Upload
littlegate-publishing
View
255
Download
1
Tags:
Embed Size (px)
DESCRIPTION
Corporate Brochure
Citation preview
WRITTEN BY JACK SLATER
Providing one of the most important gateways to Africa and The Middle East, Cairo International Airport plays a vital role in the global transport of peoples and cargo. Located at the crossroads of Africa, the Middle East, Europe and the Persian Gulf, it plays a role as a regional hub for millions of visitors to Egypt.
SAND AND
Skies
To this end, they have recently finished the projects upon Runway
05R/23L and the new Control Tower to accommodate the increase
of future traffic development. Additional projects include enterting
the final stage of completion of the Seasonal Terminal aimed at
accommodating 3.5 million passengers per year, a three thousand
capacity Multi Story Carpark with the Automated people Mover for
transporting two thousand passengers/hour from T1 to T3. Further
ongoing developments include a five star Hotel and an Extended
Metro Line linking Cairo Airport with Giza.
Cairo International is the second busiest airport in Africa after
OR Tambo International Airport in Johannesburg, South Africa. Over
forty five passenger airlines use Cairo airport (including charter
airlines) and nine cargo airlines. EgyptAir is the largest operator at
the airport.
It is administered together with other airport facilities by
EHCAAN (Egyptian Holding Company for Airports and Air
Navigation). Management is through contractual arrangements,
currently held by Fraport AG. Started as a naval base, it was after the
Second World War that Cairo Airport started to take shape. After the
American Forces commanding the base had left after the end of the
war, it was taken over by the Civil Aviation Authority for global civil
aviation purposes but it wasn’t until 1963 that Cairo International
Airport earned its title after replacing Heliopolis, the old airport,
located along the Hike-Step region in the eastern part of Cairo.
By 2009 Cairo Airport was able to serve about 14.4 million
passengers, a sizeable percentage increase from the previous year.
It also handled about 143,000 movements of aircrafts in the same
year, also a strategic increase from the previous year. The tonnage of
airfreight passing through the airport was about 275,000. Amidst this
statistics, Cairo Airport still comes second in Africa in terms of busy
airport activity.
There are more than 65 airlines using the airport, as well as nine
cargo and charter airline. EgyptAir has the largest chunk of operations
in the airport taking up to 61 percent of all departure slots. After
EgyptAir was assimilated into the lucrative Star Alliance carrier, Cairo
Airport has been poised to become the chief hub of major destinations
from Africa, Europe and the Middle East, since it has A380 facilities
among other major utilities.
CAIRO AIRPORT
The Ministry of Civil Aviation along with the Egyptian Holding Company for Airports and Air Navigation and the Cairo Airport Company have embarked on a long-term development plan to upgrade and modernize its facilities, increase its capacities and set a new standard of service in the region.
Cairo Airport’s mission is to become a passenger and cargo
hub for the Middle East North Africa region (MENA).
The plan is to achieve the top levels of service by rising
to global competitive levels and gradually applying air transport
liberalization policies. Part of the airport’s strategy includes working
closely with Egypt Air, which joined the Star Alliance group, as well
as its partner airlines. The openings of the 211,000 m2 Terminal
3 doubled the capacity of the current facilities to 22 million annual
passengers.
2002 saw the beginning of the ambitious plan to upgrade Egypt’s
civil aviation facilities which continues with the renovation of Terminal
One’s VIP Lounges and Terminal Two was recomissioned. The aim is
to make them ready to host 8.5 million international passengers per
year.
ARINC_Littlegate-Endeavour_halfpage ad.pdf 1 06/01/2014 16:23
ProjectsA number of projects are underway to enable Cairo to compete
with Dubai as a transit destination, according to the Minister of Civil
Aviation Abdel Aziz Fadhel.
Speaking at the Euromoney Conference 2013, Fadhel said a 350-
room hotel attached to the Cairo International Airport is currently
under construction and is part of the ministry’s EGP 6bn backlog.
“Such a hotel will help promote the airport as a transit alternative”
to Dubai and boost the number of transit travelers amounting to
currently 30% of total arrivals”, he said.
Fadhel added that expansions to the airport with the goal of
increasing its capacity from the current annual 21 million passengers
are in the pipeline, as well as an unspecified “mega-project” to be set
up over a 10 million square metre area that he said would create
100,000 new jobs.
New Attractions And The 50 Year Anniversary – Golden Jubilee
To celebrate its half centinneriary the Ministry of Civil Aviation &
Cairo Airport company celebrated with The Golden Jubilee for Cairo
Airport Company. This was on the occasion of the 5th anniversary for
Cairo Airport Company that was established in 1963.
Another attraction for both leisure and business travelers is the
new ‘5 Star Hotel’ which has been built in front the new terminal
and linked with an air-conditioned, 230m long skyway that is also
equipped with moving walkway/travelators. The Hotel will offer, on a
total of 10,000 sqm of land assigned for the facility, opportunities for
Conferences, Business Meetings and simply the highest comfort. The
Hotel will include 350 Rooms and will be managed by “Le Meridien.
In addition to offering more choice and flexibility ARINC’s
unrivalled technical expertise and customer-first policy has
led to numerous Airport Systems integration contracts in the
Middle East where one of its biggest projects was Terminal
3 at Cairo International Airport. The company delivered,
installed and integrated a suite of 14 specialist information-
handling systems, many of which were later extended to
the new Seasonal Flights Terminal and Automated People
Mover (APM) Stations.
In partnership with AVIT, ARINC expanded its customer base
in 2013 with the award of an Egyptian Airports Company
contract covering five Regional Airports including Sharm El
Sheikh, Luxor, Borg El Arab, Aswan and Abu Simbel.
www.littlegatepublishing.com
SAND AND
Skies
CAIRO AIRPORT
0020226966811
WWW.CAIRO-AIRPORT.CC