40
CAD MODELS FOR MPGD CHAMBERS 24/06/2011 1 II MPGD WORKSHOP Antonio Conde, PH-CMX

CAD MODELS FOR MPGD CHAMBERS

  • Upload
    ponce

  • View
    41

  • Download
    0

Embed Size (px)

DESCRIPTION

Antonio Conde, PH-CMX. CAD MODELS FOR MPGD CHAMBERS. POINTS. 1 DIMENSIONAL & GEOMETRICAL CHANGES. 2 SINGLE CHAMBERS INSTALLED. 3 DOUBLE CHAMBERS. 4 INSTALATION PROCEDURE. 5 PATCH PANEL SCKETCH. 1 DIMENSIONAL & GEOMETRICAL CHANGES. THICKNES REDUCED 1 mm - PowerPoint PPT Presentation

Citation preview

Page 1: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 1

CAD MODELS FOR MPGD CHAMBERS

24/06/2011

Antonio Conde, PH-CMX

Page 2: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 2

1 DIMENSIONAL & GEOMETRICAL CHANGES

2 SINGLE CHAMBERS INSTALLED

3 DOUBLE CHAMBERS

4 INSTALATION PROCEDURE

5 PATCH PANEL SCKETCH

POINTS

24/06/2011

Page 3: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 3

1 DIMENSIONAL & GEOMETRICAL CHANGES

24/06/2011

Page 4: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 4

24/06/2011

THICKNES REDUCED 1 mmIN THESE TWO SPACERS

Page 5: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 5

24/06/2011

CHIMNEY WILL BE CONICAL IN STEAD OF PARALELL AS HERE

THE HEIGHT WILL BE REDUCED

8 mm. (enough for services)

13mm. (15 before)

Page 6: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 6

24/06/2011

24 CONNECTORS NOW (8 BEFORE) NEEDS CONICAL CHIMNEY

Page 7: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 7

24/06/2011

OLD PARALELL CHIMNEY

NEW CONICAL CHIMNEY (24 connectors)

Page 8: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 8

24/06/2011

GOOD GAP BETWEEN TWO CHIMNEYS (NO CLASHES)

Page 9: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 9

2 SINGLE CHAMBERS INSTALLED

24/06/2011

Page 10: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 10

24/06/2011

RADIAL RAILS

9° ROTATED RAILS

SET OF CHAMBERS MOUNTED ON THE BACK FLANGE

Page 11: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 11

24/06/2011

INSERTION WINDOWS IN THE BRACKETS OF THE BACK FLANGE

Page 12: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 12

3 DOUBLE CHAMBERS (S.C.)

24/06/2011

Page 13: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 13

24/06/2011

VERY COMPACT CHAMBERS NOW

Page 14: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 14

24/06/2011

-GAP BETWEEN CHAMBERS: 1mm- STACKED CHAMBERS TOTAL HEIGHT: 98mm

Page 15: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 15

24/06/2011

GAP BETWEEN BACK FLANGE & MUON CHAMBERS: 100mm

Page 16: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 16

24/06/2011

TWO TYPES OF PIVOTS & ANGLES BUT ONLY 1 ONE TYPE OF CHAMBER FOR ALL SC

both SC match well

(2 or 3 empty protos should be made theninsered in all the positions, the next opening of the detector put in the schedule??)

Page 17: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 17

4 INSTALATION PROCEDURE (same for single chamber or SC)

24/06/2011

Page 18: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 18

4 INSTALATION PROCEDURE4.a FIRST SC

24/06/2011

Page 19: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 19

24/06/2011

FIRST SC TO ENTER

Page 20: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 20

24/06/2011

FIRST SC ENTERING

Page 21: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 21

24/06/2011

FIRST SC ENTERED TO PIVOT STOP

Page 22: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 22

24/06/2011

FIRST SC ROTATED TO ITS FINAL POSITION

Page 23: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 23

4 INSTALATION PROCEDURE4.b SECOND SC

24/06/2011

Page 24: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 24

24/06/2011

SECOND SC TO ENTER

Page 25: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 25

24/06/2011

SECOND SC ENTERING

Page 26: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 26

24/06/2011

SECOND SC IN ITS FINAL POSITION

Page 27: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 27

24/06/2011

THE TWO TYPES OF SC MATCHING IN PLACE

Page 28: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 28

4 INSTALATION PROCEDURE4.c THIRD SC

24/06/2011

Page 29: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 29

24/06/2011

THIRD SC ENTERING

Page 30: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 30

24/06/2011

NEEDS TO BE ROTATED 4° TO AVOID CLASH

Page 31: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 31

24/06/2011

WHEN ROTATED 4°, THE SC ENTERS WELL (same as RPC’s)

Page 32: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 32

24/06/2011

THIRD SC IN ITS FINAL POSITION

Page 33: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 33

4 INSTALATION PROCEDURE4.d FOURTH SC

24/06/2011

Page 34: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 34

24/06/2011

FOURTH SC TO ENTER

Page 35: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 35

24/06/2011

FOURTH SC ENTERING

Page 36: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 36

24/06/2011

FOURTH SC IN ITS FINAL POSITION

Page 37: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 37

5 PATCH PANEL SCKETCH

24/06/2011

Page 38: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 38

24/06/2011

PATCH PANELS(their surface cover the two openings of the chimneys for each SC)

Page 39: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 39

24/06/2011

25 mm. length, SPACERS

Page 40: CAD MODELS FOR MPGD CHAMBERS

II MPGD WORKSHOP 40

ENTRETIENS AVEC JOSÉ SALICIO, CHEFS DE GROUPE, PERSONNEL DEPT. ITTHANK YOU FOR YOUR ATTENTION !!

REMARKS / QUESTIONS ?

24/06/2011

Antonio Conde, PH-CMX