOS ANGELES CA SCE Antelope-Piute 66kV line 12/1/2009 12/1/2009 Waived Active
California ISO Public Page 12 of 27
Report Run Date: 6/3/2016
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue
DateApplication Status
Reason for
Withdrawal
Study
Process
Ty
pe
-1
Ty
pe
-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal Full
Capacity,
Partial or
Energy Only
(FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line
Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Withdrawn
Study AvailabilityGenerating Facility Net MWs Location Point of Interconnection
298 1/23/2008 1/23/2008 Withdrawn Serial ST S 140 140 CLARK NV SCE El Dorado 220kV switchyard 11/1/2011 11/1/2011 Active
299 11/19/2010 1/29/2008 Withdrawn TC CC NG 27 27 FC KINGS CA PGE Hanford Switchyard 115kV bus 5/1/2010 5/1/2013 Complete Complete
300 11/19/2010 2/4/2008 Withdrawn TC CC NG 400 400 FC KERN CA PGE
Midway-Wheeler Ridge #1 and #2
230kV line 9/1/2014 9/1/2015 Complete Complete
301 2/8/2008 2/8/2008 Withdrawn Serial PV S 500 500 SAN BERNARDINO CA SCE Lugo-Pisgah Line 220kV line 1/1/2016 1/1/2016 Complete
302 2/19/2008 2/19/2008 Withdrawn Serial PV S 200 200 SAN BERNARDINO CA SCE Lugo-Pisgah 220kV line 2/1/2010 2/1/2010 Active
303 2/27/2008 2/27/2008 Withdrawn Serial WT W 500 500 BAJA CALIFORNIA MX SDGE Imperial Valley - Miguel 500kV line 12/31/2011 12/31/2011 Active
305 3/18/2008 3/10/2008 Withdrawn Serial CC NG 611 611 CONTRA COSTA CA PGE
Contra Costa Substation 230kV
Switchyard 7/30/2012 7/30/2012 Active
306 3/11/2008 3/11/2008 Withdrawn Serial CT NG 200 200 SAN JOAQUIN CA PGE
Tesla-Belota 230kV and Tesla-
Webber 230kV lines 5/1/2012 5/1/2012 Active
307 3/11/2008 3/11/2008 Withdrawn Serial PV S 100 100 LOS ANGELES CA SCE Lancaster Redman 66kV line 5/1/2009 5/1/2009 Active
308 3/11/2008 3/11/2008 Withdrawn Serial PV S 100 100 LOS ANGELES CA SCE
Helijet-Little Rock-Palmdale-Rockair
66kV line 5/1/2009 5/1/2009 Active
309 11/19/2010 3/11/2008 Withdrawn TC PV S 100 100 FC LOS ANGELES CA SCE Antelope Substation 66kV 5/1/2009 7/1/2013
310 3/11/2008 3/11/2008 Withdrawn Serial PV S 100 100 LOS ANGELES CA SCE
Del-Dur-Lancaster-Rite Aid 66kV
line 5/1/2009 5/1/2009 Active
311 3/11/2008 3/11/2008 Withdrawn Serial PV S 100 100 LOS ANGELES CA SCE
Lancaster-Little Rock-Piute 66kV
line 5/1/2009 5/1/2009 Active
312 3/11/2008 3/11/2008 Withdrawn Serial PV S 100 100 LOS ANGELES CA SCE Oasis-Tortoise 66kV line 5/1/2009 5/1/2009 Active
313 3/11/2008 3/11/2008 Withdrawn Serial PV S 100 100 LOS ANGELES CA SCE Piute-Redman 66kV line 5/1/2009 5/1/2009 Active
314 3/11/2008 3/11/2008 Withdrawn Serial PV S 100 100 LOS ANGELES CA SCE
Lancaster-Little Rock-Piute 66kV
line 5/1/2009 5/1/2009 Active
315 3/11/2008 3/11/2008 Withdrawn Serial PV S 100 100 LOS ANGELES CA SCE
Helijet-Little Rock-Palmdale-Rockair
66kV line 5/1/2009 5/1/2009 Active
316 3/11/2008 3/11/2008 Withdrawn Serial PV S 100 100 LOS ANGELES CA SCE Antelope-Rosamond 66kV line 5/1/2009 5/1/2009 Active
317 11/19/2010 3/11/2008 Withdrawn TC PV S 100 100 FC LOS ANGELES CA SCE Antelope Substation 66kV 5/1/2009 6/1/2013
318 3/11/2008 3/11/2008 Withdrawn Serial PV S 100 100 KERN CA SCE Goldtown-Lancaster 66kV line 5/1/2009 5/1/2009 Active
319 3/11/2008 3/11/2008 Withdrawn Serial PV S 100 100 LOS ANGELES CA SCE Corum-Goldtown 66kV line 5/1/2009 5/1/2009 Active
321 3/18/2008 3/18/2008 Withdrawn Serial WT W 100 100 PLUMAS CA PGE
Caribou Substation 230kV
switchyard 12/15/2013 12/1/2013 Active
322 3/17/2008 3/18/2008 Withdrawn Serial CC NG 611 611 CONTRA COSTA CA PGE Pittsburg 230kV switchyard 9/30/2012 9/30/2012 Active
323 3/27/2008 3/27/2008 Withdrawn Serial PV S 100 100 KERN CA SCE Coram-Rosemond 66kV line 5/1/2009 5/1/2009 Active
324 3/27/2008 3/27/2008 Withdrawn Serial PV S 250 250 SAN BERNARDINO CA SCE
Eldorado Baker Cook Water Dunn
Siding Mountain Pass 115kV line 5/1/2009 5/1/2009 Active
325 3/27/2008 3/27/2008 Withdrawn Serial PV S 100 100 KERN CA SCE Kramer-Cool Water 115kV line 5/1/2009 5/1/2009
326 3/27/2008 3/27/2008 Withdrawn Serial PV S 100 100 KERN CA SCE Kramer-Tortilla 115kV line 5/1/2009 5/1/2009
327 3/25/2008 3/27/2008 Withdrawn Serial PV S 100 100 KERN CA SCE
Kramer-Inyokern-Randsberg No. 1
115kV line 5/1/2009 5/1/2009 Active
328 3/27/2008 3/27/2008 Withdrawn Serial PV S 100 100 KERN CA SCE
Kramer-Inyokern-Randsberg No. 3
115kV line 5/1/2009 5/1/2009 Active
329 3/31/2008 3/31/2008 Withdrawn Serial ST S 264 264 KERN CA SCE Whirlwind Substation 230kV 8/1/2012 8/1/2012
330 3/31/2008 3/31/2008 Withdrawn Serial ST S 33 33 LOS ANGELES CA SCE Antelope-Calcement 66kV line 12/1/2009 12/1/2009
331 3/31/2008 3/31/2008 Withdrawn Serial ST S 231 231 KERN CA SCE Windhub Substation 5/1/2010 5/1/2010
332 3/31/2008 3/31/2008 Withdrawn Serial ST S 264 264 KERN CA SCE Windhub Substation 9/1/2011 9/1/2011
333 3/31/2008 3/31/2008 Withdrawn Serial ST S 33 33 SAN BERNARDINO CA SCE Cool Water-Kramer 115kV line 7/1/2009 7/1/2009
335 4/4/2008 4/4/2008 Withdrawn Serial RE NG 99 99 ALAMEDA CA PGE Kelso Substation 230kV bus 6/1/2012 6/1/2012
336 4/7/2008 4/7/2008 Withdrawn Serial PV S 75 75 SAN DIEGO CA SDGE Borrego Substation 69kV 12/31/2010 12/31/2010
338 4/17/2008 4/17/2008 Withdrawn Serial CC NG 10 10 FRESNO CA PGE Kerman-Helms 70kV line 6/1/2010 6/1/2010
339 4/18/2008 4/18/2008 Withdrawn Serial CT NG 50 50 SAN FRANCISCO CA PGE Mission Substation 6/1/2011 6/1/2011
341 4/23/2008 4/23/2008 Withdrawn Serial CT NG 525 525 MERCED CA PGE Wilson Substation 230kV Bus 3/1/2012 3/1/2012
343 4/25/2008 4/25/2008 Withdrawn Serial PV S 40 40 LOS ANGELES CA SCE Piute-Redman 66kV Line 5/1/2011 5/1/2011
344 5/5/2008 4/25/2008 Withdrawn Serial PV S 40 40 LOS ANGELES CA SCE
Lancaster-Little Rock-Piute 66kV
line 5/1/2011 5/1/2011 Waived Active
345 4/25/2008 4/25/2008 Withdrawn Serial PV S 40 40 LOS ANGELES CA SCE
Lancaster-Little Rock-Piute 66kV
Line (Lancaster side of Tap 72) 5/1/2011 5/1/2011
346 4/25/2008 4/25/2008 Withdrawn Serial PV S 30 30 LOS ANGELES CA SCE Lancaster-Redman 66kV Line 5/1/2011 5/1/2011
347 4/25/2008 4/25/2008 Withdrawn Serial PV S 50 50 LOS ANGELES CA SCE
Helijet-Little Rock-Palmdale-Rockair
66kV line (primary: Palmdale side of
Tap 62; Aternate: Little Rock side of
Tap 62) 5/1/2011 5/1/2011
350 4/25/2008 4/25/2008 Withdrawn Serial PV S 80 80 SAN BERNARDINO CA SCE
Eldorado-Baker- Coolwater-Dunn
Siding-Mountain Pass 115 kV line 5/1/2013 5/1/2013 Waived Active
351 4/25/2008 4/25/2008 Withdrawn Serial CT NG 49 49 YOLO CA PGE Tap Vaca-Rio Oso 115 kV line 7/1/2009 7/1/2009
352 4/25/2008 4/25/2008 Withdrawn Serial CT NG 49 49 STANISLAUS CA PGE Salado Substation 115 kV 7/1/2009 7/1/2009
353 4/25/2008 4/25/2008 Withdrawn Serial CT NG 49 49 FRESNO CA PGE Panoche Substation 115 kV bus 7/1/2009 7/1/2009
California ISO Public Page 13 of 27
Report Run Date: 6/3/2016
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue
DateApplication Status
Reason for
Withdrawal
Study
Process
Ty
pe
-1
Ty
pe
-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal Full
Capacity,
Partial or
Energy Only
(FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line
Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Withdrawn
Study AvailabilityGenerating Facility Net MWs Location Point of Interconnection
354 4/25/2008 4/25/2008 Withdrawn Serial CT NG 49 49 FRESNO CA PGE Tap Helm-Valley Nitrogen 70 kV line 7/1/2009 7/1/2009
355 4/28/2008 4/28/2008 Withdrawn Serial PV S 100 100 SAN LUIS OBISPO CA PGE
San Luis Obispo-Tremblor 115kV
line 5/1/2011 5/1/2011
357 4/28/2008 4/28/2008 Withdrawn Serial PV S 100 100 KERN CA PGE
Midway Substation via Midway-
Sunset Gen-Tie 230 kV line 5/1/2010 12/1/2013
358 4/30/2008 4/30/2008 Withdrawn Serial PV S 100 100 KERN CA PGE
Midway Sunset via Midway-Sunset
Gen-Tie 230 kV line 5/1/2011 5/1/2011
359 5/2/2008 5/1/2008 Withdrawn Serial PV S 350 350 SAN BERNARDINO CA SCE
Eldorado-Baker-Cool Water-Dunn
Siding-Mountain Pass 115kV line 3/1/2011 3/1/2011 Active
360 5/5/2008 5/1/2008 Withdrawn Serial CT NG 200 200 COLUSA CA PGE Cortina Substation 230kV Bus 6/1/2012 6/1/2012
361 5/2/2008 5/2/2008 Withdrawn Serial ST S 200 200 RIVERSIDE CA SCE Blythe-Eagle Mountain 161 kV line 8/30/2012 8/30/2012 Active
362 5/2/2008 5/2/2008 Withdrawn Serial ST S 300 300 RIVERSIDE CA SCE Midpoint Substation 8/30/2012 8/30/2012 Active
363 5/5/2008 5/6/2008 Withdrawn Serial PV S 700 700 KERN CA SCE Windhub Substation 230 kV 5/1/2013 5/1/2011 Waived Active
364 5/5/2008 5/6/2008 Withdrawn Serial PV S 700 700 KERN CA SCE Windhub Substation 230 kV 5/1/2014 5/1/2013
366 4/25/2008 5/12/2008 Withdrawn Serial RE NG 115.5 115.5 ALAMEDA CA PGE Kelso Substation 6/1/2012 6/1/2012
367 5/12/2008 5/12/2008 Withdrawn Serial PV S 50 50 SANTA BARBARA CA PGE
69kV proximate to the Cuyama
Substation 12/31/2009 12/31/2009
368 5/9/2008 5/16/2008 Withdrawn Serial CT NG 150 150 SAN DIEGO CA SDGE Escondido Substation 69 kV 6/1/2010 6/1/2010
369 5/16/2008 5/16/2008 Withdrawn Serial H WTR 1300 1300 RIVERSIDE CA SCE Midpoint Substation 500 kV 6/1/2014 6/1/2014
370 5/5/2008 5/19/2008 Withdrawn Serial CT NG 390.4 390.4 SOLANO CA PGE
Lambie-Contra Costa Substation
230 kV bus 6/1/2012 6/1/2012
371 5/9/2008 5/23/2008 Withdrawn Serial CC NG 337.5 337.5 FRESNO CA PGE
McCall-Kingsburg #1 & #2 115 kV
lines 12/1/2010 12/1/2010
372 5/21/2008 5/21/2008 Withdrawn SGIP PV S 20 20 EO KINGS CA PGE Jacobs Corner Substation 70kV bus 11/1/2010 4/2/2012 N/A Complete Executed
373 5/27/2008 5/27/2008 Withdrawn Serial CT NG 315 315 SAN JOAQUIN CA PGE
Loop Tesla Stagg and Tesla-Eight
Mile 230 kV lines 7/1/2012 7/1/2012
374 5/27/2008 5/27/2008 Withdrawn Serial CT NG 49 49 GLENN CA PGE
Tap Cottonwood-Logan Creek-Vaca
Dixon 230kV line 6/1/2010 6/1/2010
375 5/28/2008 5/28/2008 Withdrawn Serial ST NG 49.9 49.9 KERN CA PGE Famoso Substation 6/2/2011 6/2/2011
376 5/28/2008 5/28/2008 Withdrawn Serial ST S 612 612 SAN BERNARDINO CA SCE Pisgah-Lugo 230kV Line 12/1/2012 12/1/2012 Waived
377 5/28/2008 5/28/2008 Withdrawn Serial CT NG 600 600 ALAMEDA CA PGE Tracy Substation 230 kV 5/1/2013 5/1/2013
379 5/28/2008 5/28/2008 Withdrawn Serial CC NG 600 600 SUTTER CA PGE Table Mountain-Tesla 500kV line 5/1/2012 1/1/2014
380 5/29/2008 5/29/2008 Withdrawn Serial ST S 145 145 SAN BERNARDINO CA SCE Lugo-Mohave 500 kV Line 5/1/2013 5/1/2013
381 5/29/2008 5/29/2008 Withdrawn Serial ST S 240 240 CLARK NV SCE Eldorado Subsation 230kV 5/1/2013 5/1/2013
382 5/29/2008 5/29/2008 Withdrawn Serial ST S 290 290 SAN BERNARDINO CA SCE Lugo-Eldorado 500 kV line 5/1/2013 5/1/2013
383 5/29/2008 5/29/2008 Withdrawn TC CC NG 85 85 FC LOS ANGELES CA SCE Arco Gen #1 & #2 230kV lines 5/31/2012 12/1/2012 Complete Complete In Progress
384 5/29/2008 5/29/2008 Withdrawn Serial ST S 900 900 SAN BERNARDINO CA SCE Lugo-Mojave 500 kV Line 2/1/2012 2/1/2015 Waived Active
385 5/29/2008 5/29/2008 Withdrawn Serial ST S 600 600 SAN BERNARDINO CA SCE Lugo-Mojave 500kV Line 2/1/2011 2/1/2014
386 5/29/2008 5/29/2008 Withdrawn Serial ST S 600 600 IMPERIAL CA SDGE
New Substation on North Gila-
Imperial Valley 500 kV line 1/1/2012 10/1/2014 Waived
387 5/29/2008 5/29/2008 Withdrawn Serial ST S 900 900 LA PAZ AZ SCE Devers-Palo Verde 500 kV Line 2/1/2015 2/1/2015 Waived Active
388 5/29/2008 5/29/2008 Withdrawn Serial ST S 900 900 LA PAZ/MARICOPA AZ SCE Devers-Palo Verde 500 kV Line 6/1/2014 6/1/2014 Waived Active
389 5/29/2008 5/29/2008 Withdrawn Serial ST S 900 900 MARICOPA AZ SCE Devers-Palo Verde Line 500 kV line 5/1/2015 5/1/2015
390 5/29/2008 5/29/2008 Withdrawn Serial ST S 300 300 MARICOPA AZ SDGE North Gila-Hassayampa 500 kV line 5/1/2011 3/1/2012 Waived
391 11/19/2010 5/29/2008 Withdrawn TC ST G 15 15 FC INYO CA SCE Kramer Substation 230kV 1/11/2010 1/11/2010 Complete Complete
392 11/19/2010 5/29/2008 Withdrawn TC ST G 15 15 FC INYO CA SCE BLM Substation 230kV 3/13/2019 1/11/2010 Complete Complete
393 11/19/2010 5/29/2008 Withdrawn TC ST G 15 15 FC INYO CA SCE Inyokern Substation 115kV 8/19/2011 1/11/2010 Complete Complete
394 11/19/2010 5/29/2008 Withdrawn TC ST G 60.7 60.7 FC CHURCHILL NV SCE Control Substation 115kV bus 12/1/2012 12/1/2015 Complete Complete
395 5/29/2008 5/29/2008 Withdrawn Serial ST G 52.5 52.5 CHURCHILL NV SCE Bishop Substation 12/1/2012 12/1/2012
396 11/19/2010 5/29/2008 Withdrawn TC ST G 60.7 60.7 FC CHURCHILL NV SCE Control Substation 115kV bus 6/1/2013 6/1/2016 Complete Complete
397 5/29/2008 5/29/2008 Withdrawn Serial ST G 52.5 52.5 CHURCHILL NV SCE Bishop Substation 6/1/2013 6/1/2013
398 11/19/2010 5/29/2008 Withdrawn TC ST G 60.7 60.7 FC CHURCHILL NV SCE Control Substation 115kV bus 6/1/2012 6/1/2012 Complete Complete
399 11/19/2010 5/29/2008 Withdrawn TC ST G 60.7 60.7 FC CHURCHILL NV SCE Control Substation 115kV bus 6/1/2012 6/1/2013
400 5/30/2008 5/30/2008 Withdrawn Serial PV S 700 700 KERN CA SCE Windhub Substation 5/1/2011 5/1/2011
401 5/30/2008 5/30/2008 Withdrawn Serial ST NG 49.85 49.85 LOS ANGELES CA SCE ChevGen Substation 9/1/2010 9/1/2010
402 5/30/2008 5/30/2008 Withdrawn Serial CC NG 600 600 KERN CA PGE Midway Substation 230kV line 6/1/2012 6/1/2012
403 5/30/2008 5/30/2008 Withdrawn Serial PV S 30 30 KERN CA PGE Midway Substation 230 kV Bus 6/1/2012 12/31/2011
404 5/30/2008 5/30/2008 Withdrawn Serial CT NG 450 450 KERN CA PGE Midway Substation 230kV line 6/1/2011 6/1/2011
405 5/15/2008 5/30/2008 Withdrawn Serial ST S 450 450 IMPERIAL CA SDGE Imperial Valley Substation 12/31/2012 12/31/2012 Waived
406 5/30/2008 5/30/2008 Withdrawn Serial WT W 130 130 SAN DIEGO CA SDGE Boulevard Substation 6/1/2011 6/1/2011 Waived
409 5/30/2008 5/30/2008 Withdrawn TC WT W 150 150 EO KERN CA SCE Highwind Substation 230kV 10/1/2011 12/31/2012 Complete Complete In Progress
410 5/30/2008 5/30/2008 Withdrawn Serial ST S 49.5 49.5 RIVERSIDE CA SCE Midpoint Substation 500kV 8/1/2012 8/1/2012
411 5/30/2008 5/30/2008 Withdrawn Serial ST S 49.5 49.5 RIVERSIDE CA SCE Midpoint Substation 500 kV 8/1/2012 8/1/2012
413 5/30/2008 5/30/2008 Withdrawn Serial ST S 280 280 SAN BERNARDINO CA SCE Pisgah Substation 230 kV 8/1/2012 8/1/2012
California ISO Public Page 14 of 27
Report Run Date: 6/3/2016
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue
DateApplication Status
Reason for
Withdrawal
Study
Process
Ty
pe
-1
Ty
pe
-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal Full
Capacity,
Partial or
Energy Only
(FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line
Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Withdrawn
Study AvailabilityGenerating Facility Net MWs Location Point of Interconnection
414 5/30/2008 5/30/2008 Withdrawn Serial ST S 280 280 IMPERIAL CA SDGE
Imperial Valley Substation 230kV
bus 7/1/2012 7/1/2012
415 5/30/2008 5/30/2008 Withdrawn Serial ST S 280 280 RIVERSIDE CA SCE Devers-Palo Verde 500 kV Line 8/1/2012 8/1/2012
416 5/30/2008 5/30/2008 Withdrawn Serial ST S 280 280 RIVERSIDE CA SCE Midpoint Substation 230 kV 8/1/2012 8/1/2012
417 5/30/2008 5/30/2008 Withdrawn TC WT W 14 14 FC CONTRA COSTA CA PGE Pittsburg-Tesla 230kV line 9/30/2010 5/30/2015 Complete Complete Executed
418 5/30/2008 5/30/2008 Withdrawn Serial CT NG 400 400 SAN JOAQUIN CA PGE Tesla Substation 230 KV bus 11/1/2012 11/1/2012
419 5/30/2008 5/30/2008 Withdrawn Serial CT NG 188 188 FRESNO CA PGE Panoche Substation 230kV Bus 3/1/2011 3/1/2011
420 5/30/2008 5/30/2008 Withdrawn Serial ST S 49.5 49.5 SAN DIEGO CA SDGE Borrego Substation 69kV 2/1/2013 2/1/2013
422 5/30/2008 5/30/2008 Withdrawn Serial ST S 49.5 49.5 RIVERSIDE CA SCE Camino-Iron Mountain 230kV line 2/1/2012 2/1/2012
423 5/30/2008 5/30/2008 Withdrawn Serial ST S 49.5 49.5 RIVERSIDE CA SCE Camino-Iron Mountain 230kV line 2/1/2012 2/1/2012
424 5/30/2008 5/30/2008 Withdrawn Serial ST S 250 250 SAN BERNARDINO CA SCE Mohave switchyard 7/1/2014 7/1/2014 Waived
425 5/30/2008 5/30/2008 Withdrawn Serial ST S 250 250 RIVERSIDE CA SCE Colorado River Substation 7/1/2014 7/1/2014 Waived
426 5/30/2008 5/30/2008 Withdrawn Serial ST S 250 250 CLARK NV SCE Mohave Switchyard 7/1/2014 7/1/2014
427 4/30/2008 5/30/2008 Withdrawn Serial ST S 250 250 KERN CA SCE Antelope Substation 7/1/2014 7/1/2014 Waived Active
428 5/30/2008 5/30/2008 Withdrawn Serial ST S 250 250 SAN BERNARDINO CA SCE Eagle Mountain Substation 7/1/2014 7/1/2014 Waived
430 5/30/2008 5/30/2008 Withdrawn Serial ST S 250 250 KERN CA SCE Kramer Substation 7/1/2014 7/1/2014 Waived
431 11/19/2010 5/30/2008 Withdrawn TC ST S 150 150 FC RIVERSIDE CA SCE Midpoint Substation 220kV 7/1/2014 7/1/2014 Complete Complete
432 5/30/2008 5/30/2008 Withdrawn Serial ST S 250 250 RIVERSIDE CA SCE Colorado River Substation 230 kV 7/1/2014 7/1/2014 Waived
433 5/30/2008 5/30/2008 Withdrawn Serial ST S 250 250 SAN BERNARDINO CA SCE Iron Mountain Substation 5/29/2015 5/29/2015 Waived
434 5/30/2008 5/30/2008 Withdrawn Serial ST S 500 500 SAN BERNARDINO CA SCE Mohave switchyard 5/29/2015 5/29/2015
435 5/30/2008 5/30/2008 Withdrawn Serial ST S 250 250 LA PAZ AZ SCE Palo Verde Devers #2 line 7/1/2014 7/1/2014 Waived
436 5/30/2008 5/30/2008 Withdrawn Serial ST S 250 250 MARICOPA AZ SCE Palo Verde Devers #2 line 7/1/2014 7/1/2014 Waived
437 5/30/2008 5/30/2008 Withdrawn Serial WT W 350 350 SHASTA CA PGE Pit #3 Round Mountain 230kV line 6/1/2011 6/1/2011
438 5/30/2008 5/30/2008 Withdrawn Serial WT W 500 500 KERN CA SCE Windhub Substation 12/31/2011 12/31/2011
439 5/30/2008 5/30/2008 Withdrawn Serial ST S 500 500 RIVERSIDE CA SCE Midpoint Substation 12/31/2011 12/31/2011 Waived
440 5/30/2008 5/30/2008 Withdrawn Serial ST S 500 500 KERN CA SCE Whirlwind Substation 12/31/2011 12/31/2011 Waived
441 5/30/2008 5/30/2008 Withdrawn Serial ST G 50 50 LAKE CA PGE Geyers 17- Fulton #2 230kV line 7/31/2012 7/31/2012
443 5/30/2008 5/30/2008 Withdrawn Serial CT NG 49 49 SAN DIEGO CA SDGE Telega - Escondido 230kV Line 7/1/2009 7/1/2009 Waived
444 5/30/2008 5/30/2008 Withdrawn Serial CT NG 49 49 SAN DIEGO CA SDGE Lilac Rincon 69kV 7/1/2009 7/1/2009 Waived
445 6/7/2008 5/30/2008 Withdrawn Serial CT NG 49 49 SAN DIEGO CA SDGE Pala - lilac 69kV line 7/1/2009 7/1/2009 Waived
446 5/30/2008 5/30/2008 Withdrawn Serial CT NG 49 49 ORANGE CA SDGE Talega San Mateo 69kV line 7/1/2009 7/1/2009 Waived
447 5/30/2008 5/30/2008 Withdrawn Serial CT NG 49 49 SAN DIEGO CA SDGE Ash - Valley Center 69kV line 7/1/2009 7/1/2009 Waived
448 6/7/2008 5/30/2008 Withdrawn Serial CT NG 49 49 SAN DIEGO CA SDGE Border Substation 69 kV 7/1/2009 7/1/2009 Waived
449 5/30/2008 5/30/2008 Withdrawn Serial ST S 250 250 RIVERSIDE CA SCE Midpoint Substation 500 kV 7/1/2012 7/1/2012
450 5/30/2008 5/30/2008 Withdrawn Serial WT W 1150 1150 LOS ANGELES/KERN CA SCE Whirlwind Substation 230 kV 5/30/2013 5/30/2013
451 5/30/2008 5/30/2008 Withdrawn Serial ST S 1150 1150 SAN BERNARDINO CA SCE Pisgah Substation 230 kV 5/30/2013 5/30/2013
452 6/2/2008 6/2/2008 Withdrawn Serial CC NG 730 730 SOLANO CA PGE
Loop Lakesville-Sobrante and
Lakesville-Ignacio 230kV Lines 6/15/2012 6/15/2012
453 6/2/2008 6/2/2008 Withdrawn Serial ST S 250 250 LA PAZ AZ SCE Mohave Switchyard 7/1/2014 7/1/2014
454 5/30/2008 6/2/2008 Withdrawn Serial ST S 84 84 IMPERIAL CA SDGE Imperial Valley Substation 230 kV 2/1/2011 2/1/2011 Waived
455 5/30/2008 6/2/2008 Withdrawn Serial ST S 141 141 LOS ANGELES CA SCE Whirlwind Substation 230 kV 10/1/2013 10/1/2013 Waived Active
456 5/30/2008 6/2/2008 Withdrawn Serial ST S 840 840 LOS ANGELES CA SCE Vincent Substation 9/1/2014 9/1/2014
457 6/2/2008 6/2/2008 Withdrawn Serial PV S 55 55 RIVERSIDE CA SCE Victor substation 115kV 6/15/2010 6/15/2010 Waived
458 6/2/2008 6/2/2008 Withdrawn Serial PV S 50 50 RIVERSIDE CA SCE Antelope Cal Cement 60kV line 6/15/2010 6/15/2010
459 6/2/2008 6/2/2008 Withdrawn Serial PV S 50 50 SAN DIEGO CA SDGE Cameron Substation 69 kV 12/15/2009 12/15/2009 Waived
460 6/2/2008 6/2/2008 Withdrawn Serial PV S 40 40 KERN CA SCE Inyokern Substation115 kV bus 12/1/2010 12/1/2010
461 6/2/2008 6/2/2008 Withdrawn Serial PV S 40 40 SAN BERNARDINO CA SCE
Dunn Siding Cool Water 115 kV
Line 12/1/2010 12/1/2010
462 6/2/2008 6/2/2008 Withdrawn Serial PV S 58.8 58.8 SAN DIEGO CA SDGE Borrego Substation 69 kV 6/15/2010 6/15/2010 Waived
463 6/2/2008 6/2/2008 Withdrawn Serial PV S 58.8 58.8 SAN DIEGO CA SDGE Warner Substation 69 kV 6/30/2010 6/30/2010 Waived
464 6/2/2008 6/2/2008 Withdrawn Serial PV S 40 40 KERN CA SCE Redman Substation 69 kV bus 12/1/2010 12/1/2010
465 6/2/2008 6/2/2008 Withdrawn Serial PV S 40 40 KERN CA SCE Little Rock Substation 69 kV bus 12/1/2010 12/1/2010
466 6/2/2008 6/2/2008 Withdrawn Serial PV S 100 100 RIVERSIDE CA SCE Baker Substation 115kV 6/15/2010 6/15/2010
469 12/1/2010 7/14/2008 Withdrawn SGIP ST NG 16.3 16.3 EO AMADOR CA PGE Valley Springs Martel #2 60kV line 12/31/2008 12/31/2008
470 7/30/2008 7/30/2008 Withdrawn SGIP PV S 20 20 EO KINGS CA PGE Jacobs Corner Substation 70kV bus 3/1/2011 5/1/2012 Active Complete Executed
471 7/30/2008 7/30/2008 Withdrawn SGIP PV S 20 20 EO KINGS CA PGE Jacobs Corner Substation 70kV bus 7/1/2011 6/1/2012 N/A Complete Executed
474 9/11/2008 9/15/2008 Withdrawn SGIP PV S 19.9 19.9 EO SAN BERNARDINO CA SCE Dunn Siding Substation 6/1/2011 6/1/2011 Active Withdrawn
475 12/1/2010 10/8/2008 Withdrawn SGIP WT W 20 20 EO RIVERSIDE CA SCE Devers-Garnet-Venwind 115 kV line 12/1/2009 12/1/2010 Active
476 10/23/2008 10/23/2008 Withdrawn SGIP RE B 9.9 9.9 EO MARIN CA PGE Lakeville #2 60 kV line 5/29/2010 7/15/2014 N/A Complete Executed
480 3/16/2009 3/16/2009 Withdrawn SGIP PV S 20 20 EO SAN DIEGO CA SDGE Borrego Substation 69kV 12/31/2010 6/30/2014 N/A Complete Executed
483 4/29/2009 4/29/2009 Withdrawn SGIP PV S 10 10 EO KERN CA SCE Vincent Substation 6/1/2010 6/1/2010 Complete
485 3/16/2011 6/18/2009 Withdrawn SGIP-TC WT W 20 20 FC KERN CA SCE Winhub 230 KV via Highwind 66 KV 12/15/2012 12/15/2012
486 6/29/2009 6/29/2009 Withdrawn SGIP PV S 20 20 EO KERN CA SCE Antelope-Neenach 66kV line 1/1/2012 11/1/2013 Complete N/A Complete In Progress
California ISO Public Page 15 of 27
Report Run Date: 6/3/2016
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue
DateApplication Status
Reason for
Withdrawal
Study
Process
Ty
pe
-1
Ty
pe
-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal Full
Capacity,
Partial or
Energy Only
(FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line
Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Withdrawn
Study AvailabilityGenerating Facility Net MWs Location Point of Interconnection
487 11/19/2010 7/31/2009 Withdrawn C1 PV S 600 600 FC KERN CA PGE
Midway-Wheeler Ridge 230kV
double circuit line 12/1/2015 12/1/2015
488 4/6/2009 7/31/2009 Withdrawn C1 ST S 92 92 FC CLARK NV SCE Eldorado Substation 230kV 9/30/2012 9/30/2012 Complete Complete
489 5/26/2009 7/31/2009 Withdrawn C1 WT W 98.9 98.9 FC SOLANO CA PGE Birds Landing Substation 230kV 5/31/2011 5/31/2014 Complete
490 6/3/2009 7/31/2009 Withdrawn C1 ST NU 48 48 FC SAN DIEGO CA SCE
San Onofre Nuclear Generating
Station 230kV switchyard 12/31/2012 12/31/2012 Complete Complete In Progress
491 6/4/2009 7/31/2009 Withdrawn C1 PV S 230 230 FC SAN BERNARDINO CA SCE Coolwater-Dunn Siding 115kV line 6/1/2014 4/1/2014 Complete Complete
492 11/19/2010 7/31/2009 Withdrawn C1 PV S 350 350 FC KERN CA SCE Windhub Substation 230kV 12/1/2015 12/1/2015
494 7/20/2009 7/31/2009 Withdrawn C1 PV S 150 150 FC KERN CA SCE Windhub Substation 230kV 12/1/2015 10/1/2016 Complete Complete Executed
496 8/4/2009 7/31/2009 Withdrawn Serial ST S 960 960 YUMA AZ SDGE
500 kV collector station 40 mi east
of NGila sub and 4.5 mi w of
proposed Agua Caliente sub 1/1/2014 1/1/2014
497 11/19/2010 7/31/2009 Withdrawn C1 ST S 6 6 FC SAN BERNARDINO CA SCE New Ivanpah Substation 115kV 3/31/2012 3/31/2012
498 11/19/2010 7/31/2009 Withdrawn C1 ST S 20 20 FC SAN BERNARDINO CA SCE New Ivanpah Substation 115kV 9/30/2012 9/30/2012
499 11/19/2010 7/31/2009 Withdrawn C1 ST S 40 40 FC SAN BERNARDINO CA SCE New Ivanpah Substation 115kV 3/31/2013 3/31/2013
500 11/19/2010 7/31/2009 Withdrawn C1 ST S 960 960 FC LINCOLN NV SCE Eldorado Substation 500kV 1/1/2014 1/1/2015
501 11/19/2010 7/31/2009 Withdrawn C1 PV S 750 750 FC YUMA AZ SDGE
Hassayampa-North Gila 500kV
switching station 6/30/2015 6/30/2015 Complete
504 9/21/2009 7/31/2009 Withdrawn Serial WT W 688 688 KERN CA SCE Highwind Substation 230kV bus 3/11/2013 3/11/2013
505 11/19/2010 7/31/2009 Withdrawn C1 PV WT S W 975 125 1100 FC KERN CA SCE Highwind-Windhub 230kV line 11/30/2012 11/30/2012
507 12/1/2010 7/31/2009 Withdrawn C1 CC NG 131 131 FC CONTRA COSTA CA PGE Contra Costa Substation 230kV bus 12/1/2013 12/31/2017
508 11/19/2010 7/31/2009 Withdrawn C1 CC NG 58.3 58.3 FC FRESNO CA PGE Sanger-Reedley 115kV line 3/15/2011 3/15/2011 Complete
511 11/19/2010 7/31/2009 Withdrawn C1 ST S 92.6 92.6 FC KERN CA SCE Goldtown-Lancaster 66kV line 12/31/2012 12/31/2012
512 7/31/2009 7/31/2009 Withdrawn IC Request C1 PV S 2 2 FC LOS ANGELES CA SCE Neenach Substation 66kV 2/15/2012 10/1/2020 Complete Complete In Progress
513 7/31/2009 7/31/2009 Withdrawn IC Request C1 PV S 141 141 FC LOS ANGELES CA SCE Whirlwind Substation 230kV 8/1/2013 12/31/2017 Complete Complete In Progress
513A 7/31/2009 7/31/2009 Withdrawn Serial CT NG 190 190 SAN DIEGO CA SDGE
Otay Mesa Energy Center
Substation 230 kV 5/1/2013 5/1/2013 Waived
514 7/31/2009 7/31/2009 Withdrawn SGIP PV S 20 20 EO KERN CA PGE Arco Substation 69kV bus 12/15/2010 10/30/2016 N/A Complete Executed
515 8/12/2009 8/12/2009 Withdrawn SGIP-TC PV S 20 20 FC KERN CA SCE Kramer-Ransburg 115kV line 4/1/2011 4/1/2012 In Progress
516 12/1/2010 8/21/2009 Withdrawn SGIP PV S 20 20 EO SAN DIEGO CA SDGE Borrego Substation 69kV 1/1/2011 1/1/2011
518 8/19/2009 8/19/2009 Withdrawn SGIP PV S 20 20 EO KERN CA PGE Kern Old River #2 70kV line 12/31/2014 12/31/2014 Active
519 8/19/2009 8/19/2009 Withdrawn SGIP PV S 20 20 EO KERN CA PGE Elk Hills Taft 70kV line 12/31/2014 12/31/2014 Active
520 8/19/2009 8/19/2009 Withdrawn SGIP PV S 20 20 EO KERN CA PGE Blackwell-Carneras 70kV line 12/31/2014 12/31/2014 Complete Active
522C 8/19/2009 8/19/2009 Withdrawn SGIP-TC PV S 20 20 EO KERN CA SCE Kern River-Cummings 66kV line 12/31/2013 12/31/2013 In Progress
523 8/21/2009 8/21/2009 Withdrawn SGIP PV S 20 20 EO KINGS CA PGE Arco Substation 70kV bus 10/30/2011 6/30/2013 N/A Complete Executed
523A 11/19/2010 8/26/2009 Withdrawn SGIP PV S 19.9 19.9 EO KERN CA SCE Goldtown-Corum 66kV line 12/31/2010 12/31/2010
524 11/19/2010 9/2/2009 Withdrawn SGIP PV S 20 20 EO SAN BERNARDINO CA SCE Eldorado-Pisgah #2 230kV line 12/1/2011 12/1/2011 Active
525 11/30/2010 9/11/2009 Withdrawn SGIP PV S 20 20 EO KERN CA PGE Arco Caneras 70kV line 4/30/2011 12/31/2010
527 11/19/2010 9/23/2009 Withdrawn SGIP PV S 20 20 EO INYO CA SCE
Control-Haiwee-Inyokern #2 115kV
line 6/1/2011 6/1/2011
528 10/5/2009 10/5/2009 Withdrawn SGIP PV S 20 20 EO SOLANO CA PGE Birds Landing Substation 230kV bus 6/1/2011 6/1/2011
529A 10/23/2009 10/23/2009 Withdrawn SGIP RE NG 14.5 14.5 EO FRESNO CA PGE Helm-Kerman 70kV line 4/1/2011 6/15/2014 Complete N/A Complete Executed
530 10/29/2009 10/29/2009 Withdrawn SGIP PV S 20 20 FC TULARE CA PGE Alpaugh 115kV substation 7/1/2011 7/1/2011 Active Active
531 3/16/2011 10/29/2009 Withdrawn SGIP PV S 16 16 EO TULARE CA PGE Corcoran Smyrna 115 kV line 7/1/2011 7/1/2011 Complete
531B 11/19/2010 10/29/2009 Withdrawn SGIP PV S 20 20 EO LOS ANGELES CA SCE Neenach Substation 69kV 6/1/2011 6/1/2011 Active
533 11/11/2009 11/11/2009 Withdrawn SGIP PV S 20 20 EO KERN CA PGE Semitropic Midway #2 115kV line 1/1/2012 1/1/2012
534 8/4/2009 11/13/2009 Withdrawn SGIP PV S 20 20 EO SAN BENITO CA PGE
Moss Landing-Panoche #2 230kV
line 6/30/2011 6/30/2011 Complete Active
536 11/30/2010 11/19/2009 Withdrawn SGIP PV S 20 20 EO MERCED CA PGE Mercy Springs 70kV Line 12/31/2011 12/31/2011
537A 11/23/2010 11/23/2009 Withdrawn SGIP WT W 19.5 19.5 EO KERN CA SCE Highwind Substation 220kV bus 4/1/2011 7/1/2015 N/A Complete Executed
538 12/16/2009 12/16/2009 Withdrawn SGIP PV S 20 20 EO FRESNO CA PGE Oro Loma-Mendota 69kV line 1/1/2012 1/1/2012 Complete
540 12/22/2009 12/22/2009 Withdrawn SGIP PV S 20 20 EO LOS ANGELES CA SCE Little Rock-Piute 69kV line 5/1/2012 6/30/2015 N/A Complete In Progress
541 1/5/2010 1/5/2010 Withdrawn SGIP-TC PV S 20 20 EO FRESNO CA PGE Panoche-Oro Loma 115kV Line 1/3/2012 3/31/2016 Complete Complete Executed
541A 11/19/2010 1/5/2010 Withdrawn SGIP PV S 20 20 EO LOS ANGELES CA SCE Antelope-Neenach 66kV 6/1/2011 6/1/2011 Active
541B 11/19/2010 1/5/2010 Withdrawn SGIP PV S 20 20 EO LOS ANGELES CA SCE Antelope-Neenach 66kV 6/1/2011 6/1/2011 Active
542 1/6/2010 1/6/2010 Withdrawn SGIP PV S 20 20 EO FRESNO CA PGE Schindler Sub 115kV bus 1/1/2012 12/1/2016 N/A Complete Executed
543 1/6/2010 1/6/2010 Withdrawn SGIP PV S 20 20 EO FRESNO CA PGE Schindler Sub 70kV bus 1/1/2012 1/1/2012 Complete
544 1/6/2010 1/6/2010 Withdrawn SGIP PV S 20 20 EO KERN CA PGE Lamont Substation 115kV bus 10/31/2011 10/31/2011
545 1/6/2010 1/6/2010 Withdrawn SGIP PV S 20 20 FC KERN CA PGE Wheeler Ridge-Lakeview 70kV 10/31/2011 10/31/2011 Active
546 1/6/2010 1/6/2010 Withdrawn SGIP PV S 15 15 EO LOS ANGELES CA SCE Redman-Piute 66kV Tap 12/1/2012 12/1/2012 N/A Complete In Progress
547 1/6/2010 1/6/2010 Withdrawn SGIP PV S 20 20 EO LOS ANGELES CA SCE Loop Redman-Lancaster 66kV 12/1/2012 12/1/2012 N/A Complete
549 11/19/2009 1/15/2010 Withdrawn SGIP PV S 20 20 EO MERCED CA PGE Mercy Springs Oro Loma 70kV line 3/31/2012 3/31/2012 Active
551 1/27/2010 1/27/2010 Withdrawn SGIP-TC PV S 20 20 FC KERN CA PGE Wheeler Ridge Sub 70kV bus 10/31/2011 10/31/2011 Complete
553 11/19/2010 2/1/2010 Withdrawn C2 PV S 400 400 FC SAN BENITO NV PGE
Moss Landing-Panoche #2 &
Coburn-Panoche #2 230 kV 12/15/2013 12/15/2013 Complete
554 1/26/2010 2/1/2010 Withdrawn C2 WT W 138 138 FC SHASTA CA PGE Pit River 1-Cottonwood 230kV 10/31/2013 12/31/2013 Complete
California ISO Public Page 16 of 27
Report Run Date: 6/3/2016
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue
DateApplication Status
Reason for
Withdrawal
Study
Process
Ty
pe
-1
Ty
pe
-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal Full
Capacity,
Partial or
Energy Only
(FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line
Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Withdrawn
Study AvailabilityGenerating Facility Net MWs Location Point of Interconnection
555 11/19/2010 2/1/2010 Withdrawn C2 WT W 92 92 FC SAN DIEGO CA SDGE Boulevard Substation 138kV 11/22/2013 12/30/2014 In Progress Complete
556 11/19/2010 2/1/2010 Withdrawn C2 WT W 126 126 EO MENDOCINO CA PGE Eagle Rock Substation 115 kV 10/31/2013 10/31/2013
560 1/27/2010 2/1/2010 Withdrawn C2 PV S 100 100 FC MERCED CA PGE Los Banos-Dos Amigos 230kV 7/1/2012 3/31/2013 Complete Complete In Progress
561 1/27/2010 2/1/2010 Withdrawn C2 PV S 200 200 FC IMPERIAL CA SDGE Imperial Valley Substation 230kV 2/1/2013 12/1/2014 Complete Complete Executed
562 11/19/2010 2/1/2010 Withdrawn C2 PV S 420 420 FC SAN BERNARDINO CA SCE Victor Substation 230kV 10/1/2013 10/1/2013
563 1/29/2010 2/1/2010 Withdrawn C2 PV S 22 22 FC LOS ANGELES CA SCE Antelope Substation 66kV 6/1/2013 6/1/2013
564 1/29/2010 2/1/2010 Withdrawn C2 PV S 23 23 FC LOS ANGELES CA SCE Antelope Substation 66kV 7/1/2013 7/1/2013
565 1/29/2010 2/1/2010 Withdrawn C2 RE NG 100 100 FC SAN DIEGO CA SDGE Mission-Carlton Hills 138kV Line 5/31/2014 1/29/2017 Complete Complete Executed
566 11/19/2010 2/1/2010 Withdrawn C2 PV S 21 21 FC KERN CA SCE Rosamond-Corum 66kV 12/1/2013 12/1/2013
567 11/19/2010 2/1/2010 Withdrawn C2 H WTR 1400 1400 FC RIVERSIDE CA SCE Red Bluff Substation 230kV 6/1/2016 6/1/2016
569 1/28/2010 2/1/2010 Withdrawn C2 CC NG 600 600 FC SUTTER CA PGE Table Mountain-Tesla 500kV 5/1/2013 5/1/2018 Complete Complete
570 11/19/2010 2/1/2010 Withdrawn C2 WT W 102 102 FC SHASTA/TRINITY CA PGE Trinity-Cottonwood 115 kV Line 11/22/2012 11/22/2012
571 11/19/2010 2/1/2010 Withdrawn C2 PV S 450 450 FC KERN CA SCE Windhub Substation 500kV 12/31/2013 12/31/2013 Complete
572 1/28/2010 2/1/2010 Withdrawn C2 PV S 110 110 FC RIVERSIDE CA SCE Valley Substation 500 kV bus 12/31/2013 12/31/2013
573 11/19/2010 2/1/2010 Withdrawn C2 PV S 50 50 FC KERN CA SCE Antelope-Cal Cement 66kV 6/1/2013 6/1/2013 Complete
575 11/19/2010 2/1/2010 Withdrawn C2 RE B 9.6 9.6 FC SOLANO CA PGE Brighton-Davis 115 kV Line 6/30/2013 6/30/2013
578 11/19/2010 2/1/2010 Withdrawn C2 PV S 70 70 FC SAN BERNARDINO CA SCE Cottonwood-Savage 115kV line 12/31/2013 12/31/2013
579 11/19/2010 2/1/2010 Withdrawn C2 PV S 220 220 FC MADERA CA PGE Borden Sub 230kV bus 5/1/2013 12/31/2013
580 11/19/2010 2/1/2010 Withdrawn C2 PV S 170 170 FC RIVERSIDE CA SCE Blythe-Eagle Mountain 161kV line 12/31/2012 12/31/2012
582 11/19/2010 2/1/2010 Withdrawn C2 PV S 500 500 FC KERN CA SCE Midway - Vincent #1 & #2 500kV 7/1/2013 7/1/2013 Complete
583 1/29/2010 2/1/2010 Withdrawn IC Request C2 WT W 57.5 57.5 EO SAN DIEGO CA SDGE Boulevard East Substation 138kV 12/31/2012 1/29/2017 Complete Complete In Progress
584 11/19/2010 2/1/2010 Withdrawn C2 PV S 150 150 EO LOS ANGELES CA SCE Antelope Sub 220kV Bus 2/28/2013 2/28/2013 Complete
585 1/29/2010 2/1/2010 Withdrawn C2 WT W 150 150 EO LOS ANGELES CA SCE Antelope Sub 220kV Bus 2/28/2013 8/12/2014 Complete Complete In Progress
586 1/29/2010 2/1/2010 Withdrawn C2 ST G 42 42 FC SONOMA CA PGE Geysers #17-Fulton 230kV 6/1/2013 7/1/2017 Complete Complete In Progress
587 11/19/2010 2/1/2010 Withdrawn C2 ST S 106.8 106.8 EO FRESNO CA PGE Gates Substation 9/30/2012 9/30/2012
588 1/29/2010 2/1/2010 Withdrawn C2 PV S 1 1 FC RIVERSIDE CA SCE Red Bluff Substation 230kV 12/1/2012 11/1/2017 Complete Complete In Progress
589 1/29/2010 2/1/2010 Withdrawn IC Request C2 PV S 1 1 FC SAN BERNARDINO CA SCE Victor Substation 115kV 12/1/2012 1/29/2017 Complete Complete In Progress
591 1/29/2010 2/1/2010 Withdrawn IC Request C2 PV S 40 40 FC SAN DIEGO CA SDGE Borrego Substation 60kV 6/1/2011 6/1/2011
592 1/29/2010 2/1/2010 Withdrawn C2 PV S 250 250 FC KINGS CA PGE
Midway-Gates & Arco-Gates 230kV
lines 12/31/2012 2/28/2013 Complete
594 11/19/2010 2/1/2010 Withdrawn C2 PV S 20 20 FC MERCED CA PGE Merced Substation 70 kV 12/31/2012 12/31/2012
595 11/19/2010 2/1/2010 Withdrawn C2 PV S 15 15 FC KINGS CA PGE Henrietta - Tulare 70kV line 12/31/2012 12/31/2012
596 11/19/2010 2/1/2010 Withdrawn C2 PV S 20 20 FC KINGS CA PGE Henrietta Tulare 70kV line 12/31/2012 12/31/2012
597 11/19/2010 2/1/2010 Withdrawn C2 PV S 15 15 FC MADERA CA PGE
Merced #1 70 kV line (El Nido
Bonita segment) 12/31/2012 12/31/2012
598 11/19/2010 2/1/2010 Withdrawn C2 PV S 17.75 17.75 FC KINGS CA PGE Henrietta Tulare 70kV line 12/31/2012 12/31/2012
599 11/19/2010 2/1/2010 Withdrawn C2 PV S 20 20 FC SAN JOAQUIN CA PGE Corral Substation 70 kV 12/31/2012 12/31/2012
600 11/19/2010 2/1/2010 Withdrawn C2 PV S 20 20 FC MERCED CA PGE Merced #1 70 kV 12/31/2012 12/31/2012 Complete
601 11/19/2010 2/1/2010 Withdrawn C2 PV S 10 10 FC KINGS CA PGE Tulare Henrietta 70kV line 12/31/2012 12/31/2012
603 11/19/2010 2/1/2010 Withdrawn C2 PV S 146 146 FC KERN CA SCE Whirlwind Substation 230kV 7/1/2013 7/1/2013
604 1/30/2010 2/1/2010 Withdrawn C2 CT NG 600 600 FC IMPERIAL CA SDGE Imperial Valley Substation 230kV 4/1/2014 4/1/2014
605 11/19/2010 2/1/2010 Withdrawn C2 ST NG 600 600 FC CLARK NV SCE Eldorado Substation 230kV 4/1/2014 4/1/2014 Complete
610 2/4/2010 2/5/2010 Withdrawn SGIP-TC PV S 20 20 FC FRESNO CA PGE Stroud SW STA-Schindler 70kV 12/1/2012 12/1/2012 In Progress Complete In Progress
611 2/17/2010 2/17/2010 Withdrawn SGIP PV S 20 20 EO FRESNO CA PGE Oro Loma-El Nido 115kV 1/1/2012 1/1/2012
612 2/19/2010 2/19/2010 Withdrawn IC Request SGIP PV S 13 13 EO FRESNO CA PGE Panoche-Schindler #2 115kV Line 7/15/2013 12/1/2017 N/A Complete Executed
613 2/19/2010 2/19/2010 Withdrawn SGIP PV S 20 20 EO FRESNO CA PGE Helm 70kV bus 2/10/2014 4/1/2015 N/A Complete Executed
613A 2/24/2010 2/24/2010 Withdrawn SGIP-TC WT W 20 20 EO KERN CA SCE
Cal Cement - Monolith - Windland -
Arwind 66 kV line 6/30/2012 6/30/2012 In Progress
614 3/2/2010 3/2/2010 Withdrawn SGIP PV S 20 20 EO FRESNO CA PGE Merced-Madera 70kV 5/1/2011 12/15/2014 N/A Complete Executed
614A 3/4/2010 3/4/2010 Withdrawn SGIP-TC PV S 20 20 FC KERN CA SCE Goldtown-Lancaster 66kV 12/1/2013 12/1/2013 Complete
615 11/19/2010 3/10/2010 Withdrawn SGIP PV S 20 20 EO KERN CA SCE Zondwind Sub 66kV Bus 12/30/2012 12/30/2012
616 11/19/2010 3/17/2010 Withdrawn SGIP PV S 20 20 EO RIVERSIDE CA SCE Eagle Mountain-Blythe 161kV 7/1/2012 7/1/2012
617 3/22/2010 3/22/2010 Withdrawn SGIP PV S 20 20 EO SAN JOAQUIN CA PGE Tesla-Tracy 115kV 6/1/2012 5/1/2016 N/A Complete Executed
617A 3/30/2010 3/30/2010 Withdrawn SGIP PV S 20 20 EO LOS ANGELES CA SCE Piute-Redmond 66kV 12/1/2012 5/1/2014 N/A Complete In Progress
617B 3/31/2010 3/31/2010 Withdrawn SGIP PV S 19.7 19.7 EO TULARE CA PGE Corcoran-Smyrna 115kV 12/1/2012 12/1/2012 Complete
617C 11/19/2010 3/31/2010 Withdrawn SGIP PV S 19.993 19.993 EO MONO CA SCE Control-Silverpeak 55 kV 12/1/2012 12/1/2012
617AA 11/19/2010 3/26/2010 Withdrawn SGIP PV S 20 20 EO RIVERSIDE CA SCE Eagle Mountain-Blythe SCE 161 kV 3/1/2011 3/1/2011
618 4/1/2010 4/1/2010 Withdrawn SGIP PV S 20 20 EO FRESNO CA PGE Coalinga-Mendota Road 69kV 8/1/2012 8/1/2012 Complete
618A 4/19/2010 4/19/2010 Withdrawn SGIP PV S 20 20 EO FRESNO CA PGE Helms-Schindler 70kV 1/1/2012 1/1/2012 Active
618B 3/19/2010 4/19/2010 Withdrawn SGIP PV S 10 10 EO FRESNO CA PGE Kerman-San Joaquin 70kv 1/1/2012 1/1/2012 Active
619 11/19/2010 4/22/2010 Withdrawn SGIP PV S 14 14 EO LOS ANGELES CA SCE Piute-Lancaster 66kV 1/1/2012 1/1/2012
620A 4/26/2010 4/26/2010 Withdrawn SGIP PV S 20 20 EO KERN CA PGE Lakeview Sub 70kV bus 12/31/2014 12/31/2014 N/A Complete In Progress
621 3/3/2010 4/26/2010 Withdrawn SGIP-TC PV S 20 20 EO IMPERIAL CA SDGE Imperial Valley Sub 12kV Bus 8/1/2012 3/3/2017 Complete In Progress
622 12/21/2009 5/6/2010 Withdrawn SGIP PV S 10 10 EO KERN CA PGE Temblor-King Ellis 70kV 12/1/2011 12/1/2011 Active
623 11/19/2010 5/10/2010 Withdrawn SGIP PV S 20 20 EO KERN CA SCE Cal Cement-Antelope 66kV 12/31/2013 12/31/2013
623A 11/19/2010 5/10/2010 Withdrawn SGIP PV S 10.4 10.4 EO SAN DIEGO CA SDGE Boulevard Sub 138 kV Bus 6/1/2011 6/1/2011
624 11/19/2010 5/14/2010 Withdrawn SGIP PV S 20 20 KERN CA PGE Maricopa Substation 70 kV bus 12/1/2012 12/1/2012
626 5/17/2010 5/17/2010 Withdrawn SGIP PV S 20 20 EO KINGS CA PGE Henrietta-Guernsey 70kV 12/31/2011 6/15/2017 N/A Complete In Progress
California ISO Public Page 17 of 27
Report Run Date: 6/3/2016
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue
DateApplication Status
Reason for
Withdrawal
Study
Process
Ty
pe
-1
Ty
pe
-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal Full
Capacity,
Partial or
Energy Only
(FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line
Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Withdrawn
Study AvailabilityGenerating Facility Net MWs Location Point of Interconnection
627 11/19/2010 5/18/2010 Withdrawn SGIP PV S 20 20 EO LOS ANGELES CA SCE Neenach-Antelope 66kV 12/31/2013 12/31/2013
629 5/20/2010 5/20/2010 Withdrawn SGIP PV S 20 20 EO STANISLAUS CA PGE Salado-Miller 115kV line 12/1/2011 12/1/2011 Active
630 11/19/2010 5/20/2010 Withdrawn SGIP PV S 4.9 4.9 EO KERN CA SCE Goldtown Substation 66kV 12/1/2010 12/1/2010
631 5/24/2010 5/24/2010 Withdrawn SGIP PV S 20 20 EO FRESNO CA PGE Strout SW Station 70kV 6/30/2014 2/15/2016 N/A Complete In Progress
632A 3/16/2011 5/27/2010 Withdrawn SGIP-TC PV S 20 20 EO STANISLAUS CA PGE Salado-Miller 115 kV 12/1/2011 12/1/2011
632C 6/1/2010 6/1/2010 Withdrawn IC Request SGIP-TC PV S 20 20 FC FRESNO CA PGE Stroud switching station 70kV 12/1/2012 5/30/2017 Complete Complete In Progress
634 6/30/2010 6/30/2010 Withdrawn SGIP PV S 20 20 EO KINGS CA PGE
Camden Junction-Lemoore Tap
70kV 6/30/2013 12/15/2015 N/A Complete Executed
635 7/1/2010 7/1/2010 Withdrawn SGIP-TC PV S 20 20 FC MERCED CA PGE Oro Loma-Canal 70kV 6/15/2012 6/15/2012 In Progress
638 7/8/2010 7/8/2010 Withdrawn SGIP PV S 10 10 EO FRESNO CA PGE Coalinga 1-Gates 70kV 12/31/2012 12/31/2014 N/A Complete In Progress
638A 3/9/2011 7/9/2010 Withdrawn SGIP-TC PV S 12 12 EO FRESNO CA PGE
Coalinga CoGen 70 kV Tap &
Tornado Dist 12/31/2011 12/31/2011
639 5/26/2010 7/15/2010 Withdrawn SGIP-TC PV S 20 20 FC LOS ANGELES CA SCE Redman-Piute 66kV 11/1/2011 1/1/2013 In Progress
640 5/26/2010 7/15/2010 Withdrawn SGIP-TC PV S 20 20 FC KERN CA SCE Rosamond 66kV - Tap 52 11/1/2011 1/1/2013 In Progress In Progress
640A 7/20/2010 7/20/2010 Withdrawn SGIP-TC PV S 20 20 FC FRESNO CA PGE Schindler Sub 115 kV Bus 12/15/2011 12/15/2011 Complete
640B 7/20/2010 7/20/2010 Withdrawn SGIP-TC PV S 20 20 FC MERCED CA PGE Oro Loma 115kV 12/25/2011 12/25/2011 Complete
641 11/19/2010 7/23/2010 Withdrawn SGIP ST NG 11.2 11.2 EO KERN CA PGE Midsun-Midway 115 kV 12/31/2011 12/31/2011
642 7/30/2010 7/30/2010 Withdrawn SGIP-TC PV S 20 20 EO GLENN CA PGE Elk Creek 60kV Tap 7/1/2011 7/1/2011 Complete Complete In Progress
643 7/26/2010 7/31/2010 Withdrawn C3 WT W 149.5 149.5 FC FRESNO CA PGE Los Banos-San Luis PGP #1 230 kV 12/31/2014 12/31/2014 In Progress
643A 7/29/2010 7/31/2010 Withdrawn C3 PV S 300 300 FC KERN CA PGE Arco Sub 230 kV Bus 12/31/2014 12/31/2014
643B 11/19/2010 7/31/2010 Withdrawn C3 WT W 300 300 EO BAJA CALIFORNIA MX SDGE Imperial Valley Sub 230 kV Bus 6/30/2012 6/30/2012
643C 11/19/2010 7/31/2010 Withdrawn C3 WT W 540 540 EO BAJA CALIFORNIA MX SDGE ECO Sub 230 kV Bus 12/31/2013 12/31/2013
643D 7/30/2010 7/31/2010 Withdrawn C3 PV S 150 150 FC KINGS CA PGE Angiola Sub 70 kV Bus 12/31/2014 12/31/2016 Complete In Progress
643E 7/30/2010 7/31/2010 Withdrawn C3 PV S 200 200 FC FRESNO CA PGE Schindler Sub 115 kV Bus 12/31/2014 12/31/2014 Complete In Progress
643F 7/30/2010 7/31/2010 Withdrawn C3 PV S 220 220 FC PLACER CA PGE Rio Oso-Lockford 230 kV 3/1/2014 3/1/2014 Complete Complete Executed
643H 7/30/2010 7/31/2010 Withdrawn C3 PV S 600 600 FC KINGS CA PGE Gates-Gregg 230 kV 5/1/2015 5/1/2015
643I 7/30/2010 7/31/2010 Withdrawn C3 PV S 200 200 FC FRESNO CA PGE Mendota-Dairyland 115 kV 3/1/2014 3/1/2014 Complete Complete In Progress
643J 7/30/2010 7/31/2010 Withdrawn C3 PV S 1 1 FC FRESNO CA PGE Coalinga #2-Schindler 70 kV 4/1/2017 4/1/2017 Complete In Progress
643K 7/30/2010 7/31/2010 Withdrawn C3 PV S 289 289 FC FRESNO CA PGE Mendota-San Joaquin-Helm 70 kV 4/1/2017 4/1/2017
643L 7/30/2010 7/31/2010 Withdrawn C3 PV CT S NG 240 49 289 FC FRESNO CA PGE Panoche-Schindler #1 & #2 115 kV 4/1/2017 4/1/2017
643M 7/30/2010 7/31/2010 Withdrawn C3 PV CT S NG 240 49 289 FC FRESNO CA PGE Panoche-Schindler #1 & #2 115 kV 4/1/2017 4/1/2017
643N 7/30/2010 7/31/2010 Withdrawn C3 PV CT S NG 120 49 169 FC FRESNO CA PGE Helm-Stroud Sw Sta 70 kV 4/1/2017 4/1/2017
643O 7/30/2010 7/31/2010 Withdrawn C3 PV S 20 20 EO YOLO CA PGE Brighton-Davis 115 kV 3/1/2014 5/1/2015 Complete Complete In Progress
643P 11/19/2010 7/31/2010 Withdrawn C3 PV S 480 480 FC KERN/LOS ANGELES CA SCE Whirlwind Sub 500 kV Bus 10/30/2014 10/30/2014
643Q 11/19/2010 7/31/2010 Withdrawn C3 PV S 80 80 FC KERN CA SCE Windhub Sub 220 kV Bus 11/1/2014 11/1/2014
643S 7/30/2010 7/31/2010 Withdrawn C3 PV S 320 320 FC FRESNO CA SCE Vestal Sub 230 kV Bus 6/1/2013 6/1/2013 Complete
643U 7/31/2010 7/31/2010 Withdrawn C3 PV S 500 500 FC IMPERIAL CA SDGE Imperial Valley Sub 230 kV Bus 1/30/2014 1/30/2014
643V 7/30/2010 7/31/2010 Withdrawn C3 PV S 250 250 FC IMPERIAL CA SDGE Imperial Valley Sub 230 kV Bus 9/30/2013 9/30/2013
643Y 7/30/2010 7/31/2010 Withdrawn C3 PV S 80 80 FC KINGS CA PGE Henrietta-Leprino Food 115 kV 7/1/2013 7/1/2013
643Z 7/31/2010 7/31/2010 Withdrawn C3 PV S 150 150 FC KERN CA SCE Whirlwind - Windhub 500 kV 11/1/2013 7/1/2014 In Progress
643AA 7/26/2010 7/31/2010 Withdrawn C3 WT W 200.1 200.1 FC LOS ANGELES CA SCE Antelope Sub 230kV Bus 12/31/2012 12/31/2012 Complete Complete In Progress
643AB 11/19/2010 7/31/2010 Withdrawn C3 ST S 260 260 FC LOS ANGELES CA SCE Whirlwind Substation 230kV Bus 1/1/2015 1/1/2015 Complete
643AC 7/30/2010 7/31/2010 Withdrawn C3 ST S 750 750 FC RIVERSIDE CA SCE Colorado River Sub 220 kV Bus 1/1/2015 1/1/2015 Complete Complete In Progress
643AD 7/30/2010 7/31/2010 Withdrawn C3 ST G 95 95 FC INYO CA SCE Kramer Sub 220kV Bus 7/1/2012 7/1/2012
643AF 7/30/2010 7/31/2010 Withdrawn C3 PV S 500 500 FC RIVERSIDE CA SCE Colorado River Sub 220kV Bus 10/30/2015 10/30/2015 Complete
643AG 7/30/2010 7/31/2010 Withdrawn C3 PV S 50 50 FC INYO CA SCE Control-Inyokern 115 kV 1/1/2014 1/1/2014
643AH 7/29/2010 7/31/2010 Withdrawn C3 PV S 170 170 FC RIVERSIDE CA SCE Red Bluff Sub 230 kV Bus 1/1/2014 1/1/2014 Complete
643AI 7/29/2010 7/31/2010 Withdrawn C3 PV S 300 300 FC CLARK NV SCE Eldorado Sub 220 kV Bus 11/30/2014 11/30/2014 Complete Complete In Progress
643AK 7/30/2010 7/31/2010 Withdrawn C3 ST G 5.6 5.6 FC CHURCHILL NV SCE Control Sub 115 kV Bus 12/31/2011 12/31/2011 In Progress
643AL 7/30/2010 7/31/2010 Withdrawn C3 ST S 1000 1000 FC YUMA AZ SCE Palo Verde-Devers #1 500kV 1/1/2015 1/1/2015 Complete
643AN 7/30/2010 7/31/2010 Withdrawn C3 PV WT S W 66 20 86 FC SAN DIEGO CA SDGE Boulevard Sub 138kV Bus 11/22/2013 11/22/2013
643AO 7/30/2010 7/31/2010 Withdrawn C3 PV S 200 200 FC IMPERIAL CA SDGE Imperial Valley 230 kV Switchyard 6/1/2014 6/1/2014
643AP 7/30/2010 7/31/2010 Withdrawn C3 WT W 16.1 16.1 FC IMPERIAL CA SDGE Sunrise Powerlink 500 kV 12/31/2012 12/31/2013 Complete
643AQ 7/31/2010 7/31/2010 Withdrawn C3 PV S 238 238 FC YUMA AZ SDGE Hassayampa-North Gila 500kV line 6/1/2013 6/1/2013
643AR 7/30/2010 7/31/2010 Withdrawn C3 ST G 364.2 364.2 FC CHURCHILL/PERSHING CA SCE Control Sub 115 kV Bus 6/1/2016 6/1/2016
643AS 7/31/2010 7/31/2010 Withdrawn C3 PV S 200 200 FC RIVERSIDE CA SCE Colorado River Substation 6/1/2013 6/1/2013 Complete
643AT 11/19/2010 7/31/2010 Withdrawn C3 PV S 242 242 FC CLARK NV SCE Mead-Eldorado 230kV 12/31/2013 12/31/2013
645 8/19/2010 8/19/2010 Withdrawn SGIP-TC PV S 20 20 FC MONTEREY CA PGE Jolon 60 kV sub 2/1/2012 2/1/2012 In Progress
646 8/25/2010 8/25/2010 Withdrawn SGIP-TC PV S 8 8 FC FRESNO CA PGE Chaney #1 115kV Tap 3/1/2013 3/1/2013 Complete Complete In Progress
647 8/25/2010 8/25/2010 Withdrawn SGIP-TC PV S 20 20 FC FRESNO CA PGE Panoche - Oro Loma 115 KV 4/1/2012 4/30/2012 Complete Complete In Progress
649 8/25/2010 8/25/2010 Withdrawn SGIP-TC PV S 11.75 11.75 FC FRESNO CA PGE Helm 70kV 12/1/2013 12/1/2013 Complete Complete In Progress
649A 9/15/2010 10/25/2010 Withdrawn SGIP-TC PV S 14 14 EO SOLANO CA PGE Dixon-Vaca #2 60kV 3/1/2013 3/1/2013 Complete Complete In Progress
650 9/7/2010 9/7/2010 Withdrawn SGIP-TC PV S 20 20 EO FRESNO CA PGE Westlands 138 kV Tap 12/25/2011 12/25/2011
650A 9/8/2010 9/8/2010 Withdrawn SGIP-TC PV S 20 20 FC LOS ANGELES CA SCE Lancaster-Purify-Redman 66 kV 12/31/2013 12/31/2013 Complete In Progress
California ISO Public Page 18 of 27
Report Run Date: 6/3/2016
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue
DateApplication Status
Reason for
Withdrawal
Study
Process
Ty
pe
-1
Ty
pe
-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal Full
Capacity,
Partial or
Energy Only
(FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line
Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Withdrawn
Study AvailabilityGenerating Facility Net MWs Location Point of Interconnection
650B 11/19/2010 9/13/2010 Withdrawn SGIP PV S 20 20 EO RIVERSIDE CA SCE
Line to be constructed 1 mile south
& tie into SCE 69kV 2/28/2012 2/28/2012
650AC 9/8/2010 9/8/2010 Withdrawn SGIP-TC PV S 20 20 EO KINGS CA PGE Henrietta-Tulare Lake 70kV line 12/31/2012 12/31/2014 Complete Complete In Progress
651 9/16/2010 9/16/2010 Withdrawn SGIP-TC PV S 15 15 EO YUBA CA PGE Nicolaus-Marysville 60kV 6/1/2012 8/1/2012 Complete Complete In Progress
652 9/23/2010 9/23/2010 Withdrawn SGIP-TC PV S 20 20 FC FRESNO CA PGE Woodward-Sanger 115kV 6/15/2013 6/15/2013 In Progress
653 9/29/2010 9/29/2010 Withdrawn SGIP-TC PV S 20 20 EO KINGS CA PGE Arco 70 kV 1/15/2013 1/15/2013 Complete Complete In Progress
653A 9/29/2010 9/29/2010 Withdrawn SGIP-TC PV S 20 20 EO KERN CA PGE Arco Sub 70 kV Bus 1/15/2013 1/15/2013 Complete Complete In Progress
653C 1/25/2011 9/30/2010 Withdrawn SGIP PV S 20 20 EO SANTA BARBARA CA PGE Taft-Cuyama#1 70kV 7/1/2012 7/1/2012
653D 9/30/2010 9/30/2010 Withdrawn SGIP-TC PV S 20 20 EO FRESNO CA PGE Panoche-Mendota 115kV 1/1/2012 6/1/2012 Complete Complete Executed
653E 9/30/2010 9/30/2010 Withdrawn SGIP-TC PV S 20 20 EO FRESNO CA PGE Helm Sub 70 kV Bus 1/3/2012 2/10/2014 Complete Complete Executed
653G 10/20/2010 10/20/2010 Withdrawn SGIP-TC PV S 20 20 FC FRESNO CA PGE
Mendota - San Joaquin - Helm 70
KV line 12/30/2012 3/1/2013 In Progress
653BA 9/29/2010 9/29/2010 Withdrawn SGIP-TC PV S 20 20 EO KERN CA SCE Kern River-Cummings 66kV 12/31/2012 12/31/2012 In Progress
653EB 9/30/2010 9/30/2010 Withdrawn SGIP-TC PV S 20 20 FC KERN CA PGE
Midway 230 KV bus via Midway-La
Paloma 230kV #1 5/1/2013 5/1/2013 Complete
653EC 3/8/2011 9/30/2010 Withdrawn SGIP-TC PV S 20 20 EO KINGS/KERN CA PGE Arco Sub 70 kV Bus 7/1/2012 7/1/2012
653ED 9/30/2010 9/30/2010 Withdrawn SGIP-TC PV S 20 20 FC SAN DIEGO CA SDGE Boulevard East Substation 69 kV 10/31/2013 5/31/2016 Complete Complete In Progress
653EF 10/5/2010 10/5/2010 Withdrawn SGIP-TC PV S 20 20 EO KERN CA SCE
Cal Cement-Monolith-Windland 66
kV 6/30/2011 6/30/2011 In Progress
653FA 10/13/2010 10/13/2010 Withdrawn SGIP-TC PV S 20 20 FC LOS ANGELES CA SCE Lancaster-Little Rock-Piute 66kV 12/31/2013 12/31/2013 In Progress
653FB 10/13/2010 10/13/2010 Withdrawn SGIP-TC PV S 20 20 FC LOS ANGELES CA SCE Lancaster-Little Rock-Piute 66kV 12/31/2013 12/31/2013 Complete
655 3/9/2011 11/11/2010 Withdrawn SGIP-TC PV S 20 20 EO KERN CA PGE Westpark-Magunden 115 kV 5/2/2013 5/2/2013
656 11/11/2010 11/11/2010 Withdrawn SGIP-TC PV S 10 10 FC KERN CA PGE Taft-Elk Hills 70 kV 12/31/2013 12/31/2013
657 3/8/2011 11/12/2010 Withdrawn SGIP-TC PV S 20 20 EO BUTTE CA PGE Glenn #3 60 kV 3/1/2012 3/1/2012
657A 11/15/2010 11/15/2010 Withdrawn SGIP-TC PV S 20 20 FC LOS ANGELES CA SCE Antelope-Neenach 66kV 12/1/2013 12/20/2013 In Progress
657B 11/19/2010 11/19/2010 Withdrawn SGIP-TC PV S 20 20 FC KERN CA SCE Goldtown-Corum 66 kV 12/1/2013 12/20/2013 In Progress
663 12/15/2010 12/15/2010 Withdrawn SGIP-TC PV S 20 20 EO LOS ANGELES CA SCE Lancaster-Redman-Purify 66KV 7/1/2013 12/31/2013 Complete In Progress
664 12/15/2010 12/15/2010 Withdrawn SGIP-TC PV S 20 20 FC LOS ANGELES CA SCE Piute Sub 66 kV Bus 12/31/2012 12/31/2013 In Progress In Progress
665 2/25/2011 3/31/2011 Withdrawn FT PV S 5 5 EO FRESNO CA PGE
Coalinga #1-Tornado 70kV line;
pole number 4/3 1/12/2012 1/12/2012
666 2/28/2011 3/31/2011 Withdrawn FT PV S 5 5 EO CONTRA COSTA CA PGE
Pittsburg - Kirker - Columbia Steel
115 KV line 12/31/2012 12/31/2012
668 3/31/2011 3/31/2011 Withdrawn C4 PV S 118 118 FC FRESNO CA PGE Mendota 115 kV 9/1/2014 9/1/2014 Complete
669 3/31/2011 3/31/2011 Withdrawn C4 WT W 502 502 FC KERN CA SCE Highwind Substation 230kV Bus 11/15/2014 11/15/2014 In Progress
672 3/31/2011 3/31/2011 Withdrawn C4 PV S 51.2 51.2 FC KERN CA SCE Whirlwind Substation 66kV 3/31/2013 3/31/2013
673 3/30/2011 3/31/2011 Withdrawn C4 PV S 250 250 EO MARICOPA AZ SDGE Hassayampa - N. Gila 500 kV line 5/1/2015 5/1/2015 Complete
674 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC KERN CA PGE Arco - Polonios Pass 70kV 11/1/2013 11/1/2013
675 3/31/2011 3/31/2011 Withdrawn C4 PV S 100 100 FC SAN JOAQUIN CA PGE Bellota - Tesla 230 kV Tap 6/1/2014 6/1/2014
676 3/31/2011 3/31/2011 Withdrawn C4 PV S 30 30 FC SAN DIEGO CA SDGE Borrego Substation 69kV Bus 12/31/2014 12/31/2014 In Progress
677 12/15/2010 3/31/2011 Withdrawn C4 ST G 470 470 FC IMPERIAL CA SDGE Imperial Valley Sub 6/16/2015 6/16/2015
680 3/31/2011 3/31/2011 Withdrawn C4 PV S 1000 1000 FC KERN CA PGE
Diablo Canyon - Midway #3 500 KV
Line 3/31/2018 3/31/2018 Complete In Progress
681 3/31/2011 3/31/2011 Withdrawn C4 PV WT S W 100 383 483 FC KERN CA SCE SCE Highwind Substation 230kV 5/1/2015 5/1/2015 In Progress
682 3/31/2011 3/31/2011 Withdrawn C4 PV S 1.25 1.25 FC FRESNO CA PGE Mendota Biomass Tap line 70 KV 2/1/2013 1/1/2013
683 3/31/2011 3/31/2011 Withdrawn C4 PV S 14 14 FC FRESNO CA PGE Camden Substation 70kV Bus 7/10/2014 7/10/2014 In Progress
684 3/31/2011 3/31/2011 Withdrawn C4 PV S 7 7 FC FRESNO CA PGE Caruthers - Kingsburg 70kV 7/10/2014 7/10/2014 Complete
685 3/31/2011 3/31/2011 Withdrawn C4 PV S 45 45 EO IMPERIAL CA SDGE Imperial Valley 230 kV bus 9/1/2014 9/1/2014 Complete
686 3/31/2011 3/31/2011 Withdrawn C4 PV S 48 48 FC RIVERSIDE CA SCE Colorado River Substation 230kV 9/1/2014 9/1/2014 In Progress
688 3/31/2011 3/31/2011 Withdrawn C4 PV S 19.2 19.2 FC KINGS CA PGE Henrietta - Lemoore 70 kV 8/30/2013 9/1/2014 Complete Complete In Progress
689 3/31/2011 3/31/2011 Withdrawn C4 WT W 1700 1700 FC LINCOLN NM SCE Four Corners Sub 345kV Bus 5/1/2016 5/1/2016
690 5/23/2011 3/31/2011 Withdrawn C4 CT NG 300 300 FC SAN DIEGO CA SDGE
Approx 4 mi south of the
Penasquitos sub along the East side
of the Penasquitos-Old Town 230kV
line 6/30/2015 6/30/2015
691 3/31/2011 3/31/2011 Withdrawn C4 PV S 3 3 FC SOLANO CA PGE Lambie Switching Station 230 KV 11/30/2013 10/30/2013
692 4/15/2011 3/31/2011 Withdrawn C4 ST G 27 27 FC MINERAL NV SCE Control Substation 115kV Bus 12/31/2013 12/31/2013 Complete
693 3/31/2011 3/31/2011 Withdrawn C4 PV S 38 38 FC LOS ANGELES CA SCE Del Sur Substation 66kV Bus 6/1/2012 3/1/2013 Complete
694 3/31/2011 3/31/2011 Withdrawn C4 PV S 200 200 FC RIVERSIDE CA SCE
Keim Substation, 500kV, 7.1 miles
northeast of Colorado River Station 1/1/2014
695 3/31/2011 3/31/2011 Withdrawn C4 ST G 38 38 FC CHURCHILL NV SCE Control Sub 115kV Bus 12/31/2014 12/31/2014 Complete Complete
696 3/31/2011 3/31/2011 Withdrawn C4 WT W 301.35 301.35 FC YOLO CA PGE
Cortina - Vaca 230; Delevan - Vaca
#1 230 KV, and Delevan - Vaca #2
230 KV 1/11/2014 11/1/2014 Complete
697 3/31/2011 3/31/2011 Withdrawn C4 H WTR 1400 1400 FC RIVERSIDE CA SCE Red Bluff Substation 230kV 7/1/2017 7/1/2017 In Progress
698 3/31/2011 3/31/2011 Withdrawn C4 ST G 38 38 FC CHURCHILL NV SCE Control Substation 115kV bus 12/31/2014 12/31/2014 Complete
699 3/31/2011 3/31/2011 Withdrawn C4 PV S 45 45 FC SAN DIEGO CA SDGE Borrego Substation 69kV bus 6/1/2015 6/1/2015
700 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC KERN CA SCE Rosamond-Del Sur 66kV line 12/31/2015 12/31/2015 Complete
701 3/31/2011 3/31/2011 Withdrawn C4 PV S 28 28 FC SAN DIEGO CA SDGE Borrego Substation 69kV 12/31/2013 12/31/2013
California ISO Public Page 19 of 27
Report Run Date: 6/3/2016
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue
DateApplication Status
Reason for
Withdrawal
Study
Process
Ty
pe
-1
Ty
pe
-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal Full
Capacity,
Partial or
Energy Only
(FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line
Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Withdrawn
Study AvailabilityGenerating Facility Net MWs Location Point of Interconnection
703 3/31/2011 3/31/2011 Withdrawn C4 PV S 100 100 FC FRESNO CA PGE Panoche - Oro Loma 115 KV Tap 6/23/2014 1/1/2015 Complete
704 3/31/2011 3/31/2011 Withdrawn C4 PV S 240 240 FC SAN BERNARDINO CA SCE
Mojave Generating Station 500 kV
bus 12/31/2016 12/31/2013 In Progress
706 3/31/2011 3/31/2011 Withdrawn C4 PV S 17.9 17.9 FC FRESNO CA PGE Giffen Substation 70KV 3/1/2014 3/1/2014 Complete
707 3/31/2011 3/31/2011 Withdrawn C4 PV S 70 70 FC STANISLAUS CA PGE Solado sub 115 KV bus 7/1/2014 7/1/2014 Complete In Progress
708 3/31/2011 3/31/2011 Withdrawn C4 WT W 50 50 FC ALAMEDA CA PGE Tesla - Keslo 230 KV 12/31/2013 12/31/2013 Complete Complete In Progress
710 3/31/2011 3/31/2011 Withdrawn C4 PV S 3 3 FC SOLANO CA PGE Lambie Switching Station 230 KV 11/30/2013 11/30/2013
711 3/31/2011 3/31/2011 Withdrawn C4 PV S 120 120 FC TULARE CA PGE Corcoran-Smyrna 115kV line 12/31/2013 12/31/2013
712 3/31/2011 3/31/2011 Withdrawn C4 CC NG 28 28 FC LOS ANGELES CA SCE Harbor Cogeneration Facility 5/1/2015 5/1/2015 Complete
713 3/31/2011 3/31/2011 Withdrawn C4 PV S 400 400 FC IMPERIAL CA SDGE Imperial Valley 230kV Sub 7/1/2014 7/1/2014
714 3/31/2011 3/31/2011 Withdrawn C4 STH S 540 540 FC NYE NV VEA Crazy Eye Tap Substation 230kV 6/30/2014 12/1/2014 Complete Complete
715 3/31/2011 3/31/2011 Withdrawn C4 PV S 13.5 13.5 FC KINGS CA PGE Jacob Corner Substation 70KV Bus 2/1/2013 2/1/2013
716 3/31/2011 3/31/2011 Withdrawn C4 PV S 100 100 FC RIVERSIDE CA SCE
Colorado River Substation 230kV
Bus 7/1/2014 7/1/2014 Complete
717 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 EO KINGS CA PGE Arco Sub 70 KV Bus 2/28/2013 6/1/2013 Complete
718 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 EO KINGS CA PGE Arco Sub 70 KV Bus 2/28/2013 6/1/2014 Complete
719 3/31/2011 3/31/2011 Withdrawn C4 PV S 3 3 FC SOLANO CA PGE Lambie Switching Station 230 KV 11/30/2013 11/30/2013
721 3/31/2011 3/31/2011 Withdrawn C4 WT W 299 299 FC ALAMEDA CA PGE Tesla - Westley 230 KV line 12/31/2013 12/31/2013
722 3/31/2011 3/31/2011 Withdrawn C4 WT W 299 299 FC KERN CA SCE Windhub Substation 230kV 12/31/2013 12/31/2013
724 3/31/2011 3/31/2011 Withdrawn C4 PV S 500 500 FC KINGS CA PGE Gates 230 KV Bus 12/31/2017 12/31/2017
725 3/31/2011 3/31/2011 Withdrawn C4 PV S 90 90 FC FRESNO CA PGE Hammond Sub 115 KV 7/1/2014 7/1/2014 Complete In Progress
726 3/31/2011 3/31/2011 Withdrawn C4 PV S 150 150 FC KERN CA PGE
Midway - Wheeler Ridge #1 and #2
230 kV 10/30/2013 10/20/2015
727 3/31/2011 3/31/2011 Withdrawn C4 PV S 150 150 FC KERN CA PGE
Midway - Wheeler Ridge #1 & #2
230 kV 10/30/2013 10/30/2013
728 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC KINGS CA PGE
69 KV POI is at a designated
google coordinates 3/1/2013 3/1/2013
729 3/31/2011 3/31/2011 Withdrawn C4 PV S 75 75 FC FRESNO CA PGE Mendota Sub 115 KV Bus 10/1/2013 10/1/2013 In Progress
730 3/31/2011 3/31/2011 Withdrawn C4 PV S 500 500 FC RIVERSIDE CA SCE Colorado River Substation 230kV 12/31/2018 12/31/2018 Complete
731 3/31/2011 3/31/2011 Withdrawn C4 PV S 75 75 FC FRESNO CA PGE Kearney Sub 230 KV 7/1/2014 7/1/2014
732 3/31/2011 3/31/2011 Withdrawn C4 PV S 200 200 FC KERN CA SCE Windhub Substation 230kV bus 12/31/2013 12/31/2013 In Progress
733 3/31/2011 3/31/2011 Withdrawn C4 WT W 150 150 FC MONTEREY CA PGE Coburn Sub 230 KV 12/31/2013 12/31/2013
734 3/31/2011 3/31/2011 Withdrawn C4 WT W 250 250 FC SOLANO CA PGE Birds Landing Substation 230 kV 11/1/2012 11/1/2012 Complete
735 11/2/2010 3/31/2011 Withdrawn C4 PV S 200 200 FC IMPERIAL CA SDGE Imperial Valley Substation 230kV 6/1/2014 6/1/2014
736 3/31/2011 3/31/2011 Withdrawn C4 PV S 150 150 FC RIVERSIDE CA SCE
Colorado River Substation 230kV
bus 1/1/2014 1/1/2014 Complete
739 3/31/2011 3/31/2011 Withdrawn C4 CC NG 20 20 FC SAN DIEGO CA SDGE Otay Mesa Substation 3/7/2013 3/7/2013 Complete
740 3/31/2011 3/31/2011 Withdrawn C4 ST S 270 270 FC CLARK NV VEA Crazy Eyes Tap 230kV 9/30/2015 9/30/2016 Complete Complete
741 3/31/2011 3/31/2011 Withdrawn C4 WT W 3000 3000 FC PLATTE WY SCE Eldorado Substation 500kV Bus 3/3/2016 1/1/2020 Complete
742 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC YOLO CA PGE Line Tap to 69 KV - Plainfield 3/1/2013 3/1/2013
743 3/31/2011 3/31/2011 Withdrawn C4 PV S 100 100 FC KERN CA PGE
Morrow Bay - Midway #1 & #2 230
KV 5/2/2015 5/2/2015
745 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC FRESNO CA PGE Coalinga - Gates #1 70 KV 12/31/2013 12/31/2013
747 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC KERN CA PGE
Smyrna - Semitropic - Midway 115
KV 12/31/2013 12/31/2013
748 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC KERN CA PGE
Smyrna - Semitropic - Midway 115
KV line 12/31/2013 12/31/2013
749 3/31/2011 3/31/2011 Withdrawn C4 PV S 5 5 FC KERN CA PGE Old River - Kern #1 70 KV 12/31/2013 12/31/2013
750 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC KERN CA SCE
Either Goldtown-Corum or Goldtown-
Lancaster 66kV line on Holt St. 12/31/2014 12/31/2014
751 3/31/2011 3/31/2011 Withdrawn C4 PV S 5 5 FC FRESNO CA PGE Strout SW Station 70kV 12/31/2013 12/31/2013 Complete In Progress
752 3/31/2011 3/31/2011 Withdrawn C4 PV S 12 12 FC KINGS CA PGE Guernsey - Henrietta 70 KV 12/31/2013 12/31/2014 Complete Complete In Progress
753 3/31/2011 3/31/2011 Withdrawn C4 PV S 3 3 FC FRESNO CA PGE Gates - Coalinga #1 70 KV 12/31/2013 12/31/2013
754 3/31/2011 3/31/2011 Withdrawn C4 PV S 300 300 FC RIVERSIDE CA SCE 220kV Red Bluff Substation 12/31/2014 12/31/2014
755 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC FRESNO CA PGE Gates - Coalinga #1 70 KV 12/31/2013 12/31/2013
756 3/31/2011 3/31/2011 Withdrawn C4 PV S 60 60 FC SAN DIEGO CA SDGE Borrego substation 69kV 12/31/2013 12/31/2013 In Progress
757 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC FRESNO CA PGE Gates - Coalinga #1 70 KV 12/31/2013 12/31/2013
758 3/31/2011 3/31/2011 Withdrawn C4 PV S 19.98 19.98 FC KERN CA SCE
Goldtown-Corum or Goldtown-
Lancaster 66kV line 12/31/2014 12/31/2014
759 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC FRESNO CA PGE Gates - Coalinga #1 70 KV 12/31/2013 12/31/2013
760 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC KERN CA PGE
Smyrna - Semitropic - Midway #1
115 KV 12/31/2013 12/31/2013
761 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC KERN CA SCE Cal Cement-Antelope 66kV line 12/31/2014 12/31/2014
762 3/31/2011 3/31/2011 Withdrawn C4 PV S 70 70 FC CONTRA COSTA CA PGE Contra Costa-Delta SW Yard 230kV 7/1/2014 7/1/2014 Complete In Progress
763 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC FRESNO CA PGE Stroud SW Sta 70 KV 12/1/2013 12/1/2013
California ISO Public Page 20 of 27
Report Run Date: 6/3/2016
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue
DateApplication Status
Reason for
Withdrawal
Study
Process
Ty
pe
-1
Ty
pe
-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal Full
Capacity,
Partial or
Energy Only
(FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line
Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Withdrawn
Study AvailabilityGenerating Facility Net MWs Location Point of Interconnection
764 3/31/2011 3/31/2011 Withdrawn C4 WT W 508 508 FC ENSENADA MX SDGE
Imperial Valley Substation 500kV
Bus 12/31/2014 12/31/2014 In Progress
765 3/31/2011 3/31/2011 Withdrawn C4 PV S 30 30 FC STANISLAUS CA PGE Salado - Newman 60 KV 10/1/2013 10/1/2013 Complete Complete In Progress
766 3/31/2011 3/31/2011 Withdrawn C4 PV S 150 150 FC IMPERIAL CA SDGE
Imperial Valley Substation 230kV
bus 12/31/2014 12/31/2014 Complete
767 3/31/2011 3/31/2011 Withdrawn C4 WT W 400 400 FC KERN CA SCE Highwind Substation 230kV bus 7/1/2015 7/1/2015 In Progress
770 3/31/2011 3/31/2011 Withdrawn C4 ST S 1080 1080 FC IMPERIAL CA SDGE ECO Sub 230kV 6/30/2015 6/30/2015 In Progress
771 3/31/2011 3/31/2011 Withdrawn C4 PV S 14 14 FC LOS ANGELES CA SCE Plute-Lancaster 66kV line 3/3/2012 3/1/2013 In Progress
772 3/31/2011 3/31/2011 Withdrawn C4 PV S 100 100 FC SAN JOAQUIN CA PGE
Stanislaus - Manteca #2 115 kV
Line 6/1/2014 6/1/2014
773 3/31/2011 3/31/2011 Withdrawn C4 PV S 18 18 FC GLENN CA PGE Elk Creek 60 KV Tap 6/1/2013 6/1/2013 In Progress
774 3/31/2011 3/31/2011 Withdrawn C4 ST G 38 38 FC CHURCHILL NV SCE Control Substation 115 kV bus 12/31/2013 12/31/2013 Complete
776 3/31/2011 3/31/2011 Withdrawn C4 PV S 25 25 FC KINGS CA PGE Tulare Lake - Arco 70 KV 12/31/2014 12/31/2014
777 3/31/2011 3/31/2011 Withdrawn C4 CT NG 400 400 FC KERN CA SCE Pastoria-Magunden 230kV line 7/1/2015 7/1/2015
780 3/31/2011 3/31/2011 Withdrawn C4 PV S 30 30 FC YOLO CA PGE
Woodland - Zamora - Rio Oso #2
115kV Bus 3/1/2013 3/1/2013
781 3/31/2011 3/31/2011 Withdrawn IC Request C4 PV S 0.1 0.1 FC SAN DIEGO CA SDGE Barrett-Cameron 69kV line 12/31/2014 11/30/2015 Complete Complete
782 3/31/2011 3/31/2011 Withdrawn C4 PV S 100 100 FC SAN BERNARDINO CA SCE Jasper Switching Station 220kV bus 6/1/2014 6/1/2014 Complete
783 3/31/2011 3/31/2011 Withdrawn C4 PV S 200 200 FC SAN BERNARDINO CA SCE Cool Water Substation 115kV 6/1/2014 6/1/2018 Complete
784 3/31/2011 3/31/2011 Withdrawn C4 PV S 50 50 FC SAN JOAQUIN CA PGE Schulte sub 115 KV 6/2/2014 6/2/2014 Complete
785 3/31/2011 3/31/2011 Withdrawn IC Request C4 PV S 16 16 FC KERN CA SCE Silver Queen-Goldtown 69kV line 1/5/2013 1/5/2013 In Progress
786 3/31/2011 3/31/2011 Withdrawn C4 PV S 80 80 FC KERN CA SCE Windhub Substation 66kV 12/1/2014 12/1/2014 In Progress
787 3/31/2011 3/31/2011 Withdrawn C4 PV S 8 8 FC KERN CA PGE Arco-Carneras 70 kV Line 10/7/2014 1/1/2015
788 3/31/2011 3/31/2011 Withdrawn C4 PV S 100 100 FC LOS ANGELES CA SCE Antelope Substation 66kV bus 6/1/2014 6/1/2018 Complete
790 3/31/2011 3/31/2011 Withdrawn C4 PV S 45 45 FC KERN CA SCE Antelope-Rosamond 66kV line 6/1/2014 6/1/2014 In Progress
791 3/31/2011 3/31/2011 Withdrawn C4 PV S 150 150 FC LOS ANGELES CA SCE Antelope Substation 220kV Bus 7/31/2013 7/31/2013 In Progress
792 3/31/2011 3/31/2011 Withdrawn C4 WT W 200 200 FC SAN BERNARDINO CA SCE Ivanpah Substation 220kV bus 9/1/2014 12/15/2015 Complete
793 3/31/2011 3/31/2011 Withdrawn C4 PV S 75 75 FC KERN CA SCE Goldtown Substation 66kV Bus 4/1/2013 12/31/2015 Complete
794 3/30/2011 3/31/2011 Withdrawn C4 PV S 45 45 FC SAN DIEGO CA SDGE Boulevard East Substation 138kV 4/30/2015 5/31/2016 Complete Complete
797 3/31/2011 3/31/2011 Withdrawn C4 PV S 0.5 0.5 FC RIVERSIDE CA SCE Red Bluff Substation 230kV 12/31/2014 12/31/2014 Complete Complete In Progress
801 3/31/2011 3/31/2011 Withdrawn C4 PV S 75 75 FC BUTTE CA PGE Butte-Table Mountain 115kV No. 2 2/28/2014 2/28/2014
802 3/31/2011 3/31/2011 Withdrawn C3 WT W 150 150 EO IMPERIAL CA SDGE 500kV at Ocotillo Express 12/31/2013 12/31/2013
803 3/31/2011 3/31/2011 Withdrawn C4 ST S 1080 1080 FC KERN CA PGE
Midway - Wheeler Ridge #1 & #2
230 kV 6/30/2015 6/30/2015
804 3/31/2011 3/31/2011 Withdrawn C4 ST S 540 540 FC KERN CA PGE Arco Substation 230 KV bus 6/30/2015 12/1/2015
807 3/29/2011 3/31/2011 Withdrawn C4 PV S 300 300 FC MARICOPA AZ SCE Harquahala Substation 500kV 9/15/2014 9/15/2014 In Progress
808 3/29/2011 3/31/2011 Withdrawn C4 PV S 700 700 FC MARICOPA AZ SCE Harquahala Substation 500kV 9/15/2014 9/15/2014
810 3/31/2011 3/31/2011 Withdrawn C4 PV S 100 100 FC FRESNO CA PGE Gates-McCall 230kV 2/28/2014 2/28/2014
811 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC FRESNO CA PGE Schindler Substation 115 KV Bus 6/30/2013 12/25/2013 Complete
812 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC FRESNO CA PGE Schindler Substation 115 KV Bus 6/30/2013 12/25/2013 Complete
813 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC FRESNO CA PGE Schindler Substation 115 KV Bus 6/30/2013 12/25/2013 Complete
817 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC TULARE CA PGE Henrietta-GWF 115kV 6/30/2012 6/30/2012
818 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC MERCED CA PGE Le Grand 115 KV 6/30/2013 6/30/2013
819 3/31/2011 3/31/2011 Withdrawn C4 PV S 250 250 FC KINGS CA PGE Gates Substation 500 KV 12/31/2014 12/31/2014
821 3/31/2011 3/31/2011 Withdrawn C4 PV S 60 60 FC MADERA CA PGE Borden Sub 70 KV Bus 2/28/2014 2/28/2014
822 3/31/2011 3/31/2011 Withdrawn C4 PV S 110 110 FC KINGS CA PGE Gates - Midway 230 KV 2/28/2014 2/28/2014
826 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC KERN CA PGE Westfield Sub 70 KV 12/31/2013 12/31/2013
827 3/31/2011 3/31/2011 Withdrawn C4 PV S 100 100 FC SAN JOAQUIN CA PGE Bellota - Tesla #2 230 KV 2/28/2014 2/28/2014
828 3/31/2011 3/31/2011 Withdrawn C4 PV S 50 50 FC KERN CA PGE Smyrna Sub 115 KV Bus 4/30/2014 4/30/2014
830 3/31/2011 3/31/2011 Withdrawn C4 PV S 80 80 FC SOLANO CA PGE Vaca - Dixon Sub 115 KV Bus 2/28/2014 2/28/2014
831 3/31/2011 3/31/2011 Withdrawn C4 ST S 270 270 FC RIVERSIDE CA SCE Colorado River Substation 230kV 1/1/2016 10/31/2016 Complete Complete In Progress
832 3/31/2011 3/31/2011 Withdrawn C4 PV S 75 75 FC STANISLAUS CA PGE Tesla - Miller 115 KV 2/28/2014 2/28/2014
833 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC FRESNO CA PGE Coalinga 70 KV 12/1/2013 12/1/2013
834 3/31/2011 3/31/2011 Withdrawn C4 CT NG 49 49 FC KERN CA SCE Gorman-Kern River 66kV line 6/1/2013 6/1/2013 Complete
835 3/31/2011 3/31/2011 Withdrawn C4 PV S 800 800 FC KINGS CA PGE Gates Sub 500 KV Bus 2/1/2018 2/1/2018
836 3/31/2011 3/31/2011 Withdrawn C4 ST S 150 150 FC YUMA AZ SDGE North Gila Substation 500 kV 12/1/2015 12/1/2015 Complete
837 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC SAN DIEGO CA SDGE
East County (ECO) Substation
138kV 5/1/2013 2/1/2016 Complete In Progress
839 3/31/2011 3/31/2011 Withdrawn C4 PV S 100 100 FC IMPERIAL CA SCE
Colorado River Substation 230kV
bus 11/30/2015 11/30/2015 Complete
840 3/31/2011 3/31/2011 Withdrawn C4 PV S 300 300 FC RIVERSIDE CA SCE
Colorado River Substation 230kV
bus 12/31/2015 12/31/2015 Complete
841 3/31/2011 3/31/2011 Withdrawn C4 ST S 250 250 FC YUMA AZ SDGE Hassayampa-North Gila 500kV 9/1/2014 9/1/2014 Complete
842 3/31/2011 3/31/2011 Withdrawn C4 ST S 540 540 FC SAN BERNARDINO CA SCE Jasper Substation 220kV 1/1/2016 10/31/2016 Complete
843 3/31/2011 3/31/2011 Withdrawn C4 PV S 35.3 35.3 FC KERN CA SCE 66kV Windhub Substation 11/30/2014 12/1/2013 Complete
844 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC KERN CA SCE Cal Cement-Antelope 66kV line 12/31/2014 12/31/2014
845 3/31/2011 3/31/2011 Withdrawn C4 PV S 15 15 FC KERN CA SCE Corum-Goldtown 69kV line 9/15/2015 9/15/2015 In Progress
California ISO Public Page 21 of 27
Report Run Date: 6/3/2016
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue
DateApplication Status
Reason for
Withdrawal
Study
Process
Ty
pe
-1
Ty
pe
-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal Full
Capacity,
Partial or
Energy Only
(FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line
Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Withdrawn
Study AvailabilityGenerating Facility Net MWs Location Point of Interconnection
846 3/31/2011 3/31/2011 Withdrawn C4 PV S 510 510 FC IMPERIAL CA SDGE Imperial Valley 230-kV Substation 4/30/2017 4/30/2017 In Progress
847 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC SAN BERNARDINO CA SCE Kramer-Victor 115kV line 6/30/2013 1/1/2016 Complete
848 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC IMPERIAL CA SDGE Imperial Valley Substation 12kV Bus 12/1/2013 12/1/2013 Complete
849 3/31/2011 3/31/2011 Withdrawn C4 PV S 100 100 FC KERN CA SCE Whirlwind Substation 230kV 12/31/2016 12/31/2016 Complete
850 3/31/2011 3/31/2011 Withdrawn C4 PV S 25 25 FC LOS ANGELES CA SCE Redman-Lancaster 66kV line 12/31/2014 12/31/2014 In Progress
851 3/30/2011 3/31/2011 Withdrawn C4 ST G 70 70 FC CHURCHILL NV SCE Control Substation 115kV 8/1/2013 8/1/2013 In Progress
852 3/31/2011 3/31/2011 Withdrawn C4 PV S 25 25 FC KERN CA SCE Rosamond-Cal Cement 66kV line 6/30/2014 6/30/2014 In Progress
853 3/31/2011 3/31/2011 Withdrawn C4 PV S 20 20 FC KERN CA SCE Monolith Substation 66kV 10/1/2013 12/31/2014 Complete
854 3/31/2011 3/31/2011 Withdrawn C4 PV S 37 37 FC RIVERSIDE CA SCE Blythe Substation 161kV bus 6/23/2014 1/1/2015 Complete
857 3/31/2011 3/31/2011 Withdrawn C4 PV S 150 150 FC TULARE CA SCE Springville Sub 230 KV Bus 2/28/2014 2/28/2014 In Progress
858 3/31/2011 3/31/2011 Withdrawn C4 PV S 21 21 FC RIVERSIDE CA SCE Devers-Farrel 115kV line 12/31/2012 9/1/2014 Complete
861 3/18/2011 3/31/2011 Withdrawn FT PV S 5 5 EO SAN JOAQUIN CA PGE
PG&E Valley Springs #2 60 kV Line
from Valley Springs to Lockford 60
kV line 12/15/2012 12/15/2012
862 3/31/2011 3/31/2011 Withdrawn FT PV S 5 5 EO KINGS CA PGE
PG&E Armstrong 70kV switching
station at intersection of S 11th Ave.
and Idaho Avenue, Hanford, CA. 6/30/2012 6/30/2012
863 3/31/2011 3/31/2011 Withdrawn C4 PV S 7.8 7.8 FC KINGS CA PGE Guernsey - Henrietta 70 KV line 7/31/2012 3/31/2013 Complete
864 3/31/2011 3/31/2011 Withdrawn C4 PV S 19.9 19.9 FC FRESNO CA PGE Stroud 70 KV substation 8/31/2012 6/30/2013 Complete
865 3/31/2011 3/31/2011 Withdrawn C4 PV S 13.4 13.4 FC KINGS CA PGE Hardwick 70 KV sub 7/31/2012 3/31/2013
866 10/24/2011 11/15/2011 Withdrawn C5 WT W 72 72 FC HUMBOLDT CA PGE Humboldt-Bridgeville 115 kV line 10/1/2015 10/1/2015
867 10/27/2011 11/15/2011 Withdrawn C5 WT W 132 132 FC SISKIYOU/MODOC CA PGE Pit#1-Pit#3 230kV line 10/1/2016
868 11/10/2011 11/15/2011 Withdrawn C5 WT W 301 301 FC NAPA CA PGE Vaca-Bahia 230kV line 10/1/2016 10/1/2016
869 11/15/2011 11/15/2011 Withdrawn C5 PV S 23 23 FC FRESNO CA PGE Helm Substation 70kV Bus 12/1/2015 12/1/2015 Complete Complete
870 11/10/2011 11/15/2011 Withdrawn C5 CC Other 340 300 FC KERN CA PGE Midway-Wheeler Ridge 230 kV 9/1/2017 9/1/2017 In Progress
871 11/15/2011 11/15/2011 Withdrawn C5 PV S 80 80 FC RIVERSIDE CA SCE Colorado River Substation 230kV 3/1/2014 10/31/2015 Complete
872 11/15/2011 11/15/2011 Withdrawn C5 PV S 75 75 FC KERN CA PGE Carneras-Taft 70 kV Line 12/15/2014 12/15/2014
873 11/9/2011 11/15/2011 Withdrawn C5 PV S 200 200 FC MARICOPA AZ SCE Palo Verde-Devers #1 500kV line 9/30/2015 12/1/2016 Complete
874 11/15/2011 11/15/2011 Withdrawn C5 PV S 500 500 FC RIVERSIDE CA SCE Colorado River Substation 230kV 10/30/2015 10/30/2015
875 11/9/2011 11/15/2011 Withdrawn C5 PV S 60 60 FC IMPERIAL CA SDGE Imperial Valley Substation 230kV 12/31/2014 12/31/2014
876 12/6/2011 11/21/2011 Withdrawn FT PV S 5 5 EO SANTA BARBARA CA PGE Cuyama Substation 10/13/2013 10/13/2013
878 3/27/2012 4/2/2012 Withdrawn C5 WT W 51 51 FC LASSEN CA PGE Westwood Substation 60kV 12/31/2013 12/31/2013 In Progress
879 3/28/2012 4/2/2012 Withdrawn C5 H WTR 1.35 1.35 EO TEHAMA CA PGE Volta/South 60 kV 12/15/2013 12/15/2013 In Progress
880 3/23/2012 4/2/2012 Withdrawn C5 PV S 180 180 FC NYE NV VEA Gamebird Substation 138kV 1/1/2013 1/1/2013
881 3/28/2012 4/2/2012 Withdrawn C5 PV S 500 500 FC RIVERSIDE CA SCE Colorado River Substation 230kV 10/30/2015 10/30/2015
882 3/23/2012 4/2/2012 Withdrawn C5 PV S 120 120 FC TULARE CA PGE Olive Substation 115 kV 12/31/2015 12/31/2015
883 3/28/2012 4/2/2012 Withdrawn C5 CC NG 11 11 FC SAN JOAQUIN CA PGE
Tesla - Stockton Co-Gen Jct 115 kV
Line 9/1/2018 9/1/2018
884 3/29/2012 4/2/2012 Withdrawn C5 PV S 250 250 FC NYE NV VEA Crazy Eyes Subsation 230kV 12/31/2018 12/31/2018
886 3/30/2012 4/2/2012 Withdrawn C5 ST B 15 15 FC SAN JOAQUIN CA PGE Tracy-Tesla 115kV line 8/31/2014 8/31/2014
887 3/23/2012 4/2/2012 Withdrawn C5 PV S 300 300 FC CLARK NV SCE Eldorado Substation 220kV Bus 1/1/2015 11/1/2016 Complete
888 3/31/2012 4/2/2012 Withdrawn C5 PV S 100 100 FC SAN BERNARDINO CA SCE Jasper 220 kV 10/15/2015 10/15/2015 Complete
889 3/31/2012 4/2/2012 Withdrawn C5 ST NG 540 540 FC CLARK NV SCE Eldorado Substation 220 kV Bus 6/30/2016 6/30/2016
890 3/31/2012 4/2/2012 Withdrawn C5 PV S 50 50 FC KERN CA SCE Cal Cement-Rosamond 69kV line 3/1/2014 8/31/2018 Complete
891 3/30/2012 4/2/2012 Withdrawn C5 PV S 180 180 FC CLARK NV SCE Eldorado Substation 230 kV bus 6/1/2014 7/1/2016 Complete
892 3/31/2012 4/2/2012 Withdrawn C5 STH S 140 140 FC SAN BERNARDINO CA SCE Pisgah Substation 220kV bus 12/31/2015 12/31/2015 Complete
894 4/2/2012 4/2/2012 Withdrawn C5 CT NG 310 310 FC YUBA CA PGE
Table Mountain-Rio Oso 230kV
circuit 4/1/2017 4/1/2017 In Progress
895 4/2/2012 4/2/2012 Withdrawn C5 PV S 15 15 FC SAN DIEGO CA SDGE Boulevard East Substation 138kV 12/31/2014 12/31/2014 Complete Complete
896 4/2/2012 4/2/2012 Withdrawn C5 PV S 100 100 FC SAN DIEGO CA SDGE Boulevard East Substation 138kV 9/1/2015 9/1/2015 Complete
898 4/2/2012 4/2/2012 Withdrawn C5 CT NG 45 45 FC KERN CA PGE Famoso Substation 115kV bus 1/1/2014 9/30/2019 Complete
899 4/2/2012 4/2/2012 Withdrawn C5 WT W 100 100 FC YOLO CA PGE
Ckt I & 2 Delevan-Vaca and Cortina-
Vaca 230 kV lines 8/31/2015 11/30/2013 In Progress
902 4/2/2012 4/2/2012 Withdrawn C5 PV S 150 150 FC RIVERSIDE CA SCE Colorado River sub, 230 kV bus 12/31/2016 12/31/2016 In Progress
903 4/2/2012 4/2/2012 Withdrawn C5 PV S 387 387 FC LOS ANGELES CA SCE Lugo-Vincent 500 kV line 12/20/2016 12/20/2016 In Progress
904 4/2/2012 4/2/2012 Withdrawn C5 PV S 150 150 FC RIVERSIDE CA SCE Colorado River Substation 230kV 7/1/2016 7/1/2016 In Progress
905 4/2/2012 4/2/2012 Withdrawn C5 PV S 80 80 FC KERN CA PGE Temblor-Kernridge 115kV line 6/30/2016 6/30/2016
906 4/2/2012 4/2/2012 Withdrawn C5 PV S 100 100 FC SAN BERNARDINO CA SCE Jasper Substation 230kV 5/1/2015 5/1/2015
907 4/2/2012 4/2/2012 Withdrawn C5 PV S 80 80 FC FRESNO CA PGE Newhall Substation 115 kV bus 10/22/2013 10/22/2013
908 4/2/2012 4/2/2012 Withdrawn C5 PV ST S S 50 160 210 FC NYE NV VEA Crazy Eyes Tap 230kV 6/1/2017 2/28/2019 Complete Complete
910 4/2/2012 4/2/2012 Withdrawn C5 ST G 20 20 FC LASSEN CA PGE Honey Lake Substation 60 kV 1/1/2015 6/1/2016 In Progress
912 4/2/2012 4/2/2012 Withdrawn C5 PV S 150 150 FC KERN CA SCE Windhub Substation 220kV 1/1/2015 1/1/2015
913 4/2/2012 4/2/2012 Withdrawn C5 PV S 150 150 FC RIVERSIDE CA SCE
Colorado River Substation 230 kV
bus 12/31/2016 12/31/2016 In Progress
914 4/2/2012 4/2/2012 Withdrawn C5 PV S 20 20 FC NYE NV VEA Vista Substation 138kV 12/1/2014 3/31/2016 Complete
915 4/2/2012 4/2/2012 Withdrawn C5 PV S 20 20 FC NYE NV VEA Thousandaire Substation 138kV 12/1/2014 12/1/2014
916 3/30/2012 4/2/2012 Withdrawn C5 PV S 20 20 FC KINGS CA PGE Henrietta-GWF 115 kV Line 12/1/2014 12/1/2014 Complete
California ISO Public Page 22 of 27
Report Run Date: 6/3/2016
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue
DateApplication Status
Reason for
Withdrawal
Study
Process
Ty
pe
-1
Ty
pe
-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal Full
Capacity,
Partial or
Energy Only
(FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line
Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Withdrawn
Study AvailabilityGenerating Facility Net MWs Location Point of Interconnection
917 3/30/2012 4/2/2012 Withdrawn C5 PV S 20 20 FC KINGS CA PGE Henrietta-GWF 115 kV Line; 12/1/2014 12/1/2014 Complete
918 3/30/2012 4/2/2012 Withdrawn C5 PV S 200 200 FC FRESNO CA PGE Mendota Dairyland 115kV 12/31/2015 12/31/2015
919 4/2/2012 4/2/2012 Withdrawn C5 PV S 75 75 FC IMPERIAL CA SDGE Imperial Valley Substation 230kV 1/1/2015 1/1/2015 In Progress
920 4/2/2012 4/2/2012 Withdrawn C5 PV S 75 75 FC KERN CA SCE
Coolwater-DunnSiding-Baker
Substation 115kV 1/1/2015 1/1/2015
921 4/2/2012 4/2/2012 Withdrawn C5 PV S 40 40 FC TULARE CA PGE Alpaugh-Smyrna 115kV Line 12/1/2016 12/1/2016 Complete
922 4/2/2012 4/2/2012 Withdrawn C5 CT NG 291 291 FC KERN CA SCE Highwind Substation 230kV 1/1/2016 1/1/2017 Complete Complete
923 4/2/2012 4/2/2012 Withdrawn C5 CC NG 402 402 FC SAN BERNARDINO CA SCE Vista Substation 230kV 1/1/2017 1/1/2018 Complete
924 4/2/2012 4/2/2012 Withdrawn C5 WT W 150 150 FC MERCED CA PGE Los Banos-Westly 230 kV Line 12/1/2015 12/1/2015
925 4/2/2012 4/2/2012 Withdrawn C5 STR FW 20 20 FC KERN CA SCE Windhub Substation 230kV bus 9/30/2014 9/30/2014 Complete
926 4/2/2012 4/2/2012 Withdrawn C5 CC NG 550 550 FC KERN CA SCE Windhub Substation 230 kV 3/15/2015 8/6/2018 Complete Complete
927 4/2/2012 4/2/2012 Withdrawn C5 PV S 45 45 FC KERN CA SCE Highwind Substation 230kV bus 1/15/2015 12/1/2016 Complete Complete
928 4/2/2012 4/2/2012 Withdrawn C5 WT W 175 175 FC SOLANO CA PGE
CPN Creed/ Goose Haven Subs -
Lambie Switching Station 230 kV 12/31/2015 12/31/2015 Complete Complete
929 4/2/2012 4/2/2012 Withdrawn C5 CT PV NG S 50 200 250 FC CLARK NV SCE Mohave-Lugo 500kV line 12/1/2015 12/31/2016 Complete
930 4/2/2012 4/2/2012 Withdrawn C5 CT PV NG S 50 200 250 FC CLARK NV SCE Mohave-Lugo 500kV line 12/1/2015 12/31/2016 Complete
931 4/2/2012 4/2/2012 Withdrawn C5 PV CT S NG 150 150 300 FC CLARK NV SCE Mohave-Eldorado 500kV line 12/1/2015 12/31/2016 Complete
932 4/2/2012 4/2/2012 Withdrawn C5 CT PV NG S 100 200 300 FC CLARK NV SCE Mohave-Eldorado 500kV line 12/1/2015 12/31/2016 Complete
933 4/2/2012 4/2/2012 Withdrawn C5 Other NG 49 49 FC KERN CA PGE
Rio Bravo Tomato Substation 115
kV Bus 4/1/2014 4/1/2014 In Progress
934 4/2/2012 4/2/2012 Withdrawn C5 Other NG 49 49 FC MERCED CA PGE Santa Nella-Canal 70kV line 4/1/2014 4/1/2014 In Progress
935 4/2/2012 4/2/2012 Withdrawn C5 Other NG 49 49 FC YOLO CA PGE Woodland-Davis 115kV line 4/1/2014 4/1/2014
936 4/2/2012 4/2/2012 Withdrawn C5 PV S 20 20 FC FRESNO CA PGE Coalinga 1-Coalinga 2 70kV line 5/1/2015 5/1/2015
937 4/2/2012 4/2/2012 Withdrawn C5 Other NG 49 49 FC KINGS CA PGE Lemoore-Henrietta 115kV line 4/1/2014 4/1/2014 In Progress
938 4/2/2012 4/2/2012 Withdrawn C5 RE NG 300 300 FC KERN CA SCE Windhub 230 kV bus 6/1/2016 6/1/2016
939 3/13/2012 4/2/2012 Withdrawn C5 CC NG 1902.9 1902.9 FC LOS ANGELES CA SCE Alamitos Switching Station 230kV 11/1/2025 11/1/2025
940 4/2/2012 4/2/2012 Withdrawn C5 PV S 238 238 FC HYDER AZ SDGE Hassayampa-North Gila 500kV Line 7/1/2014 7/1/2014
941 3/13/2012 4/2/2012 Withdrawn C5 CT NG 475.72 475.71 FC LOS ANGELES CA SCE
Redondo Beach Switching Station
230kV 1/1/2019 1/1/2019 Complete
942 3/29/2012 4/2/2012 Withdrawn C5 PV S 250 250 FC KERN CA SCE Kramer Substation 220kV bus 4/30/2016 4/30/2016 Complete
943 4/15/2013 4/30/2013 Withdrawn C6 PV S 50 50 FC KERN CA PGE Lerdo 115 kV Substation 12/1/2015 12/1/2015 Complete
944 4/15/2013 4/30/2013 Withdrawn C6 PV S 20 20 FC SAN DIEGO CA SDGE Valley Center 69kv Sub 8/1/2015 7/1/2015 Complete In Progress
947 4/24/2013 4/30/2013 Withdrawn C6 PV S 120 120 FC TULARE CA PGE Olive Substation 115 kV 12/1/2017 12/1/2017 In Progress
948 4/29/2013 4/30/2013 Withdrawn C6 PV S 20 20 FC SAN DIEGO CA SDGE Border 69 KV Substation 8/1/2015 8/1/2015 In Progress
949 4/29/2013 4/30/2013 Withdrawn C6 PV S 20 20 FC SAN DIEGO CA SDGE Warners 69kV line 8/1/2015 8/1/2015
950 4/29/2013 4/30/2013 Withdrawn C6 PV S 200 200 FC SAN BERNARDINO CA SCE Kramer Substation 230kV 10/1/2016 10/1/2016 In Progress
951 4/29/2013 4/30/2013 Withdrawn C6 PV S 20 20 FC ALAMEDA CA PGE Vasco 60kV Substation 8/1/2015 8/1/2015 In Progress
956 4/30/2013 4/30/2013 Withdrawn C6 WT W 65 65 FC SOLANO CA PGE
VACA-VACAVILLE-JAMESON-
NORTH TOWER 115KV 12/31/2016 12/31/2016 In Progress
957 4/30/2013 4/30/2013 Withdrawn C6 RE NG 205 205 FC SAN DIEGO CA SDGE Otay Mesa Substation 230kV 6/1/2017 6/1/2017 Complete
958 4/30/2013 4/30/2013 Withdrawn C6 CT NG 49.9 49.9 FC SAN DIEGO CA SDGE 69kV bus of the El Cajon Sub 1/3/2015 1/3/2015
959 4/30/2013 4/30/2013 Withdrawn C6 PV S 30 30 FC SAN DIEGO CA SDGE
Crestwood-Boulevard East 69kV
line 12/31/2016 12/31/2016 In Progress
960 4/30/2013 4/30/2013 Withdrawn IC Request C6 CC NG 59.328 59.32 FC ORANGE CA SCE
Huntington Beach Switching Station
230kV 6/1/2020 1/30/2023 Complete In Progress
962 4/30/2013 4/30/2013 Withdrawn C6 H WTR 15.5 15.5 FC PLACER CA PGE Halsey Substation 60Kv 1/15/2017 1/15/2017 Complete
964 4/30/2013 4/30/2013 Withdrawn C6 Other NG 47.821 47.82 FC KERN CA PGE Arco-Twisselman 70 kV Line 3/1/2017 3/31/2017 In Progress
966 4/30/2013 4/30/2013 Withdrawn C6 Other NG 47.821 47.82 FC KERN CA PGE Midway-Midsun 115 kV line 3/31/2017 3/31/2017 In Progress
969 4/30/2013 4/30/2013 Withdrawn C6 CT NG 110 110 FC SAN DIEGO CA SDGE Otay Mesa Switchyard 230kV 4/1/2017 4/1/2017 Complete
973 4/30/2013 4/30/2013 Withdrawn C6 PV S 150 150 FC CLARK NV SCE Primm Substation 230kV 12/31/2016 12/31/2016
974 4/30/2013 4/30/2013 Withdrawn C6 WT W 150 150 FC KINGS CA PGE Morrow Bay-Gates 230 kV Line 12/31/2016 12/31/2016 In Progress
975 4/30/2013 4/30/2013 Withdrawn C6 PV S 20 20 FC STANISLAUS CA PGE
Salado- Newman 60 kV Line #1,
Pole No. 3/13 12/31/2016 1/30/2016 Complete
976 4/30/2013 4/30/2013 Withdrawn C6 WT W 60 60 FC BUTTE CA PGE TABLE MTN-RIO OSO 230 KV Line 12/31/2016 12/31/2016 In Progress
977 4/30/2013 4/30/2013 Withdrawn C6 CC NG 778 778 FC VENTURA CA SCE Santa Clara Substation 230kV bus 6/1/2019 6/1/2019 In Progress
978 4/30/2013 4/30/2013 Withdrawn C6 CT NG 99 99 FC SAN DIEGO CA SDGE
Avocado-Monserate 69kV line
approx 2.5 mile from Monserate 5/15/2016 5/15/2016
979 4/30/2013 4/30/2013 Withdrawn C6 CT NG 99 99 FC SAN DIEGO CA SDGE Pendleton Sub 5/15/2016 5/15/2016
980 4/30/2013 4/30/2013 Withdrawn C6 CT NG 200 200 FC SAN DIEGO CA SDGE San Luis Rey-Pendleton 69kV line 5/15/2017 5/15/2017
981 4/30/2013 4/30/2013 Withdrawn C6 CT NG 200 200 FC VENTURA CA SCE Goleta Substation 220kV bus 5/15/2018 5/15/2018
982 4/30/2013 4/30/2013 Withdrawn C6 CT NG 49.9 49.9 FC SAN DIEGO CA SDGE San Luis Rey-Stuart 69kV line 5/15/2016 5/15/2016
983 4/30/2013 4/30/2013 Withdrawn C6 CT NG 200 200 FC LOS ANGELES CA SCE Walnut Substation 230kV 5/15/2017 5/15/2017
984 4/30/2013 4/30/2013 Withdrawn C6 CT NG 344 344 FC IMPERIAL CA SDGE Imperial Valley Sub 230kV 1/1/2018 1/1/2018
985 4/30/2013 4/30/2013 Withdrawn C6 PV S 150 150 FC IMPERIAL CA SDGE Imperial Valley 230 kV bus 12/31/2016 12/31/2016 In Progress
986 4/30/2013 4/30/2013 Withdrawn C6 PV S 245 245 FC KERN CA SCE Kramer Substation 230kV 8/1/2015 11/1/2016 In Progress
California ISO Public Page 23 of 27
Report Run Date: 6/3/2016
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue
DateApplication Status
Reason for
Withdrawal
Study
Process
Ty
pe
-1
Ty
pe
-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal Full
Capacity,
Partial or
Energy Only
(FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line
Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Withdrawn
Study AvailabilityGenerating Facility Net MWs Location Point of Interconnection
987 4/30/2013 4/30/2013 Withdrawn C6 PV S 20 20 FC SAN LUIS OBISPO CA PGE SLO to Oceano 115kV line 8/1/2015 8/1/2015 In Progress
989 4/30/2013 4/30/2013 Withdrawn C6 PV S 20 20 FC SAN JOAQUIN CA PGE Kasson-Manteca 60kV 8/1/2015 5/1/2018 Complete Complete
991 4/30/2013 4/30/2013 Withdrawn C6 CC NG 1047 1047 FC LOS ANGELES CA SCE Rio Hondo Substation 230kV 1/1/2019 1/1/2019 Complete
992 4/30/2013 4/30/2013 Withdrawn C6 PV S 20 20 FC SUTTER CA PGE East Nicolaus 60 kV substation 8/1/2015 8/1/2015 Complete Complete
995 4/30/2013 4/30/2013 Withdrawn C6 PV S 150 150 FC KINGS CA PGE Gates-Midway 230kV line 6/1/2016 6/1/2016
996 4/30/2013 4/30/2013 Withdrawn C6 PV S 150 150 FC KERN CA PGE
Midway- Wheeler Ridge 230 kV line
tap via .5 mile gen tie 6/1/2016 6/1/2016
997 4/30/2013 4/30/2013 Withdrawn IC Request C6 PV S 16 16 FC SONOMA CA PGE
Monte Rio-Fulton 60 kV
transmission line 6/30/2015 9/15/2015 Complete Complete
998 4/30/2013 4/30/2013 Withdrawn C6 ST S 300 300 FC MARICOPA AZ SDGE
Proposed switch station on the
Hassayama-North Gila Bend 500 kV
line 4/1/2018 4/1/2018 In Progress
999 4/30/2013 4/30/2013 Withdrawn C6 WT W 250 250 FC KERN CA PGE Caliente Switching Station 230 kV 1/1/2017 1/1/2017
1000 4/30/2013 4/30/2013 Withdrawn C6 CC Other 300 300 FC KERN CA PGE Midway-Wheeler Ridge 230 kV Line 1/1/2019 1/1/2019 Complete
1001 4/30/2013 4/30/2013 Withdrawn C6 PV S 20 20 FC KINGS CA PGE Henreitta-GWF 115kV Line 10/1/2016 10/1/2016 Complete
1003 4/30/2013 4/30/2013 Withdrawn C6 CT NG 86 86 FC KERN CA SCE Vestal-Magunden #2 220kV line 1/1/2017 1/1/2017 Complete
1004 12/24/2013 1/23/2014 Withdrawn FT PV S 5 5 EO KERN CA SCE Highwind Substation 220kV 10/31/2014 10/31/2014
1006 3/28/2014 3/28/2014 Withdrawn IC Request ISP ST G 5 5 EO CHURCHILL NV SCE Control Substation 115kV 10/1/2014 10/1/2014 In Progress
1007 4/30/2014 4/30/2014 Withdrawn C7 STR BAT 20 20 FC SANTA CLARA CA PGE Los Esteros Substation 115kV 3/1/2019 1/1/2020 In Progress
1008 4/29/2014 4/30/2014 Withdrawn C7 CT NG 309 309 FC CONTRA COSTA CA PGE Pittsburg Substation 115 kV 6/1/2017 6/1/2017
1009 4/29/2014 4/30/2014 Withdrawn C7 STR BAT 20 20 FC CONTRA COSTA CA PGE Pittsburg Substation 60kV 6/1/2016 6/1/2016
1012 4/30/2014 4/30/2014 Withdrawn C7 STR BAT 20 20 FC SANTA CLARA CA PGE FMC Substation 115 kV 6/1/2016 6/1/2016
1013 4/30/2014 4/30/2014 Withdrawn C7 H WTR 15.5 15.5 FC PLACER CA PGE Halsey Substation 60 kV 1/15/2018 1/15/2018 In Progress
1015 4/30/2014 4/30/2014 Withdrawn C7 STR BAT 20 20 FC PLACER CA PGE Pleasant Grove Substation 115 kV 12/31/2016 12/31/2016 In Progress
1017 4/30/2014 4/30/2014 Withdrawn C7 STR BAT 50 50 FC ALAMEDA CA PGE Newark Substation 115 kV 1/1/2019 1/1/2019
1018 4/30/2014 4/30/2014 Withdrawn C7 STR BAT 50 50 FC SAN MATEO CA PGE Las Positas 60 kV 1/1/2019 1/1/2019 Complete
1019 4/30/2014 4/30/2014 Withdrawn C7 STR BAT 40 40 FC EL DORADO CA PGE Shingle Springs Substation 115kV 12/31/2016 12/31/2016 In Progress
1020 4/28/2014 4/30/2014 Withdrawn C7 WT W 50 50 FC SOLANO CA PGE
Vaca-Vacaville-Jameson-North
Tower 115kV 12/31/2017 12/31/2017 In Progress
1022 4/30/2014 4/30/2014 Withdrawn C7 STR BAT 30 30 FC ALAMEDA CA PGE Patterson Pass 230 kV Substation 12/1/2016 12/1/2016
1023 4/30/2014 4/30/2014 Withdrawn C7 STR BAT 20 20 FC SANTA CLARA CA PGE Evergreen Substation 60kV 8/1/2016 8/1/2016 Complete
1024 4/30/2014 4/30/2014 Withdrawn C7 STR BAT 30 30 FC SAN JOAQUIN CA PGE Victor Substation 60 kV 12/31/2016 12/31/2016 Complete
1025 4/30/2014 4/30/2014 Withdrawn C7 STR BAT 15 15 FC SOLANO CA PGE Jameson Substation 115 kV 1/1/2017 1/1/2017
1026 4/30/2014 4/30/2014 Withdrawn IC Request C7 STR BAT 25 25 FC SAN JOAQUIN CA PGE Weber Substation 60kV 12/31/2016 12/31/2016 Complete
1033 4/30/2014 4/30/2014 Withdrawn C7 PV S 20 20 FC KERN CA PGE Arco Substation 70 kV 11/1/2016 11/1/2016 Complete Complete
1034 4/30/2014 4/30/2014 Withdrawn C7 PV S 20 20 FC KINGS CA PGE Waukena Substation 115kV 11/1/2016 11/1/2016
1035 4/25/2014 4/30/2014 Withdrawn C7 PV S 20 20 FC KERN CA PGE Arco Substation 70kV 12/1/2017 6/1/2018 Complete
1037 4/28/2014 4/30/2014 Withdrawn C7 ST NG 300 300 FC KERN CA PGE Midway-Wheeler Ridge 230 kV 1/1/2020 1/31/2020 Complete
1039 4/30/2014 4/30/2014 Withdrawn C7 PV S 20 20 FC KERN CA PGE 7th Standard Substation 115 kV 11/1/2016 11/1/2016
1041 4/30/2014 4/30/2014 Withdrawn C7 PV STR S BAT 20 20 20 FC IMPERIAL CA SDGE Imperial Valley Substation 230 kV 6/1/2015 6/1/2015
1042 4/29/2014 4/30/2014 Withdrawn C7 PV S 20 20 FC SAN DIEGO CA SDGE Cameron Substation 69 kV 11/1/2016 11/1/2016
1043 4/29/2014 4/30/2014 Withdrawn C7 PV S 20 20 FC SAN DIEGO CA SDGE Creelman Substation 69 kV 11/1/2016 11/1/2016 In Progress
1044 4/30/2014 4/30/2014 Withdrawn C7 CT STR NG BAT 448 60 508 FC SAN DIEGO CA SDGE Mission-San Luis Rey 230 kV line 6/1/2019 6/1/2019
1046 4/28/2014 4/30/2014 Withdrawn C7 STR BAT 10 10 FC SAN DIEGO CA SDGE East County Substation 138kV 12/15/2016 12/15/2016 In Progress
1049 4/29/2014 4/30/2014 Withdrawn C7 PV S 20 20 FC SAN DIEGO CA SDGE ECO Substation 138kV 11/1/2016 11/1/2016 In Progress
1050 4/29/2014 4/30/2014 Withdrawn C7 PV S 20 20 FC SAN DIEGO CA SDGE Cameron Substation 69kV 11/1/2016 11/1/2016 Complete In Progress
1051 4/30/2014 4/30/2014 Withdrawn C7 STR PV BAT S 30 90 120 FC SAN DIEGO CA SDGE Kearny Substation 69kV 6/1/2019 6/1/2019 In Progress
1052 4/29/2014 4/30/2014 Withdrawn C7 PV S 20 20 FC SAN DIEGO CA SDGE San Ysabel Substation 69kV 11/1/2016 11/1/2016 In Progress
1054 4/30/2014 4/30/2014 Withdrawn C7 STR BAT 150 150 FC SAN DIEGO CA SDGE Miguel Substation 230kV 12/31/2016 12/31/2016
1055 4/30/2014 4/30/2014 Withdrawn C7 STR CT BAT NG 60 384 444 FC SAN DIEGO CA SDGE San Luis Rey Substation 230 kV 6/1/2019 6/1/2019 In Progress
1056 4/30/2014 4/30/2014 Withdrawn C7 PV/STR CT S/BAT BAT 90 448 538 FC SAN DIEGO CA SDGE Talega-Escondido 230kV line 6/1/2019 6/1/2019 Complete
1057 4/30/2014 4/30/2014 Withdrawn C7 CC NG 35 35 FC SAN DIEGO CA SDGE Otay Mesa Switchyard 230 kV 5/1/2016 5/1/2016 Complete
1059 4/30/2014 4/30/2014 Withdrawn C7 STR BAT 20 20 FC SAN DIEGO CA SDGE San Luis Rey Substation 69 kV 1/1/2017 1/1/2017 Complete
1060 4/30/2014 4/30/2014 Withdrawn C7 WT W 160 160 FC SAN DIEGO CA SDGE Boulevard East Substation 138kV 12/31/2017 12/31/2017 Complete
1063 4/29/2014 4/30/2014 Withdrawn C7 PV S 20 20 FC SAN DIEGO CA SDGE Salt Creek Substation 69kV 11/1/2016 11/1/2016 In Progress
1067 4/30/2014 4/30/2014 Withdrawn C7 PV S 100 100 FC NYE NV VEA Gamebird Substation 138kV 12/1/2017 12/1/2017 In Progress
1068 4/30/2014 4/30/2014 Withdrawn C7 PV S 65 65 FC NYE NV VEA Valley Substation 138kV 12/1/2017 12/1/2017 In Progress
1072 4/30/2014 4/30/2014 Withdrawn C7 PV S 100 100 FC RIVERSIDE CA SCE Devers Substation 230kV 11/1/2017 11/1/2017 In Progress
1073 4/30/2014 4/30/2014 Withdrawn C7 CC NG 305 305 FC VENTURA CA SCE Santa Clara Substation 230 kV 3/1/2019 3/1/2019 Complete
1075 4/30/2014 4/30/2014 Withdrawn C7 STR BAT 50 50 FC KERN CA SCE Whirlwind 230kV bus 12/1/2016 12/1/2017 Complete
1077 4/29/2014 4/30/2014 Withdrawn C7 STR BAT 300 300 FC LOS ANGELES CA SCE Alamitos Switching Station 220kV 3/1/2018 3/1/2018 Complete
1079 4/17/2014 4/30/2014 Withdrawn C7 CC NG 378 378 FC ORANGE CA SCE Ellis-Santiago line 220kV 7/1/2018 7/1/2018
1080 4/17/2014 4/30/2014 Withdrawn C7 CT STR NG BAT 507.4 118 625.4 P ORANGE CA SCE Ellis-Santiago line 220kV 3/1/2018 3/1/2018 In Progress
1082 4/29/2014 4/30/2014 Withdrawn C7 CC NG 378 378 FC ORANGE CA SCE Johanna Switchyard 230 kV 7/1/2018 7/1/2018
1083 4/29/2014 4/30/2014 Withdrawn C7 CT STR NG BAT 507.4 118 625.4 P ORANGE CA SCE Johanna Switchyard 230kV 7/1/2018 7/1/2018 In Progress
California ISO Public Page 24 of 27
Report Run Date: 6/3/2016
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue
DateApplication Status
Reason for
Withdrawal
Study
Process
Ty
pe
-1
Ty
pe
-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal Full
Capacity,
Partial or
Energy Only
(FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line
Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Withdrawn
Study AvailabilityGenerating Facility Net MWs Location Point of Interconnection
1084 4/30/2014 4/30/2014 Withdrawn C7 CT NG 220 220 FC ORANGE CA SCE Johanna Substation 230 kV 3/1/2019 3/1/2019 In Progress
1085 4/30/2014 4/30/2014 Withdrawn C7 CT STR NG BAT 455 50 910 FC SAN BERNARDINO CA SCE Mira Loma Substation 220kV Tap 6/1/2020 6/1/2020
1087 4/28/2014 4/30/2014 Withdrawn C7 CT NG 700 700 FC ORANGE CA SCE Johanna Substation 230 kV 12/31/2018 12/31/2018 Complete
1088 4/30/2014 4/30/2014 Withdrawn C7 STR Ct/ST BAT NG 50 860 910 FC RIVERSIDE CA SCE Chino-Viejo 220 kV line 6/1/2019 6/1/2019 In Progress
1089 4/30/2014 4/30/2014 Withdrawn C7 PV S 89.95 89.95 FC SAN BERNARDINO CA SCE Desert View Substation 220kV 8/15/2018 4/30/2018 Complete
1090 6/11/2014 6/11/2014 Withdrawn FT STR S 2 2 EO IMPERIAL CA SDGE Imperial Valley 230kV sub 1/15/2015 1/15/2015
1091 5/22/2014 5/14/2014 Withdrawn Failure to cure a deficiency FT PV S 1.5 1.5 EO FRESNO CA PGE Gates-Coalinga 70 kV Line #1 2/15/2015 8/1/2015
1093 11/4/2014 10/31/2014 Withdrawn FT STR BAT 5 5 EO SAN DIEGO CA SDGE Miguel 69kV 3/1/2016 3/1/2016 Offered
1094 2/19/2015 3/26/2015 Withdrawn IC Request ISP STR BAT 25 25 FC YOLO CA PGE
115kV tap on Woodland-Davis
115kV line 9/1/2017 9/1/2017 In Progress
1095 2/5/2015 4/7/2015 Withdrawn IC Request FT PV S 5 5 EO NYE NV VEA Valley Substation 138kV 12/1/2015 12/1/2015
1099 4/29/2015 4/30/2015 Withdrawn C8 STR BAT 103 103 FC CONTRA COSTA CA PGE Du Pont Substation 60 kV Bus 12/31/2021 12/31/2021 In Progress
1100 4/29/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 412 412 FC SAN MATEO CA PGE Martin Substation 115 kV Bus 12/31/2021 12/31/2021
1101 4/30/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 20 20 FC SAN MATEO CA PGE Cooley Landing 60kV Substation 9/1/2017 6/1/2018 In Progress
1102 4/30/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 20 20 FC CONTRA COSTA CA PGE Pittsburgh - GWF Tap #1 60kV 6/1/2018 6/1/2018 In Progress
1104 4/29/2015 4/30/2015 Withdrawn IC Request C8 ST G 0.1 74 FC SONOMA CA PGE
Geysers 17-Fulton 230kV
transmission line 3/3/2017 3/3/2017 In Progress
1105 4/30/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 20 20 FC CONTRA COSTA CA PGE
230 kV bus at the Kelso Substation
via the Mariposa Energy 230 kV tie
line 12/1/2018 8/1/2021 In Progress
1107 4/30/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 10 10 FC SONOMA CA PGE Molino Substation 60kV bus 3/1/2020 3/1/2020 Complete
1110 4/29/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 156 153 FC ALAMEDA CA PGE Oakland J 115kV substation bus 12/31/2021 12/31/2021
1112 4/30/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 10 10 FC MENDOCINO CA PGE Point Arena Substation 60kV 3/1/2020 3/1/2020 Complete
1114 4/30/2015 4/30/2015 Withdrawn IC Request C8 WT W 52.5 52.5 FC ALAMEDA CA PGE
Tesla to Delta Switching Yard at the
Altamont-Midway Substation 6/30/2017 6/30/2017 Complete
1115 4/30/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 10 10 FC EL DORADO CA PGE Shingle Springs Substation 115 kV 3/1/2020 3/1/2020 Complete
1118 4/29/2015 4/30/2015 Withdrawn C8 PV S 300 300 FC STANISLAUS CA PGE Westley-Quinto 230 kV line 12/1/2016 9/1/2018 In Progress
1119 4/30/2015 4/30/2015 Withdrawn IC Request C8 PV S 60 60 FC FRESNO CA PGE Mendota 115kV substation 6/1/2021 6/1/2021 In Progress
1123 4/30/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 50 50 FC FRESNO CA PGE
Panoche-Schindler #2 115 kV Line
via the Cheney #1 Tap 115 kV Line 5/1/2018 5/1/2018 In Progress
1124 4/30/2015 4/30/2015 Withdrawn IC Request C8 PV S 247 247 FC FRESNO CA PGE Helm-Firebaugh 230kV line 12/31/2018 12/31/2018
1125 4/22/2015 4/30/2015 Withdrawn IC Request C8 PV S 50 50 FC FRESNO CA PGE Coalinga No 1 Substation 70kV 12/31/2018 12/31/2018
1126 4/30/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 25 25 FC KINGS CA PGE Henrietta Substation - 70kV 5/1/2020 5/1/2020 In Progress
1132 4/30/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 10 10 FC FRESNO CA PGE Kearney Substation 70kV bus 3/1/2020 3/1/2020 Complete
1133 4/30/2015 4/30/2015 Withdrawn IC Request C8 PV S 50 50 FC MERCED CA PGE Cantua 115kV substation 6/1/2020 6/1/2020 In Progress
1134 4/24/2015 4/30/2015 Withdrawn IC Request C8 PV S 40 40 FC FRESNO CA PGE
Gates-Coalinga #1 70kV line at
Jacalito 12/31/2018 12/31/2018
1140 4/30/2015 4/30/2015 Withdrawn IC Request C8 PV S 50 50 FC MERCED CA PGE Le Grand Substation 115kV 6/1/2020 6/1/2020 Complete
1142 4/29/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 206 206 FC KERN CA PGE Magunden 115 kV Substation 12/31/2021 12/31/2021 In Progress
1144 4/28/2015 4/30/2015 Withdrawn IC Request C8 PV S 120 120 FC KINGS CA PGE Henrietta Substation 70kV 11/1/2020 11/1/2020 In Progress
1145 4/30/2015 4/30/2015 Withdrawn IC Request C8 PV S 200 200 FC KERN CA PGE Arco 230kV substation 12/31/2018 12/31/2018
1147 4/30/2015 4/30/2015 Withdrawn IC Request C8 PV S 80 80 FC KERN CA PGE Famoso Substation 115kV 12/31/2018 12/31/2018 In Progress
1148 4/29/2015 4/30/2015 Withdrawn IC Request C8 PV S 21.7 21.7 FC KERN CA PGE Arco-Polonio Pass 70 kV line 3/31/2018 3/31/2018 In Progress
1150 4/22/2015 4/30/2015 Withdrawn IC Request C8 PV S 20 20 FC KERN CA PGE Blackwell Substation 70kV 12/31/2018 12/31/2018
1151 4/30/2015 4/30/2015 Withdrawn IC Request C8 PV S 100 100 FC KERN CA PGE Semitropic Substation 115kV 12/31/2018 12/31/2018
1152 4/30/2015 4/30/2015 Withdrawn IC Request C8 PV S 20 20 FC KERN CA PGE Maricopa-Copus 70kV line 12/31/2017 12/31/2017 Complete
1153 4/27/2015 4/30/2015 Withdrawn IC Request C8 Other WTR 650 650 FC SAN LUIS OBISPO CA PGE Morro Bay PP 230 kV 3/31/2020 3/31/2020 In Progress
1155 4/29/2015 4/30/2015 Withdrawn IC Request C8 PV STR S BAT 77.3 77.5 77.5 FC KERN CA PGE Eastshore 115kV Substation 12/31/2018 12/31/2018
1156 4/30/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 42 42 FC SANTA BARBARA CA PGE Santa Maria Cogen 115 kV Tap 5/1/2018 5/1/2018 In Progress
1160 4/29/2015 4/30/2015 Withdrawn IC Request C8 PV S 20 20 FC KERN CA PGE Arco - Polonio Pass 70kV line 3/31/2018 3/31/2018 In Progress
1161 4/29/2015 4/30/2015 Withdrawn IC Request C8 STR PV BAT S 180.5 179.8 180.5 FC KERN CA PGE Wheeler Ridge-Midway 230kV line 4/1/2019 4/1/2019
1164 4/30/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 20 20 FC KERN CA PGE 115kV Rosedale Substation 12/1/2018 8/1/2021 In Progress
1167 4/30/2015 4/30/2015 Withdrawn IC Request C8 STR PV BAT S 20 64 84 FC SAN DIEGO CA SDGE
0.2 miles from Monsrate Tap on the
Monsrate Tap-Pala 69 kV line 12/31/2017 12/31/2017
1168 4/29/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 40 40 FC SAN DIEGO CA SDGE Encina Substation 138 kV 12/31/2019 12/31/2019 In Progress
1172 4/30/2015 4/30/2015 Withdrawn IC Request C8 STR Other 110 110 FC SAN DIEGO CA SDGE Otay Mesa Substation 230 kV bus 11/30/2019 11/30/2019
1173 4/30/2015 4/30/2015 Withdrawn IC Request C8 STR PV BAT S 20 64 84 FC SAN DIEGO CA SDGE
0.2-mile from Moro hill tap on the
Moro Hill Tap - Monserate 69 kV
line 12/31/2017 12/31/2017
1176 4/20/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 25 25 FC SAN DIEGO CA SDGE Otay Mesa Switchyard 230 kV 7/31/2018 7/31/2018
1177 4/17/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 100 100 FC SAN DIEGO CA SDGE Pala 69kV Substation 5/1/2019 5/1/2019
1178 4/17/2015 4/30/2015 Withdrawn IC Request C8 CT NG 507.4 507.4 FC SAN DIEGO CA SDGE Talega-Escondido 230 kv line 3/1/2019 3/1/2019
1179 4/30/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 30 30 FC SAN DIEGO CA SDGE Miguel Substation 69kV bus 7/31/2017 7/31/2019 In Progress
1180 4/30/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 50 50 FC SAN DIEGO CA SDGE
New substations San Luis-Melrose
69 kV 11/15/2019 11/15/2019 In Progress
California ISO Public Page 25 of 27
Report Run Date: 6/3/2016
Deliverability
Status
Queue
Position
Interconnection
Request
Receive Date
Queue
DateApplication Status
Reason for
Withdrawal
Study
Process
Ty
pe
-1
Ty
pe
-2
Fu
el-
1
Fu
el-
2
MW
-1
MW
-2
MW
To
tal Full
Capacity,
Partial or
Energy Only
(FC/P/EO)
County State Utility Station or Transmission Line
Proposed
On-line Date
(as filed with
IR)
Current
On-line
Date
Feasibility
Study or
Supplemental
Review
System Impact
Study or
Phase I Cluster
Study
Facilities Study (FAS)
or
Phase II Cluster Study
Optional
Study
(OS)
Interconnection
Agreement
Status
Report Run Date: 06/03/2016
The California ISO Controlled Grid Generation Queue - CISO Withdrawn
Study AvailabilityGenerating Facility Net MWs Location Point of Interconnection
1181 4/30/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 200 200 FC SAN DIEGO CA SDGE Otay Mesa Substation 230 kV Bus 1/1/2018 1/1/2018
1182 4/30/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 5 5 FC SAN DIEGO CA SDGE
Border Substation 69kV Alta and
Otay Mesa Road 8/8/2017 8/8/2017
1183 4/30/2015 4/30/2015 Withdrawn IC Request C8 PV STR S BAT 28 9 37 FC SAN DIEGO CA SDGE Pala 69kV substation 12/31/2017 12/31/2017
1184 4/30/2015 4/30/2015 Withdrawn IC Request C8 PV S 200 200 FC YUMA AZ SDGE Hoodoo Wash Switchyard 500 kV 12/1/2018 12/1/2018 In Progress
1185 4/20/2015 4/30/2015 Withdrawn IC Request C8 CT NG 110 110 FC SAN DIEGO CA SDGE Otay Mesa Switchyard 230 kV 12/15/2018 12/15/2018
1186 4/30/2015 4/30/2015 Withdrawn IC Request C8 CT STR NG BAT 462 61 523 FC SAN DIEGO CA SDGE
New Substation to Loop in TL2330
Talega- Escondido 230kV line 6/30/2018 6/30/2018 In Progress
1188 4/30/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 25 25 FC SAN DIEGO CA SDGE Pomerado Substation 69 kV 11/15/2019 11/15/2019
1190 4/30/2015 4/30/2015 Withdrawn IC Request C8 ST NG 300 300 FC MARICOPA AZ SDGE Hassayampa 500 kV Substation 9/30/2020 9/30/2020
1193 4/29/2015 4/30/2015 Withdrawn IC Request C8 PS WTR 1408 1408 FC RIVERSIDE CA SCE Red Bluff Substation 500 kV 1/1/2022 1/1/2022 In Progress
1195 4/30/2015 4/30/2015 Withdrawn IC Request C8 CT NG 49 49 FC RIVERSIDE CA SCE
Blythe Energy Park #1 (BEP1)
230kV 6/1/2020 6/1/2020
1199 4/30/2015 4/30/2015 Withdrawn IC Request C8 PV S 108.8 108.8 EO RIVERSIDE CA SCE Red Bluff 220kV bus 12/31/2019 12/31/2019
1202 4/30/2015 4/30/2015 Withdrawn IC Request C8 STR Other 140 140 FC SAN BERNARDINO CA SCE Kramer Substation 230kV bus 8/31/2020 9/1/2021 In Progress
1203 4/30/2015 4/30/2015 Withdrawn IC Request C8 PV STR S BAT 136.75 30.8 167.55 FC SAN BERNARDINO CA SCE Calcite Substation gen-tie at 230KV 5/1/2018 5/31/2019 In Progress
1205 4/29/2015 4/30/2015 Withdrawn IC Request C8 STR PV BAT S 66.7 66.5 66.7 FC SAN BERNARDINO CA SCE Coolwater 115kV Substation 12/31/2018 12/31/2018 Complete
1210 4/29/2015 4/30/2015 Withdrawn IC Request C8 STR BAT 420 412 FC TULARE CA SCE Springville Substation 220kV bus 12/31/2021 12/31/2021 In Progress
1213 4/30/2015 4/30/2015 Withdrawn IC Request C8 PV S 100 100 FC KERN CA SCE Whirlwind 230 kV substation 6/30/2018 6/30/2018
1220 4/29/2015 4/30/2015 Withdrawn IC Request C8 STR PV BAT S 103 102.5 103 FC IMPERIAL CA OTHER Liebert 230kV Switchyard 12/31/2018 12/31/2018 In Progress
California ISO Public Page 26 of 27
The California ISO Controlled Grid
Generation queue - IR Submittal Results
Report Run Date: 6/3/2016
YearStudy
Process
IRs
SubmittedIRs Validated
IRs Rejected or
Failed
Screening/Test
Reasons for Failure
2015 Cluster 8 131 131 0
2015 ISP 2 2 0
2015 FT 3 2 1 IC did not cure IR deficiences
California ISO Public Page 27 of 27