About Cadiz
☀ California NR company
founded in 1983.
☀ Founders identified
aquifer in Mojave Desert
using NASA data.
☀ 45,000 acres & water
rights.
☀ 20 years of organic
farming
2
Cadiz Location: 200 Miles Northeast of Los Angeles
aa
5
15 10
5
15
40
8
Los Angeles
San Diego
Las Vegas
Barstow
Fresno
Bakersfield
San Bernardino
SantaBarbara
Yuma
Kingman
Needles
Laughlin
El Centro
Cadiz Project Site
3
Colorado RiverAqueduct
Phase 1: Conservation & Supply
✷ Intercept 32,500 AFY before evaporates.
✷ Conserve 1.6 MAF of water that would otherwise evaporate.
✷ Create new 50-year supply for 400,000 people throughout So. Cal. via Public Water Providers
✷ In-lieu storage up to 150,000 AF in wet yrs.
Permitted Infrastructure
✷ Complete construction of well-field (20+ wells), natural gas power source and ancillary facilities.
✷ Construct 43-mile pipeline within existing active railroad to avoid adverse impacts.
✷ Connect to existing Colorado River Aqueduct to bring water to So. Cal.
Put water that otherwise would evaporate to beneficial use throughout
Southern California:
Facilities & Location
5
Wellfield Area
Colorado River
Aqueduct Tie-In
RR ROW
Pipeline Route
Fenner Gap
New York and
Providence Mountains
(Source of Rainwater)
Bonanza Spring
11 miles
1,000 ft.You Are
Here
Dry Lakes
☀ Import surplus water for storage in the aquifer system when available
and return to agencies when needed.
Phase 2 – Imported Water Storage
6
☀ Total storage capacity = 1 million
acre-feet.
☀ Programmatic EIR approved;
additional permitting necessary.
☀ 220 miles of existing natural gas
pipeline to be re-purposed.
☀ Construction of recharge basins
Overview of Watershed
8
☀ 1,300 sq. mile
watershed area, size of
Rhode Island.
☀ 17-34 MAF of water in
aquifer (in alluvium),
comparable to Lake
Mead.
☀ Excellent water quality,
low TDS (avg. 300).
☀ Natural recharge =
32,000 AF/year.
☀ 1 MAF storage capacity.
Cadiz Area Hydrology
☀ Closed basin watershed system, not connected to Colorado River.
☀ Precipitation in 7,000-ft. mnts. percolates down through porous soils, moves downhill to aquifer.
☀Water flows through alluvial, carbonate, and fractured granitic rock.
☀Water table deep below ground surface; 700 ft bfs at wellfield.
☀ Groundwater moves very slowly down mountains to aquifer then on to dry lakes where turns saline.
☀ Finally, it evaporates at dry lakes, forever wasted.
Conserving Water for Beneficial Use
☀ Dry lakes act as
pump, moving
water from
ground to air
(evaporation) …
☀ Project will shift
pumping from dry
lakes to Project
wellfield and put
that water to
beneficial use.
☀ Used USGS hydrology model to determine
aquifer’s scale, productivity, recharge rate.
☀ Examined topography, precip./temp., soils,
geology, and vegetation.
☀ New technical studies:
✦ Groundwater Modeling & Impact Analysis
✦ Springs Studies
✦ Effects on Cadiz & Bristol Playas
✦ Biological Resource Assessment
✦ Estimated Evaporation Study
☀ 10 new wells at Project site drilled to depths of
up to 2,000 ft. bgs.
Extensive Study
Modeling to Determine Effects of Pumping
☀ To determine potential effects of
pumping on the aquifer and desert
ecosystem, models were run using three
scenarios, assuming three recharge rates:
✦ 32,000 AFY (expected)
✦ 16,000 AFY
✦ 5,000 AFY
☀ For ALL scenarios, NO NEGATIVE IMPACT
on aquifer, flora, fauna, springs, or desert
ecosystem.
PR
OV
ID
EN
CE
MO
UN
TA
INS
GR A N I T E M T N S ,
C L I P P E RM T N S ,
S H I PM T N S ,
MA
RB
LE
MT
N S .
BR ISTOL DRY LAKE
OL
D W
OM
AN
M
TN
S.
BR
IST
OL M
T
NS
.
PI U
TE
MT
NS
.
FENNER GAP
FE
NN
ER
VA
LL
EY
CADIZ Inc. Agricultural Fields
BU
LL
I ON
MO
UN
TA
INS
CA
LU
ME
T M
TN
S.
IR O N M T N S
CADIZ DRY L AKE
DANBY DRY LAKE
CO X C O M BMT N S
NE W Y OR KMT N S
SH
EE
P H
OL
E M
TN
S
HAC KB ERRY M T NS.
W OODS MTNS.
Cima
Cadiz
Amboy
Essex
Goffs
Kelso
Bagdad
Fenner
Chubbuck
I40
I15
Nat io
nal T
rai ls
29 Palms
Bagdad
Bagdad
Bag
da
d
590000
590000
600000
600000
610000
610000
620000
620000
630000
630000
640000
640000
650000
650000
660000
660000
670000
670000
680000
680000
690000
690000
37
60
00
0
37
60
00
0
37
70
00
0
37
70
00
0
37
80
00
0
37
80
00
0
37
90
00
0
37
90
00
0
38
00
00
0
38
00
00
0
38
10
00
0
38
10
00
0
38
20
00
0
38
20
00
0
38
30
00
0
38
30
00
0
38
40
00
0
38
40
00
0
38
50
00
0
38
50
00
0
38
60
00
0
38
60
00
0
38
70
00
0
38
70
00
0
38
80
00
0
38
80
00
0
38
90
00
0
38
90
00
0
39
00
00
0
39
00
00
0
39
10
00
0
39
10
00
0
Legend
Cadiz Study Area
Interstates
Highways
Roads
Rail Roads
Figure 2-1Overall Cadiz and Fenner Valleys Location Map
I40
I15
Las Vegas
Palm Springs
Twentynine PalmsLos Angeles
San Diego
Arizona
California
NevadaUtah
112°0'0"W
112°0'0"W
116°0'0"W
116°0'0"W
120°0'0"W
120°0'0"W
36°0'0"N 36°0'0"N
34°0'0"N 34°0'0"N
32°0'0"N 32°0'0"N
Projected Coordinate System:
NAD 1983 UTM Zone 11N meters
0 4 82 Miles
0 5 102.5 Kilometers
\\cheron\Projec ts \BrownsteinHyattFarbe\386303Cadiz\GIS\ArcMap\TMFigures\Fig2-1_CADIZ_TM_StudyArea_V3_MR.mxd
Legal Framework
• Project’s proposed extraction and export of water is consistent with all legal principles applicable to water management in California.
• The California Constitution requires maximum reasonable and beneficial use of available groundwater. Article X, Section 2.
• Water Code Section 106 provides a legislative declaration that domestic use is the highest use of water in the State.
• Groundwater may be extracted for off-site appropriative uses so long as there is available groundwater supply that is surplus to the present cumulative needs of overlying owners.
• The Project will not harm any other legal user of water and will not compromise the “No Injury Rule”
☀ Groundwater Stewardship Council: A 13-member unpaid peer
review panel found project can be operated without significant
impacts, May 2011.
☀ CEQA/Environmental Impact Report: 18-month public process,
100 day public comment, multiple public meetings, EIR
certified by Santa Margarita Water District in July 2012.
☀ County Groundwater Ordinance: San Bernardino County Board
of Supervisors approved independent groundwater
management plan. October 2012.
Permitting & Third Party Peer Review
15
Groundwater Management PlanApproved & Enforced by San Bernardino County
16
☀ GMMMP protects Mojave Desert flora, fauna, springs, and aquifer.
☀ 40 monitoring features, action criteria, and corrective actions.
☀ Water Quality
☀ Springs
☀ Vegetation
☀ Subsidence
☀ Saline Water Migration
☀ Air Quality (for dust)
☀ Drawdown Maximum = 80 Feet at Wellfield
☀ GMMMP includes action triggers designed to identify potential
impacts before they take effect, and before they are irreversible.
☀ Enforcement by County and SMWD.
☀ Primary Project opponents: the Center for Biological Diversity and Tetra
Technologies Inc. (mining company)
☀ Key environmental concerns: (a) impact on desert flora and fauna; (b)
impact on springs in mountains; and (c) impact on air quality.
☀ Tetra was concerned about impacts on its dry lake salt mining ops.
☀ They brought numerous legal cases challenging the Project’s CEQA
approval and its underlying science. Six of these case went to court,
and in 2014, the Superior Court Judge ruled against all petitions,
finding no scientific deficiencies in the Cadiz GMMMP and EIR.
☀ Opponents appealed. In 2016, the California Court of Appeal ruled for
Cadiz in all 6 cases, found environmental review sound.
Claims by Opponents
17
19
Cost Comparison
Supplemental Water Supply Alternatives
6
Project Annual Yield Unit Cost ($/AF)
Long‐term Annual Supply
Cadiz Valley Water Conservation Project 50,000 $875 ‐ 1270
OCWD Groundwater Replenishment System 70,000 $900
West Basin Seawater Desalter 22,000 to 112,000 $1,366 to $1,835
MWDOC ‐ Dana Point Desalter 16,500 $1,403
Carlsbad Seawater Desalination 48,000 to 56,000 $ 2,014 to $2,257
Huntington Beach Seawater Desalination 56,000 $1,768 to $1,812
Camp Pendleton Seawater Desalination 56,000 $1,900 to $2,340
Elsinore Valley Repurified Water (Wildomar) 3,000 $1,312
Central Basin Repurified Water (Southeast) 15,000 $1,672
MWD Untreated/Treated Tier 2 Rate ‐ $735 ‐ $1,032
Short‐term/Dry‐year Supply
Buena Vista Water Storage District 12,000 $1,135
Madera County Farmers 3,200 $2,190
Riverdale Farmers 600 $1,800Source: all numbers from 2014 public information
Benefits – Water Reliability & Environment
20
☀ Broad Service Area. Cadiz water to serve
inland and coastal southern California.
☀ High Quality Water. Cadiz water in CRA =
lower TDS in CRA.
☀ Groundwater Storage. 1 MAF underground
storage capacity for imported water =
reliability for water providers.
☀ Water Conservation. Conserves 1.5 MAF of water over 50 yrs.
☀ Enhanced Water Supply. Increases area’s long-term water supply reliability
with a source not dependent on Colorado River or State Water Project.
☀ Protects Environment. No harm to flora, fauna, aquifer, springs, or desert
ecosystem.
Benefits – Economy and Jobs
☀ $800 million total economic benefit from construction.
☀ 5,900 jobs created – 1,500/year during construction.
☀ 10% of jobs reserved for Veterans.
☀ $19.6 million in new state and local tax revenues in Phase 1
construction.
☀ $6 million/year in local
tax revenue once Project
is operational.
21
✸ Support DCP. Enable 150,000 AF of in-lieu storage capacity in Phase 1;
850,000 AF of imported storage capacity in Phase 2.
✸ Repurposing Existing Infrastructure. Use 226 miles of existing natural gas
pipelines for conveyance of water.
✸ Desert Tortoise Preservation and Enhancement. Partnership with San Diego
Zoo Global for creation of 7,400 acres for desert tortoise conservation bank.
Desert tortoise rearing and protection is underway.
✸ Water Quality. CR6 technology.
✸ Helping Disadvantaged Communities. Water for economically disadvantaged
communities within Project Participant service areas.
✸ Green Storage. Dedication of storage capacity for environmental benefit.
✸ Green Power. In-pipe hydropower generation.
Innovations
22
Steps to Breaking Ground
✓ Environmental Review with extensive public comment.
✓ Approval of Environmental Review by Lead Agency.
✓ Approval of groundwater management plan by San Bernardino
County.
✓ Resolution of CEQA lawsuits and appeals.
✓ BLM decision permitting use of railroad ROW.
Resolve new litigation re ROW.
CRA tie-in and terms with Metropolitan Water District.
Final design and final construction financing.
23