CABA COMMON BODYOF KNOWLEDGE

Version 9.1 © 2008

Guide to the

Page 2: CABA_CBOK_Ver_9-1
Page 3: CABA_CBOK_Ver_9-1

Certified Associate SoftwareBusiness Analyst

Common Body of Knowledge

Copyright © 2008 byQAI Global Institute2101 Park Center Drive,Suite 200Orlando, FL 32835-7614Phone 407-363-1111Fax 407-363-1112Web site: www.qaiworldwide.org

Page 4: CABA_CBOK_Ver_9-1

Revision and Copyright

Copyright

Copyright © QAI Global Institute 2008 All Rights ReservedNo part of this publication, or translations of it, may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or any other media embodiments now known or hereafter to become known, without the prior written permission of the QAI Global Institute.

DESCRIPTION BY DATEInitial Release Patterson/Marina 08/01/2008

Page 5: CABA_CBOK_Ver_9-1

Table of Contents

Version 9.1 1

Skill Category 1Business Analyst Principles and Concepts . . . . . 1-11.1. Introduction to Business Analyst Principles and Concepts . . . . . . . . .1-11.2. Relationship between Certified Software Business Analyst and Quality

1-21.3. Quality Pioneers, Thinkers and Innovators . . . . . . . . . . . . . . . . . . . . .1-3

1.3.1. Walter Shewhart . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-31.3.2. Joseph M. Juran . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-41.3.3. Frederick Herzberg . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-51.3.4. W. Edwards Deming . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-51.3.5. Kaoru Ishikawa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-71.3.6. Genichi Taguchi . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-81.3.7. Philip Crosby . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-81.3.8. Tom DeMarco . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-9

1.4. Basic Quality Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-91.4.1. Quality . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-91.4.2. Quality Assurance (QA) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-101.4.3. Quality Control (QC) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-101.4.4. Quality Improvement (QI) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-111.4.5. Quality Management (QM) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-11

1.5. Business Analysis and Management Tools for Quality . . . . . . . . . . .1-111.5.1. Affinity Diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-121.5.2. Baselining . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-121.5.3. Benchmarking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-131.5.4. Cause-and-Effect Diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-141.5.5. Control Charts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-151.5.6. Graphical Representations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-17

1.5.6.1. Pie Charts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-171.5.6.2. Bar (Column) Charts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-17

Page 6: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

2 Version 9.1

1.5.7. Cost of Quality . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-181.5.8. Earned Value . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-201.5.9. Expected Value/Cost . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-231.5.10. Flow Chart . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-251.5.11. Force Field Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-261.5.12. Kaizen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-291.5.13. Pareto Principle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-301.5.14. Relationship Diagram, Entity Relationship Diagram . . . . . . . . . . 1-311.5.15. Scatter Diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-311.5.16. Six Sigma . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-33

1.6. Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-33

Page 7: CABA_CBOK_Ver_9-1

Table of Contents

Version 9.1 3

Skill Category 2Management and Communication Skills . . . . . . . 2-12.1. Leadership and Management Concepts . . . . . . . . . . . . . . . . . . . . . . . .2-12.2. Quality Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-5

2.2.1. Manage by Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-52.2.2. Manage with Facts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-62.2.3. Manage Toward Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-82.2.4. Focus on the Customer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-92.2.5. Continuous Improvement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-92.2.6. Creating the Infrastructure for Improving Quality . . . . . . . . . . . . .2-10

2.2.6.1. Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-102.2.6.2. Do . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-112.2.6.3. Check . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-112.2.6.4. Act . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-13

2.3. Communication and Interpersonal Skills for Software Business Analysts 2-13

2.3.1. Listening Skills . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-132.3.2. Interviewing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-152.3.3. Facilitation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-192.3.4. Team Building . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-232.3.5. Tuckman’s Forming-Storming-Norming-Performing Model . . . . .2-24

2.3.5.1. Tuckman's Forming-Storming-Norming-Performing - Original Model . . 2-242.3.5.2. Hersey's and Blanchard's Situational Leadership® Model . . . . . . . . . . . . 2-27

2.3.6. Brainstorming . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-272.3.7. Focus Groups . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-282.3.8. Negotiating . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-292.3.9. Johari Window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-322.3.10. Prioritization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-35

2.3.10.1. Conflict Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-352.3.10.2. Prioritization Techniques . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-38

2.4. Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-41

Page 8: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

4 Version 9.1

Skill Category 3Define, Build, Implement and Improve Work Process-es . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-13.1. Understanding and Applying Standards for Software Development 3-1

3.1.1. Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-13.2. Standards Organizations and Models . . . . . . . . . . . . . . . . . . . . . . . . . 3-2

3.2.1. International Organization for Standardization (ISO) . . . . . . . . . . . 3-23.2.2. Software Engineering Institute and the Capability Maturity Model - SEI/CMM and CMMI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5

3.2.3. Six Sigma . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-83.2.3.1. DMAIC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-93.2.3.2. DMADV . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-93.2.3.3. Six Sigma Fundamentals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-9

3.2.4. Information Technology Infrastructure Library (ITIL) . . . . . . . . . 3-103.2.5. National Quality Awards and Models . . . . . . . . . . . . . . . . . . . . . . 3-113.2.6. The Role of Models and Standards . . . . . . . . . . . . . . . . . . . . . . . . 3-11

3.3. Process Management Concepts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-123.3.1. Definition of a Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-123.3.2. Why Processes are Needed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-123.3.3. Process Workbench and Components . . . . . . . . . . . . . . . . . . . . . . 3-13

3.3.3.1. Policy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-133.3.3.2. Standard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-14

3.3.4. Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-153.3.4.1. Do Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-153.3.4.2. Check Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-15

3.3.5. Process Categories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-163.3.5.1. Management Processes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-163.3.5.2. Work Processes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-163.3.5.3. Check Processes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-16

3.3.6. The Process Maturity Continuum . . . . . . . . . . . . . . . . . . . . . . . . . 3-173.3.7. How Processes are Managed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-18

3.3.7.1. Align the Process to the Mission . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-193.3.7.2. Identify the Process and Define the Policy . . . . . . . . . . . . . . . . . . . . . . . 3-193.3.7.3. Evaluate Process Development Stage . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-203.3.7.4. Determine Current and Desired Process Capability . . . . . . . . . . . . . . . . 3-213.3.7.5. Establish Process Management Information Needs . . . . . . . . . . . . . . . . . 3-253.3.7.6. Establish Process Measurement, Monitoring and Reporting . . . . . . . . . . 3-25

Page 9: CABA_CBOK_Ver_9-1

Table of Contents

Version 9.1 5

3.3.8. Process Template . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-263.4. Process Mapping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-26

3.4.1. Unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-273.4.2. Tasks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-283.4.3. Actions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-303.4.4. Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-303.4.5. Role of Process Maps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-31

3.5. Process Planning and Evaluation Process . . . . . . . . . . . . . . . . . . . . . .3-313.5.1. Process Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-313.5.2. Do Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-323.5.3. Check Processes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-323.5.4. Act Processes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-33

3.5.4.1. Process Improvement Teams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-333.5.4.2. Process Improvement Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-33

3.6. Measures and Metrics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-343.6.1. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-34

3.6.1.1. Measure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-343.6.1.2. Metrics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-36

3.6.2. Types and Uses of Measures and Metrics . . . . . . . . . . . . . . . . . . . .3-373.6.2.1. Strategic or Intent Measures and Metrics . . . . . . . . . . . . . . . . . . . . . . . . . 3-373.6.2.2. Process Measures and Metrics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-383.6.2.3. Efficiency Measures and Metrics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-383.6.2.4. Effectiveness Measures and Metrics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-383.6.2.5. Size Measures and Metrics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-39

3.6.3. Developing Measures and Metrics . . . . . . . . . . . . . . . . . . . . . . . . .3-393.6.3.1. Responsibility for measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-393.6.3.2. Responsibility for Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-393.6.3.3. Responsibility for Analysis and Reporting . . . . . . . . . . . . . . . . . . . . . . . . 3-403.6.3.4. Common Measures for Information Technology . . . . . . . . . . . . . . . . . . . 3-40

3.6.4. Obstacles to Establishing Effective Measures and Metrics . . . . . .3-423.6.4.1. Use in performance appraisals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-423.6.4.2. Unreliable, invalid measures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-423.6.4.3. Measuring individuals rather than projects or groups of people . . . . . . . 3-433.6.4.4. Non-timely recording of manual measurement data . . . . . . . . . . . . . . . . . 3-433.6.4.5. Misuse of measurement data by management . . . . . . . . . . . . . . . . . . . . . 3-433.6.4.6. Unwillingness to accept “bad numbers” . . . . . . . . . . . . . . . . . . . . . . . . . . 3-43

3.7. Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-43

Page 10: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

6 Version 9.1

Skill Category 4Business Fundamentals . . . . . . . . . . . . . . . . . . . . .4-14.1. Concept Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-14.2. Understanding Vision, Mission, Goals, Objectives, Strategies and Tac-

tics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-44.2.1. Vision . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-44.2.2. Mission . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-64.2.3. Goals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-84.2.4. Objectives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-94.2.5. Strategies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-114.2.6. Tactics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13

4.3. Developing an Organizational Vocabulary . . . . . . . . . . . . . . . . . . . . 4-134.3.1. Risk Analysis and Management . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-20

4.3.1.1. What is risk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-204.3.1.2. Event identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-214.3.1.3. Risk Assessment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-214.3.1.4. Risk Response . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-214.3.1.5. Control Activities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-22

4.4. Knowledge Area Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-22

Page 11: CABA_CBOK_Ver_9-1

Table of Contents

Version 9.1 7

Skill Category 5Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-15.1. Business Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-1

5.1.1. How Requirements are defined . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-15.1.1.1. What is a requirement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-25.1.1.2. Separating requirements and design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2

5.1.2. Who Participates in Requirement Definition . . . . . . . . . . . . . . . . . .5-35.1.2.1. Business Project Sponsor or Champion . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-35.1.2.2. Business Stakeholders and Subject Matter Experts (SME) . . . . . . . . . . . . 5-45.1.2.3. Developers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-45.1.2.4. Testers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-55.1.2.5. Customers and Suppliers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-55.1.2.6. Business Analysts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6

5.1.3. Attributes of a good requirement . . . . . . . . . . . . . . . . . . . . . . . . . . .5-65.1.3.1. Correct . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-65.1.3.2. Complete . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-75.1.3.3. Consistent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-75.1.3.4. Unambiguous . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-75.1.3.5. Important . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-85.1.3.6. Stable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-85.1.3.7. Verifiable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-85.1.3.8. 5.1.3.8 Modifiable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-85.1.3.9. Traceable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-9

5.2. Processes used to define business requirements . . . . . . . . . . . . . . . . . .5-95.2.1. Joint Application Development (JAD) . . . . . . . . . . . . . . . . . . . . . .5-10

5.2.1.1. What is Joint Application Development . . . . . . . . . . . . . . . . . . . . . . . . . . 5-105.2.1.2. Who participates in Joint Application Development . . . . . . . . . . . . . . . . 5-115.2.1.3. How is Joint Application Development conducted . . . . . . . . . . . . . . . . . 5-11

5.2.2. Business Event Model . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-145.2.2.1. What is a Business Event Model . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-145.2.2.2. How is a Business Event Model Created . . . . . . . . . . . . . . . . . . . . . . . . . 5-165.2.2.3. Using the Business Event Model . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-17

5.2.3. Use Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-185.2.3.1. What is a Use Case . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-185.2.3.2. How Use Cases are Created . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-205.2.3.3. How are Use Cases Applied . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-225.2.3.4. Considerations for Use Case Usage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-23

5.2.4. Process Models . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-235.2.4.1. Data Flow Diagrams (DFD) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-245.2.4.2. Entity Relationship Diagrams (ERD) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-265.2.4.3. State Transition Diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-28

Page 12: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

8 Version 9.1

5.2.5. Prototyping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-305.2.6. Test First . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-30

5.3. Quality Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-315.3.1. Quality Factors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-31

5.3.1.1. Efficiency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-315.3.1.2. Reliability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-315.3.1.3. Availability / Response Time . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-325.3.1.4. Integrity / Security . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-325.3.1.5. Usability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-325.3.1.6. Maintainability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-325.3.1.7. Flexibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-335.3.1.8. Portability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-335.3.1.9. Reusability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-335.3.1.10. Interoperability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-33

5.3.2. Relationship of Quality Requirements . . . . . . . . . . . . . . . . . . . . . . 5-345.3.3. Measuring Business and Quality Requirements . . . . . . . . . . . . . . 5-35

5.3.3.1. Minimum Level of Acceptable Quality . . . . . . . . . . . . . . . . . . . . . . . . . . 5-365.3.4. Enterprise Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-37

5.3.4.1. Standardization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-375.3.4.2. Accessibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-385.3.4.3. Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-38

5.4. Constraints and Trade-offs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-385.4.1. Constraints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-39

5.4.1.1. Hardware . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-395.4.1.2. Software . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-395.4.1.3. Policies, Standards and Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-395.4.1.4. Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-395.4.1.5. Internal Environment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-405.4.1.6. External Environment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-40

5.5. Critical Success Factors and Critical Assumptions . . . . . . . . . . . . . 5-405.5.1. Critical Success Factors (CSFs) . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-415.5.2. Critical Assumptions (CA) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-42

5.6. Prioritizing Requirements and Quality Function Deployment . . . . 5-435.6.1. Prioritizing Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-445.6.2. Quality Function Deployment (QFD) . . . . . . . . . . . . . . . . . . . . . . 5-45

5.7. Developing Testable Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . 5-475.7.1. Ambiguity Checking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-48

5.7.1.1. What is Ambiguity Checking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-485.7.1.2. Performing Ambiguity Checking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-48

5.7.2. Resolving Requirement Conflicts . . . . . . . . . . . . . . . . . . . . . . . . . 5-49

Page 13: CABA_CBOK_Ver_9-1

Table of Contents

Version 9.1 9

5.7.3. Reviews . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-505.7.4. Fagan Inspections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-51

5.7.4.1. Fagan Inspection Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-525.7.4.2. Fagan Inspection Participants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-535.7.4.3. Fagan Inspection Issues . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-54

5.7.5. Gilb Agile Specification Quality Control . . . . . . . . . . . . . . . . . . . .5-555.7.5.1. Agile Specification Quality Control (SQC) Approach . . . . . . . . . . . . . . . 5-555.7.5.2. Using Inspection Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-555.7.5.3. Agile SCQ Participants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-565.7.5.4. Agile SCQ Issues . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-56

5.7.6. Consolidated Inspection Approach . . . . . . . . . . . . . . . . . . . . . . . . .5-565.8. Tracing Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-57

5.8.1. Uniquely Identify All Requirements . . . . . . . . . . . . . . . . . . . . . . . .5-575.8.2. From Requirements to Design . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-58

5.8.2.1. Tracing Requirements to Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-585.8.2.2. Tracing Design to Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-58

5.8.3. From Requirements to Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-585.8.3.1. Tracing Requirements and Design to Test . . . . . . . . . . . . . . . . . . . . . . . . 5-595.8.3.2. Tracing Test Cases to Design and Requirements . . . . . . . . . . . . . . . . . . . 5-59

5.9. Managing Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-595.9.1. Create a known base . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-615.9.2. Manage Access . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-615.9.3. Authorize changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-62

5.9.3.1. Change Control Board (CCB) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-625.9.3.2. Change Scope: Requirement, Enhancement or New Project . . . . . . . . . . 5-635.9.3.3. Establish priority . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-645.9.3.4. Publish . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-64

5.9.4. Control results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-645.9.4.1. 5.8.4.1 Size the effort . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-645.9.4.2. Adjust the resources or the plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-655.9.4.3. Communicate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-65

5.10. Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-66

Page 14: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

10 Version 9.1

Skill Category 6Software Development Processes, Project and Risk Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-16.1. Software Development in the Process Context . . . . . . . . . . . . . . . . . . 6-1

6.1.1. Policies, Standards, Procedures and Guidelines . . . . . . . . . . . . . . . 6-26.1.1.1. Policies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-26.1.1.2. Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-26.1.1.3. Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-26.1.1.4. Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2

6.1.2. Entry and Exit Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-36.1.2.1. Entry Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-36.1.2.2. Exit Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-36.1.2.3. Applying Entry and Exit Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-3

6.1.3. Benchmarks and Measures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-46.1.3.1. The Role of Measures and Metrics in the Development Environment . . . . 6-56.1.3.2. Establishing Meaningful Software Development Measures . . . . . . . . . . . . 6-5

6.2. Major Components of Software Processes (Objectives and Deliverables) 6-6

6.2.1. Pre-Requirements Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-66.2.1.1. Preliminary Scope Statement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-66.2.1.2. Preliminary Benefit Estimate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-76.2.1.3. Preliminary Estimate and Related Cost Calculation . . . . . . . . . . . . . . . . . . 6-76.2.1.4. Feasibility Study Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7

6.2.2. Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-86.2.2.1. Requirements Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-86.2.2.2. Preliminary Test Cases and Test Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-86.2.2.3. Project Charter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-86.2.2.4. Project Scope Statement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-86.2.2.5. Project Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-96.2.2.6. Revised Estimate, Cost and Benefit Information . . . . . . . . . . . . . . . . . . . . 6-96.2.2.7. Organizational Approvals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9

6.2.3. Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-96.2.3.1. External and Internal Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-106.2.3.2. Revised Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-116.2.3.3. New and Revised Test Cases and Test Plan . . . . . . . . . . . . . . . . . . . . . . . 6-116.2.3.4. Final Project Scope and Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-116.2.3.5. Final Project Estimate, Cost and Benefit Information . . . . . . . . . . . . . . . 6-11

6.2.4. Code, Development, Construct or Build . . . . . . . . . . . . . . . . . . . . 6-126.2.4.1. Unit and System Tested Code . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-126.2.4.2. Revised Requirements and Test Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13

Page 15: CABA_CBOK_Ver_9-1

Table of Contents

Version 9.1 11

6.2.4.3. Defect Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-136.2.5. Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-13

6.2.5.1. Executed Test Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-136.2.5.2. Production Ready System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-146.2.5.3. Organizational Approvals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-146.2.5.4. Defect Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-14

6.2.6. Implementation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-146.2.6.1. Product Documentation / User Manual . . . . . . . . . . . . . . . . . . . . . . . . . . 6-156.2.6.2. Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-156.2.6.3. Product Turnover . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-156.2.6.4. Help Desk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-16

6.3. Traditional Approaches to Software Development . . . . . . . . . . . . . .6-166.3.1. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-166.3.2. Typical Tasks in the Development Process Life Cycle . . . . . . . . .6-176.3.3. Process Model / Life-Cycle Variations . . . . . . . . . . . . . . . . . . . . .6-186.3.4. Ad-hoc Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-186.3.5. The Waterfall Model . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-19

6.3.5.1. Problems/Challenges associated with the Waterfall Model . . . . . . . . . . 6-206.3.6. Iterative Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-20

6.3.6.1. Problems/Challenges associated with the Iterative Model . . . . . . . . . . . . 6-216.3.7. Variations on Iterative Development . . . . . . . . . . . . . . . . . . . . . . .6-22

6.3.7.1. Prototyping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-226.3.7.2. Prototyping steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-236.3.7.3. Problems/Challenges associated with the Prototyping Model . . . . . . . . . 6-236.3.7.4. Variation of the Prototyping Model . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-24

6.3.8. The Exploratory Model . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-246.3.8.1. The Exploratory Model . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-246.3.8.2. Problems/Challenges associated with the Exploratory Model . . . . . . . . . 6-24

6.3.9. The Spiral Model . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-256.3.9.1. The Spiral Model steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-266.3.9.2. Problems/Challenges associated with the Spiral Model . . . . . . . . . . . . . . 6-26

6.3.10. The Reuse Model . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-266.3.10.1. The Reuse Model steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-276.3.10.2. Problems/Challenges Associated with the Reuse Model . . . . . . . . . . . . 6-27

6.3.11. Creating and Combining Models . . . . . . . . . . . . . . . . . . . . . . . . .6-286.3.12. Process Models Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-29

6.4. Agile Development Methodologies . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-296.4.1. Basic Agile Concepts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-296.4.2. Agile Practices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-31

Page 16: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

12 Version 9.1

6.4.3. Effective Application of Agile Approaches . . . . . . . . . . . . . . . . . . 6-326.4.4. Integrating Agile with Traditional Methodologies . . . . . . . . . . . . 6-33

6.5. Software Development Process Improvement . . . . . . . . . . . . . . . . . . 6-336.5.1. Post Implementation Reviews . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-336.5.2. Defect Studies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-366.5.3. Surveys . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-36

6.6. Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-376.7. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-38

Page 17: CABA_CBOK_Ver_9-1

Table of Contents

Version 9.1 13

Skill Category 7Acceptance Testing . . . . . . . . . . . . . . . . . . . . . . . . 7-17.1. Concepts of Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-2

7.1.1. Dynamic Testing Activities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-37.1.1.1. Unit Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-47.1.1.2. Integration Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-47.1.1.3. System Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-57.1.1.4. Acceptance Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-6

7.1.2. Dynamic Testing Types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-67.1.2.1. White Box . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-77.1.2.2. Black Box . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-77.1.2.3. Equivalence Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-87.1.2.4. Boundary Value Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-87.1.2.5. Smoke Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-97.1.2.6. Regression Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-107.1.2.7. Stress Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-107.1.2.8. Conditional and Cycle Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-117.1.2.9. Parallel Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-137.1.2.10. Risk-based Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-137.1.2.11. Security Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-147.1.2.12. Backup and Recovery Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-157.1.2.13. Failure and Ad Hoc Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-157.1.2.14. Other Test Types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-16

7.2. Roles and Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-167.2.1. Project Manager . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-167.2.2. Test Manager and the Test Team . . . . . . . . . . . . . . . . . . . . . . . . . .7-177.2.3. Designer/Developer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-187.2.4. Business Partner and Subject Matter Expert . . . . . . . . . . . . . . . . . .7-197.2.5. Operations and Network . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-197.2.6. Data Security and Internal Audit . . . . . . . . . . . . . . . . . . . . . . . . . .7-207.2.7. Control Verification and the Independent Tester . . . . . . . . . . . . . .7-217.2.8. Business Analyst . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-227.2.9. Other Participants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-23

7.3. Use Cases for Acceptance Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-237.3.1. Use Case Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-257.3.2. Use Case Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-287.3.3. Use Case Format . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-29

Page 18: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

14 Version 9.1

7.3.4. Writing effective Use Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-317.4. Defect Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-31

7.4.1. Defect Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-327.4.1.1. Defect . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-327.4.1.2. Errors, Faults and Defects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-347.4.1.3. Recidivism and Persistent Failure Rates . . . . . . . . . . . . . . . . . . . . . . . . . . 7-34

7.4.2. Defect Life Cycle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-357.4.2.1. Creation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-357.4.2.2. Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-387.4.2.3. Resolution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-397.4.2.4. Closure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-39

7.5. Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-40

Page 19: CABA_CBOK_Ver_9-1

Table of Contents

Version 9.1 15

Skill Category 8Commercial Off-the-Shelf Software and Performance Based Contracting . . . . . . . . . . . . . . . . . . . . . . . . . 8-18.1. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-2

8.1.1. Commercial Off-the-Shelf Software (COTS) . . . . . . . . . . . . . . . . . .8-28.1.2. Custom Software . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-28.1.3. Modified Off-the-Shelf Software (MOTS) . . . . . . . . . . . . . . . . . . . .8-28.1.4. Performance Based Contracting (PBC) . . . . . . . . . . . . . . . . . . . . . .8-2

8.2. Establish Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-38.3. Commercial Off-The-Shelf Software (COTS) Considerations . . . . . .8-3

8.3.1. Determine compatibility with your computer environment . . . . . . .8-48.3.1.1. Hardware Compatibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-48.3.1.2. Operating System Compatibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-58.3.1.3. Software Compatibility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-58.3.1.4. Security . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-58.3.1.5. Virtualization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-5

8.3.2. Ensure the software can be integrated into your business system work flow . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-6

8.3.2.1. Current system based on certain assumptions . . . . . . . . . . . . . . . . . . . . . . 8-68.3.2.2. Existing forms, existing data, and existing procedures . . . . . . . . . . . . . . . 8-78.3.2.3. COTS based on certain assumptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-7

8.3.3. Assuring product usability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-88.3.3.1. Telephone interviews with current and previous customers . . . . . . . . . . . . 8-88.3.3.2. Demonstrate the software in operation . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-10

8.4. Roles and Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-108.4.1. Project Manager . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-118.4.2. Project Liaison . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-118.4.3. Attorneys and Legal Counsel . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-128.4.4. Test Manager and the Test Team . . . . . . . . . . . . . . . . . . . . . . . . . .8-128.4.5. Designer/Developer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-138.4.6. Business Partner and Subject Matter Expert . . . . . . . . . . . . . . . . . .8-138.4.7. Business Analyst . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-148.4.8. Other Participants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-14

8.5. Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8-14

Vocabulary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1

Page 20: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

16 Version 9.1

Page 21: CABA_CBOK_Ver_9-1

Business Analyst Principles and Concepts

Version 9.1 1-1

Business Analyst Principles and Concepts

1.1 Introduction to Business Analyst Principles and ConceptsThe Business Analyst position is uniquely placed in the organization to provide a strong link between the Business Community and Information Technology (IT). Historically, the Business Analyst was a part of the business operation who was assigned to work with Information Technology (or Data Processing as it was once known). The Business Community was willing to provide these services because of the desire to improve the quality of the products and services being delivered by the IT organization and because it perceived this as a way to control the amount of resources being consumed by developmental support activities.

Originally referred to as “users” by the IT staff, the business organization had little control over the quality, cost, or the schedule of the development process. The IT staff was struggling with an evolving technology, with few rules, and a constantly changing infrastructure. What was not changing was the insatiable appetite for the productivity increases provided by automation on the part of “users.”

The Business Analysts, gathered Business Requirements, assisted in Integration and Acceptance Testing, supported the development of training and implementation material, participated in the implementation, and provided immediate post-implementation support. While doing this, they were actively involved in the development of project plans and often provided project management skills when these skills were not available in other project participants. Although there are many new tools and techniques to perform these tasks today, they are still the key functions performed by the Business Analyst.

SkillCategory

1

Page 22: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

1-2 Version 9.1

Many of these activities relied on the outstanding communication skill, both verbal and written, which was one of the BA’s most valuable characteristics. As IT struggled to provided the improvements in quality and productivity which were being demanded by a “user” which had metamorphisized into a “customer,” the role of the Business Analyst became even more important. Over time, many of these individuals were recruited into IT because of their ability to translate business needs into terms that were understood by IT. They became Software Business Analysts.

The shift in the balance of power, which occurred when “users” became “customers,” failed to produce the kind of improvements in schedule, cost, and quality that the business community had anticipated. It was clear that this was also a “zero-sum game.” The evolution of the Business Partnership model, which had its roots in the very earliest days of the quality revolution, has finally created a relationship that is win-win. The Business Analyst, fluent in both the language of business and the language of IT, is once again the key player.

1.2 Relationship between Certified Software Business Analyst and QualityThis introductory chapter looks at the background and evolution of the Quality Movement, which had its roots in 1920s manufacturing processes. As Information Technology works to move from an unstructured “art form” to an “engineering” approach, the lessons learned in manufacturing are increasingly relevant.

The dramatic transformation of the automobile industry over the last thirty years is an excellent example of what happens when organizations fail to deliver what the ultimate customer (internal or external to the organization) perceives to be “quality.” It is not enough to build a vehicle that provides transportation from point A to point B. If the price of gas goes up, so must the fuel efficiency of the vehicle. If the roads become congested and parking difficult, vehicles need to become smaller and more maneuverable. Vehicles that require frequent, unpredictable repairs, whether major or minor, are viewed as less desirable than those with fewer, more predictable service needs. Products not responding to these needs will be perceived as having lower quality, and therefore they are less desirable in the marketplace. Customers purchase those items in smaller quantities and want to pay comparatively less for them. Japan, using their understanding of quality production techniques, has succeeded in displacing most North American and European vehicles as “quality vehicles” in the eyes of world customers.

One of the important lessons learned was that it is essential to understand what the external customer defined as “quality.” This chapter will look at the varying operating definitions of Quality which are in common usage today, and how they relate to IT. Business Analysts have the opportunity each day to impact the final quality of the products they are involved with; by better understanding the options and the tools available for developing quality systems, they make a major contribution to the organization.

Page 23: CABA_CBOK_Ver_9-1

Business Analyst Principles and Concepts

Version 9.1 1-3

As the body of knowledge about quality practices evolved, it became clear that improving quality was an excellent approach for addressing the problems of meeting schedule and budget objectives, not an alternative. This is why a proficient Business Analyst must have a firm foundation in Quality concepts to be truly professional.

1.3 Quality Pioneers, Thinkers and InnovatorsThe theoretical framework for how to create high quality products and services evolved over time. The concepts for automation began simply and grew more sophisticated; so too with the concepts of quality. The individuals discussed below added to the understanding in specific and important ways. Each contribution is individually useful to the BA committed to providing the very best work for their organization; collectively they are extraordinarily powerful.

1.3.1 Walter Shewhart

Much of the early work in quality was focused on the manufacturing of goods; Bell Laboratories in the 1920’s was the testing grounds for much of this work. Leading the effort for many years, Walter Shewhart developed conceptual framework for much of the Total Quality Management (TQM) approach to improving quality. Key among his many contributions are two which are fundamental to the business of providing quality software systems:

1. The concept of Continuous Improvement

2. The related 1-2-3-4 Cycle.1

Continuous improvement stresses continuous learning and creativity as the pathway to ongoing incremental improvements. Lack of creativity eventually results in dead end products. Lack of learning inhibits creativity and results in boredom and lack of attention to detail.

The 1-2-3-4 cycle is a methodical approach to applying the concept of Continuous Improvement. Although not captioned in this fashion originally, the four steps are the foundation for the PLAN-DO-CHECK-ACT approach popularized by Deming. In this approach, organizations identify how a process or activity will be done (PLAN); they then perform the process or activity according to the Plan (DO). When the process or activity is complete, it is then time to evaluate the results of the plan and its execution to determine if the desired results were achieved (CHECK). Based on the results of this evaluation, adjustments

1. Shewhart, Walter,; Statistical Method from the Viewpoint of Quality Control, (Graduate School, Department of Agriculture, Washington, 1939)

Page 24: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

1-4 Version 9.1

will be made to the PLAN so that it will better achieve the desired results (ACT). The cycle is then repeated.

Although the explanation above appears to describe a single iteration of a process, Shewhart quickly realized that to have a sound foundation for action there would need to be many iterations. (In the manufacturing environment, this is not difficult). As a result he also developed a third fundamental concept: Statistical Process Control.

The pioneering work done by Shewhart has subsequently been expanded, enhanced, and refined by others, some of whom are presented below.

1.3.2 Joseph M. Juran

Also working for Bell Telephone Laboratories, at the Hawthorn plant near Chicago, Joseph Juran had a background in Engineering and Statistics. The Hawthorn Plant was the location of a number of innovations and insights over a wide range of disciplines (the Hawthorne Effect on human motivation is one of the most widely known). Juran added several key innovations and improvements to the work done by Shewhart:

1. The application of the Pareto Principle to the Quality Improvement Process

2. The addition of the Human Element to the existing statistical basis of quality

3. His step-by-step process for breakthrough improvement (which evolved into SixSigma).

Juran’s book, the Quality Control Handbook2 is the backbone of most Quality Improvement Libraries. In it, he provides significant and detailed information about how to implement quality processes with specific attention to the human aspects of quality. In his publications, he provides one of the two most commonly cited definitions of Quality:

Fitness for Use.

This concept includes the idea that a product is created to fulfill a need, and that it must do so in a way that is effective and free from defects.

Juran’s application of the Pareto Principle (also referred to as the 80-20 Rule) helps to focus an organization’s attention on the critical few (20%) issues or activities that will result in the greatest benefit. The remainder are the trivial many (80%.)

His work identified the Quality Trilogy as:

1. Quality Planning

2. Quality Improvement

3. Quality Control.

2. Juran, Joseph M. Quality Control Handbook, 1951.

Page 25: CABA_CBOK_Ver_9-1

Business Analyst Principles and Concepts

Version 9.1 1-5

Taken together, these three move an organization forward by focusing on delivering those products and features that the customer actually needs and wants.

From a manufacturing perspective, the Quality Control activities were well established; “inspectors” examined some number of finished products to determine if they were acceptable. Juran, following the work of Shewhart, demonstrated that by collecting information about the number of products that were not acceptable and what the characteristics of the problems were, it would be possible to improve the manufacturing process.

1.3.3 Frederick Herzberg

Herzberg became interested in the question of how people were motivated. Work by quality pioneers, especially Juran had revealed that motivation was a key ingredient in the effective implementation of quality processes. Based on his research, Herzberg developed his Hygiene Motivation Theory.

According to Herzberg, people have two sets of needs: basic (or hygiene) needs and motivators. Hygiene needs are conditions, that, if not met, will cause people to become Dissatisfied; these include items such as Company policy and administration, salary, interpersonal relationships, and supervision. Motivational Needs are conditions that if met, will cause people to be Satisfied, these include items such as achievement, responsibility, recognition, advancement, and the work itself.

These results complement and support the concepts later articulated by Dr. Deming.

1.3.4 W. Edwards Deming

Deming worked for the US Census Bureau following his academic career and began applying and refining his understanding of Statistical Processes. Following World War II, he began his private career, which lead him to his now famous work in Japan, helping them to transform the statement “Made in Japan” from a symbol of cheap goods and poor quality to a symbol of high quality, innovative products competing head-to-head with any other producer in the world. During this and other work, Deming developed the 14 Points, which were first presented in his book Out of the Crisis3.

The 14 Points encapsulated key concepts that result in a more productive environment leading to increased profits and quality. These points are:

1. Create constancy of purpose toward improvement of product and service, with the aimto become competitive and to stay in business, and to provide jobs.

3. Deming, W. Edwards, Out of the Crisis, MIT/CAES, 1982

Page 26: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

1-6 Version 9.1

2. Adopt the new philosophy. We are in a new economic age. Western management mustawaken to the challenge, must learn their responsibilities, and take on leadership forchange.

3. Cease dependence on inspection to achieve quality. Eliminate the need for inspectionon a mass basis by building quality into the product in the first place.

4. End the practice of awarding business on the basis of price tag. Instead, minimize totalcost. Move toward a single supplier for any one item, on a long-term relationship ofloyalty and trust.

5. Improve constantly and forever the system of production and service, to improvequality and productivity, and thus constantly decrease costs.

6. Institute training on the job.

7. Institute leadership. The aim of supervision should be to help people and machines andgadgets to do a better job. Supervision of management is in need of overhaul, as well assupervision of production workers.

8. Drive out fear, so that everyone may work effectively for the company (see Ch. 3).

9. Break down barriers between departments. People in research, design, sales, andproduction must work as a team, to foresee problems of production and in use that maybe encountered with the product or service.

10. Eliminate slogans, exhortations, and targets for the work force asking for zero defectsand new levels of productivity. Such exhortations only create adversarial relationships,as the bulk of the causes of low quality and low productivity belong to the system andthus lie beyond the power of the work force.

• Eliminate work standards (quotas) on the factory floor. Substitute leadership.

• Eliminate management by objective. Eliminate management by numbers, numerical goals. Substitute leadership.

11. Remove barriers that rob the hourly worker of his right to pride of workmanship. Theresponsibility of supervisors must be changed from sheer numbers to quality.

12. Remove barriers that rob people in management and in engineering of their right topride of workmanship. This means, inter alia, abolishment of the annual or merit ratingand of management by objective.

13. Institute a vigorous program of education and self-improvement.

14. Put everybody in the company to work to accomplish the transformation. Thetransformation is everybody's job.

Deming, based on his experience and approach to quality, developed a different definition of Quality which is: “Quality is the Continuous Improvement of all processes.” This definition more clearly articulates the continually evolving nature of the perception of quality. This definition is especially useful for organizations that are struggling to get started improving

Page 27: CABA_CBOK_Ver_9-1

Business Analyst Principles and Concepts

Version 9.1 1-7

their quality. He popularized his approach, based on Shewhart’s earlier work as the PLAN-DO-CHECK-ACT cycle; it is often referred to as the Deming Cycle. 4

1.3.5 Kaoru Ishikawa

Ishikawa was a colleague of Deming’s in Post World War II Japan. He wanted to help managers understand the sources of problems with products; this resulted in the development of the Root Cause Analysis Process. In addition, Ishikawa was a pioneer in the use of the Seven Quality Tools, and he developed and championed the implementation of the Quality Circle.

The Root Cause Analysis Process is also known as the “Ishikawa Diagram,” the “Fishbone Diagram,” and the “Cause-and-Effect Diagram.” These tools make it possible to identify all of the roots (basic causes) in a retrospective approach, or, all of the potential effects (possible outcomes) in a prospective approach. Ishikawa identified five (5) key areas which occur repeatedly in either type of analysis:

1. People

2. Processes

3. Machines

4. Materials

5. Environment

Ishikawa identified the seven (7) basic quality tools that are fundamental to the process of improving and managing quality:

1. Control Chart

2. Run Chart

3. Histogram

4. Scatter Diagram

5. Flow Chart

6. Pareto Chart

7. Cause and Effect Diagram

4. Deming, W. Edwards, Out Of Crisis,pp88-89

Page 28: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

1-8 Version 9.1

1.3.6 Genichi Taguchi

Working in Japan in the same general time frame as Deming and Ishikawa, Taguchi was also looking at how to improve manufacturing processes. He understood that in any process there are many elements that can affect the ultimate outcome of the process for better or for worse. He began to examine what those elements were and how they could be controlled more effectively. The resulting approach is known as Robust Design or The Taguchi Method. He is also known for his Loss Function, which is a mathematical approach to defining the decline in quality as perceived by the customer.

The Taguchi method labels those elements that can negatively affect the product as “noise in the process.” Engineers and managers work together to reduce the noise, thereby improving both the process and the product(s). Taguchi considered not only those factors that arose during the creation of the product, but also those that developed as a result of its use. As a part of this process, he pioneered the use of the Othogonal Array to display the impact of noise in a cost-effective manner.

1.3.7 Philip Crosby

Crosby is representative of the “second wave” of quality pioneers, who built upon the foundations laid by Shewhart, Juran and Deming. Capitalizing on the growing realization that Japan was coming to dominate many markets with the savvy combination of quality and continuous improvement, Crosby worked to popularize the concepts of quality in the western world. Crosby also came from a manufacturing background and could translate many of the quality concepts into pragmatic approaches that were easily understood by non-mathematicians.

In his popular book “Quality is Free”5, Crosby articulates the Four Absolutes of Quality Management:

1. Quality is defined as conformance to requirements, not as “goodness” or “elegance”

2. The system for causing quality is prevention, not appraisal

3. The performance standard must be Zero Defects, not “that’s good enough”

4. The measurement of quality is the Price of Non-Conformance (i.e. money), not indices

Additionally, Crosby popularized the concept of “the cost of quality.” This approach identifies the four components of the total product cost as:

1. Product Cost: the amount of resources (time and money) required to build the productone time, correctly

2. Product Appraisal Costs: the resources used to determine if the product has been builtcorrectly, such as inspections, reviews and testing

5. Philip Crosby, “Quality is Free,” McGraw-Hill, 1979

Page 29: CABA_CBOK_Ver_9-1

Business Analyst Principles and Concepts

Version 9.1 1-9

3. Product Failure Costs: the resources consumed to handle and correct problems(defects) in the product, such as rework, lost of reputation, delivery delays and helpdesks

4. Prevention Costs: those costs incurred to prevent defects from occurring, such asprocess development and maintenance costs and training costs

Total Product Cost: is the sum of all four of the elements above.

Crosby demonstrated that, to reduce Total Product Cost, the best approach is to increase prevention costs, which can then make it possible to reduce appraisal and failure costs.

1.3.8 Tom DeMarco

DeMarco is another of the second wave of Quality pioneers, and like many of the originals, began his career with Bell Telephone Laboratories. He is a prolific author, who has effectively translated many of the quality lessons learned in the pure manufacturing environment into the world of Information Technology. As such, he represents a unique blend of the two worlds.

His ground breaking book, “Peopleware” 6, co-authored by Timothy Lister, takes the human element identified by Juran and Herzberg and extrapolates it into the world of Information Technology projects. This followed his more technical book, “Controlling Software Costs: Managing Schedule and Estimation.”7

1.4 Basic Quality DefinitionsThroughout the remainder of the Skill Categories, reference will be made to the basic quality definitions below. Understanding each and how they relate to each other is essential.

1.4.1 Quality

Fitness for Use8 or The Continuous Improvement of All Processes9; Quality is subjective and dependent upon the role of the assessor. Best practice is that quality is measured from the point of view of the ultimate consumer of the product or service. Failure to measure from this

6. DeMarco, Tom and Lister, Timothy, Peopleware, Dorset House, 1987.7. DeMarco, Tom, “Controlling Software Projects: Managing Schedule and Estimation, Prentice Hall,

19828. Juran, Joseph M. Quality Control Handbook, 19519. Deming, W. Edwards, Out of the Crisis, MIT/CAES, 1982

Page 30: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

1-10 Version 9.1

perspective will result in a gap between what the customer expects and what is actually delivered.

Historically many IT organizations have defined “Quality” as “meeting requirements.” They then have assumed (often with the consent and encouragement of their business partners) that they” know what the customer wants.” This is a broken requirements gathering process and consistently yields low quality products which fail to meet the business partner or the external customer’s requirements.

Best practice also indicates that any quality assessment is a “point in time” or “dynamic” rather than static. What is perceived as quality will change over time with additional information, new choices or more experience.

1.4.2 Quality Assurance (QA)

Quality Assurance is defined as those activities which are designed to prevent defects from occurring. By preventing defects before they are created through process improvement and other activities, Quality Assurance both improves product quality and reduces product costs. One of four (4) components of product costs, quality assurance activities such as standards development and training are prevention costs according to Crosby10.

An effective Quality Assurance function will be using process data gathered from Quality Control activities to identify potential process improvements. They will support the effort to develop and implement processes and procedures designed to reduce the likelihood that defects will be created. This may also include developing and supporting process training, tool acquisition and training, as well as providing facilitation and administrative skills to various parts of the organization.

Within Information Technology there are often organizations whose primary function is Testing. This is a Quality Control function, not Quality Assurance (see below).

1.4.3 Quality Control (QC)

Quality Control is defined as those activities designed to identify defects which have already been created. As such, Quality Control is a much less cost effective method of improving product quality than Quality Assurance, since defects detected must still be analyzed and corrected. However, as a prudent organization will not assume that all the defects possible have actually been prevented, a robust Quality Control function is still needed. Inspections, reviews and testing are primary Quality Control activities in the Software Development Lifecycle (SDLC). Quality Control activities are appraisal costs.

An effective set of Quality Control activities provides information about where and how defects are created. The historical approach to QC is to assume that as the majority of their

10. Philip Crosby, “Quality is Free” 1979

Page 31: CABA_CBOK_Ver_9-1

Business Analyst Principles and Concepts

Version 9.1 1-11

activities are testing, there is no reason to involve QC personnel early in the product life cycle. More recent experience shows that introducing Quality Control as early in the product development as possible is extremely cost effective. Defects caught early are the least expensive to correct.

1.4.4 Quality Improvement (QI)

Quality Improvement is defined as a systematic approach to improvement of product quality, typically through a combination of increasing the accuracy of Quality Assurance activities resulting from an analysis of the results of Quality Control activities. Effective Quality Improvement activities often are the result of Root Cause and Pareto style analysis.

Improving processes enhances the products created by those processes. The application of the Kaizen style of management (which will be discussed in Section 1.5.12 on page 1-29) and quality improvement will yield small continuous upgrades to processes (the Evolutionary Approach). Using other approaches, such as Six Sigma (which will be discussed in Section 1.5.16 on page 1-33), will have a much more Revolutionary effect on the organization and its processes.

Regardless of the approach taken, it is essential to have established a baseline before the improvement activities are undertaken so that it is possible to demonstrate the nature and extent of the improvements made.

1.4.5 Quality Management (QM)

Quality Management is defined as an approach which uses decisions based on facts, data, and logic, rather than emotion, schedule, and budget. Quality Management relies upon the consistent generation of reliable information (data// measures/metrics/statistics) about how processes are performing (management dashboard) and what the organization needs to achieve (vision, mission, strategies, goals and objectives). This in turn requires that processes exist which are robust and realistic and will support the work effort required.

1.5 Business Analysis and Management Tools for QualityIn order to effectively perform the tasks of a Business Analysis, the business analyst must have a wide range of “tools” available to address different types of situations. Many of the most important are designed to organize data and information in ways that make it easier to

Page 32: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

1-12 Version 9.1

assimilate and understand. The tools discussed in the following sections should be well understood by the CSBA.

1.5.1 Affinity Diagram

The Affinity Diagram is used to organize large quantities of suggestions, ideas and comments into groupings for later analysis. It was developed by Kawakita Jiro and handles “messy data” very effectively. Affinity Diagrams are often the next step after an initial Brainstorming Session (covered in Skill Category Two).

In the simplest version of the Affinity Diagram, each of the items generated as a result of a survey or Brainstorming Session are recorded on a Note Card or Post-It11Note. The participants then conduct a free-form session in silence in which items are accumulated into what seem to be logical groupings to the participants. The session continues until the movement of the items has stopped. At that point, each of the resulting groupings is given representative names such as, “Communication Problems”; “Response Time Issues”; or “Inadequate Requirements.”

If there has not been a preceding Brainstorming session, one can be conducted at the outset of the meeting. Kawakita Jiro recommended that each member contribute 5-10 items, each of which must meet the following criteria:

• It is a statement of fact, not a judgment or evaluation

• The fact is in some way related to the problem or situation under consideration

• The fact need not be either a cause or a solution and may be tangentially related

Following the naming process, each of the items within a grouping are examined to determine what its relationship is to the group name and to other items in the group (such as, A and B are components of C which is one part of the topic described by the Group Name). Relationships within the group are recorded, as is the relationship of the groupings to each other. The completed Affinity Diagram is then a springboard for further analysis, prioritization and potential activity.

1.5.2 Baselining

The foundation of any improvement process includes a determination of what is the current level of organizational performance in the target area. The current level of performance is referred to as the baseline. There are three general steps in developing a baseline:

1. Identifying the sources of baseline data

11. Post It is a trademarked name by 3M Corporation for their “sticky note” product.

Page 33: CABA_CBOK_Ver_9-1

Business Analyst Principles and Concepts

Version 9.1 1-13

2. Collecting the data

3. Analyzing the data

The analysis activity is often one of the most difficult steps in process improvement.

Organizations, which are concerned or embarrassed about their current level of performance, often either do not collect the necessary numbers, or do so in a way that makes them difficult to access and understand. To document a level of performance that warrants the expenditure of resources is often a painful step for organizations. The Business Analyst, who understands that it is impossible to measure progress if there is not a defined starting point, may need to be very creative in securing agreement to a baseline.

This activity is described in more detail in the Skill Category Three, Define Implement and Improve Processes.

1.5.3 Benchmarking

Benchmarking is often an early activity in the organizational assessment process that initiates a major quality/process improvement effort by an organization. Organizations seek to learn how well others perform in many aspects of their business. Benchmarking activities often are the precursor to major systems initiatives and, therefore, are of great importance to the Business Analyst.

Within Information Technology, common benchmark issues include items such as the Percent of the IT Budget devoted to New Development, Maintenance/ Enhancements and Problem Resolution. In the Development Lifecycle, benchmark issues may focus on the Percentage of Defects identified in Requirements, Design, Code, Test and Production respectively. Organizations seek to learn who is “best” and how their organization compares. They also seek to learn how those results are being achieved.

Benchmarking can be as simple as gathering whatever published reports and documents (Annual Reports, advertising materials, newspaper articles, etc.) are available. The primary issue with this approach is that it is often lacking in the critical details needed to determine whether the results are credible and applicable.

A more rigorous approach is to identify which organizations appear to be performing well through either the sources above or through personal or industry contacts. Direct contact is then made to see if the organization is willing to share the real data and what is behind it. This often requires protracted negotiations and may involve signing of confidentially agreements. Winners of the major national quality awards (Canadian National Quality Award, Malcolm Baldrige Award, National Quality Award (India), etc.) are generally required to provide information about their results and how they were achieved. These can be an excellent source of data.

Once performance information has been gathered, it is compared to the internal baseline already developed. (It may be necessary to adjust the calculation of the baseline to insure direct comparability with external data.) This comparison provides information which

Page 34: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

1-14 Version 9.1

becomes part of the decision making process when determining which improvement activities should be undertaken.

1.5.4 Cause-and-Effect Diagram

The “Cause and Effect Diagram,” “Ishikawa Diagram,” “Root Cause Analysis Diagram” and the “Fishbone Diagram” all refer to the same basic process. The essential elements are the identification of a specific problem, desired outcome, or issue, which is then clearly articulated by the group. This becomes the head of the diagram. To the extent that it is possible to do so, this statement should contain measurable data that defines the parameters of the statement, for example; “In the last 6 project completed by the Sales Team, 20% or more of the Requirements were identified after the initiation of Integration Testing.”

The group is then challenged to identify reasons why the stated problem or situation might be occurring. In his research, Ishikawa identified that 5 areas occur fairly consistently:

1. People

2. Processes (Methods)

3. Material

4. Machines

5. Environment

When dealing with Information Technology projects, it is common practice to include a sixth area that is IT Specific: Data. It is also increasingly common to add Communications.

Figure 1-1 Cause-and-Effect Diagram

Page 35: CABA_CBOK_Ver_9-1

Business Analyst Principles and Concepts

Version 9.1 1-15

The illustration in Figure 1-1 represents the basic “Fishbone” format. As individual items are suggested, they are entered onto the appropriate “fin” or leg of the diagram as shown in Figure 1-2.

Figure 1-2 Cause-and-Effect Diagram with Initial Level of Detail

Once all of the “big ticket” items have been added to the diagram, they need to be decomposed (broken down, one level at a time) into finer levels of detail. The decomposition is complete when it comes to something outside the control of the organization (the weather) or when a Root Cause has been identified. Ishikawa states that it may be necessary to ask WHY five (5) times to arrive at a Root Cause. For small, contained issues only one or two levels may be necessary.

When all of the Root Causes have been identified, it is then possible to begin the process of analysis and prioritization.

1.5.5 Control Charts

Control charts are one of the seven key tools identified by Ishikawa for improving Quality. Presenting data in this format can provide both the Business Analyst and the Business Partner with useful insight into a problem or situation. Control Charts are especially useful in understanding how systems and processes are performing over time.

Control Charts have the following characteristics:

• A centerline. This usually represents a numeric average of either actual historical or desired performance for the system or process.

Page 36: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

1-16 Version 9.1

• Upper and Lower Boundaries represent the limits that define acceptable, or controlled, performance. These generally have a statistical base and are frequently described in terms of the number of standard deviations (Sigma is the mathematical representation of a Standard Deviation, hence Six Sigma12) they represent. A standard deviation is the square root of the sum of the differences between the population mean and the single instance, squared.For example, if the mean is 20 and the first instance is 12, (20-12=8; 8 squared = 64.) Repeat this process for each item in the distribution. Add then all up, then calculate the square root; or use the formulas built into any spreadsheet.

• Performance over time is plotted on the chart. Plot points that fall outside the acceptable or desired performance range are generally subject to further scrutiny.

In Figure 1-3, Periods 1 and 6 are outside the established control limits and would normally require investigation and action to determine the cause(s) and address them. Control Charts are occasionally referred to as “Run Charts,” “Line Charts” or “Shewhart Charts.” The effective use of Control Charts for managing processes is the backbone of Statistical Process Control (SPC). Statistical Process Control is a necessary tool for moving from CMMI™13 Level 3 to Level 4. This will be discussed in more detail in Skill Category 3.

Figure 1-3 Standard Control Chart

12. Six Sigma is the copyrighted name for Motorola’s Quality Control program. 13. CMMI is a trademarked product of the Software Engineering Institute (SEI.)

Control Chart for 10 Periods

0

200

400

600

800

1000

1 2 3 4 5 6 7 8 9 10

Performance Over Time

Lower LimitAverageUpper LimitPerformance

Page 37: CABA_CBOK_Ver_9-1

Business Analyst Principles and Concepts

Version 9.1 1-17

1.5.6 Graphical Representations

1.5.6.1 Pie Charts

Pie Charts are an excellent method for displaying data where there are relationships to be understood. The conceptual presentation is very simple and a large amount of information can be conveyed very quickly. As the name implies, Pie Charts are round and have wedges as seen in Figure 1-4.

Figure 1-4 A Typical Pie Chart

1.5.6.2 Bar (Column) Charts

Bar or Column charts are often used to present the same kinds of data as pie charts, but bar charts can include multiple series as opposed to the single series shown in Figure 1-4. In Figure 1-5, data for three periods is presented, but the detail of each entry has been eliminated. For analysis purposes, it is possible to determine the general trends for each country, but not the precise numbers. This will be effective in some situations; in others, it may be necessary to supplement the display with the actual

20xx Revenue By Country

Hong Kong, 120

Thailand, 212

China, 397

India, 406

Japan, 315

Australia, 300

Page 38: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

1-18 Version 9.1

data.

Figure 1-5 A Typical Chart with 3 Series of Data

When data is displayed vertically as it is in Figure 1-3, the chart is properly known as a column chart. When the data is displayed horizontally, it is a bar chart. Both Pie and Bar/Column Charts can be manipulated in a number of ways (3-D, Pulled out Wedges, etc.) which make them a very popular and flexible tools for the Business Analyst. These graphical representations of data are easily accomplished with most spreadsheet packages.

1.5.7 Cost of Quality

Although the popular name for this concept is the cost of quality, it is in reality, the cost of poor quality. For the Business Analyst, the cost to design and develop a new system, or modify an existing one, is of key importance. The language of business is money. Therefore, translating the impact of quality decisions into financial terms makes very good sense. It helps to bridge the gaps in understanding which can occur when there is no other common basis.

• Product Cost: The amount of resources (time and money) required to build the product one time, correctly. In manufacturing environments, this represents the bulk of the total costs, often as much as 95%. By contrast, in Information Technology, it is common for this to represent as little as 30% of the final cost of a product. The remaining funds expended are the cost of (poor) quality. Some of these costs are to prevent errors from being created, while others are to catch and correct defects already built.

• Product Appraisal and Inspection Costs: The resources used to determine if the product has been built correctly and to identify the defects that have been created. Included in these costs would be Design Reviews, Code Inspections, Glass Box and Black Box Testing, Test Automation, Usability Testing, Beta Testing and Pre-Release out-of–the Box Testing.14 Pushing appraisal costs as early into the life cycle as possible will reduce the total cost to find and fix defects. This has lead to

14. Kaner, Cem; Quality Cost Analysis: Risks and Benefits; www.kaner.com; 1996

Revenue Comparisons

0

100

200

300

400

500

Hong Kong Thailand China India Japan Australia

20x1 through 20x3

20x120x220x3

Page 39: CABA_CBOK_Ver_9-1

Business Analyst Principles and Concepts

Version 9.1 1-19

the increased popularity of Inspecting Requirements, which is commonly cited as the most effective cost reduction tool available.15

• Product Failure Costs: The resources consumed to handle and correct problems (defects) in the product. Failure costs have historically been divided into two (2) categories: Internal Failure Costs and External Failure Costs. Many organizations focus on only External Failure Costs (it’s OK as long as the customer doesn’t see it.). This mentality creates focus on the external customer. However, this approach ignores the very significant internal costs, which may be very important in the long term.

• Internal Failure Costs are activities and expenses incurred as a result of defects both during and after product development. Examples of Internal Failure Costs include redefinition of requirements, redesign of elements, tables, modules and screens, algorithm fixes, regression testing, wasted business partner, analyst, programmer, designer, architect and tester time, changes to training materials, changes to user manual, delays in product delivery, impact to other projects, help desk staffing,16 and missed business opportunities.

• External Failure Costs cover a wide range of potential exposures for organiza-tions, even if the software they develop is only used by their own employees. Typical costs include customer dissatisfaction, product returns, lost sales, dam-aged reputation, reshipping of replacements, cost to develop and implement “work arounds,” cost to maintain multiple versions as a result of new, unstable releases, contract disputes, loss of goodwill and legal fees and penalties.

• Prevention Costs: those costs incurred to prevent defects or poor quality from occurring. Prevention costs includes the time to develop, document, and implement good standards and procedures, including time to train in how to use them effectively, time spent in collection and analysis of defect data, time spent to acquire, install and train staff of the use of appropriate tools, and time spent learning effective communications and interpersonal skills. Because they prevent defects from being created, prevention costs are the most effective in actually improving quality; but because those defects do not actually occur, it is often difficult to demonstrate the return on investment directly.

• Total Product Cost: this is the sum of all four of the elements above. Juran, Crosby and Perry have demonstrated that small percentage increases in Prevention Costs yield much larger percentage cost reductions in Failure Costs, thereby producing a net reduction in Total Product Costs as shown in Figure 1-6 Cost of Quality.

15. Wiegers, Karl; Cosmic Truths About Software Testing; QAI Spring Conference 2006. 16. Help Desk Staffing is an expense organizations will incur because of the anticipation (based on past

performance) that problems will occur and support will be required. If the product is used by others outside the organization, Help Desk Staffing is also an External Failure Cost.

Page 40: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

1-20 Version 9.1

Figure 1-6 Cost of Quality

1.5.8 Earned Value

This approach compares information about the amount of work planned to what has actually been completed. This is used to determine if cost, schedule and work accomplished are progressing as planned. The comparisons are often expressed in equations such as:

BCWP - ACWP = CV

(Budgeted Cost for Work Performed minus the Actual Cost of Work Performed equals the Cost Variance)

Value is earned as work is completed. This approach is very effective for the CSBA as it allows the compilation of information across projects on a consistent and reliable basis. According to many sources, two-thirds or more of all IT projects are over budget, behind schedule, or both. This leads to massive outlays of unplanned resources to address the problem or to avoid significant negative financial results for late delivery or delivery of a defective product.

In addition to Schedule and Budget, it is essential to have a clearly defined and agreed upon Scope Statement. Without this, neither the schedule nor the budget are meaningful. The Scope Statement describes, in significant detail, the work to be accomplished.

The advantage of this approach is that it allows the early detection of slippage by using an industry standard approach to:

1. Measure a project’s actual progress

2. Forecast both project completion date and final cost

Prevention, 3

Appraisal, 32

Failure, 35

Product, 30

Prevention, 4

Appraisal, 32

Failure, 31.5

Product, 30

0

20

40

60

80

100

1 2

Cost of Quality

Page 41: CABA_CBOK_Ver_9-1

Business Analyst Principles and Concepts

Version 9.1 1-21

3. Track schedule and budget throughout the project life cycle

Measuring only scope, schedule or budget in isolation allows one to be maximized at the expense of the other (for example, delay the delivery date and cut scope to reduce budget; impact: work is finished but at a higher cost or the date is met, regardless of the cost, even if it means cutting scope and reducing quality). Early detection of problems allows more flexibility in developing effective responses.

Earned Value Analysis works most effectively when there is a consistent and realistic approach to developing the project Work Breakdown Structures (WBS). This detailed effort is essential to creating a solid estimate of the work to be done and to creating reasonable benchmarks along the critical path. Failure to break work down to a sufficient level of granularity will make it difficult to identify schedule issues in a timely fashion.

One issue that can arise with Earned Value reporting is that it does not have an integrated measure of the quality of the work being performed. Unless other specific quality measures are carefully designed and implemented, it will be possible to deliver a product on time and in budget, but with significant defects.

The formula, BCWP - ACWP = CV is one example of many potential metrics, which can be developed using the Earned Value Analysis; others include a comparison of Budgeted Cost for Work Performed to Actual Cost of Work Performed for the Project to date, sometimes referred to as the Cost Performance Index (CPI):

BCWP / ACWP = CPI

CPI should be greater than 1, indicating that 100% or less of the budget was consumed for the work that has been completed. A CPI less 1 indicates funds in excess of the budget have been spent for the actual work completed.

Budgeted Cost for Work Performed to Budgeted Cost for Work Scheduled is referred to as the Schedule Performance Index as shown in the formula below:

BCWP / BCWS = SPI

SPI should also be greater than 1, indicating that 100% or less of the time allowed has been used to complete the scheduled work. When multiplied (SPI times CPI) the result should also be greater than 1. The more negative (below 1) the result is, the more difficult it will be to bring the project in as planned, because more time has been spent doing less work than anticipated.

BCWP BCWP120000 150000

Page 42: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

1-22 Version 9.1

In the examples above, the Budgeted Cost for Work Performed (BCWP) in the first column is $120,000 and $150,000 in the second column. In Example 1 the Actual Cost of Work Performed (ACWP) in each case is = $160,000, or $40,000 over budget the $120,00 budget in the first column. When the BCWP is divided by the ACWP, the resulting Cost Performance Index (CPI) is 0.75. This number, less than one, indicates the project has spent more money than budgeted for work actually performed. For example, we estimated that to define 50 requirements would cost $10,000. We have defined 50 requirements, but at a cost of $12,000.

Still using data from the first column, when the Budgeted Cost of Work Performed (BCWP) is divided by the Budgeted Cost of Work Scheduled (BCWS) of $150,000, the resulting Schedule Performance Index (SPI) is .80. This shows that the project is significantly (20%) behind schedule. The calculation of the Cost Schedule Index (CSI) using this data is shown in Example 3. The result, .60, indicates that this is a project in serious difficulty from both a schedule and a cost perspective. The further below 1.0 the CSI is, the more problems will be encountered in attempting to recover.

In Example 2, still using a BCWP of $120,000, the Actual Cost ACWP is $110,000 and the Scheduled Cost BCWS is also $120,000. The resulting CSI, shown in the first column of Example 4 is 1.09. This project is currently in good shape in terms of both schedule and budget.

Working in conjunction with the Project Manager, the Business Analyst will be able to use these and other metrics, which can be developed using the Earned Value Analysis, to detect and address signs of trouble early in the project. Many organizations find that once a project is more than 10% complete, any budget or schedule overrun that exists at that point is almost impossible to recover. At the 20% completion point, the CPI will not change by more than 10%. Assuming that the numbers shown in Example 1 were calculated at the 20% completion point, the project is 20% over budget. A 10% variance would mean that the finished project will be between 18% and 22% over budget.

Example 1 ACWP 160000 0.75 0.94Example 2 ACWP 110000 1.09 1.36

Example 1 BCWS 150000 0.80 1.00Example 2 BCWS 120000 1.00 1.25

CPI x SPI = CSIExample 3 0.80 0.75 0.60Example 4 1.00 1.09 1.09

Page 43: CABA_CBOK_Ver_9-1

Business Analyst Principles and Concepts

Version 9.1 1-23

1.5.9 Expected Value/Cost

Expected Value/Cost is a method for examining the relative potential costs or benefits of multiple options, based on both the anticipated dollar outcome (either positive or negative), as well as, the probability that any particular outcome will occur. This is often a difficult discussion to conduct, particularly when there is one especially larger cost, or, more frequently, benefit involved. Decisions makers, lacking an objective structure for evaluating the alternatives and drawing conclusions, often have difficulty in turning their back(s) on a very large potential benefit, regardless how unlikely it is to occur.

In Figure 1-7 a decision must be made in the following situation:

Should a prototype of the new airport security X-ray product be built? Project requirements were poorly defined. As a result, there is the risk that the final product will not pass the user acceptance test. However, a prototype also would substantially reduce the cost of rework for failures at user acceptance test.

• Cost to build the prototype $98,000

• Probability of passing user acceptance test

• With prototype 90%

• Without prototype 20%

• Cost of rework after user acceptance test

• With prototype $20,000

• Without prototype $250,000

In an unstructured discussion, the cost to build the prototype may easily be more tangible to decision makers than the potential cost of the failure to build the prototype. There are two (2) main Branches for this Decision Tree, build the Prototype at an initial cost of $98,000 or do not build one at an initial cost of zero dollars. Off the top branch of the Decision Tree, there are two options with associated probabilities and costs; Pass Acceptance Testing and incur no additional costs; (90% probability) or Fail Acceptance Testing, but perform better, therefore incurring smaller additional testing cost of $20,000. There is a 10% probability of this occurring if the prototype is built; therefore the Expected Value of this outcome is $2,000 (the cost of the outcome times the probability that it will occur).

The total Expected Value of this Branch is as follows:

Page 44: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

1-24 Version 9.1

Figure 1-7 Decision Tree with Expected Values

$98,000 + $0 + $2,000 = $100,000

Using the same approach, the total Expected Value of the lower branch is as follows:

$0 + $0 + $200,000 = $200,000

Based on this analysis, the organization can expect to spend twice as much if they fail to build the prototype. This example shows a fairly simple application of the expected value decision making approach. Often decisions in real life are significantly more complex, with more than two initial options and nested financial amounts and probabilities. Figure 1-8 shows a more complex Decision Tree.

Page 45: CABA_CBOK_Ver_9-1

Business Analyst Principles and Concepts

Version 9.1 1-25

Figure 1-8 Decision Tree and Expected Value for Multiple Outcomes

Note that in Figure 1-8 all 6 final branches have the same number of options. This is not uncommon; often the final options and their costs do not change, but the associated probabilities do change depending upon the preceding decisions. In this example, Option C significantly decreases the probability that a catastrophic failure will occur, while simultaneously increasing the probability of passing.

1.5.10 Flow Chart

A traditional tool of systems developers, flow charting is an excellent method for reducing ambiguity in the relationships among objects, information, people and processes. Because of the frequency of its use, flow charting symbols have been standardized and are included in virtually all graphics and word processing products. These tools will handle simple charts. For more complex charts and relationships, there are more specialized products available.

Page 46: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

1-26 Version 9.1

Figure 1-9 Simple Generic Flow Chart

Specialized flow charts are used for specific issues in software development; Data Flow Diagrams trace the movement of information through a process; Business Process Maps define all of the components of a specific activity, whether automated or not; State Transition Diagrams identify how and when transformations occur; Entity Relationship Diagrams identify who and what are involved in a process and how they interact.

1.5.11 Force Field Analysis

Developed by Dr. Kurt Lewin17, Force Field Analysis is a structured approach for identifying and evaluating the forces that will promote, encourage and support change and those that will resist change. He referred to these as driving forces and restraining forces. When these two forces are balanced, the status quo is maintained; only when the driving forces are stronger than the restraining forces, will change occur. Lewin created a visual representation of these forces, which allows a more intuitive interpretation of the forces.

The desired change is identified at the top of the analysis. Driving forces are displayed on the left of the page and the corollary resisting forces are shown to their right. This presentation allows the analyst to identify more clearly how strong the obstacles to change are and what assets exist to help. In this approach, arrows are used to demonstrate both the direction and the

17. Lewin, K. (1948) Resolving social conflicts; selected papers on group dynamics. Gertrude W. Lewin (ed.). New York: Harper & Row, 1948.

Page 47: CABA_CBOK_Ver_9-1

Business Analyst Principles and Concepts

Version 9.1 1-27

strength of the force; the shorter the arrow is, the weaker the force. Conversely the stronger the force is, the longer the arrow.

Desired Change: Implement Inspections for Requirements

Figure 1-10 Simple Force Field Analysis

For the Business Analyst, completing the Force Field Analysis will provide a detailed insight into what might be involved in any potential project or process change. It requires the Analyst to gather information about:

• What is the current situation?

• What is the problem (gap) that the change is intended to address?

• Who are the key players?

• What is their position, and can that position be changed?

• What are the costs and benefits associated with the proposed change (not just monetary but also in terms of power and politics)?

Notice in Figure 1-10 that for some Driving Forces, there is more than one Resisting Force. This is common, and the total weight of the two may be greater than the driving force if action is not taken. With this information in hand, the Business Analyst can develop a strategy to address the issues of those who will resist change and maximize the benefits perceived by those in favor. Alternatively, it may also help to determine that the current situation has too many resisting forces and that this change should be deferred.

1.5.1Histogram

Page 48: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

1-28 Version 9.1

This chart is one of the “key tools” identified by Ishikawa as essential for improving process quality. It is a special- purpose Bar Chart for recording process information. It can provide the following information to the analyst:

• Mean - The arithmetic average of all values created by the process

• Minimum - The smallest of all values created by the process

• Maximum – The largest of all the values created by the process

• Standard Deviation - A measure of how closely grouped the values created by the process are (density or tightness). Standard Deviations are measured from the Mean. One Standard Deviation always includes 68% of all of the items in a class; 34% on either side of the Mean. Two (2) Standard Deviations will always include 95.5% of all the values; 47.8% on either side of the Mean.

• Number of Classes - Classes represent natural subgroups within the values produced by the process. Typical processes will have more than 4 and fewer than 10 processes. This determines the number of bars in the histogram.

• Class Width - The range of values within an individual class. This is usually a standard amount for all of the bars; occasionally it will be standard for the central distribution, but may be larger in the tails. For example the columns representing the classes in the first two standard deviations may be measured in hundreds; while those in the third and fourth are measured in thousands.

• Skewness - Most processes will produce an even distribution on either side of the arithmetic mean. This will produce a symmetrical histogram (the traditional bell curve is a symmetrical distribution). When the mean does not fall close the center of the classes, the distribution is said to be skewed. The further from the central class(es) the mean falls, the more skewed the distribution.

Figure 1-11 Bar Chart with Skewness

0

50

100150

200250

Wk Minus 3

Wk Minus 2

Wk Minus1

Wk 0 Wk Plus1

Wk Plus2

Wk Plus3

Avg = 116 STD = 68

Trouble Calls During Acceptance Test and Implementation Calls

Page 49: CABA_CBOK_Ver_9-1

Business Analyst Principles and Concepts

Version 9.1 1-29

Figure 1-12 is a fairly typical histogram with no apparent skewness, while representing a single iteration of a process. There are 7 Classes and the Class Width is 1 Week. While this information may have some use, it becomes much more valuable when placed in the context of multiple iterations of the process. If the Business Analyst knew from previous implementations that the Mean for similar sized projects was 56, it would indicate that this project had issues that need to be addressed. Alternatively if the Mean was 95, it would indicate that this project had performed better than average. In either case, the Analyst would want to understand what happened and make use of Lessons Learned.

Figure 1-12 Histogram with Even Distribution

1.5.12 Kaizen

The Japanese strategy of “small continuous improvement”, this approach emphasizes process-oriented thinking rather than results-product oriented thinking. Kaizen is the purview of staff, line and middle management, the highest level of the organization is rarely involved in small improvements. Top Management is responsible for major innovation, Middle Management is responsible for ensuring that small improvements are being made on a daily basis, and staff is responsible for maintaining the improvements that have been made and for suggesting new ones.

This approach focuses on creating the right environment and individual attitudes for the continuous improvement of all processes and features the following concepts:

• Something in the organization should be improved every day

• All management actions should ultimately lead to increased customer satisfaction

2758

97122

10472

44

020406080

100120140

Wk Minus

3

WkMinus

1

WkPlus 1

WkPlus 3

Mean =74.9 STD Dev = 34.4

Trouble Calls During Acceptance Test and Implementation Calls

Page 50: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

1-30 Version 9.1

• Process-oriented thinking and actions

• Quality, not profit, is first

• Defects are a treasure. Finding defects is encouraged and rewarded

• Problem solving is cross-functional and systemic, not ad hoc

For the Business Analyst, using Kaizen as a personal and project philosophy will result in an emphasis on the kind of continuous learning and process improvements that create outstanding performance.

1.5.13 Pareto Principle

Vilfredo Pareto, an economist, gave his name to a phenomena that had been observed by many others in the past. The Pareto Principle states that the distribution of critical factors is not random or uniform but follows a pattern. There are the critical few, approximately 20% of the distribution, and the trivial many, generally about 80% of the distribution.

In Information Technology this is reflected in situations such as, 80% of the time in systems development is often focused on about 20% of the functionality; 80% of the problems arise from 20% of the product. In the larger business context, most organizations see that 20% of their customers generate about 80% of the revenue.

For the Business Analyst, this Principle provides an excellent tool for allocating attention and resources. In the frenzied world of Information Technology it is not uncommon to see the urgent drive out the important. This results in wasting resources on trivial, current problems when there are more important issues to be addressed. Using the Pareto Principle will provide focus and help the project move toward a more successful conclusion.

Figure 1-13 is a simple Pareto Chart displaying both the quantitative data on the left side y-axis and the percentage data on the right side, secondary y-axis. The cumulative total of the data is displayed by the line extending from the first data point on the left to the 100% mark on the right.

Page 51: CABA_CBOK_Ver_9-1

Business Analyst Principles and Concepts

Version 9.1 1-31

Figure 1-13 Simple Pareto Chart with Data Count and Percentages

1.5.14 Relationship Diagram, Entity Relationship Diagram

This tool is used to understand how various components interact under specific circumstances. It allows the analyst to look at one-to-one, one-to-many, and many-to-one relationships. Because many-to-many relationships are often the source of logic errors if not carefully defined, the Relationship Diagram requires that Many-to-Many relationships be broken down into one of the other formats using an associated entity. This removes the potential ambiguity in these relationships. Entity Relationship Diagrams are examined in more detail in Skill Category Five, Business Requirements.

1.5.15 Scatter Diagram

This is another of the basic tools identified as essential to managing and improving process quality by Ishikawa. It allows the analyst to examine two variables and determine the extent and nature of their relationship. Typical scatter diagrams use a limited number of data points to reduce clutter and improve comprehension. They maybe used examine the change in process results over time or similar situations.

Defects Indentified by Phase

0

200

400

600

800

1000

1200

1400

Requ

iremen

ts

Desig

n

Codin

g

Testi

ng

Imple

mentat

ion

Prod

uctio

n

Phases

Def

ects

100%

0%

50%

20%

80%

Page 52: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

1-32 Version 9.1

Figure 1-14 Scatter Chart for Inspection and Testing Time By Project

In Figure 1-14 the analysis looks at the relationship between hours spent, by project, on Inspecting Requirements versus Testing activities for a group of similarly sized projects. It is not uncommon to see a several of such charts, looking at a series of factors to determine which function has the greatest impact on the factor held constant. For example Figure 1-15 is an alternative chart to this one, looking at the experience level of the testers compared to the hours spent in Testing.

Figure 1-15 Scatter Chart Experience Level of Testers and Hours Spent

In Figure 1-15, there is no clear correlation on this analysis of similarly sized projects. This type of analysis might be useful in determining whether the most effective method of reducing the testing effort is to hire more experience testers, or implement Inspection of Requirements.

Hours Spent in Reqirements Inspection vs Integration, Regression and Acceptance Testing

0100200300400500600

0 10 20 30 40 50 60

Hours Spend in Requirements Inspections

Hou

rs S

pent

in

Inte

grat

ion,

Reg

ress

and

Acce

ptan

ce T

es

Hours Spent in Integration, Regression and Acceptance Testing

0

200

400

600

0 2 4 6 8 10

Years of Testing Experience

Hour

s S

pent

Test

Page 53: CABA_CBOK_Ver_9-1

Business Analyst Principles and Concepts

Version 9.1 1-33

1.5.16 Six Sigma18

Introduced by Motorola in the 1980s, Six Sigma refers to a level of quality in which the defect rate falls outside 6 Standard Deviations from the statistical mean. Technically, this translates to 2 per billion; but because of the tendency of the process mean to “drift” with very high levels of data, Motorola established a quality level of 3.4 errors per million. It is this number that is most commonly seen in reference to Six Sigma Quality.

Although originally introduced into the high-volume manufacturing world, the quality concepts have been adapted to the development of software. Often organizations that are seeking to achieve ISO (International Standards Organization) Certification for their software products will use the Six Sigma practices to move them forward.

The keys to implementation of Six Sigma are a management commitment to a multi-year (often as long as 5 years) process for implementing the necessary processes; the support of trained leaders (Black Belts) for driving and supporting the transition and a commitment to use process improvement to drive out variability.

A more detailed consideration of Six Sigma concepts is contained in Skill Category Seven, Software Development Processes.

1.6 Summary In this Skill Category we have examined the evolution of quality concepts and practices around the world. By understanding the work of quality pioneers, the Business Analyst is better positioned to provide a strong link needed between the Business community and Information Technology (IT).

Skill Category 1 also provides an introduction to the basic tools of implementing quality processes and procedures. Many of these tools will appear in later Skill Categories; where their application to specific needs will be addressed.

Armed with a good knowledge of the basic concepts and tools of quality, the CSBA can approach project needs with greater knowledge and skills. In the next Skill Category, Management and Communication, we will examine the role of management and communication in the functions of the CSBA.

18. Six Sigma, Motorola Journal 1986.

Page 54: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

1-34 Version 9.1

Page 55: CABA_CBOK_Ver_9-1

Management and Communication Skills

Version 9.1 2-1

Management and Communication SkillsThe most important prerequisites for successful implementation of any major quality initiative are leadership and commitment from executive management. Management must create a work environment supportive of quality initiatives. It is management’s responsibility to establish strategic objectives and build an infrastructure that is strategically aligned to those objectives. This category will cover the management processes used to establish the foundation of a quality-managed environment, as well as commitment, new behaviors, building the infrastructure, techniques, approaches and communications.

2.1 Leadership and Management ConceptsManagement has existed to organize human activities, from simple to complex, since the days of the Pharaoh’s or even earlier. There were very few books written about management or leadership until the Eighteenth Century, and those that were written generally focused on military organizations. The operating theories of management that developed in the early days of the Industrial Revolution were generally reflective of the attitudes of the day: in a class society, the “upper class” had complete control and authority over the activities of those in the “lower class.” “Upper Class” individuals were intelligent, educated, energetic and entitled, or so the theory went. The “lower class” was characterized as having the opposite attributes.

Organizations of all types were hierarchical in nature. At the top were a very few individuals, not infrequently a single individual, who exercised all of the power and control. The Ownership and Management were often synonymous. Rensis Likert1 in his research captioned this management style as “exploitive-authoritarian” and defined it as follows:

1. Likert, Rensis; The Human Organization, Its Management and Value, McGraw-Hill, 1967

Skill Category

2

Page 56: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

2-2 Version 9.1

“where decisions are imposed on subordinated, where motivation is characterized bythreats, where high levels of management have great responsibilities but lower levelshave virtually none, where there is very little communication and no joint teamwork.”

Likert also identified a second, somewhat less controlling style which he captioned “benevolent-authoritarian”:

“where leadership is by a condescending form of master-servant trust, wheremotivation is mainly by rewards, where managerial personnel feel responsibility butlower levels do not, where there is little communication and relatively littleteamwork”2

Within context, these styles appeared to work fairly well, especially for those at the top.

As the Nineteenth Century gave way to the Twentieth, massive socials changes were underway thought the world. The working class was becoming better educated in much of the world, and the growth of modern transportation systems made it easier for workers to relocate in search of better working conditions. The formerly unquestioned assumptions about how to manage effectively were challenged by a series of researchers and writers who became interested in productivity and motivation.

Frederick Taylor, the father of “Scientific Management,” developed a management approach that identified four fundamental and interrelated principles:

1. Management is a science. The solutions to the problems of business management couldbe discovered by the application of the scientific method of experimentation andobservation. This will establish the one correct way to perform any task.

2. The selection of workers is a science. The “first class worker” was the worker who issuitable for the job. It is management’s job to determine which worker is best suited forwhich job.

3. Workers are to be trained and developed. Once the correct worker is selected, theyneed to be trained in the ‘one right way” to perform their tasks. Managers need toensure that as the tasks evolve, workers are updated on the new procedures.

4. Scientific management is collaboration between management and the worker.3Managers plan, develop processes, schedule and train; workers execute the way theyhave been trained, according to the plan.

Unlike the US, in France there was enormous emphasis on the way work was administered. This was grounded in the Bureaus which had been established for the administration of the French government. Henri Fayol4, an engineer working for a mining company, developed a list of “fourteen principles” successful organizations ought to follow. They include:

• Division of work - Work should be specialized and like jobs should work together

2. Ibid.3. This is the origin of the most common definition of management as “the accomplishment of prede-

termined objectives through others.”4. Henri Fayol, Theory of Administration, www.mgmtguru.com, The History of Management, 2006.

Page 57: CABA_CBOK_Ver_9-1

Management and Communication Skills

Version 9.1 2-3

• Authority - Delegated persons ought to have the right to give instructions and expect that they will be followed

• Unity of command and direction - Workers should receive direction from only one person and that direction should be consistent across the organization

• Subordination of individual interests - By focusing on a single organizational objective, internal conflict will be minimized

• Stability of personnel - Turnover is disruptive and expensive; organizations do not want to lose the knowledge of experienced workers

The USA focused on how to improve productivity. The most well know of the research activities took place at the Hawthorne Works of the Western Electric Company, outside Chicago between 1924 and 1932. The work was conducted by a team of researchers; but, the analysis and reporting done by Elton Mayo whose name was most associated with these experiments. In what is termed “The Hawthorne Effect”, Mayo proposed the true way to improve productivity was to pay attention to the workers and to recognize that the work place exists as a social construct. His research led to the concept of talking to workers about what was important to them. It also became an important foundation for the work done by Abraham Maslow.

Maslow conducted his research during the early years of World War II. He proposed that there were 5 needs felt by all individuals, called the basic needs. He arranged these needs in a sequence which represented the order in they are felt and fulfilled by individuals. Each need must be satisfied to a certain extent before the next need, and only rewards based on that need would be recognized. This he referred to as The Hierarchy of Needs.5 The 5 needs he identified are:

1. Physiological - Hunger, thirst, sleep. The basic needs to survive

2. Safety - Freedom from physical danger and deprivation

3. Love - The need to be part of a group, to give and receive affection

4. Self-Esteem - Reputation, the need to be recognized with in the group

5. Self-Actualization - The desire to improve, to create, to find job satisfaction

This theory, for the first time, explained why the rewards being offered by management to workers were not producing the desired levels of effort and results. A few organizations explored how to change the relationship between management and workers, but most had not heard of Maslow and his work.

By contrast, at the end of World War II, the fundamentals of the assembly line processing (Taylor and Gilbert) and the administrative / hierarchical management concepts (Fayol) were seen in every kind of organization in many countries. The post war demand for goods of all kinds gave renewed emphasis to the quest to determine how to become more productive. In the West, the underlying assumption, based on the theories of the past, was that it was

5. Maslow, Abraham; Motivation and Personality, published in 1954 (second edition 1970)

Page 58: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

2-4 Version 9.1

necessary for the workers to become more highly motivated, while in Japan, Deming was laying the foundations for the Quality Revolution.

In 1960, Douglas McGregor published his theory about how people are managed6. In this work he identified two vastly different management styles, which have their roots in the belief systems of managers (and to some extent workers):

Theory X holds that people are basically lazy and will avoid work (or learning) if it isat all possible; because of this, most people must be coerced, threatened, etc. to getthem to put forth the effort needed to achieve the results the organization desires.Because most people desire security above all else (according to those who agree withTheory X) they wish to avoid responsibility and prefer to be directed.

Theory Y holds that working is as normal for people as playing, and that people do notneed to be threatened to get them to work; they need to identify with the goals andobjectives of the work. The rewards they crave are at the high end of Maslow’s scale,not the low end. People have enormous capacity for creativity and learning, but littleof that capacity is utilized by most organizations.

This then opened the door for the two other styles of management which Likert7 described:

Consultative system- where leadership is by superiors who have substantial, but notcomplete trust in subordinates, where motivation is by rewards and some involvement,where a high proportion of personnel, especially those at the higher levels feelresponsibility for achieving organization goals, where there is some communication(both vertical and horizontal) and a moderate amount of teamwork.

Participative-group system - which is the optimum solution (according to Likert)where leadership is by superiors who have complete confidence in their subordinates,where motivation is by economic rewards based on goals set in participation wherepersonnel at all levels feel real responsibility for the organizational goals, where thereis much communication, and a substantial amount of teamwork.

Despite the fact that these studies were published in the late 1960’s, organizations continued to operate under the older hierarchical / authoritarian models, and continued to focus on ineffective or counterproductive management strategies. By the mid 1990’s this problem was becoming acute due to 3 major influences8 according to Feigenbaum:

1. The formation of an increasingly competitive global market

2. The continuing change in customer values

3. The trend toward affordable high quality products

6. McGregor, Douglas, The Human Side of Enterprise; 1960.7. Op. cit Likert8. Feigenbaum, Armand, “How Total Quality Management Counters Three Forces of International

Competitiveness”; National Productivity Review, Summer 1994.

Page 59: CABA_CBOK_Ver_9-1

Management and Communication Skills

Version 9.1 2-5

It is no longer enough to provide a quality product or service, according to Feignebaum,9 it must also be affordable. Cutting costs to improve productivity without measures to maintain or improve quality will be counter-productive. The old model for management, which focused on centralized command and control, limited the ability to provide creative input to a select few, and focused on people as the source of problems and defects, never produced the organizational synergy needed.

2.2 Quality ManagementAn effective Quality Management approach represents the successful integration of the concepts learned through the work of Juran, Deming, Crosby and others on the quality side with those learned from Mayo, Maslow, Drucker and McGregor. The following are the major characteristics of Quality Management:

• Manage by Process

• Manage with Facts

• Manage toward Results

• Focus on the Customer

• Continuous Improvement

2.2.1 Manage by Process

This is a deceptively simple statement. Most organizations have a large number of processes. They use those processes for accomplishing their work. They assume they are in fact managing by processes. In looking a little more closely at these organizations, the processes have innumerable exceptions, workarounds and loopholes. In this situation the organization is in fact managing people and schedules, not processes.

To manage by process the organization must have substantial, well defined and fully implemented processes that describe how work is done. People are trained in those processes. Those processes are controlled; the results each process produces is known and documented. Reasons for deviations are identified. (Once robust processes are in place for the primary flows, collateral processes for handling exceptions can be developed and documented. This accommodates those items which must, for one reason or another be handled as exceptions.) Data about what the process is capable of is produced and collected in a systematic fashion. This data is at the detail level of the processes and provides great insight into how the process

9. Ibid.

Page 60: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

2-6 Version 9.1

is actually performing over time. Concepts such as Process Capability are possible at this level.

When things do go wrong in organizations which do not manage by process (and they always do), the questions is, “Whose fault is this?” The on-going “blame game” is typical of a lower maturity level organization and significantly impedes the willingness of individuals to take risks.

If there is a problem, organizations which manage by process examine that process to see how that problem or defect could have been created. This process oriented thinking allows the full use of the Kaizen principles of turning each defect into an opportunity for improvement.

For the Business Analyst, it is important to maintain context about which group of people constitute “senior and executive management.” If the processes which need to be managed are IT processes, typically the management to consider is IT management. If they are business processes, then it will be necessary to consider the business management.

Occasionally there may be process management issues which will involve other parts of the organization, in which case the management to be considered needs to encompass all of the players. This happens most frequently during the early stages of establishing Management By Process, when the traditional ways of doing business are re-examined. In the case of cross functional processes, it may be necessary to invoke both set of managers. Cross functional processes are fairly common at a high level, but at the actual task level, tasks are concluded within a single organizational area.

Often the old processes required significantly less input from the business community (and produced lower quality). Although desirous of the improved quality, many business unit managers are initially reluctant to commit additional resources to processes. This is best addressed by providing a firm grounding in Cost of Quality Concepts and the SEI Capability Maturity Model.

2.2.2 Manage with Facts

At every level, for every decision, people want to have good information as a basis for their decisions. Lacking information the choices are:

• Do what we’ve always done

• Don’t do what we did last time, it didn’t work

• Go with your instinct

• Do whatever the boss decides

None of these gives the decision maker a secure feeling that the best possible decision is being made. The results are decisions to which there is at best a half-hearted commitment and a real lack of confidence in the outcome.

Page 61: CABA_CBOK_Ver_9-1

Management and Communication Skills

Version 9.1 2-7

When organizations manage by process, one of the things they get is data. The raw numbers generated by the measurement activities associated with controlling each process. Data can then be turned into information useful for making decisions. For example:

The average regression testing activity yields 1 major and 4 minor defects per 10,000lines of code. On average it takes 15 working days to return a major defect toregression testing and 4 days for minor defects. Our residual rate (the percentage oferrors recurring after regression) is 2%, or one in 50. We estimate the newenhancement will have 20,000 lines of code. How many regression cycles should weinclude in the project plan?

Organizations will make different decisions based on how willing they are to assume various risks. If this decision is made often enough, the organization will build a track record of how these facts correlate to the regressions cycles required and establish standards or guidelines (if it is a new team or new technology, round up; otherwise round down).

Lacking data, decisions are often made on intangible and emotional issues. The inclusion of feelings and emotions in the decision making process is not all bad, but it should be placed in the context of available data. (“I have a really bad feeling about this project, I think we may have missed something in the Requirements. Even though the numbers say 1 cycle, let’s go with 1.5 to allow some slack.”)

In the US the National Quality Award (MBNQA) Criteria is explicit about management by fact;

Modern businesses depend upon measurement and analysis of performance.Measurements must derive from the company’s strategy and provide critical data andinformation about key processes, outputs and results. Data and information needed forperformance measurement and improvement are of many types, including: customer,product and service performance, operations, market and competitive comparisons,supplier, employee-related, and cost and financial. Analysis entails using data todetermine trends, projections and cause and effect - that might not be evident withoutanalysis. Data and analysis support a variety of company purposes, such as planning,reviewing company performance, improving operations and comparing companyperformance with competitors’ or “best practice” benchmarks.10

For the Business Analyst, being able to prepare and present project and process recommendations based upon well documented and organizationally accepted data is an enormous advantage. Removing the fuzzy logic and personal preferences from a situation allows an effective business case to be developed and presented with a greater probability of success. It is also important to be able to measure the process effectiveness and efficiency. Any process which maximizes one at the expense of the other will create long term problems for the organization.

10. NIIST, Baldrige Criteria, 1997

Page 62: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

2-8 Version 9.1

2.2.3 Manage Toward Results

Organizations which focus on the results they need to achieve are far more likely to actually achieve them. To do this, everyone needs to be clear about what the target is and the processes that will be used to achieve it. The Leader needs to have clearly articulated the vision. This makes it possible for the manager to have selected the right people for the task. Together the Manager and the Leader create a supportive environment where the staff feels confident their efforts will be rewarded. This in turn allows the staff to focus on the work to be accomplished, rather than be distracted by dissatisfies.11

Because of the organizations clear focus on the objective, it is possible to develop the strategic measures needed to track progress toward that goal. Unlike the detailed data collected from process control and execution, Strategic Measures are focused on the big picture. In the Business Skill Category there is more information on developing and tracking Strategic Measures.

One approach which has drawn considerable popular attention is the “Balanced Scorecard”, developed by Drs. Robert Kaplan and David Norton.12 Organizations historically found it easiest to measure financial information. Because it was easiest to do and because it was desired by capital markets, financial measures became the de facto standard. Kaplan and Norton recognized these measures left out a lot of important information about any activity taking place in the organization. To balance this they recommended adding the following to financial measures:

• Learning and Growth Perspective

• Business Process Perspective

• Customer Perspective

This approach emphasizes the need for the feedback loop in reporting processes to ensure progress toward goals. Measuring the Business Processes and the Customer Perspective are more obvious than the Learning and Growth area. Measuring the Learning and Growth area means looking at more than training hours per employee; it includes things like the development and use of effective mentoring schemes.

Managing toward results focuses on activities which are win-win for the organization rather than setting up conflicts and the ‘zero sum game.” For the Business Analyst, the focus on agreed upon goals and objectives, which have clearly established measures and metrics associated with them, helps to reduce the “noise”13 surrounding project activity. This in turn aids overall productivity.

11. Herzberg, Hygiene Theory of Motivation. Ibid.12. Kaplan, Robert and Norton, David; “The Balance Scorecard: Strategy in Action”; 199613. Noise is a term used by many management theorists to describe a wide variety of activities which

contribute nothing to the accomplishment of the objective.

Page 63: CABA_CBOK_Ver_9-1

Management and Communication Skills

Version 9.1 2-9

In implementing these concepts it is important to remember that these other areas are intended to augment, not replace the financial perspective which has a strong orientation on operational and financial controls.

2.2.4 Focus on the Customer

Do nothing that does not benefit the ultimate customer. This concept is fundamental to the teachings of Taguchi in his Robust Design and is the backbone of Quality Function Deployment (QFD). It is the heart of Quality Management; organizations exist only as long as they continue to meet the needs of their customers. If the focus of the organization is internal (this is what the Auditors or Accounting or Human Resources want) as opposed to external, resources will be spent ineffectively.

Organizations which focus on satisfying the “Internal Customer” set up situations which create competition for resources and conflict in policy and practice. Satisfying internal customers (business partners) is effective only to the extent that it leads to the satisfaction of the external customer also. The Strategic Measures identified as a part of the Manage Toward Results process will help maintain the focus on the external customer if they are properly established. Organizations which have implemented the Partnership Model for working with those in their own organization (Business Partners) find that it is easier to focus on the true customer and there are far fewer distractions.

In some organizations it is difficult for the Business Analyst to gain access to the true customer, while at the same time they are asked to represent their interests and needs in both the Requirements and the Testing processes. To the extent that it is realistic and possible, every attempt should be made to make the voice of the customer audible to everyone in the organization. Some organizations accomplish this through customer panels or interviews which are then shown to employees; others conduct surveys or provide feedback formats and distribute the summarized results. For organizations which provide support to their customers, a few days working on the “Help Desk” will be illuminating.

Where possible, customer data should be collected in a systematic and repeatable process and the results quantified. This will allow the creation of trend data, which can be used to maintain focus on improving those things which truly matter to the customer.

2.2.5 Continuous Improvement

Continuous improvement is the definition for quality proposed by Deming more than 50 years ago. This encapsulates what good organizations have learned about themselves and their environment:

• Quality is not static - no matter how good the product or service, no matter how excellent the current performance, if the organization ceases to change, others will surpass them quickly;

Page 64: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

2-10 Version 9.1

• Good enough is not good enough - any process can be improved, sometimes in small ways yielding small benefits and sometimes with radical transformations which yield comparable rewards

Integrating the four preceding concepts with the continuous improvement mentality creates organizations of unusual strength and ability. This does not mean that organizations must adopt and implement every “new thing” that comes into the market place. Nor does it mean that it must deliberately “reinvent itself” every three or four years. It is not the exclusive property of those who have reached great heights of customer service and product quality. Instead it is a grass roots, every day attitude which allows organizations to move from wherever they are, in the direction they wish to go.

Continuous improvement of all processes offers the Business Analyst the opportunity to learn from each iteration of the process and feed back lessons learned. In the Process Identification, Definition, Implementation and Improvement Knowledge Area, the activities involved in making this a reality will be examined in more detail.

2.2.6 Creating the Infrastructure for Improving Quality

The fundamentals for improving quality were clearly spelled out by Shewhart and Deming:

• Plan

• Do

• Check (Study or Analyze)

• Act (Adjust Plan if necessary)

In creating an infrastructure to support continuous improvement, this is the best model to use.

2.2.6.1 Plan

Regardless of the level within the organization for which the Quality Improvement process is undertaken, the top management of that group needs to participate in the planning. During the planning stage, the team needs to articulate why this process is being undertaken and what are the expected results. Typically this involves creating a baseline of current performance. This baseline should be numeric and grounded in facts which are agreed to by the organization. Failure to have a well established baseline will make it difficult or impossible to establish results at a later date.

In addition to creating a baseline, many organizations perform significant benchmarking research at this time. This provides a context for creating the necessary improvement goals. If there is no goal, people will not be able to measure progress toward that goal which is very disheartening.

Page 65: CABA_CBOK_Ver_9-1

Management and Communication Skills

Version 9.1 2-11

The plan which is created must be reviewed and evaluated to ensure that it is achievable. Creating an Improvement Plan which the organization cannot possibly execute is a major cause of failure. The three chief components of this type of failure are unrealistic schedules, un-achievable goals, and the failure of senior management to stay focused and involved in the process once the plan is agreed upon.

Once the goal is determined, tentative action plans are created and reviewed. Each action plan must include information on who (specifically) is responsible for seeing that the action plan is accomplished and in what time frame. Action plans are broken down into smaller parts and responsibilities assigned to specific work units and finally to individuals. Responsibility for ensuring the work gets done remains with management.

If the Quality Improvement Process is organization wide, this planning stage may include the establishment of a “chief quality officer” who reports directly to the Board or the CEO. While this has the advantage of creating a position which is solely focused on quality, it does have the potential disadvantage of making quality improvement “someone else’s problem.” To be effective, quality improvement must be embedded in every position. To make that real, it must be included in performance reviews for everyone. One of the early steps in the planning process is to make this happen. The only possible reason to exclude someone would be if they had no possible way of contributing to the quality goals of the organization. (In that case they should not be on the payroll!)

Many organizations will use internal and external consultants to help develop the plan instead of, or in addition to a CQO. In either case, these tend to be individuals with a sound understanding of process, of quality and of the dynamics of change. Business Analysts are often tapped to become one of these internal consultants. In that position they have the opportunity to leverage their knowledge and skills in a dramatic fashion.

2.2.6.2 Do

Once a plan is created and agreed to by all of the stakeholders, it is time to execute the plan. This requires participation at all levels of the organizations. Senior managers maintain focus, model the new behaviors, reinforce the importance of change and ensure support down through the chain of command. Middle managers allocate resources, remove roadblocks, monitor progress and performance and model behaviors. Line managers provide feedback and support at the individual task level, provide training on new processes and procedures, resolve conflicts and model behaviors. Staff uses the improved processes and procedures, identify and escalate problems with the new processes and procedures and track progress at the detail level. When all of these happen simultaneously, the organization makes real progress on improving the quality of their processes.

2.2.6.3 Check

As a part of an effective continuous quality improvement initiative, the organization will generate a significant amount of data about how they perform. Depending upon the size and scope of the initiative, the process of analyzing the results may occur after 10, 15, or maybe

Page 66: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

2-12 Version 9.1

even 100 iterations. Within IT initiatives it is typical to see incremental analysis. A Requirements Gathering process improvement initiative undertaken as a part of a Continuous Improvement program may be examined at the end of Requirements Gathering, again at the end of Design, at the end of Unit Test, prior to Implementation and again at some point following implementation. At each point it will be possible to determine the impact of the changed requirements process on the succeeding stages. Waiting until the conclusion of the project will result in the loss of important information about the early stages in all but very small projects.

Having done an incremental analysis of several projects in this fashion, it will be possible to develop reliable trend data about the long term impact of the changes. It is tempting but risky to come to major conclusions on the basis of a single project. In the case of IT projects which often have such a long “tail” from beginning to end, this may be necessary. During this analysis, the results will be compared to the established baseline to determine progress from the starting point, and against any selected benchmarks to measure progress toward the goal or objective. It is not enough to measure just one of these, as it can provide a misleading appearance of progress. A reduction in incomplete test cases by 2 per hundred cases may reflect either of the following:

• The baseline was 60 errors per hundred, a reduction of 2 per hundred is a 3% decrease. A decrease is good, three percent is progress. However if the benchmark is 8 errors per hundred, progress toward the goal is small, less than 10%.

• The baseline was 12 errors per hundred, a reduction of 2 per hundred is still a 3% decrease, however given the same benchmark progress toward the goal is much greater, 50%!

There is one more critical piece of information needed to evaluate how well the organization is doing in meeting its’ objectives: time. In the first example above, if the 2 per hundred reduction was seen in the first 6 weeks, this would probably be considered excellent progress; 6 months not much progress and at a year, this would probably be considered relatively ineffective. The organization would want to perform further analysis on the results, looking at items such as:

• Was the new process properly documented?

• Were people adequately trained?

• Was the process actually being followed?

• Were the new measures being performed correctly?

• Are some groups performing better than others?

Conversely, in the second example, because of the very high initial baseline number, reducing it by 2 errors in 6 months would probably be considered a very good result. While it may be worthwhile reviewing the same issues raised for the first examples, there are other questions which might also be addressed:

Page 67: CABA_CBOK_Ver_9-1

Management and Communication Skills

Version 9.1 2-13

• Can further reductions be achieved using this process?

• Is the process fully deployed?

If the changes yield the desired results (the second example), little if any modification may be in order. If, on the other hand, it appears that further improvement is needed to achieve the goal, additional input for process improvement must be solicited. This may include activities derived from answers to the first set of questions, i.e., if some groups are performing better than others, find out why. If not everyone was fully trained, maybe more training is needed. If the process is not actually being followed by everyone, compare the results and find out why the process is not being used.

2.2.6.4 Act

Once the Check step has been completed, it is time to determine what if any action is required to further improve the process. Act steps may include performing additional training, “tweaking” the process to address problems or provide more consistent results, providing additional reinforcement on why and when to use the new process and so on.

It is not unusual for the results of the Check step to identify several potential opportunities for additional change or improvement. In the Act portion of the cycle, those to be implemented are selected, defined, documented and agreed to by all of the stakeholders. They form the baseline for the next cycle iteration(s) of the Plan step.

2.3 Communication and Interpersonal Skills for Software Business AnalystsThe Software Business Analyst is in the communication business. To be effective at their job, the CSBA must possess a wide range of communication and interpersonal habits, attitudes, knowledge and skills. These are directly involved in the tasks performed on a daily basis. Acquiring these skills if they are missing, or improving them if they are weak will yield enormous payback both personally and professionally.

2.3.1 Listening Skills

When there is a discussion of communication skills the emphasis tends to be on the “sending” skills. Speaking, writing and doing presentations are all important, but as an information gatherer, listening skills are crucial. Improving basic listening skills can improve the amount of information the CSBA is able to gather by a large amount.

Page 68: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

2-14 Version 9.1

Every message has three parts: the sender (or speaker), the message itself, and the receiver. A good listener, in addition to improving their own actions, can also directly impact the other two. Good listeners encourage speakers to communicate more information. Good listeners also exercise skills which will improve the accuracy of the message. Good listening is not a passive activity. Active listening is essential to good communication. It requires that you do the following:

• Eliminate distractions- Turn off or away from computer screens, close or move reports, books or other written material which may lure attention away from the speaker. If, as a listener, you are prone to fidgeting, empty your pockets and put away pencils and paper not actively used for note taking. Even though it may not seem like it, each of these items has the potential to cause the your attention to drift away from the speaker.

• Avoid outside interruptions - Make arrangements to have phone calls go to the voice mail, or let someone else answer. Answering a phone call after setting up an appointment for an interview sends the message that the phone call is the more important of the two activities. If for some reason it will be necessary to take a call during the interview, explain why, in advance, and keep the call short. The same is true for people who “just happen” to show up while the interview is being conducted.

• Focus on the Speaker - Make eye contact frequently, but don’t stare. Don’t let eyes drift away for an extended period. Do not use the period while the speaker is speaking to decide what you want to say next. This kind of interchange results in many words being spoken, but no communication. Watch the body language of the speaker as they answer or avoid answering questions. Be alert for signs of anger, frustration, or stone-walling. Be aware of the extent to which the speaker is comfortable or uncomfortable with the topic under discussion. Some people are more sensitive about some topics than others.

• Be patient - Some speakers need a few moments to organize their thoughts when being asked a question. This is especially true when dealing with many IT personnel who, as a group, tend to be highly introverted. Don’t immediately follow up with a restatement of that question or a new question. Silence is ok. Only if the silence is prolonged and there are no cues that the speaker is attempting to form a response should the listener follow up. Often the best information arrives at the end of a long pause. Once the speaker has started speaking avoid interrupting them. Interruptions are a signal that the interrupter does not respect either what the speaker is saying or perhaps even the speaker.

• Send non-verbal listening cues - Listeners who lean forward slightly send a signal of interest. Leaning or turning away indicates lack of interest. Likewise nodding the head in agreement or understanding reassures the speaker that the listener “gets it.” This reinforcement will encourage the speaker to continue the communication.

• Check for understanding - One of the most effective tools for a listener is to periodically restate a particularly important or complex point to demonstrate

Page 69: CABA_CBOK_Ver_9-1

Management and Communication Skills

Version 9.1 2-15

comprehension. “So what I heard you say is…” or “Let me see if I have this correct….” These restatements serve two purposes: the confirm for the speaker that the listener is paying attention to their message and they offer the opportunity to amplify or clarify key points.

• Withhold judgment - Do not evaluate or analyze the speaker’s comments until they have completed their thoughts. Disagreement is particular easy to read in the listeners and will have a discouraging effect on the speaker. This is especially true when there is a significant difference in the organizational level of the individuals involved. Premature expression of disagreement may cut off communication entirely.

• Listening is a group activity - In a group discussion, allow each person to have an equal share of time. In a group of 4, everyone should be listening 75% of the time. The length of pauses in conversations is culturally dependent. In Japan it may be as long as 8 or 10 seconds between speakers. In North America it may be as short as 1 or 2 seconds. Be aware of the local style.

• Telephone listening - When deprived of the opportunity to see the speaker, it is more important than ever to practice good listening skills. It is very easy to recognize that the listener is doing their e-mail or reading a memo when all of the responses are “Mmmm.”

2.3.2 Interviewing

Interviewing activities are the heart and soul of the Business Analyst’s job. CSBA’s use the quality listening skills described in the previous section to gather the information needed to develop the right requirements for the project. They use them to expand their knowledge of the requirements into the associated test cases. They use them to develop the information needed for effective implementation processes and support. The keys to effective interviews are as follows:

• Planning the Interview and Interview Environment - Effective interviewing is like most other activities; it benefits enormously from planning and preparation.

In planning interviews it is essential that the right people are both interviewers andinterviewed. This can happen only with adequate planning and preparation. Theinterviewers should include one person who’s knowledgeable about the desiredprocess and is an effective listener. In addition there should be one person to act asa recorder so that information can be captured effectively, without interruption tothe flow of the interview. The interviewees have information to share about whatthe process is and does or what it is supposed to do and be. In order for the interviewees to share their knowledge, they need to know inadvance what is expected of them. The best way to accomplish this is through theuse of an agenda. The agenda will provide a summary of the purpose of the

Page 70: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

2-16 Version 9.1

interview, an outline the topics to be discussed, and a list of potential questions tobe covered. As a part of the agenda, or as a separate document, each interviewee shouldreceive information about how best to prepare for the interview. This will includerecommending that they bring copies of forms and examples of issues or problemsthey encounter in working with this process or system. If only one member of alarger team is to be interviewed, suggest that the team meet and discuss the topicand questions beforehand. In that way the interviewee will be able to provide abroader picture of the process and its idiosyncrasies. Likewise, the interviewers need to prepare for each interview. They should reviewany information already collected and have copies of any forms or materials whichmight be useful. Any relevant fully or partial complete lists should be available fordiscussion.Interviewees are most likely to be responsive if there has been “buy-in” from thetop of the organization. Obtaining and communicating that support is a vital step inthe interview process. At the beginning of the interview process communicateclearly to the project sponsors and key stake holders what the expected timecommitment will be on the part of their staff. Where possible scheduleappointments for staff level personnel through their manager or supervisor. Thiswill allow the work of the department to be managed effectively while one or morepeople are being interviewed.Allow about 90 minutes for each interview. Allow at least 30 minutes betweeninterviews. This provides time to clean up lose ends on the documentation, updatenotes and profiles, and change where necessary. It will also allow time to preparefor the next interview. Interviewing is a strenuous mental activity; try not toschedule more than 3 in a day. Select a mutually convenient time for the interview in a “neutral location.” Ideallythis will be the project “home”, this reduces the overhead in setting up eachsession. This location should provide enough privacy that sensitive issues can bediscussed if need be. Notify the interviewee well in advance of the time andlocation. The interview process is essential for clear and correct data gathering whether forRequirements, Test Case Development or Post Implementation Problem Solving.It is important that interviewers enter the process with an open mind, prepared tohear that much of what they have already recorded is wrong, incorrect orincomplete. They must be prepared for “experts” to have wildly differing views onhow certain activities occur and to be able to resolve those conflicts. In addition to planning and preparation, this is an area which will improve withpractice and feedback from team members and interviewees. Although anexcellent product may be achieved using less than excellent interviewing practices,it is not a common occurrence. In the best approach when there are a number ofinterviews to be performed, as is the case in Requirements Gathering, theinterview team should obtain a dedicated space for the duration of the interviewing

Page 71: CABA_CBOK_Ver_9-1

Management and Communication Skills

Version 9.1 2-17

process. This becomes their “home” and is equipped with the resources required tosuccessfully complete a requirements project.Chief among these resources are a lot of blank walls. These will become theresidence for the multiple lists or cases (for testing) in process. List or case draftingwill take place both during interviews and after. It is important to be able to see andtouch all of the items developed during the interview process. Rolling them upwith rubber bands and sticking them on a shelf is counterproductive. These may be constructed on 2’ x 3’ poster paper. Self stick is nice, but maskingtape works just fine too. During the initial stages of an interview process, it maynot be a good use of time to create this data in an electronic format. Too oftenpeople perceive what is computer produced as being “gospel” or finished and failto give it the serious scrutiny that is essential to a quality finished product. At thetop of the map is the name of the requirement, task or action being researched. Ifthere is more than one page to the map, it will also include a page number. Actions, decisions and relevant information are captured on Post It Notes ™ andplaced in their proper position on the poster paper map. As new information isgained it can be inserted where appropriate. Post Its can be moved multiple timesuntil the requirements flow correctly and accurately represents the desired process.Markers can be used to add directional arrows, decision diamonds and otherdescriptive information as the maps near completion. During the constructionhowever; these, should also be done with Sticky Notes as the flow may wellchange.

• Conducting An Interview - During the interview create and maintain a friendly atmosphere, set the interviewee as at ease. Establish rapport between the interviewer and the interviewee to improve the quality of the information exchange. While many interviewees will talk very freely, others may be reluctant to discuss problems because they fear that the results of the interview process may jeopardize their current job process or result in some other unpleasant consequence. It is important to be honest with people about the expected results of the project and to reassure those individuals to the extent possible. Where the fear is that information will cause personal problems for the interviewee they need to be reassured that information will be managed in a way to protect the identity of the provider where that is necessary.

If the Post-It™ technique is used, interviews can be conducted in any order afterthe initial information is gathered. This is an enormous asset to the interview teambecause people can be scheduled whenever they are available. This often meansthat several key requirements areas are in process at the same time and they are atvarying levels of detail. This may require some practice on the part of theinterviewer, but works very well. The purpose of the interview is to find out what the interviewee knows or thinksthey know about either the existing process or the proposed process. Do not beginthe process by asking the interviewee to review information already gathered; thatwill limit what they chose to say. Proceed through the Q&A agenda provided in

Page 72: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

2-18 Version 9.1

advance. Review the materials brought by the interviewee. Then compare theinformation provided with existing lists and notes. One of the keys to an effective interview is to ask good questions. When preparingfor an interview, create a list of questions which the interviewee might be able toanswer. It is much easier to be told “I don’t know” than to have to schedule afollow up interview for questions which were not asked. In creating this listconsider what function the interviewees’ department is responsible for performing.Consider what the interviewee’s role is in performing that function, are they theonly one’s performing this function, or are their others. Ask questions about bothwhat works well and what does not. Be certain to determine who the work productsupplier is and who the receiver is. If the interviewee has wide experience in theorganization, it may be worthwhile to explore what they may know based on otherpositions they have held or jobs they have performed.Question discrepancies, confirm key points, and update lists with new information.Secure confirmation on the spot that the lists correctly reflect what the intervieweebelieves to be correct. These real time updates are essential to obtaining a completeand correct picture of the process as well as for identifying areas of conflict ormisunderstanding. Flag items which do not agree with other sources.Always provide the opportunity for the interviewee to volunteer information forwhich you did not specifically ask. These more open ended questions near the endof the interview session can open up whole new areas. No requirements or testingproject should fail because “you never asked me about that.”Processes exist because the external customer needs something. How does thecustomer experience the process? Where does it meet expectations and where doesit fail? The Process Identification activities often are started because of a perceivedfailure to meet customer expectations. Effective interviewing and analysis canplace these perceived failures in the proper context.To be successful, it is necessary to actually understand the customer’s experienceand perspective. Too many organization are satisfied with an internal “expert”interpreting the customers’ needs and wants. Where at all possible it is much moreeffective to gather information directly from the external customer. This can bedone through a wide range of activities such as web-based or paper surveys, focusgroups, analysis of customer comments and letters or phone interviews. This direct feedback will provide the Business Analyst with hidden nuggets ofinformation about how the process actually works, not merely how it is intended towork. A classic example of this is the automated telephone response systemsimplemented by many organizations to provide customers with continuous accessto information about their account, thereby improving customer service. Designedto provide the answer to many routine questions with just a few entries from thetelephone keypad, few ideas have more annoyed and infuriated customers whobecome lost in the labyrinth of automated menus. Having satisfied themselves thatthey are providing service to their customers, organizations reduce the number ofindividuals available to provide assistance to the non-standard questions.Frustrated and unhappy customers abound.

Page 73: CABA_CBOK_Ver_9-1

Management and Communication Skills

Version 9.1 2-19

During the interview one of the interviewers takes notes, while the other conductsthe interview. Due to the speed of the sessions, these notes often require someclean up. Do as much of this as possible between sessions while the interview isstill fresh in both people’s minds.

• Interview Validation and Problem Resolution - Following the interview, provide the interviewee with a recap of the session. This will include a narrative description of the part(s) of the process for which they were interviewed. Ask them to review and make corrections if there are errors. This is essential to insure that at some later date no one claims that their information was misrepresented in the final product. Some interviewers deliberately insert a few obvious, but trivial errors to confirm that the documents were reviewed.

Update lists and cases with any changes required as a result of revisions to therecap. At the end of the interview process, completed materials should be sent toeveryone who participated for a final review. In the event of a conflict ofsignificance, re-interviews with key experts may be necessary. If that fails toresolve the conflict, additional steps such as site visits or product reviews may benecessary. The cost to resolve conflicts can rise rapidly with extra activity, ensurethat the conflict in question warrants the time and effort to resolve it. Otherwise,note the conflict and move on. Most issues will be resolved quickly through thereview interview process.

2.3.3 Facilitation

Facilitation skills are in demand in organizations today. The role of the facilitator is to help guide a group through a discussion or series of discussions in a non-judgmental and productive way. One of the major reasons for using a facilitator is to maintain control and eliminate the conflicts that can occur when topics of importance are under discussion.

Since the Facilitator can control and direct the course of a decision making process, it is a position of great power for the duration of the facilitated session(s). Generally speaking, a Facilitator should be knowledgeable, but not necessarily expert in the subject matter under discussion. It is often desirable to have a Facilitator who has no vested interest in the actual decisions made; neutrality will help to avoid “dictating” or supporting a particular position. For very sensitive or highly important issues, many organizations chose to retain the services of an outsider with no ties to the organization. This is not always possible, in which case the Facilitator must exercise caution and control to maintain their neutral stance.

• Sponsor and Initial Objectives - A facilitated session begins with the objectives for the session itself: develop an updated strategic plan; create a new marketing campaign; develop the requirements for a new system. Regardless of the purpose of the session, there is a Sponsor. The sponsor is generally the one who sets the initial

Page 74: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

2-20 Version 9.1

objectives and contacts the facilitator. In some situations however, others may have input into the objectives for the session.

• Facilitation Agreement – The facilitator may be a member of the staff or a consultant from another part of the organization or an outside organization. The facilitator meets with the session sponsor to review the objectives and the scheduled time frame and participants for the session. It is not unusual for the objectives at the beginning of the session to be too large, too vague and /or ambitious for the number of people and activities needed.

The facilitator will first seek to clarify the underlying issues prompting the needfor the session. Once clear on the issues, the facilitator and the sponsor shouldreview the session objectives to determine if they really address the issue(s).Objectives may be added, revised or deleted at this point. The facilitator alsoreviews the proposed attendees to ensure the correct people are in the room; onceagain some adjustments may be made. Finally they will review the amount of timeplanned for the session or sessions and make adjustments based on the precedingchanges. How long any particular topic will require is a matter which dependsupon the organization, the issue, the number of participants, and the skill of thefacilitator. A decision should be made at this time regarding a “note taker.” Facilitation ismentally exhausting work requiring a high level of focus and concentration on thepart of the Facilitator. In this environment, it is difficult to both facilitate and takenotes; best practice is to have two trained facilitators who alternate in the tworoles. This allows each to have a break from the high pressure, while maintainingthe flow and energy of the group. Where it is not possible to use two facilitators,the next best option is for the Sponsor to provide one additional resource toperform the note taking. If the confidential nature of the topic makes thisimpossible, rotate the responsibilities for note-taking among the participants. At the conclusion of this process the facilitator should produce a document whichreflects the shared understanding of the Facilitator and the Sponsor regarding theobjectives for the session, who will be attending, and how long it is expected totake. If the Facilitator is an external consultant, it is not unusual to require theSponsor to return a signed copy of the agreement. This protects both the Sponsorand the Facilitator in the event the Sponsor changes their mind or is not satisfiedwith the results.

• Logistics for Sessions - During this same session, or shortly thereafter, arrangements must be made for the session. These are best done by the Sponsor, or at least in the name of the Sponsor. The Location for the session is very important. If at all possible, facilitated sessions are best held off site; this does not necessarily mean an expensive hotel. A conference room at another organization location may work; many non-profits rent facilities for a nominal sum. Hotels are nice, but not always needed. There are several reasons to go off site; 1) people are less likely to be interrupted or pulled out of a session; 2) people are less likely to go back to their desks and get involved in the ‘crisis of the day’; and 3) often the discussions which

Page 75: CABA_CBOK_Ver_9-1

Management and Communication Skills

Version 9.1 2-21

arise during these sessions may be of a confidential or speculative nature, so it is much easier to control the flow of information and documents.

Coordination of the calendars of all of the participants ensures they will all beavailable at the desired time(s). The process can be time consuming andfrustrating. This is one of the places where the Sponsor can put a little authoritybehind the request if people are not being cooperative. The Facilitator should prepare for the Sponsors signature an agenda for the sessionwhich includes the information on where, when, and how long the sessions willlast. To the extent possible (some topics will make this easier than others)attendees should be told the nature of the discussion, materials to bring and whatpreparations are needed (it is not uncommon to use assigned readings as a part ofthe preparation.) The Facilitator may wish to do a pre-meeting status check 2 or 3days in advance to ensure there are no issues.

• Conducting a Facilitated Session - Either as a part of the initial discussions with the Sponsors, or in follow up work, the Facilitator should determine what kinds of approaches are needed to achieve the objectives. If looking for new ideas or approaches, some form of brainstorming activities may be required. If the attendees do not know each other at all, or if they do not know each other well enough for discussions to flow freely at the beginning of the day, some ice-breaker activity may be needed. If part of the issue requires problem solving, some root cause analysis activities may be required. If they know each other, but have no history of working well together, some form of team building activity may be required. It is the responsibility of the Facilitator to link the desired outcomes and individuals with the appropriate activities. Often the Sponsor will be unfamiliar with the techniques and what they involve, especially from a time perspective. Each of the activities for the session and what they contribute be discussed and agreed upon.

On the day of the first session, the Sponsor should be present and should introducethe Facilitator and the session. Ideally the Sponsor will be a full participant in atleast one session of the discussions which follow as they often have input whichothers do not, but this is not always the case. When the Sponsor is a participant in asession, it is essential to make clear that their role is as a participant. If this is notdone, the Sponsors presence may be perceived as an attempt to control on theactivities of the group. During the activities that follow the Facilitator isresponsible for the following:

• Ensuring a fair and productive discussion of the issues or challenges - Manage the discussions so one or two individuals do not dominate or intimi-date other participants. Paying attention to who is not contributing and solicit-ing their input or pulling them back into the group if they have drifted. Protecting participants from heckling, putdowns or harassment.

• Managing the pace and flow of activities - Establish a time plan for the day and keeping participants focused on the reason(s) they are there. This includes

Page 76: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

2-22 Version 9.1

limiting side conversations, detours to tangents or wasted time on hardened conflicts.

• Drawing out information - Follow up on unspoken questions, probing when discussions seem to end prematurely, and asking individuals directly to con-firm a point under discussion (“Juan, do you agree that this part of the system must be totally redesigned to achieve the desired performance levels?”)

• Building consensus - Work to develop points of agreement and finding ways to reduce conflict. This is one of the most important responsibilities of the Facilitator, and a delicate balance that must be maintained between gradually drawing a true consensus from the group and driving the group to a “false con-clusion” through lack of patience or finesse. Agreements reached as a part of the facilitation process must have the support of the participants. When the Facilitator has an agenda or a desired outcome, it is possible to hijack the pro-cess. If this happens, the participants will eventually repudiate the outcomes, leaving the organization worse off than they were before.

• Recognizing the efforts of participants - Even if the results of the session were not as substantive as desired, it is important to thank all of the participants for their time and effort. Recognize what was accomplished and outline the work that lies ahead. Encourage the group to continue working toward the res-olution of any unresolved issues.

• Summarizing Results - Finalize the draft of notes taken during the session and circulation of them for corrections and publication. To the extent possible it is desirable to record comments in the exact words of the participants so they will recognize and remember the discussions (unless it is necessary to reword comments to protect the participants from reprisals). It is very important to get the results out quickly to avoid losing steam or having the decisions become “stale” due to intervening circumstances.

• Managing multiple sessions - Have a well defined schedule and all of the logistics organized. Where the multiple sessions will be with different partici-pants but with the same agenda and with the intention of accumulating the results, it is important to hold the sessions as close together as is possible. This will prevent too much of the edge of the discussions being lost due to conversa-tions with previous participants. Where the same participants are involved in several sessions with different activities to be completed, the Facilitator must maintain focus so14the level of participation remains high.

14.

Page 77: CABA_CBOK_Ver_9-1

Management and Communication Skills

Version 9.1 2-23

2.3.4 Team Building

Team Building is an essential skill for the Business Analyst who will often be in the position of working with a group of individuals who begin the relationship with different languages, priorities, skills and styles. They are often challenged to unite this group in a way that will allow them to achieve aggressive technical, financial, quality or schedule goals. Lack of an effective team jeopardizes the effort before it can really begin. Understanding how teams work can be a major asset.

According to Rebecca Staton-Reinstein, Ph D.,15 “Effective IT Leaders build a team to manage the IT department because it is one of the best ways to ensure success. Many leaders find it effective to have the entire group take part in special team-building events and training. That is a good way to kick off the effort. Long term, the team will become high functioning if it is engaged in developing and implementing the Strategic Plan, if it is held responsible for results and given the authority to get the results. The more input people have into decision making the more they buy into the decisions and begin to jell as a team to accomplish the objectives.”

As an IT leader, the most important reasons to delegate are to spread the workload so that you can focus on leading and to build an effective team of people who can perform a wide variety of assignments. The team building process:

1. Involve your team in developing the Strategic Plan

2. Have each team member get input for the Plan from his or her staff

3. Delegate the elements of the Strategic Plan to appropriate team members

4. Have team members develop more detailed plans with their staffs to implement theirassigned areas

5. Approve all of the plans and have your team look for areas of synergy and to eliminateduplication or overlap

6. Review progress against plan regularly in team meetings and make adjustments asnecessary

7. Review individual plans regularly, one-on-one, to provide coaching and feedback andto encourage effective performance

8. Discuss the lessons learned that can be applied in new situations as assignments finish

According to Staton-Reinstein, “The team meeting agenda always includes a review of performance against plan and planning for modifying the plan and moving forward. The team becomes a team through focusing on the mission and achieving it. In turn, team member are encouraged to delegate appropriately to develop the skills and talents of their staffs.”

15. Staton-Reinstein, Rebecca, PhD., Developing Effective Information Technology Skills, 2002

Page 78: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

2-24 Version 9.1

2.3.5 Tuckman’s Forming-Storming-Norming-Performing Model16

Dr. Bruce Tuckman first published his Forming-Storming-Norming-Performing model in 1965. He added a fifth stage, Adjourning, in the 1970's. The Forming Storming Norming Performing theory is an elegant and helpful explanation of team development and behavior. Similarities can be seen with other models, such as Tannenbaum and Schmidt Continuum and especially with Hersey and Blanchard's Situational Leadership® model, developed about the same time.

Tuckman's model explains that as the team develops maturity and ability, relationships establish, and the leader changes leadership style. Beginning with a directing style, moving through coaching, then participating, finishing delegating and almost detached. At this point the team may produce a successor leader and the previous leader can move on to develop a new team. This progression of team behavior and leadership style can be seen clearly in the Tannenbaum and Schmidt Continuum - the authority and freedom extended by the leader to the team increases while the control of the leader reduces. In Tuckman's Forming Storming Norming Performing model, Hersey's and Blanchard's Situational Leadership® model and in Tannenbaum and Schmidt's Continuum, we see the same effect, represented in three ways.

2.3.5.1 Tuckman's Forming-Storming-Norming-Performing - Original Model

The progression is:

1. Forming

2. Storming

3. Norming

4. Performing

Features of each phase:

• Forming - Stage 1

16. © Bruce Tuckman 1965 original 'Forming-storming-norming-performing' concept; Alan Chapman 2001-2006 review and code; Businessballs 1995-2006. The use of this material is free provided copyright (see below) is acknowledged and reference is made to the www.businessballs.com web-site. This material may not be sold, or published in any form. Disclaimer: Reliance on information, material, advice, or other linked or recommended resources, received from Alan Chapman, shall be at your sole risk, and Alan Chapman assumes no responsibility for any errors, omissions, or damages arising. Users of this website are encouraged to confirm information received with other sources, and to seek local qualified advice if embarking on any actions that could carry personal or organizational liabilities. Managing people and relationships are sensitive activities; the free material and advice available via this website do not provide all necessary safeguards and checks. Please retain this notice on all copies.

Page 79: CABA_CBOK_Ver_9-1

Management and Communication Skills

Version 9.1 2-25

High dependence on (designated) leader for guidance and direction. Littleagreement on team aims, other than that received from leader. Individual roles andresponsibilities are unclear. Leader must be prepared to answer lots of questionsabout the team's purpose, objectives and external relationships. Processes are oftenignored. Members test tolerance of system and leader. Leader directs (similar toSituational Leadership® 'Telling' mode).

• Storming - Stage 2

Decisions do not come easily within the group. Team members vie for positions asthey attempt to establish themselves in relation to other team members and theleader, who might receive challenges from team members. Clarity of purposeincreases, but plenty of uncertainties persist. Cliques and factions form and theremay be power struggles. The team needs to be focused on its goals to avoidbecoming distracted by relationships and emotional issues. Compromises may berequired to enable progress. Leader coaches (similar to Situational Leadership®'Selling' mode).

• Norming - Stage 3

Agreement and consensus is largely formed among teams, who respond well tofacilitation by leader. Roles and responsibilities are clear and accepted. Bigdecisions are made by group agreement. Smaller decisions may be delegated toindividuals or small teams within group. Commitment and unity is strong. Theteam may engage in fun and social activities. The team discusses and develops itsprocesses and working style. There is general respect for the leader and some ofleadership is more shared by the team. Leader facilitates and enables (similar to theSituational Leadership® 'Participating' mode.)

• Performing - Stage 4

The team is more strategically aware; the team knows clearly why it is doing whatit is doing. The team has a shared vision and is able to stand on its own feet with nointerference or participation from the leader. There is a focus on over-achievinggoals, and the team makes most of the decisions against criteria agreed with theleader. The team has a high degree of autonomy. Disagreements occur but nowthey are resolved within the team positively and necessary changes to processesand structure are made by the team. The team is able to work towards achievingthe goal, and also to attend to relationship, style and process issues along the way.Team members look after each other. The team requires delegated tasks andprojects from the leader. The team does not need to be instructed or assisted. Teammembers might ask for assistance from the leader with personal and interpersonaldevelopment. Leader delegates and oversees (similar to the SituationalLeadership® 'Delegating' mode.)

Page 80: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

2-26 Version 9.1

Figure 2-1 The Tuckman Team Model

• Stage 5 - Adjourning

Bruce Tuckman refined his theory around 1975 and added a fifth stage to theForming Storming Norming Performing Model - he called it Adjourning, which isalso referred to as Deforming and Mourning. Adjourning is arguably more of anadjunct to the original four stage model rather than an extension - it views thegroup from a perspective beyond the purpose of the first four stages. TheAdjourning phase is certainly very relevant to the people in the group and theirwell-being, but not to the main task of managing and developing a team, which isclearly central to the original four stages.Tuckman's fifth stage, Adjourning, is the break-up of the group, hopefully whenthe task is completed successfully, its purpose fulfilled; everyone can move on tonew things, feeling good about what's been achieved. From an organizationalperspective, recognition of, and sensitivity to, people's vulnerabilities inTuckman's fifth stage is helpful, particularly if members of the group have beenclosely bonded and feel a sense of insecurity or threat from this change. Feelingsof insecurity are natural for people with high 'steadiness' attributes (as regards the'four temperaments' or DISC model) and with strong routine and empathy style (asregards the Benziger thinking styles model, right and left basal brain dominance).

Page 81: CABA_CBOK_Ver_9-1

Management and Communication Skills

Version 9.1 2-27

2.3.5.2 Hersey's and Blanchard's Situational Leadership®17 Model

The classic Situational Leadership® model of management and leadership style also illustrates the ideal development of a team from immaturity (stage 1) through to maturity (stage 4). Management and leadership style progressively develops from relatively detached task-directing in the following stages:

1. Managerially explanation

2. Managerial participation

3. Detached delegation

4. Largely self-managing, and contains at least one potential management/leadershipsuccessor

The aim of the leader or manager is therefore to develop the team through the four stages, and then to move on to another role. Ironically this outcome is feared by many managers. However, good organizations place an extremely high value on leaders and managers who can achieve this. The model also illustrates four main leadership and management styles, which a good leader is able to switch between, depending on the situation (i.e., the team's maturity).

2.3.6 Brainstorming

This technique has been around for many years and is widely used and abused by organizations. It is a basic tool for the Business Analyst in the problem solving and process improvement activities. It is often used at the beginning of a project to get people thinking in new and different ways. Historically a “brainstorm” was the term for thinking that was wild and crazy. Structured brainstorming can create an environment for exploring the outer edges of what was previously done or accepted.

The objective of brainstorming is to gather as many ideas as possible on a given subject as quickly as possible. During the initial brainstorming session, there is no evaluation or critique of the ideas presented. There are several alternative methods, but all have the same general approach:

• Prepare - Attendees are provided with information about the topic in advance of the session, which they are to read and understand. This may include information about a problem, an opportunity or both. Often it will include input from customers, business partners, and benchmarking activities. Sometimes the preparation stage may include presentations at the beginning of the session by key stakeholders to establish the need, and management support for the process.

17. cc Situational Leadership® is a trademark of the Center for Leadership Studies. Situational Leader-ship II® is a trademark of The Ken Blanchard Companies. Use of material relating to Situational Leadership® and/or Situational Leadership II® requires licence and agreement from the respective companies.

Page 82: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

2-28 Version 9.1

• Contribute - Each attendee is asked contribute as many ideas on the subject as possible. Like root-cause analysis, they must be related at least tangentially to the issue under discussion. In one method, people fill out 3x5 index cards or Post-It notes with a single idea on each. During each “round” each participant submits a single idea. These are read to the group by the Facilitator and then posted on a common list. There is then a pause while people have the opportunity to create new idea notes. During successive rounds, the number of “new” ideas will decrease until no one has anything further to contribute. In a slightly less structured method people take turns reading aloud one idea from a list they have prepared and add to the list as they hear ideas from others. The Facilitator again is responsible for posting the ideas until there are no more being contributed. The least structured approach is more like a verbal free-for-all with everyone shouting out ideas to the group as quickly as they can, leveraging off what others said. This clearly is the most spontaneous, but also the most difficult to capture effectively. The method chosen will depend in large part on the diversity of the group, the amount of input expected and the significance of the topic.

• Consolidate - Once all of the ideas are posted, the group then tries to determine where there are duplicates and eliminate them. This is often accomplished by starting at the top of the list and reviewing the items one at a time. During this process, the ideas may be expanded, or grouped with other ideas already on the list. At the end of the session, each idea or suggestion is understood by the group and is unique.

Once the ideas are consolidated, the brainstorming activity is concluded. At this point this group or another one may go through the steps of analyzing and prioritizing the ideas. This may be done in the same session if it is to be the same group, or if some research will be required before even initial assessments can be performed, another session will be scheduled.

The advantage of a brain storming activity is that it can generate a lot of input and interest in the topic. Brainstorming sessions can be fun and rewarding. It offers an opportunity for people to exercise their creativity and demonstrate their knowledge. There is a danger with brainstorming that people will get enamored of a solution which will not be organizationally acceptable. If this solution is later “shot down” there will be a corresponding let down on the part of the participants and may result in a cynical backlash.

2.3.7 Focus Groups

Focus groups are a way of gathering specific information from individuals who would not ordinarily be accessible. Typically focus groups are drawn from the external customer base, although occasionally there may be a reason to use employee groups. For example, when a new system to be used by a wide spread group of employees is to be developed. Typical uses of focus groups are to determine customer responses to current or proposed products. Participants are often given some special consideration or reward in return for their participation.

Page 83: CABA_CBOK_Ver_9-1

Management and Communication Skills

Version 9.1 2-29

Focus groups are generally held at a ‘neutral site,’ rather than the organization’s location. The session itself is often conducted by outside personnel, hired because of their skills in this area. Essential to the focus group process is a clear picture of what the organization wishes to learn, because with a focus group, time will be limited and there is generally no follow up opportunity. A software vendor might show a prototype of a new product to small groups of long term customers of a companion product. They might be asked questions about the perceived functionality, the look and feel, and perhaps the pricing or pricing strategy. In return, the customers may be offered a discount on the product should they chose to purchase it. If the product represents a significant technical breakthrough or major innovation, participants should be asked to execute a confidentiality agreement.

Where an internal focus group is conducted, the BA’s facilitation skills may lead to their participation in this activity. Generally, in addition to the host (facilitator), there will be one or more hidden observers who will also be responsible for taking notes. Obvious note taking in this context is often a detriment to participation, but participants must be advised that there are unseen observers taking notes. Failure to do so may result in people saying things embarrassing or painful.

2.3.8 Negotiating

Life is a series of negotiated situations, especially in the business environment. The rules for effective negotiation can be applied to both personal and business situations. There is a misconception that negotiating is bad, or negative, or the result of a failure to communicate, when in fact it is just the opposite. Good negotiations can help each of the parties arrive at a solution which is the optimum given the situation. Failure to negotiate often results in frustration, confusion and failed projects.

Effective negotiation skills can be employed by the Software Business Analyst in a wide range of activities such as establishing and adjusting priorities; addressing resource allocation and project responsibility issues; developing and adjusting agreements regarding cost, time, scope and quality. The rules for good negotiating are presented below in the context of a group, business issue. These same rules apply when conducting negotiations at the individual, interpersonal level.

• Communicate Clearly - Negotiations often get off on the wrong track almost immediately, because one or more of the participants fails to clearly state what they want from the specific situation. Even if it is already clear that the objective is not attainable, it is a good place to start a discussion, for example, “What I really want is to be able to implement this project on March 1, for the European Economic Community (EEC).” Depending upon the nature of the situation more clarification or detail may be needed, “That would include installing all of the programs, getting any Work Council approvals and training the staff.”

It is essential to think through and be prepared to communicate clearly whatsmaller or different level might be acceptable: “I could live with Germany and

Page 84: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

2-30 Version 9.1

Spain not being ready.” There may be several optional solutions which would beacceptable; be prepared to articulate each of them as necessary.Clear communications require effective listening. Give the speaker undividedattention. Take heed of any non-verbal clues about parts of the message which areeither difficult or creating problems for the speaker.

• Respect the other person - Many of the problems which cause negotiations to break down rather than yielding a successful result are because one or more of the parties do not feel that they or their position is being respected by others. Perceived lack of respect creates anger and frustration. This in turn leads to statements, positions and actions which are not productive for the negotiation.

One of the most common causes of feeling disrespected is interruptions. Byallowing the person or individual to make their position clear, communicate theirquestions or concerns without interruption, hearers convey the message they areinterested in what the speaker has to say. Interruptions, no matter how wellintentioned, send the message that what is being said is less important than whatthe interrupter has to say. This is a clear signal of disrespect. Expressions of anger should be a red-flag for participants that it is time to back up.Take the time to understand why the individual or group is angry. Attempt to seethe situation from their perspective. Resolving the cause of the anger will make itpossible to resolve the more important issues more easily. Recognize and clearly define the problem - At the outset each party has definedwhat they hope the outcome or decision will be. The area of disagreement amongthem is the problem to be solved. Define the area of disagreement clearly. “Saleswould like to have all 27 of their top priorities included in the first installation.This would mean that only 3 of the top 4 Accounting priorities could be included,and specifically the new Regional Balancing subsystem could not be done.Accounting would like to have all 4 of their top priorities included, this wouldmean that there would not be enough resources to include Sales items 7, 10 and 19through 27.” Until this step has been taken, it is not productive to discuss solutions. Taking thetime to make the area of disagreement clear may in fact resolve part of theperceived problem. “Sales could live without 23 through 27 until the next release,but we really need the others.” This kind of amplification and refinement will helpto lay the ground work for developing workable solutions. At this stage it is useful to clearly define and focus on areas of agreement. This willhelp build the foundation for a consensus agreement. “From what I hear we allagree that we must do at least 12 of the Sales priorities in the first release. I thinkeveryone agrees that to make this work, we must have at least a piece of RegionalBalancing plus Accounting priorities 2 and 3. I think we all accept that, givenother priorities and resource commitments, IT can not get everything else done bythe initial release date.”

• Seek solutions from a variety of sources - With the problem area clearly defined, it is time to look at potential solutions. Although it is tempting, do not accept the

Page 85: CABA_CBOK_Ver_9-1

Management and Communication Skills

Version 9.1 2-31

first idea that is offered, and not strenuously objected to, as the solution. Identify all of the potential solutions before beginning to make decisions. This may include adding outside resources, scaling back scope, agreeing to additional funding, extending the time frame and so on. Develop as many alternatives as possible. This will help people open their minds to other ways to meet their needs. “We could give up most of Regional Balancing in this release, if we were able to see the daily totals by Region on the Flash screen.”

• Collaborate to reach a mutual solution - Once a variety of alternative solutions have been proposed, work to find those which will best meet the organizations needs as a whole. This may require a number of variations be discussed until identifying one which will best suit the organization as a whole. Test the proposed solutions with each of the involved parties. “So, if we were to move priorities 13, 17 and 23 to 27 to the next release, Sales could live with that? And, if we were to add the Regional daily totals to the Flash screen and do priorities 2,3 and 4, Accounting could live with that? And IT agrees that these can be accomplished by the proposed date for the initial release?”

The resulting agreement should be published where appropriate to all parties to theagreement. Many smaller items can simply be added to the documentation of theproject or activity.This may be harder to accomplish when involved in an interpersonal negotiation assome individuals may remain unresponsive to suggestions that they accommodatethe needs of others. It may be difficult to reach an amicable solution in this event.This is why there are contracts, courts and arbitrators.

• Be reliable - Once the agreement is reached via negotiation, it is essential that all of the parties follow through on their respective piece of the plan or commitment. Failing to follow through or deciding to unilaterally reject the agreement will undermine all credibility in future negotiations.

• Preserve the relationship - Throughout the process it is important to focus on the relationship, especially for those within the organization. Winning the battle in one particular situation may cause long term hard feelings and create a road block to collaboration in the future. There will be many negotiations over time. Before “going to the wall” on one particular situation, ensure the long term cost will not outweigh the long term benefit.

This is especially true in interpersonal negotiations; beware of taking a positionfrom which it will be difficult or impossible to retreat gracefully. Try not to letothers do that either, as regardless of the financial or objective results of thenegotiations, the relationship will have sustained a mortal wound. Even though vendors or suppliers are not part of the organization in a literal sense,most organizations find a solid working relationship with their vendors is essentialto their success. Think carefully about pressing suppliers to the point that thetransaction is no longer financially attractive. The deal may go through this time,but they may not be willing to do business in the future.

Page 86: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

2-32 Version 9.1

2.3.9 Johari Window

The Johari Window model was created by two American psychologists, Joseph Luft and Harry Ingham who were researching group dynamics in the 1950's. The name of the model is a combination of their names, Joe and Harry. It uses the same four quadrant format as the Tuckman team model discussed earlier. In the case of the Johari model, the areas of the quadrant are not fixed, but can change over time with better information and determination on the part of team members. The four areas are:

1. What is known by the person about him/herself and is also known by others - openarea, open self, free area, free self, or 'the arena'

2. What is unknown by the person about him/herself but which others know - blind area,blind self, or 'blind spot'

3. What the person knows about him/herself that others do not know - hidden area,hidden self, avoided area, avoided self or 'facade'

4. What is unknown by the person about him/herself and is also unknown by others -unknown area or unknown self 18

Figure 2-2 shows the basic or standard view of the Johari Window, with all four quadrants being about equal.

18. The use this material is free provided copyright (Alan Chapman 1995-2006 adaptation, review and code based on Ingham and Luft's original johari window concept) is acknowledged and reference is made to the www.businessballs.com website. This material may not be sold, or published in any form. Disclaimer: Reliance on information, material, advice, or other linked or recommended resources, received from Alan Chapman, shall be at your sole risk, and Alan Chapman assumes no responsibility for any errors, omissions, or damages arising. Users of this website are encouraged to confirm information received with other sources, and to seek local qualified advice if embarking on any actions that could carry personal or organizational liabilities. Managing people and relationships are sensitive activities; the free material and advice available via this website do not provide all nec-essary safeguards and checks. Please retain this notice on all copies.

Page 87: CABA_CBOK_Ver_9-1

Management and Communication Skills

Version 9.1 2-33

Figure 2-2 The Basic Johari Window

In the open area, both the self (or team) and the other individual (or group) know the information in this area. This is where productive discussions occur, because everyone has the same information. The larger the open area is, the easier it is to prevent and resolve conflicts. Effective individuals attempt to maximize the open area to the extent that it does not jeopardize their strength or ability to perform.

In the hidden area there is information about the self (or team) that is not shared with the other individual or group. Often information is hidden because people feel revealing it creates a loss of status or bargaining position. Hidden information creates significant problems in resolving problems as the other individuals or groups may not feel there is a need for protection the information and may become quite hostile if and when hidden information is revealed. Individuals and groups actively placing information in the hidden area need to carefully assess the potential short and long term risks.

Most people are fairly comfortable with the concepts of both hidden and open information areas. The other two areas are less commonly discussed. In the blind area there is information about the “self” that is unknown to them but known to others. This can be especially difficult to deal with as often the information is not favorable to the “self.” A fairly typical example of this is when some managers in an organization are aware that a management change is about to occur and that the “self” individual or group will lose some portion of their control or authority over the area under discussion, while the “self” is unaware. A second frequent situation is when others recognize that the “self” becomes angry, emotional or distracted in certain situations and are able to use it to their advantage.

Page 88: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

2-34 Version 9.1

The fourth area is the unknown area in which there is information about the self, of which they and others are unaware. This may include changes totally outside their control, or information which has been successfully repressed by and individual. Operating in the unknown area can result in unpredictable responses and actions by the self.

Compare the open area in Figure 2-2 with the same area in Figure 2-3. The groups or individuals interacting with the self represented in Figure 2-3 are much more likely to achieve a successful conclusion to any problem or conflict. Notice how the open area is significantly expanded while the hidden, blind and unknown areas are decreased. Effective problem solvers work hard to reduce the size of the blind area so they are not surprised during negotiations, by negative information. The hidden area may contain information that is not relevant to the situation under discussion, even though the “other” might wish to know it. For example, the self may know that a third group, external to the situation, is going to be disbanded shortly. While this is grist for the gossip mills, there is no need to share the information if it is not essential to the discussion. Some things appropriately remain in the hidden area.

Figure 2-3 A more productive Johari Window

Page 89: CABA_CBOK_Ver_9-1

Management and Communication Skills

Version 9.1 2-35

2.3.10 Prioritization

2.3.10.1 Conflict Management

Conflict occurs when two or more (individuals or groups) with contrasting goals or objectives come in contact with each other. Throughout much of history thinkers and writers assumed conflict was always bad and it was best thing to eliminate all conflict. This led to a wide range of social and political situations in which anyone voicing disagreement was at least suspect, and possibly criminal. According to Schmidt,19 there a number of potential negative outcomes for an organization from unmanaged conflict; they include:

• A climate of suspicion and distrust

• Resistance to teamwork

• People leaving the situation because of turmoil

Despite the best efforts of various states, religions and organizations, conflict remains a part of life. Schmidt went on to identify several potential benefits from properly managed conflict:

• New approaches and solutions

• Long standing problems brought out in the open

• Clarified thoughts and feelings

• Stimulation of interest and creativity

• Stretched personal capabilities

That leaves the CSBA with very few choices: they can ignore and suppress all conflict they encounter, or they can choose to manage it.

In the 1960’s Robert Blake and Jane Mouton conducted a series of studies on conflict and conflict management.20 Their findings provide a framework for effective conflict management. They created a grid on which they rated an individual’s “concern for self” and their “concern for others.” Each of these factors is shown on an nine (9) point scale. Their research revealed that depending upon an individual’s location on the grid, they were most likely to adopt one of five (5) conflict management styles or strategies. Each strategy has both positive and negative features.

19. Schmidt, S.M.; Conflict: a powerful process of (good and bad) change; Management Review, 197420. Blake,R.R. and Mouton J. S.; The Managerial Grid; Gulf Publishing; 1964.

Page 90: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

2-36 Version 9.1

Figure 2-4 Blake and Mouton Conflict Management Style Diagram

Blake and Mouton discovered most people did not use the same style all the time nor did they stay with that style throughout an entire conflict. Instead, they observed that individuals favor styles and typical strategies, but they can and will vary those depending upon the circumstances. Understanding each of the styles and how they impact conflicts provides the CSBA with another tool for use in conflict management.

• Withdrawing or Avoiding Conflict -There are a few good and a lot of less worthwhile reasons to avoid conflict. Many IT people are heavily introverted and find confrontation of any sort difficult to manage; so they seek to avoid any situation in which conflict may occur. The difficulty with conflict avoidance is that the individual or groups who did not withdraw (call them K), assume that everyone is in agreement with their point of view. This is because they heard no objections. If K is correct in their objective or plan of action everything may be alright. However, the individual or group which failed to object so they could avoid the conflict (call them L), still thinks they are right (and they may be right). The act of suppressing ideas and objections creates a certain amount of frustration and tension which may surface in other situations. It certainly creates a lack of commitment to the approach adopted. The organization has not had an opportunity to examine their concept or to take advantage of their knowledge and skills. Worse, the problem has not actually been solved and there are difficulties down the road.

Page 91: CABA_CBOK_Ver_9-1

Management and Communication Skills

Version 9.1 2-37

Withdrawing or avoiding may be a good strategy if the problem will be solved bysomething else, with no action required by either K or L. Likewise, if the issue istrivial and will not have a noticeable impact, avoidance may be a good approach.Withdrawing may also be a good choice if K will be convinced by production ofinformation or data that L knows exists, but does not currently have available.Avoiding/withdrawing prevents K from settling into a hardened position fromwhich it will be difficult or impossible to move them. Finally there are conflictswhich are “un-winnable” for L. In that case, avoiding conflict will make excellentsense.

• Smoothing - In this approach L simply gives in to K, even though they may strongly disagree. Unlike Avoiding, some conflict does occur between L and K, but L minimizes it and gives every impression of agreement, and often is obvious in their desire to adopt K’s solution in an effort to please K or to meet K’s needs. Like Avoiding, this approach may be successful if K is correct. If K is not correct, the problem is still not solved. Outwardly however, the appearance is that harmony is restored, but like Avoiding, there may be some residual frustration at sacrificing their personal goals, objectives or ideas.

There are times when Smoothing works well and should be the strategy of choice:when it is a small issue, and goodwill needs to be preserved for the discussion ofthe larger issues. This is especially true if the resolution of the issue is moreimportant to K than it is to L.

• Compromising - Unlike Avoiding or Smoothing, L will obtain at least part of their objective in a compromise solution. Compromises typically represent a less than optimal solution for all of the parties involved; typically every party to a compromise feels they gave away too much. This creates the same kind of background frustration seen in withdrawing/avoiding and smoothing; but now everyone has a piece of it, not just L. In addition, if there is a correct solution, compromise will rarely reach it. The problem still exists and the organization agreed to a series of steps or actions which will probably not solve it. At some point the organization needs to either accept the cost of the problem, or invest more to find a real solution. In that process, both K and L may lose a lot of credibility within the organization for having adopted and possibly implemented an incorrect solution.

Compromising can be effective when both sides want to demonstrate good faithand a willingness to work together, and where the issue is small. Compromise canbe a good building block for cooperation on larger issues, and it can save time andenergy for dealing with those issues.

• Forcing - Forcing is sometimes also referred to as “competing,”21 and is set up as a “win-lose” situation. It is a method of interacting with others which depends heavily on individual or group power; this power may be actual (L is the boss), or it

21. Conflict Strategies, Organizational Design and Development, Inc., HRDQ, 2004

Page 92: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

2-38 Version 9.1

may be political, technical or financial power. In any case, L committed to an approach and nothing K can say or do will alter the situation. This is not a mirror image of avoiding, as in this case K entered into the situation prepared to contribute and to support their position strongly. Once firmly overruled, K has little commitment to the result and may even be willing to sabotage the effort. One of the other problems with forcing or competing is that L may not be correct, in which case, failure to heed reasonable suggestions from K, may have strong negative consequences.

Forcing is a popular style in hierarchical organizations despite a negative long termtrack record. On occasion, it is the correct choice; the best example of this is whentwo or more approaches are being supported, no one is giving ground, and adecision must be made quickly. In that case, someone (typically at the next levelup in the organization) says, “We’ll do it this way.”

• Problem Solving - This is the optimal approach in most situations. It focuses not on individual needs, wants or agendas, but on what will work best for the organization. Problem solving focuses on the problem, taking from both K and L, those portions of the solution which will work well. While sometimes referred to as a strategy of integration, often the ultimate resolution looks nothing like the initial offerings, but is something wholly new and different. Problem solving opens up the doors to creative thinking by all participants. Problem solving will work well in complex situations which require new or different approaches.

The downside to problems solving are that it may take longer to reach anagreement, even though that agreement will be more productive than fastersolutions. Problem solving also asks individuals to step away from political issuesand personal career objectives; this is often not easy to do.

2.3.10.2 Prioritization Techniques

One of the challenges facing the Business Analyst is the need to focus resources on a limited number of activities which can actually be accomplished. This may include situations where there are a large number of worthwhile activities or objectives, it may include the results of a requirements gathering process, it may include structuring an acceptance test plan. Helping groups to select a limited subset can be a conflict prone activity, when what is needed is consensus. Below are two techniques which can help accomplish that goal.

1. Group Ranking - The objective of group rankings is to reduce the total number ofitems under consideration down to a manageable number and to have the resultingitems in a priority sequence. In addition it will help to build support for those itemsfrom the participants in the selection process. There are several variations to thisprocess, of which two (Simple Note Card Approach and the Multi-Voting Approach)are described below, both start out with the same basic steps:

• An “item gathering” process takes place. This may be one or more Brainstorming Sessions, Requirements Gathering Sessions or Acceptance Test Case development

Page 93: CABA_CBOK_Ver_9-1

Management and Communication Skills

Version 9.1 2-39

session. The result of the activity is a list that is not in a priority sequence that is acceptable to all participants (often not prioritized at all) and often there are too many options to research or act upon in the time allowed.

• A consolidation/clarification session is held. In this activity each of the items is reviewed at a high level to eliminate duplicates, consolidate components of a single event or activity and to ensure that people understand what each item on the list is about.

• Establish a target number of priorities as the output of the process (we want to identify our Top 10, or 5).

At this point you can proceed in one of the following ways:

• Simple Note Card Approach - This approach works well if the list is fairly short (fewer than 15 objects) and the number of people is fairly large (can include 15 or 20 easily, but 5 as a minimum). Give each person 5 note cards. Participants are then instructed to write one of their top 5 (five) on each note card. They are further instructed that they may not cast multiple votes for the same item. No discussion is allowed at this time. The Facilitator gathers up the note cards and records one “tick mark” next to an item for each card. The maximum number of votes any item can receive is one per attendee.

In a typical scenario there will be 3-4 items which receive votes from the majorityof attendees; another 3-4 will receive either no or very few votes. The first group isclearly “in” and the second group is clearly “out.” In the middle there will be 7-9items which received some, but not complete support. On a new list, start with the item which received the highest number of votes. Addthe others in sequence. The group now has a prioritized list of items, which isshorter and more manageable. Often additional research is required before finaldecisions are made.

• Multi-Voting - This is a more substantial version of the same process. It is much more effective when the number of items to be prioritized is larger and the group of participants is somewhat smaller (10 -12 is the maximum). The Facilitator divides the total number of items by 2 and then adds either ½ or 1 to arrive at an uneven number. (For example, 49 items divided by 2 equals 24.5. Add ½ for a total of 25. Or, 36 items divided by 2 equals 18, add 1 to equal 19.) Each participant then has that number of “votes.”

Participants are then instructed to take a magic marker and place a tick mark nextto each of the items they wish to vote for; once again, only one vote per item. Asbefore when everyone has finished, the results are summarized on a new list; thislist will be half as long as the first list. If the original list was quite long, it may bedesirable to repeat the multi-voting process after a review of the items on the newlist.One of the advantages of this process is that people can see what is important toothers, as voting is not quite as anonymous as the first approach.

Page 94: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

2-40 Version 9.1

2. Forced Choice - Once the number of items is reduced down to 7 or less, anotherapproach will be useful in creating the final priority listing. This is called the ‘ForcedChoice Decision Making Model.” In Figure 2-5 below, a direct comparison is madebetween each of the items, one at a time, going across the row. The letter of the moreimportant of the two items is entered in the box. In this example A is more importantthan B, C and E, but less important than D. The process is repeated for each row, butbeing careful not to repeat ratings (this is why the lower left blocks are grayed out).

Figure 2-5 Basic Forced Choice Model

After completing the one to one comparisons, the total number of times each letterappears in the chart is recorded at the end of that row. Note that an entry for D appearsin the E column and must be added to the D total.

Sometimes options are very close in their ratings and the decision is difficult; othertimes there is a wide gap. This may mean simply counting the number of responses isinadequate to truly convey the relationship. In that case, adding a weight for thedifference to each comparison will help to clarify the situation.

Figure 2-6 Forced Choice with Weights

Page 95: CABA_CBOK_Ver_9-1

Management and Communication Skills

Version 9.1 2-41

In Figure 2-6 a simple 5 point scale has been used to identify how large the gap isbetween the items being compared; 1 = little difference, very close; 3 = noticeabledifference; 5 = a major difference. After making the decision regarding relativeimportance, the weighting is added. Note that in Figure 2-5, item A received 3 anditem E received 2 counts. It would be easy to assume that they are close in value. Thetotal weighting assigned in Figure 2-6 makes it clear that A (11 pts) is much moreimportant than C (6 pts). It is also clear that A is almost as important as D (12. pts).

The discussions held to create these rankings will allow all participants to understandthe relative relationship of the items under discussion and build support for the finalpriority on items.

2.4 SummaryIn this Skill Category you have seen how Theories of Management evolved and the role the attitude of management plays in the successful implementation of improvement initiatives. The most important prerequisites for successful implementation of any major quality initiative are leadership and commitment from executive management. We have examined the characteristics of a work environment supportive of quality initiatives. It is management’s responsibility to establish strategic objectives and build an infrastructure that is strategically aligned to those objectives. This can only be done when management has the necessary information from processes to allow them to manage by fact rather than by intuition or emotion. The creation and support of robust processes is a key ingredient of effective management. As the CSBA works within the organization, they must be able to see where and how management is performing well in addition to understanding those areas in which they perform less well. This will create realistic expectations about what the organization is capable of achieving in any specific situation.

In this Skill Category we have also looked at the management and communication skills the Software Business Analyst must have to be able to successfully perform their job. These include basic skills such as listening and more complex skills such as facilitation and conflict management. Future Skill Categories will address increasingly specific areas of job skills for the Software Business Analyst. Armed with an understanding of the environment and communication skills, the CSBA will be able to apply those skills with maximum effect.

Page 96: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

2-42 Version 9.1

Page 97: CABA_CBOK_Ver_9-1

Define, Build, Implement and Improve Work Processes

Version 9.1 3-1

Define, Build, Implement and Improve Work ProcessesThe world is constantly changing. Customers are more knowledgeable and demanding; therefore, quality and speed of delivery are now critical needs. Companies must constantly improve their ability to produce quality products adding value to their customer base. Defining and continuously improving work processes allows the pace of change to be maintained without negatively impacting the quality of products and services. This category addresses process management concepts, including the definition of a process, the workbench concept and components of a process which includes a policy, standards, procedures (i.e., do and check procedures), and guidelines. It lays the groundwork for this by examining the role and contribution of various national and international quality standards. Additionally, it will address the understanding of definitions and continuous improvement of a process through the process management Plan-Do-Check-Act (PDCA) cycle and an understanding of the importance of entrance and exit criteria at each stage of the PDCA.

3.1 Understanding and Applying Standards for Software Development

3.1.1 Background

The dynamic growth of the world economy following the Second World War was fueled in part by the expansion of markets. Consumers in every part of the world became familiar with goods and services from other countries. The globalization of the world economy was

Skill Category

3

Page 98: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

3-2 Version 9.1

underway. As organizations tried to be more efficient, one of the major issues that stood in the way was the lack of standardization in processes.

A number of organizations arose to help fill this gap. One of the earliest non-governmental organizations addressing computers specifically was the International Electrical and Electronic Engineers (IEEE).1 Created in 1963 from the merger of two much older groups of engineers, the IEEE quickly became one of the leaders in establishing standards through a collaborative process. Their primary focus was on the hardware elements of computers, as this level of standardization was essential for organizations to work with each other.

During that same time a number of government agencies, especially those supporting military establishments, saw the need for some standards and processes for developing software. There were initiatives in the UK, USSR and USA. The results demonstrated by these initiatives encouraged industry groups to attempt similar approaches. At first each of the groups worked in isolation from each other. Over time an increasing level of integration occurred. Some of the major organizations and their approaches are described below. There are numerous organizations that have contributed in some fashion to the efforts described by these major organizations. Some of those organizations, commercial, professional and governmental have been consolidated, renamed or eliminated. Others still exist and are still making major contributions.

3.2 Standards Organizations and Models

3.2.1 International Organization for Standardization (ISO)2

The ISO Certification is the most widely recognized of its kind in the world. Holders of ISO certifications are able to operate internationally at a considerable advantage. Although the early efforts were criticized by many, the evolution of the ISO certification products has addressed most of the issues.

In 1987 ISO released the first set of standards, the 9000 series. These were standards for a quality management system. These standards were written for all kinds of organizations and have a strong manufacturing orientation; as a result, it was difficult to apply them directly to the software development process. These standards were developed by people with a strong quality orientation, but little technical insight; the result is a focus on “what” is to be done, rather than “how” to do it. As such, it is not a quality management approach, but a quality management approach.

In 1991, to address the Information Technology applicability issue, ISO released ISO 9000-3. This guideline was oriented toward ensuring that the product delivered “conformed to

1. IEEE Data2. ISO Data

Page 99: CABA_CBOK_Ver_9-1

Define, Build, Implement and Improve Work Processes

Version 9.1 3-3

requirements.” The emphasis of ISO 9000-3 is the quality control activities needed to catch defective products. There is an emphasis on creating and maintaining records and documents to support the processes. This aspect of the approach caused may organizations to avoid the early implementations. In the years since the initial introduction, ISO has continued to refine and enhance the certification platform they offer.

Organizations doing business internationally find it advantageous to be ISO Certified. Certification is the result of an external assessment, conducted by trained assessors. Organizations which are certified must submit to periodic reassessments to maintain that status. The documentation and records created by the various processes are essential for successful certification. Some organizations wish to follow the ISO protocols, but have not been certified. These organizations often refer to themselves as ISO compliant.

Described below are a few of the key ISO standards publications of significance to those in IT:

In ISO 9000-3 the guidelines divide the activities into three groupings of tasks:

• General company and management requirements

• Project and maintenance phase requirements

• Supporting activities requirements

As a part of the 9000 series, ISO also published 9004-4, which addressed the concept of quality improvement as a part of the process for producing quality goods and services.

In ISO 9000:1994, published in 1994, the 9000-3 guidelines were revised to incorporate a much more proactive approach to quality. Quality Assurance activities were specifically added to each phase of the development cycle.

In ISO 9001:2000, introduced in 2000, a further shift was made away from the pure quality control of 9000-3 to the concept that management must be actively involved in the development of quality systems. This was a major shift from a line focused, documentation heavy approach that enriched the quality assurance approach introduced in 9000:1994. This publication introduced five Quality Elements to replace the list of 23 contained in 9000-3. These are:

1. Quality Management System

2. Management Responsibilities

3. Resource Management

4. Product Realization

5. Measurement, Analysis and Improvement

As ISO received feedback from various organizations using their guidelines, they addressed gaps and issues brought to their attention. ISO 9126 was introduced in 2000 as a standard for evaluating software. It created a list of characteristics and sub-characteristics for quality software:

Page 100: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

3-4 Version 9.1

• Functionality - which includes suitability, accuracy, interoperability, compliance and security

• Reliability -which includes maturity, recoverability and fault tolerance

• Usability - which includes learnability, understandability and operability

• Efficiency - which includes time behavior and resource behavior

• Maintainability - which includes stability, analyzability, changeability and testability

• Portability - which includes installability, replaceability and adaptability

ISO 12207 was published in 1995 and established a lifecycle for the development process from conception to retirement. It focused on a negotiated acquisition with a supplier (either internal or external) rather than a Commercial Off the Shelf product (COTS). ISO 12207 was designed to be flexible and tailorable and provides guidelines at a fairly high level. Adopting organizations need to develop the detail in concert to reflect the specific aims of the acquisition.

ISO 14001 addressed the establishment of environmental policies, including planning, environmental and regulatory assessment. The intent of 14001 was to provide guidelines for improving the cost effectiveness and quality of the environment.

ISO 15504 incorporated much of the process assessment capability developed by SPICE (Software Process Improvement and Capability dEtermination). This framework was designed to support process assessment, process improvement and capability determination. In addition to the five Maturity Levels described in SEI/CMM and CMMI, the SPICE model adds a Level 0: Incomplete Processes. ISO 15504 focused on five process areas:

1. Customer-supplier processes

2. Engineering processes

3. Support processes

4. Management processes

5. Organization processes

ISO 20000 is the standard introduced to addressed the issue of Information Technology Service Management. Based significantly on work done by the British Standards Institute, ISO 20000 addresses how to control and manage the delivery of Information Technology products and services. There are two areas: 20000-1 is the Specification for Service Management and 20000-2 is the Code of Practice for Service Management.

Page 101: CABA_CBOK_Ver_9-1

Define, Build, Implement and Improve Work Processes

Version 9.1 3-5

3.2.2 Software Engineering Institute and the Capability Maturity Model - SEI/CMM and CMMI

The Software Engineering Institute established at Carnegie-Mellon University in the US focuses on the processes required to develop quality software. The Capability Maturity Model developed at SEI is based on the premise that maturity indicates capability and further, that to obtain continuous improvement it is much better to take small evolutionary steps rather than rely upon revolutionary innovations.3

In 1989 SEI introduced their five level model that included a framework for improvement. Each of the levels addresses the following four areas:

1. Key Process Areas - a group of related activities that are performed together to achievea set of goals

2. Goals - a description of the environment or state that is achieved through theimplementation of Key Process Areas

3. Common Features - found at each maturity level to achieve success; examples arecommitment to perform, and measurement and analysis

4. Key Practices - elements of the infrastructure that contribute to effectivelyimplementing Key Process Areas.

This model described a specific environment associated with each level and the processes needed to move from one level to the next. These are referred to as Key Process Areas (KPAs). Each KPA must have a policy, a standard, a process description and a detailed procedure.

Figure 3-1 SEI Capability Maturity Model (Integrated)

3. ESSI – Scope Software Process Improvement Approaches, www.cse.dcu.ie/essiscope/sm5/approach; 2006

Page 102: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

3-6 Version 9.1

According to SEI, the initial Capability Maturity Model was designed to provide the following:

• A place to start

• The benefit of a community’s prior experiences

• A common language and shared vision

• A framework for prioritizing actions

• A way to define what improvement means to the organization

As the model evolved, new versions were published each containing some slightly different information. In 2000 CMMI, Capability Maturity Model Integrated was published to reconcile the previous versions. The original CMM is no longer available from SEI.

Organizations can characterize their environment through reference to their Maturity Level. SEI provides a certification process which allows qualified organizations to advertise their maturity level. The SEI process, unlike ISO, is based upon a self-assessment conducted in good faith.

Each of the levels, and the KPAs required to move to the next level, are described below:

1. Initial Level - This level is also referred to as ad hoc, chaotic or heroic. At the initiallevel of maturity organizations have few good processes with the result that theenvironment is not stable from one project to the next. The focus is on meeting timeand budget criteria at the expense of quality and processes, but projects often fail tomeet the schedule and budget criteria. Failures are blamed on people. Processes areviewed as an impediment to success. Some projects are successful despite theenvironment. Success depends upon heroic efforts of talented individuals and isdifficult to repeat from project to project. Level 1 organizations tend to “over promiseand under deliver.” The migration from Level1 to Level 2 is the most difficult for most organizations. Itrequires a major internal shift in priorities and commitments. Often the impetus toundertake the effort is as a result of a spectacular failure or an impeding calamity.

There are seven Key Process Areas which must be implemented to move from Level 1to Level 2:

1. Requirements Management2. Project Monitoring and Control3. Project Planning4. Supplier Agreement Management5. Configuration Management6. Measurement and Analysis7. Process and Product Quality Assurance

2. Managed Level - At this level, the processes developed at Level 1 can be repeated byothers in the organization. Not all processes are necessarily used effectively by all

Page 103: CABA_CBOK_Ver_9-1

Define, Build, Implement and Improve Work Processes

Version 9.1 3-7

projects. The organization still focuses significantly on time and budget, but processesare not abandoned in times of stress. Project planning is improved, so that time andbudget overruns, while still occurring, are more controlled. With the growth of projectpredictability, there is improved customer satisfaction.

The migration from Level 2 to Level 3 requires the implementation of many moreprocess areas, but each is smaller in scope than the original seven. The fourteen KPAsare:

1. Product Integration2. Requirements Development3. Technical Solution4. Validation5. Verification6. Organizational Process Definition7. Organizational Process Focus8. Organizational Training9. Integrated Project Management10. Integrated Supplier Management11. Integrated Teaming12. Risk Management13. Decision Analysis and Resolution14. Organizational Environment for Integration

3. Defined Level - At Level 3 processes are fully integrated into the everyday operationsof the organization. Exceptions and deviations from published standards andprocedures are rare; tailoring the process set to meet the needs of a specific project isthe norm. Focus has shifted from schedule and budget to management by process. Thisdoes not mean that time and budget are ignored; it does mean that how those goals areachieved has changed. The focus is on qualitative measures of success and there is amajor improvement in customer satisfaction.

The move from Level 3 to Level 4 requires the implementation of two KPAs:

1. Organizational Process Performance2. Quantitative Project Management

4. Quantitative Level - The introduction of quantitative measurement is the key for theachievement of Level 4. Statistical process control provides ongoing information abouthow well processes are performing, the source of deviations and process capability.Process performance is improved in key sub-processes to achieve desired results.

Of the organizations which begin the effort to improve their process capability, fewachieve Level 4 or beyond without significant incentive. The time and effort investedis great, and unless the reward is greater, the improvement effort will stall out. Tomove from Level 4 to Level 5 requires two final KPAs:

1. Organizational Innovation and Deployment 2. Causal Analysis and Resolution

Page 104: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

3-8 Version 9.1

5. Optimizing Level - With processes being effectively measured and data used forselective optimization, the Level 5 organization spends far fewer resources on failurethan its competitors. It is able to use those resources to innovate and evolve.Information Technology (IT) becomes a strategic enabler for the organization as awhole.

The first organization to achieve Level 5 was in Bangalore, India, in June of 1999.Since that time there have been a number of other organizations which have beencertified at that level. A large number of those organizations are located in India,Russia and China as they seek to capture the very lucrative off shore programmingmarket.

3.2.3 Six Sigma

This approach was introduced by Motorola in 1986 as a method of systematically improving their manufacturing processes with the specific intention of eliminating defects. The Six Sigma methodology integrated tools and techniques developed by Shewhart, Deming, Juran, Ishikawa, Taguchi and others. Motorola added to these techniques a group of trained individuals whose only function was to support the organization in implementing improvements. These individuals are known as Green Belts, Black Belts and Master Black Belts depending upon their level of training and expertise.4

Six Sigma is a systematic, data-driven approach to problem analysis and solution, with a strong focus on the impact to the (external) customer. It relies heavily on the use of statistical analysis tools and techniques. The approach can be implemented by organizations with a low level of competence in this area; however, as the process matures, so will the level of statistical complexity.

The name Six Sigma is derived from the statistical model for the standard distribution of data. As explained in Skill Category 1, Quality Basics, data is distributed in predictable patterns. Sigma (σ) is the symbol for a Standard Deviation. This is a measure of how closely grouped the values created by the process are (density or tightness). Standard Deviations are measured from the Mean. One Standard Deviation always includes 68% of all of the items in a class; 34% on either side of the Mean. Two Standard Deviations will always include 95.5% of all the values; 47.8% on either side of the Mean. In a purely mathematical context, six sigma will include .99999998% of all of the values; so that 2 in 100 million will fall outside the range. Based upon a theory called “sigma shift” Motorola actually defines Six Sigma for their approach as 3.4 defects per million opportunities. The difference between the two measures is the subject of considerable discussion and some criticism regarding the naming.5

At the heart of the approach are two key methodologies, DMAIC and DMADV. The first is used to improve existing systems and the second to create new processes or products.

4. Motorola University – What is Six Sigma (http://motorola.com/content) 20065. Wheeler, Donald J. Phd, The Six Sigma Practitioner’s Guide to Data Analysis; SCPPress

Page 105: CABA_CBOK_Ver_9-1

Define, Build, Implement and Improve Work Processes

Version 9.1 3-9

3.2.3.1 DMAIC

DMAIC is an acronym based upon the following five steps:

1. Define process improvement goals that are consistent with enterprise strategies andcustomer demands.

2. Measure the current process performance and collect data for future use (establish abaseline).

3. Analyze all factors to verify relationships among them and identify causality where itexists.

4. Improve or optimize the process based upon the analysis.

5. Control the process to correct variances before they can cause defects. Pilot theprocess to establish capability; implement and measure. Compare the new processmeasures with the established baseline and improve controls where needed.

3.2.3.2 DMADV

DMADV is the other acronym based upon these five steps:

1. Define process improvement goals that are consistent with enterprise strategies andcustomer demands.

2. Measure and identify factors that are critical to quality (CTQs); measure productcapabilities and production process capabilities; analyze risks.

3. Analyze the problems to identify alternative solutions, create and evaluate high-leveldesigns to select the best design.

4. Design details, optimize the design and verify.

5. Verify the design, set up and run pilot, implement process.

3.2.3.3 Six Sigma Fundamentals

Eight Six Sigma fundamentals are necessary to understand and employ for a successful implementation:

1. Information Integrity is essential to all of the Six Sigma activities. Systems andProcesses which produce incorrect or inaccurate data, or fail to produce data in a timelyfashion will cause major problems.

2. Performance Management must be based on contribution to the organization’sgrowth and profitability. It must include both financial and non-financial data, such asthat in the Balanced Scorecard, to be meaningful.

Page 106: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

3-10 Version 9.1

3. Sequential Production which is streamlined and focused on timely delivery of goodsand services is key, especially in manufacturing environments. The implications for theunstructured development approach used in many IT organizations are clear.

4. Point-of-Use Logistics place information and materials in the locations where theywill be used. On-line access to requirements, standards, policies and procedures shouldbe provided, as opposed to hard copies maintained in remote locations.

5. Cycle Time Management focuses on processes and process improvement rather than“fire-fighting.” This approach, adopted by many of the Agile Methodologies, allowsorganizations to accurately estimate and timely deliver products.

6. Production Linearity keeps work moving at a constant pace, rather than planning foror allowing “surges” to catch up on work. Project plans that fail to allow the necessarytime to do the work required, create surges which are costly and error prone.

7. Resource Planning entails not only downsizing when needed, but upsizing also. Afailure to have the appropriate resources to complete critical tasks in a timely fashioncreates further scheduling bottlenecks.

8. Customer Satisfaction requires interaction with real customers to understand boththeir needs and their perceptions. In the case of customers, perception is reality.

3.2.4 Information Technology Infrastructure Library (ITIL)

Originally developed in the 1980s in the UK by the Central Computer and Telecommunications Agency (CCTA), ITIL is intended to help IT organizations deliver high quality information technology services. The material was published in a 30 volume set that described service delivery “best practices.” As product development technology has improved, there has been a strong interest in the parallel improvement in service delivery.

There are strong similarities between the information and approaches offered in ITIL and those published by IBM in the early 1980s, especially in the Service Support volume. The material initially published was intended for large main-frame centric processing centers. Subsequent revisions have addressed smaller scale IT operations.

ITIL is comprised of nine books:

1. Service Delivery

2. Service Support

3. ICT (Information and Communications Technology) Infrastructure Management

4. Security Management

5. The Business Perspective

6. Application Management

7. Software Asset Management

Page 107: CABA_CBOK_Ver_9-1

Define, Build, Implement and Improve Work Processes

Version 9.1 3-11

8. Planning to Implement Service Management

9. ITIL Small-Scale Implementation

3.2.5 National Quality Awards and Models

The role of national quality models and awards is significant in the adoption of processes within a specific country. Because of the increasing international trade, the adoption of a model or award within one country will impact others within its local trading region.

The earliest, and one of the most prestigious awards, is the Deming Prize established in 1950 and administered by the Union of Japanese Scientists and Engineers (JUSE). As the global economy developed, more countries adopted quality models and awards in an effort to assure their continuing success in the world economy. The European Quality Award and the Malcolm Baldrige National Quality Award, have been widely adopted by other organizations as a starting point for their own quality efforts. These, and the other awards listed below as well as others like them, provide a methodology for assessing performance and are heavily process oriented.

• Canadian Award for Excellence established 1984

• European Quality Award established 1999

• Malcolm Baldrige National Quality Award established 1987

• Premio Nacional da Qualidade (Brasil) established 2000

• Rajiv Gandhi National Quality Award established 1991

• Russian Quality Award of the Government established 2000

3.2.6 The Role of Models and Standards

The role of the various international standards and models described in this Skill Category is to provide an organization with a road map or template to use in understanding and improving processes. Every organization must start with who they are and what they wish to accomplish in order to determine which, if any, of the available models will help them achieve their goals and objectives.

Many organizations find that no one model meets all of their needs precisely. Instead they chose the standard or model that provides the “best fit.” Sometimes it will be a combination of several. No matter what model is chosen, it will only be useful it there is a solid management commitment for the time and effort needed to make it real.

Page 108: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

3-12 Version 9.1

3.3 Process Management Concepts

3.3.1 Definition of a Process

A process is a set of activities that represent the way work is to be performed. According to The Concise Oxford Dictionary it is “a course of action or a series of stages in the manufacture of a product.” Webster’s Dictionary defines it as “a system of operations in producing something. A series of actions, changes, or functions that achieve an end result.” A more technical definition found in IEEE, Standard 610, “a sequence of steps performed for a given purpose.” One final useful definition comes from Hammer and Champy, “a collection of activities that takes one or more kinds of input(s) and creates an output that is of value to the customer.”6

3.3.2 Why Processes are Needed

Processes provide a stable framework for activities that can be replicated as needed. Creating processes is natural. In our personal lives, we often call our processes “habits” or “routines.” These are good things that help us to manage the daily complexity of our lives. Most people have a morning routine for workdays; when they get up, a sequence for getting dressed and getting something to eat before leaving for work. This routine, worked out over the years, ensures that we do not arrive at work, late, hungry, and still in our night clothes.

For the CSBA, processes provide guidance on what is to be done and when. It can provide insight into potential problems and roadblocks; it allows the analyst to learn from the experience of others. All work activities begin at what is referred to in the Maturity Models as the “ad hoc” approach level. Each repetition of the cycle is different.

In the going-to-work example above, consider what happens when starting to work for a new employer: the first day (cycle), anxious not to be late, we get up so we can leave extra early, arrive only to find that no one is there to let us into the building and get started with work; we are too early (wasted time resource). The second day (cycle) we leave 25 minutes later. We encounter much more traffic than we did on the first day, and as a result arrive late to work (schedule slippage). The third day, based on prior experience, we leave 10 minutes earlier than the second day, and arrive on time despite the traffic.

At this point, a prudent person knows what time he or she needs to leave for work, barring external forces, in order to arrive on time. It becomes a part of the morning process. Some people, however, will continue to leave at different times resulting in daily cycle time issues; they continue to operate in ad hoc mode. Their productivity and that of those around them will suffer.

6. Hammer, Michael and Champy, James; ReEngineering the Corporation: Get pub date

Page 109: CABA_CBOK_Ver_9-1

Define, Build, Implement and Improve Work Processes

Version 9.1 3-13

Software development processes are, of course, much more complex than the simple example above. The number of variables, even on a small project, will be large. The traffic encountered on projects is other projects, each with their own schedules and resource requirements. Without processes to help plan the route, getting our project completed correctly, on time, and in budget will be a matter of good luck rather than good judgment.

3.3.3 Process Workbench and Components

A process may incorporate one or more workbenches.

Figure 3-2 Workbench Concept

The components found in every workbench are discussed in the following sections.

3.3.3.1 Policy

The policy defines the objective to be achieved. Policies are high-level documents that guide and direct a wide range of activities, and answer the basic question, “Why are we doing this, what is the purpose of this process?” A policy should link to the strategic goals and objectives of the organization and support customer needs and expectations. It will include information about intentions and desires. Policies also contain a quantifiable goal.

Examples of policy statements:

• “We will be perceived by our customers as the IT Services provider of choice, as measured by the Widget Industry Annual Ranking of IT Service Providers.”

This is a very high level policy statement and while it does provide informationabout intention and desires, it will require further definition to be actionable. Most

Page 110: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

3-14 Version 9.1

policy statements should not be focused at this level, although some are needed atthe top level of the organization. A more specific policy statement is shown below.

• “A Joint Application Design (JAD) is conducted to identify customer requirements early and efficiently, and to ensure that all involved parties interpret the requirements consistently.”

A policy statement at this level is very actionable. While some definitions arerequired to nail down words such as “early” and “consistently,” there is no doubtof the intent or the actions required.

3.3.3.2 Standard

Standards describe how work will be measured. A standard answers the question “what.” What must happen to meet the intent/objectives of the policy? Standards may be developed for both processes and the deliverables produced. These standards may be independent of each other only to the extent that the standards set for the process must be capable of producing a product which meets the standard set for it. A standard must be:

• Measurable - It must definitively establish whether or not the standard has been met.

• Attainable - Given current resources and time frames, it must be reasonable to comply with the intent of the policy.

• Critical - It must be considered important/necessary in order to meet the intent of the policy.

There are two types of standards that can be developed to support a policies; Literal and Intent. A literal standard is directly measurable. An intent standard indicates what is desired. An example of each is shown:

• Literal Standard - “JAD sessions will be completed prior to project submission to the IT Steering Committee for final project funding approval.” This standard clarifies what is meant by “early.” It is directly measurable on a binary scale (Yes, it is complete/ No, it isn’t).

• Intent Standard - “All Requirements identified and agreed to in each JAD session must be documented, reviewed, and approved by the JAD participants immediately after the completion of that session.” The standard set for work completion here supports the attainability of the first standard cited.

Page 111: CABA_CBOK_Ver_9-1

Define, Build, Implement and Improve Work Processes

Version 9.1 3-15

3.3.4 Procedures

Procedures establish how work will be performed and how it will be verified. There may be a significant number of procedures to be performed in any single process. A process may require a lengthy period of time for completion. Substandard or defective work performed early in the process can result in schedule-breaking delays for rework if not caught promptly. For this reason there are two types of procedures which will be discussed in the following sections.

3.3.4.1 Do Procedure

How work will be performed. Each Do procedure addresses the question “how must the work be performed?” The Do procedures define how tasks, tools, techniques, and people are applied to perform a process. These tasks, when properly performed will transform the input to the desired output; that is, one that will meet the established standard(s).

Examples of Do procedures developed to support standards are:

• “A JAD Scribe will be appointed for each JAD Session. This responsibility will rotate among all of the participants in the session.” Notice that this procedure is about resources: who is to do what. Resource allocations are a critical component of effective procedures; a task that is everybody’s job is nobody’s job.

• “The JAD Scribe will use the Option Finder tool to document and display requirements as they are identified.” This procedure and the one that follows are about techniques to be used to achieve the standard set for having participants agree to the results of the session.

• “The JAD Scribe will use the Option Finder tool to display the complete list of requirements gathered in the session once all requirements have been identified and documented.” Taken together, these procedures will make it possible to comply with the standard and achieve the intention of the policy. It is essential to have a methodology for ensuring that this has happened.

3.3.4.2 Check Procedure

How the completed work will be checked to ensure it meets standards. A quality control method, when integrated with the Do procedures, will enable the product producer to ascertain whether the product meets product standards and/or whether the intent of the policy has been achieved. These control methods may include reviews, walk-throughs, inspections, checklists, and software testing.

Examples of Check procedures developed to support standards are show below:

Page 112: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

3-16 Version 9.1

• “The JAD Moderator will facilitate the resolution of areas of disagreement prior to the end of the session.” By incorporating the check step into the flow of the procedure, discrepancies can be identified and addressed immediately.

• “At the conclusion of the session, the JAD Scribe will read each requirement as it is displayed. The JAD Moderator will request a positive affirmation from each participant that they agree with, and accept, the requirement as stated.” This then is the check procedure, to insure the requirements are agreed to by all the participants.

3.3.5 Process Categories

Procedures are the building blocks of processes. Just as there is more than one kind of procedure, there is also more than one kind of process. Each kind of process plays a role in ensuring that each product satisfies the policies and standards identified by the organization. In many projects, there are multiple processes underway concurrently. While this is an excellent way to maximize the time resource, it can create other problems. Maintaining the proper relationships among the processes is a part of the Management Process.

3.3.5.1 Management Processes

The management process includes all of the activities necessary to ensure that the other processes are able to accomplish their objectives. The most familiar of the management processes is project management. It includes the planning, resource acquisition, allocation, and control necessary for project completion.

3.3.5.2 Work Processes

The work processes are the activities that create products. These include the Requirements Elicitation Process, the High-Level Design Process and the Code Development Process. Depending upon the size of the project, some work processes are quite large and time consuming. Because of this, there is often a temptation to overlap processes as mentioned above. Except in cases where the process so specifies (such as Agile), beginning work on coding before all of the requirements are complete will result in a rise in defects and resulting rework.

3.3.5.3 Check Processes

The check processes are activities that are designed to identify defects or non-conformances in products created. The Testing Process is the best known of the checking processes, but there are others. Change Control is a checking process designed to verify that changes have been properly made and authorized. There is a circular relationship between work processes

Page 113: CABA_CBOK_Ver_9-1

Define, Build, Implement and Improve Work Processes

Version 9.1 3-17

and check processes, as many of the check processes have work processed that result in products that must be checked! An example of this is the creation of test cases (a product set) designed as a part of the check process (testing). Reviews and inspections of tests cases then are a check process on those products.

3.3.6 The Process Maturity Continuum7

In Figure 3-3, it is possible to see the interrelationship among processes, services, business partners and business practices as the organization matures. The bottom row represents the Level 1 organization, with its focus on time and budget, an ad hoc approach to processes, and personnel policies that focus on heroes.

Figure 3-3 The Process Maturity Continuum

At this level there is significant conflict with other parts of the organization as a result of frustration over uneven delivery of products, both in terms of time and quality. Resources are severely constrained and as a result of the emphasis on end-of-cycle quality control, products often are delivered with little or no testing. Often in this environment, measurement is avoided for fear that it will be used as a weapon against the IT organization. Through the implementation of the Key Process Areas (KPAs) shown in 3.2.2 on page 3-5, there is a major change in the organization.

As the organization develops a more process-oriented management style (Level 2), each of the areas reflect the impact of a more stable environment; better definition of the work to be done and the processes needed to achieve the organization’s goals. A key result of the implementation of the Requirements KPA is an improved relationship with other parts of the organization. Processes are now well supported by the organization and as a result, product variability is reduced. Importantly, there are now measurements in place to support the

7. Quality Assurance Institute (QAI), Process Maturity Continuum, 2003

Page 114: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

3-18 Version 9.1

improvements being achieved. Some of these measures are now subjective, as the organization becomes more comfortable with the kinds of information it can generate.

Continued progress in implementing effective processes, and moving from a Level 2 organization to a Level 3 organization has a major impact on employees. The heroes of Level 1 have grown into a staff with a wide range of competencies. Managers understand more clearly the competencies needed to achieve project and product goals. This leads to personnel hiring and project assignments based on competencies. It also triggers a surge in training activities. The creation of well-defined, stable processes lays the foundation for an effective use of the defect data gather from various check processes and procedures. Product delivery is much more predictable in terms of time, cost and quality.

As the process orientation continues to mature to a Level 4, individuals who were hired because they possessed certain competencies, are now compensated for demonstrating those competencies, rather than merely having them. Defect data is now sufficiently reliable that processes can be said to be within statistical control with regard to common causes. Measurement activities embedded in processes provide information about process capability that can be used by managers to make fact-based decisions.

At Level 5, sound, reliable processes, used by skilled personnel with a wide range of competencies provide the IT organization with the ability to be pro-active in the application of technology to business problems. Level 1 organizations often spend as much as 70% of their time in non-productive activities. Level 5 organizations have reduced this number dramatically, and are able to use that time to provide greater value to the organization.

3.3.7 How Processes are Managed

Skill Category 1 provided an introduction to some of the tools used for managing processes: the Control Chart, the Scatter Diagram and the Histogram. 3.2.3 Six Sigma provided a hint about the uses of those tools. Fundamental to the management of processes is the concept:

What you can’t measure, you can’t manage.

Regardless of the intention, the general management approach is the same:

Step 1: Align the Process to the Mission

Step 2: Define a Process Policy

Step 3: Define Input Standard(s)

Step 4: Define a Process Standard(s)

Step 5: Define Output Standard(s)

Step 6: Define Do Procedures

Step 7: Define the Check Procedures

Step 8: Integrate the Do & Check Procedures

Page 115: CABA_CBOK_Ver_9-1

Define, Build, Implement and Improve Work Processes

Version 9.1 3-19

3.3.7.1 Align the Process to the Mission

To manage anything requires that there be an objective. To manage processes, organizations must first agree upon the purpose of managing those processes. For some organizations, the purpose will be to simply understand what the process is doing, for some to improve those processes, for some others, it will be to maintain the processes, and occasionally the purpose will be to render obsolete or eliminate a process.

Regardless of the reason for managing a process, the first step is to ensure that the intent of the process is aligned with the Mission of the organization. Failure to perform this basic step may lead to processes in conflict with the overall direction of the organization.

3.3.7.2 Identify the Process and Define the Policy

The next step in managing an existing process is to gather the existing information about the process. At the outset, many of the pieces of information will be incomplete, incorrect or missing entirely. Over time it will be possible to find, correct and complete the information gathered initially. The following is a list of the kinds of information to collect:

• Name and Description - While this may seem basic, all too often a single process will be called by two, three or even four different names or titles, depending upon who is referencing it. Alternatively, the same name may be applied to more than one process. Attaching a description of what the process is will help to identify any conflicts in nomenclature. By establishing a single, agreed upon, name and description, the process is already improved. Historically, IT has tended to apply numeric designations to processes. While this does help keep process identification unique, it does little to help people understand and remember what the process is about. Stick with real words for names and add a numeric designation if the organization’s standards require it.

• Policy, Purpose and Ownership - The purpose statement for the process should identify how it supports specific policies and standards within IT. The Process Policy answers the question, “Why are we doing this?” Processes with no apparent connection to policies and standards should be examined closely to determine if they actually contribute anything. Not all processes are worth doing.

Each process must have an owner. That owner should be identified by bothposition and by name. Over time either or both may have changed. It may benecessary to find a new owner for the process. Ownership cannot just be randomlyassigned because it carries with it significant responsibility. Individuals mustaccept ownership of a process. Processes that no one is willing to own should alsobe looked at carefully. The problem may be with the process; it may be unwieldy,unpopular or extremely contentious. These are issues that must be addressedeventually. A process that no one is willing to own is a candidate for elimination.

• Inputs and Outputs; Suppliers and Customers - Although there are a few “originating processes” in the IT development lifecycle, most processes will receive

Page 116: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

3-20 Version 9.1

inputs from predecessor processes. Each of these inputs, along with the name and description of the supplying process, must be identified. For each input, there must be a standard that describes what that product must do or be. This is sometimes referred to as the entry criteria. Products which do not meet this standard are of no value to the process and should be rejected.

For some processes there is only a single input from a single source, but oftenprocesses will receive the same kind of input from different sources. For example,input to business requirements will be provided by members of the businesscommunity; technical requirements are often provided by members of the ITOperations staff. The individuals and organizations that provide input are processsuppliers. In development processes, the exact names and departments of thesuppliers will often change from project to project and may need to be identifiedgenerically.Every process produces something. It may produce a single output or multiplethings. Each output must be named and described. It is important to identify whoreceives the product, in some cases it will merely be another process, but usuallythere is an individual or job function associated with that receiving process.The products created by this process must also meet a standard if they are to be ofvalue to the customer. These standards are sometimes referred to as the exitcriteria. Accepting products that fail to meet the entry criteria will significantlyincrease the difficulty in achieving the exit criteria.

• Sub-Processes and Procedures - Most organizations begin identifying the major processes at this level of detail. As the practice of learning about processes expands, more detail will be available. Even in the initial stages, it is necessary to identify the sub-processes and associated procedures that create the process flow. If, for example, the process being described is “Create a project plan,” one sub-process would be “Create a test plan”. All of the major sub-processes should be included in such a way that the process flow is clear. A process with more than five to seven major sub-processes is generally too complex to be well managed. There may be multiple layers of sub-processes. Do not attempt to include them all in the major process.

Likewise, there will be many supporting procedures. It is not necessary to includethe full detail of all of the Do and Check Procedures. Include a reference to wherethat detail is to be found.

3.3.7.3 Evaluate Process Development Stage

Processes evolve through time, especially in organizations that are moving from an ad hoc environment to one managed by processes. Processes are created to meet a need. The initial iteration may be less than satisfactory; that leads to changes in the process. At some point the process achieves an organizationally acceptable level of performance and the level of change drops. The process is at least marginally stabilized. This does not mean that the process is a good one, only that the organization is willing to live with the results it produces.

Page 117: CABA_CBOK_Ver_9-1

Define, Build, Implement and Improve Work Processes

Version 9.1 3-21

Over time the process will evolve; new sub-processes are added to address new development needs; old sub-processes are dropped as they become obsolete. If the organization engages in some process improvement activities, the process may have been improved. If the improvement process was extensive enough, the process may have become an optimized mature process.

Major processes are generally not tied to specific technologies, platforms or environments; that connection is generally at the sub or sub-sub-process level. For that reason, major processes rarely become obsolete. To manage anything, it is important to understand where it is now. Identify and record where along the process development lifecycle the process is now.

3.3.7.4 Determine Current and Desired Process Capability

Process capability is the measure of what the process is able to produce. It generally includes a gross production amount, a defect rate and a time scale. For example:

• The Requirements Inspection Process can inspect 20.0 requirements per hour. One defect in 50 will escape detection in the Inspection process.

• The User Manual Creation Process can create 12 pages of documentation per Analyst, per Day. There are 1 major and 4 minor errors created for every 40 pages of the manual.

To have this kind of information, organizations must have some kind of on-going measurement process. For the information to be reliable in any specific instance, the production process must be under control. This means that the amount of variability in the process has been reduced to the point that defects occur outside the three standard deviations range. Three standard deviations (3) include 99.9% of the entire population. Restated, out of 1000 opportunities, only one will be excluded. In order to know that, data must be collected from multiple iterations of the cycle and recorded consistently.

To return to the example of the Requirements Inspection Process, each time there is an inspection, the time spent, the number of requirements inspected and the number of defects found will be recorded. In order to know the process failure rate, defects data must continue to be collected through out the life of the project.

INSPECTION DATAProject Name

# Requirements Inspected Hours

Defects Found Escaped

A 214 12 32 1B 402 20 84 2C 47 3 11 0D 135 6 38 1E 369 18 91 2F 95 5 27 0G 117 6 32 1

Page 118: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

3-22 Version 9.1

Figure 3-4 Requirements Inspection Data

The information from the example might have come from a chart like Figure 3-4. While the data contained in the chart could (and should) be used for other purposes, the specific intent of this chart is to examine the effectiveness of the Requirements Inspection Process. By manufacturing industry standards, this is a very small sample; for Information Technology processes, it is a reasonable initial sample.

With 40 or more occurrences of a process recorded, it is easier to use tools such as the Control Chart to examine what is happening. Establishing reliable standard deviations for small groups of items requires the use of different techniques such as T scoring which are explained in most Statistical Analysis courses and textbook. One of the issues with small groups is that the mean and the standard deviation are easily changed by the addition of new data. Figure 3-5 is a generic Control Chart for a process that is under control.

Figure 3-5 Standard Control Chart

Each individual occurrence of a process or activity is plotted along the line. There is a time flow from left to right; this means that the most recent activity will be shown at the right side of the chart. When a problem occurs, it is then possible to put the event in a time context. This is important for determining causation

H 187 9 52 1I 256 12 74 1

1822 91 441 9Inspection Rate 20.02 Escape Rate 2.04%

INSPECTION DATA

Page 119: CABA_CBOK_Ver_9-1

Define, Build, Implement and Improve Work Processes

Version 9.1 3-23

Figure 3-6 Revised Inspection Data Chart

Figure 3-6 shows a revision to the original Data Chart. A new entry (I) has been added at the arrow. The inspection results for this occurrence are significantly different than most of the others shown. Rather than one in fifty defects escaping (2%), in this instance one in four defects escaped (25%). This is a large enough change that in the small sample used, it changes all of the result rates. In a larger sample, it might be very difficult to find the table entry that is the source of the problems. The control chart does this much more effectively. In Figure 3-7it is very easy to spot the problem event.

Figure 3-7 Control Chart with out of Control Event

Once the out-of-control event has been identified, a quick look at the supporting data chart will point the analyst in the right direction. In this case, the amount of time spent in the Inspection Process was well below the organization standard. The result was that fewer defects were found and more escaped.

Project Name

# Requirements Inspected Hours

Defects Found Escaped

A 214 12 32 1B 402 20 84 2C 47 3 11 0D 135 6 38 1E 369 18 91 2F 95 5 27 0G 117 6 32 1H 187 9 52 1I 209 7 28 7J 256 12 74 1

2031 98 469 16Inspection Rate 20.72 Escape Rate 3.41%

Page 120: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

3-24 Version 9.1

Events causing process variation are classified in one of two ways: common cause and special cause.

• Common Cause - Common cause is an event that is a part of the process, such as the amount of time spent in the inspection process in the example above. Common cause items are within the control of those using the process.

Much of the work done in CMM Level 3 and Level 4 is removing common causesof variability from processes. Common causes are often easy to identify early inthe improvement process; they are things that people know already about how thework is done. For example, if the Design Estimation Sub-Process consistently failsto yield accurate estimates, the staff may already know that the estimates are beingdeveloped before the requirements are significantly completed. Correcting thispart of the process is within the control of the organization. As each common cause is identified and eliminated, the process variabilitydecreases; the results are increasingly within the predicted and acceptable standardrange of performance. Common causes are often responsive to training efforts andmore effective communication regarding the true priorities. At some point therelative cost-benefit of identifying and removing additional common causesbecomes too small to pursue further.

• Special Cause - Special cause is an event outside the process. It may or may not be within the control of the organization. A hurricane that causes damage to the facility which results in many days when people are unable to come to work would be an example of a special cause. This might cause the Design Estimation Sub-Process to yield inaccurate estimates, but the organization cannot control the event.

Even before organizations gain control of common causes, they often attempt toidentify potential special causes and predict the potential impact. This is a part ofthe project risk management process.Not all special causes are as dramatic as a hurricane; they may include regulatorychanges, staffing changes, and environmental factors such as power outages or icyroads.

To return to the example of the Inspection of Requirements, it would appear from the data presented in Figure 3-4 and Figure 3-6 that the process is working well at an inspection rate of 20 requirements per hour. It would also appear that it works significantly less well at an inspection rate of 30 pages per hour (Project I.) From the perspective of the designers, coders and testers, inspecting at a rate of 20 requirements per hour should produce the desired level of quality. Going faster leaves more defects to be found and fixed later in the life cycle.

As the project manager responsible for allocating resources, it is highly desirable to be able to inspect more requirements per hour. Given that there are between four and six individuals in each inspection, inspections are very labor intensive. Being able to increase productivity, even slightly, releases significant resources for other uses. Perhaps a rate of 23 or 24 pages per hour will yield the same benefit using fewer resources. Work will need to be done to establish what the actual desired capability threshold should be.

Page 121: CABA_CBOK_Ver_9-1

Define, Build, Implement and Improve Work Processes

Version 9.1 3-25

The point of data such as this is that it provides good information about what the current processes are capable of doing. It would appear that the Requirement Inspection Process is working well when properly used. It would also appear that the current Requirements Gathering and Documentation process is not as good as it could be; one in four requirements contains a defect. Based on this information, the organization may decide that the Requirements Gathering and Documentation process needs to be analyzed to find out how it can be improved to achieve the desired level of accuracy.

Based upon their current position, this organization might develop a target performance for the process of one in ten requirements containing a defect. This would be a very significant improvement in the current process. Large gains are possible early in the control process; later it will be smaller incremental gains.

3.3.7.5 Establish Process Management Information Needs

At the outset of the effort to manage processes it was necessary to grab whatever information was available. Often the measures available in the beginning are those that show the process in the best possible light. They may not be the correct measures for determining how well the process is actually functioning.

While learning about the process capability, it may have become clear that additional information is necessary. If new sub-processes have been added or existing sub-processes modified, it will be necessary to develop new measures for them.

The primary question to be answered is “What do we need to know about this process to determine how well it is working?” When answering this question, it is essential to remember that there may be more than one answer to the question. There are often multiple stakeholders for a single process.

3.3.7.6 Establish Process Measurement, Monitoring and Reporting

Staff, along with first and second level management, needs to have detailed information that will allow them to successfully complete the tasks at hand - using the processes provided. They need to know what kinds of errors are occurring and under what circumstances; this is tactical information. Senior staff and managers need to know what the organizational status and capabilities are; this is strategic information.

• Tactical Measures - Tactical measures are collected at the detail level by the individuals performing the process. These might include the number of test cases developed for a specific project and the amount of time required to do so. It might be the actual number of test cases in the suite and the number that have actually been executed. This is progress information. If the standards state that 100% of the suite must be executed, the number actually executed provides information about where we are in the process. As testing progresses it will also include information about how successful the test execution has been (97% pass rate; 8 failed test cases to be researched.)

Page 122: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

3-26 Version 9.1

This information about the process is very important to the project manager, theother members of the business and IT development team working on the project.This information is often the result of sub-process and procedure information.

• Strategic Measures - These measures are provided to senior managers to allow them to make appropriate decisions. They are at a much higher level of detail and cover a much wider perspective. They may need to know that 95% (19 out of the last 20) Acceptance Testing projects using the process have been completed within the time originally estimated, and with residual error rates of less than 1 per 250 requirements. This level of information allows IT senior management to negotiate effectively for following the process and allocating the correct amount of time.

Once the appropriate measures have been identified, it is necessary to determinethe responsibility for collecting data from the process performers, analyzing it andreporting it.

3.3.8 Process Template

Process templates are designed to contain all of the information above, plus any organization-specific requirements. By creating electronic templates and storing them in an easily retrievable location, everyone involved in creating, documenting, assessing, revising and using them will be able to do so. The use of templates also serves as a way to save time and energy when developing process information. It will ensure that the vital pieces of information are collected and stored.

3.4 Process Mapping In order to understand how work is actually accomplished, it is important to know how various components of a process work together and how they work with other processes. The approach for gathering and organizing this information is called process mapping. Creation of a process map can require a significant amount of time and energy. It is generally performed at the beginning of a major process improvement cycle.

Process maps look very similar to flow charts. They use many of the same symbols however, there is a key difference. In process mapping, time always flows. There are no loops in a process map. Time begins in the upper left of the process map and flows to the lower right. Where there is a rework or error activity, it will be shown along with the time consequences. This approach allows the map to demonstrate visually significant issues with process capability.

Earlier in this section, the need to document and understand process capability was discussed. What is missing from the picture is the information about how the results are achieved. The identification and linking of sub-processes together to form a process is an important step, but

Page 123: CABA_CBOK_Ver_9-1

Define, Build, Implement and Improve Work Processes

Version 9.1 3-27

only the beginning. In order to understand the process, it will be necessary to have much more detail. There are four levels to most major processes:

1. Unit

2. Activity

3. Task

4. Procedure

3.4.1 Unit

Units are the major activities of a process. Most processes have 3 to 5 units. These units taken together sequentially should provide a general, but comprehensive, end-to-end description of the process; each unit relies upon the result of a previous unit for its input. This end-to-end description should be adequate for a comparative novice to be able to understand what this process is about.

Each unit should be at about the same level of detail. If one unit is “Send battle ship to Gulf,” “Buy toothpaste” is not at the same level of detail. If the process appears to have 10 or 15 units, look at the level of detail to see if some are much more detailed than others. It may also turn out that what are listed as two or three units are actually one that unit has not been clearly named.

A change in setting or location signals the end of one segment and the beginning of another; setting is important in Process Mapping. One effective method of determining what constitutes a unit is to use the geographical location (setting) of the activities. This allows a clear break and can help in identifying trouble spots.

Units should be named as either subject verb or verb subject (Bill Processing or Process Bills); this will improve readability and reduce redundancy and confusion. Units may well cross functional lines, beginning in one department, passing through another before terminating in a third. It is important to know this information; it will be used to create the unit level map.

To further improve understandability and traceability units should be numbered sequentially through the process, as well as named. Units contain no “how to” or detailed level information. The units also flow from left to right until there are several in one area; at that point the flow moves sequentially down the page from top to bottom.

Page 124: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

3-28 Version 9.1

Figure 3-8 Unit Level Process Map

Units are connected in the map by directional arrows. Each unit now has a unique number. With this map it is possible to see the “big picture” very clearly. Each of these units contain many components. This is analogous to the movie plot summary: “Boy meets girl; boy wins girl; boy losses girl; boy wins girl back.” Although the entire plot is present, we have no idea how and when these things happen. When seeking to understand a process we need more detail; therefore we need to break Units down to a lower level of detail. A single unit does not cross locations although multiple units do occur in a single location.

3.4.2 Tasks

Tasks are the building blocks of units. Units may have many or few tasks, but when those tasks are taken together, they form a complete “drill down” description of the work to be done to successfully complete a unit. Tasks may rely upon the completion of previous units or tasks for their input; however, tasks need not be interdependent. For example, a single trigger may be used to initiate several tasks which run concurrently, but do not require interaction. For example a school bell ringing may be the trigger for teachers and students to go to their classrooms; however, classes do not begin until the next bell rings and the teacher arrives. Students may arrive (with penalty) after the beginning of class.

Tasks should be named following the convention used for units (either verb subject or subject verb) whichever format is chosen should be used consistently. In addition, each task will be numbered in a way that will allow it to be properly associated with both the unit it is part of and the other tasks involved in the completion of the unit. Because not all of the tasks may

Page 125: CABA_CBOK_Ver_9-1

Define, Build, Implement and Improve Work Processes

Version 9.1 3-29

have been correctly identified at this point, using some form of word processor or spreadsheet is recommended. Anticipate that there will be changes to the task list which may require modifying the numbering system.

The focus of tasks is often at the group or department level of the organization. Where the unit level defines the “who” very broadly, at the task level it will be more specific. Often the “who” will be a department name or a job title.

Tasks are still at the “what” level, not the “how’” level.

Figure 3-9 Task Level Map with Delay

In Figure 3-9, the who is defined by the various functional titles shown at the top of the map. This allows for the existence of multiple individuals performing the same set of tasks. If this is the case, it is essential that task descriptions be verified with multiple incumbents. If only one source is used, it is entirely possible that some steps will be missed or done differently.

In an organization with little standardization of their processes, it is entirely possible that each incumbent does things differently. This in itself is an important finding for the Mapping activity. Before the process is automated, it will be essential to identify which one process is most successful and ensure that everyone is prepared to accept that process. However, during the initial stages of mapping, the task level map should reflect the most common and consistent sets of activities.

Also in Figure 3-9, notice that item 4.5, Correct Defects is flagged with a large “D”. This indicates a place in the process where there is a Delay. A Delay is any time period in which no

Page 126: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

3-30 Version 9.1

work on this task is occurring. Delays extend the total amount of time required to complete the process without adding value to the process. Defects are accumulated and returned to Development on a weekly basis. Corrections are returned bi-weekly. While the “batch” error handling methodology may simplify tracking of individual defects, it can create considerable wasted time in the process. One of the goals of Business Process Management (BPM) is to identify delays and remove them from the process.

Where interviews indicate significant, unexplained delays, the CSBA should suspect that there is another process that is transparent to the interviewee, taking place. It is important to identify that process and add it to the map.

3.4.3 Actions

Actions are the building blocks of tasks. It may require several actions to complete a single task. Each action relies upon the input from a previous task or action. Actions are usually focused on steps taken by a single individual. Action descriptions are very specific.

Up until now the mapping process has been fairly streamlined and uncluttered, but at the action level it is necessary to begin adding more detail. These maps begin to look much more like the traditional data flow diagrams with which IT processionals are familiar. An action level map may begin with a trigger which is the end of a previous action; the “off page connector” symbol is often used to reflect this.

In the action map there will be decisions, activities which may create multiple activity paths. One typical set of activities seen on the action map will be the ‘error loop.’ Error loops should always be flagged with an “R” to reflect that rework is occurring at this point. Rework is any set of activities which are repeated in order to completely and correctly finish an action or task. Rework does not add value. Figure 3-9, already identified as having a built-in delay, also has the Rework Cycle, Correct Errors.

This is one major difference between a data flow diagram and a process map; because the business process map is concerned with time, the “loop” moves forward in time rather than being reflected as reentering the process at the beginning. In addition to removing Delays, another goal of the finished process is to remove as much Rework as possible. Separating Rework from other types of Delays is important because they typically will require some other action to be inserted earlier in the process to prevent them.

Because actions are specific, their names should contain more information than the verb-noun syntax that has been used for units and actions. Actions steps are often accompanied by forms or documents which are used in the completion of the action.

3.4.4 Procedures

Procedures are the building blocks of activities. In 3.3.4 on page 3-15 of this Skill Category, the two types of procedures, Do Procedures and Check Procedures are discussed. Detailed

Page 127: CABA_CBOK_Ver_9-1

Define, Build, Implement and Improve Work Processes

Version 9.1 3-31

procedures do not form a part of the finished process map, but it is essential that they exist and are properly documented. Early in the mapping process, it is good practice to ask individuals to bring samples of the procedures they use. If they are unable to do so, or if the procedures lack detail and clarity, a separate project may be required to develop the needed procedures.

3.4.5 Role of Process Maps

Creating a process map is an excellent place to begin work when processes fail to deliver the needed or expected results. Business Analysts are often key players in mapping projects. Because of their unique knowledge and skills, they can see more of the ‘big picture” than most individuals. They often are very knowledgeable about both the strengths and weaknesses of existing processes.

3.5 Process Planning and Evaluation ProcessWhile 3.3.7.2 on page 3-19 addresses evaluation the relative maturity of the process, this section presents a process for ensuring that any process is properly structured for successful execution. To achieve this, a process must contain all of the key process improvement steps, first identified in Skill Category 1, Quality Basics. By embedding the PLAN-DO-CHECK-ACT methodology into the process, ongoing improvement activities always occur, rather than requiring special direction or approval.

3.5.1 Process Planning

The first portion of any process should be the planning. There should be discrete and identifiable planning activities associated with each cycle of the process. For example, in the Requirements Gathering Process, the planning portion would include items such as:

• Identify what areas of the organization will have requirements for this project

• Identify who within those areas will have the knowledge and authority to provide requirements

• Identify and determine what process will be used for gathering requirements, individual interviews, JAD, etc.

• Identify how long it will take to complete those activities

• Identify who will be able to verify requirements

• Identify who will be able to approval the final list of requirements

Page 128: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

3-32 Version 9.1

These explicit planning steps, included in the process activities, reduce the likelihood that key planning activities will be missed.

3.5.2 Do Process

The Do portion of the process should explicitly perform all of the functions addressed in the process definition. The majority of detailed Do and Check Procedures discussed earlier will be performed here. In evaluating the process, it should be clear how the desired result will be achieved.

These are the check procedures shown in Figure 3-2, the Process Workbench. They are performed here to ensure that each component of the product is built correctly. There are rework procedures to address components that are not correct. For example, the Acceptance Testing process may specify that each functional requirement be tested at the upper and lower boundary levels. Each time a test case fails on these boundary tests, it will be recycled for correction.

For most IT organizations, the documentation on processes is focused on the Do Processes. In evaluating this portion of the process, it is important to ensure that the proper Check Procedures also exist.

3.5.3 Check Processes

At the end of each iteration of the process, the Check Processes ensure that the relative success of that iteration in toto is assessed. By performing the Check Procedures, it is possible to determine if the process in the aggregate provided the desired result.

In the example shown in Figure 3-9 on Acceptance Testing, it would be perfectly possible to have a perfect result on boundary testing, and still deliver a significantly flawed product (i.e., the operation was a success, but the patient died). By assessing the total results of the process at a macro level, it is possible to identify where improvements are needed.

The best known and least used tool for this type of assessment is the “Post Implementation Review.” In many organizations this step is a nominal step in the process, but is dropped due to “time constraints.” The time constraints are real; but they are often the result of the failure to learn from previous mistakes. It becomes a self-perpetuating cycle. New technologies make it possible to conduct effective post-implementation reviews for large projects in about four hours.

Phase end reviews that require the product to meet certain criteria before moving to the next phase are an intermediate approach. To be effective, the standards must be real and organizationally enforced. This means that the kind of process measures discussed in Figure 3.3.7.5 must be effectively implemented.

Page 129: CABA_CBOK_Ver_9-1

Define, Build, Implement and Improve Work Processes

Version 9.1 3-33

In evaluating the process, it is important to be able to explicitly identify those places where measurements are being collected. If they do not exist, they must be developed.

3.5.4 Act Processes

For most organizations, the process ends with the Check step. To improve the performance of the process, it is necessary to explicitly describe what happens when it yields an unacceptable result. This entails identifying not only what will be done, but also who will do it.

3.5.4.1 Process Improvement Teams

The establishment of standing Process Improvement Teams helps to address the question of “Who do we tell?” The Process Improvement Team is composed of a group of qualified and interested individuals who are assigned the guardianship of a particular process. They report to the Process Owner identified in the Process Model.

The process team receives the information from each iteration of the process. A single sub-standard evaluation may not produce a flurry of activity. Rather, it is assessed to determine how the result was produced. Among other things, the team will need to know:

• Was the team properly and fully trained in how to use the process?

• Was the process followed correctly?

• If there were deviations from the standard process, were they the cause of the problems?

• Have other teams had the same or similar results when following this process?

Once this information has been collected and analyzed, a decision can be made on whether or not changes need to be made to the process.

3.5.4.2 Process Improvement Process

The Process Improvement Team, based on their analysis, may recommend the process be changed. This will follow the same PDCA approach as has been used before. The Team will identify the proposed change, conduct a pilot (test), evaluate the results and either change and re-pilot or implement.

Page 130: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

3-34 Version 9.1

3.6 Measures and MetricsThe need to create and maintain effective measures and metrics has been stressed throughout this Skill Category. The need to measure processes and the use of those measurements has been a consistent theme. It is now time to take a closer look at these topics. Earlier in this category one of the three truths of measurement appeared:

What you cannot measure, you cannot manage.

Only when there is accurate ongoing information about what is happening in a process (or anything else) is it possible to establish control over the process. This is a well-know, often-quoted maxim. All too often the other two truths are not considered, with catastrophic results. The other two truths are essential to understanding and creating effective measurement systems:

What you measure is what you get.

The measured should establish the measure.

The second truth, while offered as the outcome of years of observation and study by a wide range of individuals, is also easily observable by individuals and organizations. People do the things they are measured on. If a programmer is paid by lines of code, he or she will produce many lines of code. If a Business Analyst is measured on the number of test cases created, she or he will create many test cases. In either case, if this is the only measure, the quality may be poor and the utility zero, but the expected volume is created. Because of this situation, it is very important to understand both the expected and the potential results of implementing specific measures.

The third truth is about the acceptance and the validity of the data being created. If those being measured do not accept or agree with the standard set for the measure, it will be manipulated. If the data about their process does not come from them, the producers will reject it as suspect or unfair.

3.6.1 Definitions

3.6.1.1 Measure

A measure is a single attribute of a product or process. A measure must be defined in terms of a standard, such as a liter, a kilometer, or an hour. A measure should meet these two characteristics:

• Reliability - A measure must be consistent. If two or more individuals performed the same measurement process, they should achieve the same result each time. The old carpenter’s adage, “Measure three times, cut once” addresses the potential unreliability of measures performed by individuals.

Page 131: CABA_CBOK_Ver_9-1

Define, Build, Implement and Improve Work Processes

Version 9.1 3-35

This definition of a measure is called a standard unit of measure. This is the sameconcept that a country uses when it establishes standard units of measure distance,such as kilometers or miles, and weight, such as kilograms or pounds. In providingthis example, it is important to recognize that some countries use miles and othersuse kilometers; without a standard base, the results are not directly comparable. Ifthe actual base is unknown, comparison is impossible. Likewise, all informationservices groups do not use the same definitions for measures, such as hours ordefects. Without standard units of measure comparison within or betweenorganizations is not practical unless detailed information is provided about thedevelopment and definition of the standards used.

• Validity - The degree to which a measure actually measures what was intended. Often it is difficult to obtain a direct measure of the desired product or process, so indirect measures are adopted. Lacking direct measures of productivity, some organizations measure the amount of time individuals spend “at work.” This indirect measure has little validity as a measure of productivity, but is commonly used.

3.6.1.1.1 Measure Examples

A measure is a quantitative description of a single attribute of a product, service, or process. For example, hours would be a measure associated with a process; defects could be a measure associated with a product; and customer satisfaction could be a measure associated with service. If these measures are standardized, then every time they are used the measure will have the same meaning. As such, it can be used effectively to manage by fact.

• Lines of code

• Time to write (work effort)

• Number of go-to verbs used

• Number of defects

The measurement of an hour as a unit of time to complete a work task is subject to interpretation unless it is well defined. For example, an hour could be a paid hour or a worked hour. An organization might pay someone for eight hours during a day, but the individual may actually work ten hours or seven. To create valid and reliable measures, it is essential to know whether the hours mean hours worked or hours paid for. Likewise, a defect can mean many things to many people. If a user forgets to provide a requirement, is that a defect? The number of defects will be impacted by the precise definition of a defect.

Without standard units of measure, collective quantitative data is not comparable. For example, if one project does not calculate person-hours in the same way another project does, those numbers are not comparable. Assume that Project One collects all hours worked, regardless of whether they are paid or unpaid hours; and Project Two only collects paid hours. The net result might be that Project One indicates they are less productive than Project Two, when in fact Project One may be more than effective Project Two—the difference being that the two projects used different units of measure.

Page 132: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

3-36 Version 9.1

3.6.1.2 Metrics

A metric is a combination of two or more measures. Given the previous examples of measures, a common metric is kilometer or miles per hour. A metric will provide a rate at which something is occurring. Six Sigma provides a rate at which defects occur per million opportunities. A metric must meet the same two criteria as a measure; it must be reliable and it must be valid.

While the reliability of most measures is fairly easy, the calculation of some metrics can be quite complex and demonstrating reliability becomes increasingly important. When using a metric, it is essential to demonstrate that not only is the calculation of the metric reliable, but also that each of the underlying measures are also reliable. The criteria, that two or more individuals using the same measurement and calculation process would consistently achieve the same result, still applies.

When examining the validity of measures, the example of hours at work as a measure of productivity was used. Simple measures often fail to achieve complex purposes. A metric, number of hours to create a function point, combines two simple measures; hours worked and function points created. The combination of the two may provide better information about productivity if the underlying data are good.

3.6.1.2.1 Metrics Examples

The chart below was used earlier in this Skill Category to illustrate the use of process control charts. What was missing from that discussion was the explicit consideration of the collection and calculation of the data.

The “Inspection Rate” is a metric. It is composed of two measures: 1) hours spent and 2) requirements inspected. The second metric is the “Escape Rate;” this compares the number of defects that escaped detection to the number found. For each of the four individual measures taken, the kind of definitional work described in 3.6.1.1 Measure and 3.6.1.2 Metrics must have been completed for the measures to be reliable and have validity. Once validated, these two metrics can be used for a wide variety of project planning and management activities. They will support decision-making based on facts.

INSPECTION DATAProject Name

# Requirements Inspected Hours

Defects Found Escaped

A 214 12 32 1B 402 20 84 2C 47 3 11 0D 135 6 38 1E 369 18 91 2F 95 5 27 0G 117 6 32 1H 187 9 52 1I 256 12 74 1

1822 91 441 9Inspection Rate 20.02 Escape Rate 2.04%

Page 133: CABA_CBOK_Ver_9-1

Define, Build, Implement and Improve Work Processes

Version 9.1 3-37

Using the same data, it is possible to develop other metrics. One such metric would be defects escaped compared to the number of requirements inspected (0.5% or 1 in 202). Is this a meaningful metric? What is it intended to tell the organization? If the intent is to provide information about the quality of the requirements being provided to designers following inspection, it would be very effective. If the intent is to measure the quality of the requirements gathering process, it is ineffective (as is the requirements gathering process prior to inspections)!

Most of the data for this chart comes from those performing the inspections: how many requirements were inspected, how long did it take, how many defects were found. Only the last item, “Defects Escaped” would be collected from others, later in the life cycle.

3.6.2 Types and Uses of Measures and Metrics

3.6.2.1 Strategic or Intent Measures and Metrics

These measures and metrics are created, collected and applied at the top levels of the organization. They address global issues for the organization and provide information for long term decision-making. Some of the results of these measures may become a matter of public record through the filing of financial reports to various government agencies. Not all strategic measures are the result of government requirements; some will be a result of the organization’s desire to know where it stands in the market place. Most of the other kinds of measures and metrics are a result of the strategic or intent measures. Examples of strategic measures are listed below:

• Shareholder measures and metrics include financial indicators such as Return on Investment (ROI), Earnings Per Share, and Period to Period Results. Not all shareholder measures are directly financial. Management goals and objectives are included in the strategic measures group. These should be quantified and measured.

• Customer measures examine the relationship with the customer. One popular measure is customer satisfaction. Other customer measures often include market share for products or services and customer retention rates. These provide key information to the senior management team about what is working in the marketplace and what is not working.

• Employee measures and metrics examine key factors, from a management perspective, in the staffing of the organization. Typically these will include items such as turnover rates, payroll and head count change, and increasingly the costs of employee benefits (retirement and healthcare).

• Community measures examine the organization’s relationship with both the local and the extended community. It may include tracking of public service hours, charitable contributions, and compliance with federal, state and local regulations.

Page 134: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

3-38 Version 9.1

3.6.2.2 Process Measures and Metrics

Process measures and metrics are essential to the long term health of the organizations. Process measures provide information about how well the organization can perform the basic functions needed for success. Process measures can provide both strategic and tactical information for the organization.

• Process measures examine the process directly to determine how effective it is. Measures such as cycle time, resources consumed, process budget and cost, and schedule achievement are examples of direct process measures.

• Output measures focus on the capability of the process. How much work can be accomplished to achieve the customer’s needs? Can that work be done at a consistent rate?

• Outcome measures look at how well the product or service performs once in the hands of the customer. In a sales-oriented organization, this measure is often focused on returned or rejected products. Where the customer is a part of the same organization, it may be measured in terms of man hours of help desk support required, or problem tickets created post-implementation.

3.6.2.3 Efficiency Measures and Metrics

Efficiency measures and metrics are focused on “doing things right.” In this context right means that the process is followed, there are a minimum of delays, resource costs are minimized and waste is eliminated. Cycle time, already identified as process measure, is also a good efficiency measure. Earned Value, discussed in Skill Category 1, is another set of efficiency measures for the organization. Efficiency measures reward the highest productivity to resource ratio. It is a tactical measure. When only efficiency measures are used, organizations can become very good (that is, efficient) at delivering products and services that do not meet the customers expectations.

3.6.2.4 Effectiveness Measures and Metrics

Effectiveness measures and metrics are focused on “doing the right things.” In contrast to efficiency, effectiveness is focused on the outcome. To be effective, the product must be right, it must meet the customer’s needs, it must function properly. Effectiveness is a tactical measure that rewards the highest customer satisfaction. When only effectiveness measures are used, customers will be delighted, but the organization may be fail to make a profit on the products or services provided.

Page 135: CABA_CBOK_Ver_9-1

Define, Build, Implement and Improve Work Processes

Version 9.1 3-39

3.6.2.5 Size Measures and Metrics

Size Measures and Metrics are the backbone of the measurement system. Size measures provide a scale against which other things can be measures. Earlier examples looked at counting requirements; the number of requirements can become a size measure for proposed systems. An alternative to this approach is to use Function Points to size a system. Instead of counting requirements, External Inputs and Outputs, Internal Logical Files and so on are counted. As with any measure, it is essential that size measures meet the reliability and validity criteria. Manipulation of the data means any resulting decisions will be flawed. As described earlier, simple measures can be combined into a wide variety of useful metrics.

3.6.3 Developing Measures and Metrics

3.6.3.1 Responsibility for measurement

Responsibility for measurement rests with management at all times. The line manager (first level manager) is responsible for ensuring that the work of the individuals supervised is measured and that the measurement process is performed correctly and consistently.

Management is responsible for clearly identifying the intent of any measures and metrics to be developed. They are responsible for validating that the proposed measures and metrics accomplish that purpose. They are responsible for ensuring that properly collected information is handled appropriately with regard to security and confidentiality.

Management can, and should, delegate the performance of various management tasks to individuals working for them. The delegation process may be embedded in detailed “Do” procedures. This ensures that everyone using that specific procedure will collect the same data in the same way (reliability).

3.6.3.2 Responsibility for Development

Responsibility for the development of individual measures and metrics is often delegated to a group of qualified staff members. The Business Analyst may be involved in defining and developing appropriate measures and metrics for all of the various functions they perform within the organization. Because of their wider view of the product and its impact on the organization as a whole, the Business Analyst may be involved in helping other areas develop meaningful measures. Others who are often involved in developing cross functional measures include project managers and quality assurance analysts.

The development of measures and metrics requires a solid understanding of the work being performed and the consequences of that work. This is why measures need to be developed by the measured and applied consistently by all who perform that work process. For example, the procedures need to clearly identify what a “test case” is and what it contains: is it a single

Page 136: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

3-40 Version 9.1

scenario or all of the scenarios? Individuals unfamiliar with testing will not appreciate the difference that failure to standardize the counting of these items will make in the final result.

Once measures have been developed and agreed upon by those knowledgeable in the process, they should be piloted or tested prior to full scale implementation. As with any other process, the pilot will provide the opportunity to validate the process and procedures, identify and correct any deficiencies and gather support prior to a full scale release.

3.6.3.3 Responsibility for Analysis and Reporting

Those who create the individual data records often have little time to perform the necessary analysis. At the line level, functional managers or supervisors may perform the initial data collection and analysis themselves. This provides an opportunity to assess how well their portion of the organization is doing with respect to these measures. Good managers want to have this information available themselves before it goes to someone else.

For measures and metrics that are accumulated at a “roll-up” level, there is typically a management position responsible for ensuring that the roll-up and analysis are performed on a consistent and timely basis. This function is often assigned by management to individuals or departments with a broad understanding of many aspects of the organization. Some organizations have a Measures and Metrics function assigned to the Quality Assurance area; others use staff resources wherever they can find them. Business Analysts usually possess both the knowledge and the skills needed to perform the analysis and are therefore often tapped for the job.

Reporting may take the form of a simple distribution of the current periods data, with comments on significant variations, to all contributors and their chain of command. At the upper end of the reporting scale are electronic slide shows that contain past and current period performance data, trend analysis, improvement recommendations and so forth, delivered to the senior organization (both IT and Business) management. The form and content of the reporting activities do not have any direct correlation to the commitment to Management by Process. It is only what management does or causes to be done to address issues that reveals the commitment to management by process, or lack of it.

An increasingly popular form of reporting is the IT Management Dashboard. This is composed of organizationally determined “key measures” that are reported regularly in a standard format. A Dashboard typically contains not fewer than four or more than nine measures or metrics. The risk of having too few items on the dashboard is that with only a few items to maximize, the results can be manipulated by staff members determined to be successful. The risk of having too many items on the dashboard is that it is difficult to assimilate them all and form the necessary conclusions about the level of performance. There is no one dashboard that is correct for every organization.

3.6.3.4 Common Measures for Information Technology

There are no industry wide standards for measuring IT performance. As discussed earlier, many organizations use the same ratios, but the definition of the components may differ

Page 137: CABA_CBOK_Ver_9-1

Define, Build, Implement and Improve Work Processes

Version 9.1 3-41

wildly. The Quality Assurance Institute Research Committee surveyed QAI member companies to identify the 20 top producer/provider metrics and then surveyed to determine how QAI member companies ranked those 20 metrics in importance to their measurement program.

The definition of provider/producer is: Represents organizational entities involved in delivering IS products and services to the customer. The multiplicity of potential suppliers to producers and producers to providers should be transparent to the customer. For this reason, in this phase of the research study, the "provider" represents all entities responsible for developing and delivering information services.

The top 20 producer/provider metrics, as they were ranked by QAI member companies are:

1. Customer Satisfaction - A subjective measure of the quality of product or service,versus agreed-to level or expectation.

2. Accuracy (of results) - Percentage of problem results requiring action categorized byseverity of impact on the customer.

3. System Reliability - Defined confidence level that the product or service will becorrectly operational when needed.

4. Completeness (of implemented requirements) - Number of functions delivered ontime versus the number of functions expected and agreed upon by the customer.

5. Availability (of resources) - Percentage of time the system is available versus thescheduled available time.

6. Maintainability - Actual maintenance cost in relationship to the size of the system(e.g., hours per KLOC or number of function points).

7. Usability - Ease with which the customers can use the system, which can be expressedas the number of problem logs attributed to user interface problems as a percentage oftotal problem logs.

8. Timeliness of Output/Response Time - Percentage of scheduled reports/outputs andsystem availability delivered on time, compared to the total number of reports/outputsand system availability delivered.

9. Efficiency (of functionality) - Percentage of time required to process all functionalityof a system versus expected time (designated processing window).

10. Defect Density - Number of defects in relationship to size of product (e.g., defects perKLOC or function points) at a specific point in the life cycle (e.g., development,operational, test, etc.).

11. Testability - Ease by which defects can be removed from systems.

12. Functional Requirements - Number of functions mutually agreed by the producerand customers to be included in a product.

13. Conformity to Standards - Building and delivering a product that meets producerstandards.

Page 138: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

3-42 Version 9.1

14. Auditability - Ability to reconstruct processing, including the ability to trace data fromthe original source to the final destination.

15. Documentation - Readability, completeness, usability, and ease of finding any specifictopic.

16. Interoperability (between other systems) - Effective interface with other systems,including interface to shared data, platforms, processes, etc.

17. Portability - Capability to port the software from one system/platform to another.

18. Modularity - Independence and cohesiveness of modules.

19. Security - Ability to protect the system from unintentional and/or unauthorized access.

20. Traceability - Ability to trace functional requirements through processing.

3.6.4 Obstacles to Establishing Effective Measures and Metrics

It’s easier to fail than succeed in using measurement to manage an IT function. Installing measurement programs in an organization not used to measurement is a real challenge.

3.6.4.1 Use in performance appraisals

The first concern that most individuals have is that quantitative data will be used in their performance appraisal. For example, if the organization wanted to know how many defects testers created, testers might be reluctant to provide that information. They might feel if they acknowledged making defects in testing it would negatively impact their performance appraisal.

3.6.4.2 Unreliable, invalid measures

Another impediment to measurements is the lack of reliability of quantitative data. For example, two or more people not getting the same number from the same situation. This is a fairly common occurrence in organizations where the procedures do not include specific information on how and when to capture basic data.

Completion of time reports is a classic example of this problem. Some groups and individuals will record the time spent on each activity on a daily basis. Others will wait until the end of the reporting period and then try to remember how the time was spent. Failing an accurate recollection, they will allocate the time the way the employee thinks their manager expects to see it. In any organization where both systems are in use, calculations based on time reports are flawed from the outset.

Page 139: CABA_CBOK_Ver_9-1

Define, Build, Implement and Improve Work Processes

Version 9.1 3-43

If the measures are not reliable and are not valid, they are not believable. When measures are not believable, they tend to be ineffective, and in some instances counterproductive. For example, an incorrect estimation measurement will cause people to meet that measure, as opposed to producing quality products.

3.6.4.3 Measuring individuals rather than projects or groups of people

When people perceive measures as individual performance evaluators, they tend to manipulate those measures to make their personal performance look better. This is not precisely the same as the first item in which even group measures are feared as potential sources of negative performance information.

3.6.4.4 Non-timely recording of manual measurement data

Another aspect to the example cited under Section 3.6.4.2, is that if people are asked to keep manual logs they frequently do not keep them up to date, resulting in inaccurate recording of data. In the time recording example the employee knows how many hours are to be recorded for each period. The total will be correct, but the details will be wrong. In this aspect, because the incremental data was not recorded, even the totals will be wrong. Defect logs that do not list all of the defects, and help desk records that do not reflect all of the trouble-shooting calls, are but two common examples of this phenomena.

3.6.4.5 Misuse of measurement data by management

This is the dreaded outcome made real; measurement data used to punish employees/projects rather than improve process quickly undermines the concept of measurement. The results of this approach are numbers manipulated to become acceptable and processes out of control, as well as poor employee morale and high turnover.

3.6.4.6 Unwillingness to accept “bad numbers”

In too many instances, the individual or group responsible for reporting a problem is treated as though they created the problem. When this exists, everyone will go to great lengths to avoid being the person or department responsible for telling management that there is a problem. The classic phrase for this approach is: “shoot the messenger.”

3.7 SummaryThis Skill Category is focused on understanding processes as they relate to the role of the Software Business Analyst. It looks at how various national and international models and

Page 140: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

3-44 Version 9.1

awards provide support for process-oriented thinking. This provides a context for examining what a process is, how it is defined, how it functions in the organization and assessing the maturity of an organization’s processes.

By understanding how processes inter-relate using tools such as process mapping, it is possible to streamline and improve their performance. Application of process management techniques such as control charts and statistical analysis allow the organization to achieve better results. These activities rest on a strong foundation of effective measurement and metrics.

Page 141: CABA_CBOK_Ver_9-1

Business Fundamentals

Version 9.1 4-1

Business Fundamentals

4.1 Concept OverviewThe title “Business Analyst” places clear emphasis on understanding “The Business”. When Business Analysts were consistently derived from the line of business operations, many felt (not necessarily correctly) that the Business Analyst would have a solid understanding of business. As the relationship between Information Technology and their business partners has changed, so has the ability to consistently identify and recruit knowledgeable business people into the analyst ranks. Today it is not uncommon to find organizations in which the Business Analyst has no line of business experience. This lack of direct business knowledge can result in products which are incompletely or incorrectly specified, test plans which miss critical issues and implementation strategies which are doomed to chaos.

Furthermore, in many larger organizations, functions have been segregated to the extent that the Software Business Analyst does not perform the Business Analysis; it is done by the Financial Analyst. For smaller firms, where individuals "wear more hats”, the Software Business Analyst will be expected to be thoroughly conversant with the business issues and processes.

Business knowledge comes in two flavors: Financial/Accounting knowledge and Industry knowledge. This Knowledge Category will provide specific practices and approaches for financial knowledge and guidance on understanding, finding and applying Industry knowledge. This CBOK uses the phase “business” and “organization” interchangeable to include both For Profit Businesses and Not-For-Profit enterprises as well as Federal, Provincial /State and Local Governmental entities.

Knowledge Category 4 examines the knowledge, skills and attitudes which are fundamental to understanding the policies, procedures and practices used to accomplish operational objectives. The category is divided into seven areas of understanding which are then further

Skill Category

4

Page 142: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

4-2 Version 9.1

subdivided. Each area builds upon the preceding one; failure to understand one area will make it much more difficult to understand the next.

Businesses and organizations exist for a purpose; the Certified Software Business Analyst (CSBA), Certified Associate Business Analyst (CABA), and Certified Manager Business Analyst (CMBA) must understand what that purpose is and how it is intended to be achieved in the organization involved. Most CSBA’s will be working for a “going concern”, which means that some of the most basic questions have been answered and that those answers are a part of the culture of the organization. Although answers have been created and published, this does not always mean that they are relevant to the organization as it exists at a specific point in time. For this reason it is often prudent to verify that these fundamental answers are still valid, especially for a large or complex project or when the CSBA is new to the organization. Section 4.2 will look at what the questions are, how they are answered and by whom.

Countless studies and articles have documented the consequences of communication failures between Information Technology and the Business Community. Much of what is often labeled “scope creep” is in fact the result of a failure to effectively translate an operational need into terms that Information Technology understands. This is the heart of the Business Analyst functionality. The CSBA must be fully “bilingual” speaking both Information Technology and Business fluently. Section 4.3 will provide a basic business vocabulary needed to communicate successfully with the Business community in their language.

Each organization must find ways to generate funds to cover the costs of staff, facilities, supplies, and all of the other expenses which are part of the “going concern”. For some organizations covering expenses is not enough, they are intended to be able to generate a profit for their stakeholders. The CSBA must understand how their organization obtains the funds it needs. Part of understanding funding, is the understanding of funding cycles, fiscal years and calendar years all of which can be very different. Project timing is one of the essentials for success in many organizations. Business Analysts who are not fully aware of the potential impact of a project on funding sources or timing may make the wrong decisions.

In Section 4.2 the CSBA learns the fundamentals of the organization. Now armed with a broader vocabulary and an understanding of the general funding issues, it is time to look at the external environment in more detail. Each successful organization must possess an intimate knowledge of their customers or business partners; what do they have, what do they need, how can the business fulfill that need. Likewise they must understand their suppliers; who are they, what do they offer, what do they need, and who is the competition. Business Analysts will need to factor this information into any project assessment in order to help make the difficult decisions on time, scope and quality.

Information Technology projects often represent the greatest potential expense and the greatest potential for growth an organization may experience in a year. Few organizations have the resources to execute all of the potential revenue generating or cost reducing projects that are identified. The CSBA must be able to investigate potential projects and translate the ideas into a format which can be used as the basis for evaluation. While the ultimate responsibility for the final product often rests with the Project Manager, the Business Analyst will be very involved. In organizations without a Project Management Office (PMO), more responsibility falls on the Business Analyst to perform these functions.

Page 143: CABA_CBOK_Ver_9-1

Business Fundamentals

Version 9.1 4-3

Businesses do not exist in a vacuum. For many organizations, both large and small, there are a myriad of legal and regulatory issues which create boundaries. The effective Business Analyst will be well aware of Industry specific issues and the legal issues. These issues, individually or taken in concert, can radically alter what is possible, what is necessary and when things must be done.

Cash flow projections alone are not enough to determine which projects should proceed and which should be tabled. This information needs to be evaluated and placed in context for effective decision making. The Business Analyst (often in concert with the Project Manager, or working at their direction) will bring all of the pieces together in products which communicate the financial, legal as well as technical issues to stakeholders.

Page 144: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

4-4 Version 9.1

4.2 Understanding Vision, Mission, Goals, Objectives, Strategies and TacticsThe concepts covered in this section provide a foundation for understanding the Business portion of the Business Analyst function. They provide the necessary focus and linkage to allow an organization to move as a single entity. The chart below provides a quick summary of the terms Vision, Mission, Goals, Objectives, Strategies and Tactics

.

Table 1.

4.2.1 Vision

The primary challenge for any individual or project is to ensure alignment with the organization. This starts by understanding why the organization exists. Each organization has a Vision, whether it is articulated as such or not. The Vision is a short statement that captures the essence of the reason the organization exists. Vision statements should be short and easy to remember; ideally nine words or less. Examples of effective Vision Statements include Ford’s® “Quality is Job One” and can even be the name of the organization such as “Toys R Us”®. Longer, wordier Vision Statements lack the clarity of purpose and punch necessary to provide good focus to the organization. When considering accepting employment with an organization it is a good practice to become familiar with their Vision, and assess to what extent the organization actually reflects that Vision.

The characteristics of a good Vision Statement are:

• Short -Nine words or less is ideal

• Memorable

Concept Question Addressed Time Frame Organization Level Involved

Vision Why Do We Exist? 5 years or more ExecutiveMission What Is Our Long

Range Position?3 - 5 years Executive and Senior

ManagementGoals How will we reach

success? 2- 3 years Senior and Middle

ManagementObjectives How will we measure

success? 2 -3 years Senior and Middle

ManagementStrategy How will we achieve

Objectives? 1 – 2 years Middle and Line

ManagementTactics How will we achieve

Strategy? A few months to a few years

Line Management

Page 145: CABA_CBOK_Ver_9-1

Business Fundamentals

Version 9.1 4-5

• Carries an important message

• Known by everyone in the organization

Vision Statements are developed at the highest level of the organization, typically Executive Management and the Board of Directors if there is one. In some countries, such as Canada, the Boards of Directors are required by Regulators to approve the Vision Statement along with any associated Code of Conduct.1 They are relatively stable for long periods of time. Recreating a Vision in a well established organization is symptomatic of some form of turmoil, either within the organization or in the industry of which it is a part. Frequent changes in the Vision leave the organization confused about who they are and where they are headed. This can be devastating for morale. A well understood and accepted Vision Statement conversely will serve as an effective focal point for project evaluation.

The best companies will seek input from all levels of the organization when developing a Vision Statement. That being said, the CSBA is rarely directly involved in the development of a Vision Statement, unless it is a very new organization or one undergoing a radical transformation. More often the task is to examine a prospective project with the rest of the project team and answer the question, “Does this project conform to the Vision of the organization?” Because Vision Statements are often broad and vague, this may not be an easy question to answer. Projects which are glaringly out of alignment with the official Vision Statement need to be challenged at the earliest possible moment. This may be done by asking questions such as:

• “How does this support our Vision of ourselves as….?”

• “This appears to be well outside the area covered by our Vision Statement, has something changed?”

It is essential to understand the linkage to the Vision, as at some point, the question must be answered, “Why are we spending these resources on this activity?” Projects which do not tie to the Vision are excellent candidates for later cancellation as support for the resource commitment dwindles. Terminating these potential projects early is an important part of managing the organization’s resources effectively.

Failure to have an effective and well implemented Vision can result in some or all of the following:

• Loss of market to competitors

• Loss of customers

• Reduced real or perceived quality

• Wasted resources

• Churning

1. Michael Gunns, Gunns Group 2006

Page 146: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

4-6 Version 9.1

• Low morale

• High Turnover

• Organizational conflict

Alternatively, acceptance by Executive and Senior Management of a project clearly outside the scope of the current Vision may be a signal that the organization is evolving in a new direction. This is important information as it will impact other current and pending projects. The CSBA must pay close attention to these changes in order to be effective.

Poorly implemented changes in a Business’s Vision of themselves may result in some or all of the following:

• Confusion on the part of management about the current direction

• Confusion in the market place about the organization’s direction leading to depressed stock prices or loss of market share

• Loss of confidence by employees in management’s ability to run the business

Project Vision Statements are a small scale implementation of a Business Vision Statement. Business Analysts will often be involved in the drafting of a Project Vision Statement for a larger project. An effective Project Vision Statement will focus the project team’s effort on the work to be done.

4.2.2 Mission

While a good Vision Statement provides clarity of purpose and focus, at nine words or less, it is short on information about what that Vision looks like in action. The Mission Statement expands on the Vision Statement by answering the question, “What is it we do?” This generally requires more detail about how to recognize the Vision in practice. A Mission Statement should be more than 1 sentence, but less than 1 page. It should be of sufficient clarity and precision that the organization can make business decisions based upon it. It will often take the form of a short list of desired performance characteristics, such as: “We will be our customer’s provider of choice”; “We will consistently be viewed as the highest quality manufacturer of product X”; “We will be the dominant market share holder for Industry Y in Europe”.

Like the Vision Statement, the Mission Statement is typically developed at a fairly high level in the organization; Executive and Senior Management are generally involved. Occasionally Middle Management will participate, but once again, unless it is a small and new organization, the CSBA will rarely be involved in the development of the Mission Statement. Unlike the Vision Statements which are “time neutral”, Mission Statements are focused on the future and provide a road map for change. Expressed a different way, Mission Statements should be actionable.

A good Mission Statement:

Page 147: CABA_CBOK_Ver_9-1

Business Fundamentals

Version 9.1 4-7

• Clearly expands the Vision Statement into positive statements of desired outcomes;

• Relates the business to the external environment, customers, suppliers, competitors, etc.

• Looks forward to the edge of the foreseeable business horizon

• Is actionable

Mission Statements have a shorter life span than Vision Statements; traditionally this is a 3 to 5 year period. Because the economic environment, competition and products change, what is a reasonable Mission needs to be reassessed a little more frequently. Because the Mission Statement is used as the basis for long term resource acquisition and allocation, too frequent changes to it can have a serious negative bottom line impact. These impacts are very similar to those resulting from an ineffective Vision Statement.

Mission Statements which are too wordy and vague create the same sorts of problems that similar Vision Statements do. Because it is supposed to lend depth and understanding to the Vision Statement, the Mission Statement is the next filter the CSBA might use to examine a prospective project.

Projects must be examined in light of the Mission Statement, using the same sorts of questions which were used with the Vision Statement:

• “What part of the Mission does this project support?”

• “How does it help the business to achieve its Mission?”

Each project should display a clear linkage to the Mission and from the Mission to the Vision. If the existing Mission Statement lacks the desired clarity, the CSBA may need to talk with multiple members of the business community to get their interpretation of what the Mission really is. Without this kind of understanding, it will be difficult to ensure that the proper linkages exist.

The CSBA will occasionally encounter projects which fall outside the Mission, but are approved anyway. There may be valid business reasons for this to happen. The most common of these reasons is some form of Regulatory change. Implementation of these projects often diverts resources from other more focused projects, but must be done anyway. If a proposed project does not support the Mission and is not required by law, it is important to understand why it is being put forward. It may signal a shift from the established Mission, or it may represent a “pet project” which will later have a negative impact on the organization.

Many projects also have a Mission Statement; these are sometimes referred to as Statements of Work or Business Objective. This Mission Statement clarifies the intent of the project for the project team. The Business Analyst, as the communication link between Business and Information Technology will be very involved in the drafting of the Mission Statement. Care must be taken to avoid the use of standardized statement templates which sound good, but add little value or understanding.

Page 148: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

4-8 Version 9.1

4.2.3 Goals

If Mission Statements are actionable, Goals are the series of actions designed in response. Taken as a whole, Goals should be sufficient to create the environment described by the Mission Statement. Goals are often found in their consolidated form in documents which look forward for a specified timeframe (3 Year Plan or 5 Year Plan). If the Mission Statement is the high level view of where the organization will be, the Goals are the major building blocks for accomplishing that view. An individual strategy may require 1 to 2 years to complete, but the entire suite of activities (Goals) may require 3 or more years for successful completion.

Good goals have the following characteristics:

• Action oriented wording

• Measurable results

• Time oriented

• Realistic

Goals are typically the product of collaboration between Senior and Middle Management and reflect a gap between the state desired by the Mission Statement and the existing situation. Some organization use a process called “Gap Analysis” to understand what occupies the space between where the organization is and where it wants to be. A Gap Analysis is a systematic process for examining:

• The marketplace the business occupies

• The organization’s product(s) for that marketplace

• The competitive products and technologies

• The external customer

• Unfilled needs in the marketplace

• Changes in regulation and technology

This information is used to better define what changes must be made to close the gap between the organization and the target. In small to medium sized organizations, Business Analysts may be called upon to provide input to a Gap Analysis. Skills the Business Analyst may need to support a Gap Analysis and the subsequent development of Goals include:

• Conducting Market research

• Designing questionnaires and surveys

• Analyzing the resulting data

• Writing effective reports

Page 149: CABA_CBOK_Ver_9-1

Business Fundamentals

Version 9.1 4-9

• Presenting results

• Facilitating meetings

During these activities the Business Analyst will have the opportunity to validate their understanding of what is important to the organization and why. Participation in the planning process will provide good insight for working on Requirements. In developing Goals there is a temptation to create a path that is merely an extension of where the organization is at the current time. What an effective Gap Analysis will show is if that strategy will close the Gap, or allow it to widen.

Traditionally, much of this work was done without significant Information Technology input, however, when technology became a product differentiator their expertise made it important to include them in the process. The time when simple technology or automation projects provided significant competitive advantage has past. In the current environment, a core of sophisticated technologies is assumed to be in place. In this increasingly complex and fast changing environment, the CSBA must be well educated in how technology is currently deployed. The Business Analyst may be called upon to function as a translator between the Business Community and the Information Technology technical specialists as they seek to determine if, and how, new technology might provide a further competitive advantage.

Creating a useful and practical objective is not always easy. While the business may know that it needs to sell more products, that is not enough of a statement to be called a Goal. An essential element in designing effective objectives is that they must be measurable. If there is no ability to measure, it will not be possible to determine whether or not the objective has been achieved.

Measurement can take many forms; a goal statement that can be answered yes or no is measurable. For example, “Create a new corporate branding logo.” If the logo has been created, the objective has been met; if it has not, the objective is un-met. Insertion of a number into the Goal Statement will often make it easier to determine if it has been achieved. “Increase annual sales of widgets by 10%.”

To make it clearer, Goal statements often include time frames. “Increase annual sales of widgets by 10% by year end 20xx.” This kind of goal statement helps the organization move forward in a clear direction. When working with projects, the CSBA should be able to link a project to a specific organization goal. With goals which have different time frames and priorities, it is important to be very clear about which goal a project is in support of and why that project is happening now.

4.2.4 Objectives

Creation of measurable goals is the first step toward actual accomplishment of those goals. Objectives are the incremental signposts along the road which show that progress is being made toward the goal. Goals are not necessarily tied to one specific project, while objectives often reflect the successful completion of a project or a related group of projects. There are usually multiple objectives associated with a single goal.

Page 150: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

4-10 Version 9.1

Objectives for the goal statement, “Increase annual sales of widgets by 10% by year end 20xx.” might include the following:

• Begin marketing in Belgium, Germany and Austria Region by end of 1st quarter 20xx.

• Begin marketing in Spain, Portugal and Italy Region by end of 2nd quarter 20xx.

• Begin marketing in Luxemburg, Denmark, the Netherlands and Finland Region by end of 3rd quarter 20xx.

• Implement Common Market brand awareness campaign by end of 3rd quarter 20xx.

These objectives reflect a progressive decomposition of the Vision, Mission and Goals into the major activities which will be required to accomplish them. The work needed to create the objectives and understand what is involved in the successful completion of each one often requires intensive interaction between the Business Community and Information Technology. The Business Analyst is often deeply involved in this process as the activities of developing high level estimates of work required to complete specific objectives are created.

The characteristics of good objectives are as follows:2

• Action oriented wording

• Specific

• Measurable results

• Time oriented

• Realistic

• Assignable

The high level estimation process is fraught with problems. Failure to do the necessary research to clearly understand the objective will place IT at a severe disadvantage going forward. The CSBA should be able to translate the high level objectives into “project chunks” for IT to estimate. These estimates should be based on prior experience with other similar projects and include an estimate of the staff resources required to meet the objective. Project Estimation is addressed in more detail in Knowledge Area 8.

This is the earliest point in the Business Planning Process that there is the opportunity for a “reality check”. Both Information Technology and the Business Community have the opportunity to assess the time and resources which will be required to achieve specific Goals. An effective planning processing includes the means and the opportunity to streamline or scale back Goals based on the cost to the organization, if that is appropriate. The question of the “cost/benefit” for the organization can be estimated at a gross level at this point. .

2. George Doran, “There is a S.M.A.R.T. Way to Write Management Goals and Objectives”, Manage-ment Review, November 1981, pp. 35-36.

Page 151: CABA_CBOK_Ver_9-1

Business Fundamentals

Version 9.1 4-11

At a high level there are two factors which differentiates Goals and Objectives; Objectives are specific and they are assignable. While both are “time specific”, time becomes more granular when creating Objectives; that is, it is more specific. The units of time are smaller. This specificity can be seen in the examples Goals and Objectives used above. This is the difference in granularity between “solve world hunger” and “establish a local food bank”.

The value of the increasing level of specificity in Objectives is that it becomes possible to assign responsibility. Until this point, responsibility has been global; experience shows that when everyone is responsible, no one is responsible. Therefore is it necessary to decompose down to the point where it is possible to assign tasks. This is first possible at the Objective level.

At the Objective Level, this assignment will typically be at the Functional Unit level. A Functional Unit is a major component of the organization with a specific and well defined purpose. Information Technology is a functional unit, as are Marketing, Manufacturing, Human Resources and Finance. The functional unit assigned the responsibility for a specific objective is typically the major stakeholder for that objective.

4.2.5 Strategies

Strategies are the next level decomposition of Goals. As such, good strategies must meet all of the criteria for good objectives, but they will be more specific. The Business Analyst will be heavily involved in the development of strategies. Their knowledge of the existing business environment, coupled with their knowledge of Information Technology positions the Business Analyst to become an effective translator. This is an essential role, as this is the point at which the High Level Requirements for a project begin to emerge and the general scope will be defined.

Good Strategies meet the following criteria:

• Action oriented wording

• Specific

• Measurable results

• Time oriented

• Realistic

• Assignable

The objective below is one of several identified as necessary to met the goal of increase annual sales of ‘widgets’ by 10% by year end 20xx. Listed beneath it are several strategies which will be necessary to accomplish the objective.

Objective: Begin marketing in Hong Kong Region by end of 1st quarter 20xx. Strategies:

Page 152: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

4-12 Version 9.1

• Identify staff needs and complete recruiting by January 31, 20xx

• Select and acquire location by February 15, 20xx

• Develop marketing plan by February 20, 20xx

• Develop and reproduce marketing materials March 15, 20xx

The granularity of the items has increased significantly as the decomposition progresses. The original Goal had a time unit measured in years; the subsequent Objectives where measured in quarters of years; the Strategies are now measured in months or even portions of months. The advantage of the decreasing scale is that it is easier to verify that a given set of activities is on track from a time perspective.

The decreasing scale also has a positive impact on the assignability of the Strategies. Where Objectives were assignable at the Functional Unit Level, Strategies are assignable at the Department Level. If a Functional Unit is Human Resources, Departments might include Payroll, Benefits, Employee Relations, and Recruiting. In Information Technology Departments often include Operations, New Development, Maintenance Services; Voice and Data Communications and Quality.

For the Business Analyst, the challenge is to ensure that the decomposition does continue and that each of the involved Departments is participating in the process. Working in concert with the Project Manager, the Business Analyst will be conducting meetings to discuss each set of strategies to ensure clarity and commitment. A well rounded understanding of the Business environment is critical to the decomposition to ensure that required activities are not missed during the process. Previous experience with similar processes will provide insight into the process; using a similar project as a cross-reference will capitalize on lessons learned.

The results of the meeting should included documented agreements to the Objectives and Strategies being discussed. These documents will become a part of the project documentation. Time and resource estimates which were developed during the Objectives stage will be refined. Ideas which have had broad acceptance at the Mission and Goal level will become controversial at the Objective and Strategic level as the reality of the resource commitment involved becomes apparent. The Business Analyst will need to demonstrate skills in the following areas to be successful:

• Team Building

• Facilitation

• Motivation

• Effective written and verbal communications

• Organization

• Cost Benefit Analysis

• Estimating

Page 153: CABA_CBOK_Ver_9-1

Business Fundamentals

Version 9.1 4-13

4.2.6 Tactics

Tactics are the implementation of strategies in the form of individual projects or sub-projects. For small organizations, one Project Manager and one Business Analyst may be responsible for an entire suite of Strategies, including all of the associated tactical projects. In very small organizations, the Project Manager and the Business Analyst may be the same person. Conversely in larger organizations Project Managers and Business Analysts may work on only one or two of the Tactical Solutions. Business Analysts may be supporting multiple Tactics (projects) with different Project Managers, and those Project Managers may be reporting to a Senior Project Manager. It is essential that the Business Analyst have good time management skills in this environment.

Tactics are assignable at a unit or individual level depending upon the size of the task and the size of the organization. Group Units are the lowest organizational level. Within Information Technology the Maintenance Services area is often divided into groups which provide support to specific applications or groups of applications. Business Analysts are often specialists in specific application areas and will be assigned all of the Tactical solutions in their area of expertise. This becomes their portfolio of project activities.

Time and staff estimates which have been developed earlier are reviewed and fine tuned. In many organizations it is difficult to increase either at this point. In better organizations, most time and staff estimates are not finalized until it has been reviewed and agreed to at the tactical level. This process of roll down (from Vision to Mission to Goals to Objectives to Strategies to Tactics) and then roll up (only to Goals) will yield the most realistic estimate of time frames and resource requirements.

When dates have been “set in stone”, the Business Analyst and the Project Manager will need to work carefully to ensure that the highest priority items are completed by that date. To accomplish this, the Business Analyst will need to have a good process for prioritizing requirements. This is covered in Knowledge Area 5.

At this lowest level of activity, it should be easy to directly identify the Goals that this project supports and make a clear link to the Mission and Vision. If this is not possible, it is essential that the question be asked, “Why are we doing this?”

4.3 Developing an Organizational Vocabulary

The language of business is focused on economic value. The Business Analyst need not be an accountant or a financial analyst, but they must be familiar with the basic vocabulary of these two disciplines in order to communicate effectively with the Business Community.

The ability to understand the terminology and apply it correctly will significantly improve the requirements gathering and test case development processes. Conversely, the lack of under-standing can create, at best, time delays and, at worst, critical defects in a product.

Page 154: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

4-14 Version 9.1

Table 4-1 Common Business Terms and Descriptions

Term Description

Amortization and Depreciation

The systematic write-off of an asset over its useful life or some other predefined period. Depreciation and amortization are expenses which reduce income (but not cash), therefore effectively reducing potential tax liabilities. The Accounting Department in most organizations has the knowledge and documentation to expand or select amortization and depreciation methods and lives. Depreciation is a non-cash transaction. Of particular interest to Information Technology is the treatment of software purchase costs, which are typically amortized as non-tangible assets. (Costs to develop software, unless it is for resale must generally be expensed.)

Assets Tangible and intangible property owned by the corporation. Tangible assets may include cash, investments, inventory, buildings, machinery and furniture. Intangible assets include accounts receivable, prepaid expenses, intellectual capital such as trademarks and patents, and goodwill.

Balance Sheet A listing of the assets, liability and equity accounts from the Trial Balance. The format is prescribed by Generally Accepted Accounting Principles (GAAP). The sum of assets should equal liabilities plus equity plus net income (loss). The Balance Sheet presents the financial position of an organization at a given point in time (as of XX/xxxx). All accounts for an organization, except dividends, should appear on either the Balance Sheet or the Income Statement; nothing should appear on both.

Business Partner(s) Those on the same side of a business activity or financial transaction; a term increasingly being used to refer to those within the same organization. Business partners may provide or receive services as a part of a joint support of the organizations Vision, Mission, Goals, Objectives, Strategies and Tactics.

Page 155: CABA_CBOK_Ver_9-1

Business Fundamentals

Version 9.1 4-15

Capital Capital is cash used to produce income, by investing it. That investment may take the form of assets, income producing investments (including other businesses), activities such as on going operations or new projects. Invested capital is a term often used by businesses to refer to capital used to fund projects.

Cash Flow The net amount of cash received and paid out during a period. This period may coincide with standard accounting cycles (monthly, quarterly, annually) or may be for the life for the project. Cash flow does not consider when the revenue was actually earned or the expense incurred; it simply tracks all cash in and cash out.

Customers Individuals, groups, businesses, organizations, government entities, whether local, national or international who pay an entity or organization for their goods and services.

Equity Equity represents 1) The net monies received by an organization for the issuance of its stock and 2) Retained earnings. Retained earnings are the sum of net income (loss) less dividends paid since the inception of the organization. Businesses which do not issue stock often refer to equity as net assets.

Feasibility Study A preliminary research document done to determine if there is enough potential benefit to proceed with further investigation and analysis; it is typically conducted very early in the life of a project. The Feasibility Study often includes significant high level assumptions about the potential cost of a project as well as the potential benefits. Information in a Feasibility Study is often generic rather than specific.

Forecast Verifiable assumptions about the future based on history and trend data. Forecasts are generally more reliable and sustainable than projections. Items which are often forecast include interest rates, inflation, sales or revenue numbers. Forecasts used in developing financial projections must be clearly identified as such. When using forecasts it is essential to identify the source of trend or historical information being used.

Table 4-1 Common Business Terms and Descriptions

Term Description

Page 156: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

4-16 Version 9.1

Functional Unit A major component of the organization with a specific and well defined purpose.

Gap Analysis A systematic process for examining the marketplace, the organization’s product(s) for that marketplace, competitive products, and technologies to better define what changes must be made to close the gap. It looks at the current situation and the future or proposed situation in order to identify the gap.

Generally Accepted Accounting Principles (GAAP)

Accounting methodologies and practices used in Financial Reporting as promulgated in the U.S. by the Financial Accounting Standards Board (FASB) and the Securities and Exchange Commission (SEC). These provide a standard for comparison among similar companies.

Goals The major building blocks for accomplishing a specified Mission.

Hurdle Rate An expected minimum return on internally invested capital. In the US, hurdle rates are often based on Treasury Bill or other very secure investment rates of return. Projects are often expected to produce returns in excess of the Hurdle Rate to be approved.

Table 4-1 Common Business Terms and Descriptions

Term Description

Page 157: CABA_CBOK_Ver_9-1

Business Fundamentals

Version 9.1 4-17

Income (Loss) Refers to the net of Revenue less certain expenses. There are a number of “income” numbers used in financial reports and analysis, the most common of these are:Income (Loss) from Operations - Revenue (as defined below) after all administrative and operating costs have been deducted. This would include both direct costs such as raw materials and overhead such as a Human Resources Department. In many organizations the budgetary process will summarize to this number. Net Income (Loss) before Taxes – This number is the Income (Loss) from Operations less any non-operating or unique events (such as plant closings, sale of or discontinuing a line of business)Net Income (Loss) - This number is the Net Income (Loss) before Taxes minus accounting tax effect on income. Taxes are rarely a consideration for the Business Analyst in project activities. Net Income (Loss) is commonly referred to as “the bottom line”.Income (Gross) - There is no firm accounting definition for this term, as such it is used in different contexts in different organization. It may be used to refer to Revenue, or Revenue with additional deductions or adjustments. If using the term, it is important that there be a solid organizational definition for what it does and does not include.

Income Statement The summary presentation of revenues less the expenses (including depreciation, taxes, and non-operating items). The resulting total of an income statement is Net Income. All accounts for an organization should appear on either the Balance Sheet or the Income Statement; nothing should appear on both.

Liabilities Obligations of the organization to pay or perform at some future date. These may include accounts payable, accrued expenses, and debt. In some industries there are other items such as Reserves which represent estimates of potential future losses.

Mission expands on the Vision Statement by answering the question, “What is it we do?”

Table 4-1 Common Business Terms and Descriptions

Term Description

Page 158: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

4-18 Version 9.1

Net Present Value The current cash equivalent of some future action(s), based upon an expected earnings or interest rate over a given time period. The interest rate used is generally derived from a well documented/published rate of return such as Treasury Bills, the Consumer Price Index (CPI) or an organization standard rate of return.

Opportunity Cost An economic rather than accounting term and there is not an industry wide definition. Generally it is the recognition of the resources (cash and other) associated with the selection of a specific course of action, and which are therefore not available for other uses. It is also used to present the issue of mutually exclusive options, if Option A is chosen; Option B is no longer available.

Profit This is not an “official” accounting term, but is used to refer to one or more of the definitions of Income. When profit is used, it implies that there is an excess of revenues over expenses.

Projection Assumptions about the future based on speculation, intuition or deviating significantly from historical or trend information. Projections are often part of a series of “what-if” iterations to determine the possible options. Projections are generally less reliable than forecasts when used in developing cash flow information.

Return on Investment (ROI)

The appreciation received based on the investment made. This amount is generally expressed as a percent of the base capital. A time factor must be defined for the number to be meaningful (a 10% return on investment over a 2 year period). Other formats which may be used in an organization to express this are: Return on Assets (ROA); Return on Equity (ROE) or Internal Rate of Return (IRR). The name of the format defines the basis used.

Revenue The gross sales, receipts or billings for an organization for a given period, also known as “the top line”. Revenue numbers are typically only adjusted for returns, allowances and pricing adjustments. There is no tax consideration in revenue numbers

Table 4-1 Common Business Terms and Descriptions

Term Description

Page 159: CABA_CBOK_Ver_9-1

Business Fundamentals

Version 9.1 4-19

Stakeholder(s) An individual, a small group, and/or another organization, groups of organizations or stock market investors who have an interest in an organization achieving its Vision and Mission and therefore provide resources to the organization on which they expect a return.

Statutory Reporting Non-GAAP reporting; certain industries are required to provide information to various government entities in formats and with information not consistent with GAAP. The most common example of this is tax reporting which often varies significantly from GAAP. It would not be atypical for organizations in some industries to do both GAAP and Statutory Reporting. A major example of this is the U.S. Insurance industry which does reporting to the individual states based on accounting principles defined by the National Association of Insurance Commissioners (NAIC).

Strategies The next level decomposition of Goals, and are actionable, assignable and time oriented.

Sunk Cost Resources which have been expended or committed, but which should not be considered in the decision making process for a future project or program. These may include monies spent on previous (unsuccessful) projects and expenses which will not change no matter what option is selected.

Trial Balance The listing of all accounts in the organization’s books. Under double entry bookkeeping, which is a fundamental of GAAP, the books are “in balance” when, in the Trial Balance, the debits equal the credits. The accounts from the Trail Balance will appear in either the Balance Sheet or the Income Statement, but not both.

Vision A short statement that captures the essence of the reason the organization exists.

Table 4-1 Common Business Terms and Descriptions

Term Description

Page 160: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

4-20 Version 9.1

4.3.1 Risk Analysis and Management

4.3.1.1 What is risk

Risk is the likelihood that an event will occur combined with the potential for negative consequences resulting from that event. Individuals and organizations take risks every day. Dealing with Risk is a key issue for Business Analysts as they work on projects. Risks exist in a large context for the organization as a whole and in a smaller context for individual projects. Risks to the organization as a whole should be managed at the Enterprise Level; many organizations have documented Risk Management functions. Risks at the project level are the responsibility of the key stakeholders, the project manager and the business analyst.

The Committee of Sponsoring Organizations for the Treadway Commission (COSO) has created a framework for understanding and managing risk. This is often referred to as Enterprise Risk Management (ERM). COSO created an eight step process for establishing and managing ERM, which is shown in Table 4-2. Of the eight steps, the Software Business Analyst is typically only involved in Steps 3, 4, 5 and 6. The eventual implementation of ERM is a SOX requirement for larger organizations.

Table 4-2 COSO 8 Step Process for Establishing and Managing ERM

Activity Steps Detail

1. Internal Environment Management establishes a risk appetite and sets a risk foundation

2. Objective Setting Objectives must be established before Enterprise Risk Management (ERM) process can begin

3. Event Identification The potential impact of events must be identified

4. Risk Assessment Identified risks are analyzed so they can be understood and managed

5. Risk Response Management selects an approach to align risks with the entity’s risk appetite

6. Control Activities Policies and procedures are established so that risks identified will be managed

7. Information and Control Relevant information is identified, captured and timely communicated to the proper groups and individuals

8. Monitoring Assess the effectiveness of the ERM process and modify as necessary to improve results

Page 161: CABA_CBOK_Ver_9-1

Business Fundamentals

Version 9.1 4-21

Risk Appetite is the term used to describe the extent to which an organization is willing to take risks. Some organizations are very risk averse, taking only small, manageable risks. Others have a much greater risk tolerance and are willing to assume substantial risks in return for the opportunity of substantial profit. Organizations need to clearly define their risk appetite before people can participate in effective objective setting.

4.3.1.2 Event identification

This process consists of identifying events which can impact a project, both internally and externally. Potential negative outcomes are risks; potential positive outcomes are opportunities. If following a structured process which includes a SWOT analysis and Business Environment Analysis, many of these items will have already been identified. The CSBA should be maintaining a list of these items as a part of the documentation process. Risks can arise from any of the six resource areas (Manpower, Processes, Machines, Materials, Environment and Data).

4.3.1.3 Risk Assessment

This process examines risks to determine how likely they are to occur and how severely they will impact the organization if they do occur. These risks

Can be organized in a simple table as shown in Table 4-3, and assessed using a simple scoring methodology.3

4.3.1.4 Risk Response

The intent of the assessment process is to determine which risks have the potential to create the largest negative impact on the business. In most projects there are far too many potential

Table 4-3 Risk Assessment Chart

Risk Description Severity Likelihood Ranking

One or more test team members will resign before completion

High Medium 6

The accounting department will not be available on time

Medium Medium 4

The testing environment will fail to mirror production

High Low 3

3. In this case a simple 1-2-3 scoring has been used, from low to high. The results shown in the Rank-ing column are the multiple of Severity times Likelihood.

Page 162: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

4-22 Version 9.1

risks for the organization to respond to all of them. Several key questions should be answered when considering which risks to address and which might safely be ignored:

• Are we willing to assume the consequences of this risk?

• Can this risk be avoided entirely?

• How can the likelihood that this risk will occur be lessened?

• How can we minimize the impact of this risk if it does occur?

• Should it occur, is the cost of mitigation or avoidance likely to exceed the impact of the risk?

The Business Analyst will be actively involved in these discussions and must ensure that the results are properly recorded for future reference.

4.3.1.5 Control Activities

Many organizations create a Risk Category structure and process which describes how to approach risks with various Ranking Scores. This is a portion of the Control Activities which the Business Analyst must understand. In organizations with no official structure for controlling risks, the Business Analyst must research the existing policies and procedures to determine if they provide any guidance. Often the control steps are implied in various IT policies. Failure to effectively control the risks management process negates its effectiveness. Examples of Control Activities may include authorization needed for changes to requirements and budget approvals for expenses to mitigate risks (such as the hiring of contract programmers to cover staffing shortages).

4.4 Knowledge Area SummaryIn this section we have seen a view of the business part of the organization which is often undiscovered by much of the Information Technology staff. The section lays a firm foundation for learning about the specific instantiations of the business practices within the organization. For BA’s without “business experience” this section provides a vocabulary for effective discussion and learning. Learning to be a fully “bilingual” BA, speaking both Information Technology and Business fluently, adds both personal and professional value. By developing a better understanding of the business and creating a partnership with other portions of the organization, the CSBA will add value to each project activity. In each of the areas considered, the CSBA is exposed to the full range of potential job requirements, while being focused on those which will have the most impact.

By understanding the nature of “for-profit” and “not-for-profit” organizations and the alternative structural decisions that can be made, the BA will now be better able to place

Page 163: CABA_CBOK_Ver_9-1

Business Fundamentals

Version 9.1 4-23

specific project activities in their proper context. They will be able to associate project activity with organizational Vision, Mission, Goals and Objectives in a way that is actionable.

A consideration of how and why organizations receive funds and revenues expands on the earlier exploration of organization types. Project timing is one of the essentials for success in many organizations. Business Analysts who are not fully aware of the potential impact of a project on funding sources or timing may make the wrong decisions. The CSBA is now able to combine that knowledge with the skills to understand where their organization is in the marketplace, who their customers/clients are and how they interact with vendors and suppliers.

Within the framework of organizational risks and opportunities, with constrained resources and limited horizons, decisions must be made on which project to pursue and which to abandon. The CSBA now has the tools to understand (or even develop) the information needed to make those decisions. Creating information out of raw data is a significant communication skill. By looking at potential risks and rewards at increasing levels of detail, the BA is able to participate in the process. This detail includes not only competitive risks, but also those posed by the regulatory environment.

This information needs to be evaluated and placed in context for effective decision making. The Business Analyst, often in concert with the Project Manager, or working at their direction, will now be able to bring all of the pieces together in products which communicate the financial, legal as well as technical issues to stakeholders, using tools such as Risk Analysis documents, SWOT (Strength, Weakness, Opportunity and Threat) Analysis, and Cash Flow Analysis to complete an effective Feasibility Study.

Page 164: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

4-24 Version 9.1

Page 165: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-1

RequirementsThroughout Skill Categories One, Two, Three and Four a conceptual foundation has been laid for the work the Business Analyst must perform. In those categories, the Business Analyst learned the basic skills of the profession. Skill Category Five is the first step in applying theses skills.

Just as the Requirements process is the heart of the software development life cycle, so too the Requirements process is the heart of the Software Business Analyst’s job. So much depends upon the quality of the work done during Requirements. If this fails, it will be difficult to save the project. Just finding requirements can be a challenge; ensuring that they are complete, correct and meaningful is a whole new challenge. In this Skill Category the CSBA will learn how to gather, clarify, prioritize and manage requirements.

5.1 Business RequirementsBusiness Requirements are exactly what the name implies: they are what the organization needs to accomplish their purpose. Business Requirements are sometime call Functional Requirements. This other name is based on the idea that these requirements describe what the system must be able to do.

5.1.1 How Requirements are defined

Requirements definition should be a collaborative process, involving all of the stakeholders for a specific project. When performed in this fashion, there is the highest probability that the correct requirements will be identified. As the representation from the stakeholder population decreases, so does the probability that the requirements will be complete and correct.

Skill Category

5

Page 166: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-2 Version 9.1

Requirements definition should be an iterative process, in which needs and wants are offered, evaluated, clarified and eventually accepted or rejected by the stakeholders. For small projects, with few requirements, the individual iterations or process cycles will be brief; for larger projects, they may be very time-consuming.

The analogy of building a custom home is often used as a construct for building a software system; they contain many of the same issues and challenges. It is a useful analogy in many respects; certainly in the requirements phase. The original concept may be sketched out on a napkin or some other piece of paper. Everyone is excited about the plan, ready to proceed at full speed; but giving that napkin to the builder at that point is an invitation to disaster. Unless details are identified and worked out, the dream house will become a waking nightmare. This is the requirements phase.

5.1.1.1 What is a requirement

A Requirement is a specific and detailed statement about what a system must do or be.

Often the initial statement of what the system must do or be is very high-level: “The billing system must correctly calculate the total amount due for the order.” While this is very clear and specific, there is a lot of detail to be added before it is complete. (In the home building example it is the equivalent of saying “3 bedrooms and 2 baths.”) These requirements will then be refined in increasing levels of detail until they are fully understood and agreed to by all the stakeholders.

The sum of all of the Business Requirements identified for a specific project must reflect all the functionality desired by the stakeholders.

5.1.1.2 Separating requirements and design

Design is all about how the functionality described in the requirements will be provided. Design includes things like file and table layouts and more commonly screens and reports. Because many of the answers to provisioning Information Technology systems are so well known, they are often incorrectly supplied as requirements.

This tendency to begin designing solutions before the problem is fully defined creates a wide range of problems in the attempt to deliver a quality system. It is common to see the need for a specific screen or report identified as a requirement when, in fact, these are solutions to information needs and as such are design.

The Business Analyst when confronted with design elements submitted as requirements must begin the painstaking task of determining the underlying need. It will be necessary to find out what purpose the information fulfills for the stakeholder. (“We need to be able to review the complete order while still on the phone with the customer.”)

Once the real need is understood, there may be many potential solutions to the problem, of which the one originally submitted as a requirement is only one.

Page 167: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-3

Not only do design elements included as requirements rule out other, potentially more effective, solutions; they may also mask a problem which is not properly explored. For example:

Question: “Why do we need to review the order while on the phone?”

Answer: “Because the pricing tables are not always current and we want to make certain the correct price is being charged.”

In this case, reviewing the order on the phone does not solve the problem at all; it merely alerts the employee taking the order that the pricing table for this item is not current. Correcting this issue will require a different solution. The time and money spent on creating the requested screen will not solve the problem at all.

This fundamental step in separating requirements and design is often overlooked in the rush to get the requirements and design done, so coding can begin. This emphasis on coding is a trap for the unwary; in the hurry to get there, too many errors and ambiguities are left in the requirements. In traditional Waterfall methodologies, this in turn leads to defects that must be corrected, requiring additional coding time. When working in the Agile methodologies, creation of the test cases, prior to the development of code will reduce this problem. Methodologies will be discussed in more detail in Skill Category 6.

5.1.2 Who Participates in Requirement Definition

In a world of free resources, everyone would be invited to participate in the Requirements Definition process. As it is, in every project the determination must be made on who to include and who to exclude from the process. The participants discussed in Sections 5.1.2.1 through 5.1.2.6 represent the minimum knowledge sets that must be involved in the process.

5.1.2.1 Business Project Sponsor or Champion

The Business Project Sponsor or Champion is the individual with the organizational authority tocommit resources to the project and the interest in doing so. This individual is the functional headof the project on the business side. Typically their signature will appear on the initial request tobegin the project (other, higher level signatures may also appear depending upon the size and scopeof the project.)

The Sponsor or Champion is the individual who will make decisions and approve resourcecommitments on the business side. Generally one or more of the other stakeholders and subjectmatter experts will report to this person. In most cases this individual fills both the roles: Sponsorand Champion.

In a project that is cross-functional, involving several departments and their respectivemanagement, the area which originated the request and/or is committing the most resource willbecome the Project Sponsor. It is not unusual for the role of Sponsor and Champion to be split inthis instance, with the Sponsor being somewhat more aloof from the project.

Page 168: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-4 Version 9.1

The issue of Sponsor aloofness from the project is a very serious one; if the Sponsor is frequentlyinaccessible or unresponsive, the entire project will slow down, unless the Champion has adequateauthority. In circumstances like this it is a good idea to determine if the problem is lack of time orlack of interest. Lack of interest in the project should raise warning flags for the entire project team.

Occasionally there will be a Champion for the project in another area, because of an especiallykeen interest in one or more aspects of the project. Project Champions, because of their interestlevel are very important to the health of the project. Every effort must be made to keep themengaged in the process and to educate them as to the reasons for the emphasis on RequirementsDefinition.

5.1.2.2 Business Stakeholders and Subject Matter Experts (SME)

Business Stakeholders are other individuals or groups within the organization that have an interest in the project. A typical example is Accounting, which is often a stakeholder; many projects sponsored by Sales or Human Resources have tax implications involving the accounting area. In any project such as this, the Accounting Department is a key stakeholder in the requirements process. They will have significant contributions to make. Excluding them from the early stages of the project will result in rework throughout the project.

Subject Matter Experts (SMEs) are a very important group of people. Many people know the general outlines of the process flow and the business activities. Then there are those few people who know one or more specific areas in depth. They know the details which cause business processes to fail. Their knowledge is essential to a successful project, so identifying the SMEs early is a critical part of the requirements process.

Working with these individuals may require care; while they know their piece of the puzzle intimately, they often lack perspective on the big picture. When gathering their information about what the software must do and be, it is essential to verify the processes must actually be performed as described for some reason other than “that’s the way we do it here.” It is not uncommon to find the IT support staff in the position of a SME in regards to the system they support. In some organizations the business units have completely delegated the understanding of automated processes to the IT maintenance team. This is a potential dangerous position for all concerned.

When working with both Stakeholders and SMEs, it is important to remember they are often “overbooked.” It may be difficult to get their time and attention for the project. Careful scheduling with these individuals is essential.

5.1.2.3 Developers

Developers play a crucial role in the requirements definition process. They will be able to articulate the functionality contained in any predecessor system; they may become the SME. They will be able to identify interfacing systems and articulate the requirements for those. They also bring knowledge of how similar business problems have been solved before. While

Page 169: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-5

the requirements process is still about what the system needs to do or be, not how to do it; it is useful to know what is easy and what is difficult.

Developers will also ask good questions about specifically how things should work. They are excellent at identifying gaps in information that will cause problems later. Having the developers participate in the requirements process has another benefit: they obtain a clear understanding, from the beginning, of what the project is really supposed to accomplish.

5.1.2.4 Testers

Testers bring a unique mind-set to the requirements process; they immediately begin asking “How would I test this.” When the answer to that question is not clear, there is a problem with the requirement. Testers are very analytical and detail oriented. They find things that do not work. In this capacity they lend great strength to the final requirements product.

The other benefit to having the Testers involved in the Requirements Definition is they immediately begin the development of the associated test cases. This helps to spread the testing workload for the project over a longer period, reducing the resource crunch at the end of the project; that time crunch often results in inadequate testing.

5.1.2.5 Customers and Suppliers

In this context, customers and suppliers are individuals and organizations external to the developer of the software. As organizations are increasingly vertically integrated with others in their industry, the need to include those in their chain is more important than ever. If some portion of the system will impact those supplying goods and services to the organization, it is important to include them in the Requirements Definition process. Failure to do so may mean at a later date it will be more difficult or more costly to do business with those organizations.

External customers are especially important in the Requirements Definition process. Many organizations have an internal representation of an external customer; often in the Sales or Marketing Department. They are intended to provide the voice of the customer within the organization; minimizing or eliminating all other direct contact with the customer. These internal representations of the customer often have a wealth of statistical data about what customers buy and why. They often hear directly from customers about what they do and do not like. As such, these individuals can make a valuable contribution to the Requirements Definition process and should always be included.

However, it is important to remember these individuals are not the actual customer. Their vision of what the customer does and does not want may be influenced by a few very vocal customers, not a representation of the majority. They may unconsciously be filtering important information about product strength and weakness.

Requirements teams must be very careful when they make the decision on who will be the voice of the customer for the project. In many projects there is more than one customer. Great care must be taken to ensure that each customer population is adequately and appropriately represented in the requirements process.

Page 170: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-6 Version 9.1

When the project is important, every reasonable effort should be made to obtain direct, unfiltered information from each of the customer segments about what they would like the product to do and be. These requirements may be very different from what the internal representatives anticipate; or they may validate those requirements entirely. Without verification it is possible to miss the mark on a product with catastrophic financial impact to the organization.

5.1.2.6 Business Analysts

Business Analysts are the core of the Requirements Definition process. Because they are fluent in both the language of business and the language of technology, they are able to translate for both sides. They know who the SMEs are; they know who the IT support team is; based on their experience with the organization, they usually also know who additional stakeholders might be. With this knowledge they are uniquely positioned to ensure that all of the right people participate in the process.

In addition to this they bring the experience gained from previous projects on how to approach the requirements definition process. For individuals in the business community, this may be their first project; while they know what they want, they do not know how to go about getting it. For individuals in IT, this is one of many projects; they know how to deliver functionality, but often do not understand the business implications of what they deliver. Focusing these two viewpoints and the rest of the participants on obtaining a clear definition of what is needed and why, is the job of the Business Analyst.

Section 5.2 will examine various methods for obtaining requirements from this highly diverse group of contributors and the Business Analysts role in the process.

5.1.3 Attributes of a good requirement

If the requirements are not right, the project has no chance of success. Despite many years of experiencing the results of inadequate and ineffective requirements definition, organizations continue to rush through the process; only to create expensive products which fail to deliver the anticipated functionality. If the requirements are wrong, the product will be wrong; it is that simple!

IEEE and others have identified a number of attributes which together define what a “good requirement” is. This yardstick can be used to measure the adequacy and appropriateness of proposed requirements. Each of the most common facets is identified below.

5.1.3.1 Correct

Correctness would seem to go without saying, and yet many organizations continue to develop incorrect requirements. Correctness includes accuracy. If a formula is provided, the formula must be right. If a set of activities are described, they should be the right activities.

Page 171: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-7

Lack of correctness may be the result of inattention to detail, failure to step through a calculation or process flow, or merely a typographical error. The net effect, regardless of the cause is the same; the requirement is not correct.

5.1.3.2 Complete

Completeness is the complement of correctness. Incomplete requirements are often correct “as far as they go,” but they do not go far enough. The entire requirement should be stated in a single place, not broken up into pieces and scattered throughout the document. Lack of completeness will lead to missing functionality and inappropriate system responses. Often lack of completeness is a result of making assumptions about the process, instead of verifying the steps.

Karl Wiegers, noted expert in the Requirement area, makes this point, “The Requirements may be vague, but the Product will be specific.”1 Someone, at some point will fill in the missing details needed to build a product. If that someone guesses correctly what is actually intended, wonderful; but often the guesses are not correct, leading to defects and rework.

5.1.3.3 Consistent

A requirement must be both internally and externally consistent. That is, it must not contradict itself, and it must not conflict with another requirement. Identifying internal conflicts is fairly straight-forward using typical review and inspection techniques. Checking external consistency can be more time consuming and potentially complex. Each requirement can be checked against each other requirement to ensure there is no conflict. A matrix structure will work well for this in smaller projects. When the number of requirements is in the hundreds, the process can become quite cumbersome; however, not as cumbersome as finding the defects in testing or production and having to resolve them at that stage of the software development life cycle.

5.1.3.4 Unambiguous

The requirement should be stated clearly and concisely, in such a way that one, and only one, interpretation is possible. Where more than one interpretation is possible, there is ambiguity. Where there is ambiguity, errors will be inserted in the product. It is not a question of if but of how many. If two or more technically competent individuals can read the same requirement and come to different conclusions about what is being requested, the door is open for error. In the world of multi-national development efforts, ambiguity is a major concern. Adoption of a uniform and consistent vocabulary across the organization will greatly reduce the opportunity for these kinds of errors to occur.

1. Wiegers, Karl E, "Cosmic Truths About Software Requirements," © 2006.

Page 172: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-8 Version 9.1

5.1.3.5 Important

If the requirement is not important, why are resources being allocated for it? Very few organizations today have enough resources to implement “nice to have” functionality. In defining requirements, the question of “what does this do for us (or the customer)?” should always be part of the discussion. For this reason many organizations are reluctant to ask about “blue sky requirements.” However, failure to do so can leave the organization exposed to missing opportunities to meet real business needs. The compromise then, is to ask the question, “If you could have anything, what would you want?” but follow up with the statement, “But you need to remember that we may not be able to afford to do any of this.”

To further aid in ensuring only important requirements are implemented, the final list of requirements should be prioritized from one to n. Usage of groupings such as high, medium and low, or A,B,C lends itself to conflict and manipulation of the list of requirements to be implemented. This topic will be addressed in more detail in Skill Category 5.5.

5.1.3.6 Stable

Building any computerized system involves hitting a moving target. The organization and the environment are consistently changing. A good requirement takes that into account. Defining a requirement to interface with a process or system that will be obsolete before the requirement is implemented is not cost effective. Placing the requirement in a time context will aid in this discussion; will it still be necessary to do this in 60, 90, 120 days post implementation. If the answer is no, perhaps another approach would be more cost effective. Likewise, failing to anticipate the need to connect with another system that will be coming on line shortly before or after your project implementation can cause major problems.

5.1.3.7 Verifiable

How can this requirement be tested? If it is not possible to answer this question, there is still work to be done on the requirement. Some literature refers to this attribute as “testability”. This can be problematic as many people approach testing as an “end of project” activity. Waiting until the end of the project to determine the requirement is too poorly defined to develop appropriate test cases is not cost effective. Verification includes the ability to perform reviews and inspections of requirements; these can be early life cycle activities which will reduce the total project cost. As discussed in Section 5.1.2.4, inclusion of testers in the Requirements Definition process will ensure questions of verifiability are raised early. Lack of verifiability is often a result of speculative thinking about how a process might work, without getting down to the detail levels necessary for successful construction and use.

5.1.3.8 5.1.3.8 Modifiable

It is unrealistic to think a system, once written, will not change. It will change, therefore, ensuring the change can be managed successfully is essential. To be modifiable, an item must

Page 173: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-9

be defined once, and only once, in the system. If ‘Date’ is to be used, it should be defined with a standard format and all occurrences of ‘Date’ should use that format. Maintaining definitions in multiple places means more work when changes do occur; instead of making one change, there are four or five. Because people forget, eventually one or more of the occurrences will be missed or done incorrectly; the result is chaos. If for some reason another format of the date is required, it must have a unique and distinctive name, such as ‘Date_Mailed’. The need for the additional format such be directly linkable to a different requirement.

5.1.3.9 Traceable

Each requirement must be uniquely identifiable so that it can be traced throughout the project. Many organizations choose to use the priority ranking for the identifier, thus making it serve two purposes. At the end of the design phase, it should be possible to identify where each requirement is implemented in the design. Likewise at the end of the coding stage, it should be possible to trace each element of the code back through the design to the original requirement(s). If there is more than one requirement tied to a specific element of code, all of the requirements must be identified. In that fashion, any problem can be fully researched; nothing is missing or lost, nothing is added. The use of spreadsheets or word processors for creating and tracking requirements greatly facilitates the process if the organization does not already own a tool for this purpose.

5.2 Processes used to define business requirementsMany people refer to the Requirements phase as “Requirements Gathering”. This name is unintentionally misleading, helping people to think the requirements are there for the taking, like apples from a tree. To quote Karl Wiegers, “Requirements development is a discovery and invention process, not a collection process.”2 The difference between the two approaches is enormous. The mistaken idea that requirements are readily available, needing only to be collected or gathered, may be why so many organizations consistently under resource this most essential part of the process.

Depending upon the size and complexity of the proposed project, there are a number of available approaches. Some might be used alone for a small project or in combination with one or more others for a larger project. There is no “one size fits all” method however, some of these methods will be used far more often than others.

2. Op Cit., Wiegers, Karl E.

Page 174: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-10 Version 9.1

5.2.1 Joint Application Development (JAD)

Joint Application Development is a methodology developed in the late 1970s by Chuck Morris and Tony Crawford, both of IBM. It was called Joint Application Design (not Development), and was intended to bring IT and the customer together in a structured setting with the intent of obtaining quality requirements.3 This structured approach was rapidly approved and adapted for a wide variety of development related activities. Regardless of the specific application, the structure and rigor are the same.

The power of JAD comes from the time and effort spent to include all of the key players in the requirements process and to create a productive environment for them to work in. A central concept in the JAD process is that the bonds established early in the process among the participants will be strong enough to survive the inevitable frustrations and conflicts that are a part of every major project.

5.2.1.1 What is Joint Application Development

The original definition of the JAD from IBM was as a technique for development of business systems requirements. The process includes a significant amount of planning and preparation prior to one or more extended (3 to 5 day) sessions dedicated to defining the requirements. The initial session(s) may be followed by other shorter sessions to finish the remaining work and resolve the outstanding issues.

Although JADs gained widespread popularity in the ‘80s and ‘90s for projects of all sizes, they can be very time-consuming. This was due in part to the requirement for an external (unbiased) facilitator for the process. Consulting firms, called in to fill this roll, often became involved in the project on a long term basis. The potential high cost, coupled with the time commitment caused many larger organizations to back away from the process in the late 90s, especially as the Agile methodologies emerged.

The resulting drop in requirements quality has created a renewed interest in the process for mid-sized to large scale projects. For these projects, the time invested in the process will yield significant paybacks. In a study by Capers Jones, a computer industry productivity expert, of the 60 projects he studied, those that did not use JAD missed 35% of the functionality, and that functionality represented almost 50% of the final product code. Those using the JAD process missed less than 10% of the functionality and those items had a minimal impact of the final product code.4

3. Yatco, Mei C; "Joint Application Design/Development", Systems Analysis, Management Informa-tion Systems Program, School of Business Administration, University of Missouri-St. Louis, Fall 1999.

4. Jones, Capers; Programming Productivity; McGraw Hill.

Page 175: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-11

5.2.1.2 Who participates in Joint Application Development

The list of participants in JAD includes all of the groups and individuals already identified as a part of the Requirements Definition process (Sponsor/Champion, Developers, Business Partners, Customers, Testers and Analysts), plus a few additional specialized roles. One difference between a JAD and a typical facilitated session is the number of participants; generally the number of participants in a facilitated session is limited to 10-12 total. In a JAD session, especially the early ones, the number of participants may be as high as 20-22. The specialized roles in a JAD are as follows:

• Facilitator/Session Leader - Chairs the meeting and directs the flow of activities, keeping the participants on track. The facilitator is responsible for identifying issues that need to be addressed and determining whether that can be done within the session or must be followed up on later. The facilitator traditionally contributes no content to the session. Further information on Facilitation roles, responsibilities and skills, can be found in Skill Category 2.

• Project Manager/Leader - This individual is explicitly included in the JAD session. It is essential that they be included in the team developed as a part of the process, and that they are invested in the decisions that are made. It is equally important they not fill the role of facilitator; this will cause too many role/goal conflicts during the JAD sessions.

• Scribe, Modeler, Documentation Specialist - One or more of these roles will be needed for every session. The Scribe is responsible for capturing the flow of the meeting and all results. A Modeler may be there to support the use of Data Flow and State Transition Models where they are employed for clarity. A Documentation Specialist may be there to speed the translation of decisions into permanent records. None of these roles contribute content to the sessions.

• Outside Experts - Occasionally it may be desirable to include industry, financial, legal, or technology experts in the session to provide information to the participants. They are there as an information resource, to be called upon as needed. Their presence keeps the sessions from bogging down for lack of information.

• Observers - Some organizations choose to include additional members of the development team as non-participant listeners/observers. This is a very difficult role for many individuals, and great care should be taken in making the decision to include observers.

5.2.1.3 How is Joint Application Development conducted

A JAD is conducted in five phases, and three of those five are focused on preparation. Like any facilitated session, good preparation is the key to achieving desired results.

1. JAD Project Definition - During this part of the process, the facilitator and othermembers of the team will need to ensure the necessary project origination, scope and

Page 176: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-12 Version 9.1

authorizations exist. This includes background information about how the projectarose. These documents, if they do not exist, must be created before a meaningfulsession can be conducted. A general understanding of the size and complexity of theproject is important in determining how many resources it is reasonable to allocate tothis process. The facilitator must also work with others to gather a clear understandingof the organizational and political issues surrounding the project. Additionally, the facilitator in concert with the project manager, the business analystand the project sponsor will need to determine if all of the stakeholders can beaccommodated in a single JAD series, or if multiple sessions must be scheduled.Particularly when the external end customer is a part of the JAD, great care must betaken in identifying who else will participate in those sessions.

2. Research on Requirements - The facilitator needs to be familiar with any high levelrequirements that already exist, identify (in conjunction with the project leader andbusiness analyst) what the anticipated deliverables are, and what the critical successfactors are expected to be. While not all of this information will turn out to be correct, itwill create a reasonable context for planning the JAD sessions.

3. Prepare for the Session - This includes typical activities for the session as detailed inSkill Category 2.6 and 2.7. On Facilitated Sessions. One key difference here is that inclassical JAD, it is recommended that a full day be planned for team building activities.This is because the projects will have a long life span and need to have the team stylecommunication in place for the duration. Time needs to be set aside for developing acommon working vocabulary for the project. Organizations which already have a wellunderstood common language may be able to short-cut, but not eliminate this part ofthe process.

Preparation for the JAD session includes a pre-meeting briefing on the projectobjectives and limitations, as well as the expected deliverables. This briefing can bedone via conference call if the participants are geographically dispersed. It isimportant however, they all hear the same thing at the same time. This will reduce laterconflict about who was told what.

If a number of information gathering sessions have been held, especially with externalcustomers, it is important to provide that information to the participants in advance, sothey will have the opportunity to review and analyze that material.

4. Conduct the Session(s) - The session itself brings participants into a structured, neutral(non-hostile) environment for the purpose of identifying and resolving issues aboutrequirements. The workshop session will have a highly structured agenda, with clearobjectives, and includes a mechanism for resolving conflicts and issues.

After the initial activities designed to build a collective acceptance of the roles andobjectives of the team, there is usually a period for addressing language andcommunication issues. During this time individuals learn a little about each other’sfunction in the project and how they will contribute to the final outcome. Only whenthis has been completed is the group ready to begin the process of identification andrefinement of requirements.

Page 177: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-13

Any one of several approaches can be used during the process of defining therequirements, from structured or unstructured Brainstorming, to Business EventModels, Use Cases, and various flow diagrams. The process will proceed from thegeneral idea stage to the increasingly specific level of detail needed.

Depending upon the size and complexity of the project and the number ofconstituencies involved (the number of internal business partner areas or the customersegments) the group may need to break into sub-groups to consider some topics indetail.

One of the advantages of the JAD process is that it helps to identify ambiguities earlyas individuals from different backgrounds interpret the suggestions presented.Throughout the process it is essential to maintain the focus on what each requirementwill contribute toward the achievement of the objectives for the project and theorganization.

During one or several sessions, requirements will be identified, refined, documentedand eventually prioritized for the project. It is not unusual for the team to be taskedwith identifying the Critical Success Factors, Critical Assumptions, Project Risks andRisk Responses.

At each stage of the process, the facilitator is responsible for ensuring the product(s)being created represent the consensus of the participants and not a vocal minorityview. This may entail considerable time spent in negotiation and the construction ofacceptable compromises.

Because this time and effort is being expended at the “front end” of the project, it ishighly visible and this is part of what has created a sometimes negative perception ofthe JAD process. What is often overlooked is that these issues will arise and will needto be resolved during the life of the project. By addressing these issues at the front end,later and much larger project delays and miscues can be avoided. Not all issues will bequickly and easily resolved. Despite the best efforts of the participants, there may be aneed to continue to work on one or more specific items after the conclusion of the JADsessions. In this case, it is the responsibility of the Facilitator to ensure that the itemsare followed to their resolution and conclusion. This may entail additional meetingswith individuals not originally a part of the JAD process.

5. Prepare and Obtain Approval for Output Documents - Depending upon thecommission for the JAD, there will be a few or many output documents. Each of thesemust be agreed to by the participants and then distributed to the appropriate areas of theorganization. In some cases there are also approvals required.

Great care and thought needs to be given to the issue of post-process approvals. Ifsomeone not in the process has the ability to veto some, or all, of the decisions madeby the group it is rendered ineffective. If this happens on a consistent basis, individualswill be unwilling to commit the kind of time and mental energy required to produce aquality product. From an organizational morale and effectiveness position, it is farmore productive to identify the acceptable constraints ahead of the JAD session. Thiscan be done as a part of the pre-session planning and communication.

Page 178: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-14 Version 9.1

5.2.2 Business Event Model

The focus of the Requirements Definition process is determining the parameters of a business problem and what is needed to address that problem. The Business Analyst may have already participated in the problem definition process and perhaps in an initial Business Process Modeling activity. These both focus on what is. The Business Event Model is an excellent first step in determining what is to be.

The life of any organization contains five kinds of events: 5

1. Strategic Events - are decisions and activities triggered by the organization’s strategicplanners. These help to shape the environment, but are internally generated. A strategicplan event may result in project activity directed toward the customer.

2. System Events - are manual and automated stimuli that trigger activity sets within theorganization; they originate within the organization. They are invented by theorganization to meet perceived needs.

3. Regulatory Events - are external to the organization and can be an activity trigger, butthey do not come from the customer, and may not impact the customer in any directway. These may arise at any point during the project, but should be identified aspotential events during the risk management activities for the project. RiskManagement will be addressed in more detail in Skill Category 6.

4. Dependent Events - are typically the result of vendor relationships, often the result ofoutsourcing activities. They trigger responses within the organization, but once againmay not directly impact the customer.

5. Business Events - are triggered by the true external customer. Organizations exist tofulfill business event activity.

5.2.2.1 What is a Business Event Model

The Business Event Model is a representation, from the ultimate customer’s perspective, of how the process will operate. It is an effective tool for isolating requirements from design, as it does not address at any point how a system satisfies the needs, only what the interaction will be. In this circumstances it is appropriate to think of the customer as the user of the product. Individuals within the organization may be the ultimate customer for a product or it may be someone outside the organization. The concept of the customer and the Business Partner is discussed in more detail in Skill Category 4. The Business Event Model is a depiction of what the customer will see, hear, feel, experience and/or do.

In the example of a proposed purchase event from a ticket kiosk from the point of arrival at the kiosk, the interaction might look as follows:

5. Dickinson, Bryan and LCI Press, Creating Customer Focused Organizations; 1998

Page 179: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-15

Figure 5-1 Sample Business Event Model

Page 180: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-16 Version 9.1

And so on through the verification of the payment amount and the production of the desired tickets.

Nothing in the Event Flow addresses where the information is stored, how it is formatted, edited, or presented. Although the introduction indicated this was to be a kiosk based system, there is nothing in the flow of the interaction specified that would prevent this from becoming a Automated Voice Response System (telephone based). It merely addresses the desired customer experience, from the perspective of the customer. In this matter it is more basic than Use Cases, and is often a useful precursor to the development of Use Cases.

5.2.2.2 How is a Business Event Model Created

A Business Event Model represents collaboration between the Business Partner(s) and Information Technology. The Business Partner understands the functionality they wish to provide to the ultimate customer, and the more literal and detail oriented IT participants ask the “what if” questions, drawing out more details. This process leads to an understanding of alternative paths, options, and the way errors and exceptions will be handled. Limits and boundaries on the model will be addressed more fully when considering constraints later in this Skill Category. During the development of the Business Event Model, the limits and boundaries will be focused on functionality to be included or excluded. (In the Kiosk example shown earlier, a limit on the system functionality was drawn when only the options for Theatre, Football, Concerts and Hockey were included. Because it was not included, City Tours is excluded.) Neither IT nor the Business Partner can successfully complete the Model alone.

The process of creating the model is very straight forward. The participants, often with the Business Analyst functioning as a facilitator, begin the discussion of what the proposed product must do or be. The discussion starts at the beginning, with the first customer interaction. (Any Business Process that does not begin with a customer initiated activity is suspect.)

“What does the Customer do first?” is the question to ask. After this is described, and written on a white board or poster paper under the Customer column, the discussion moves on to “What happens then?” and that information is posted under the System Response column. As the model is being constructed, it will become clear that steps have been missed or the process began sooner than was originally described. Since no code has been designed or written, making corrections to the flow at this point is easy and cost effective.

Sometimes questions will arise that cannot be answered by the individuals present about what responses or activities are required. These can be flagged for later clarification and included in the final version of the model. These may include legal or regulatory issues about which participants are unclear. (“Are we required by law to give them a receipt, or is it just something we will provide?”)

The finished model should have a complete view of the interaction from the customer’s (i.e. the user of the product) perspective. It will describe all of the products and services provided to the customer; but at no point does it describe how those products and services are provided. That is design.

Page 181: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-17

For smaller systems, the Business Event Model can often be completed in a single session. For larger systems, it may be necessary to have a session for each major “chunk” of functionality. If it is necessary to “chunk it up”, one or more sessions will be needed to perform some consistency checks among the various pieces (to develop good requirements)! At this point it is also possible to look for common functionality among the components. Identifying these in requirements will facilitate the design process.

5.2.2.3 Using the Business Event Model

The Business Event Model should be developed very early in the Requirements Process. It is a real aid to analytical thinking. Above and beyond that the model provides significant benefits in the Requirements Process.

• Scope - The concept of project scope exists from the very beginning. Things that are in scope are included; things that are out of scope are excluded from the project. Scope management is a project management challenge from the outset. Anything which will assist in the difficult and often politically dangerous task of defining scope is important.

The Business Event Model begins immediately to define what is in scope and whatis not. Those things which appear on the Business Event Model may be in scope;everything else is out of scope. In the Ticket Kiosk example, the ticket optionslisted include Theatre, Symphony, Football and Hockey. Already excluded fromscope are Concerts, Sightseeing Excursions and Railway tickets. Functionality toprovide those tickets will not be provided in this project. Drill-downs in each of the other flows will yield similar boundaries. Thecompleted Business Event Model will describe all of the desired functionalityfrom the customer’s perspective.

• Acceptance Test Case Development - One of the major challenges facing the Business Analyst is the management of testing resources. Historically this effort has been back-end loaded on the project; little or no involvement in the project until it is time for Acceptance Testing. Then it is a scramble to develop and run all of the necessary test cases in the limited time available.

Use of the Business Event Model allows the development of functional test casesvery early in the project life cycle. Early development makes some resourceleveling possible, moving some activities much earlier in the project. This in turnleads to much better estimates of the testing effort that will be required. Allowing testers to participate with the Business Analyst in the development of theBusiness Event Model also makes it possible for them to ask the verificationquestions: How can I test this? How will I know if this is working correctly? Thiswill lead directly to better requirement from the outset.

Page 182: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-18 Version 9.1

• Use Case Development - As will be seen in Skill Category Section 5.2.3, completed Business Event Models provide a significant jump start on the development of Use Cases.

5.2.3 Use Cases

The concept of the Use Case was developed by Ivar Jacobson as a part of his work in Object-Oriented (OO) development methodology.6 Use Cases have migrated from the OO world into the rest of the mainstream of software development processes. Like the business model, Use Cases are intended to be free of technical jargon and devoid of design considerations. They are increasingly assumed to be a fundamental part of the Business Analyst's repertoire.

5.2.3.1 What is a Use Case

A Use Case is a technique for capturing the functional requirements of systems through the interaction between an Actor and the System. The Actor is an individual, group or entity outside the system. One key differentiator between Use Cases and the Business Event Model, is that the only interaction described with the system in the Event Model comes from a person (the customer). In the Use Case, the Actor may include other software systems, hardware components or other entities.7 The addition of these actors allows the Use Case to add depth and understanding to what has been simply a customer perspective.

Actors can be divided into two groups: a primary actor is one having a goal which requires the assistance of the system. A secondary actor is one from which the system requires assistance.

The Use Case shares a common focus with the Event Model on the goal of the interaction. It looks at what the Actor is attempting to accomplish through the system. Use Cases provide a way to represent the user requirements and must align with the system’s business requirements. Because of the broader definition of the Actor, it is possible to include other parts of the processing stream in Use Case development.

Use Cases describe all the tasks that must be performed for the Actor to achieve the desired objective and include all of the desired functionality. To return to the example of the system designed to allow the purchase of tickets at a kiosk, one Use Case will follow a single flow uninterrupted by errors or exceptions from beginning to end.

The example below continues with the Kiosk example developed in the Business Event Model. All of the identified options are listed. The actions in italics represent the flow of a single Use Case (for example Shop by Date; Select a Valid Option (Date); Ask Customer Enter Date… ):

6. Jacobson, Ivar; Object-Oriented Software Engineering: A Use Case Driven Approach; Addison-Wesley, 1992.

7. Wiegers, Karl, Software Requirements; Microsoft Press, 1999

Page 183: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-19

Figure 5-2 Sample Use Case

And so on through the completion of the transaction.

Where there is more than one valid path through the system, each valid path is often termed a scenario.

Page 184: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-20 Version 9.1

5.2.3.2 How Use Cases are Created

Use Cases are created as a part of the Requirements Definition process. For small projects with little complexity, the Business Analyst may move directly to the creation of Use Cases, bypassing the Business Event Model. Use Cases can be developed as a part of a JAD process, or as a part of any sound development methodology.

Each Use Case is uniquely identified; Wiegers recommends usage of the Verb-Noun syntax for clarity. The Use Case above would be Purchase Tickets. An alternative flow (and Use Case) that addresses use of the Cancel Option at any point might be captioned Cancel Transaction.

While the listing of the various events as shown earlier can be helpful, Use Case Models are developed to provide a graphic representation of the possibilities. In addition to the main flow of a process, Use Cases models can reflect the existence of alternative flows by the use of the following three conventions:

1. <<extend>> extends the normal course, inserts another Use Case that defines analternative path. For example, a path might exist which allows the customer to simplysee what is available without making a purchase. This could be referred to as CheckAvailability.

2. <<include>> is a Use Case that defines common functionality shared by other UseCases. Process Credit Card Payment might be included as a common function if it isused elsewhere.

3. Exceptions are conditions that result in the task not being successfully completed. Inthe case above, Option Not Available could result in no ticket purchase. In some casesthese may be developed as a special type of alternative path.

Page 185: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-21

Figure 5-3 Simple USE CASE Model

The initial development of the Use Case may be very simple and lacking in detail. One of the advantages of the Use Case is that it can evolve and develop over the life of the project. Because they can grow and change Use Cases for large projects may be classified as follows:8

• Essential Use Case - is described in technology free terminology and describes the business process in the language of the Actor; it includes the goal or object information. This initial business case will describe a process that has value to the Actor and describes what the process does.

• System Use Case - are at a lower level of detail and describe what the system does; it will specify the input data and the expected data results. The system Use Case will describe how the Actor and the system interact, not just what the objective is.

As the popularity of Use Cases has grown, numerous individuals and organizations have developed templates for them. The use of any particular template should be based on what makes sense for the organizations. Many of the development and testing tools available commercially will include a template. Whatever format is adopted should be employed consistently throughout the organization. The general requirements for items to be included are:

• Use Case Name

8. Ob.cit, Jacobson, Ivar.

Page 186: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-22 Version 9.1

• Summary Description

• Trigger

• Basic Course of Events

• Alternative Events

• Business Rules

• Notes

• Author and Date

Additional information directly useful to the testing effort is considered in Section 5.2.3.3.

5.2.3.3 How are Use Cases Applied

Because of their flexibility and the vision they provide into the functionality needed by the customer, Use Cases are an excellent requirements definition tool. They take the information derived from the Business Event Model and add more detail and greater understanding of what will be involved.

Using the Kiosk example above, it becomes clear this process will require access to many kinds of information from multiple sources. Although no design decisions are ready to be made about how to access that data, the requirement to do so is obvious. A quick survey of entertainment purveyors (the source of the tickets) may reveal that while hockey, theatre and symphony tickets are readily accessible, football ticket are not. This may lead to a change in scope to exclude football tickets or in an upward revision of the time and cost estimates for achieving that functionality.

Likewise, the Use Case provides an excellent entrée into the testing effort, to such an extent that for many organizations, the benefits of Use Cases for requirements are ignored in the effort to jump start testing! When Use Cases are the foundation of the testing effort, some additional information will need to be added to the template:

• Pre Conditions

• Post Conditions

• Iteration Number, Date and Author

Although Pre and Post Condition information is fairly clear, Iteration may require a little explanation. As the Use Case evolves from a purely Business Event focus to include more system information, it may be desirable to maintain several versions or levels of the Use Case. For example the initial Use Case, developed during the first JAD session(s), might be Iteration 1; as it is expanded to include systems information, it becomes Iteration 2 and when fully configured to include the remaining testing related information it is Iteration 3. Use of

Page 187: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-23

common Iteration levels across projects will reduce confusion and aid applicability of the Use Case.

5.2.3.4 Considerations for Use Case Usage

It is essential to remember that the development of Use Cases, in and of themselves, is not enough to ensure the organization is effectively defining good requirements. It is perfectly possible to write any number of Use Cases that, in fact, do not address the real requirements! The most common cause of this problem is, in the rush to begin design and coding, the failure to rigorously include the true customer in the requirements process.

While the development of appropriate Use Cases will aid in understanding the requirements, it is possible to develop far too many, wasting valuable time and effort. Some organizations assign priority rankings to Use Cases to help maintain the focus on what is truly important. Then if resources run short, it is possible to make decisions based on the highest priority.

Because of the ability to include system based Actors in the Use Case, there is a temptation to include increasing levels of Information Technology data, moving away from requirements into design.

Screen and Report layouts and Data Dictionary Definitions are not part of requirements. Although customers often will present the request for a new screen or report as a requirement, it is a solution to a business problem; and that is design.

5.2.4 Process Models

Process models provide the Business Analyst with focused views into the requirements. Each process model provides additional insight about what the system must do and be. Business people often find these models difficult to understand and work with at the outset. They are on the boundary between the natural language employed by the business and the structured languages employed by Information Technology.

Because the process models are not intuitively obvious to many business people, many IT organizations simply do not share them. This of course will lead to requirements defects when assumptions are made about some aspect of the process. Taking the time and effort to make the business partner comfortable with the models, the process for developing them, and the need to do so is one of the talents of a skilled Business Analysts. The models presented here vary in the level of technical detail and applicability to specific projects. The Business Analyst will want to choose those models which are best suited to the project at hand. They are presented in increasingly levels of complexity and detail. This is often, but not always, the sequence in which they are developed.

Page 188: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-24 Version 9.1

5.2.4.1 Data Flow Diagrams (DFD)

The data flow diagram represents the path of data (information) through a process or function. It shows the external sources of data, the activities that transform data, and places where data comes to rest. In due course, it will be necessary to test each of these aspects of the system; creating complete and correct DFDs is part of ensuring the requirements are verifiable.

The symbolism generally used for DFDs is as follows:

• Processes - are represented by circles showing processes that use data. They modify the inputs of the process to create desired outputs. Some outputs are temporary and transient, others will be permanent. The verb-noun syntax is once again recommended for use. Developing an index of names will help to ensure that one name is not used for more than one object or process.

• External Entities or Process Terminators - are represented by rectangles. They are outside of the system being modeled. Terminators represent where the information comes from and where it is going to. In developing the requirements, it is not necessary to understand why the data is needed, only that it is needed. These are analogous to Actors in Use Cases.

• Data Stores - are represented by parallel lines; these are places where data comes to rest. When creating the initial DFD, no effort is made to identify how the data is stored; this is a design issue and will be addressed later in the project lifecycle. Sufficient at this point is to identify that certain types of data must be stored for some period of time. That time period is often unknown in the early stages of requirements definition.

• Flows - arrows show the movement of data from point to point through the system.

• Data Elements - Labels on arrows represent data elements; this may be a single element or a packet. This will be defined later and in detail in the Data Dictionary.

Data Flow Diagrams are generally developed sequential, or “top down” much like peeling away the layers of an onion. The following represent the three general types of DFDs:

• Context Diagrams - defines and validates the scope of the project; what is diagrammed is in scope, what is excluded is out of scope. Data represented at the Context level always originates and terminates outside the scope of the project. Good practice recommends that 10 or fewer data store, terminator and process elements be contained in any one DFD.

• N Level Diagrams - these decompose the context level diagram into finer levels of detail. Each DFD addresses a subprocess; levels are counted down. The lowest level of detail is the zero level. Large processes may decompose into four or more levels. Smaller projects may only have one or two.

• Action Level Diagrams - are the graphic and textual description of the logic used by a process to convert inputs to outputs. It ties data models to process models. As a

Page 189: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-25

part of this analysis, specific calculations and processing, not initially visible, will be identified as requirements.

The Context Level DFD shown in Figure 5-4 uses the ticket kiosk example discussed to create the high level flow of data. Notice that the need to have specific kinds of information available at certain points in the process is made explicit here. There is no indication of how long the Data Element Ticket Request will need to exist; only that it will be used by two of the processes. The Data Store Ticket Request Data may be a permanent collection of information or it may be transient. The designers will make that decision once the full need for the information has been determined by the requirements process.

Figure 5-4 Data Flow Diagram Example at the Context Level

Ed Yourdan, a pioneer in structured analysis, suggests a less intensive approach may work well with many projects.9 He recommends the following four step approach:

1. A list of all events is made

2. For each event, a process is constructed

9. Yourdan, Edward; Just Enough Structure Analysis; http://www.yourdon.info/jesa.php.

Page 190: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-26 Version 9.1

3. Each process is linked (with incoming data flows) directly with other processes or viadata stores so that it has enough information to respond to a given event.

4. The reaction of each process to a given event is modeled by an outgoing data flow.

This approach is somewhat less labor intensive, it is called the Event Partitioning Approach. It evolved from the same roots as the Business Event Model and the two work well together.

For the Business Analyst, the creation of the DFD serves two purposes; it refines and clarifies the requirements about how various information flows occur and it provides another opportunity for the early development of test cases. As before, the benefit of early development is the continuing examination and clarification of the requirements as well as work load leveling.

5.2.4.2 Entity Relationship Diagrams (ERD)

Entity relationship diagrams offer the opportunity to create a more detailed view of what is happening with the data. While DFDs are about how the data moves, ERDs are about how various pieces and groups of data relate to each other. Some of the same nomenclature will be seen, but in slightly different roles. ERDs are initially created during the Requirements phase, but will continue into design. In requirements, they are about logical entities; in design those entities will become physical.

As with DFDs there are a number of approaches to the diagramming schemes but most have the following symbols in common:

• Entities - are represented by Rectangles. An entity is a noun; a discrete object; a person, place or thing. Entities may represent a single item or a group of items. A data store may appear as an entity or as an actor. Ticket Requester (a person) and Ticket Request (a data flow) may both be entities. It is in the role of data, data elements, and data stores that entities are of prime importance in the ERD. Until this point in the Requirements process, the details about data have been fairly general. Now it is necessary to understand exactly what pieces of information are needed and how they relate to each other.

• Attributes of an Entity - are represented by Ovals. A Ticket has Date, Time, Location and Price attributes. Each attribute of an entity is connected to the entity by a line. Related attributed may be joined by a single line which is then connected to the entity. For example, a ticket might also have an attribute of Color, which could be unrelated to the first four attributes. Color would have a separate line connector to the entity, Ticket.

• Relationships - are represented by Diamonds. Relationships are verbs, phrased in the active tense; moving, tracking, buying (or moves, tracks, buys). Relationships connect entities to each other: a Ticket Requestor (an entity) Placing (a relationship) a Ticket Request (an entity).

Relationships are further described in terms of multiplicity; that is how many ofeach entity are a part of the relationship. There are four basic relationships types:

Page 191: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-27

One to one:

The above is the most basic relationship; it is read as a One-to-one Relationship.The symbol means that for every item in entity A, there is one and only one item inentity B. If these entities will eventually become databases, there will be only onerow in A for every row in B and vice-versa. Notice that this one symbol reflectswhat is occurring at each end of the relationship. In this one instance, therelationship is the same for A to B and for B to A. One-to-one relationships are notcommon in most applications, although they do occur.

One to zero or one:

The second relationship is both more common and more complex. The left end ofthe line, nearer the letter A, reflects the relationship of B to A. In this case eachitem in B is uniquely related to one, and only one, item in A. Reading the symbolsat the right end of the line, near the letter B, A is uniquely related to either zero or1 item in B. If the circle were at the other end of the line, the meanings would bereversed.

One to many:

The crows-foot, at right end of the line, symbolizes many. This relationship can beread as one item in A is related to one or more (perhaps many) items in B, but notzero items. Each item in B however is only related to one item in A. Clearly thisrelationship can be reversed. What is not allowed are many-to-many relationships.Where a many-to-many relationship appears, it must be broken down into finerdetail. It would be possible to have a null value symbol at the A end of the line,indicating that there might be no match in A for some items in B.

One to zero or many:

Page 192: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-28 Version 9.1

The fourth symbol set allows for the possibility an item in A may relate to none ormany items in B. Each item in B however, must still have a relationship with anitem in A. This flow also can be reversed.

Figure 5-5, the Entity Relationship Diagram, describes how the various entities in the Kiosk example relate to each other. Clearly, by the time the Business Analyst and the rest of the Requirements teams have been able to identify these relationships, much of the ambiguity has been driven out of the process.

Figure 5-5 Entity Relationship Diagram

5.2.4.3 State Transition Diagrams

State Transition Diagrams provide a representation of all states in which an object may exist during a process. They also include a representation of how the process is initiated, limits the parameters which control the execution of the process, and how the process can be terminated. While many of these issues have been hinted at in other requirements definition processes, nowhere are they made this explicit. Because they do require a consideration of limits on the process, previously unidentified business rules are often identified during the creation of the State Transition Diagram.

Page 193: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-29

As with the DFD and the ERD, the State Transition Diagram has a standard set of symbols which are used to describe the process.

• States - Rectangles with rounded corners are used to represent a state in which the object may exist. A single object may exist in multiple states within a single process, but may only be in one state at any specific point in time. It must be possible to determine how an object arrives at that state and what causes it to move to another state.

• Transitions - from one state to another are shown using arrows. Transitions connect state pairs to reflect allowed moves from one state to another. A single state may pair with multiple other states in a predetermined sequence.

• Causes - labels on arrows are causes. These causes are the conditions that must exist for an object to move from one state to another.

• Guards on the process - are shown as rectangles. These are the rules that must be satisfied for a move (state change) to be allowed.

• Actions taken in response to state change - are represented as slashes. A single state change may generate multiple actions.

Figure 5-6 State Transition Diagram

Transitions are often troublesome in design and construction. Effective use of the State Transition Diagram will help identify issues much earlier in the process. Returning to the

Page 194: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-30 Version 9.1

Kiosk example, notice in Figure 5-6 the guard box ‘No Activity for 90 Seconds’. This is a business rule that did not surface in earlier discussions. For the Business Analyst and the Tester, these are key areas to focus on when planning the Acceptance Testing Effort.

5.2.5 Prototyping

A prototype is a non-operational representation of a process or system. Once it is built and has served its intended purpose, it will be thrown away. For larger projects, the development of a prototype may be very cost effective as a means of identifying requirements. With the rapid prototyping tools available, customers and business partners can be shown a representation of the system that will give them much better insight into what the finished product might be. Many people in the Business community understand prototyping, however, it is always wise to preface the use or display of a prototype with the warning that this is not, and cannot be a production product. The analogy of an architect’s scale model is an apt one, the building is made of cardboard and glue, not bricks and mortar. No matter how big it is, people cannot live or work in it.

Use of the term prototype instead of model will help in making the distinction; after all one can purchase and use a model home or the floor model of a car. It may take time and effort, but it can be done. There is no such corollary for prototype. Prototyping and its role in the development process will be discussed in more detail in Skill Category 6.

5.2.6 Test First

Many of the techniques above grew out of the Object Oriented Methodology. Test First is a foundation of the so-called Agile Technologies, the best known of these is Extreme Programming or XP10. These approaches focus on delivering high quality products to customers in fast increments. The approach to Requirements is to focus on how it can be tested, and to develop and execute those tests before any code is written. Those tests then become a part of the overall test suite, first at the unit level and later at the systems level.

This process can be especially beneficial when working on an existing system. By creating and running the test cases before the new code is written, developers will have a much clearer understanding of what will need to be changed for the new system to work correctly. This process of changing the old code to work correctly in the new context, before installing new code is called refactoring, and is a key step in delivering quality products. Agile Methodologies will be examined in more detail in Skill Category 6.

10. Andres, Cynthia and Beck, Kent; Extreme Programming Explained: Embrace Change; Addison –Wesley.

Page 195: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-31

5.3 Quality RequirementsThe first two sections of this Skill Category have been focused on the Business or Functional Requirements. These are, after all, the reason the system is being developed. But it is entirely possible to develop a system that provides the complete and correct business functionality and still have a system that is completely unsatisfactory to the intended business partner or external customer. Business Requirements are not the entire story, there are other things to be considered. The Business Analyst must understand how well the system must perform (quality factors) and the issues that restrict the project activities (constraints). Without a full understanding of these two areas, the best set of business requirements will remain unsuccessful.

5.3.1 Quality Factors

Quality Factors or Quality Requirements deal with how a system or application will perform. In some organizations these are referred to as Technical Requirements, either term is acceptable; it is the concept of Quality Requirements that is essential. The importance of Quality Factors cannot be overrated. According to Tom Gilb, more systems fail because of Quality Factors than for any other single reason.11 Often the business partner or customer expectations regarding these factors are not articulated early in the process; in fact, they often do not appear until the product is presented and does not meet those expectations. Addressing the Quality Factors also ensures areas of IT, often not thought of as stakeholders in the requirements process, are included; Operations, Data Security, and the Network Staff are all typical of this phenomena.

5.3.1.1 Efficiency

The amount of processing resources, including programs, data and the associated environment,required to perform a function. Being efficient was once the most highly desirable attribute forprograms, because the resources were very expensive. Every organization has some resourceconstraints. Making efficient use of resources is part of creating a quality product. Applications andproducts that require excessive resources will create dissatisfaction in the long run. Alternatively,as the cost of resources declines, continued emphasis on efficiency alone can cause organizations tomake poor decisions on product design and development creating problems for the organization inother dimensions. For the CSBA, finding the balance point between the two extremes is essential.

5.3.1.2 Reliability

The extent to which a program or process can be expected to perform its intended function with the required precision. Reliability is closely correlated with the functional attribute of

11. Gilb, Thomas, Software Engineering Management; Addison-Wesley, 1988.

Page 196: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-32 Version 9.1

correctness, but takes it a step further. Reliability looks at the consistency with which correct results are produced and the extent of that correctness. This often includes the stability of the system in production. When defining reliability within an organization, care must be taken to clarify the boundary between reliability and availability. A product may consistently produce the correct result, but be prone to outages for internal or external causes, that is it is highly unstable. Internal causes should be allocated to Reliability while external causes are allocated to Availability.

5.3.1.3 Availability / Response Time

The extent to which a system or program is functionally accessible by those intended to use it. Availability can be measured many ways, at many places in the process, resulting in wildly varying times; this issue can create friction and frustration if not anticipated and dealt with effectively. Likewise, a multi-second response time from one screen to the next can create major processing bottlenecks, or cause customers to go elsewhere. Anticipating volumes of traffic and provisioning the necessary system resources can be both time consuming and expensive. Making a significant mistake in this area can be life-threatening for the organization. A system may be highly stable/reliable, and still have low availability because of the difficulty of resolving the problems and restoring the system when “crashes” do occur.

5.3.1.4 Integrity / Security

The extent to which access to software and data by authorized individuals, groups or programs can be controlled. There are two aspects to integrity and security, one deals with individuals that are supposed to have access to the system, process or data; the other deals with everyone else. These two facets can create significant conflicts with other Quality Factors if not fully understood and explored.

5.3.1.5 Usability

The effort required to learn, operate, prepare input, and interpret output of a program, process or system. Early programs and processes required individuals using them to remember long strings of complex commands. As more people used systems, the need to make them easier to use increased. Ease of use for the ultimate user of the system often adds significantly to the complexity of the design and the resources required for implementing the design (efficiency).

5.3.1.6 Maintainability

The effort required to enhance and improve the product or system after the initial deployment of the functionality. Clearly defined requirements, well articulated in design, fully documented architecture and standardized coding processes all contribute to an application that is easily maintained. All of these things also drive up the initial time frame for implementation.

Page 197: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-33

5.3.1.7 Flexibility

The extent to which the system is capable of being used in multiple configurations, specific to the needs of one or more groups of business partners or customers, without requiring significant modifications. The business community and external customers want systems and processes to be flexible, so they can be changed “on-the-fly”. They want configuration options that can be exercised without programming intervention. This flexibility requires sophisticate design capabilities, generally is resource intensive, and often is a challenge to manage in the security/integrity arenas.

5.3.1.8 Portability

The effort required to transfer a program or process from one hardware or software platform/environment to another. During the early days of computerization, hardware and software environments were relatively stable, changing only slowly over a period of year or more. In today’s environment a commercial product can anticipate a life span of two to three years. The cost to build in the ability to rapidly change from one platform to another is often seen in terms of operating efficiency and response time.

5.3.1.9 Reusability

The extent to which a program can be used in other applications, related to the packaging and scope of the functions and programs. Like efficiency, reusability is a desirable attribute when resources are very expensive. Reusable programs and modules can also provide the ability to quickly delivery proven functionality to the customer. For this reason, when an organization is going to be developing a series of applications that will require very similar functionality, the development of reusable code can provide considerable cost savings. The price for this is the time and effort required to develop and maintain the code in an application neutral format. When considering the development of reusable code, the Business Analyst should work with the IT staff to verify that the probability of reuse in the very near future is high. Otherwise the extra time and effort may not provide value to the organization.Writing reusable code requires significant time and effort and today is rarely worth the effort.

5.3.1.10 Interoperability

The effort required to couple and uncouple systems. This Quality Factor has increasingly been seen as a design decision rather than as a requirements issue. As the environment for developing and supporting modular systems has become more robust, the expectation that data can be shared seamlessly among applications has grown also. The need to have access to the information is a requirements issue; making it possible is a design issue.

Page 198: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-34 Version 9.1

5.3.2 Relationship of Quality Requirements

As can be seen from the descriptions in Section 5.3.1, not all of the Quality Factors interact well. The effort to make programs more efficient will impede efforts to make them highly usable and easily maintainable.

The matrix in Figure 5-7 demonstrates the general relationship among some of the Quality Requirements. The attempt to maximize efficiency will have a negative impact on all of the other attributes in this matrix. Some of the conflicts can be easily resolved; others are more difficult.

Figure 5-7 Quality Requirements Conflict Matrix

The issues with Integrity and Security are difficult. It is essential that Usability, Maintainability, and Response Time all be maintained for those who should have access. Differentiating those who should have access from those who should not takes resources. Determining precisely what level of access is allowed for each authorized individual takes more resources. The need to stay one step ahead of determined and creative hackers means that efforts do not stop with implementation, so maintainability must not only begin high, it must stay that way.

In addition, attention to the issues presented by the Quality Factors must occur well in advance of the time when the impact can be seen. The resources are consumed early and often the benefits show up late. There is an enormous temptation to short change the early expenditure to save time and money. The negative impact will be correspondingly greater if this happens. Figure 5-8 shows time relationship for many of the Quality Factors. Note that in this example Testability has been included, although it was not in the list in Section 5.3.1. Testability is a necessary attribute of all aspects of requirements.

FactorsCorrectness Correctness

Reliability o Reliability

Efficiency Efficiency

Integrity x Integrity

Usability o o x o Usability

Maintainability o o x o Maintainability

Testability o o x o o Testability

Flexibility o o x x o o Flexibility

Portability x o Portability

Reusability x x x o o o o ReusabilityInteroperability x x o Interoperability

Negative impact on the intersecting attribute = x Positive impact on the intersecting attribute = o

Blanks indicate no relationship between the pairs of attributes

Page 199: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-35

Figure 5-8 Time Line Relationship among Quality Factors

5.3.3 Measuring Business and Quality Requirements

One of the commonly overlooked aspects of the Requirements Definition process is the need to be able to measure the result. For most Business Requirements, the measure is binary. The requirement is either present or absent; the flag is on or off; the field is highlighted or it is not; the calculation is correct or it is not, and so on. While the scenario route to any specific requirement may be long and complex, certain states may only be able to be achieved after multiple interactions, but the end result is either positive or negative.

Quality or technical requirements are generally measured on an analogue scale; this means that there are a range of possible values. Some parts of that range may be acceptable and other parts may not. It is essential to clearly identify how the requirement will be measured. Earlier the problems with measuring Availability and Response time were alluded to; a typical Availability and Response Time Requirements begin by looking like this:

• Availability - The system will be available 99.5% of the time, measured monthly.

• Response Time - The system will provide sub-second response time between screens 94% of the time, 1 to 3 seconds not more than 5% of the time. 100% of between screen response times will be less than 6 seconds.

Development Evaluation Post-development

Req’ts Design Code &Debug

SystemTest

Operation Revision Transition Expected Cost Saved vs.Cost to Provide

Correctness O O O X X X High

Reliability O O O X X X High

Efficiency O O O X Low

Integrity O O O X Low

Usability O O X X Medium

Maintainability O O X High

Testability O O X X High

Flexibility O O X X Medium

Portability O O X Medium

Reusability O O X Medium

Interoperability O X X Low

O = where quality measures should be taken X = where impact of poor quality is realized

Page 200: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-36 Version 9.1

This may seem like a reasonable and achievable requirement, but it lacks the necessary clarity and definition. Where will this be measured? At the server? At the desktop? A remote laptop? The impact of that difference is clear. The measure must be clear also.

• Availability - The system will be available 99.5% of the time, measured monthly, at the server.

• Response Time - The system will provide sub-second response time between screens 94% of the time, 1 to 3 seconds not more than 5% of the time. 100% of between screen response times will be less than 6 seconds, measured at the server.

While this will help the operations and network staff to understand their requirement, it does not provide the person using the desktop or the laptop with a clear expectation of what they will experience.

• Availability - The system will be available 99.5% of the time, measured monthly, measured at the server. The system will be unavailable from 2:00 a.m. until 2:30 a.m., the first Sunday of each month for routine maintenance. The system will be available 98.5% for desktop and locally connected laptop users at the Main Office, measured monthly. The system will be available 99.9% of the time between 6 a.m. Monday morning and 9 p.m. Friday night for all other authorized users, measured monthly.

This expanded description of what is required in terms of Availability clarifies exactly what will happen. In addition to a planned monthly outage of 30 minutes, there is also the possibility of up to 20 minutes outage, per month from other causes.

5.3.3.1 Minimum Level of Acceptable Quality

Quality Requirements measures such as the one in the preceding section clearly identify what the external customer or the business partner wants and needs. But what happens if IT does not think they can deliver that level of quality, or at least not initially? Does the project stop? Does IT agree, knowing full well they cannot deliver? Is something else specified?

The answer to the question is provided by Tom Gilb.12 The development of the Minimum Level of Acceptable Quality, will address the issue. This is the lowest possible performance by the system that will allow it to be useful to the intended customer or partner. Below this level of performance, the system has no value.

Quality Requirement must always include the Minimum Level of Acceptable Performance as a part of the measurement description. This then allows the Quality Requirement to specify what the customer actually wants and also what they are willing to accept.

The dialogue to develop this information will be very productive and informative for both IT and the customer or business partner. It will provide IT the opportunity to talk about the

12. Op. cit; Tom Gilb.

Page 201: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-37

relative cost of achieving alternative levels of performance. Those costs may be staff time, hardware resources, or schedule impact to other projects.

It will provide the customer or partner the opportunity to talk about the relative value of achieving alternative levels of performance. Those values may include increased revenue, reduced expenses, customer satisfaction, or market share.

The result of this dialogue is often a staggered implementation of the Quality Requirement; initial implementation at or near the minimum level of performance and progressing over a specified period of time to the desired level. This approach makes clear what costs and benefits are associated with that level, so that reasonable business decisions can be made and everyone will know how and why.

5.3.4 Enterprise Requirements

Each Business Unit operates under the larger umbrella of the organization or enterprise as a whole. The Business Units develop strategies and tactics to support the organizational vision and mission. Just as the individual business unit plans and projects must fit within the overall plan, so too must the requirements fit within the enterprise umbrella. Often Enterprise Requirements are defined and embedded in the IT Standards and Procedures Documentation; in that way each project can simply refer to that section of the Standards and Procedures to incorporate those Requirements. Enterprise requirements apply to all projects, regardless of size or intent; they fall into three general categories:

1. Requirements to standardize

2. Requirements to handle accessibility issues

3. Requirements to ensure the existence of the needed levels of control

5.3.4.1 Standardization

These are often referred to as “common look and feel” to systems. Standardization addresses such things as how and where organization logos will be used, required language(s) and acceptable images. While some of the standardization issues fall within design, such as where controls will be placed on screens, there are others which are strictly requirements.

It is easy to assume that “everyone knows that,” but failure to explicitly include references to those standards may result in significant embarrassment for the project team. This is particularly important when working in a multi-cultural, multi-national environment, where some words, references or images may be offensive to parts of the organization not represented on the requirements team.

Standardization is not simply a negative, it is also about who the organization is and how they wish to be portrayed. Managing that image through their system representation is very important.

Page 202: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-38 Version 9.1

5.3.4.2 Accessibility

As computer technology evolves, individuals once excluded from participation due to physical limitations are increasingly part of the business and customer base. The requirement to address those aspects that limit participation is increasingly common. A number of governments13 have created accessibility standards for their own systems which are rapidly being adopted by private enterprise.

The visually impaired may need to be provided with voice recognition capabilities that will allow them to talk to a system, paired with reader capabilities that provide choices verbally rather than visually.

The hearing impaired may need to be provided with visual error clues instead of the standard beeps or tones. They may also need text transcription to provide access to dialogues.

The mobility impaired may need to be provided with alternative interface to commands instead of a mouse or keyboard.

Each of these sets of requirements must be articulated prior to design if the system is going to be effective in meeting these needs.

5.3.4.3 Control

Skill Category 4 addressed the issue of the need for appropriate controls from the business perspective. This need must be translated into effective system requirements. Compliance with various national legislation on the control of financial transactions is a significant part of the process. While in some countries (U.K. for example), compliance is optional, the choice not to comply must be explained, which results in few organizations electing non-compliance.

Explicit statements about controls in the requirements document will ensure that those controls are properly designed into the system.

5.4 Constraints and Trade-offs

In an ideal world, anything is possible and everything will be included. In the real world, some things, though possible are not practical as there are not enough resources to do everything. Choices will need to be made.

To this point in Skill Category 5, the emphasis has been on identifying all of the possible requirements for the prospective project. The point has been to ensure they are all known. Now that they are known, it is time to put some parameters around them. This section describes how and where this occurs.

13.Detail of the web assess requirements from the US Federal government are provided in Section 508 of the American with Disabilities Act (ADA); see www.section508.gov/.

Page 203: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-39

Many of the issues raised here are a direct bridge to the design process. Why are they included as requirements? The answer is fairly straight-forward, designers cannot be, and should not be, expected to guess at the environment they are designing for. The job of requirements is to get this right.

5.4.1 Constraints

A constraint is anything that places a limit on what is possible. For Information Technology projects, some of the constraints are constant, others change with the project. To place the requirements in the proper context, it is essential to identify the constraints and fully describe them before entering Design.

5.4.1.1 Hardware

Hardware constraints run the gamut from simple to complex; the amount and capacity of available servers; desktop/laptop capabilities; internal and external network capacity and data storage resources issues to name a few. Will the proposed system run on the existing hardware platform; is the proposed hardware platform capable of performing the desired functionality; does hardware to meet the requirements exist or must it be created? For each project some sub-set of these issues and others like them will need to be addressed during requirements.

5.4.1.2 Software

Software constraints include the current and proposed operating system environment, the interoperability of multiple products and multiple operating systems; the need to interface with existing applications and to anticipate the arrival of new applications. Software constraints may also include required or prohibited languages and tools. Each of these will impose limitations on the final design solution.

5.4.1.3 Policies, Standards and Procedures

Each of these contribute to the structure that describes what can and cannot be done in IT and the wider organization. These may support or prohibit changes to the standard hardware and software platform; they may require or forbid specific development methodologies; they may support or exclude the inclusion of the business partner and the external customer in the development process; they may encourage or ignore quality consideration.

5.4.1.4 Resources

This is usually what is mentioned first when the question of constraints arises. The classic duo of schedule and budget are at the top of the resource constraint list for many organizations.

Page 204: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-40 Version 9.1

How many people can we have, for how long? How experienced are they? Will we have the right number of people, but with the wrong skills? Do we get to choose? What is the budget for the project, and who is in control of it? How are schedule and budget managed? Are they inflexible and arbitrary, or realistic and negotiable? As emotionally fraught as these issues are, it is essential to know the answers to these questions during requirements. They will have an enormous impact on what is a realistic set of finished requirements.

5.4.1.5 Internal Environment

This addresses many issues that IT often tries to ignore: especially organizational politics. This includes as consideration of who is the project sponsor and how important is this project to them and the organization as a whole. It also includes taking cognizance of the wider issues, is the organization making money or losing it? Is there a stable, collegial environment or are shakeups and reorganizations a fact of life? What do these issues have to do with requirements? Everything! Unstable, volatile environments suggest that smaller, less risky, requirement sets might be delivered quickly, before the rules change. A more stable and supportive environment makes larger and more complex requirements set a realistic possibility.

5.4.1.6 External Environment

This addresses issues that originate outside the organization, but that are still important to the project. Typically included in this set of constraints are local and national legislation, either currently in force or impending; it may also include industry standards. There may be a need to interface with a dominant supplier or customer, in which case their requirements are also project requirements. The economy as a whole may be significant to the project: is there a small window of opportunity that only the nimble will be able to exploit? Are there local, national or international implications for the product? If so, each of those must be separately addressed during requirements to ensure that unwarranted conclusions are not drawn.

5.5 Critical Success Factors and Critical Assumptions

As the Requirements Definition process is being conducted, it becomes apparent not all requirements are created equal; some are much more important than others. Some are so important to the project that if they are not properly implemented, the project cannot be considered a success. There are other things, important to the success of the project, that are outside the control of the organization. All of these sets of information must be considered when creating the finished requirement set.

Page 205: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-41

5.5.1 Critical Success Factors (CSFs)

Critical Success Factors, are those factors within the control of the organization and essential to a successful project. These were addressed briefly in Skill Category 4, as one important element of the finished Feasibility Study. Critical Success Factors must meet all of the criteria for good goals and objectives (Specific, Measurable, Assignable, Realistic and Time-Oriented.)

Without an effective definition of what constitutes a successful project, the team may continue to churn endlessly on trivial items. By clearly agreeing up front, during the Requirements Definition process, what it takes to “succeed,” everyone is both focused on the right things and knows when they have achieved them. Failure to define success early can create strong motivation for scope creep and make control of the project much more difficult.

The number of Critical Success Factors will vary with the size of the project, but should never be large. A small project may have one or two. Larger projects may have three to five, per delivery. Creating larger lists of CSFs for projects merely diverts the attention of the project team from what is truly important. When everything is critical, nothing is critical. This is often a difficult process for the team as they must whittle down the list of the important things to the truly essential ones. Applying techniques such as multi-voting followed by the Forced Choice process described in Skill Category 2 will help to reduce the number of Critical Success Factors down to those that are truly critical. Items that are not Critical Success Factors may still operate as important requirements and/or constraints for the project. It is often an emotional and difficult process if left until implementation time.

Critical Success Factors should be clearly and directly linked to the Business Problem that was the originating reason for the project, and so, directly linked to the organization’s customers. Critical Success Factors that have no significance for the customer base must be scrutinized carefully to determine what purpose they serve. Occasionally, compliance with some local or national regulation will become a CSF, this is not an exception to this rule. In the case of regulation, failure to comply may well jeopardize the organization’s ability to serve the customer or to effectively serve the customer, and in extreme cases, to serve the customer at all.

Development of the project’s CSFs will help to focus the team’s attention on those things which must get accomplished. Requirements that do not support these items will have a lower priority, even though they may still be very important. The weaker the link to the CSFs, the lower the priority will be. Some of the very lowest priority items may need to be dropped from the product, either temporarily or permanently. They will become out of scope for the current delivery.

An example of project CSFs would be:

• Required Functionality: the minimum delivered functionality will include the Sales and Inventory functions as described in Requirements 1 through 4, 8 and 9.

• Required Locations: the product will be implemented in all of the EUC locations except France on or before 1 January, 20xx. Requirements 5, 7 and 12.

Page 206: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-42 Version 9.1

• Required Availability: the system will be available 99.5% of the standard normal business week, as locally described, measured at the remote locations within 90 days of implementation. 90% availability as described above is the Minimum Acceptable Level of Performance for Implementation. Requirements 6 and 15.

Notice the clear traceability of the CSFs to the project requirements. What is also clear is that they are tied to the most important requirements. If these criteria are met, the project is a success; otherwise, it is not. Creating reasonable CSFs will keep the team energized to achieving them. For a more detailed review of establishing goals and objectives, review Skill Category 4.

5.5.2 Critical Assumptions (CA)

Critical Assumptions are key factors for the project that are outside the control of the project team and they can make or break the project. As important as it is to define what constitutes success, it is equally important to identify those things which can jeopardize that success. Critical Assumptions should always be complete with recommended mitigating tactics or risk responses.

The discussion about Critical Assumptions is an evolutionary one; the initial focus will be on what could jeopardize the success of the project. Many of these potential risks are within control of the organization. They can be managed using various risk techniques; some of them are common, some are less so. Beginning this list as early as possible in the Requirements Definition process allows information about the CA to be collected and assessed in a structured fashion. Any project with a lengthy list of Critical Assumptions should be carefully appraised. Is the organization willing to expend the resources required on a project with this many issues outside their control?

Once the list of risks has been created, and those within control of the organization eliminated, the remainder must be scrutinized to determine how great a risk they pose to the project. Only those few, which could actually cause the project to fail, should become critical assumptions.

For example, an organization that develops Accounting Software might have the following:

Critical Assumption - No substantial changes to the IRC (Internal Revenue Code)provisions for the Not-For-Profit Sector, that are required to be effective on or beforethe product delivery date, and that have not already been proposed, will be enactedafter the final design is approved and the test cases written, but before the scheduleddelivery date.

Response: In the event that this does occur, a statistical analysis of the customerbase will be conducted. If the change will have a significant impact on less than20% of the customer base, it will be deferred to the next release. If the change willimpact 20% or more of the customer base, it will be added to the current phase. An estimate will be prepared for the new requirements. If the estimate will require80 Standard Work Days (SWD) or less, additional resources will be acquired to

Page 207: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-43

perform the work and the date will not change. If more than 80 SWD are required,the delivery date will be changed.

In reviewing this example, there are several items of note. The window of opportunity for this event to occur has been very narrowly defined. The organization has identified the risk of changes, but has determined changes proposed prior to a specific point in the process can be accommodated.

They have also identified an escalating series of responses, depending upon the severity of the impact.

1. If the impact is not significant to customers, it will be deferred.

2. If the impact is significant, but only to a small segment of customers, it will be deferred.

3. If the impact is significant to a larger number of customers, it will be included in thecurrent product.

4. If the size of the change is not too large, resources will be added and the date heldconstant.

5. Finally if the size of the change is large, the date will be moved.

As with the Critical Success Factors, identifying the responses during the Requirements Process allows participants to address the issues logically rather than emotionally. Waiting until the last minute to decide what to do is always the most expensive option. A second consideration is that under pressure to do something now the necessary time to research alternatives and come up with the correct response may not be taken. This may result in a response that is inappropriate, ineffective or inefficient. Finally, experience shows that obtaining the needed approvals for the resources to address risks is often a time consuming process. This results in delays to the schedule and cost overruns.

Managing risks, of which Critical Assumptions represent just one category, will be addressed in more detail in Skill Category 6.

5.6 Prioritizing Requirements and Quality Function DeploymentPrioritizing Requirements is not simply an academic exercise. It provides real value to the team and to the organization. Effective use of priorities allows the most important items to be delivered first. It provides the framework for effective decision making about what to include in a project, and when to include it.

The time spent in prioritizing requirements will be saved later in the project, when hard decisions must be made. One of the early situations is the sizing of the project or the initial delivery of the project. Based upon the priority and time estimates for development, it is possible to optimize the functionality delivered using the resources available. Much like

Page 208: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-44 Version 9.1

packing the trunk of a car, the large important items go in first, then the nooks and crannies can be filled with smaller, but still important items.

If the project is running late, the best and most obvious strategy, if the date cannot be moved, is to cut scope. But what to cut and how to decide? With a complete listing of priorities, the answer is simple, look at the lower ranking items first. This does not mean it is a pain-free process. It does mean the foundation has been laid for making sound business decisions.

The alternative scenario is a “group ranking” such as ABC or High, Medium, Low. Realistically things that a ranked as C or Low rarely make it into the product. So the decision makers are faced with choosing among things that are all important. Often there is pressure to make a decision quickly because time is an issue; the result is often not the best choice.

5.6.1 Prioritizing Requirements

The Requirements process does not end with the identification of all of the Requirements. In harvesting fruit, all of the apparently ripe fruit is picked, then those that are too small, have rotten spots, or other defects are culled out. So too with requirements. Not all of those defined will actually be used, or at least not immediately. The question is then how to decide which to choose.

Skill Category 2, Section 2.3.10.2 discussed the need for Prioritization and presented two methods for developing consensus around a list of priorities: multi-voting and forced choice. The Business Analyst will need to be very comfortable with both of those methods. Sometimes there is additional work to be done in preparation for the use of those two tools.

When working with multiple stakeholders, it is worthwhile to have each stakeholder go through a mini-prioritization process. This should include all of the common function requirements that will support all of the stakeholders plus the stakeholder specific requirements. During this session, it is important to maintain focus on the importance of achieving the overall business objectives. This will help the individual groups to recognize the importance of the common functionality.

At this point also it is worthwhile to talk about meaningful “chunks” of functionality, as opposed to entire processes. The goal here is to help each stakeholder group begin to develop realistic expectations about what they might be able to get in the new system and when that might be feasible. Doing this internally will allow some grumbling about the need to share resources, without having to fight with another organization for those resources at the same time.

Defining the functionality chunks can be a challenge. One approach to this problem is to use the Affinity Diagram process described in Skill Category 1, Section 1.5.1. Allow the participants to group the requirements into related sets, give the sets a working title, then determine the relative importance of each functional set. When working with multiple groups, the Business Analyst will want to maintain a working list of titles so there is no duplication or conflict.

Page 209: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-45

Once each of the stakeholder groups have completed this step, they can be brought together to begin the process of creating a consolidated list. Depending upon the size and complexity of the proposed system it may be worthwhile to extract the common functionality requirements and prioritize those first. As each group has already done some internal evaluation, this can provide a useful benchmark.

When the Affinity Group process has been used, it may be necessary to do a reconciliation of the items included in the sets. The objective is to have the sets consistently defined. Some items may need to be dropped out of a set. ‘Homes’ will need to be found for these requirements so they do not become lost.

If there are multiple stakeholders, with different agendas, it will be necessary to ensure each group is appropriately represented in the multi-voting process. Failure to do this may result in one or two groups “packing the room” (that is, having more than their representative share or participants) to ensure their agenda prevails. If this has not been addressed in advance, it will be necessary for the Business Analyst to ask each stakeholder group who their “voting representative” is. This will allow control of the process to be retained. Representation should be based upon what each group has at stake; in some organization it is possible to do this on a budgetary basis.

The end result of the prioritization process should be a list of requirements, numbered from 1 to N. Each stakeholder should sign the finished list as confirmation they have been part of the decision-making process. Each requirement is a discrete entity that can be addressed independently. This final list will become the source control for all future discussions of requirements. The paper copy, with signatures, should be maintained securely for the life of the project. Electronic copies should be created for future use and stored with the appropriate amount of access control.

Failure to go through a process like this, even though it can be difficult and time-consuming, will lead to endless strife on the project. Each group will feel they are being treated unfairly and their expectations of the system are not being addressed. There is no way a project like this will be seen to be successful.

5.6.2 Quality Function Deployment (QFD)

This technique which grew out of the manufacturing environment in Japan in the 1960s, was developed by Drs. Yoji Akao and Shigeru Mizuno. The focus of QFD is to hear “The Voice of the Customer (VOC),” and to ensure what is heard is successfully translated into products that have value for the customer. QFD is an integrated, four-stage approach which covers the entire life-cycle of product development: Product Planning, Assembly/Part Deployment, Process Planning, and Process/Quality Control.

• Product Planning - includes defining and prioritizing the customer’s needs; analyzing competitive opportunities, planning a product that responds to the perceived needs and opportunities and establishing critical characteristics and target values.

Page 210: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-46 Version 9.1

• Assembly/Part Deployment - includes identifying critical parts, components and assemblies of the product, decomposition of critical product characteristics, and translation of critical components into class characteristics and target values.

• Process Planning - includes determining critical processes and process flows, development of required techniques and technology, and establishing process control targets.

• Process/Quality Control - includes determining individual part and process characteristics, creating process control methods to support measurement and establishing standard inspection and testing processes.

Many of the information gathering and measurement development techniques included in QFD have already been discussed. What makes this approach of value is the structure used to generate products containing the requirements of the highest value to the customer. This is accomplished through the use of a series of matrices for listing and ranking various attributes.

Section 5.6.1 on Prioritization discusses a number of subjective evaluation processes that can be used to determine priorities. QFD attempts a more quantitative approach. Based upon input gathered from customers, a few, high-level product objectives are defined. (Critical Success Factors may be used in some circumstances.) Each product objective is given a ranking that translates into a weight. Once a set of potential requirements has been developed, they are mapped against the objectives in a matrix and assigned a value based upon how well they support that objective.

Figure 5-9 Quality Function Deployment Matrix

Figure 5-9 looks at 3 possible requirements for the Kiosk example used earlier. The score shown on the right side indicates how well each of these three options support the top three

Objectives

Purchase transaction takes 2 minutes or less

Ability to purchase many kinds of tickets at one location

Ability to purchase tickets up to 3 prior to the Event

Weight 9 5 3

Requirement Score

Sell tickets for local events only

3 1 3 41

Sell tickets for state wide and local events only

2 2 2 34

Sell tickets for region, state and local events

1 3 2 30

Page 211: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-47

characteristics customers said they would want for this product. The requirements are ranked using a simple high (3), medium (2) and low (1) scale. That ranking is multiplied by the weight for the objective. The ranking is the sum of all of the results. Using this type of mathematical model lends an air of certainty to the prioritization process. Developing and agreeing upon the scales and weights can be difficult and time consuming.

It is possible to consider several other characteristics in this same fashion. Once the list of requirements has been trimmed down to what may be the final working set, a preliminary assessment of how long it will take to create the requirement and test the requirement and how technically difficult that may be is a worthwhile activity. This process allows the team to look at the relative contribution of specific requirements to the needs of the customer, as opposed to what it will take to deliver that requirement. Items with low value and high difficulty may be reassessed.

A second use for this process is in determining the configuration of the various product releases. The difficulty and duration analysis allows the team to balance the complexity of a release, while maintaining high customer value.

One other attribute of the QFD approach is the traceability of the requirement, from the Voice of the Customer, through design and construction to the finished product. This issue of traceability will be explored in more depth in Section 5.8.

Because the ranking process is performed by all of the stakeholders, it provides an excellent communication forum. It can be a very positive approach to a difficult problem. There are a few risks with the approach, chief among them is an unconscious tendency toward “group think” which may cause some characteristics to be over-valued and unchallenged.

5.7 Developing Testable RequirementsThroughout this Skill Category, the need to develop testable requirements has been emphasized. Testability is the only criterion that appears on the most commonly seen lists of critical attributes for Business Requirements and often on the list for Quality Requirements. It is one thing to say it is important, it is another to know specific approaches for accomplishing it. Discussed below are some of the most common and well respected methods for improving the testability of requirements.

Each of these methods addresses one or more aspects of the quality of the requirement. These methods can be used individually or in combination, depending upon the needs of the organization. Each will require the investment of time and effort to obtain the desired result. Business Analysts and Project Managers who choose to add these steps to the process should expect to be challenged to demonstrate the cost effectiveness of the process in question. A sound working knowledge of the economics of quality as presented in Skill Categories 1, 2, and 3 is necessary.

Page 212: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-48 Version 9.1

5.7.1 Ambiguity Checking

Unambiguous is one of the top criteria for “good requirements.” But, what does it mean to be unambiguous and how can someone tell?

To be unambiguous, a statement must have one, and only one possible interpretation. That is, any group of individuals reading the statement independently would all come to the same conclusion about its meaning.

5.7.1.1 What is Ambiguity Checking

There are several tests that can be applied to a requirement to determine if it is clear, some are quick and easy, others require more effort. One approach is to change the focus or emphasis of the statement to see if the meaning changes. The following example is a classic analysis.14

Each iteration in the example looks at the possible changes in meaning to a simple and familiar statement. The rhyme goes on to say “its fleece was white as snow.” This could be read as a requirement for the lamb. If this phrase is appended to the original statement, “Mary had a little lamb,” some of the ambiguity might be removed. However, if the two requirements are fragmented or examined in isolation, the intent is unclear.

Another approach is to substitute a synonym for one or more of the key words to determine if the meaning will change. For example, the requirement for a system to be able to “punch the ticket” can be interpreted as placing a small mark or hole on a physical document, or it might mean to hit the document. There are also several slang interpretations of this phase which could further cloud the issue.

5.7.1.2 Performing Ambiguity Checking

One place to begin the process is to do a simple test for potential ambiguity. Select a small set of related requirements. Choose a small group of qualified developers and ask them to do a quick estimate on how long it will take to implement those requirements. The resulting numbers themselves might be of little interest, what is important is the level of consistency.

14. www.construx.com; Ambiguity Checking Heuristics; March 2007

Statement In contrast toMary had a little lamb it was hers, not someone else’s Mary had a little lamb but she doesn’t have it anymoreMary had a little lamb just one, not severalMary had a little lamb it was very, very smallMary had a little lamb not a goat or a chickenMary had a little lamb but John still has his

Page 213: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-49

If the responses are all within a fairly narrow range, there is probably little ambiguity (the requirements may not be correct, but everyone interprets them the same way). If there is a noticeable divergence, ambiguity may be an issue and the requirements set should be subject to further scrutiny.

The checking process can be done by as few as two or as many as five or six qualified professionals, at least one of whom should be representative of the stakeholder group submitting the requirement. Walking through the requirement in the group and performing restatements will provide the opportunity for ambiguities to be identified and resolved.

Building this into the development process would indicate that early estimation of requirements sets, by qualified individuals, can help to identify potential areas of ambiguity. As estimates will be needed eventually, doing them when they can contribute to the quality of the requirements makes good sense.

Many organizations have limited estimating skills, with the result that only a few individuals routinely perform the estimating tasks. In this environment, the need to have multiple estimates for a single body of requirements may meet a lot of resistance. One solution to this is to have one experienced estimator as a part of the group and include several other novices. Initially there will be wide divergences, but over time the quality and consistency will improve. The novices will learn the estimating skills while helping to identify potential ambiguities. This will help the organization to ease the estimating bottleneck.

5.7.2 Resolving Requirement Conflicts

Conflicts among requirements require special attention. The need for consistency in requirements has been discussed earlier. Consistency means there are no internal contradictions among and between requirements statements. A conflict would mean it would not be possible to satisfy the conflicting requirements concurrently.

There are two possible causes of conflict: 1) a misunderstanding or miscommunication of what is actually needed or wanted, resulting in one or more requirements being incorrect; or 2) an actual conflict in the underlying business rules as presented by the stakeholders, based upon existing priorities and practices. Of these two, the easier to deal with is the first category. Once identified, the incorrect or misstated requirement is repaired and everyone is satisfied that there is not a conflict.

The second scenario is more difficult for the Business Analyst to resolve. The initial steps are to clarify with each of the respective stakeholder groups that their requirement, as stated, accurately reflects the existing Business Rules. It is also worthwhile to learn the underlying reason or rational for the Business Rule(s). It may be possible to resolve the conflict at this point by a determination that one group is operating from ‘old information’ or the business need has changed since the rules were implemented. In this case, all of the groups can be reconciled to meeting the new business needs and the conflict corrected.

The final, and most difficult case, is that a genuine conflict exists. It may also occur in loosely coupled organizations, where each unit has a wide range of authority in adopting operating

Page 214: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-50 Version 9.1

approaches. The potential solutions to this are to not share the system, to create different versions, or to go with the stakeholder with the most at stake.

This situation may occur when the stakeholders represent different external customers who have different business needs. In this case, a business decision must be made about which or how many customer sets to satisfy and in what sequence. The decision is often made to satisfy the largest group in the initial release and then to create other versions to address the smaller groups.

Identifying conflicts is fairly simple for smaller systems. In the process of prioritizing requirements, they will be compared against each other at a one-to-one level. The conflict should be immediately apparent.

For larger systems, the possibility of overlooking conflicts is much greater. The same approach, one-to-one comparisons, can be onerous in a system with several hundred requirements. If the relative priority of the requirements is the same for each of the stakeholder groups, they may be discussed in the same prioritization session, or in sessions attended by the same people. This is an argument for having some consistency in the prioritization processes.

In the case that potential conflicts may affect the health or safety of individuals, there may be no alternative but do performed detailed, one-to-one comparisons. In that situation, adequate time must be allowed during the Requirements process.

5.7.3 Reviews

The term “review” is widely used to cover virtually any kind of project meeting. This leads to confusion about what a review is, how it is conducted and who is involved. The end result is a project with a large number of meetings, with little or no impact on the quality and correctness of the finished product.

This Skill Category contains descriptions of a number of specific meeting types, and the activities conducted during those meetings. By using the correct names for those activities and others to follow, the confusion about the purpose of a specific meeting will be reduced.

The term review generally implies a lack of depth and detail; it is a fairly high-level presentation of the subject matter. There are other names for more specific activities; i.e. a code inspection as opposed to a code review.

A review is properly regarded as an organizational and political event, held at the end of a major project landmark. The purpose of the review is to certify the landmark has been completely and correctly achieved. Reviews should include all stakeholders for the product, process or project subject to review. Reviews are generally not decision-making sessions. They are a recitation and ratification of decisions already made.

Reviews often feature presentations by technical experts to decision makers, describing what has been done and why. Review meetings are differentiated from status meetings primarily in the level of detail presented and the lack of technical decision making and action plan development. In a status meeting the technical team will examine the issue, determine an

Page 215: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-51

action plan and assign responsibility for ensuring the actions are taken. In a review meeting the management team may or may not be advised that this was necessary.

Reviews should always be conducted in a “no surprises” environment. Potentially contentious issues should have been presented to key stakeholders in advance and agreement secured to the proposed course of action. If agreement has not been reached, the review should be postponed. Public arguments are bad for projects.

Requirements should be reviewed at the end of the JAD process if one was conducted. Requirements should be reviewed with each key stakeholder group prior to consolidation with other stakeholder groups, but after internal prioritization. Requirements should be reviewed at the end of the consolidated prioritization process, before design begins in earnest. At each of these landmarks, the key decision makers, sponsors, champions and stakeholder will be asked to affirm their support for the product presented. In this way there is a clear link from each point of origin to the finished product, at an organizational level.

5.7.4 Fagan Inspections

In 1974 Michael Fagan,15 then of IBM, developed a methodology for improving the quality of software; the resulting publication in 1976 made this approach available to the industry. His inspection technique is credited with dramatically reducing the number of defects escaping into production. The Fagan Inspection Technique, also referred to as Formal Inspections, is a rigorous, structured approach to finding defects. Initially developed and applied to code, the use of the formal inspection process has been expanded to include work products at all stages of the development process. Examples of work products would include items such as a Function Requirements Document, a Test Plan or Acceptance Test Plan, an External or Internal Design Document as well as many others. The application of the Fagan Inspection process to Requirements has proved to be extraordinarily cost effective:

Karl E. Wiegers, noted Requirements expert, states inspecting requirements is thesingle most effective process in reducing defects and improving product quality,returning as much as 40 to 1 the time spent in Inspections!16

Kirby Fortenberry,17 another well known consultant and writer about inspections citedthe following results based on his work with clients:

• Inspections were three times more effective than testing in finding defects

• $1600 savings/defect found prior to test

• $105 cost to find/fix a defect in Requirements using Inspections

15. Fagan, Michael E. Design and Code Inspections; IBM Systems Journal, 1976. 16. Wiegers, Karl E, Cosmic Truths about Requirements, Quality Assurance Institute International

Quality Conference, Orlando Florida, April 2006.17. Kirby Fortenberry, “Software Inspections.” Proceedings, 16th International Software Testing Con-

ference, Quality Assurance Institute, 1998

Page 216: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-52 Version 9.1

• $1700 cost to find/fix in Testing

• $25,000 average Inspection savings

• 10 – 25% reduction, development time

• 90% reduction, corrective maintenance

5.7.4.1 Fagan Inspection Process

The Fagan Inspection process has a single objective: to find defects. As defect data is the engine that drives all process improvement it is clear how this approach contributes to both short and long-term improvements. To accomplish this, Fagan devised a structured approach for reviewing work products at points of stability, that is, when they are supposed to be “done.”

Because the Business Analyst has been instrumental in the development of many of the work products, especially the Requirements documents and the Acceptance Test Plan document, they will be very knowledgeable about the specific product. They may be involved as a representative of the authoring group if it is a product they have worked on. Alternatively, they may be present in the role of a skilled, but objective, pair of eyes if this is not a project they have been working on. In either case, they will be a major asset to the process of finding defects.

To determine when a product is ready for inspection, the organization must have and use an effective set of standards and procedures. This includes both the project management information and the development methodology details. These two provide information about the activities that must be completed for a product to be ready for inspection; these are called the entry criteria.

These references must also include the level of performance for the work being examined; these are called the exit criteria. Work that fails to meet the performance standard for one or more reasons is defective. Work products are judged against both the entry criteria and the exit criteria.

When inspecting requirements, defects are categorized as either major or minor. The classic definition of a major defect is that it will cause a “failure in production.” Since what constitutes a failure in production varies a great deal from organization to organization, this must be defined and agreed to by all parties. Anything that is not a major defect is a minor defect.

Major and minor defects are also categorized by type: wrong, missing or extra. Of the three, wrong is the easiest to identify, missing requirements take time and effort to see the gaps where a requirement should be. “Extra” requirements tend to be the most error prone, as they do not result from a customer or business partner request, so there are no real “requirements.”

While it is possible to further categorize defects, there is little reason to do so. What will be important is to track where in the development process the defect is identified. If a

Page 217: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-53

requirements defect escapes into design, code, test or production, some work will need to be done to determine why the defect was not found earlier.

5.7.4.2 Fagan Inspection Participants

All inspections include the same set of roles, although the roles may be filled by different individuals for different types of inspections.

• Moderator - The Moderator plans and conducts the inspection session(s), ensures the required rework is addressed, and ensures the results of the inspection are properly recorded and reported. The Moderator must be a skilled facilitator, well organized, and able to provide the time and effort needed to ensure a good result. The Moderator also participates as an Inspector.

• Author - The Author is a representative of the authoring group for the work product. The Author is the expert in the work product under review and is able to answer questions or issues that are identified during the inspection. The Author is responsible for carrying the identified defects back to the authoring group, which is responsible for ensuring they are fixed. The Author is also and Inspector. Authors are generally the best inspectors on the team as they have the best insight into the product and the project.

• Reader - The Reader is responsible for reading and paraphrasing the material (to ensure that only one interpretation is possible). The Reader maintains the pace of the meeting; each item is read, restated, a reasonable pause is allow for someone to offer a defect, if none, move on to the next item. The Reader is also and Inspector.

• Recorder - The Recorder is responsible for logging all identified defects and their classification (Major or Minor; Wrong, Missing, Extra). At the end of the session, the Recorder reviews all defects to ensure that there is consensus on them. The Recorder is also an Inspector. It is possible for one individual to perform the roles of Recorder and Moderator in a session. These are the only two roles that can be combined.

• Inspector - In addition to the roles above, one or more qualified individuals may participate in the inspection session. The recommended total group size is seven; eight is possible, larger than that becomes difficult to manage. Each Inspector is responsible for having inspected the material prior to the session and having identified as many defects as possible. Unprepared Inspectors may not remain in the session as they slow the process down and have a negative impact on morale.

The Moderator can be from any part of the organization, but should be technically competent to inspect the material. Often Business Analysts and Software Quality Assurance staff possess the right skill mix for this job. The Reader is one of the most demanding jobs, and initially should be performed by the most skilled individuals. The various roles for inspecting requirements should include representatives from the business unit, business analysts,

Page 218: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-54 Version 9.1

developers and testers. This mix will provide the best coverage of the most important element of the project.

One fundamental rule of Inspections is that Managers may not participate. There are very sound reasons for this, the most important being that the possibility of this information becoming part of the personnel evaluation process is enough to kill the effectiveness of inspections.

5.7.4.3 Fagan Inspection Issues

Fagan Inspections are a powerful tool for identifying defects early in the life cycle, however, despite this, they have not been implemented as widely as might be expected. There are a number of issues that may contribute to this.

• Time - Inspections are labor intensive, particularly in the early stages of implementation. The history of the industry is to short-cut any process that delays the beginning of coding, regardless of how counter-productive that strategy may be. Even for well intentioned organizations, the commitment to inspecting products, line by line can be difficult to maintain in light of the pressure to deliver products quickly. The fact that Inspections will actually improve delivery time and reduce expenses is not well accepted despite numerous studies of it effectiveness.18

• Level of Maturity - Effective use of the Fagan Inspection technique requires that organizations be at least a CMM(I)19 Level Two, and probably Level Three to obtain the maximum benefit on a consistent basis. The key to this is the need to have well defined processes and procedures that are employed consistently by the organization, and not jettisoned as soon as time pressures are applied.

• Fixing Defects -The identification of defects during the session is firmly separated from the correction of the defects, which is the responsibility of the authoring group. Failure to require defects to be addressed in a consistent manner, will discourage participants from investing the time and effort needed to find the defects. For some organizations, the discipline needed to fix the defects is very difficult.

• Environmental Barriers - One final issue for many organizations is the need to establish a trusting environment in which finding defects does not have a negative connotation. This topic was addressed in Skill Category 2, and the direct need for that environment is seen here. For organizations intent on finding someone to blame for every defect, Inspections are not a viable option.

18. In addition to the Fagan and Fortenberry information previously cited, there are studies by Motorola in conjunction with their Six Sigma initiative, work by Harlan Mills, and Capers Jones.

19. CMM(I) is a trademarked process of the Carnegie Mellon University, Software Engineering Insti-tute. Detailed descriptions of the CMMI Model, its development, use and the content of various lev-els is found in Skill Category 3.

Page 219: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-55

5.7.5 Gilb Agile Specification Quality Control

Because of the some of the issues above, Tom Gilb has developed an alternative approach to the Inspection Process.20 This approach uses sampling of work products early in the life cycle to predict defect rates and to identify potentially defect laden products from being developed.

5.7.5.1 Agile Specification Quality Control (SQC) Approach

Rather than attempting to perform line by line inspections of many large documents, this approach takes small, representative, samples and examines them carefully, but not necessarily line by line. The results of these examinations are then used as the basis for calculating the defects in the entire body of work, using statistical data.

For the purpose of the SQC, Gilb defined a major defect as anything that can potentially lead to loss of time or product quality. Minor defects are anything that is not correct but will not lead to loss of time or product quality. This definition sets the bar much lower than the Fagan definition.

Instead of reviewing against the entire process and procedure set, Inspectors select a limited number of very important criteria to use in the inspection process, typically between 3 and 7. For Requirements Gilb recommends “clear enough to test, unambiguous to the intended readers and completeness when compared to sources.” Using a streamline rule set speeds up the process, but does leave the potential for missing other kinds of errors.

Experience with this method had determined that two inspectors, working together for 30-60 minutes will find about one third (33%) of the total defects in the document of about one page. Individuals working alone will find a smaller percentage. Using either the average of all reviewers or the best average, the result of the sample inspection is then used to calculate a defect rate for the document as a whole:

10 major defects identified on one page of an 80 page document would mean a defectdensity of 2400 for the entire document (10 * 3 * 80).

Organizations establish an acceptable exit rate for defects. Initially it may be set fairly high and then reduced as the processes improve.

5.7.5.2 Using Inspection Results

Unlike the Fagan approach that mandates the correction of all (or almost all) defects, the Gilb approach is used to educate the staff about how to do things correctly. Following participation in an SQC session, the defect injection rate falls by about 50%, thus improving product quality.

For this reason Gilb recommends using SQC very early in the process, before products are large and fully developed. He recommends the on-going sampling of products through

20. Gilb, Tom; Simplified SQC, [email protected]; October 7, 2004.

Page 220: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-56 Version 9.1

development. This strategy will lead to the incremental improvement of the products being developed. It may indicate the need for additional training or modification of standards and procedures before the product is too badly flawed to be saved.

5.7.5.3 Agile SCQ Participants

A minimum of two inspectors and one inspection leader are required for each 60 minute session. Depending upon the size of the material to be sampled there may be as many as five or six inspectors. Inspectors must be professionally competent to understand the material being examined. Business partners, business analysts, testers, developers and managers are all viable participants.

5.7.5.4 Agile SCQ Issues

While this method does address many of the issues raised with the traditional Fagan Inspection, there are other issues created:

• Defects are not found - The emphasis in this method is not on finding all of the defects, it is about estimating the defect density and using this information to motivate engineers to learn to avoid defect injection in the first place. Defects will still need to be found and the will still need to be addressed. Because of the use of a few simplified rules, only certain kinds of defects will be identified. Others will simply be missed. One strategy is to use root cause analysis to determine the largest sources of errors, and use those rules first. As these defects types are reduced, other rules can replace them in the examination process.

• No Feedback Loop - Because the emphasis is not on finding defects, the kind of process improvement loop that is typical in an organization committed to Fagan inspections is missing. While it is anticipated that individuals will do a better job of creating work products, this improvement does not necessarily become institutionalized.

• No Accountability - Because there is no structure around the process, there is no way to track what happens to the defects that are discovered. This means that even relatively defect laden material can be “moved along the process,” as no one has an obligation to ensure problems are being corrected.

5.7.6 Consolidated Inspection Approach

Some organizations are reporting good results by using a combination of the two inspection approaches. The Gilb Agile SQC method is used early in the development of requirements as a diagnostic aid. Those products that exceed a specified threshold are required to undergo a

Page 221: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-57

full Fagan Inspection; those below a specified threshold are approved; and those in the middle are subject to on-going sampling to monitor their quality.

This approach appears to allow organization to focus their efforts on those products most in need, while conserving significant staff resources.

5.8 Tracing Requirements The entire reason for creating a list of requirements is that it represents what the business partner or customer needs or wants to find in the finished project. While this fact may be embarrassingly obvious, too many organizations fail to take the steps necessary to ensure that the requirements are there. These are fairly straight-forward and can be accomplished easily if a small amount of forethought is given to the process.

5.8.1 Uniquely Identify All Requirements

Notice the emphasis on the word all. Many organizations track requirements that are included in the approved version of the product. This is an excellent starting place, but it is not enough. Every potential requirement that survived any requirements definition session to end up on a document should be tracked. This means there must be at least two listings for even small projects; one for the requirements to be implemented and one for those that will not be implemented.

In Section 5.6 the need to give each requirement a unique priority ranking was discussed. For most projects, this ranking, combined with a project number is sufficient to uniquely identify each requirement. It is possible to become much more complex in creating a numbering scheme, but there is little payback for doing so. Keeping this part of the process as simple and clear as possible will save resources.

Items that are not to be included in any planned release of the products are often the source of later conflict and contention. For each rejected item, there should be listed, in addition to the requirement itself, the date, the group or authority making the decision and the reason for rejection. This will preempt later attempts to revive requirements that have already been investigated and found not to fit the scope of the project. For some requirements the criteria that disqualified it may change or disappear, making future consideration of the requirement a possibility. It will also allow a later evaluation of the decision-making process on what to include and what to exclude.

By creating the listing of rejected requirements incrementally, and making it electronically accessible to all stakeholders, it is possible to manage down the amount of time spent cycling around pet requirements. Requirements on this list should be uniquely identified; a simple 1 to N scheme will work. Organizations can use an R for Rejected or N for Not Approved to preface the number. This eliminates confusion in numbering.

Page 222: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-58 Version 9.1

For larger projects, the listing of requirements to be implemented can be broken down by those for each planned release of the project. This provides clarity about what the total product will include, and in what sequence functionality will be delivered. Making these decisions is a part of the prioritizing process that was discussed earlier. This list also should be available electronically to stakeholders.

5.8.2 From Requirements to Design

Once the list of uniquely identified requirements has been agreed upon, it is time for the designers to begin the work of translating those requirements into solutions. The listing provides the opportunity for a two way inspection of the final design.

5.8.2.1 Tracing Requirements to Design

This is, of course, essential. It should be possible to take each requirement and see where it is addressed in the design. If the requirement was a good requirement, the designer will have had the complete information necessary to come up with the best solution.

Tracing each requirement to the design component takes time, but also ensures the product to be built will meet the business partner’s or the customer’s wants and needs. It will ensure that nothing is missing from the design.

5.8.2.2 Tracing Design to Requirements

This backward flow is an essential step to ensure additional requirements have not been inserted into the design. After each element has been traced back to the source requirement, there should be nothing left over. If there is, these represent defects in the design.

The better the basic requirements set is, the less likely it is that the designer will feel the need to add functionality. Providing the designer with access to the list of Rejected (Not Approved) or deferred requirements, means that before inserting unspecified functionality, they can look to see if it is coming later or has been rejected.

5.8.3 From Requirements to Test

This aspect of traceability allows the Testing staff to develop the needed test cases for the functionality to be delivered. As discussed earlier, the sooner the testing effort can begin, the better the final product will be. Creating test cases early in the life cycle allows the effort to be spread out over a much longer time.

Page 223: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-59

5.8.3.1 Tracing Requirements and Design to Test

The question of how to test a specific requirement will arise early and often. By the time the test plan is complete, all of the issues about how to test specific parts of the requirements should be resolved. Clearly some of those issues will not be resolved until the design is complete. Testers need to know the specific implementation that the design will create for a requirement.

The requirement may be that the result of a calculation be made available to the customer. The implementation of that requirement in design may be to show the total on the screen. The resulting test cases will need to address both the initial intent to correctly perform the calculation and the subsequent decision to place that result in a specific screen after a specific set of inputs. This relationship creates a treelike structure of test cases that can be executed.

Tracing the relationships will expose areas for which the needed test cases do not exist, allowing this defect to be corrected before the product is released to the customer.

Methods for determining how much to test and what to test based on project risks will be addressed in much more detail in Skill Categories 6 and 7.

5.8.3.2 Tracing Test Cases to Design and Requirements

As with the backwards flow of design, the reverse tracing of test cases can highlight potential problems. Redundant test cases waste resources. Tests for items not included also waste resources. This being said, when experienced business analysts or testers identify a “missing requirement”, they should develop the appropriate test cases and bring the issue to the attention of the project team. This issue will be addressed in more depth in Skill Category 7, Acceptance Testing.

By addressing traceability issues as early as in the project as possible, resources can be spent as effectively as possible.

5.9 Managing RequirementsRequirements will change.

Despite the best efforts of all concerned, for all but the very smallest of projects, the requirements will change. Typical reasons for changes to requirements include errors in the original requirement (missing, incorrect or extra); changes to the internal organization or its functions (added or deleted); changes to the external environment (regulatory or competitive). This means the goal of creating a fully complete, fully correct and unchanging set of requirements at the beginning of a multi-year project is unrealistic.

The Agile approach suggests collecting just enough requirements for the current development effort, and keeping that effort small enough to control the rate of change. While this does work well for many projects, it is not always the best approach, so organizations must have a

Page 224: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-60 Version 9.1

viable alternative. A further analysis of the strengths and weaknesses of the Agile and other development approaches, and the kinds of projects for which each is best suited is discussed in Skill Category 6. As organizations progress from CMM(I) Level 1 to Level 2 the emphasis on an effective Requirements Gathering process pays major dividends in both quality and productivity. All too often however the attention paid to rigor and control during the initial stages of Requirements Gathering erodes as the project moves forward to Design, Development and Testing. The result is miscommunication, additional time in the testing stages and more expensive products.

For this reason, it is only prudent to plan for the changes that will occur during a project, and to develop a mechanism for managing that change effectively. As with traceability, managing change entails a small set of fundamental steps. Developing a Requirements Configuration Management Process will allow the organization to maintain control over the project in a way that will best meet the needs of the organization. Without this kind of a process, creeping scope can rapidly lead to out of control projects which are headed for significant quality, budget and timeliness problems!

By looking at the Requirements Configuration Management activities as a process, it is possible to leverage what we know about our processes and improve the product(s). The same key concepts that historically have been demonstrated to work effectively for source code management and production control can be applied to requirements. There are two key components, a Requirements Configuration Manager, and a Requirements Change Control Board. These two work together to ensure that only properly authorized requirements are added to the project scope. Data regarding sources should be captured in an automated system which will allow trend analysis.

Unlike beginning to establish control over the production environment, much of the basic work has already been done. The same key concepts which have been demonstrated to work effectively for source code management and production control can be applied to requirements. Organizations operating above CMM (I) Level 1 will have already established the traditional change control and change management processes for the management of the production environment. What remains is to create and formalize a similar process for requirements and to employ it consistently.

Effective team building skills on the part of the overall project management will help to create a positive environment where the need to objectively discuss and decide upon proposed changes can be handled smoothly. For projects of any significant size and duration, the project manager will typically identify an individual to function as a requirements configuration manager. This individual will have access to the requirements document and be able to make authorized modifications to that document. The Requirements Configuration Manager may fill that role for a single project, or for the organization as a whole. At a minimum, the configuration manager must be perceived as a team player and one upon whom the rest of the team can rely. The Business Analyst may find that there is no established “requirement configuration manager” for a specific project. In that instance, they may need to fill the gap while helping the organization understand why it is essential that the role be filled.

If Information Technology and the Business Community are working as partners to solve common business problems, contention over scarce resources diminishes. Prioritization of

Page 225: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-61

proposed changes, including the impact on budget and schedule are handled in a much less adversarial fashion.

5.9.1 Create a known base

The Project Owner or key stakeholders have been identified and documented in the Project Charter. The base is the approved Requirements Document for the project. This document is the result of all of the various Requirements Definition and Prioritization activities that have taken place on the project to-date. It includes the Critical Success Factors, the Critical Assumptions, as well as other significant information about the project. The complete list of contents and the process for developing the Project Charter is contained in Skill Category 4.

Finding these documents for an active project is rarely a challenge, assuming they have actually been created. These documents should be accessible to the project team members and stakeholders electronically. Creating and maintaining paper based documents becomes very time consuming and labor intensive. It also opens the door for the possibility the paper copy will be lost or destroyed by accident.

A fundamental component of this known base is the document that contains all of the approvals for the requirement set by the project stakeholders, champions, sponsors, and other appropriate team members. It also contains a document “change history.” This document is “proof-positive” of the approved list of requirements, the known base. Going forward, anything not included on this signed document is a change to the project and must be treated as such.

5.9.2 Manage Access

Once final agreement has been reached on the Requirements document, it is essential to protect the integrity of the document. In this electronic age, that is readily managed through the careful application of appropriate access permissions. The document may be read by many, but only changed by a few.

To make this work, there must be a process for managing access. This process must be a part of the organization’s standards and procedures. It must include the necessary Do and Check steps. Typically, the parties authorized to submit changes provide an updated version of the material to the individuals actually making the change. These changes may be regarded as an update to any application system and processed via the normal “change control” process.

In some organizations all changes are routed through the network or operations staff. In other organizations this can be done by selected team members. The first approach is preferable as the network staff will require the appropriate documentation be submitted on a consistent basis. This eliminates the possibility of people “forgetting” approvals are required for changes.

Page 226: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-62 Version 9.1

5.9.3 Authorize changes

The approval process for change requests should be a subset of the original approval process, managed by the Requirements Change Control Board. Often organizations create change categories which determine what approval is required based upon the scope and impact of the changes. This is effective at keeping the approval process simple, but care must be taken that large changes are not merely being broken into pieces that can be approved at a lower level.

Changes to the Requirements may or may not be a result of a defect in the process. The documentation for the new or revised requirement must meet the standards for the original requirements. Once the requirement has been documented it can be properly estimated. Documentation accompanying the change request should include not only how long it will take and how much it will cost, but also the impact on the schedule. Any change request marked “no impact” should be subject to very close scrutiny and probably rejection.

5.9.3.1 Change Control Board (CCB)

For configuration management of requirements to be effective it must be officially sanctioned at some level of the organization. While it is possible to create this as a one time function for a single project, that defeats the purpose of approaching configuration management as a process. Spending the time to establish the “roles and goals” of a configuration management board and documenting them in a charter may seem frivolous, but it is not. The purpose of the Change Control Board is to ensure the integrity of the requirements change process, not to address or resolve technical issues. A CCB is not an inspection agency. While the team on the CCB will generally be highly skilled professionals, any move on their part to take over the roles of the project team is inappropriate.

The act of “ceremonializing” a function lends it credibility and respect. The discussions about how the process will work and developing an agreement about how to handle specific situations brings potential issues to the surface which must be resolved. It is a mistake to jump into the process without a clear understanding of its purpose, what is to be accomplished and how much authority is available to do so.

Creating a Charter for the Requirements Change Control Board will force these things to occur. The charter should specify how members of the CCB are selected; generally it will be composed of members from both the business side and the technical side of the project team. Often key stakeholders will be named as the representatives from their organization to the CCB. Typically they will delegate the responsibility for handling the routine matters to staff members and only participate directly when there are significant issues or conflicts.

Because not all changes are accepted or approved, it is essential that those responsible for the Requirements Change Control Board are perceived as being fair and responsible. This starts with excellent communication skills, especially listening skills. If not listened to carefully and considerately, people requesting or suggesting the change will become disillusioned and frustrated with the process and look for ways around it.

Some level of conflict is inevitable whenever there are scarce resources, the Requirements CCB needs to be skilled at anticipating and defusing conflict when possible. They also need to

Page 227: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-63

be prepared to handle the conflict when it becomes unavoidable; working toward a solution which is in the best interests of the entire organization.

The Charter should specify which projects are subject to the CCB process if it does not apply to all projects. In some organizations certain kinds of changes are exempted, especially when just getting started; however this is not the best method long term. Creating realistic project thresholds will improve the creditability of the process and discourage the development of creative strategies for avoiding it. The process definition should also specify what kinds of changes must be reviewed by the Board, regardless of other criteria. This is common when the project under development contains health or safety dimensions

In larger organizations the Requirements Change Control Board may be supported administratively by the Business Analyst or the Quality Assurance organization, either of which may also function as the acting Chair for routine meetings.

5.9.3.2 Change Scope: Requirement, Enhancement or New Project

Scope creep is the bane of every business analyst and project manager’s existence. The need to keep the product within schedule and budget parameters while maintaining the quality and functionality is their number one responsibility. Each suggested or requested or demanded change to the requirements challenges the team to maintain that balance.

Typically, the first aspect of the change addressed is: how big is it? It this a small change, easily accommodated? Is it a little bigger, but still not requiring any significant redesign? Or is it major, perhaps impacting work products with design, code or even testing already completed?

It is essential to preserve a sense of scale regarding potential changes to the system requirements. If the organization has a reasonably effective requirements process, large, late development stage changes should be relatively uncommon; and they should come from a limited number of sources. Generally they should have been anticipated, at least in the abstract, in the Critical Assumptions.

If the requested changes are approaching 10-15% of the estimated work effort at the completion of Design, some serious rethinking must be done. Is this really a part of this project, or is it a new project? When a lot of projected resources are to be consumed by a function or series of functions not strongly related to the business goal, it may be time to break them out as a separate project. If the key customers see them as essential to the project, it may be time to revisit the project definition to ensure everyone has the same understanding of the problem to be solved.

As a general rule of thumb, any change that increases the original scope by 10% should be looked at as a potentially new project, requiring a separate cost-benefit analysis and associated approvals. The CCB should be asking fundamental questions about every proposed change to requirements, especially non-trivial ones; they include:

• Why does this need to be done?

• Must it be done now?

Page 228: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-64 Version 9.1

• How is it related to the overall business objective of this project?

• How is it cost justified?

• Does this replace something else previously included?

5.9.3.3 Establish priority

The Change Control Board, having ensured that the same level of analysis was exercised in the development of the proposed requirement as with the original requirements, must have the authority to accept or reject the change. Because the CCB is comprised of the key stakeholders or their assignees, this should not be an issue. It may be difficult to reach consensus, but the authority is present.

The process for the decision making should be a microcosm of the initial requirements development. In particular, the CCB will need to determine, based on input from all invested parties, what the priority of each of the requested changes is. The new requirement will need a unique identifier that will allow it to be tracked through the development and testing process.

5.9.3.4 Publish

Once the decisions have been made, the results must be made official through publication. This includes updating the appropriate listings of accepted and rejected requirements and having them moved into the viewable space by the authorized individuals or groups. Failure to update the log of deferred or rejected items will often cause them to reappear with a new name or sponsor. Communication is essential.

5.9.4 Control results

The intent of the process is to help the organization achieve the result it desires. The controls exist to combat chaos and confusion. The process provides the development team in particular with protection from random, unwarranted intrusions into the life of the project. Effective control of the final result is dependent upon the diligence of the CCB and the project team to specific areas of concern.

5.9.4.1 5.8.4.1 Size the effort

The CCB should never accept for consideration a change request that is not accompanied by a standard estimate of work to be performed. Allowing generic estimates (small, medium, large) or vague ones (3-5 staff-weeks, based on available resources), creates the opportunity for severely defective requirements to be approved.

Page 229: CABA_CBOK_Ver_9-1

Requirements

Version 9.1 5-65

5.9.4.2 Adjust the resources or the plan

What will be a more troublesome issue in many organizations is how to integrate an approved change into the existing project plan. The CCB has been provided with information about the size and complexity of the proposed change. They also know the priority of the request. The basic options, mentioned earlier in this Skill Category, are few:

• Integrate the change into the plan with no change to the official schedule, resources, scope or quality. While this does not make rational sense in the overwhelming number of situations, this is the option most commonly chosen. This is done despite having estimates that demonstrate the change will, in fact, require time and effort to develop and test. This decision is characteristic of CCM(I) Level 1 organizations that will not accept reality that this is actually a decision to cut quality, as well as jeopardize the ability to achieve schedule and budget.

• Integrate the change into the plan and adjust schedule, budget or both. These are acceptable solutions if the adjustments are realistic. These are generally unpopular, especially with the ultimate customer or the business partner, who may have created elaborate plans based upon the planned implementation cost or schedule. It is not unusual to see the amount of the adjustment “adjusted” further (and always lower) in the face of pressure. Allowing too few resources to do the job properly creates exactly the same scenario as seen in the first response. It does exacerbate the frustration on the part of the business partner or customer, because they feel the problem was addressed when resources were added.

• Integrate the change into the plan and cut scope to compensate for the added work. This is where the effort to estimate and prioritize both the original requirement set and subsequent changes to requirements will pay dividends. For example, if the new requirement was prioritized between the old number 14 and 15, it is now 15. Anything prioritized at 16 or above is fair game. If the release includes priorities through 31, the numerical higher requirements (the lower priority requirements) can be evaluated to determine which ones can be deferred to accommodate the new requirement. This approach preserves schedule, budget and quality, as well as the integrity of the development process.

5.9.4.3 Communicate

Throughout the process it is essential to ensure all of the stakeholders are made aware of each proposed change to the approved set of requirements. They must have the opportunity to assess the risk, the reward, the potential cost in dollars, staff, schedule, scope and quality. The decision making process must be transparent to maintain creditability. Compromises, when they are made, must be undertaken in the context of what is best for the organization as a whole, and then supported by the entire decision making group.

Page 230: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

5-66 Version 9.1

5.10SummaryThis Skill Category addresses the single most important part of the development process, Requirements. There are those who argue that construction is more important, but without good requirements, whatever is built will be defective. The steps taken to move a vaguely understood, poorly articulated want or need to a clearly actionable statement are detailed. Methods for gathering the information, refining it and prioritizing it are presented.

The result is a process that creates and manages usable, highly accurate information for the design and development processes. It provides an ideal opportunity to jump start the testing process. The Business Analyst, in participating in an effective requirements process will be ideally positioned to support the project through the remaining stages of development and testing as well as the final implementation.

Page 231: CABA_CBOK_Ver_9-1

Software Development Processes, Project and Risk Management

Version 9.1 6-1

Software Development Processes, Project and Risk ManagementThe Business Analyst is in the business of helping organizations develop software to meet business needs. Throughout the previous skill categories, the need for processes has been emphasized. Skill Category 6 focuses on the processes that are used by Information Technology to perform their work. Skill Category 6 begins by examining the Software Development process. It includes a comparison of various methodologies. Software development occurs in the context of an individual project and represents a single instantiation of a methodology. Successful project planning and management are essential for delivery of the products needed by the organization. For the Business Analyst, solid project management skills will enable them to keep the development effort on track and in control. Skill Category 6 concludes by examining the role of risk management in the context of successful software development projects.

6.1 Software Development in the Process Context Since a Business Analyst works in and around the software development process on a daily basis, it is critical to understand both the terminology and the products of various parts of the process. Skill Category 3 focused on the impact of processes in Information Technology product development. A brief recap of key definitions is provided below.

Skill Category

6

Page 232: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

6-2 Version 9.1

6.1.1 Policies, Standards, Procedures and Guidelines

These elements provide the framework for planning and constructing software. If the framework is incomplete, inadequate or ineffective, the products developed will rely upon the heroic efforts of individuals to produce quality software.

6.1.1.1 Policies

The objectives to be achieved. Policies are high-level documents that guide and direct a wide range of activities and answer the basic questions; “Why are we doing this, What is the purpose of this process?” A policy should link to the strategic goals and objectives of the organization and support customer needs and expectations. It will include information about intentions and desires. Policies also contain a quantifiable goal. The development of Standards is addressed in more detail in Skill Category 3, Section 3.3.3.1.

6.1.1.2 Standards

Standards describe how work will be measured. A standard answers the question “what?” What must happen to meet the intent/objectives of the policy? Standards may be developed for both processes and the deliverables produced. These standards may be independent of each other only to the extent that the standards set for the process must be capable of producing a product which meets the standard set for it. A standard must be measurable, attainable and critical. The development of Standards is addressed in more detail in Skill Category 3, Section 3.3.3.2.

6.1.1.3 Procedures

Procedures establish how work will be performed and how it will be verified. There may be a significant number of procedures to be performed in any single process. A process may require a lengthy period of time for completion. Substandard or defective work produced early in the process can result in schedule-breaking delays for rework if they are not caught promptly. For this reason there are two types of procedures: Do Procedures and Check Procedures. Development of Procedures is addressed in more detail in Skill Category 3, Section 3.3.4.

6.1.1.4 Guidelines

Guidelines are recommendations for ways of working. They are optional, not mandatory. This means that they are not enforceable. Guidelines may be useful when the organization is piloting new procedures, but generally should be avoided. Where there is more than one acceptable procedure, it is better to include all of them with the caveat that these are the only allowable procedures; one of them must be used.

Page 233: CABA_CBOK_Ver_9-1

Software Development Processes, Project and Risk Management

Version 9.1 6-3

6.1.2 Entry and Exit Criteria

Entry and Exit Criteria describe the input and output for a given process. Each plays a critical role in the development of quality products. Many organizations assume that individuals “know what they are doing” and fail to provide adequate information in this area.

6.1.2.1 Entry Criteria

Entry Criteria are the “must have” inputs for a specific process. Entry criteria are the border guards between processes. They serve as a filter to keep incomplete products from moving forward. Failure to pass through this filter can waste considerable resources.

At the simplest level, the entry criteria for the Design Process is the Requirements Document. Typically there are several other “must have” items: a Project Scope Statement and Plan, a budget and authorization to use resources, a preliminary test plan and so on. Each of these must be available for a meaningful and productive Design Process to begin.

Entry criteria are often found as a check list contained in the related Standards and Procedures documentation.

6.1.2.2 Exit Criteria

Exit Criteria address the question of how well the work has been performed. They are the details found in the Standards and Procedures. If the Entry Criteria answer the question “What must we do?”, the Exit Criteria provide the information in response to the question, “How will we know if we have done it right?”

Additionally, it is essential to know when a product is “done”. The development of effective and agreed upon implementation criteria is the basis for the decision. This issue will be addressed in Skill Category 7, Acceptance Testing.

The work done to define and document what constitutes an acceptable work product is applied here. Available as a reference during the development of the product, it is used again at the end to determine if the product will “measure up.”

The Requirements Process Exit Criteria will contain information about the format of the document, the amount of detail in the project and test plan, and which approvals are required.

6.1.2.3 Applying Entry and Exit Criteria

Entry and Exit Criteria can be used effectively in many ways. The most basic is the phase end review and approval process employed by many organizations as an alternative to the “throw it over the wall” approach. The authoring organization is responsible for verifying that their product (output) meets the exit criteria (first line quality control of a product), that is, defects have been identified and corrected.

Page 234: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

6-4 Version 9.1

The receiving organization then verifies that it has received all of the necessary inputs (Entry Criteria) from each of the contributing organizations. They may also choose to spot-check the items received to ensure that the product meets the Exit Criteria for the previous stage. This will provide the recipient with a minimum comfort level regarding the quality of the material to be used. Substandard material is immediately returned to the producer for correction.

A second important use for Entry and Exit Criteria is to serve as the baseline for an Inspection Process. This usage was discussed in detail in Skill Category 5.

Entry and Exit Criteria are also useful as a kind of mental checklist of things to be included in developing the project estimate. Clearly understanding the nature and amount of the work to be done will assist in the definition of the workload and the skill sets required to accomplish the workload.

6.1.3 Benchmarks and Measures

Benchmarking is often an early activity in the organizational assessment process that initiates a major quality/process improvement effort by an organization. Organizations seek to learn how well others perform in many aspects of their business. Benchmarking activities often are the precursor to major systems initiatives and, therefore, are of great importance to the Business Analyst.

Within Information Technology (IT), common benchmark issues include items such as the percent of the IT budget devoted to new development, maintenance, enhancements, and problem resolution. In the Development Lifecycle, Benchmark issues may focus on the Percentage of Defects identified in Requirements, Design, Code, Test, and Production respectively. Organizations seek to learn who is “best” and how their organization compares. They also seek to learn how those results are being achieved.

Skill Category 1 discussed Benchmarking in this context, as a macro level activity. It can also be applied at a much lower, micro level, examining how well other organizations perform specific sets of activities or tasks. If the organization is considering a change to the testing process, by expanding test automation, they may canvas multiple organizations to determine what percentage of their time and budget is allocated to manual versus automated testing, and how happy each respondent is with their allocation. This information can help the organization determine if additional automation might be beneficial.

Organizations considering the adoption of one of the Agile Methodologies may wish to determine what the most common team size and cycle length is for organizations in their industry. They may also want to establish how long it took for other organizations to become comfortable with the process. These kinds of benchmarks provide guide posts along the implementation path.

Page 235: CABA_CBOK_Ver_9-1

Software Development Processes, Project and Risk Management

Version 9.1 6-5

6.1.3.1 The Role of Measures and Metrics in the Development Environment

Skill Category 3 examined the process for developing measures. It emphasized that the initial work product measures should be made by the individuals and groups actually performing the work. Historically this has focused on measuring schedule and budget, planned to actual. While this information is important, it is essential to go beyond these boundaries to identify and measure key elements in the development process.

Once developed, these measures and the metrics developed from them, can be used to guide process improvement, target training issues and recognize performance excellence. Without substantive measures, this is all based on perception, which may or may not be well grounded in fact. Measures and metrics, over time, will be added to the estimating process to improve the accuracy of the estimates and to do a better job of resource assignment and planning.

6.1.3.2 Establishing Meaningful Software Development Measures

Throughout this and preceding Skill Categories, various potential measures have been mentioned. The list is, in fact, virtually endless. It is possible to develop a staggering array of measures and associated metrics. The Business Analyst is often able to help in the analysis of the organization’s true commitment to a measurement process. The investigation involves discussions with those who would sponsor a measurement initiative and those for whom it could have value. It is essential is to determine the answers to the following questions:

• Why does the organization wish to measure? If the answer is because it seems to be the thing to do, any set of measures will be acceptable. If the answer is because we need to get better, then a good understanding of the areas the organization perceives to be in need of improvement will be required. Defect data and other information the Business Analyst has at their disposal will be a major asset in this investigation. Since organizations (and individuals) get what they measure, the areas for improvement will need to be carefully targeted to achieve the desired result.

• What will be done with the measures collected? If the answer to this question is placed in file for unspecified future reference, once again, it is not worth expending enormous effort to collect the measures. If the answer is, it will be used as the basis for developing staff training plans and budgets, establishment of improvement task forces, and so on, then it is important to get it right.

• Who will have access to the information? Wide accessibility to the information, especially to the producers of the product and to those involved in the establishment and improvement of the methodology is the key here. Simply reporting to management is not enough.

• What resources will be available to collect and analyze measures? If the work to collect and analyze the data is merely one more set of tasks assigned to already over-worked and over-stressed staff members, the end result may be of little or no value. To be effective, the individuals assigned must have adequate time to collect, validate, and analyze the data. There must be time to try different metrics to find

Page 236: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

6-6 Version 9.1

ones that are meaningful and repeatable. Not everyone on the IT staff has the skills or the interest to do this.

6.2 Major Components of Software Processes (Objectives and Deliverables) The Business Analyst may be involved in many stages of the development of a software product, depending upon the organization for which they work. In some organizations, the Business Analyst only participates in the Analysis and Requirements phase; in others they are almost exclusively involved in Testing; for some the focus is on the training and implementation aspects of the project. In smaller organizations, the CSBA may be doing all of these things. If everyone worked for the same employer forever, knowing parts of the process that are not a requirement of their current position would not be necessary. With the increasing mobility of employees and jobs, it is essential to be fully informed on all aspects of development.

The phases, products, and document titles below are common throughout the industry when using the waterfall or spiral methodologies. Due to the different approach of the Agile Methodologies, they will be considered later. The material that follows focuses on the traditional development methodologies; however, many of the same products will be created, simply in a different flow. While an individual organization may have a different name or title for a specific work product, what is important is the intent and the content of the document.

6.2.1 Pre-Requirements Analysis

Ideas for new or revised systems come from many places within an organization. The number of proposed projects vastly outnumber those projects actually initiated. Every organization has a method of winnowing out those projects that appear to offer limited benefits in return for the resources expended. Regardless of what these steps are called, they have common characteristics.

6.2.1.1 Preliminary Scope Statement

This is often begun as a memo or a conversation. It is the original idea for the project. Projects may remain at the conversation stage for relatively long periods of time, and involve many parts of the organization. At some point it becomes necessary to “make it official.” This document contains the preliminary description of the business functionality desired by the project sponsor. It will typically include high level language and lots of ambiguities. It will outline what will be included and what will be excluded. The Business Analyst may work with the project sponsor to draft the Preliminary Scope Statement, asking probing questions to

Page 237: CABA_CBOK_Ver_9-1

Software Development Processes, Project and Risk Management

Version 9.1 6-7

help clarify the vision. The preliminary Scope Statement for the Kiosk example used in Skill Category 5 might be as follows:

We want to be able to sell tickets to multiple events from multiple locations across theregion. We already provide a ticket by mail service, but customers often want to have afaster turnaround and a better way to select their activities. We would purchase eventseats wholesale, allow the customer to select the event, time and seat they want, acceptpayment and produce a paper ticket, using a self contained kiosk.

6.2.1.2 Preliminary Benefit Estimate

The preliminary benefit estimate is the rationale for pursuing the project. Organizations undertake projects for only one of two reasons: because they must or because it appears to offer some form of benefit to the organization. Benefits can take many forms, they often include increased profit, decreased cost, improved customer satisfaction, reduced time to market, improved market share, and so on.

The Preliminary Benefit Estimate will indicate both the potential sources of benefits and estimates of what the amount of those benefits will be. The Project Sponsor generally has identified some benefit areas before suggesting the project. Development of the Preliminary Benefit Estimate is discussed in more detail in Skill Category 4.

6.2.1.3 Preliminary Estimate and Related Cost Calculation

There is great concern in the Information Technology area when a business partner or external customer requests a “ball park estimate.” There are a number of very good reasons for this concern: if the first number is much too low, and the project goes forward, the business partner will not be happy to see the price going up and up; if the first number is much too high, the project may be dropped when it could have been very successful, and once again the business partner will not be happy.

Nonetheless, it is essential to obtain an early estimate of what it will cost to create the system. Skill Category 4 discusses approaches for creating the early estimate and how it will be refined over time.

6.2.1.4 Feasibility Study Report

The final product of the Pre-Requirements Analysis phase is the Feasibility Study. This document brings together the three items above to form a cohesive look at a potential project. Developing a Feasibility Study report is discussed in more detail in Skill Category 4. If the Feasibility Study results in a favorable recommendation to proceed, and that recommendation is approved, the project will go forward. Otherwise it may be officially terminated or sent back for further study.

Because it is essential to understand the full scope of the work to be done before completing the final Cost Benefit Analysis, this step is best done in conjunction with the Requirements

Page 238: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

6-8 Version 9.1

Development process. If the project Feasibility Study is approved, the next step will be the Requirements phase.

6.2.2 Requirements

Skill Category 5 covers this topic extensively. There are however, specific outputs that must be created during the Requirements phase of a project. The CSBA will be heavily involved in the creation of these work products and so must understand them fully.

6.2.2.1 Requirements Definition

The development of this work product has already been covered in detail. It is the central deliverable for this phase.

6.2.2.2 Preliminary Test Cases and Test Plan

Based upon the size and scope of the project, it will be possible to develop some portion of the functional test cases during Requirements. This will help the Testing team size the testing effort and create a effective test plan. The Business Analyst will be very involved in the development of the Acceptance Test Plan, which is a subset of the overall Test Plan. Acceptance Test Planning will be addressed in more detail in Skill Category 7.

6.2.2.3 Project Charter

The Project Charter is the high level document that addresses the project strategy, as well as the project deliverables and objectives. It is both a technical and a business document. It serves as the organization and table of contents for other project related documents that will be created. When agreement has been achieved at a detail level for those documents, such as the Scope Statement and the Project Plan, the Project Charter can be signed off on. Project Planning will be discussed in more detail in Skill Category 7.

6.2.2.4 Project Scope Statement

The Project Scope Statement documents the agreement between all of the principal participants regarding what is to be accomplished. Project Scope is often the single most contentious issue for a project team to reconcile. Throughout the Requirements Development process, the list of desired functions and attributes has been growing. Using the various prioritization processes discussed in Skill Category 5, that list is reduced to the set that will comprise the completed functionality. A complete Project Scope Statement will include both what is included and what is specifically excluded. This is an important, but often neglected

Page 239: CABA_CBOK_Ver_9-1

Software Development Processes, Project and Risk Management

Version 9.1 6-9

piece of information. By addressing the exclusions early in the life of the project it is possible to reduce future conflict on the topic.

The Scope Statement must be agreed to by all key stakeholder for the project. Failure to secure agreement to this document sets the stage for runaway “scope creep.” Scope creep is the gradual expansion of project inclusions. Scope creep can be controlled most effectively through the use of a rigorous Requirements Configuration Management process.

All future decisions regarding actions to accept or reject should be based upon the contents of the Scope Statement.1 The Project Scope Statement may be a part of a Project Plan document, or the Plan document may be a part of the Scope Statement. Often both are included as attachments to a Project Charter. All must exist in some format.

6.2.2.5 Project Plan

The Project Plan describes what will be done, by whom and when. Initially this information will be created at a very high, conceptual level. As the information about what is to be accomplished is developed and solidified, the ability to break this information down to finer levels of detail will emerge. Failure to create plans at an appropriate level of detail will result in misallocation of time and resources and is a frequent cause of late project delivery. Developing the Project Plan will be addressed in more detail in Skill Category 7.

6.2.2.6 Revised Estimate, Cost and Benefit Information

Based upon the information learned during this stage of the project, it will be necessary to expand and update cost and benefit information originally presented as a part of the Feasibility Study.

6.2.2.7 Organizational Approvals

Throughout the Requirements Definition and Project Plan activities, the Business Analyst and others on the project team have been working to build consensus in support of the finished document. The final step is to ensure that the formal organizational approvals are acquired before moving into the Design stage.

6.2.3 Design

Design is the process of translating what the business product must do or be (Requirements) into a technical solution for achieving that functionality. While the Business Analyst must be conversant with the process and the terminology, the work will be performed by others. The

1. Riordan, Jeb; Project Magazine; 2001. http://projectmagazine.com/scope/writing-a-scope-state-ment.html

Page 240: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

6-10 Version 9.1

CSBA may be called upon to provide clarity or insight into the relative value of different implementation, but will not be doing the Design. In some organizations the BA may be charged with developing report and screen layouts based on input from the business community. It is essential that this work, which is Design, is not undertaken until the Requirements issues have been completed. Failure to follow this approach often results in missed opportunities and early elimination of otherwise valuable options.

6.2.3.1 External and Internal Design

These elements are the products of the process of translating the requirements into actionable items for programmers. For all but the smallest projects, this stage will include some consideration of the project architecture. This is a conceptual view of the components of the product and how they will relate to each other.

The External Design looks at the project as a complete entity. The External Design process uses the requirements and what is known of the architecture to determine what the major components of a product will be. Using more detailed versions of the Data Flow, Entity Relationship and State Transition diagrams discussed in Skill Category 5, the designer will describe how the functionality defined in the requirements will be implemented. Included in this will be a consideration of interfaces to external systems and the environment.

The Internal Design describes what will happen within each of the major components at two levels of detail. The first provides a map of the sub-components required to achieve the desired functionality:

• Files - file types needed, file formats, file names

• Data- new databases to be created and their structure, existing data bases to be accessed, data formats

• Modules and sub-routines to be accessed from existing applications

• Common error formats

As the work of design progresses, individual items will be described in greater detail, so for a given sub-component information such as:

• Component name and description

• Inputs and Outputs

• Arguments and formulas connecting inputs to outputs

• Specific error

• Versioning information

Page 241: CABA_CBOK_Ver_9-1

Software Development Processes, Project and Risk Management

Version 9.1 6-11

6.2.3.2 Revised Requirements

Throughout the Design process there will be opportunities to clarify and improve Requirements. As the organization becomes more proficient at developing requirements, these opportunities should be reduced, but they will never be eliminated. The Business Analyst will need to exercise the same skill and care in the development of these later stage requirements that was used earlier.

6.2.3.3 New and Revised Test Cases and Test Plan

During the Requirements stage of the life cycle, the majority of the functional requirements and many of the quality requirements are identified and initial test cases developed. As the requirements are instantiated in the design, additional test cases will be required to address the specific situation. The Designer, working with the Development Team and the BAs, will be able to provide the traceability of each requirement into the final design.

Changes to test cases developed earlier may arise from the recognition that the initial requirement was not complete or correct (often this is discovered in the process of writing test cases). The Acceptance Test Process and Test Case Development will be addressed in more detail in Skill Category 8.

6.2.3.4 Final Project Scope and Plan

For large projects one output of the design activity may well be the need to re-validate the project scope and plan. The actual implementation of some desired functionality may be too costly, too difficult, and/or too time consuming for the organization. This may result in a change in scope or plan.

Alternatively, the design process may uncover missed, but needed functionality resulting in an increase in the project scope. These will create changes to the project plan that may have significant financial, operational, and/or performance implications for the organization. Before proceeding with the actual implementation, it is essential to ensure that any changes are accepted and approved by the organization.

6.2.3.5 Final Project Estimate, Cost and Benefit Information

The project time and cost estimates can be finalized at this point. The scope is set, the design is known and planned for, the needed resources can be fully identified and the time for completion of tasks can be realistically estimated based upon past performance. There may be some changes to the Cost Benefit Analysis as a result of what has been learned through the Design process.

Although many organizations are unwilling to do so, terminating projects at this point if they can no longer meet the organization’s ROI standards is the most prudent action to take.

Page 242: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

6-12 Version 9.1

Although a significant amount of money, time and emotional energy may have been expended, it should not be allowed to continue if the project cannot succeed.

6.2.4 Code, Development, Construct or Build

The traditional name for the next stage, “coding,” arises from the early languages format that was very difficult for humans to read and understand. Newer approaches have created much easier interfaces that in turn, result in new terms such as “construction,” “building,” “development,” or “design implementation.” Which ever name is used, the object is the same: to turn the design into something that can be successfully executed by the hardware and software platform(s) of choice.

Although this process is being presented in a linear fashion, in many organizations, the transition from Design to Code is much less coherent. In an effort to shorten the delivery time span, work begins on building parts of the system before the design is complete. The risk in this situation is that the missing pieces of the design will have an unintended or unexpected impact on work that has already been completed, causing errors and rework.

Often the specifics of the of the construction process are determined by the product being used. Each product has a language and the BA should be familiar with the coding tool being used and the associated terminology. During the initial stages of construction the BA will typically not be heavily involved in the activity. Only when the product reaches the executable stage will the interaction increase.

6.2.4.1 Unit and System Tested Code

As each unit of the program or module is completed, the developer (or coder or builder) tests that component to see if it will work as programmed. The “chunks” of functionality being tested will become larger as more pieces are developed. The developer identifies errors and corrects them in an iterative process.

Unit Testing generally refers to the testing done by the developer at the small component level. Each component or program or module is tested when it is deemed to be complete by the producer. While the developer may have access to test cases developed earlier in the life cycle by the Business Analyst and the Requirements team, in some organizations they may choose not use them, developing their own cases instead. (Some of the issues surrounding this choice will be addressed in more detail in Skill Category 7, Acceptance Testing.) Developers tend to perform positive testing designed to answer the question “Does it work?” Some developers will perform limited boundary testing, but this is not consistently seen across organizations. While much unit testing is focused on removing syntax errors, it will sometimes highlight deeper problems. The failure to perform rigorous negative testing at this stage is one of the sources of conflict between developers and testing organizations.

System Testing refers to the testing done on complete processes and sub-processes. System Testing will often combine the work products of several developers to ensure the functionality

Page 243: CABA_CBOK_Ver_9-1

Software Development Processes, Project and Risk Management

Version 9.1 6-13

that performs correctly in the isolation of unit testing continues to perform correctly. It also ensures that complete processing streams are performing the necessary handoffs. System testing often requires a significant level of development resources to perform.

6.2.4.2 Revised Requirements and Test Cases

Errors and problems uncovered during Unit and System Testing may reveal the need for new or revised requirements. This will involve the Business Analyst in the process. New or revised requirements will in turn drive the need for new or revised test cases. The importance of keeping the test bed current cannot be overstressed.

6.2.4.3 Defect Data

Collection of defect data during this stage of the process is very important, but is often overlooked. Defects uncovered during the development process can shed light on problems with earlier parts of the process. Since these are often unreported, the problems they would highlight are often underestimated. This in turn leads to a lack of willingness to invest resources in “a small problem.”

6.2.5 Test

The objective of testing activities is to ensure that the developed product fulfills the defined requirements, providing the desired results in an acceptable fashion. Although a significant amount of testing has already been conducted, the “Test” phase is typically focused on testing performed by someone other than the developer. The need for “independent testing”, is a separate issue from the need for “acceptance testing”, although the two may happen concurrently or, in fact, be the same testing.

For the Business Analyst, Testing is a significant part of their role in the development of quality software. Understanding the work products of testing is a fundamental part of the job. Testing will be explored in more detail in Skill Category 7.

6.2.5.1 Executed Test Cases

Successfully executed test cases are the objective of the Testing process. The number of test cases created and executed should be the minimum number necessary to ensure the desired product quality and functionality. Once selected for execution, test cases may need to be re-run many times before they are successful. The Business Analyst is often executing tests as well as working with others to determine if the test results are acceptable or not. Tracking progress is both rewarding and frustrating. As will be discussed in Skill Category 7, an effective Acceptance Testing process will establish criteria for determining when the

Page 244: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

6-14 Version 9.1

cumulative successful execution of test cases is sufficient to state that the product is production ready.

6.2.5.2 Production Ready System

This is the product the entire process was designed to create. What constitutes “production ready” should be consistently organizationally defined to avoid putting defective products in the hands of customers. While it is often worthwhile (and necessary) to allow business partners to begin using a product with known defects, the costs in terms of lost productivity and frustration should be carefully weighed against the proposed benefits. “The bitterness of poor quality remains long after the sweetness of meeting the schedule has past.”2

6.2.5.3 Organizational Approvals

Once the development team determines that the product is ready for production, it is important to secure the organizational approvals for implementation. While for small projects this may be trivial, for larger projects it may be quite contentious, especially if it has been necessary to reduce scope or go into production with significant functionality missing or not performing as required.

6.2.5.4 Defect Data

From the unsuccessful test case execution will come information about defects: where they were created, their cause, their significance, where they were found and how much they cost to repair, are only a few of the vital pieces of information to be gathered in this process. The development and maintenance of a centralized defect database is typically the responsibility of someone either in the Testing area or Quality Assurance. The Business Analyst will contribute a great deal to the quality of both the current and future products through the rigorous collection and recording of defect data.

6.2.6 Implementation

The final stage of the project is the actual implementation of the product. The products of this stage provide the setting for the successful use of the product throughout its life-cycle. The objective of the products and activities of this stage is to put the product in the hands of the individual(s) who will actually use it, as smoothly and cleanly as possible by providing a minimum level of disruption to the other work of those individuals. Since the focus of these products is on the customer or business partner who will use them, the Business Analyst will

2. Perry, William E.; Quality Assurance Institute; QAI Journal

Page 245: CABA_CBOK_Ver_9-1

Software Development Processes, Project and Risk Management

Version 9.1 6-15

be heavily involved in their development. Skill Category 10 will explore this topic in greater detail.

6.2.6.1 Product Documentation / User Manual

Few products are so intuitively obvious that no instructions are necessary. Computer programs are notorious for their complexity. An effective guide to the use of the product is essential. It should contain the information needed to successfully navigate the system and produce the desired result(s). It should also help users of the system identify and recover from problems that can be reasonably anticipated.

Historically, this material was provided in a paper based product. As people are becoming more comfortable with on-line searching, there is a trend toward placing this material on an intranet or the internet, depending upon the intended audience. Regardless of this, creating and maintaining a paper based “master” copy of this material is good practice.

If the development of this material is left until the end of the product development and testing, the result is often a less than complete and less than useful product. Incremental development will help to avoid a pre-implementation time crisis.

6.2.6.2 Training

Not all application projects will require “training.” For large, new, complex functionality products, especially in an organizational setting, letting people ‘figure it out for themselves” is not cost effective. The size and scope of the training effort is dependant upon the product itself and can range from small informal one-on-one sessions to large scale multi-site training “road-shows.” The Business Analyst, with their unique understanding of how the product will actually be used by the intended audience is often involved in developing “train the trainer” materials. They may also provide some of the initial training.

6.2.6.3 Product Turnover

Moving a new product into the production environment is akin to installing a new engine in an automobile. It is one thing to have a new engine and an automobile sitting side by side, it is another to have the engine properly installed and wired into to the other vehicle components so that when the key is turned, the engine starts and continues to operate until turned off by the operator. This work is typically performed by skilled specialists in the organization’s operations staff. There are opportunities for unanticipated defects and delays. The Business Analyst, like the remainder of the development team, watches the turnover process with anticipation.

Page 246: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

6-16 Version 9.1

6.2.6.4 Help Desk

Since not all defects will be discovered in testing, because User Manuals are not perfect, and people are sick on the day the training class is held, there must be a resource to respond to questions and problems. That is the role of the Help Desk. For the Help Desk to be effective, they must have a process for diagnosing problems and know the answers to routine questions. The Business Analyst may be the one to provide some of the initial training for the Help Desk staff, and in some cases may work on the Help Desk during the first few critical days of implementation.

6.3 Traditional Approaches to Software Development A Business Analyst will be working with one or more development processes during their career. Increasingly, organizations are using blended development approaches in order to achieve specific objectives. A clear understanding of the various System Development Methodologies (SDMs), their strengths and weaknesses, will help the Business Analyst to provide the best project support regardless of the process selected.

The description of various methodologies is reproduced from:

A Survey of System Development Process Models3

CTG.MFA - 003Models for Action Project:Developing Practical Approaches to Electronic Records Managementand Preservation

6.3.1 Introduction

This section provides an overview of the more common system development Process Models used to guide the analysis, design, development, and maintenance of information systems. There are many different methods and techniques used to direct the life cycle of a software development projects and most real-world models are customized adaptations of the generic models. While each is designed for a specific purpose or reason, most have similar goals and share many common tasks. This unit will explore the similarities and differences among these

3. This material is based upon work supported in part by the National Historical Publications and Records Commission under Grant No. 96023 Center for Technology in Government University at Albany / SUNY ã 1998 Center for Technology in Government The Center grants permis-

sion to reprint this document provided that it is printed in its entirety.Numeric section headings have been inserted to aid in locating key materials and have no impact on the

content of each section

Page 247: CABA_CBOK_Ver_9-1

Software Development Processes, Project and Risk Management

Version 9.1 6-17

various models and will also discuss how different approaches are chosen and combined to address practical situations.

6.3.2 Typical Tasks in the Development Process Life Cycle

Professional system developers and the customers they serve share a common goal of building information systems that effectively support business process objectives. In order to ensure that cost-effective, quality systems are developed which address an organization’s business needs, developers employ some kind of system development Process Model to direct the project’s life cycle. Typical activities performed include the following:4

• System conceptualization

• System requirements and benefits analysis

• Project adoption and project scoping

• System design

• Specification of software requirements

• Architectural design

• Detailed design

• Unit development

• Software integration & testing

• System integration & testing

• Installation at site

• Site testing and acceptance

• Training and documentation

• Implementation

• Maintenance

4. Kal Toth, Intellitech Consulting Inc. and Simon Fraser University; list is partially created from lec-ture notes: Software Engineering Best Practices, 1997.

Page 248: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

6-18 Version 9.1

6.3.3 Process Model / Life-Cycle Variations

While nearly all system development efforts engage in some combination of the above tasks, they can be differentiated by the feedback and control methods employed during development and the timing of activities. Most system development Process Models in use today have evolved from three primary approaches: Ad-hoc Development, Waterfall Model, and the Iterative process.

6.3.4 Ad-hoc Development

Early systems development often took place in a rather chaotic and haphazard manner, relying entirely on the skills and experience of the individual staff members performing the work. Today, many organizations still practice Ad-hoc Development either entirely or for a certain subset of their development (e.g. small projects).

The Software Engineering Institute (SEI) at Carnegie Mellon University5 points out that with Ad-hoc Process Models, “process capability is unpredictable because the software process is constantly changed or modified as the work progresses. Schedules, budgets, functionality, and product quality are generally (inconsistent). Performance depends on the capabilities of individuals and varies with their innate skills, knowledge, and motivations. There are few stable software processes in evidence, and performance can be predicted only by individual rather than organizational capability.”6

Figure 6-1 Ad-hoc Development

“Even in undisciplined organizations, however, some individual software projects produce excellent results. When such projects succeed, it is generally through the heroic efforts of a

5. Information on the Software Engineering Institute can be found at http://www.sei.cmu.edu. 6. Mark C. Paulk, Charles V. Weber, Suzanne M. Garcia, Mary Beth Chrissis, and Marilyn W. Bush,

"Key Practices of the Capability Maturity Model, Version 1.1," Software Engineering Institute, Feb-ruary 1993, p 1.

Page 249: CABA_CBOK_Ver_9-1

Software Development Processes, Project and Risk Management

Version 9.1 6-19

dedicated team, rather than through repeating the proven methods of an organization with a mature software process. In the absence of an organization-wide software process, repeating results depends entirely on having the same individuals available for the next project. Success that rests solely on the availability of specific individuals provides no basis for long-term productivity and quality improvement throughout an organization.”7

6.3.5 The Waterfall Model

The Waterfall Model is the earliest method of structured system development. Although it has come under attack in recent years for being too rigid and unrealistic when it comes to quickly meeting customer’s needs, the Waterfall Model is still widely used. It is attributed with providing the theoretical basis for other Process Models because it most closely resembles a “generic” model for software development.

Figure 6-2 Waterfall Model

The Waterfall Model consists of the following steps:

• System Conceptualization - Refers to the consideration of all aspects of the targeted business function or process, with the goals of determining how each of those aspects relates with one another, and which aspects will be incorporated into the system.

• Systems Analysis - Refers to the gathering of system requirements, with the goal of determining how these requirements will be accommodated in the system. Extensive communication between the customer and the developer is essential.

7. Ibid.

Feedback and Error Correction

Page 250: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

6-20 Version 9.1

• System Design - Once the requirements have been collected and analyzed, it is necessary to identify in detail how the system will be constructed to perform necessary tasks. More specifically, the System Design phase is focused on the data requirements (what information will be processed in the system?), the software construction (how will the application be constructed?), and the interface construction (what will the system look like? What standards will be followed?).

• Coding - Also known as programming, this step involves the creation of the system software. Requirements and systems specifications from the System Design step are translated into machine readable computer code.

• Testing8 - As the software is created and added to the developing system, testing is performed to ensure that it is working correctly and efficiently. Testing is generally focused on two areas: internal efficiency and external effectiveness. The goal of external effectiveness testing is to verify that the software is functioning according to system design, and that it is performing all necessary functions or sub-functions. The goal of internal testing is to make sure that the computer code is efficient, standardized, and well documented. Testing can be a labor-intensive process, due to its iterative nature.

6.3.5.1 Problems/Challenges associated with the Waterfall Model

Although the Waterfall Model has been used extensively over the years in the production of many quality systems, it is not without its problems. Criticisms fall into the following categories:

• Real projects rarely follow the sequential flow that the model proposes.

• At the beginning of most projects there is often a great deal of uncertainty about requirements and goals, and it is therefore difficult for customers to identify these criteria on a detailed level. The model does not accommodate this natural uncertainty very well.

• Developing a system using the Waterfall Model can be a long, painstaking process that does not yield a working version of the system until late in the process.

6.3.6 Iterative Development

The problems with the Waterfall Model created a demand for a new method of developing systems which could provide faster results, require less up-front information, and offer greater flexibility. With Iterative Development, the project is divided into small parts. This allows the development team to demonstrate results earlier on in the process and obtain valuable

8. Mark C. Paulk, Bill Curtis, Mary Beth Chrissis, and Charles V. Weber, "Capability Maturity Model for Software, Version 1.1," Software Engineering Institute, February 1993, p 18.

Page 251: CABA_CBOK_Ver_9-1

Software Development Processes, Project and Risk Management

Version 9.1 6-21

feedback from system users. Often, each iteration is actually a mini-Waterfall process with the feedback from one phase providing vital information for the design of the next phase. In a variation of this model, the software products which are produced at the end of each step (or series of steps) can go into production immediately as incremental releases.

Figure 6-3 Iterative Development

6.3.6.1 Problems/Challenges associated with the Iterative Model9

While the Iterative Model addresses many of the problems associated with the Waterfall Model, itdoes present new challenges.

• The user community needs to be actively involved throughout the project. While this involvement is a positive for the project, it is demanding on the time of the staff and can cause project delays.

• Communication and coordination skills take center stage in project development.

• Informal requests for improvement after each phase may lead to confusion -- a controlled mechanism for handling substantive requests needs to be developed.

9. Kal Toth, Intellitech Consulting Inc. and Simon Fraser University, from lecture notes: Software Engineering Best Practices, 1997.

Page 252: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

6-22 Version 9.1

• The Iterative Model can lead to “scope creep,” since user feedback following each phase may lead to increased customer demands. As users see the system develop, they may realize the potential of other system capabilities which would enhance their work.

6.3.7 Variations on Iterative Development

A number of Process Models have evolved from the Iterative approach. All of these methods produce some demonstrable software product early on in the process in order to obtain valuable feedback from system users or other members of the project team. Several of these methods are described below.

6.3.7.1 Prototyping

The Prototyping Model was developed on the assumption that it is often difficult to know all of your requirements at the beginning of a project. Typically, users know many of the objectives that they wish to address with a system, but they do not know all the nuances of the data, nor do they know the details of the system features and capabilities. The Prototyping Model allows for these conditions, and offers a development approach that yields results without first requiring all information.

When using the Prototyping Model, the developer builds a simplified version of the proposed system and presents it to the customer for consideration as part of the development process. The customer in turn provides feedback to the developer, who goes back to refine the system requirements to incorporate the additional information. Often, the prototype code is thrown away and entirely new programs are developed once requirements are identified.

There are a few different approaches that may be followed when using the Prototyping Model:

• Creation of the major user interfaces without any substantive coding in the background in order to give the users a “feel” for what the system will look like

• Development of an abbreviated version of the system that performs a limited subset of functions; development of a paper system (depicting proposed screens, reports, relationships etc.)

• Use of an existing system or system components to demonstrate some functions that will be included in the developed system10

10. Linda Spence, University of Sutherland, “Software Engineering,” available at http://osiris.sunder-land.ac.uk/rif/linda_spence/HTML/contents.html

Page 253: CABA_CBOK_Ver_9-1

Software Development Processes, Project and Risk Management

Version 9.1 6-23

6.3.7.2 Prototyping steps

Prototyping is comprised of the following steps:

• Requirements Definition/Collection - Similar to the Conceptualization phase of the Waterfall Model, but not as comprehensive. The information collected is usually limited to a subset of the complete system requirements.

• Design - Once the initial layer of requirements information is collected, or new information is gathered, it is rapidly integrated into a new or existing design so that it may be folded into the prototype.

• Prototype Creation/Modification - The information from the design is rapidly rolled into a prototype. This may mean the creation/modification of paper information, new coding, or modifications to existing coding.

• Assessment - The prototype is presented to the customer for review. Comments and suggestions are collected from the customer.

• Prototype Refinement - Information collected from the customer is digested and the prototype is refined. The developer revises the prototype to make it more effective and efficient.

• System Implementation - In most cases, the system is rewritten once requirements are understood. Sometimes, the Iterative process eventually produces a working system that can be the corners stone for the fully functional system.

6.3.7.3 Problems/Challenges associated with the Prototyping Model

Criticisms of the Prototyping Model generally fall into the following categories:

• Prototyping can lead to false expectations. Prototyping often creates a situation where the customer mistakenly believes that the system is “finished” when in fact it is not. More specifically, when using the Prototyping Model, the pre-implementation versions of a system are really nothing more than one-dimensional structures. The necessary, behind-the-scenes work such as database normalization, documentation, testing, and reviews for efficiency have not been done. Thus the necessary underpinnings for the system are not in place.

• Prototyping can lead to poorly designed systems. Because the primary goal of Prototyping is rapid development, the design of the system can sometimes suffer because the system is built in a series of “layers” without a global consideration of the integration of all other components. While initial software development is often built to be a “throwaway,” attempting to retroactively produce a solid system design can sometimes be problematic.

Page 254: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

6-24 Version 9.1

6.3.7.4 Variation of the Prototyping Model

A popular variation of the Prototyping Model is called Rapid Application Development (RAD). RAD introduces strict time limits on each development phase and relies heavily on rapid application tools which allow for quick development.11

6.3.8 The Exploratory Model

In some situations it is very difficult, if not impossible, to identify any of the requirements for a system at the beginning of the project. Theoretical areas such as Artificial Intelligence are candidates for using the Exploratory Model, because much of the research in these areas is based on guess-work, estimation, and hypothesis. In these cases, an assumption is made as to how the system might work and then rapid iterations are used to quickly incorporate suggested changes and build a usable system. A distinguishing characteristic of the Exploratory Model is the absence of precise specifications. Validation is based on adequacy of the end result and not on its adherence to pre-conceived requirements.

6.3.8.1 The Exploratory Model

The Exploratory Model is extremely simple in its construction; it is composed of the following steps:

• Initial Specification Development - Using whatever information is immediately available, a brief System Specification is created to provide a rudimentary starting point.

• System Construction/Modification - A system is created and/or modified according to whatever information is available.

• System Test - The system is tested to see what it does, what can be learned from it, and how it may be improved.

• System Implementation - After many iterations of the previous two steps produce satisfactory results, the system is dubbed as “finished” and implemented.

6.3.8.2 Problems/Challenges associated with the Exploratory Model

There are numerous criticisms of the Exploratory Model:

• It is limited to use with very high-level languages that allow for rapid development, such as LISP.

11. Kal Toth, Intellitech Consulting Inc. and Simon Fraser University, from lecture notes: Software Engineering Best Practices, 1997.

Page 255: CABA_CBOK_Ver_9-1

Software Development Processes, Project and Risk Management

Version 9.1 6-25

• It is difficult to measure or predict its cost-effectiveness.

• As with the Prototyping Model, the use of the Exploratory Model often yields inefficient or crudely designed systems, since no forethought is given as to how to produce a streamlined system.

6.3.9 The Spiral Model

The Spiral Model was designed to include the best features from the Waterfall and Prototyping Models, and introduces a new component - risk-assessment. The term “spiral” is used to describe the process that is followed as the development of the system takes place. Similar to the Prototyping Model, an initial version of the system is developed, and then repetitively modified based on input received from customer evaluations. Unlike the Prototyping Model, however, the development of each version of the system is carefully designed using the steps involved in the12 Waterfall Model. With each iteration around the spiral (beginning at the center and working outward), progressively more complete versions of the system are built.13

Figure 6-4 Spiral Model14

12. Frank Kand, “A Contingency Based Approach to Requirements Elicitation and Systems Develop-ment,” London School of Economics, J. Systems Software 1998; 40: pp. 3-6.

13. Linda Spence, University of Sutherland, “Software Engineering,” available at http://osiris.sunder-land.ac.uk/rif/linda_spence/HTML/contents.html

Page 256: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

6-26 Version 9.1

Risk assessment is included as a step in the development process as a means of evaluating each version of the system to determine whether or not development should continue. If the customer decides that any identified risks are too great, the project may be halted. For example, if a substantial increase in cost or project completion time is identified during one phase of risk assessment, the customer or the developer may decide that it does not make sense to continue with the project, since the increased cost or lengthened time frame may make continuation of the project impractical or unfeasible.

6.3.9.1 The Spiral Model steps

The Spiral Model is made up of the following steps:

• Project Objectives - Similar to the system conception phase of the Waterfall Model. Objectives are determined, possible obstacles are identified and alternative approaches are weighed.

• Risk Assessment - Possible alternatives are examined by the developer, and associated risks/problems are identified. Resolutions of the risks are evaluated and weighed in the consideration of project continuation. Sometimes prototyping is used to clarify needs.

• Engineering & Production - Detailed requirements are determined and the software piece is developed.

• Planning and Management - The customer is given an opportunity to analyze the results of the version created in the Engineering step and to offer feedback to the developer.

6.3.9.2 Problems/Challenges associated with the Spiral Model

The risk assessment component of the Spiral Model provides both developers and customers with a measuring tool that earlier Process Models do not have. The measurement of risk is a feature that occurs every day in real-life situations, but (unfortunately) not as often in the system development industry. The practical nature of this tool helps to make the Spiral Model a more realistic Process Model than some of its predecessors.

6.3.10 The Reuse Model

The premise behind the Reuse Model is that systems should be built using existing components, as opposed to custom-building new components. The Reuse Model is clearly

14. Kal Toth, Intellitech Consulting Inc. and Simon Fraser University, from lecture notes: Software Engineering Best Practices, 1997

Page 257: CABA_CBOK_Ver_9-1

Software Development Processes, Project and Risk Management

Version 9.1 6-27

suited to Object-Oriented computing environments, which have become one of the premiere technologies in today’s system development industry.

Within the Reuse Model, libraries of software modules are maintained that can be copied for use in any system. These components are of two types: procedural modules and database modules.

When building a new system, the developer will “borrow” a copy of a module from the system library and then plug it into a function or procedure. If the needed module is not available, the developer will build it, and store a copy in the system library for future usage. If the modules are well engineered, the developer, with minimal changes, can implement them.

6.3.10.1 The Reuse Model steps

The Reuse Model consists of the following steps:

• Definition of Requirements - Initial system requirements are collected. These requirements are usually a subset of complete system requirements.

• Definition of Objects - The objects, which can support the necessary system components, are identified.

• Collection of Objects - The system libraries are scanned to determine whether or not the needed objects are available. Copies of the needed objects are downloaded from the system.

• Creation of Customized Objects - Objects that have been identified as needed, but that are not available in the library are created.

• Prototype Assembly - A prototype version of the system is created and/or modified using the necessary objects.

• Prototype Evaluation - The prototype is evaluated to determine if it adequately addresses customer needs and requirements.

• Requirements Refinement - Requirements are further refined as a more detailed version of the prototype is created.

• Objects Refinement - Objects are refined to reflect the changes in the requirements.

6.3.10.2 Problems/Challenges Associated with the Reuse Model

A general criticism of the Reuse Model is that it is limited for use in object-oriented development environments. Although this environment is rapidly growing in popularity, it is currently used in only a minority of system development applications.

Page 258: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

6-28 Version 9.1

6.3.11 Creating and Combining Models

In many cases, parts and procedures from various Process Models are integrated to support system development. This occurs because most models were designed to provide a framework for achieving success only under a certain set of circumstances. When the circumstances change beyond the limits of the model, the results from using it are no longer predictable. When this situation occurs it is sometimes necessary to alter the existing model to accommodate the change in circumstances, or adopt or combine different models to accommodate the new circumstances.

The selection of an appropriate Process Model hinges primarily on two factors: organizational environment and the nature of the application. Frank Land, from the London School of Economics, suggests that suitable approaches to system analysis, design, development, and implementation be based on the relationship between the information system and its organizational environment. Four categories of relationships are identified:

• The Unchanging Environment - Information requirements are unchanging for the lifetime of the system (e.g. those depending on scientific algorithms). Requirements can be stated unambiguously and comprehensively. A high degree of accuracy is essential. In this environment, formal methods (such as the Waterfall or Spiral Models) would provide the completeness and precision required by the system.

• The Turbulent Environment - The organization is undergoing constant change and system requirements are always changing. A system developed on the basis of the conventional Waterfall Model would be, in part; already obsolete by the time it is implemented. Many business systems fall into this category. Successful methods would include those, which incorporate rapid development, some throwaway code (such as in Prototyping), the maximum use of reusable code, and a highly modular design.

• The Uncertain Environment - The requirements of the system are unknown or uncertain. It is not possible to define requirements accurately ahead of time because the situation is new or the system being employed is highly innovative. Here, the development methods must emphasize learning. Experimental Process Models, which take advantage of prototyping and rapid development, are most appropriate.

• The Adaptive Environment - The environment may change in reaction to the system being developed, thus initiating a changed set of requirements. Teaching systems and expert systems fall into this category. For these systems, adaptation is key, and the methodology must allow for a straightforward introduction of new rules.

Page 259: CABA_CBOK_Ver_9-1

Software Development Processes, Project and Risk Management

Version 9.1 6-29

6.3.12 Process Models Summary

The evolution of system development Process Models has reflected the changing needs of computer customers. As customers demanded faster results, more involvement in the development process, and the inclusion of measures to determine risks and effectiveness, the methods for developing systems evolved. In addition, the software and hardware tools used in the industry changed (and continue to change) substantially. Faster networks and hardware supported the use of smarter and faster operating systems that paved the way for new languages and databases, and applications that were far more powerful than any predecessors. These and numerous other changes in the system development environment simultaneously spawned the development of more practical new Process Models and the demise of older models that were no longer useful.15

6.4 Agile Development MethodologiesAs the preceding discussion makes clear, there are strengths and weaknesses associated with all of the methodologies. In the mid 1990s a number of alternative development solutions appeared to address some of the perceived shortcomings, especially the lack of flexibility. These approaches, which include Scrum, Crystal Clear, Adapative Software Development, Feature Driven Development, Dynamic Systems Development Methodology (DSDM) and probably best know Extreme Programming (XP), collectively have come to be referred to as Agile Methodologies.

6.4.1 Basic Agile Concepts

As the various methodologies emerged, there were similarities and differences. In an effort to bring some cohesion and “critical mass” to the Agile movement, there were a number of conferences and workshops. In 2001, a number of the key figures16 in the Agile movement met in an effort to define a lighter, faster way of creating software which was less structural and more people focused. The result was a document which has become known as the Agile Manifesto; it articulates the key principles of the Agile technologies.

15. This is the end of the material based upon work supported in part by the National Historical Publi-cations and Records Commission under Grant No. 96023 Center for Technology in Government Uni-versity at Albany / SUNY ã 1998 Center for Technology in Government The Center grants permission to reprint this document provided that it is printed in its entirety.

16. Kent Beck, Mike Beedle, Arie van Bennekum, Alistair Cockburn, Ward Cunningham, Martin Fowler, James Grenning, Jim Highsmith, Andrew Hunt, Ron Jeffries, Jon Kern, Brian Marick, Rob-ert C. Martin, Steve Mellor, Ken Schwaber, Jeff Sutherland, Dave Thomas

Page 260: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

6-30 Version 9.1

Principles behind the Agile Manifesto

We follow these principles:

Our highest priority is to satisfy the customer through early and continuous delivery of valuable software.

Welcome changing requirements, even late in development. Agile processes harness change for the customer's competitive advantage.

Deliver working software frequently, from a couple of weeks to a couple of months, with a preference to the shorter time scale.

Business people and developers must work together daily throughout the project.

Build projects around motivated individuals. Give them the environment and support they need, and trust them to get the job done.

The most efficient and effective method of conveying information to and within a development team is face-to-face conversation.

Working software is the primary measure of progress.

Agile processes promote sustainable development. The sponsors, developers, and users should be able to maintain a constant pace indefinitely.

Continuous attention to technical excellence and good design enhances agility.

Simplicity--the art of maximizing the amount of work not done--is essential.

The best architectures, requirements, and designs emerge from self-organizing teams.

At regular intervals, the team reflects on how to become more effective, then tunes and adjusts its behavior accordingly17

17. 2001, Per the above authors this declaration may be freely copied in any form, but only in its entirety through this notice.

Page 261: CABA_CBOK_Ver_9-1

Software Development Processes, Project and Risk Management

Version 9.1 6-31

6.4.2 Agile Practices

Despite the reputation for being undisciplined, effective Agile approaches are anything but that. The structure and the flow is very different from traditional approaches, and the way products are derived is very different, even if the name is the same.

• Detailed Planning - is done for each iteration, this may be called a “timebox” or a “sprint” or merely a cycle or iteration. Requirements are gathered from the customer as “stories” of desired capabilities. In a bullpen style discussion they are analyzed in depth to understand what is needed and what will be required to provide that functionality. This process combines both a verification step for Requirements and a group high level design.

Design is kept as simple as possible while still achieving the desired functionality.Future potential use is not considered. While the concept of a product architecturemay exist, it does not drive the inclusion of functionality not requested by thecustomer or essential to meet an immediate customer need. Work to be done is carefully estimated using a standard unit of measure (oftencalled points). The amount of work, measured in units, that can be completedwithin a given amount of time (cycle, iteration, etc.) is tracked over time, and isknown as velocity. Once established, velocity is relatively fixed and it determineshow much functionality can be delivered per cycle.

• Test Driven Development - To ensure that Requirements are fully understood, the test cases are developed and run before the code is written. This process helps to identify things that will need to be changed for the new functionality to work properly.

• Refactor Relentlessly - Refactoring is the term for changing existing code to work properly with the new requirements. This part of the process is one of the most contentious for those accustomed to traditionally architected systems which strive to “pre-plan” all possible interfaces and accesses. Failure to effectively and aggressively refactor will result in a steady increase in the testing effort combined with a significant decline in productivity.

• Continuous Integration - As individual units of work are completed, they are added to the existing base and integration tested. New test cases developed for the specific functionality are installed and become a part of the future test base for all other developers. Updates which fail must be removed and repaired, along with the associated test cases so that the work of others will not be jeopardized. Typical development cycles lasting from one to three weeks will often see twice daily integration activity.

• Paired Programming - To obtain the benefits of reviews and inspections, as well as to facilitate the dispersion of the knowledge base, programmers work in pairs. The pairs may change partners often to promote the collective ownership of code.

Page 262: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

6-32 Version 9.1

This is also supported by the strict adherence to a set of uniform coding standards that makes code understandable and modifiable by any experienced team member.

• Onsite Customer - One of the major issues addressed by the Agile approach is the need for continuous involvement on the part of the intended product user, or a designated representation. This individual is a part of the team and co-located, making access a matter of walking across the room. The onsite requirement prevents delays and confusion resulting from the inability to access the customer or business partner at critical times in the development process. It also addresses the testing and requirements issues previously cited.

6.4.3 Effective Application of Agile Approaches

The Agile approach works well in projects where it is difficult to obtain solid requirements due to an unstable environment especially those in which the requirements will continue to emerge as the product is used. For organizations that see themselves as “nimble” or “responsive” or “market-driven” and that view the necessary refactoring as an acceptable price to pay for being quick to market, Agile works well.

Agile development teams are generally small; Kent Beck18 suggests 10 or fewer. Projects requiring more people should be broken down into teams of the recommended size. Beck’s suggestion has led people to think that Agile only works well for small projects, and it often excels in this area. Many organizations are experimenting with the use of Agile on larger projects; in fact, Beck’s original project was very large.

One of the key “efficiencies” achieved through the use of Agile methodologies is the elimination of much of the documentation created by the tradition processes. The intent is for programs to be self documenting with extensive use of commentary.

This lack of documentation is one of the drawbacks for many organizations considering Agile, especially those which impact the health and safety of others. Large, publicly traded corporations involved in international commerce are finding the lack of external documentation can cause problems when complying with various international laws that require explicit documentation of controls on financial systems.

Agile development is less attractive in organizations in that are highly structured with a “command and control” oriented. There is less incentive and less reward for making the organizational and cultural changes required for Agile when the environment exists for developing a stable requirements base.

18. Beck, Kent; Extreme Programming Explained

Page 263: CABA_CBOK_Ver_9-1

Software Development Processes, Project and Risk Management

Version 9.1 6-33

6.4.4 Integrating Agile with Traditional Methodologies

As the challenges and benefits of employing Agile methodologies become more widely understood and accepted, there is a move toward selective integration. Organizations are targeting projects with a positive Agile benefit profile and applying that methodology, even while maintaining a substantial portfolio of tradition waterfall or iterative projects.

This approach allows the organization to respond rapidly to a crisis or opportunity by quickly deploying an entry level product and then ramping up the functionality in a series of iterations. Once the initial result has been achieved, it is possible to either continue with the Agile development, or consider the production product as a “super-prototype” that can either be expanded or replaced.

6.5 Software Development Process Improvement Skill Category 3 examined the role of processes, how they are established, monitored, measured and targeted for improvement. When working with the development process, there are specific tools that will assist in effective process improvement techniques.

6.5.1 Post Implementation Reviews

A Post Implementation Review is a method for examining a specific project to determine what worked, what did not work and what should be changed for the future. In some organizations, this is referred to as the “Lessons Learned Review.” Post Implementation Reviews should be conducted within a few weeks of the production turnover, but leaving enough time to gauge how well the product is functioning in the hands of the intended user.

Although these reviews appear in virtually every methodology, they are often ignored or given lip service in the rush to move on to the next project. Failure to learn from the current project means that the problems encountered will continue to reoccur.

An effective Post Implementation Review will include key participants from each of the areas participating in the project:

• Business partners

• Business analysts

• Project managers

• Software quality assurance

• Designers

Page 264: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

6-34 Version 9.1

• Developers

• Testers

• Change management

• Training

• Help desk

• Operations

In smaller projects, one person may fill several roles; for larger projects there may be more than one person representing each interest area. For smaller recurrent projects, the time required to address the lessons learned will be brief, 15 to 20 minutes may be sufficient. For larger projects, the time commitment may be a full day.

The agenda for the review will vary somewhat depending upon the specifics of the project, but should include the following six categories taken from the Root Cause Analysis process:

1. Methods

2. Materials

3. Machines

4. Personnel

5. Environment

6. Data

A productive discussion in the personnel area would include the following kinds of issues:

• Was the staffing level adequate? Too high or too low?

• Was the skill and experience level appropriate for the tasks to be done?

• Were people available when needed?

• Were there motivation or interpersonal issues that impacted the project either positively or negatively?

Similar discussions focused on each of the other areas will identify critical advantages or problems that were reflected in the overall quality of the product and productivity of the team and would include items such as the following:

Methods

• Was a project plan developed? Was it reasonable? How closely did the project time line follow the plan?

• Was the proper project management available? Was it followed?

• Was the proper project methodology selected? Did it perform as expected?

Page 265: CABA_CBOK_Ver_9-1

Software Development Processes, Project and Risk Management

Version 9.1 6-35

• Were process improvements identified and implemented to one or more processes or sub-processed based upon the experiences of this project?

Machines

• Were the hardware items needed for requirements available in a timely fashion? what about design, coding, testing and acceptance testing? Were they present in the appropriate amounts?

• Did the hardware provided reflect of the needed configurations?

• Were any changes required to the production hardware installed and successfully tested prior to implementation?

Environment

• Were the appropriate software products and tools available and installed as needed?

• Were staff members properly trained in how to use the environment and tools provided?

• Was the environment stable and reliable? Was response time adequate for the work to be done

• Did the environments established for testing mirror those of the production environment? Were any gap significant in the final quality of the product?

Data

• Was there adequate data to conduct testing? Was test data properly scrubbed and protected?

• Were test results properly stored and backup?

• Were data integrity concerns identified and responded to promptly? Is the integrity of the final product appropriate?

• Were defects captured and analyzed? Was root cause analysis conducted on significant areas of high defect density? Are all defects recorded in the defect database?

Materials

• Were hardcopy examples, materials and supplies available when needed? In the appropriate amounts?

• Were mock-up of output documents ready when needed for testing? Were revisions required prior to implementation?

In addition to these standard areas of discussion, the project may have presented some unique issues that will need to be added to the agenda.

Page 266: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

6-36 Version 9.1

These discussions can cause people to become uncomfortable, particularly if there are politically or emotionally charged issues to be addressed. In this case it is essential to have an outside facilitator for the process to maintain a productive climate and keep discussions on focus. For particularly sensitive projects it may be worthwhile to have the facilitator use polling equipment that will allow individuals to respond honestly but anonymously to the issues.

The results of the Post Implementation Review should be used as data for the process improvement process. It is possible to learn important lessons from a single project in this context.

6.5.2 Defect Studies

Defects are the fingerprints of problems in the process. Capturing all possible information about the defects created by each project will allow the organization to focus on areas for improvement. Unlike the Post Implementation Review that focuses on a single project, Defect Studies examine patterns of problems created over multiple projects. Data collected by the BA during the project can be an invaluable contribution to Defect Studies. Defects and Defect Studies will be examined in more detail in Skill Category 9.

6.5.3 Surveys

One often overlooked tool for improving the process is the use of surveys. Unlike either Post Implementation Reviews or Defect Studies, a survey is usually targeted at a specific problem or opportunity. Often it is the follow up step after a problem or opportunity is identified and can be used to either validate that the information is correct or to learn more.

Developing and administering surveys requires careful time and attention to detail. The act of being surveyed arouses expectations in the minds of those participating. Customer satisfaction surveys are an excellent case in point. If customers tell an organization in a survey that it takes too long to use certain parts of a system, it creates and expectation that the organization will address the make that part of the system run faster. If surveying business partners on satisfaction with how long it takes to deliver functionality or the quality of the finished products, the organization must be prepared to hear negative responses and address them promptly.

Because of this phenomenon, organizations opting to conduct surveys should be careful to limit the scope to those areas in which they are prepared to take action. Taking action includes having identified staff resources necessary to investigate further and initiate the needed activity. Surveys of employees of the organization can be very informative and useful, but will likewise create expectation of change.

Constructing survey questions should only be done after the organization has clearly articulated the following:

Page 267: CABA_CBOK_Ver_9-1

Software Development Processes, Project and Risk Management

Version 9.1 6-37

• What is it we need to know?

• Who has that information?

• Will they provide it to us voluntarily?

• How many responses will we need?

• How long will it take to collect the information?

• How will we deliver the questions and receive the answers?

• How will the information be used?

• When must we know the answers?

• How will we respond?

• Can we respond in a timely fashion?

Writing the actual survey questions includes a determination of what kinds of data will be collected and what scale(s) will be used. The number of responses often has an impact on the format of responses; the larger the required number of responses, the more important it will be to use simple numeric data that can be collected on-line, machine read or entered quickly.

The Business Analyst may be involved in the surveying process, supporting the development of the survey instrument, participating in the analysis of the results, and developing an action plan to respond to the information gathered. If a process improvement was initiated as a result of survey responses, a follow up survey should be conducted to ensure that the problem has been addressed satisfactorily.

6.6 SummaryPlanning for and executing successful Information Technology projects requires a sound understanding of the various development approaches, their strengths and weaknesses. Although the Business Analyst will rarely be involved in the decision of what methodology to use, understanding how they work and what they have to offer will help achieve the maximum result for the project.

Likewise, the Business Analyst typically plays a supporting, rather than a leading role in the actual management of the development project. However, understanding what needs to be done, being able to effectively communicate on project management issues and step into the breach if needed, are all part of the essential skills for a Business Analyst.

A key element of any successful project is the anticipation and assessment of potential risk events and creating a plan for addressing those risks. The Business Analyst will be a key player in identifying business related risks and helping to assess various strategies for effectively managing them.

Page 268: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

6-38 Version 9.1

6.7 References • Bassett, Paul “Partnerships take out the garbage”, Software Magazine, Nov 1994

v14 n11 p96(2).

• S. Bell and A. T. Wood-Harper, “Rapid Information Systems Development - a Non-Specialists Guide to Analysis and Design in an Imperfect World”, McGraw-Hill, Maidenhead, UK, 1992.

• W Cotterman and J Senn, “Challenges and Opportunities for Research into Systems Development”, John Wiley, Chichester, 1992.

• A L Friedman (with D.S. Cornford), “Computer Systems Development: History, Organization and Implementation”, John Wiley, Chichester, 1989.

• Frank Kand, “A Contingency Based Approach to Requirements Elicitation and Systems Development,” London School of Economics, J. Systems Software 1998.

• Mark C. Paulk, Bill Curtis, Mary Beth Chrissis, and Charles V. Weber, "Capability Maturity Model for Software, Version 1.1", Software Engineering Institute, February 1993

• Mark C. Paulk, Charles V. Weber, Suzanne M. Garcia, Mary Beth Chrissis, and Marilyn W. Bush, "Key Practices of the Capability Maturity Model, Version 1.1", Software Engineering Institute, February 1993.

• Linda Spence, University of Sutherland, “Software Engineering,” available at http://osiris.sunderland.ac.uk/rif/linda_spence/HTML/contents.html

• Kal Toth, Intellitech Consulting Inc. and Simon Fraser University; lecture notes: Software Engineering Best Practices, 1997.

• G Walsham “Interpreting Information Systems in Organizations”, John Wiley, Chichester, 1993.

• Center for Technology in Government University at Albany / SUNY 1535 Western Avenue Albany, NY 12203 Phone: 518-442-3892 Fax: 518-442-3886 [email protected] www.ctg.albany.edu

Page 269: CABA_CBOK_Ver_9-1

Acceptance Testing

Version 9.1 7-1

Acceptance Testing Previous Skill Categories have discussed the development of requirements, processes, procedures and controls. Included in these discussions were the details of verification activities appropriate to each stage of development. In addition, earlier Skill Categories provided an understanding of Systems Development Methodologies (SDM), the associated processes and their role in the life of the project. In this Skill Category these tools will be combined with testing tools and techniques to complete the process of developing products and services needed by the organization.

The objective of software development is to develop the software products that meet the true needs of the organization, not just the system specifications. To accomplish this, the Business Analyst will work with the developers and subject matter experts early in a project to clearly define the criteria that would make the software acceptable in meeting the business needs. Throughout the project, once the acceptance criterion has been established, the Business Analyst should integrate those criteria into all aspects of development process.

For the Business Analysts whose primary role is in testing, the Quality Assurance Institute Certified Software Test Engineer’s Common Body of Knowledge1 is an additional and expanded resource for testing information. It addresses all of the phases of software testing in significantly greater detail.

Testing is conducted throughout the life of a software product. Each set of testing has some set of acceptance criteria. Individuals performing these tests often refer to their activities as Acceptance Testing. This usage is found in much of the testing literature.

Final product testing is often identified as a separate phase, and has historically been referred to as User Acceptance Testing. Skill Category 1 and subsequent Skill Categories have addressed the semantic difficulties produced by the term user. Throughout this Body of Knowledge, the term Business Partner has been used to designate those within the organization; these Business Partners may be co-developers and/or the intended recipients of the finished application. The term Customer is used to designate those outside the

1. QAI, CSTE, Common Body of Knowledge, 2006.

Skill Category

7

Page 270: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

7-2 Version 9.1

organization who are the intended recipients of the actual software product or the services provided by that product.

The two terms, Business Partner and Customer, together replace the less useful and more generic term user. In this Skill Category term Acceptance Testing, unless otherwise qualified, will refer to what has historically been termed User Acceptance Testing. A more productive term, Business Acceptance Testing will appear from time to time in this Skill Category.

7.1 Concepts of Testing Testing is a process for examining a unit or body of work against a defined criteria. In the case of Information Technology, that body of work may be requirements, design, code, test cases and so forth. The standards are established in many sources: the Systems Development Methodology, Standards and Procedures, GUI Standards, product branding, industry standards, and most especially the requirements for the project.

Unlike the tests and examinations administered by schools and universities, in the development process, the test is not the end; once defects are uncovered by testing, the opportunity to correct them is available. So, for the purposes of the Business Analyst, the definition of testing is the examination of a body of work against a known standard with the intent to discover and repair defects. Acceptance Testing is the final subset of testing. Acceptance testing has a more focused intent: it is designed to validate that the product delivered meets the customer’s needs, that is, it is acceptable to the customer.

The world of testing is divided into two realms. Those activities that can be performed without the use of executable code, called static testing; and those activities that require the use of some portion of the executable code, called dynamic testing. Reviews and inspections are classic examples of static testing, while systems and acceptance testing are typically focused exclusively on dynamic testing.

Throughout much of the literature of testing, the terms Validation and Verification are used. The usage is not consistent from source to source at a superficial level. Although a deep and penetrating analysis of the supporting documentation by each of the authoring groups can resolve some of the points of conflict, it is not a particularly useful exercise.

For the purposes of this Common Body of Knowledge and Skill Category, verification is used to refer to activities performed prior to the existence of executable code. Validation is used to refer to those activities which are performed with the executable code.

The “V” Model shown in Figure 7-1 represents the relationship of various life cycle activities and the verification and validation activities that are conducted. The base of the V is the point at which executable code is available. This marks the transition from the ability to only perform static testing to the ability to perform both static and dynamic testing. In many organizations testing does not begin until there is executable code. This deprives them of the opportunity to improve the quality of their products at a reduced cost through the early use of static testing approaches.

Page 271: CABA_CBOK_Ver_9-1

Acceptance Testing

Version 9.1 7-3

Verification activities begin immediately with the initiation of a potential project: during the feasibility study and the development of the Cost Benefit Analysis, information about the potential costs and benefits of the project are first estimated and later refined through financial verification activities. These are discussed in Skill Category 4, Business Knowledge.

Figure 7-1 The V Model of Verification and Validation

Likewise, the activities to verify the Requirements, such as Inspections and the early development of Use Cases are discussed in Skill Category 5, Requirements. The importance of these early life-cycle verification activities to the success of acceptance testing cannot be overstated. Failure to perform these functions in a timely and professional manner will cause significant project quality and schedule problems.

7.1.1 Dynamic Testing Activities

When the term “testing” is used in Information Technology, dynamic testing is what comes to mind. In many organizations there are no “testing’ activities prior to Unit test. The quality of the products produced in this scenario is generally poor and the relative costs are high. The Business Analyst must understand the role and potential contributions of each of the various testing activities in order to maximize the contribution of each to a quality product.

Page 272: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

7-4 Version 9.1

7.1.1.1 Unit Testing

Unit testing is performed by the developer upon completion of some amount (or unit) of work. Unit testing begins with the smallest bits of code as they are developed. The developer, by habit, training and inclination, tests to ensure that the code works as it was written to work. This positive or confirmation testing is one of the reasons many defects are undetected during unit testing.

The developer tests to verify that “when I input the order quantity, the system properly multiplies it by the unit price and displays the total price.” As the code is developed, the size of the unit being tested by the developer grows, but it is still being testing in isolation from any other part of the system. It is good practice for developers to test each other’s code; this is addressed through paired programming in Agile methodologies.

As the functionality of the unit grows, the testing will become more complex, simulating the input from predecessor units and creating output for successor units. Good developers will make use of a wider range of applicable techniques discussed in Section 7.1.2. Providing the developer with the test cases to be used by the acceptance test team can significantly improve the quality of the process, causing many more errors to be identified at this time.

The Business Analyst can provide a quality contribution by reviewing the proposed Acceptance Test material with the developer during this stage. Many times the developer will indicate where there are complex areas of the code which helps the Business Analyst better understand the nature and scope of the acceptance testing required. It also leverages the time and effort spent to develop these test cases, by using them, or pieces of them, repeatedly.

While code is being developed, good developers take advantage of low overhead, high impact verification techniques such as peer reviews of code and test cases. During unit testing, the developer will uncover and repair any number of defects, some caused by ambiguous or incorrect requirements, some caused by poor design and some created by the translation of the design into code. Very few organizations are able to capture defect information at this level, as helpful as it would be. Self-reporting of defects would provide invaluable information for process improvement.

In traditional development life cycles, the size of the individual units can be quite large, requiring weeks or even months to complete. Until the functionality is complete, it remains in isolation. Iterative methods will generally have smaller, but still significant size. Agile methods use a much shorter life cycle and continuous integration, so an individual unit may only exist for a matter of a few hours to a few days.

7.1.1.2 Integration Testing

Components developed in isolation may seem to be working perfectly, but when added to other units of functionality, defects appear. This is the purpose of integration testing, to find those defects that occur in the transitions between one unit and another. Two, three or more units of functionality may be combined to determine if they still operate correctly internally, and if their joint functionality is achieved. These are still fragments of the system.

Page 273: CABA_CBOK_Ver_9-1

Acceptance Testing

Version 9.1 7-5

Typical examples of defects encountered in integration testing include data not being passed at all or not passed correctly between one module and another or error messages that do not transfer or are inconsistent. In addition, integration testing may reveal portions of the processing that are not as efficient as the design predicted. These performance issues must be addressed promptly to avoid negative consequence for both the schedule and customer satisfaction.

During integration testing, the emphasis is still on validation of the functionality. Only limited assessments can be made of system performance while it is in a fragmentary state. If the Business Analyst and the developer work together on creating acceptance test cases early in the project, their reuse will again speed up and improve the quality of the product. The Business Analyst or the test team may also be called upon to develop additional test cases as issues are identified during integration testing. If developers are not provided with the needed resources and incentive, testing will again focus on verifying that the product performs as expected.

In each case it is necessary to identify the source of the error and to correct it. If defect logging was not initiated at the unit level, it is essential that it begin here. For small modifications, developer testing may essentially end with integration, as the unit that was developed is integrated into the working system and tested.

7.1.1.3 System Testing

System testing is the rigorous examination of all of the integrated components of a new product to ensure that they meet the full agreed upon set of requirements for that specific delivery. System testing is conducted in a replicated context of the production environment to allow the product to interact with other components. System testing is generally conducted by a combination of a third party test team and the development team.

If the appropriate level of unit and integration testing has been conducted, the number of functional defects identified should mainly be those resulting from the interfaces with other products and systems. The majority of simple, linear functional defects should have been discovered and addressed in earlier stages. What will be identified during systems testing in addition to interface defects, are quality defects, and more complex defects caused by interaction. Additionally, system testing will identify defects in code which were previously blocked from execution due to missing components. System testing is often divided into two stages, Alpha and Beta.

Alpha testing is conducted in the early stages and is often very rough, with many defects encountered. Frequently during alpha testing, the system will not run to conclusion, but will result in an abnormal termination. Alpha testing should be conducted by the development team to ensure the quality of the product prior to turn over to the test team. As these early defects are removed and the system becomes more stable, testing moves into the Beta testing stage.

During Beta testing the system is still known to contain a number of defects, and so is not ‘production ready’. The intent of Beta testing is to drive out defects occurring in the most commonly used paths through the product and is generally conducted by the third party test

Page 274: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

7-6 Version 9.1

team, not developers. This test team may be comprised of Information Technology staff as well as individuals from the business unit. The Business Analyst, whether a part of IT or the business, is typically included in this test team.

As was the case in integration testing, the source of the error and the design of the solution will impact the timeframe for correction and return to testing. Each defect should be tracked carefully. Analysis should be performed on all defects that have been exposed to prior quality control activities to determine how they remained undetected.

During systems testing for larger products, the Business Analyst may be increasingly involved in the interpretation of the test results and in the development of additional test cases to address solutions to previously identified defects.

7.1.1.4 Acceptance Testing

At a theoretical level, acceptance testing is the final set of activities immediately prior to implementation of the product; the software should be ‘production ready.” The definition of production may differ depending upon the product. For example, if a vendor is developing custom code for inclusion in a client’s existing product, “production ready” may mean that it is ready for the client to test. It is conducted by the “user” to ensure that the product meets the requirements. In the previous example, the client would perform the “acceptance test” of the vendor code. Acceptance testing was intended to become a validation of the existence of the functionality, or what is sometimes termed a “Victory Lap.” In all too many organizations, acceptance testing has become an extended version of the beta portion of the system test.

If early stages of the testing effort have not been as extensive and as rigorous as they should be, the result is that the number of defects remaining is very high. This in turn leads to additional problems in completing an effective acceptance testing process, resulting in poor quality systems, late deliveries and budget overruns. The keys to preventing these issues will be addressed later in this Skill Category.

7.1.2 Dynamic Testing Types

Throughout the testing process there are many approaches that can be used to determine what to test, when to test, how much to test and so on. Understanding each of these approaches, what they contribute to the testing process and to the quality of the final product is essential for the construction of a good acceptance test plan.

Some of the approaches are simple and almost intuitively obvious; others are more complex, requiring significant time and effort to apply effectively. Each approach offers specific advantages. The Business Analyst, working with the project manager and a testing manager if there is one, will determine which tests will be appropriate for the specific product under consideration.

Some of these approaches will be used consistently, beginning with Unit Testing and continuing all the way through Acceptance Testing; others may have only limited application.

Page 275: CABA_CBOK_Ver_9-1

Acceptance Testing

Version 9.1 7-7

Although this Skill Category focuses on the use of these testing types in the Acceptance testing process, their use in other areas will occasionally be noted.

7.1.2.1 White Box

White box testing could be referred to as clear box testing; it is the exact opposite of black box testing in that what is happening inside the box is the entire focus of activity. The focus of white box testing is to determine if the product has been built right, for this reason it is often referred to as structural testing. Unit and integration testing are examples of white box testing.

White box testing relies upon a sound knowledge of how the product was built and tests the paths and decision points of the product in ways that black box testing does not. In white box testing it is not enough to know that a given set of inputs does produce a specific output; it is important to know if it will always perform in the same manner. For this reason white box testing often accesses logic and paths that are rarely encountered in black box testing.

White box testing is generally performed by developers and should be completed by the time acceptance testing begins. Because there will be some rework and because over time testers and business analysts come to understand the structure of the product they are testing, some white box testing may be performed during acceptance testing. If a significant amount of acceptance testing resources are being spent on white box testing, it is generally an indication of poor development practices.

7.1.2.2 Black Box

The concept of black box testing originated in the world of hardware, with the idea that most people didn’t really care what was going on inside, they just wanted product B to successfully connect product A to product C. If the product functioned successfully, the users didn’t care what was going on inside the black box. This emphasis on functionality is central to the acceptance testing of a software product and black box is the most consistently used form of acceptance testing.

Black box testing requires a sound understanding of what the product is intended to do. Test cases will track input(s) to output(s) ensuring that the proper responses are received. Use cases developed throughout the development of the product are focused on functionality and are black box testing. Black Box Testing is sometimes difficult for developers to use successfully, because they are fully aware of the internal structure of the product and that knowledge may change the way they design tests.

One advantage of black box testing is that testers do not need to be “IT knowledgeable,” they must only understand the business side and be willing to execute the test process carefully according to the plan. In addition, black box testing focuses on the most fundamental parts of the product; has the right product been built.

Page 276: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

7-8 Version 9.1

7.1.2.3 Equivalence Testing

In even a very small product, the number of black box and white box test cases that can be developed for execution can become overwhelming. Over time a number of approaches have been developed to help reduce the sheer volume of test cases, while not compromising the integrity of the testing process. Equivalence testing is one of those approaches.

In a typical product, there are multiple situations in which some groups of responses are valid and other groups are not. These groups are referred to as equivalency classes and the set of data should be treated the same by the module under test and should produce the same answer. Test cases should be designed so that the inputs lie within these equivalency classes.2

• Example 1. A specific field might call for a value between 1 and 9. The numbers 1 though 9 are all valid and are all members of the same group or class of responses: the valid group. Numbers less than 1 or greater than 9 belong to a second group: invalid responses.

In creating test cases it is not necessary to test all the valid or positive responses,only a representative few. Likewise it is not necessary to test all of the invalidresponses, only a representative few. However, that representation must includeboth types of invalid responses: error and negative.There may be multiple groups of invalid and valid responses for any particularentry, not merely two. Each class of responses must be represented in the testcases.

• Example 2. In the Example 1, the valid classes could be expanded based upon some criteria: Sales, use 10 through 19; Marketing use 30 though 35; Finance use 50 though 58; and Human Resources use 70 through 79.

Test cases would need to be executed to verify the behavior of each valid andinvalid group.

7.1.2.4 Boundary Value Analysis

Equivalency testing helps to reduce the number of test cases by assigning responses to classes. Those classes can be quite large and have many members. Boundary value analysis helps to target the remaining test cases to those areas most likely to exhibit problems.

Boundary value analysis is based on the concept that errors tend to congregate at boundaries between valid and invalid input.3 The phenomenon of defect clustering is well established and boundary value analysis uses that to leverage the effectiveness of the executed test cases by focusing on higher risk areas. These limits need not just be between valid and invalid data; they can also be at block boundaries such as 255, 256, 1024,1025.

2. Williams, Laura, Op. cit; reference Boris Beizer; Balck Box Testing; John Wiley &Sons; New York; (1995).

3. Beizer, Boris, Software Testing Techniques; International Thompson Computer Press; Boston; 1990.

Page 277: CABA_CBOK_Ver_9-1

Acceptance Testing

Version 9.1 7-9

Focusing testing efforts on the edges or boundaries of each class is likely to reveal defects. By using a focused approach testing resources can be used most efficiently. Because of their location on the outer limits of the acceptable range, some organizations also refer to this approach as limit testing.

• Example 3. In Example 2 there are multiple boundaries between valid and invalid data. The lowest number of each range is the lower boundary value (10,30,50,70); the next lower number in each case is an invalid entry (9,29,49,69). Likewise the highest number in each case is the upper boundary value (19,35,58,79), with the next higher number in each case being invalid (20,36,59,80).

Developing test cases that focus on these numbers will satisfy the requirements oflooking for defects where they are most likely to occur (on the margins) whilecontrolling the total number of black box test cases to be executed. If the lower andupper boundary ranges are maintained for two of the four subgroups, it may not benecessary to test each control limit; however, if defects are identified, furthertesting will be required.

7.1.2.5 Smoke Testing

At the early stages of each testing effort, and especially the acceptance testing effort, it is essential to perform a quick assessment regarding the overall quality and readiness of the product. To do this a series of test cases that exercise the basic functionality of the product are executed. It establishes that the major functionality is present, the product is stable and that it “works” under normal conditions.This initial series of test cases are often referred to as a smoke test.

The reason behind this assessment is to determine if the product is indeed ready to be tested in a more rigorous fashion. If basic functionality is missing or not being executed properly (as documented in the requirements), there is little point in proceeding to full acceptance testing; the product should be returned to the developers or systems testers for further work.

To make this process function effectively, the methodology should contain stage and phase exit and entry criteria. For each project that criteria should have been fully specified during the project planning process. Smoke tests yielding results that do not meet entry criteria for acceptance testing are rejected.

A stripped down version of the regression test suite developed and used during integration and systems testing can be used for the initial smoke test. Using a risk based analysis of the major functionality; it should focus on the key project deliverables. This should be a pro forma activity; no defects should be uncovered by these test cases at this stage of the project. It should not be necessary to allow any defect correction time in the plan for the smoke test. If defects are uncovered at this juncture, it points to major development issues in the organization

Use of smoke tests is not limited to acceptance testing, it is a valuable and time saving approach to each transition during the testing of a product or process. Smoke tests need not

Page 278: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

7-10 Version 9.1

focus exclusively on functionality (or black box testing). For some products testing of performance and quality factors will be an appropriate portion of the smoke test process.

Good practice would indicate that before certifying, promoting or announcing that a product is ready to move to the next level, the entry level smoke test for the next stage should be executed successfully. Failure to do so is an indication of lack of understanding of the intent of the development and testing processes.

7.1.2.6 Regression Testing

Each component added to a system or product has the capability of causing other components to fail. If appropriate steps are not taken these failures may remain undetected until late in the test life cycle, or even into the production environment.

Regression testing is the name given to the activities designed to ensure that changes do not have a negative impact; things that worked before the new component was added, still work. Like smoke testing, regression testing has a primary, but not exclusive focus on functionality. Unlike a smoke test, the regression test focuses selectively on the areas that have been changed to ensure that nothing has been broken.

In the systems and acceptance testing environments, effective regression testing is essential. In large products it is common to deliver functionality for testing in staged increments. The first step when reviewing a new version of the system is to run the regression test suite to ensure that everything that worked correctly before, still works.

During the initial stages of system testing, the regression test suite (those cases used consistently to ensure adherence to specifications already implemented) will be fairly small. As new functionality is successfully added to the product and validated through testing, the more cases will be added.

Controlling the growth of the regression test suite, so that it does not consume a disproportionate amount of resources is an ongoing challenge for large projects, especially those that are updated with sizable releases of new and revised code. One approach to handling this workload is to create “sub-suites” that address only targeted areas of functionality for use with defect corrections. Full regression testing, using all of the cases, is then conducted at planned intervals (weekly, biweekly, etc.).

Because regression tests focus on functionality and will be executed repeatedly, they are excellent candidates for automation. Passing the regression test does not mean that the new functionality is working properly, or that it is implemented correctly, it only means that it does not break anything else. Regression testing is not a substitute for other testing activities. Likewise, careful testing of the new component, in and of itself, does not mean that the change has not unintended consequences.

7.1.2.7 Stress Testing

Until the functionality of the product has been validated to a significant extent, it is not possible to effectively determine how well it will function in the production environment.

Page 279: CABA_CBOK_Ver_9-1

Acceptance Testing

Version 9.1 7-11

Each change carries with it the potential to positively or negatively impact performance. As system testing progresses, it is necessary to confirm that the performance level requested in requirements, created in the design, and seen in unit and integration testing will exist in the hands of the ultimate product user. This must be validated if the product is in fact “production ready”.

Products are designed to operate within specified tolerances. These tolerances should be clearly defined as a part of the requirements definition process. In the absence of any specification, the designer will assume that performance is at the discretion of the designer (a very dangerous assumption). For small projects and products, stress testing may not be an issue, for larger projects and products, it is consistently an issue.

Stress testing seeks to push systems activity past the design limitations to determine how and when it will fail. If the system is designed to allow 1000 concurrent transactions and still provide 1 second or less screen to screen response time, a stress test may first attempt the designated level (1000 concurrent transactions) and if that is successful, increment that number until either transactions fail the screen to screen response time test or a designated volume is achieved.

Because of the need for very high volumes of activity, many stress tests are conducted using transaction simulators, software that is specifically designed for this purpose. These products are installed and maintained by the organizations operations and network staff. The tests themselves may be conducted without any human activity, often overnight. Alternatively, some products allow for people to participate concurrently with the tool; in these cases the business analyst may perform specific transactions to observe the results first hand.

Very rarely stress tests will be conducted using only human input. These tests require significant time and effort to plan and execute. They typically are conducted during non-business hours (nights, weekends, and holidays) and require business people access the application and perform specific tasks during the test time. This is a very expensive approach to stress testing. Often the reasons for this type of stress testing are more politically than technically based.

Large scale stress tests are typically conducted late in the acceptance testing process, after the product has become quite stable and is reliably producing the intended functional results. Scheduling stress tests involving the business community before this occurs can result in irreparable damage to the perception of the quality of the product and can jeopardize the success of the project.

7.1.2.8 Conditional and Cycle Testing

During unit testing the ability of the product to perform specific tasks and provide the correct results is validated. For many projects, there are multiple activities that can occur during the life of a product and individual tasks are combined in varying sequences to produce a specific result.

In the simplest case, a product might require that a customer account must exist before an order can be placed. This condition must be met before the order taking process can proceed. During unit testing various components of the functions needed to establish a customer

Page 280: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

7-12 Version 9.1

accounts and take an order will be tested individually. During integration testing the full functionality of each process will be tested; in both systems and acceptance testing, the combination will be tested. Test case documentation must clearly specify both the pre-condition (a valid customer account) and the post condition (a valid order).

Many applications operate on activity cycles that must be replicated during the testing process. Often the activity cycles are either date or time driven. To effectively test the application it is necessary to simulate the time or date flow to ensure the proper result, this is cycle testing.

Billing systems offer an excellent example of the issues addressed by the cycle testing process:

Day 1 - Order is placed. A batch process collects all order information overnight andforwards it to the billing system to hold pending notification of shipment.

Day 2 - Shipment confirmation passed to billing system in a batch process overnight.Shipments and pending bills are matched; bills are formatted and printed.

Day 3 - Bills are mailed.

Days 4 through 30 - Payments are posted to customer file as received. Payment in fullcloses the invoice, partial payments are recorded.

Day 31 - Follow up invoice is generated for outstanding full or partial payment. File isflagged as late.

Days 32 through 60 - Payments are posted to customer file as received. Payment infull closes the invoice, partial payments are recorded. If a previous partial paymentwas received and an additional partial payment is received, it will constitute paymentin full if the difference is less than $5.00.

Day 61 - Files flagged as late are sorted into groups based on account standing andamount: Large accounts (annual volume greater than $100K) with less than $1000 dueare sent a second notice; new accounts with payments of more than $500 due are sentto a collection agency and a letter to that effect goes to customer; accounts with morethan $100 due are flagged to require payment before another order can be accepted.All other accounts are listed on a report that is distributed to accounting for specificfollow-up and resolution.

To effectively test how well the product performs the various actions specified on Day 61, all of the previous cyclical activity must have occurred. Cycle testing can be very time consuming for extended application cycles, even when months are processed as days, which can be done using some of the tools on the market. Failing to allow adequate analysis time for review of test results between cycles can result in defects escaping into later stages. It is also important to remember that not all defects will be uncovered and resolved in the first cycle loop. The schedule should include enough time to run the cycle at least 3 times during acceptance testing.

Page 281: CABA_CBOK_Ver_9-1

Acceptance Testing

Version 9.1 7-13

7.1.2.9 Parallel Testing

When the new product or system is designed to replace an existing one that performs essentially the same function, it is important to verify that given the same inputs, they will produce the same results. A parallel test is designed to fulfill that need.

Parallel tests are typically conducted near the conclusion of the acceptance testing cycle and are black box style (functional orientation) tests. Construction of an effective parallel test requires that the production environment be replicated in enough detail to allow for interfaces among systems, updating of mock data stores, execution of batch processes and production of journals, control totals and printed materials such as forms and reports.

One of the issues with a parallel test is the need to use production data to ensure the validity of the processing. In most countries use of personal information is closely controlled to prevent the unauthorized access to, and use of, that information. By its very nature, a parallel test will strain that protective wall separating development from production. Construction of an appropriate parallel test will include a plan for who will be able to review the results of the test and how the data stores and printed materials will be managed to protect the confidentiality of customers or employees whose records appear.

Financial applications in particular are subject to extended parallel tests to ensure that the organizations records will not be compromised in any way by the installation and implementation of the new product. It is common to run for several weeks to a full quarter in parallel before the decision is made to move to production. This can place a significant burden on the operations staff and they must be a full participant in the parallel planning process. It can also dictate the possible implementation dates for the project.

7.1.2.10 Risk-based Testing

Few projects have ever had the resources needed to fully test all of the application until every defect is uncovered and resolved. At some point, decisions must be made about what to test and how long to test. Risk-based testing is a fact-based technique to making those decisions. Risk-based testing can be applied at any stage in the testing process after unit testing has been successfully completed.

In Skill Category 6. the fundamentals of project risk management were presented. Using the same approach to focus testing resources will help to make the best use of the resources available. When creating a risk model to determine the testing emphasis, the following factors should be considered:4

• Customer or user impact

• Prior history

• New and modified parts

4. Dustin, Elfriede, Effective Software Test Management; 2005

Page 282: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

7-14 Version 9.1

• Complexity

• Frequency of Use

• Exceptions

• Internal Operations

• Business Continuity

• Pareto’s Law (80/20 Rule)

By weighting each factor and assessing the test cases against those factors, risk-based testing will separate those cases that will have the most positive impact on the final product. A matrix of this sort will help the Business Analyst, and the test team, make the most of the available testing resources.

7.1.2.11 Security Testing

The growing ranks of hackers, who trash systems and applications for pleasure and notoriety, has lead to a significant increase in the security envelop surrounding products. Most of the testing effort has focused on how well the application performs within that envelop, but that is not enough. It is essential to know that once exposed to the production environment, it will stand up to repeated assaults by hackers, as well as the probing of the merely curious.

The basic security envelope is part of the initial requirements, and as such the components and functions have been tested incrementally throughout the development of the product. This includes verification that the “rights and privileges” of authorized users function appropriately to allow or deny access in specific situations. This is not the same as a concerted attack on the product, conducted by those skilled in evading or fooling security checkpoints. A full security test will include both internal and external attempts to compromise the product.

The Business Analyst may not possess the skills needed to fully test the security envelop; it may be necessary to bring in someone with special skills from another area of the organization or a consultant. Within the organization the skills may be found in the Network Support group, in Data Security or occasionally in the Internal Audit staff. If they do not have the skills, they can often recommend where to look for them.

Not every implementation will require a full security test, however any application that requires even a small change to the security envelop should include some security testing. The more significant the change the more robust the testing must be. As the representative of the business community in the development effort, it is the responsibility of the Business Analyst to ensure that security tests are included in the project plan once the risks are identified, and conducted when appropriate.

Page 283: CABA_CBOK_Ver_9-1

Acceptance Testing

Version 9.1 7-15

7.1.2.12 Backup and Recovery Testing

Organizations continue to capture and retain increasing amounts of data about their products, their customers, their business and their environment. The organization relies upon the assumption that if at any point the production data files are compromised or damaged, they can be restored from backups. Like any other assumption, if untested, this assumption may result in serious problems. Throughout the development life cycle, code and test cases have been stored and backed up using the development environment. When that code is preparing to move from development and test to the production environment, it is important to verify the result are as needed.

For large new projects or those that add significantly to the data being stored, a test of the backup process and data restoration should be performed shortly before implementation, near the end of acceptance testing. These tests will be performed by the Operations and Network staff, not the test team or the business analyst. Once successfully in production, testing of backup and recovery procedures will become a routine part of the production environment.

As with the Security tests, the responsibility of the Business Analyst is to ensure that these tests are included in the project plan and conducted in a timely fashion.

7.1.2.13 Failure and Ad Hoc Testing

The emphasis of many of the testing approaches discussed is on verifying that the functionality exists and works correctly. To increase test coverage, this testing focuses on areas that are generally overlooked or particularly error prone (boundaries) and uses techniques such as equivalency partitioning and risk-based testing to reduce the total number of test cases to be written.

Failure testing is often experience driven; it is designed specifically to target areas the Business Analyst or tester suspects might not function properly. Failure testing is often performed by the most experienced members of the acceptance test team because they have developed an understanding of the kinds of things that might cause problems for the product or system. Professional testers and experienced BAs may need to create specific test cases for this purpose toward the end of acceptance testing if significant defects are encountered

In the final stages of acceptance testing, many organizations ask members of the business community or the potential customers to “try it out”, “do what you normally would do”.5 This ad hoc approach may reveal unexpected data entries or unanticipated screen and functionality sequences.

The hope is that no defects will be uncovered during these sessions and that those involved in the testing effort will form a favorable opinion of the system. The problem with ad hoc testing is that recreation of the problem is often a challenge as the documentation of what was done

5. Some experienced testers will allocate as much as 20-25% of the allocated test time for this tech-nique and are careful to include both very experienced testers and some with little or no product knowledge or test skills.

Page 284: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

7-16 Version 9.1

may be non-existent. As this is true of problems occurring post implementation, this is a good opportunity to involve the help desk staff.

7.1.2.14 Other Test Types

This is not an exhaustive list of every possible type of test that any organization could possibly use for acceptance testing. Some of the others that may be used include:

• Usability Testing - conducted to evaluate the extent to which a user can learn to operate, prepare inputs for, and interpret outputs of a system or component.6

• Data Validation Testing - conducted to evaluate that the data components satisfy the specified requirements

• Production Verification Test - conducted using selected processing streams to verify that all necessary parts of an application were included in the move to production. Sometimes referred to as a staging test.

7.2 Roles and Responsibilities In the previous discussion of testing approaches and strategies it is evident that there are many potential participants in the acceptance testing process. A clear understanding of the roles and responsibilities of each is essential if the acceptance testing process is to run smoothly and meet its objectives. The listings below are focused on those activities with a direct impact on the acceptance testing activities. Each of these lists could be expanded significantly if a consideration of the full scope of their functions was included.

7.2.1 Project Manager

Not all projects have an official “project manager”, but all teams have someone fulfilling that role. The job of the project manager is to:

• Create, maintain and control the overall project plan

• Coordinate and manage the integration of sub-plans, such as the Test Plan, ensuring that sub-plans include time and resources for the appropriate levels of verification and validation activities

• Maintain control of scope, which includes the growth of requirements and any resulting growth of the test effort

6. IEEE; 1990.

Page 285: CABA_CBOK_Ver_9-1

Acceptance Testing

Version 9.1 7-17

• Manage budget, staff resources and progress in accordance with the project plan

• Ensure communications regarding status of, and changes to, the project plan

• Manage the resolution of issues resulting failure to meet schedule, budget, functionality or quality criteria throughout the life of the project

• Ensure that all project metrics, including defect data are collected and maintained

• Ensure the successful completion of end of project activities, including the decision to implement, implementation and post implementation reviews and the archive of project artifacts

7.2.2 Test Manager and the Test Team

The person responsible for the systems and acceptance testing effort on the project is the Test Manager; in some organizations they are referred to as the “Test Lead”. The Test Manager is usually a member of the independent team, which is typically a part of the Information Technology department. In some organizations there is a counter-part organization located in the business that is responsible for acceptance testing. The exact relationship between the two testing areas varies widely from organization to organization. The responsibilities of the Test Manager are to:

• Create and maintain the overall test plan to reflect changes to the overall project plan

• Determine what testing tools, techniques and strategies will be needed to effectively test the project and ensure the staff know how to perform that testing

• Coordinate the integration of the sub-plan for acceptance testing into the overall test plan

• Assist the project manager in the integration of the test plan into the overall project plan

• Control of the scope of the test effort

• Manage test budget, test staff resources and progress in accordance with the test plan

• Ensure communications regarding status of, and changes to, the test plan

• Participate in early life cycle verification activities such as requirements inspections and/or coordinate the participation of testing personnel

• Participate in test execution, analysis and defect tracking as needed

Page 286: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

7-18 Version 9.1

• Manage the resolution of issues resulting failure to meet schedule, budget, functionality or quality criteria throughout the testing life cycle of the project

• Participate in the completion of end of project activities, including the decision to implement, implementation and post implementation reviews

7.2.3 Designer/Developer

The work of translating the requirements of what a system must do or be (“Requirements”) into a product that will meet those needs is called design. The work of design may include the participation of systems architects, database administrators, testers, training, documentation and others to come up with how to meet the needs. The designed product is then transfer to those who will make it come to life i.e., the developers.

Developers are the traditional heart of Information Technology. For many years there has been an implicit understanding that “coding is the only real work” in systems development. While this may not be precisely true, coding does turn concept into reality. The designers/developers within IT are responsible for:

• Create and maintain the overall design and development plan to reflect changes to the overall project plan

• Coordinate the integration of the sub-plan for unit and alpha testing into the overall test plan

• Maintain control of the scope of the design and development effort

• Manage design and development budget, staff resources and progress in accordance with the project plan

• Execute the development plan and ensure communications regarding status of, and changes to, the development plan

• Participate in scheduled verification activities such as requirements inspects, design reviews

• Determine the scope of testing necessary and ensure that the appropriate tools and resources are in place

• Ensure the execution of scheduled black box and white box testing, defect analysis and tracking

• Manage and participate in the resolution of issues resulting failure to meet schedule, budget, functionality or quality criteria throughout the development life cycle of the project

• Participate in the completion of end of project activities, including the decision to implement, implementation and post implementation reviews

Page 287: CABA_CBOK_Ver_9-1

Acceptance Testing

Version 9.1 7-19

7.2.4 Business Partner and Subject Matter Expert

The participation of the business partner and subject matter experts from the business community is essential to the success of the project. Just as it is not possible to get the requirements right early in the project without their cooperation, so too it is necessary to have their input on both the creation and results of various functional tests.

With both the business partners and subject matter experts it is important to be conscious of their competing priorities and be efficient and effective in the scheduling of their participation. The responsibilities of these individuals in support of acceptance testing are:

• Support the creation and maintenance of an effective overall project and test plan with specific attention to areas of functional correctness and performance characteristics of the product

• Participate in the training for the use of testing tools, techniques and strategies to test the product

• Provide expert insight into functionality issues that arise from the development and execution of test cases

• Assist the project manager in the integration of the business and subject matter experts into the project plan and specifically where needed in requirements verification and acceptance testing

• Support efforts to maintain control of the project scope by active participation in early test life cycle activities such as requirements verification and test case development

• Provide support for an appropriate level of test budget and test staff resources in both IT and the business community

• Ensure communications regarding status of, and changes to, the test plan

• Participate in test execution, analysis and defect tracking and management as needed

• Participate in the resolution of issues resulting in failure to meet schedule, budget, functionality or quality criteria throughout the testing life of the project

• Participate in the completion of end of project activities, including the decision to implement, implementation and post implementation reviews

7.2.5 Operations and Network

The Operations and Network staffs are often overlooked in the test planning process, because the focus is on the development environment. Failure to include these areas in the planning

Page 288: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

7-20 Version 9.1

process may result in delays in the establishment of needed environments and reduction or elimination of performance, response time and stress testing due to lack of critical resources.

Not only do these groups support acceptance testing, but at the end of the testing process, they are responsible for supporting the product in production. Operations has a vested interest in ensuring that only applications that are of high quality and robust performance move into production; as such they are an excellent ally during acceptance testing. The responsibilities of these areas in support of acceptance testing are:

• Support the creation and maintenance of the overall test plan with specific attention to performance and operational characteristics of the product

• Provide the installation and maintenance of one or more environments to support the acceptance testing activities

• Determine what testing tools, techniques and strategies will be needed to effectively test the project from the operations and network perspective and ensure the staff know how to perform stress testing, database backup and recovery and end to end application response time measures

• Coordinate the integration of the sub-plan for operations and network acceptance testing into the overall test plan

• Assist the project manager in the integration of the test plan into the overall project plan

• Maintain control of the scope of the test effort

• Support the development of the operations and network test budget, test staff resources and monitor progress in accordance with the test plan

• Ensure communications regarding status of, and changes to, the test plan

• Create and maintain an appropriate test environment with the necessary level of accuracy relative to the production environment

• Participate in test execution, analysis and defect tracking as needed

• Participate in the resolution of issues resulting failure to meet schedule, budget, functionality or quality criteria throughout the testing life cycle of the project

• Participate in the completion of end of project activities, including the decision to implement, implementation and post implementation reviews

7.2.6 Data Security and Internal Audit

These two areas have overlapping concerns. Data Security is a part of the development process from the beginning, helping to ensure that appropriate controls over data are designed

Page 289: CABA_CBOK_Ver_9-1

Acceptance Testing

Version 9.1 7-21

into the product. Acceptance testing validates that data is being captured and stored appropriately, but also that all privacy concerns, including access to sensitive data, are well managed.

The Audit area does not typically participate in the development activity. They conduct routine audit reviews to ensure that the product is in compliance with published policies and procedures. They are also directly tasked with the responsibility to ensure that the proper levels of control exist for any application that will impact the financial statements of the organizations. These requirements are more fully detailed in 7.2.7 Control Verification and the Independent Tester. The responsibilities of these two groups in relationship to acceptance testing are:

• Support the creation and maintenance of an effective overall test plan with specific attention to the existence and adequacy of operational controls and the integrity of the production environment

• Determine what testing tools, techniques and strategies will be needed to effectively test the project and ensure the staff know how to perform that testing

• Maintain control of the scope of the test effort

• Manage test data security and internal audit budget resources to ensure that appropriate levels of testing are performed

• Ensure communications regarding status of, and changes to, the test plan

• Verify that management is actively involved in ensuring compliance with existing policies and procedures for early life cycle verification activities such as requirements inspections

• Participate in test execution, analysis and defect tracking as needed

• Participate in the resolution of issues resulting in failure to meet schedule, budget, functionality or quality criteria

• Participate in the completion of end of project activities, including the decision to implement, implementation and post implementation reviews

7.2.7 Control Verification and the Independent Tester

With the recent advent of various national laws regarding verification of process controls, it is necessary to clearly plan for and document how those requirements are met. The requirement for verification of control over the development process (i.e. separation of duties) results in the establishment of “independent test units” in many organizations that previously had none.

The controls in place in any application that updates the financial records of an organization must be adequate to ensure that:

Page 290: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

7-22 Version 9.1

• No unauthorized changes to the code can be made to a production system either intentionally or inadvertently

• No unauthorized changes to the data of a production system can be made either intentionally or inadvertently

• Every change to either the code or the data of a production system produces sufficient audit trail to identify the source of the change and the authorization

• The existence of sufficient controls ensuring the above three items can be independently verified

For many organizations these functions are clearly defined and implemented in an existing Configuration Management operation that is not a part of the development organization. If that function does not exist, or if it fails to fully perform these functions, the penalties can be severe.

7.2.8 Business Analyst

In earlier skill categories the point has been made that not all organizations have the same structure, and that as a result the Business Analyst often finds they are needed to perform roles and responsibilities of other functions. If there is no project manager, the BA may be needed to fulfill those responsibilities. If there is no test manager or designated test lead, the BA may be doing that work. There are however specific roles and responsibilities for the BA in the acceptance testing process:

• Participate in the creation of the overall test plan and assist with the necessary maintenance to reflect changes to the overall project plan

• Plan for and participate in early life cycle verification activities such as requirements inspections and early development and inspection of use cases

• Plan for and participate in functional, regression, stress, security and performance test execution, analysis and defect tracking as needed, with specific attention to those aspect of acceptance testing that are essential to the successful implementation of the finished product

• Coordinate the integration of the sub-plan for acceptance testing into the overall test plan

• Understand what testing tools, techniques and strategies will be needed to effectively perform acceptance testing for the project and ensure the subject matter experts know how to perform appropriate testing and test verification

• Provide expert insight into functionality and performance issues that arise from the development and execution of test cases

Page 291: CABA_CBOK_Ver_9-1

Acceptance Testing

Version 9.1 7-23

• Assist in the maintenance of the scope of the acceptance testing effort

• Participate in the development of the acceptance test budget, acceptance test staff resources and progress in accordance with the test plan

• Ensure communications regarding status of, and changes to, the acceptance test plans

• Support the resolution of issues resulting failure to meet schedule, budget, functionality or quality criteria throughout the testing life cycle of the project

• Participate in the completion of end of project activities, including the decision to implement, test reports, implementation and post implementation reviews

7.2.9 Other Participants

In addition to the participants identified above, there can be many other groups and individuals contributing to the acceptance testing effort, such as:

• Vendors

• Key Stakeholders

• Beta Customers

• Power Users

7.3 Use Cases for Acceptance Testing The development of Use Cases for design and testing grew out of the evolution of Object-Oriented Programming. Use Cases were introduced by Jacobson in 1992.7 Over time, members of the IT community began to see more ways to apply the Use Case concepts. It is now a standard tool for Requirements/Analysis throughout the industry.

There are a host of definitions for, and a wide range of approaches to, Use Cases. At the simplest level, a Use Case is a technique for capturing the functional requirements of systems through the interaction between an Actor and the System. The Actor is an individual, group or entity outside the system. In the Use Case, the Actor may include other software systems, hardware components or other entities.8

7. Jacobson, I; Object-Oriented Software Engineering: A Use-Case Driven Approach; Addision-Wes-ley; 1992.

8. Wiegers, Karl, Software Requirements; Microsoft Press, 1999

Page 292: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

7-24 Version 9.1

Actors can be divided into two categories: Primary Actors and Secondary Actors.

According to Alastair Cockburn, “A primary actor is one having a goal requiring the assistance of the system. A secondary actor is one from which the system needs assistance to satisfy its goal. One of the actors is designated as the system under discussion.”9 Primary and secondary actors will have different expected results for the same test.

Figure 7-2 Simple Use Case Model

The addition of these actors allows the Use Case to add depth and understanding to what is simply a customer perspective. Use cases are the test case development activity most closely associated with acceptance testing, because they are strongly based in the functionality desired by the stakeholders and created at a systems level.

Cockburn further expands the understanding of the relationship between the actor and the system by integrating it with the concept of responsibilities. “Each actor has a set of responsibilities. To carry out that responsibility, it sets some goals. To reach a goal, it performs some actions.”10

9. Cockburn, Alistair, A.R.; Humans and Technology; (http://alistair.cockburn.us/); 200710. Ibid.

Page 293: CABA_CBOK_Ver_9-1

Acceptance Testing

Version 9.1 7-25

7.3.1 Use Case Definition

While there are many working definitions of Use Cases, presented by many different authors, there are a central group of concepts that generally appear. One of those concepts is the separation of Use Cases into two categories: Essential Use Cases and Conventional Use Cases.

The Use Case definition can be restated somewhat differently than the Wiegers’ definition previously cited. A Use Case is “a description of a set or sequences of actions, including variants, that a system performs that yields an observable result of value to a particular actor.”11 The two definitions are consistent, but the second allows one of the problems with Use Cases to be made explicit: they can easily lead the BA and the development team to premature design decisions.

The Essential Use Case is designed to prevent that from occurring. “An essential use case is a structured narrative, expressed in the language of the application domain and of users, comprising a simplified, generalized, abstract, technology-free and implementation independent description of one task or interaction that is complete, meaningful, and well-defined from the point of view of users in some role or roles in relation to a system and that embodies the purpose or intentions underlying the interaction”12

The advantages of the Essential Use Case are:

• They explicitly exclude any consideration of User Interfaces, which reduces the tendency to premature design

• They represent a very high-level abstraction of the interaction

• They are short and simple to understand

• They can be written and revised quickly

• They can form the basis for initial validation of functionality13

Once the essential Use Cases have been defined, it is possible to interrogate them further and decompose them into finer levels of detail. Figure 7-3 is an example of an Essential Use Case for the Kiosk Project. This amount of information can easily be captured on a single piece of paper or a 3”x5” index card.

The list on the left of Exhibit represents the user’s view of the function and the list on the right represents the system responsibilities in accomplishing the goal. The jagged line down the center signifies the interaction between the user (actor) and the system.

11. Jacobson, ob.cit.12. Constantine and Lockwood; Software for Use; A Practical Guide to the Models and Methods of

Usage- Centered Design; Addison-Wesley; 1999.13. Biddle, Noble and Tempero; From Essential Use Cases to Objects; for USE 2002 Proceedings;

Amersand Press; 2002.

Page 294: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

7-26 Version 9.1

The Business Analyst has participated in the definition of Use Cases throughout the development of the product, beginning with the Essential Use Cases. This began early in Requirements and continued through design and coding. While the development of the model has been explored, the resulting test cases and scenarios have not.

Figure 7-3 An Essential Use Case

Figure 7-4, A Simple Use Case Model, provides an expanded overview of some of the functionality to be provided in the Kiosk Ticket System. This functionality can be further decomposed into even finer levels of detail. The narrative flow that accompanies the Model provides some of that detail. During Unit and Systems testing, the developers will have verified that the flow from decision to decision is working properly.

Page 295: CABA_CBOK_Ver_9-1

Acceptance Testing

Version 9.1 7-27

Figure 7-4 A Simple Use Case Model

As the detail begins to emerge, so do the business rules associated with each of the potential choices. Acceptance Testing will apply Use Cases to validate the proper application of those business rules. For the last menu choice in Figure 7-4 the following business rules might be applied:

• Event choices may only appear if there are tickets available for the date selected

Page 296: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

7-28 Version 9.1

• Event choices may only appear if there are tickets available for the time selected

• If no events match the date and time criteria display no available events for that date and time

Each combination of functionality and business rules will provide the basis for one or more Use Cases.

7.3.2 Use Case Development

Use case development typically results in a series of related tests call scenarios. Each scenario represents a unique functional (goal oriented) path through the system, if there is only one path, with no opportunities for decisions, changes or errors, there will be no scenarios, only a sequence.14 Scenarios describe the alternative actions that can occur. All the scenarios for a single Use Case must meet two criteria:

• All of the interactions described relate to the same goal or sub-goal

• Interactions start at the triggering event and end when the goal is delivered or abandoned, and the system completes its responsibilities with respect to that interaction.15

Applying the business rules shown in Section 7.3.1 to Figure 7-4, the following scenarios are intended to exist:

• Basic course of events: A date and time are selected and the desired event choice is displayed.

• Alternative course of events: A date and time are selected, but the desired event in not displayed.

• Alternative course of events: A date and time are selected and no available events message is displayed.

Other results may occur; as none of them are intended results, they represent error conditions. If there are alternative paths that lead to a successful conclusion of the interaction (the actor achieves the desired goal) through effective error handling, these may be added to the list of scenarios as recovery scenarios. Unsuccessful conclusions that result in the actor abandoning the goal are referred to as failure scenarios.

14. Cockburn, Alistair, A.R.; Humans and Technology; (http://alistair.cockburn.us/); 200715. Cockburn; op.cit.

Page 297: CABA_CBOK_Ver_9-1

Acceptance Testing

Version 9.1 7-29

7.3.3 Use Case Format

Just as there are many workable approaches to Use Case development, so to are there a wide range of recommended formats. The following list represents those found most commonly, with comments regarding specific application or justification. This information should be captured in an organization standard format.

• Case ID - A unique identifier for each Use Case, it includes cross reference to the requirement(s) being tested so that it is possible to trace each requirement through testing. Cockburn recommends that scenarios be represented as numbered points following the main or happy path alternative. For example:

1. Customer enters a valid date and time combination1.a. Submitted data is invalid 1.a.1. Kiosk requests valid date/time data1.b. Submitted data is incomplete1.b.1. Kiosk requests completed data

• Use Case Name - A unique short name for the Use Case that implicitly expresses the user’s intent or purpose16; based upon the Essential Use Case shown in Figure 7-3, the case above might be captioned ChooseEventTime. Using this nomenclature ties the individual Use Case directly to the Essential Use Cases originally described and allows it to be sequenced on a narrative basis alone.

• Summary Description - A several sentence description summarizing the use cases. This might appear redundant when an effective Use Case naming standard is in place, but with large systems, it is possible to become confused about specific points of functionality.

• Frequency / Iteration Number - These two pieces of information provide additional context for the case. The first, frequency, deals with how often the actor executes or triggers the function covered by the use case. This helps to determine how important this functionality is to the overall system. Iteration number addresses how many times this set of use cases has been executed. There should be a correlation between the two numbers.

• Status - This is the status of the case itself: In Development, Ready for Review, and Passed or Failed Review are typical status designation.

• Actors - The list of actors associated with the case; while the primary actor is often clear from the summary description, the role of secondary actors is easy to miss. This may cause problems in identifying all of the potential alternative paths.

16. Ambler, Scott; Web services programming tips and tricks: Documenting a use case; ([email protected]) ; October 2000.

Page 298: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

7-30 Version 9.1

• Trigger - This is the starting point for any action in a process or sub-process. The first trigger is always the result of interaction with the primary actor. Subsequent triggers initiate other processes and sub-processes needed by the system to achieve the actor’s goal and to fulfill its responsibilities.

• Basic Course of Events - This is called the main path, the happy path or the primary path. It is the main flow of logic an actor follows to achieve the desired goal. It describes how the system works when everything functions properly. If the Use Case Model contains an <<includes>> or <<extends>>, it can be described here. Alternatively any additional categories for <<extends>> and <<includes>> must be create. If there are relatively few, they should be broken out so they will not be overlooked. If they are common, either practice will work.

• Alternative Events - Less frequently used paths of logic, these may be the result of alternative work processes or an error condition. Alternative events are often signaled by the existence of an <<exception>> in the Use Case Model.

• Pre-Conditions - A list of conditions, if any, that must be met before the Use Case can be properly executed. In the Kiosk examples cited previously, before a payment can be calculated, an event, the number and location of seats must be selected. During Unit and System testing this situation is handled using Stubs. By acceptance testing, there should be no Stubs left in the system.

• Business Rules and Assumptions - Any business rules not clearly expressed in either the main or alternate paths must be stated. These may include disqualifying responses to pre-conditions. Assumptions about the domain that are not made explicit in the main and alternate paths must be recorded. All assumptions should have been verified prior to the product arriving for acceptance testing.

• Post Conditions - A list of conditions, if any, that will be true after the Use Case finished successfully. In the Kiosk example the Post Conditions might include:

• The customer receives the correct number of tickets

• Each ticket displays the correct event name and price

• Each ticket shows the requested data, time and seat location

• The total price for the ticket(s) was properly calculated

• The customer account is properly debited for the transaction

• The ticket inventory is properly updated to reflect tickets issued

• The accounts receivable system receives the correct payment information

• Notes - Any relevant information not previously recorded should be entered here. If certain types of information appear consistently, create a category for them.

Page 299: CABA_CBOK_Ver_9-1

Acceptance Testing

Version 9.1 7-31

• Author, Action and Date - This is a sequential list of all of the authors and the date(s) of their work on the Use Case. Many Use Cases are developed and reworked multiple times over the course of a large project. This information will help research any problems with the case that might arise.

7.3.4 Writing effective Use Cases

The following list of practices will help to ensure the quality and usefulness of the completed Use Cases17:

• Write from the point of view of the actor and in the active voice

• Write scenario text, not functional requirements18

• Use cases only document behavioral requirements

• Don’t forget the use interface

• Create a use case template

• Organize use case diagrams consistently

• Don’t forget the system responses to the actions of actors

• Alternate courses of events are important

• Don’t get hung up on <<include>> and <<extend>> associations

• Let use cases drive user documentation

• Let use cases drive presentations (as well as development, testing and training)

7.4 Defect Management The purpose of most of the testing activities performed during a project is to detect defects. While the primary purpose of Acceptance Testing is to verify that the application is ready for production, it also is engaged in identifying defects. Throughout this Skill Category identifying defects has been the subject of much of the material. Defects are identified with the objective of understanding and correcting them. This process is one of the most critical

17. Ambler, Scott; Web services programming tips and tricks: Documenting a use case; ([email protected]) ; October 2000.

18. For even experienced Business Analysts and Testers this can be a very difficult distinction at times.

Page 300: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

7-32 Version 9.1

and potential contentious in the entire project. Understanding defects, what they are and how they are managed is a key knowledge area for the Certified Software Business Analyst.

7.4.1 Defect Definitions

The way in which a defect is defined will determine what is captured and addressed by an organization. These definitions should be included in the Information Technology Standards and used consistently for all projects. These definitions should be jointly developed and agreed upon by Information Technology and the Business Partner. Failure to clearly define what a defect is or is not will create the opportunity for confusion, conflict and these will in turn negatively impact the project.

7.4.1.1 Defect

Not every organization will define defects precisely the same way because of the impact of specific kinds of defects on the mission of the organization. The inclusion of the Business Partner in the definition process ensures that mission-critical issues are properly identified.

At its most basic level, a defect is anything wrong, missing, or extra19 in the application. This definition was first introduced in Skill Category 5, 5.7.4 Fagan Inspections. The simplicity of the basic definition allows it to be clearly understood. Examples of items that are wrong include numbers that fail to add up correctly, formulas that are incorrect, and logic paths that yield false positive or negative responses. Examples of items that are missing would include requirements not identified during the requirements process; incomplete listings of states or (States), conditions or business rules; and failure to develop or include items specified by the organizations standards. Extra items are those which cannot be traced back to a business requirement. These are often added by designers and developers who think they are providing value (this is occasionally referred to as gold-plating the application).

Most organizations choose to expand upon this definition and include examples of what is considered “wrong” and what is not. In some mathematically oriented applications, such as accounting systems, misspelling the label on a report (i.e. Branche Offices instead of Branch Offices), might not be considered a significant defect. In other kinds of applications, such as those that product checks, misspellings are a serious defect.

In addition to knowing the kind of defect, it is also useful to classify them according to their severity. Fagan suggest a simple two category classification: Major and Minor.20 Major is anything that will cause a failure in production; Minor is everything else. The simplicity of this system works well in the context for which it was developed. It does rely upon the organization having a clear definition of what constitutes a failure in production.

19. Fagan, Michael E. Design and Code Inspections; IBM Systems Journal, 1976. 20. Fagan, op cit.

Page 301: CABA_CBOK_Ver_9-1

Acceptance Testing

Version 9.1 7-33

Many organizations use an expanded scale that allows for a greater range of distinction among the defects found. The five (5) point scale used by the United States Defense industry is typical:

Severity 1 (major):

• Will cause the system to malfunction

• Prevent accomplishment of essential capability, jeopardize safety, security, data integrity or other critical function

Severity 2 (major):

• Adversely affect accomplishment of an essential capability and no work-around solution is known

• Adversely affect technical, cost or schedule risks to project or life cycle sup-port of the system and no work-around is known

Severity 3 (minor):

• Adversely affect the accomplishment of an essential capability but a work-around solution is known

• Adversely affect technical, cost or schedule risks to the project or to life cycle support of the system, but a work-around solution is known

Severity 4 (minor):

• Result in business partner/operator inconvenience or annoyance but does not affect a required operational or mission-essential capability

• Results in inconvenience or annoyance for development or maintenance per-sonnel but does not prevent the accomplishment of the responsibilities of those personnel

Severity 5 (minor):

• Typos or grammatical errors that do not change the meaning of the document or appear to the end users; all other effects

There is a distinct tradeoff between the level of granularity of the classification system used and the time and value of the information that can be generated as a result. The larger the number of potential classes that exist, the more difficult it will be for individuals to decide which classification is correct and the more likely it is that occasional errors will be made.

Alternatively, more classifications yield a better understanding of what the potential impact of defects would be. It will also yield more information about the quality of the processes used to develop the product. Generally speaking, keeping the classification system simple (2-5 categories) is the best place to begin the process. Expansion of the system can then be based upon the needs of the organization.

Page 302: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

7-34 Version 9.1

7.4.1.2 Errors, Faults and Defects

Previous Skill Categories have presented the concept that placing the Quality Control step (Check Process) in line with the activity (Do Process) allows defects to be captured at the earliest possible point in the process. The economics of this are described in more detail below.

One outgrowth of this is the idea that there is a proper time and activity to catch defects. Taking this concept one step further, these organizations are defining defects by their point of capture.21 Problems that are captured in the phase where they were created, by the quality control processes designed to capture them, are referred to as errors. Problems discovered at the “wrong time”, after they have moved from the phase in which they were created, are designated as defects.

The advantage of this nomenclature is that it recognizes and rewards the efforts to capture defects promptly, when it is most cost-effective to do so. It also allows the organization better insight into the effectiveness of the quality control activities being used, providing better information for the process improvement activities.

The use of this nomenclature also helps to establish the trusting environment required to support the self-reporting of problems (either errors or defects.) Only when self reporting is fully functional does an organization have all of the information it needs about the quality of the development processes. Until that time it has only information about problems discovered and disclosed by others.

7.4.1.3 Recidivism and Persistent Failure Rates

These two concepts are closely linked and essential to managing defects.

• Recidivism is the introduction of new errors in the attempt (successful or unsuccessful) to correct a defect. Recidivism is often the result of inadequate or incomplete analysis of the reported defect, leading to an inappropriate solution. This solution may, in fact, cause the defect to be masked (the test cases provided no longer trigger the error) but not resolved (the error will still be triggered by another set of circumstances). A high rate of recidivism (the ratio of injected defect to all defects) indicates a problem with the analysis process. As this is one of the key areas for the Business Analyst, this metric is one that should receive their careful attention.

• Persistent Failure Rate is the name for defects that are not resolved by new releases of the product to the testers as compared to the total defects reported. A high Persistent Failure Rate is often coupled with a growing defect backlog and should be a signal that the project is experience significant quality problems. Because the Persistent Failure Rate can be measured beginning very early in the life of the

21. Seider, Ross; Implementing Phase Containment Effectiveness Metrics at Motorola; Quality Assur-ance Institute Journal; October 2007.

Page 303: CABA_CBOK_Ver_9-1

Acceptance Testing

Version 9.1 7-35

product, it is an excellent early indicator of quality problems. These will lead to schedule and budget problems that may not be obvious that early in the project.

7.4.2 Defect Life Cycle

Every defect follows a known path. For the Business Analyst, following the progress of defects along the path to a successful resolution is an essential part of ensuring the final quality of the delivered product. Not all resolutions are successful, and in some cases it will take extraordinary effort on the part of the project team, including the BA, to move a defect off the critical path.

7.4.2.1 Creation

Defects can be created in many ways. In earlier Skill Categories the opportunities for the insertion of defects were highlighted. Early studies into the sources of defects done on behalf of large software developers quickly focused on the Requirements stages as the one most error prone. This is due in large part to the large proportion of person to person communication; a notoriously unreliable process.

Figure 7-5 reflects the data developed James Martin in a study to identify the source of defects and when they were located. The first column in front left represents Requirements (Analysis). The study showed that 56% of errors were caused in Requirements. 27% were caused in Design and the remaining 27% were split between the Coding/Testing stage and Production/ Maintenance.

Page 304: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

7-36 Version 9.1

Figure 7-5 Where Errors are Caused

The reasons for the large proportion of errors in the Requirements phase have not changed significantly since the study was published. In the rush to begin design and code activities, analysis is left incomplete. Business Partners are not fully involved in the Requirements process. Focus on schedule and budget push projects ahead despite the misgivings voiced by participants and sponsors.

Figure 7-6 Where Defects Are Found

Figure 7-6 has been modified to include the second set of data collected by James Martin in his study. This second column is in sharp contrast to the first; it reflects where the defects

Page 305: CABA_CBOK_Ver_9-1

Acceptance Testing

Version 9.1 7-37

were located (found). About 50% of all errors are located during the Coding/Testing stage and 23% in Production. Only about 25% were found in Analysis and Design combined. This is almost a complete reversal of where they are caused.

Figure 7-7 Relative Cost of Defects by Phase

The third set of columns added to the chart (Figure 7-7) represents the relative cost to find and correct a defect, by development phase. These costs grow exponentially because earlier steps must be repeated when defects are found later in the development cycle. When the cost to find and fix defects are factored into the cost equation the results are staggering.

Figure 7-8 Extrapolated Cost of Defect Created in Requirements and Discovered in Test

Figure 7-8 translates the impact of late rather than early discovery into economic terms. This facilitates making the business case for spending resources on the early discovery of defects.

Cost savings for finding 1 error from requirements in requirements instead of test.

Fully burdened hourly rate $30

$1470.00

Fully burdened hourly rate $40

$1960.00

Fully burdened hourly rate $50

$2450.00

Page 306: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

7-38 Version 9.1

7.4.2.2 Analysis

Once a defect has been discovered, by whatever means, it must be understood. It is one thing to know that the system response to a calculation, query or actor is incorrect. It is another to know how the wrong response is being created.

This multi-step process begins by verifying that the response or action is indeed correct. In the case of a test, this may involve re-creating the document or test that produced the response. If the identified sequence fails to consistently produce the (same) incorrect response, the actual defect may be elsewhere. Where the defect is in a static document, such as a Requirements Document, the information perceived to be incorrect must be verified with the originating source. In the event of conflicting sources, time must be taken to determine the correct answer.

Where the source of the defect is not immediately obvious, someone from the project team, who understands both the project and the media of the defect, must research the problem. In the case of a program, this is typically a programmer; if it is a test case, a tester; if the requirements are involved it might be the Business Analyst.

A second aspect of the analysis activity is to understand the extent of the problem. When the defect was first identified, it is typically assigned a classification (as described in Section 7.4.1.1) This assignment was based upon the initial understanding of the defect. When it is more clearly understood, that assessment must be re-evaluated, as any of the following situations may exist:

• The problem is much less extensive than the original classification

• The problem is much more extensive that the original classification

• The wrong problem was described and classified

• There is not a problem

• There is a problem, but it has already been reported, described and classified

The classification of a problem is generally closely related to the level of attention it receives. In the classification scheme describe for use by the United States Defense industry, the classification also contains an action level standard, for example the action levels added in italics below the classification description:

Severity 1 (major):

• Will cause the system to malfunction

• Prevent accomplishment of essential capability Jeopardize safety, security, data integrity or other critical function

• Must be fixed immediately to move on

Severity 3 (minor):

Page 307: CABA_CBOK_Ver_9-1

Acceptance Testing

Version 9.1 7-39

• Adversely affect the accomplishment of an essential capability but a work-around solution is known

• Adversely affect technical, cost or schedule risks to the project or to life cycle support of the system, but a work-around solution is known

• Must be fixed before implementation

Severity 5 (minor):

• Typos or grammatical errors that do not change the meaning of the document or appear to the end users; all other effects

• Fix as time available

Good classification systems will contain action level standards such as these. For this reason, the classification process can become contentious, as the way a particular defect or group of defects are classified can have a major impact on project schedule and budget.

7.4.2.3 Resolution

Defect resolution can cover a wide range of possibilities, as shown in the action level standards above. Clearly, some problems will be resolved immediately, others will be included in “the next release”, some will be distributed as a part of a “bug fix”, still others will become the basis for a new feature or enhancement.

The resolution activities and cost will depend in large part on when and how the problem was identified. If the defect is corrected, that correction must be validated through all of the development steps that preceded its discovery. A defective requirement, found in the Requirements phase of development will be re-written, inspected and approved.

Resolution can also include the determination that a particular defect will not be fixed. Although this is usually not the initial assessment, defects that continue to linger on unresolved usually do so because the cost to fix them exceeds the benefit of doing so.

Regardless of what resolution path is chosen, it must represent the agreement of all of the stakeholders.

7.4.2.4 Closure

Defects cannot and should not live forever. At some point, the defect report and supporting material should be “closed”. Ideally this point occurs when the defect has been corrected and the correction validated. Closing the defect at this point should mean that it is gone forever, except as a statistic.

• STATUS: Corrected and Closed - The defect was corrected and tested as a part of Release 3.0.3 of this product.

Page 308: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

7-40 Version 9.1

When defects are not going to be corrected immediately, or even soon, a decision needs to be made about how to manage this defect. If it is anticipated that the defect will eventually be corrected as a part of the current project, even if that correction will be in a much later release, it must remain open or pending. Annotating the defect record with the anticipated resolution information will save time for everyone:

• STATUS: Pending - The defect will be resolved as a part of Release 3.2 of this product. At that time all of the calculations involved will be replaced with a revised table-driven structured to address the added complexity. The field has been instructed to continue using the manual calculation (see memo dated 11-03-xx.)

If the agreement has been reached that this defect is part of a new enhance or an entirely new project, the defect can be so annotated and closed.

• STATUS: Transferred and Closed - The defect will be resolved as a part of the new Sales SP3 system project Requirement #2-17). At that time all of the calculations involved will be replaced with a revised table-driven structured to address the added complexity. The field has been instructed to continue using the manual calculation (see memo dated 11-03-xx.)

If it has been agreed that the defect will not be corrected, the closing information should clearly indicate why, as the problem will not disappear. The people using the system will continue to experience the defect.

• STATUS: Closed- No Action - The defect will not be resolved. As agreed in Defect Meeting dated 05-10-XX, this problem only occurs when a customer whose account is more than 150 days in arrears attempts to purchase a priority product on credit. The estimated cost to change the logic and the resulting error message is $5300. In this case there is no benefit to fixing the problem. When this error occurs the field has been instructed to advise the customer that they must either pay cash or pay down the arrears.

Providing the additional information about how the problem was closed will allow others to respond to questions that may arise later. It also will allow for the statistical analysis of the distribution of problem resolution activities. Projects that show a high ratio of defects Closed with No Action to Total Defects typically will have a very high level of customer dissatisfaction with the product.

7.5 Summary Skill Category 7 examines one of the key roles of the Business Analyst in the development of a software product, the successful execution of the acceptance testing needed to verify that the product is ready for production. By creating an effective acceptance test plan that begins in Requirements, and allocates resources to these early life cycle activities, the Business Analyst

Page 309: CABA_CBOK_Ver_9-1

Acceptance Testing

Version 9.1 7-41

leverages the total resource contribution and minimizes the amount of actual testing time required.

Participation in the Requirements and Design activities also allows the early development of test cases which can be used throughout the lifecycle of the product. Effective Use Case development not only aids in the creation of quality requirements, it also streamlines the total volume of test cases that need to be executed to verify the quality of the product.

By developing and documenting meaningful acceptance test criteria, it is possible to have a data driven decision of “production readiness.” This reduces the probability that a severely defective product will be moved to production simply because the allocated time for testing has been exhausted. It also builds a common level of organizational understanding about what it means to deliver a quality product which is essential to long term customer satisfaction.

Finally, by creating and managing an effective defect tracking system, the organization gains valuable insight into what problems are created, where they are created, how they are resolved and the impact of unresolved defects on the organization.

Page 310: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

7-42 Version 9.1

Page 311: CABA_CBOK_Ver_9-1

Commercial Off-the-Shelf Software and Performance Based Contracting

Version 9.1 8-1

Commercial Off-the-Shelf Software and Performance Based ContractingThe majority of the information provided in the preceding 7 Skill Categories has focused on the development of systems by the organization. In this Skill Category the focus will be on the Business Analyst’s role in projects where the software is developed either in part or entirely by outside organizations. For many organizations this was confined to the purchase of Commercial Off-the-Shelf software (COTS). The growing role of outside developers, either on-shore or off-shore, has lead to an increased interest in methods to manage this development.

“The outsourcing trend is growing because many small to medium sized businesses can’t afford to hire huge numbers of information-technology workers, yet must deal with office technology that’s becoming increasingly complex. These companies are grappling with a surge of new technologies such as Internet telephony, Web video, new mobile devices - from Blackberries to cell phones- and increased security threats from viruses and worms.”1

Performance Based Contracting (PBC) is the most effective approach. Regardless of the scope of the external acquisition, the Business Analyst will play a key role in ensuring the quality of the final product.

1. Outsourcing Finds New Niche: More Small Firms Farm Out Tech Work to Tap Experts, Pare Costs; Pui-Wing Tam; Wall Street Journal; April 17, 2007.

Skill Category

8

Page 312: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

8-2 Version 9.1

8.1 Definitions Product acquisition can run the gamut from completely custom designed and based on unique requirements, to products that are pre-packaged and installed intact. Many combinations of those two, with or without some development on the part of the acquiring organization, are also possible. Regardless of where on the spectrum a specific organization finds a solution, there are significant issues to be addressed.

8.1.1 Commercial Off-the-Shelf Software (COTS)

Commercial Off-the-Shelf (COTS) software includes the wide range of software products developed for sale by software development companies. These products are generally intended to be installed and operated with no modifications by the purchaser. At the high end of the cost spectrum are large scale resource management and accounting packages, smaller and less costly products include word processing and spreadsheet products.

8.1.2 Custom Software

Custom Software includes all of the products developed by outside individuals, agencies, and organizations, on a for profit basis, where the day to day activities are not directed by the organization itself. This excludes software developed by consultants or contractors that are hired to augment the internal staff and whose day to day work activity is directed by the organization itself.

8.1.3 Modified Off-the-Shelf Software (MOTS)

Modified Off-the-Shelf (MOTS) software includes all of those products that originate as COTS and are subsequently changed for the exclusive benefit of a specific organization. These modifications may be performed by the originating vendor, the purchasing organization, or an outside third party.

8.1.4 Performance Based Contracting (PBC)

Performance Based Contracting (PBC) is an approach for managing the interaction between a software vendor and a requesting organization, that includes the following minimum components2

1. Performance requirements defining the work in measurable, mission-related terms.

Page 313: CABA_CBOK_Ver_9-1

Commercial Off-the-Shelf Software and Performance Based Contracting

Version 9.1 8-3

2. Performance standards (i.e., quality, quantity, timeliness) tied to the performancerequirements.

3. A Quality Assurance (QA) plan describing how the contractor’s work will be measuredagainst the performance standards.

4. Positive and negative incentives tied to the QA plan measurements if the acquisition iseither critical to the organization’s mission accomplishment or a relatively largeexpenditure of funds.

8.2 Establish RequirementsIt makes no difference if the product is custom developed or COTS, it is essential to conduct a rigorous requirements process. If the product is to be custom developed, the requirements will be the foundation for the development contract. If the product is to be purchased, the requirements will form the criteria against which products are to be judged. The process for identifying, documenting and prioritizing requirements is covered in Skill Category 5. Often the Requirements Development Process is concurrent with the Vendor Selection Process.

Great care must be taken with the Requirements if the vendor has already been selected. The possibility exists that the vendor will shape the product to what is easy, cost effective or efficient for them to provide rather than what the organization actually needs. This potential is especially great when an organization has made a long term outsource commitment to a vendor.

8.3 Commercial Off-The-Shelf Software (COTS) Considerations The preceding discussion has focused on the use of Performance Based Contracting for custom development. Since they are developed for a specific customer with a specific hardware and software environment, these areas should not present an issue. COTS is developed for a wide range of customers who may share common hardware and software platforms, but the product is not tailored to any organization’ s unique characteristics. Therefore, when purchasing COTS it is essential to verify these details, and others.

For the Business Analyst, the use of COTS to address a business problem is potentially either a tremendous benefit or a huge waste of resources. Taking steps to ensure that the ultimate decision creates benefits rather than waste will take careful and persistent attention. All too often the impetus to acquire COTS is the result of a glitzy advertising campaign, a skilled sales pitch by the vendor, or a presentation by industry peers that focuses solely on the

2. http://www.gao.gov/new.items/d021049.pdf

Page 314: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

8-4 Version 9.1

potential benefits. The Business Analyst will need all of their knowledge and skills to ensure that an effective Requirement Development process occurs before the decision is made on “which product to purchase.” The existence of an effective working relationship among the Project Managers, Test Managers and the Business Analyst will be especially valuable in addressing the “cart before the horse.” Failure to do so will result in the expenditure of significant resources on a solution in search of a problem.

8.3.1 Determine compatibility with your computer environment

Once a business need is established and the product requirements are identified, prioritized and agreed upon, the process of determining potential solutions can begin. There are literally thousands of software products available for purchase in every price range. It is likely that there will be more than one with the potential to solve the business problem.

Before beginning a detailed and time-consuming comparison of features and functionality, it makes sense to eliminate those products that will not operate in the existing environment. This can be done in a logical, step-by-step method that will systematically reduce the pool of candidates.

8.3.1.1 Hardware Compatibility

While hardware is no longer as expensive as it once was, it still represents a major investment for most organizations. Determine what the current hardware platform(s) is/are and what plans there are for the future. It is most cost effective to find a solution that will run on hardware already installed, or hardware that is already planned for installation.

It is not cost effective to acquire a product that must run on hardware with no other potential use, or hardware that is already becoming obsolete. To do so locks the organization into an undesirable maintenance and cost structure.

Many organizations have multiple hardware platforms that include some mainframe capability, a client-server platform as well as networked terminals and PCs. Some organizations have standardized on a single hardware vendor for their desktop solutions, others will acquire what ever is cost-effective and meets the need. It is essential to have this information to perform an assessment of the hardware compatibility of specific vendor solutions.

Included in the consideration of hardware are the network considerations. Some products are designed to be run “standalone” on a single workstation. Others are designed to be installed on a server and shared by a limited number of concurrent users. Still others are intended to provide access to a virtually unlimited number of individuals. The product under consideration must match the intended usage of the organization.

Products intended to be used by a very large number of concurrent users, initiating a high volume of large transactions may create the need for additional network bandwidth. Other

Page 315: CABA_CBOK_Ver_9-1

Commercial Off-the-Shelf Software and Performance Based Contracting

Version 9.1 8-5

vendors may solve the same problem in a way that does not require large bandwidth. The acquisition of this resource, if needed, must be factored into the overall cost of the proposed solution.

8.3.1.2 Operating System Compatibility

The industry has standardized on a relatively small number of operating systems for each of the hardware platforms. The pairing of the hardware platform and the operating system creates an environment in which application (business) software can execute and be used by the business community.

When choosing potential software solutions to business problems, it is important to verify that the product can run in one of the existing environments. While organizations can and do add environments, it is an expensive addition to the solution of the business problem. If a product can be found that will operate within the existing framework, it will be much easier to install and support. Over the long term, this translates into a less costly solution for the organization.

As with hardware, it is desirable to select a product that will run in both the current and planned future environments. Selecting a product that requires the maintenance of a back-leveled (this refers to products that are not the most current release by the vendor; for example, requiring the use of Windows 98 or 2000 after Vista is released) operating system exposes the organization to a possible of lack of technical support for problems encountered. This should be avoided.

8.3.1.3 Software Compatibility

Software compatibility is much less of an issue than it was in the past. Relatively few organizations are still running DOS based applications that have the potential to interact negatively with other applications. For those organizations that are in this situation, ensuring that the new product can run in a safe environment is typically resolved by the addition of segregated servers.

8.3.1.4 Security

Since security and access control are fundamental to the product design, it is rarely possible to have significant changes made to the product in these areas. Therefore, it is prudent to do a careful review of the security and access control fundamentals early in the evaluation process. Products that do not provide or support these areas in a fashion consistent with the organization’s needs should be dropped, even if they are functionally sound.

8.3.1.5 Virtualization

Increasingly, organizations are also looking at using the resources of other organizations or other existing applications through the “virtualization” approach. The definitions in this area

Page 316: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

8-6 Version 9.1

are still evolving; however, in essence, virtualization allows a hardware service provider to share one resource among multiple users, while protecting the integrity and functionality of each.

There are two basic approaches to virtualization3 as well as several other theoretically possible options:

1. Hardware virtualization - These approaches are intended to support multiple types ofOperating Systems on a single server. Each Operating System appears to have an entireserver at its command. This allows organizations greater range and flexibility in theirchoice(s) of Operating Systems, without necessarily requiring significant new serverresources.

2. Operating System virtualization - These approaches support multiple instances of asingle Operating System on one server. It does not allow for multiple OperatingSystems. This approach allows an organization that is committed to one or a fewOperating Systems to minimize the software overhead required to support applications.

If the vendor anticipates the use of virtualization as a part of their cost control approach, the organization must understand what the trade-offs will be in terms of availability, performance and stability. Variations on the two options may require specialized software and support.

8.3.2 Ensure the software can be integrated into your business system work flow

Most organizations are committed to their existing work processes. While there may be some inefficiencies in those processes, the business has evolved over time to provide the products and services their customers need and want in a specific manner. Any software that will require business practices be revised to conform to their product must be evaluated with great care. The cost of changing the business process can be very high; in some circumstances the cost may be worth it, but this is not a trivial decision.

8.3.2.1 Current system based on certain assumptions

Organizations create processes based on their historical experience of interfacing products and services. The processes organizations create are based on that experience and include assumptions about how other parts of the system will interoperate. A specific process may assume that it will be passed valid data in a specified format from the target product, because that is what it received from the existing product.

Customers and users may assume they will have access to certain kinds of information at specific points in the process, because that is what they have in the current process. If the

3. Top Ten Considerations for Choosing A Virtualization Technology; SWSOFT; www.swsoft.com; July 2006.

Page 317: CABA_CBOK_Ver_9-1

Commercial Off-the-Shelf Software and Performance Based Contracting

Version 9.1 8-7

current environment produces many defects at certain point in the process, there will typically be a wealth of controls at that point, designed to prevent or catch those defects.

If the target vendor product will not provide that data, or make that information available when needed, some action will need to be taken to address the issue. That action will have a cost associated with it. If the assumptions about the current system are not made explicit, it will not be possible to identify and develop these costs. In some instances, the assumed functionality or compatibility will not be possible with one or more of the vendor products. In that case, if the features are essential, those products should be eliminated from consideration.

8.3.2.2 Existing forms, existing data, and existing procedures

Today many organizations have already automated all of their basic business functions. The products and solutions they seek are replacements for existing systems that no longer meet the business need. Those current systems will have created data, as well as forms and procedures for capturing and using that data.

When considering a replacement system, it is important to carefully consider the data conversion process and the integrity of the finished database. Some products will provide a data migration process as a part of the basic product; often these will be new releases of older products or a replacement product offered when the old vendor was acquired.

More typically the vendor will offer a migration utility to be executed by the organization’s staff. The conversion and validation of the output files can be a very critical and time consuming process, these costs must be considered when determining the overall cost of the proposed vendor solution.

Rarely is it possible to continue using the same forms and processes with no modifications. What ever work will need to be done to update and reprint paper products and provide training in how to use them must also be considered.

8.3.2.3 COTS based on certain assumptions

Just as the organization has certain assumptions about how a product will operate, so to the developer of the product has made certain assumptions about how their product will be used and in what environment it will operate. Some of this has been addressed in the hardware and software considerations section.

If the product does not contain a report generation facility, or a very limited facility, the vendor may assume that the organization already has a Report Writer package installed. If that is not the case, the cost of adding that functionality to the environment must be considered when calculating the cost of the solution.

Likewise, because many products grow out of a specific organization’s practices, assumptions may be made about how business will be done. For example, if the originating organization had a very rigid segregation of duties, a sales person might only be able to enter and update sales information; they might be prohibited from setting up new accounts. In an organization

Page 318: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

8-8 Version 9.1

with less segregation of duties, sales people might perform both functions. A system designed to support the first organization would not function well in the second system.

Additionally, the vendor may assume that certain types of organizational structures or departments exist. At a conceptual level, reorganizations are not particularly expensive. In practice they can be very expensive as they often disrupt the normal flow of business for days, weeks or months. If they are not present in the current organization, it is important to consider what the cost of establishing those functions would be, and to determine if the benefits of using the vendor’s product will be sufficient to recoup those expenses

The vendor may be willing to make modifications to accommodate specific requirements, but these can be costly to acquire and maintain.

8.3.3 Assuring product usability

A specific vendor product may appear to meet all of the organization’s requirements based on presentations made by salesmen or at trade shows. A review of the platform issues and organizational compatibility issues may reveal no problems. It is still not safe to assume that the product will perform as needed without additional research. One excellent approach is to talk to existing customers about their experience.

8.3.3.1 Telephone interviews with current and previous customers

Whether there is only one vendor or several on the list of potential COTS suppliers, an excellent next step is to talk to existing customers about their experience with the product and the vendor.

Ask the vendor to supply a list of current customers, preferably including one or more in the organization’s industry. Generally the vendor will contact the customer to confirm their willingness to talk to a potential customer before they provide a name and telephone number.

The acquisition team, including the sponsor, subject matter experts, developers, testers, business analysts and help desk staff, should develop a set of questions for these interviews. Any telephone interview with an existing customer represents lost time for them. When developing the list of questions, focus on the important issues. Thirty minutes should be adequate for the interview.

General open ended questions for a telephone interview would include:

• How long have you had the product installed?

• What other products did you consider?

• Why did you choose this product?

• How long did it take for the product to be tested and implemented in production? Was this more or less time than you estimated? Why?

Page 319: CABA_CBOK_Ver_9-1

Commercial Off-the-Shelf Software and Performance Based Contracting

Version 9.1 8-9

• How much training did you do? Who provided the training? How successful was it?

• Did you have Performance Based Criteria for this acquisition? What did you use? What were the results?

In addition to these open ended questions, developing a few questions using a Likert scale might also be useful:

• On a scale of 1 to 7, how happy were you with the overall acquisition and installation experience?

• On a scale of 1 to 7, how completely does this product meet your functional needs?

• On a scale of 1 to 7, how would you rate this vendor in terms of quality, timeliness and support?

At the end of the discussion it is effective to close with the following questions:

• Is there something else important about this product and this vendor that we should know?

• Given what you know now, would you make the same decision?

To the extent that it is possible to do so, try to ask the same questions, the same way each time. Record the responses from each customer on a spreadsheet. Use the combined results of the phone calls for all of the customers of each of the vendors to help evaluate the potential choices.

It is worth asking a vendor to provide a list of former customers. They may not be willing to do so, but many are. Former customers are an excellent source for identifying potential problems with the vendor or the product. If the vendor does not have those names, it is sometime possible to get them from the current customers. It is important to remember that the reasons one organization chooses to move to a different product may not impact your organization. Questions to ask former customers are:

• How long did you use the product?

• What made you decide to change?

• What product did you select?

• Was the vendor helpful in making the transition?

• What was the best thing about the product / vendor?

• What was the worst thing about the product / vendor?

Responses from former customers must be evaluated with care, as there may be some residual hostility between the customer and the vendor that has no impact on the product itself.

Page 320: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

8-10 Version 9.1

8.3.3.2 Demonstrate the software in operation

Before committing to the acquisition of a vendor package, it is essential to see the product in use at another client location. Most vendors have a list of customers who are willing to let prospective purchasers visit their location to see the product in action. Be very cautious if the vendor is not willing to have this happen, it may indicate that there are significant issues with the product.

A Subject Matter Expert (SME), a member of the IT installation and support team, a tester and the Business Analyst should make the visit to the installation site. Each of these individuals brings a unique perspective to the demonstration and is capable of identifying strengths and weaknesses in the product that others might miss. Each team member should be focused on issues directly related to their specialty, as well as the general items at the end of this section. If it is essential to send a smaller team, a thorough pre-visit preparation session should be conducted.

Prior to the visit, talk with the host customer to discuss the organization’s special interests. Develop a list of specific functions to be executed and provide it in advance to the host customer. Make it clear that part of the purpose is to talk to people, at all levels of the organization, who are involved in the actual use of the product. If the review team only talks to the in house product champion, they may learn little more than through discussions with the vendor sales teams.

During the visit, the review team should be listening and watching as the product is used, focusing on the following issues:

• Ease of navigation through the system to accomplish tasks

• Understandability

• Clarity of communications

• Need for external references, such as manuals during operation

• Ease of use of manuals

• Functionality of software

• Knowledge needed to execute tasks

• Effectiveness of help routines

8.4 Roles and ResponsibilitiesThere are several key roles to fill when dealing with contracted software, whether custom or off the shelf. Not all organizations title these roles in precisely the same way. Regardless of

Page 321: CABA_CBOK_Ver_9-1

Commercial Off-the-Shelf Software and Performance Based Contracting

Version 9.1 8-11

what they are called, these functions must be performed for the project to be successful. Many of these roles and responsibilities have been identified in earlier Skill Categories.

8.4.1 Project Manager

Not all projects have an official “project manager”, but all teams have someone fulfilling that role. The project manager has overall schedule, budget, and quality responsibility for the project. The job of the project manager is to:

• Create, maintain and control the overall project plan

• Coordinate and manage the integration of sub-plans, such as the vendor delivery plan with the customer Test Plan, ensuring that sub-plans include time and resources for the appropriate levels of verification and validation activities

• Maintain control of scope, which includes the growth of requirements and any resulting growth of the budget and/or schedule, including the test effort

• Manage budget, staff resources and progress in accordance with the project plan

• Ensure communications regarding status of, and changes to, the project plan

• Manage the resolution of issues resulting failure to meet schedule, budget, functionality or quality criteria throughout the life of the project

• Ensure that all project metrics, including defect data are collected and maintained

• Ensure the successful completion of end of project activities, including the decision to implement, implementation and post implementation reviews and the archive of project artifacts

8.4.2 Project Liaison

This person is the primary project contact with the other party or parties to the contract. For small projects, this role may be filled by the project manager; for large projects there may be multiple individuals, each focusing on a specific vendor or product. The responsibilities of the project liaison are to:

• Ensure that proper communications, both incoming and outgoing, occur

• Track vendor deliverable against the contracted schedule

• Monitor the flow of defect reports and resolutions

Page 322: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

8-12 Version 9.1

• Facilitate technical and logistical problem resolutions sessions between the customer and the vendor

8.4.3 Attorneys and Legal Counsel

No prudent organization executes a contract without the advice of their legal counsel. These may be individuals who work for the organization and provide this service routinely, or they may be members of a law firm hired by the organization on an “as needed” basis.

• Review all documents presented to ensure conformance to both the organization’s best interests and the laws governing that organization

• Ensure that the contract(s) created are fair and support the intent expressed by the Business Unit and Information Technology

• Provide suggestions for clarification or improvement of documents presented

• Support contract negotiation efforts when required

• Provide expert support in the event of an unsuccessful contract termination

8.4.4 Test Manager and the Test Team

The person responsible for the systems and acceptance testing effort on the project is the Test Manager; in some organizations they are referred to as the “Test Lead”. The responsibilities of the Test Manager are to:

• Create and maintain the overall test plan to reflect changes to the overall project plan

• Determine what testing tools, techniques and strategies will be needed to effectively test the project and ensure the staff know how to perform that testing

• Assist the project manager in the integration of the test plan into the overall project plan

• Manage test budget, test staff resources and progress in accordance with the test plan

• Participate in test execution, analysis and defect tracking as needed

• Other functions of the Test Manager are identified in Skill Category 7

Page 323: CABA_CBOK_Ver_9-1

Commercial Off-the-Shelf Software and Performance Based Contracting

Version 9.1 8-13

8.4.5 Designer/Developer

The work of translating the requirements of what a system must do or be (“Requirements”) into a product that will meet those needs is called design. The work of design may include the participation of systems architects, database administrators, testers, trainers, documentation tech writers and others to come up with how to meet the needs. The designed product is then transferred to those who will make it come to life i.e., the developers.

• In the world of contracted software, the developers will be part of the vendor organization

8.4.6 Business Partner and Subject Matter Expert

The participation of the business partner and subject matter experts from the business community is essential to the success of the project. Just as it is not possible to get the requirements right early in the project without their cooperation, so too it is necessary to have their input on both the creation and results of various functional tests.

With both the business partners and subject matter experts it is important to be conscious of their competing priorities and be efficient and effective in the scheduling of their participation. The responsibilities of these individuals in support of contracted software are:

• Participate in the development and prioritization of the requirements forming the basis for the contract

• Support the creation and maintenance of an effective overall project with specific attention to areas of functional correctness and performance characteristics of the product

• Provide expert insight into functionality issues that arise from the development of requirements and execution of test cases

• Assist the project manager in the integration of the business and subject matter experts into the project plan and specifically where needed in requirements verification and acceptance testing

• Support efforts to maintain control of the project scope by active participation in early test life cycle activities such as requirements verification and test case development

• Provide support for an appropriate level of test budget and test staff resources in both the IT and the business communities

• Participate in the completion of end of project activities, including the decision to implement, implementation and post implementation reviews

Page 324: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

8-14 Version 9.1

8.4.7 Business Analyst

In earlier Skill Categories the point has been made that not all organizations have the same structure, and that as a result, the Business Analyst often finds they are needed to perform roles and responsibilities of other functions. If there is no project manager, the BA may need to fulfill those responsibilities. If there is no test manager or project liaison, BA may be doing that work. Regardless of this work, the responsibilities of the BA are:

• Participate in the creation of the overall project and test plan and assist with the necessary maintenance to reflect changes to the overall project plan

• Plan for and participate in early life cycle verification activities such as requirements inspections and early development and inspection of use cases

• Plan for and participate in functional, regression, stress, security and performance test execution, analysis and defect tracking as needed, with specific attention to those aspects of acceptance testing that are essential to the successful implementation of the finished product

• Support the resolution of issues resulting in the failure to meet the schedule, budget, functionality or quality criteria throughout the testing life cycle of the project

• Participate in the completion of end of project activities, including the decision to implement, test reports, implementation and post implementation reviews.

8.4.8 Other Participants

In addition to the participants identified above, there can be many other groups and individuals contributing to the contract programming project, such as:

• Other Vendors

• Key Stakeholders

• Beta Customers

• Power Users

8.5 Summary This Skill Category discusses the special issues and approaches needed to work with vendors for the development and acquisition of software products. This may range from completely custom, developed from the customers requirements, to completely off-the-shelf. Regardless

Page 325: CABA_CBOK_Ver_9-1

Commercial Off-the-Shelf Software and Performance Based Contracting

Version 9.1 8-15

of the source of the requirements, there is a need to measure the product against a defined standard to ensure delivery of the correct product. Performance Based Contracting helps both the customer and the vendor clearly understand what is expected and how delivery will be measured.

Page 326: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

8-16 Version 9.1

Page 327: CABA_CBOK_Ver_9-1

Version 9.1 A-1

VocabularyThe organization of this document is primarily alphabetical. Acronyms are grouped at the beginning of each alphabetical section, and are followed by words, terms and phrases. Acro-nyms are expanded at the beginning of each alphabetical section and defined with the full term or phrase. Four modifications are the grouping of terms and phrases in the domains of specifications, testing, qualification, and validation. Those related terms are located sequen-tially to assist the user in finding all defined terms in these domains, e.g., functional testing is defined under testing, functional.

The terms are defined, as much as possible, using available standards. The source of such def-initions appears immediately following the term or phrase in parenthesis, e.g. (NIST). The source documents are listed below.

The New IEEE Standard Dictionary of Electrical and Electronics Terms, IEEE Std. 100-1992.

IEEE Standards Collection, Software Engineering, 1994 Edition, published by the Institute of Electrical and Electronic Engineers Inc.

National Bureau of Standards [NBS] Special Publication 500-75 Validation, Verification, and Testing of Computer Software, 1981.

Federal Information Processing Standards [FIPS] Publication 101, Guideline For Lifecycle Validation, Verification, and Testing of Computer Software, 1983.

Federal Information Processing Standards [FIPS] Publication 105, Guideline for Software Documentation Management, 1984.

American National Standard for Information Systems, Dictionary for Information Systems, American National Standards Institute, 1991.

FDA Technical Report, Software Development Activities, July 1987.

FDA Guide to Inspection of Computerized Systems in Drug Processing, 1983.

FDA Guideline on General Principles of Process Validation, May 1987.

Appendix

A

Page 328: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-2 Version 9.1

Reviewer Guidance for Computer Controlled Medical Devices Undergoing 510(k) Review, Office of Device Evaluation, CDRH, FDA, August 1991.

HHS Publication FDA 90-4236, Preproduction Quality Assurance Planning.

MIL-STD-882C, Military Standard System Safety Program Requirements, 19JAN1993.

International Electrotechnical Commission, International Standard 1025, Fault Tree Analy-sis.

International Electrotechnical Commission, International Standard 812, Analysis Tech-niques for System Reliability - Procedure for Failure Mode and Effects Analysis [FMEA].

FDA recommendations, Application of the Medical Device GMP to Computerized Devices and Manufacturing Processes, May 1992.

Pressman, R., Software Engineering, A Practitioner's Approach, Third Edition, McGraw-Hill, Inc., 1992.

Myers, G., The Art of Software Testing, Wiley Interscience, 1979.

Beizer, B., Software Testing Techniques, Second Edition, Van Nostrand Reinhold, 1990.

Additional general references used in developing some definitions are:

Bohl, M., Information Processing, Fourth Edition, Science Research Associates, Inc., 1984.

Freedman, A., The Computer Glossary, Sixth Edition, American Management Association, 1993.

McGraw-Hill Electronics Dictionary, Fifth Edition, 1994, McGraw-Hill Inc.

McGraw-Hill Dictionary of Scientific & Technical Terms, Fifth Edition, 1994, McGraw-Hill Inc..

Webster's New Universal Unabridged Dictionary, Deluxe Second Edition, 1979.

Page 329: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-3

- A -

ADC. analog-to-digital converter.

ALU. arithmetic logic unit.

ANSI. American National Standards Institute.

ASCII. American Standard Code for Information Interchange.

abstraction. The separation of the logical properties of data or function from its implementation in a computer program. See: encapsulation, information hiding, software engineering.

access. (ANSI) To obtain the use of a resource.

access time. (ISO) The time interval between the instant at which a call for data is initiated and the instant at which the delivery of the data is completed.

accident. See: mishap.

accuracy. (IEEE) (1) A qualitative assessment of correctness or freedom from error. (2) A quantitative measure of the magnitude of error. Contrast with precision. (CDRH) (3) The measure of an instrument's capability to approach a true or absolute value. It is a function of precision and bias. See: bias, precision, calibration.

accuracy study processor. A software tool used to perform calculations or determine accuracy of computer manipulated program variables.

actuator. A peripheral [output] device which translates electrical signals into mechanical actions; e.g., a stepper motor which acts on an electrical signal received from a computer instructing it to turn its shaft a certain number of degrees or a certain number of rotations. See: servomechanism.

adaptive maintenance. (IEEE) Software maintenance performed to make a computer program usable in a changed environment. Contrast with corrective maintenance, perfective maintenance.

address. (1) A number, character, or group of characters which identifies a given device or a storage location which may contain a piece of data or a program step. (2) To refer to a device or storage location by an identifying number, character, or group of characters.

addressing exception. (IEEE) An exception that occurs when a program calculates an address outside the bounds of the storage available to it.

algorithm. (IEEE) (1) A finite set of well-defined rules for the solution of a problem in a finite number of steps. (2) Any sequence of operations for performing a specific task.

algorithm analysis. (IEEE) A software V&V task to ensure that the algorithms selected are correct, appropriate, and stable, and meet all accuracy, timing, and sizing requirements.

alphanumeric. Pertaining to a character set that contains letters, digits, and usually other characters such as punctuation marks.

Page 330: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-4 Version 9.1

American National Standards Institute. 11 West 42nd Street, New York, N.Y. 10036. An organization that coordinates the development of U.S. voluntary national standards for nearly all industries. It is the U.S. member body to ISO and IEC. Information technology standards pertain to programming languages, electronic data interchange, telecommunications and physical properties of diskettes, cartridges and magnetic tapes.

American Standard Code for Information Interchange. A seven bit code adopted as a standard to represent specific data characters in computer systems, and to facilitate interchange of data between various machines and systems. Provides 128 possible characters, the first 32 of which are used for printing and transmission control. Since common storage is an 8-bit byte [256 possible characters] and ASCII uses only 128, the extra bit is used to hold a parity bit or create special symbols. See: extended ASCII.

analog. Pertaining to data [signals] in the form of continuously variable [wave form] physical quantities; e.g., pressure, resistance, rotation, temperature, voltage. Contrast with digital.

analog device. (IEEE) A device that operates with variables represented by continuously measured quantities such as pressures, resistances, rotations, temperatures, and voltages.

analog-to-digital converter. Input related devices which translate an input device's [sensor] analog signals to the corresponding digital signals needed by the computer. Contrast with DAC [digital-to-analog converter]. See: analog, digital.

analysis. (1) To separate into elemental parts or basic principles so as to determine the nature of the whole. (2) A course of reasoning showing that a certain result is a consequence of assumed premises. (3) (ANSI) The methodical investigation of a problem, and the separation of the problem into smaller related units for further detailed study.

anomaly. (IEEE) Anything observed in the documentation or operation of software that deviates from expectations based on previously verified software products or reference documents. See: bug, defect, error, exception, fault.

application program. See: application software.

application software. (IEEE) Software designed to fill specific needs of a user; for example, software for navigation, payroll, or process control. Contrast with support software; system software.

architectural design. (IEEE) (1) The process of defining a collection of hardware and software components and their interfaces to establish the framework for the development of a computer system. See: functional design. (2) The result of the process in (1). See: software engineering.

architecture. (IEEE) The organizational structure of a system or component. See: component, module, subprogram, routine.

archival database. (ISO) An historical copy of a database saved at a significant point in time for use in recovery or restoration of the database.

archive. (IEEE) A lasting collection of computer system data or other records that are in long term storage.

Page 331: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-5

archive file. (ISO) A file that is part of a collection of files set aside for later research or verification, for security purposes, for historical or legal purposes, or for backup.

arithmetic logic unit. The [high speed] circuits within the CPU which are responsible for performing the arithmetic and logical operations of a computer.

arithmetic overflow. (ISO) That portion of a numeric word that expresses the result of an arithmetic operation, by which the length of the word exceeds the word length of the space provided for the representation of the number. See: overflow, overflow exception.

arithmetic underflow. (ISO) In an arithmetic operation, a result whose absolute value is too small to be represented within the range of the numeration system in use. See: underflow, underflow exception.

array. (IEEE) An n-dimensional ordered set of data items identified by a single name and one or more indices, so that each element of the set is individually addressable; e.g., a matrix, table, or vector.

as built. (NIST) Pertaining to an actual configuration of software code resulting from a software development project.

assemble. See: assembling.

assembler. (IEEE) A computer program that translates programs [source code files] written in assembly language into their machine language equivalents [object code files]. Contrast with compiler, interpreter. See: cross-assembler, cross-compiler.

assembling. (NIST) Translating a program expressed in an assembly language into object code.

assembly code. See: assembly language.

assembly language. (IEEE) A low level programming language, that corresponds closely to the instruction set of a given computer, allows symbolic naming of operations and addresses, and usually results in a one-to-one translation of program instructions [mnemonics] into machine instructions. See: low-level language.

assertion. (NIST) A logical expression specifying a program state that must exist or a set of conditions that program variables must satisfy at a particular point during program execution.

assertion checking. (NIST) Checking of user- embedded statements that assert relationships between elements of a program. An assertion is a logical expression that specifies a condition or relation among program variables. Tools that test the validity of assertions as the program is executing or tools that perform formal verification of assertions have this feature. See: instrumentation; testing, assertion.

asynchronous. Occurring without a regular time relationship, i.e., timing independent.

asynchronous transmission. A timing independent method of electrical transfer of data in which the sending and receiving units are synchronized on each character, or small block of characters, usually by the use of start and stop signals. Contrast with synchronous transmission.

audit. (1) (IEEE) An independent examination of a work product or set of work products to assess compliance with specifications, standards, contractual agreements, or other criteria.

Page 332: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-6 Version 9.1

See: functional configuration audit, physical configuration audit. (2) (ANSI) To conduct an independent review and examination of system records and activities in order to test the adequacy and effectiveness of data security and data integrity procedures, to ensure compliance with established policy and operational procedures, and to recommend any necessary changes. See: computer system audit, software audit.

audit trail. (1) (ISO) Data in the form of a logical path linking a sequence of events, used to trace the transactions that have affected the contents of a record. (2) A chronological record of system activities that is sufficient to enable the reconstruction, reviews, and examination of the sequence of environments and activities surrounding or leading to each event in the path of a transaction from its inception to output of final results.

auxiliary storage. Storage device other than main memory [RAM]; e.g., disks and tapes.

- B -

BIOS. basic input/output system.

bps. bits per second.

band. Range of frequencies used for transmitting a signal. A band can be identified by the difference between its lower and upper limits, i.e. bandwidth, as well as by its actual lower and upper limits; e.g., a 10 MHz band in the 100 to 110 MHz range.

bandwidth. The transmission capacity of a computer channel, communications line or bus. It is expressed in cycles per second [Hz], and also is often stated in bits or bytes per second. See: band.

bar code. (ISO) A code representing characters by sets of parallel bars of varying thickness and separation that are read optically by transverse scanning.

baseline. (NIST) A specification or product that has been formally reviewed and agreed upon, that serves as the basis for further development, and that can be changed only through formal change control procedures.

BASIC. An acronym for Beginners All-purpose Symbolic Instruction Code, a high-level programming language intended to facilitate learning to program in an interactive environment.

basic input/output system. Firmware that activates peripheral devices in a PC. Includes routines for the keyboard, screen, disk, parallel port and serial port, and for internal services such as time and date. It accepts requests from the device drivers in the operating system as well from application programs. It also contains autostart functions that test the system on startup and prepare the computer for operation. It loads the operating system and passes control to it.

batch. (IEEE) Pertaining to a system or mode of operation in which inputs are collected and processed all at one time, rather than being processed as they arrive, and a job, once started, proceeds to completion without additional input or user interaction. Contrast with conversational, interactive, on-line, real time.

Page 333: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-7

batch processing. Execution of programs serially with no interactive processing. Contrast with real time processing.

baud. The signalling rate of a line. It's the switching speed, or number of transitions [voltage or frequency change] made per second. At low speeds bauds are equal to bits per seconds; e.g., 300 baud is equal to 300 bps. However, one baud can be made to represent more than one bit per second.

benchmark. A standard against which measurements or comparisons can be made.

bias. A measure of how closely the mean value in a series of replicate measurements approaches the true value. See: accuracy, precision, calibration.

binary. The base two number system. Permissible digits are "0" and "1".

bit. A contraction of the term binary digit. The bit is the basic unit of digital data. It may be in one of two states, logic 1 or logic 0. It may be thought of as a switch which is either on or off. Bits are usually combined into computer words of various sizes, such as the byte.

bits per second. A measure of the speed of data transfer in a communications system.

black-box testing. See: testing, functional.

block. (ISO) (1) A string of records, words, or characters that for technical or logical purposes are treated as a unity. (2) A collection of contiguous records that are recorded as a unit, and the units are separated by interblock gaps. (3) A group of bits or digits that are transmitted as a unit and that may be encoded for error-control purposes. (4) In programming languages, a subdivision of a program that serves to group related statements, delimit routines, specify storage allocation, delineate the applicability of labels, or segment parts of the program for other purposes. In FORTRAN, a block may be a sequence of statements; in COBOL, it may be a physical record.

block check. (ISO) The part of the error control procedure that is used for determining that a block of data is structured according to given rules.

block diagram. (NIST) A diagram of a system, instrument or computer, in which the principal parts are represented by suitably annotated geometrical figures to show both the basic functions of the parts and the functional relationships between them.

block length. (1) (ISO) The number of records, words or characters in a block. (2) (ANSI) A measure of the size of a block, usually specified in units such as records, words, computer words, or characters.

block transfer. (ISO) The process, initiated by a single action, of transferring one or more blocks of data.

blocking factor. (ISO) The number of records in a block. The number is computed by dividing the size of the block by the size of each record contained therein. Syn: grouping factor.

blueprint. An exact or detailed plan or outline. Contrast with graph.

bomb. A trojan horse which attacks a computer system upon the occurrence of a specific logical event [logic bomb], the occurrence of a specific time-related logical event [time

Page 334: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-8 Version 9.1

bomb], or is hidden in electronic mail or data and is triggered when read in a certain way [letter bomb]. See: trojan horse, virus, worm.

boolean. Pertaining to the principles of mathematical logic developed by George Boole, a nineteenth century mathematician. Boolean algebra is the study of operations carried out on variables that can have only one of two possible values; i.e., 1 (true) and 0 (false). As ADD, SUBTRACT, MULTIPLY, and DIVIDE are the primary operations of arithmetic, AND, OR, and NOT are the primary operations of Boolean Logic. In Pascal a boolean variable is a variable that can have one of two possible values, true or false.

boot. (1) (IEEE) To initialize a computer system by clearing memory and reloading the operating system. (2) To cause a computer system to reach a known beginning state. A boot program, in firmware, typically performs this function which includes loading basic instructions which tell the computer how to load programs into memory and how to begin executing those programs. A distinction can be made between a warm boot and a cold boot. A cold boot means starting the system from a powered-down state. A warm boot means restarting the computer while it is powered-up. Important differences between the two procedures are; 1) a power-up self-test, in which various portions of the hardware [such as memory] are tested for proper operation, is performed during a cold boot while a warm boot does not normally perform such self-tests, and 2) a warm boot does not clear all memory.

bootstrap. (IEEE) A short computer program that is permanently resident or easily loaded into a computer and whose execution brings a larger program, such an operating system or its loader, into memory.

boundary value. (1) (IEEE) A data value that corresponds to a minimum or maximum input, internal, or output value specified for a system or component. (2) A value which lies at, or just inside or just outside a specified range of valid input and output values.

boundary value analysis. (NBS) A selection technique in which test data are chosen to lie along "boundaries" of the input domain [or output range] classes, data structures, procedure parameters, etc. Choices often include maximum, minimum, and trivial values or parameters. This technique is often called stress testing. See: testing, boundary value.

box diagram. (IEEE) A control flow diagram consisting of a rectangle that is subdivided to show sequential steps, if-then-else conditions, repetition, and case conditions. Syn: Chapin chart, Nassi-Shneiderman chart, program structure diagram. See: block diagram, bubble chart, flowchart, graph, input-process-output chart, structure chart.

branch. An instruction which causes program execution to jump to a new point in the program sequence, rather than execute the next instruction. Syn: jump.

branch analysis. (Myers) A test case identification technique which produces enough test cases such that each decision has a true and a false outcome at least once. Contrast with path analysis.

branch coverage. (NBS) A test coverage criteria which requires that for each decision point each possible branch be executed at least once. Syn: decision coverage. Contrast with condition coverage, multiple condition coverage, path coverage, statement coverage. See: testing, branch.

Page 335: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-9

bubble chart. (IEEE) A data flow, data structure, or other diagram in which entities are depicted with circles [bubbles] and relationships are represented by links drawn between the circles. See: block diagram, box diagram, flowchart, graph, input-process-output chart, structure chart.

buffer. A device or storage area [memory] used to store data temporarily to compensate for differences in rates of data flow, time of occurrence of events, or amounts of data that can be handled by the devices or processes involved in the transfer or use of the data.

bug. A fault in a program which causes the program to perform in an unintended or unanticipated manner. See: anomaly, defect, error, exception, fault.

bus. A common pathway along which data and control signals travel between different hardware devices within a computer system. (A) When bus architecture is used in a computer, the CPU, memory and peripheral equipment are interconnected through the bus. The bus is often divided into two channels, a control channel to select where data is located [address bus], and the other to transfer the data [data bus or I/O bus]. Common buses are: ISA [Industry Standard Architecture] the original IBM PC 16 bit AT bus; EISA [Extended Industry Standard Architecture] the IBM PC 32 bit XT bus [which provides for bus mastering]; MCA [MicroChannel Architecture] an IBM 32 bit bus; Multibus I & II [advanced, 16 & 32 bit respectively, bus architecture by Intel used in industrial, military and aerospace applications]; NuBus, a 32 bit bus architecture originally developed at MIT [A version is used in the Apple Macintosh computer]; STD bus, a bus architecture used in medical and industrial equipment due to its small size and rugged design [Originally 8 bits, with extensions to 16 and 32 bits]; TURBO Channel, a DEC 32 bit data bus with peak transfer rates of 100 MB/second; VMEbus [Versa Module Eurocard Bus], a 32 bit bus from Motorola, et.al., used in industrial, commercial and military applications worldwide [VME64 is an expanded version that provides 64 bit data transfer and addressing]. (B) When bus architecture is used in a network, all terminals and computers are connected to a common channel that is made of twisted wire pairs, coaxial cable, or optical fibers. Ethernet is a common LAN architecture using a bus topology.

byte. A sequence of adjacent bits, usually eight, operated on as a unit.

- C -

CAD. computer aided design.

CAM. computer aided manufacturing.

CASE. computer aided software engineering.

CCITT. Consultive Committee for International Telephony and Telegraphy.

CD-ROM. compact disc - read only memory.

CISC. complex instruction set computer.

CMOS. complementary metal-oxide semiconductor.

CO-AX. coaxial cable.

Page 336: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-10 Version 9.1

COTS. configurable, off-the-shelf software.

CP/M. Control Program for Microcomputers.

CPU. central processing unit.

CRC. cyclic redundancy [check] code.

CRT. cathode ray tube.

C. A general purpose high-level programming language. Created for use in the development of computer operating systems software. It strives to combine the power of assembly language with the ease of a high-level language.

C++. An object-oriented high-level programming language.

calibration. Ensuring continuous adequate performance of sensing, measurement, and actuating equipment with regard to specified accuracy and precision requirements. See: accuracy, bias, precision.

call graph. (IEEE) A diagram that identifies the modules in a system or computer program and shows which modules call one another. Note: The result is not necessarily the same as that shown in a structure chart. Syn: call tree, tier chart. Contrast with structure chart. See: control flow diagram, data flow diagram, data structure diagram, state diagram.

cathode ray tube. An output device. Syn: display, monitor, screen.

cause effect graph. (Myers) A Boolean graph linking causes and effects. The graph is actually a digital-logic circuit (a combinatorial logic network) using a simpler notation than standard electronics notation.

cause effect graphing. (1) (NBS) Test data selection technique. The input and output domains are partitioned into classes and analysis is performed to determine which input classes cause which effect. A minimal set of inputs is chosen which will cover the entire effect set. (2) (Myers) A systematic method of generating test cases representing combinations of conditions. See: testing, functional.

central processing unit. The unit of a computer that includes the circuits controlling the interpretation of program instructions and their execution. The CPU controls the entire computer. It receives and sends data through input-output channels, retrieves data and programs from memory, and conducts mathematical and logical functions of a program.

certification. (ANSI) In computer systems, a technical evaluation, made as part of and in support of the accreditation process, that establishes the extent to which a particular computer system or network design and implementation meet a prespecified set of requirements.

change control. The processes, authorities for, and procedures to be used for all changes that are made to the computerized system and/or the system's data. Change control is a vital subset of the Quality Assurance [QA] program within an establishment and should be clearly described in the establishment's SOPs. See: configuration control.

change tracker. A software tool which documents all changes made to a program.

check summation. A technique for error detection to ensure that data or program files have been accurately copied or transferred. Basically, a redundant check in which groups of digits;

Page 337: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-11

e.g., a file, are summed, usually without regard to overflow, and that sum checked against a previously computed sum to verify operation accuracy. Contrast with cyclic redundancy check [CRC], parity check. See: checksum.

checksum. (IEEE) A sum obtained by adding the digits in a numeral, or group of numerals [a file], usually without regard to meaning, position, or significance. See: check summation.

chip. See: integrated circuit.

client-server. A term used in a broad sense to describe the relationship between the receiver and the provider of a service. In the world of microcomputers, the term client-server describes a networked system where front-end applications, as the client, make service requests upon another networked system. Client-server relationships are defined primarily by software. In a local area network [LAN], the workstation is the client and the file server is the server. However, client-server systems are inherently more complex than file server systems. Two disparate programs must work in tandem, and there are many more decisions to make about separating data and processing between the client workstations and the database server. The database server encapsulates database files and indexes, restricts access, enforces security, and provides applications with a consistent interface to data via a data dictionary.

clock. (ISO) A device that generates periodic, accurately spaced signals used for such purposes as timing, regulation of the operations of a processor, or generation of interrupts.

coaxial cable. High-capacity cable used in communications and video transmissions. Provides a much higher bandwidth than twisted wire pair.

COBOL. Acronym for COmmon Business Oriented Language. A high-level programming language intended for use in the solution of problems in business data processing.

code. See: program, source code.

code audit. (IEEE) An independent review of source code by a person, team, or tool to verify compliance with software design documentation and programming standards. Correctness and efficiency may also be evaluated. Contrast with code inspection, code review, code walkthrough. See: static analysis.

code auditor. A software tool which examines source code for adherence to coding and documentation conventions.

code inspection. (Myers/NBS) A manual [formal] testing [error detection] technique where the programmer reads source code, statement by statement, to a group who ask questions analyzing the program logic, analyzing the code with respect to a checklist of historically common programming errors, and analyzing its compliance with coding standards. Contrast with code audit, code review, code walkthrough. This technique can also be applied to other software and configuration items. Syn: Fagan Inspection. See: static analysis.

code review. (IEEE) A meeting at which software code is presented to project personnel, managers, users, customers, or other interested parties for comment or approval. Contrast with code audit, code inspection, code walkthrough. See: static analysis.

code walkthrough. (Myers/NBS) A manual testing [error detection] technique where program [source code] logic [structure] is traced manually [mentally] by a group with a small set of test cases, while the state of program variables is manually monitored, to analyze the

Page 338: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-12 Version 9.1

programmer's logic and assumptions. Contrast with code audit, code inspection, code review. See: static analysis.

coding. (IEEE) (1) In software engineering, the process of expressing a computer program in a programming language. (2) The transforming of logic and data from design specifications (design descriptions) into a programming language. See: implementation.

coding standards. Written procedures describing coding [programming] style conventions specifying rules governing the use of individual constructs provided by the programming language, and naming, formatting, and documentation requirements which prevent programming errors, control complexity and promote understandability of the source code. Syn: development standards, programming standards.

comment. (1) (ISO) In programming languages, a language construct that allows [explanatory] text to be inserted into a program and that does not have any effect on the execution of the program. (2) (IEEE) Information embedded within a computer program, job control statements, or a set of data, that provides clarification to human readers but does not affect machine interpretation.

compact disc - read only memory. A compact disk used for the permanent storage of text, graphic or sound information. Digital data is represented very compactly by tiny holes that can be read by lasers attached to high resolution sensors. Capable of storing up to 680 MB of data, equivalent to 250,000 pages of text, or 20,000 medium resolution images. This storage media is often used for archival purposes. Syn: optical disk, write-once read-many times disk.

comparator. (IEEE) A software tool that compares two computer programs, files, or sets of data to identify commonalities or differences. Typical objects of comparison are similar versions of source code, object code, data base files, or test results.

compatibility. (ANSI) The capability of a functional unit to meet the requirements of a specified interface.

compilation. (NIST) Translating a program expressed in a problem-oriented language or a procedure oriented language into object code. Contrast with assembling, interpret. See: compiler.

compile. See: compilation.

compiler. (1) (IEEE) A computer program that translates programs expressed in a high-level language into their machine language equivalents. (2) The compiler takes the finished source code listing as input and outputs the machine code instructions that the computer must have to execute the program. See: assembler, interpreter, cross-assembler, cross-compiler.

compiling. See: compilation.

complementary metal-oxide semiconductor. A type of integrated circuit widely used for processors and memories. It is a combination of transistors on a single chip connected to complementary digital circuits.

completeness. (NIST) The property that all necessary parts of the entity are included. Completeness of a product is often used to express the fact that all requirements have been met by the product. See: traceability analysis.

Page 339: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-13

complex instruction set computer. Traditional computer architecture that operates with large sets of possible instructions. Most computers are in this category, including the IBM compatible microcomputers. As computing technology evolved, instruction sets expanded to include newer instructions which are complex in nature and require several to many execution cycles and, therefore, more time to complete. Computers which operate with system software based on these instruction sets have been referred to as complex instruction set computers. Contrast with reduced instruction set computer [RISC].

complexity. (IEEE) (1) The degree to which a system or component has a design or implementation that is difficult to understand and verify. (2) Pertaining to any of a set of structure based metrics that measure the attribute in (1).

component. See: unit.

computer. (IEEE) (1) A functional unit that can perform substantial computations, including numerous arithmetic operations, or logic operations, without human intervention during a run. (2) A functional programmable unit that consists of one or more associated processing units and peripheral equipment, that is controlled by internally stored programs, and that can perform substantial computations, including numerous arithmetic operations, or logic operations, without human intervention.

computer aided design. The use of computers to design products. CAD systems are high speed workstations or personal computers using CAD software and input devices such as graphic tablets and scanners to model and simulate the use of proposed products. CAD output is a printed design or electronic output to CAM systems. CAD software is available for generic design or specialized uses such as architectural, electrical, and mechanical design. CAD software may also be highly specialized for creating products such as printed circuits and integrated circuits.

computer aided manufacturing. The automation of manufacturing systems and techniques, including the use of computers to communicate work instructions to automate machinery for the handling of the processing [numerical control, process control, robotics, material requirements planning] needed to produce a workpiece.

computer aided software engineering. An automated system for the support of software development including an integrated tool set, i.e., programs, which facilitate the accomplishment of software engineering methods and tasks such as project planning and estimation, system and software requirements analysis, design of data structure, program architecture and algorithm procedure, coding, testing and maintenance.

computer instruction set. (ANSI) A complete set of the operators of the instructions of a computer together with a description of the types of meanings that can be attributed to their operands. Syn: machine instruction set.

computer language. (IEEE) A language designed to enable humans to communicate with computers. See: programming language.

computer program. See: program.

computer science. (ISO) The branch of science and technology that is concerned with methods and techniques relating to data processing performed by automatic means.

Page 340: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-14 Version 9.1

computer system. (ANSI) a functional unit, consisting of one or more computers and associated peripheral input and output devices, and associated software, that uses common storage for all or part of a program and also for all or part of the data necessary for the execution of the program; executes user-written or user-designated programs; performs user-designated data manipulation, including arithmetic operations and logic operations; and that can execute programs that modify themselves during their execution. A computer system may be a stand-alone unit or may consist of several interconnected units. See: computer, computerized system.

computer system audit. (ISO) An examination of the procedures used in a computer system to evaluate their effectiveness and correctness and to recommend improvements. See: software audit.

computer system security. (IEEE) The protection of computer hardware and software from accidental or malicious access, use, modification, destruction, or disclosure. Security also pertains to personnel, data, communications, and the physical protection of computer installations. See: bomb, trojan horse, virus, worm.

computer word. A sequence of bits or characters that is stored, addressed, transmitted, and operated on as a unit within a given computer. Typically one to four bytes long, depending on the make of computer.

computerized system. Includes hardware, software, peripheral devices, personnel, and documentation; e.g., manuals and Standard Operating Procedures. See: computer, computer system.

concept phase. (IEEE) The initial phase of a software development project, in which user needs are described and evaluated through documentation; e.g., statement of needs, advance planning report, project initiation memo. feasibility studies, system definition documentation, regulations, procedures, or policies relevant to the project.

condition coverage. (Myers) A test coverage criteria requiring enough test cases such that each condition in a decision takes on all possible outcomes at least once, and each point of entry to a program or subroutine is invoked at least once. Contrast with branch coverage, decision coverage, multiple condition coverage, path coverage, statement coverage.

configurable, off-the-shelf software. Application software, sometimes general purpose, written for a variety of industries or users in a manner that permits users to modify the program to meet their individual needs.

configuration. (IEEE) (1) The arrangement of a computer system or component as defined by the number, nature, and interconnections of its constituent parts. (2) In configuration management, the functional and physical characteristics of hardware or software as set forth in technical documentation or achieved in a product.

configuration audit. See: functional configuration audit, physical configuration audit.

configuration control. (IEEE) An element of configuration management, consisting of the evaluation, coordination, approval or disapproval, and implementation of changes to configuration items after formal establishment of their configuration identification. See: change control.

Page 341: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-15

configuration identification. (IEEE) An element of configuration management, consisting of selecting the configuration items for a system and recording their functional and physical characteristics in technical documentation.

configuration item. (IEEE) An aggregation of hardware, software, or both that is designated for configuration management and treated as a single entity in the configuration management process. See: software element.

configuration management. (IEEE) A discipline applying technical and administrative direction and surveillance to identify and document the functional and physical characteristics of a configuration item, control changes to those characteristics, record and report change processing and implementation status, and verifying compliance with specified requirements. See: configuration control, change control, software engineering.

consistency. (IEEE) The degree of uniformity, standardization, and freedom from contradiction among the documents or parts of a system or component. See: traceability.

consistency checker. A software tool used to test requirements in design specifications for both consistency and completeness.

constant. A value that does not change during processing. Contrast with variable.

constraint analysis. (IEEE) (1) Evaluation of the safety of restrictions imposed on the selected design by the requirements and by real world restrictions. The impacts of the environment on this analysis can include such items as the location and relation of clocks to circuit cards, the timing of a bus latch when using the longest safety-related timing to fetch data from the most remote circuit card, interrupts going unsatisfied due to a data flood at an input, and human reaction time. (2) verification that the program operates within the constraints imposed upon it by requirements, the design, and the target computer. Constraint analysis is designed to identify these limitations to ensure that the program operates within them, and to ensure that all interfaces have been considered for out-of-sequence and erroneous inputs.

Consultive Committee for International Telephony and Telegraphy. See: International Telecommunications Union - Telecommunications Standards Section.

control bus. (ANSI) A bus carrying the signals that regulate system operations. See: bus.

control flow. (ISO) In programming languages, an abstraction of all possible paths that an execution sequence may take through a program.

control flow analysis. (IEEE) A software V&V task to ensure that the proposed control flow is free of problems, such as design or code elements that are unreachable or incorrect.

control flow diagram. (IEEE) A diagram that depicts the set of all possible sequences in which operations may be performed during the execution of a system or program. Types include box diagram, flowchart, input-process-output chart, state diagram. Contrast with data flow diagram. See: call graph, structure chart.

Control Program for Microcomputers. An operating system. A registered trademark of Digital Research.

Page 342: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-16 Version 9.1

controller. Hardware that controls peripheral devices such as a disk or display screen. It performs the physical data transfers between main memory and the peripheral device.

conversational. (IEEE) Pertaining to a interactive system or mode of operation in which the interaction between the user and the system resembles a human dialog. Contrast with batch. See: interactive, on-line, real time.

coroutine. (IEEE) A routine that begins execution at the point at which operation was last suspended, and that is not required to return control to the program or subprogram that called it. Contrast with subroutine.

corrective maintenance. (IEEE) Maintenance performed to correct faults in hardware or software. Contrast with adaptive maintenance, perfective maintenance.

correctness. (IEEE) The degree to which software is free from faults in its specification, design and coding. The degree to which software, documentation and other items meet specified requirements. The degree to which software, documentation and other items meet user needs and expectations, whether specified or not.

coverage analysis. (NIST) Determining and assessing measures associated with the invocation of program structural elements to determine the adequacy of a test run. Coverage analysis is useful when attempting to execute each statement, branch, path, or iterative structure in a program. Tools that capture this data and provide reports summarizing relevant information have this feature. See: testing, branch; testing, path; testing, statement.

crash. (IEEE) The sudden and complete failure of a computer system or component.

critical control point. (QA) A function or an area in a manufacturing process or procedure, the failure of which, or loss of control over, may have an adverse affect on the quality of the finished product and may result in a unacceptable health risk.

critical design review. (IEEE) A review conducted to verify that the detailed design of one or more configuration items satisfy specified requirements; to establish the compatibility among the configuration items and other items of equipment, facilities, software, and personnel; to assess risk areas for each configuration item; and, as applicable, to assess the results of producibility analyses, review preliminary hardware product specifications, evaluate preliminary test planning, and evaluate the adequacy of preliminary operation and support documents. See: preliminary design review, system design review.

criticality. (IEEE) The degree of impact that a requirement, module, error, fault, failure, or other item has on the development or operation of a system. Syn: severity.

criticality analysis. (IEEE) Analysis which identifies all software requirements that have safety implications, and assigns a criticality level to each safety-critical requirement based upon the estimated risk.

cross-assembler. (IEEE) An assembler that executes on one computer but generates object code for a different computer.

cross-compiler. (IEEE) A compiler that executes on one computer but generates assembly code or object code for a different computer.

Page 343: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-17

cursor. (ANSI) A movable, visible mark used to indicate a position of interest on a display surface.

cyclic redundancy [check] code. A technique for error detection in data communications used to assure a program or data file has been accurately transferred. The CRC is the result of a calculation on the set of transmitted bits by the transmitter which is appended to the data. At the receiver the calculation is repeated and the results compared to the encoded value. The calculations are chosen to optimize error detection. Contrast with check summation, parity check.

cyclomatic complexity. (1) (McCabe) The number of independent paths through a program. (2) (NBS) The cyclomatic complexity of a program is equivalent to the number of decision statements plus 1.

- D -

DAC. digital-to-analog converter.

DFD. data flow diagram.

DMA. direct memory access.

DOS. disk operating system.

data. Representations of facts, concepts, or instructions in a manner suitable for communication, interpretation, or processing by humans or by automated means.

data analysis. (IEEE) (1) Evaluation of the description and intended use of each data item in the software design to ensure the structure and intended use will not result in a hazard. Data structures are assessed for data dependencies that circumvent isolation, partitioning, data aliasing, and fault containment issues affecting safety, and the control or mitigation of hazards. (2) Evaluation of the data structure and usage in the code to ensure each is defined and used properly by the program. Usually performed in conjunction with logic analysis.

data bus. (ANSI) A bus used to communicate data internally and externally to and from a processing unit or a storage device. See: bus.

data corruption. (ISO) A violation of data integrity. Syn: data contamination.

data dictionary. (IEEE) (1) A collection of the names of all data items used in a software system, together with relevant properties of those items; e.g., length of data item, representation, etc. (2) A set of definitions of data flows, data elements, files, data bases, and processes referred to in a leveled data flow diagram set.

data element. (1) (ISO) A named unit of data that, in some contexts, is considered indivisible and in other contexts may consist of data items. (2) A named identifier of each of the entities and their attributes that are represented in a database.

data exception. (IEEE) An exception that occurs when a program attempts to use or access data incorrectly.

Page 344: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-18 Version 9.1

data flow analysis. (IEEE) A software V&V task to ensure that the input and output data and their formats are properly defined, and that the data flows are correct.

data flow diagram. (IEEE) A diagram that depicts data sources, data sinks, data storage, and processes performed on data as nodes, and logical flow of data as links between the nodes. Syn: data flowchart, data flow graph.

data integrity. (IEEE) The degree to which a collection of data is complete, consistent, and accurate. Syn: data quality.

data item. (ANSI) A named component of a data element. Usually the smallest component.

data set. A collection of related records. Syn: file.

data sink. (IEEE) The equipment which accepts data signals after transmission.

data structure. (IEEE) A physical or logical relationship among data elements, designed to support specific data manipulation functions.

data structure centered design. A structured software design technique wherein the architecture of a system is derived from analysis of the structure of the data sets with which the system must deal.

data structure diagram. (IEEE) A diagram that depicts a set of data elements, their attributes, and the logical relationships among them. Contrast with data flow diagram. See: entity-relationship diagram.

data validation. (1) (ISO) A process used to determine if data are inaccurate, incomplete, or unreasonable. The process may include format checks, completeness checks, check key tests, reasonableness checks and limit checks. (2) The checking of data for correctness or compliance with applicable standards, rules, and conventions.

database. (ANSI) A collection of interrelated data, often with controlled redundancy, organized according to a schema to serve one or more applications. The data are stored so that they can be used by different programs without concern for the data structure or organization. A common approach is used to add new data and to modify and retrieve existing data. See: archival database.

database analysis. (IEEE) A software V&V task to ensure that the database structure and access methods are compatible with the logical design.

database security. The degree to which a database is protected from exposure to accidental or malicious alteration or destruction.

dead code. Program code statements which can never execute during program operation. Such code can result from poor coding style, or can be an artifact of previous versions or debugging efforts. Dead code can be confusing, and is a potential source of erroneous software changes. See: infeasible path.

debugging. (Myers) Determining the exact nature and location of a program error, and fixing the error.

decision coverage. (Myers) A test coverage criteria requiring enough test cases such that each decision has a true and false result at least once, and that each statement is executed at least

Page 345: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-19

once. Syn: branch coverage. Contrast with condition coverage, multiple condition coverage, path coverage, statement coverage.

decision table. (IEEE) A table used to show sets of conditions and the actions resulting from them.

default. (ANSI) Pertaining to an attribute, value, or option that is assumed when none is explicitly specified.

default value. A standard setting or state to be taken by the program if no alternate setting or state is initiated by the system or the user. A value assigned automatically if one is not given by the user.

defect. See: anomaly, bug, error, exception, fault.

defect analysis. See: failure analysis.

delimiter. (ANSI) A character used to indicate the beginning or the end of a character string. Syn: separator.

demodulate. Retrieve the information content from a modulated carrier wave; the reverse of modulate. Contrast with modulate.

demodulation. Converting signals from a wave form [analog] to pulse form [digital]. Contrast with modulation.

dependability. A facet of reliability that relates to the degree of certainty that a system or component will operate correctly.

design. (IEEE) The process of defining the architecture, components, interfaces, and other characteristics of a system or component. See: architectural design, preliminary design, detailed design.

design description. (IEEE) A document that describes the design of a system or component. Typical contents include system or component architecture, control logic, data structures, data flow, input/output formats, interface descriptions and algorithms. Syn: design document. Contrast with specification, requirements. See: software design description.

design level. (IEEE) The design decomposition of the software item; e.g., system, subsystem, program or module.

design of experiments. A methodology for planning experiments so that data appropriate for [statistical] analysis will be collected.

design phase. (IEEE) The period of time in the software life cycle during which the designs for architecture, software components, interfaces, and data are created, documented, and verified to satisfy requirements.

design requirement. (IEEE) A requirement that specifies or constrains the design of a system or system component.

design review. (IEEE) A process or meeting during which a system, hardware, or software design is presented to project personnel, managers, users, customers, or other interested parties for comment or approval. Types include critical design review, preliminary design review, system design review.

Page 346: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-20 Version 9.1

design specification. See: specification, design.

design standards. (IEEE) Standards that describe the characteristics of a design or a design description of data or program components.

desk checking. The application of code audit, inspection, review and walkthrough techniques to source code and other software documents usually by an individual [often by the person who generated them] and usually done informally.

detailed design. (IEEE) (1) The process of refining and expanding the preliminary design of a system or component to the extent that the design is sufficiently complete to be implemented. See: software development process. (2) The result of the process in (1).

developer. A person, or group, that designs and/or builds and/or documents and/or configures the hardware and/or software of computerized systems.

development methodology. (ANSI) A systematic approach to software creation that defines development phases and specifies the activities, products, verification procedures, and completion criteria for each phase. See: incremental development, rapid prototyping, spiral model, waterfall model.

development standards. Syn: coding standards.

diagnostic. (IEEE) Pertaining to the detection and isolation of faults or failures. For example, a diagnostic message, a diagnostic manual.

different software system analysis. (IEEE) Analysis of the allocation of software requirements to separate computer systems to reduce integration and interface errors related to safety. Performed when more than one software system is being integrated. See: testing, compatibility.

digital. Pertaining to data [signals] in the form of discrete [separate/pulse form] integral values. Contrast with analog.

digital-to-analog converter. Output related devices which translate a computer's digital outputs to the corresponding analog signals needed by an output device such as an actuator. Contrast with ADC [Analog-to-Digital Converter].

direct memory access. Specialized circuitry or a dedicated microprocessor that transfers data from memory to memory without using the CPU.

directed graph. (IEEE) A graph in which direction is implied in the internode connections. Syn: digraph.

disk. Circular rotating magnetic storage hardware. Disks can be hard [fixed] or flexible [removable] and different sizes.

disk drive. Hardware used to read from or write to a disk or diskette.

disk operating system. An operating system program; e.g., DR-DOS from Digital Research, MS-DOS from Microsoft Corp., OS/2 from IBM, PC-DOS from IBM, System-7 from Apple.

diskette. A floppy [flexible] disk.

Page 347: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-21

documentation. (ANSI) The aids provided for the understanding of the structure and intended uses of an information system or its components, such as flowcharts, textual material, and user manuals.

documentation, level of. (NIST) A description of required documentation indicating its scope, content, format, and quality. Selection of the level may be based on project cost, intended usage, extent of effort, or other factors; e.g., level of concern.

documentation plan. (NIST) A management document describing the approach to a documentation effort. The plan typically describes what documentation types are to be prepared, what their contents are to be, when this is to be done and by whom, how it is to be done, and what are the available resources and external factors affecting the results.

documentation, software. (NIST) Technical data or information, including computer listings and printouts, in human readable form, that describe or specify the design or details, explain the capabilities, or provide operating instructions for using the software to obtain desired results from a software system. See: specification; specification, requirements; specification. design; software design description; test plan, test report, user's guide.

drift. (ISO) The unwanted change of the value of an output signal of a device over a period of time when the values of all input signals to the device are kept constant.

driver. A program that links a peripheral device or internal function to the operating system, and providing for activation of all device functions. Syn: device driver. Contrast with test driver.

duplex transmission. (ISO) Data transmission in both directions at the same time.

dynamic analysis. (NBS) Analysis that is performed by executing the program code. Contrast with static analysis. See: testing.

- E -

EBCDIC. extended binary coded decimal interchange code.

EEPROM. electrically erasable programmable read only memory.

EMI. electromagnetic interference.

EPROM. erasable programmable read only memory.

ESD. electrostatic discharge.

ESDI. enhanced small device interface.

editing. (NIST) Modifying the content of the input by inserting, deleting, or moving characters, numbers, or data.

electrically erasable programmable read only memory. Chips which may be programmed and erased numerous times like an EPROM. However an EEPROM is erased electrically. This means this IC does not necessarily have to be removed from the circuit in which it is mounted in order to erase and reprogram the memory.

Page 348: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-22 Version 9.1

electromagnetic interference. Low frequency electromagnetic waves that emanate from electromechanical devices. An electromagnetic disturbance caused by such radiating and transmitting sources as heavy duty motors and power lines can induce unwanted voltages in electronic circuits, damage components and cause malfunctions. See: radiofrequency interference.

electronic media. Hardware intended to store binary data; e.g., integrated circuit, magnetic tape, magnetic disk.

electrostatic discharge. The movement of static electricity, e.g. sparks, from a non-conductive surface to an approaching conductive object that can damage or destroy semiconductors and other circuit components. Static electricity can build on paper, plastic or other non-conductors and can be discharged by human skin, e.g. finger, contact. It can also be generated by scuffing shoes on a carpet or by brushing a non-conductor. MOSFETs and CMOS logic ICs are especially vulnerable because it causes internal local heating that melts or fractures the dielectric silicon oxide that insulates gates from other internal structures.

embedded computer. A device which has its own computing power dedicated to specific functions, usually consisting of a microprocessor and firmware. The computer becomes an integral part of the device as opposed to devices which are controlled by an independent, stand-alone computer. It implies software that integrates operating system and application functions.

embedded software. (IEEE) Software that is part of a larger system and performs some of the requirements of that system; e.g., software used in an aircraft or rapid transit system. Such software does not provide an interface with the user. See: firmware.

emulation. (IEEE) A model that accepts the same inputs and produces the same outputs as a given system. To imitate one system with another. Contrast with simulation.

emulator. (IEEE) A device, computer program, or system that accepts the same inputs and produces the same outputs as a given system. Contrast with simulator.

encapsulation. (IEEE) A software development technique that consists of isolating a system function or a set of data and the operations on those data within a module and providing precise specifications for the module. See: abstraction, information hiding, software engineering.

end user. (ANSI) (1) A person, device, program, or computer system that uses an information system for the purpose of data processing in information exchange. (2) A person whose occupation requires the use of an information system but does not require any knowledge of computers or computer programming. See: user.

enhanced small device interface. A standard interface for hard disks introduced in 1983 which provides for faster data transfer compared to ST-506. Contrast with ST-506, IDE, SCSI.

entity relationship diagram. (IEEE) A diagram that depicts a set of real-world entities and the logical relationships among them. See: data structure diagram.

environment. (ANSI) (1) Everything that supports a system or the performance of a function. (2) The conditions that affect the performance of a system or function.

Page 349: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-23

equivalence class partitioning. (Myers) Partitioning the input domain of a program into a finite number of classes [sets], to identify a minimal set of well selected test cases to represent these classes. There are two types of input equivalence classes, valid and invalid. See: testing, functional.

erasable programmable read only memory. Chips which may be programmed by using a PROM programming device. Before programming each bit is set to the same logical state, either 1 or 0. Each bit location may be thought of as a small capacitor capable of storing an electrical charge. The logical state is established by charging, via an electrical current, all bits whose states are to be changed from the default state. EPROMs may be erased and reprogrammed because the electrical charge at the bit locations can be bled off [i.e. reset to the default state] by exposure to ultraviolet light through the small quartz window on top of the IC. After programming, the IC's window must be covered to prevent exposure to UV light until it is desired to reprogram the chip. An EPROM eraser is a device for exposing the IC's circuits to UV light of a specific wavelength for a certain amount of time.

error. (ISO) A discrepancy between a computed, observed, or measured value or condition and the true, specified, or theoretically correct value or condition. See: anomaly, bug, defect, exception, fault.

error analysis. See: debugging, failure analysis.

error detection. Techniques used to identify errors in data transfers. See: check summation, cyclic redundancy check [CRC], parity check, longitudinal redundancy.

error guessing. (NBS) Test data selection technique. The selection criterion is to pick values that seem likely to cause errors. See: special test data; testing, special case.

error seeding. (IEEE) The process of intentionally adding known faults to those already in a computer program for the purpose of monitoring the rate of detection and removal, and estimating the number of faults remaining in the program. Contrast with mutation analysis.

event table. A table which lists events and the corresponding specified effect[s] of or reaction[s] to each event.

evolutionary development. See: spiral model.

exception. (IEEE) An event that causes suspension of normal program execution. Types include addressing exception, data exception, operation exception, overflow exception, protection exception, underflow exception.

exception conditions/responses table. A special type of event table.

execution trace. (IEEE) A record of the sequence of instructions executed during the execution of a computer program. Often takes the form of a list of code labels encountered as the program executes. Syn: code trace, control flow trace. See: retrospective trace, subroutine trace, symbolic trace, variable trace.

exception. (IEEE) An event that causes suspension of normal program operation. Types include addressing exception, data exception, operation exception, overflow exception, protection exception, underflow exception. See: anomaly, bug, defect, error, fault.

Page 350: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-24 Version 9.1

extended ASCII. The second half of the ACSII character set, 128 thru 255. The symbols are defined by IBM for the PC and by other vendors for proprietary use. It is non-standard ASCII. See: ASCII.

extended binary coded decimal interchange code. An eight bit code used to represent specific data characters in some computers; e.g., IBM mainframe computers.

extremal test data. (NBS) Test data that is at the extreme or boundary of the domain of an input variable or which produces results at the boundary of an output domain. See: testing, boundary value.

- F -

FDD. floppy disk drive.

FIPS. Federal Information Processing Standards.

FMEA. Failure Modes and Effects Analysis.

FMECA. Failure Modes and Effects Criticality Analysis.

FTA. Fault Tree Analysis.

FTP. file transfer protocol.

Fagan inspection. See: code inspection.

fail-safe. (IEEE) A system or component that automatically places itself in a safe operational mode in the event of a failure.

failure. (IEEE) The inability of a system or component to perform its required functions within specified performance requirements. See: bug, crash, exception, fault.

failure analysis. Determining the exact nature and location of a program error in order to fix the error, to identify and fix other similar errors, and to initiate corrective action to prevent future occurrences of this type of error. Contrast with debugging.

Failure Modes and Effects Analysis. (IEC) A method of reliability analysis intended to identify failures, at the basic component level, which have significant consequences affecting the system performance in the application considered.

Failure Modes and Effects Criticality Analysis. (IEC) A logical extension of FMEA which analyzes the severity of the consequences of failure.

fault. An incorrect step, process, or data definition in a computer program which causes the program to perform in an unintended or unanticipated manner. See: anomaly, bug, defect, error, exception.

fault seeding. See: error seeding.

Fault Tree Analysis. (IEC) The identification and analysis of conditions and factors which cause or contribute to the occurrence of a defined undesirable event, usually one which significantly affects system performance, economy, safety or other required characteristics.

Page 351: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-25

feasibility study. Analysis of the known or anticipated need for a product, system, or component to assess the degree to which the requirements, designs, or plans can be implemented.

Federal Information Processing Standards. Standards published by U.S. Department of Commerce, National Institute of Standards and Technology, formerly National Bureau of Standards. These standards are intended to be binding only upon federal agencies.

fiber optics. Communications systems that use optical fibers for transmission. See: optical fiber.

field. (1) (ISO) On a data medium or in storage, a specified area used for a particular class of data; e.g., a group of character positions used to enter or display wage rates on a screen. (2) Defined logical data that is part of a record. (3) The elementary unit of a record that may contain a data item, a data aggregate, a pointer, or a link. (4) A discrete location in a database that contains an unique piece of information. A field is a component of a record. A record is a component of a database.

file. (1) (ISO) A set of related records treated as a unit; e.g., in stock control, a file could consists of a set of invoices. (2) The largest unit of storage structure that consists of a named collection of all occurrences in a database of records of a particular record type. Syn: data set.

file maintenance. (ANSI) The activity of keeping a file up to date by adding, changing, or deleting data.

file transfer protocol. (1) Communications protocol that can transmit binary and ASCII data files without loss of data. See: Kermit, Xmodem, Ymodem, Zmodem. (2) TCP/IP protocol that is used to log onto the network, list directories, and copy files. It can also translate between ASCII and EBCDIC. See: TCP/IP.

firmware. (IEEE) The combination of a hardware device; e.g., an IC; and computer instructions and data that reside as read only software on that device. Such software cannot be modified by the computer during processing. See: embedded software.

flag. (IEEE) A variable that is set to a prescribed state, often "true" or "false", based on the results of a process or the occurrence of a specified condition. Syn: indicator.

flat file. A data file that does not physically interconnect with or point to other files. Any relationship between two flat files is logical; e.g., matching account numbers.

floppy disk. See: diskette.

floppy disk drive. See: disk, disk drive.

flowchart or flow diagram. (2) (ISO) A graphical representation in which symbols are used to represent such things as operations, data, flow direction, and equipment, for the definition, analysis, or solution of a problem. (2) (IEEE) A control flow diagram in which suitably annotated geometrical figures are used to represent operations, data, or equipment, and arrows are used to indicate the sequential flow from one to another. Syn: flow diagram. See: block diagram, box diagram, bubble chart, graph, input-process-output chart, structure chart.

formal qualification review. (IEEE) The test, inspection, or analytical process by which a group of configuration items comprising a system is verified to have met specific contractual

Page 352: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-26 Version 9.1

performance requirements. Contrast with code review, design review, requirements review, test readiness review.

FORTRAN. An acronym for FORmula TRANslator, the first widely used high-level programming language. Intended primarily for use in solving technical problems in mathematics, engineering, and science.

full duplex. See: duplex transmission.

function. (1) (ISO) A mathematical entity whose value, namely, the value of the dependent variable, depends in a specified manner on the values of one or more independent variables, with not more than one value of the dependent variable corresponding to each permissible combination of values from the respective ranges of the independent variables. (2) A specific purpose of an entity, or its characteristic action. (3) In data communication, a machine action such as carriage return or line feed.

functional analysis. (IEEE) Verifies that each safety-critical software requirement is covered and that an appropriate criticality level is assigned to each software element.

functional configuration audit. (IEEE) An audit conducted to verify that the development of a configuration item has been completed satisfactorily, that the item has achieved the performance and functional characteristics specified in the functional or allocated configuration identification, and that its operational and support documents are complete and satisfactory. See: physical configuration audit.

functional decomposition. See: modular decomposition.

functional design. (IEEE) (1) The process of defining the working relationships among the components of a system. See: architectural design. (2) The result of the process in (1).

functional requirement. (IEEE) A requirement that specifies a function that a system or system component must be able to perform.

- G -

GB. gigabyte.

gigabyte. Approximately one billion bytes; precisely 230 or 1,073,741,824 bytes. See: kilobyte, megabyte.

graph. (IEEE) A diagram or other representation consisting of a finite set of nodes and internode connections called edges or arcs. Contrast with blueprint. See: block diagram, box diagram, bubble chart, call graph, cause-effect graph, control flow diagram, data flow diagram, directed graph, flowchart, input-process-output chart, structure chart, transaction flowgraph.

graphic software specifications. Documents such as charts, diagrams, graphs which depict program structure, states of data, control, transaction flow, HIPO, and cause-effect relationships; and tables including truth, decision, event, state-transition, module interface, exception conditions/responses necessary to establish design integrity.

Page 353: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-27

- H -

HDD. hard disk drive.

HIPO. hierarchy of input-processing-output.

Hz. hertz.

half duplex. Transmissions [communications] which occur in only one direction at a time, but that direction can change.

handshake. An interlocked sequence of signals between connected components in which each component waits for the acknowledgement of its previous signal before proceeding with its action, such as data transfer.

hard copy. Printed, etc., output on paper.

hard disk drive. Hardware used to read from or write to a hard disk. See: disk, disk drive.

hard drive. Syn: hard disk drive.

hardware. (ISO) Physical equipment, as opposed to programs, procedures, rules, and associated documentation. Contrast with software.

hazard. (DOD) A condition that is prerequisite to a mishap.

hazard analysis. A technique used to identify conceivable failures affecting system performance, human safety or other required characteristics. See: FMEA, FMECA, FTA, software hazard analysis, software safety requirements analysis, software safety design analysis, software safety code analysis, software safety test analysis, software safety change analysis.

hazard probability. (DOD) The aggregate probability of occurrence of the individual events that create a specific hazard.

hazard severity. (DOD) An assessment of the consequence of the worst credible mishap that could be caused by a specific hazard.

hertz. A unit of frequency equal to one cycle per second.

hexadecimal. The base 16 number system. Digits are 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, A, B, C, D, E, & F. This is a convenient form in which to examine binary data because it collects 4 binary digits per hexadecimal digit; e.g., decimal 15 is 1111 in binary and F in hexadecimal.

hierarchical decomposition. See: modular decomposition.

hierarchy of input-processing-output. See: input- processing-output.

hierarchy of input-processing-output chart. See: input-process-output chart.

high-level language. A programming language which requires little knowledge of the target computer, can be translated into several different machine languages, allows symbolic naming of operations and addresses, provides features designed to facilitate expression of data structures and program logic, and usually results in several machine instructions for each

Page 354: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-28 Version 9.1

program statement. Examples are PL/1, COBOL, BASIC, FORTRAN, Ada, Pascal, and "C". Contrast with assembly language.

- I -

I/0. input/output.

IC. integrated circuit.

IDE. integrated drive electronics.

IEC. International Electrotechnical Commission.

IEEE. Institute of Electrical and Electronic Engineers.

ISO. International Organization for Standardization.

ITU-TSS. International Telecommunications Union - Telecommunications Standards Section.

implementation. The process of translating a design into hardware components, software components, or both. See: coding.

implementation phase. (IEEE) The period of time in the software life cycle during which a software product is created from design documentation and debugged.

implementation requirement. (IEEE) A requirement that specifies or constrains the coding or construction of a system or system component.

incremental integration. A structured reformation of the program module by module or function by function with an integration test being performed following each addition. Methods include top-down, breadth-first, depth-first, bottom-up. Contrast with nonincremental integration.

incremental development. (IEEE) A software development technique in which requirements definition, design, implementation, and testing occur in an overlapping, iterative [rather than sequential] manner, resulting in incremental completion of the overall software product. Contrast with rapid prototyping, spiral model, waterfall model.

industry standard. (QA) Procedures and criteria recognized as acceptable practices by peer professional, credentialing, or accrediting organizations.

infeasible path. (NBS) A sequence of program statements that can never be executed. Syn: dead code.

information hiding. The practice of "hiding" the details of a function or structure, making them inaccessible to other parts of the program. See: abstraction, encapsulation, software engineering.

input/output. Each microprocessor and each computer needs a way to communicate with the outside world in order to get the data needed for its programs and in order to communicate the results of its data manipulations. This is accomplished through I/0 ports and devices.

Page 355: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-29

input-process-output chart. (IEEE) A diagram of a software system or module, consisting of a rectangle on the left listing inputs, a rectangle in the center listing processing steps, a rectangle on the right listing outputs, and arrows connecting inputs to processing steps and processing steps to outputs. See: block diagram, box diagram, bubble chart, flowchart, graph, structure chart.

input-processing-output. A structured software design technique; identification of the steps involved in each process to be performed and identifying the inputs to and outputs from each step. A refinement called hierarchical input-process-output identifies the steps, inputs, and outputs at both general and detailed levels of detail.

inspection. A manual testing technique in which program documents [specifications (requirements, design), source code or user's manuals] are examined in a very formal and disciplined manner to discover errors, violations of standards and other problems. Checklists are a typical vehicle used in accomplishing this technique. See: static analysis, code audit, code inspection, code review, code walkthrough.

installation. (ANSI) The phase in the system life cycle that includes assembly and testing of the hardware and software of a computerized system. Installation includes installing a new computer system, new software or hardware, or otherwise modifying the current system.

installation and checkout phase. (IEEE) The period of time in the software life cycle during which a software product is integrated into its operational environment and tested in this environment to ensure that it performs as required.

installation qualification. See: qualification, installation.

Institute of Electrical and Electronic Engineers. 345 East 47th Street, New York, NY 10017. An organization involved in the generation and promulgation of standards. IEEE standards represent the formalization of current norms of professional practice through the process of obtaining the consensus of concerned, practicing professionals in the given field.

instruction. (1) (ANSI/IEEE) A program statement that causes a computer to perform a particular operation or set of operations. (2) (ISO) In a programming language, a meaningful expression that specifies one operation and identifies its operands, if any.

instruction set. (1) (IEEE) The complete set of instructions recognized by a given computer or provided by a given programming language. (2) (ISO) The set of the instructions of a computer, of a programming language, or of the programming languages in a programming system. See: computer instruction set.

instrumentation. (NBS) The insertion of additional code into a program in order to collect information about program behavior during program execution. Useful for dynamic analysis techniques such as assertion checking, coverage analysis, tuning.

integrated circuit. Small wafers of semiconductor material [silicon] etched or printed with extremely small electronic switching circuits. Syn: chip.

integrated drive electronics. A standard interface for hard disks which provides for building most of the controller circuitry into the disk drive to save space. IDE controllers are functionally equivalent to ST-506 standard controllers. Contrast with EDSI, SCSI, ST-506.

Page 356: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-30 Version 9.1

interactive. (IEEE) Pertaining to a system or mode of operation in which each user entry causes a response from or action by the system. Contrast with batch. See: conversational, on-line, real time.

interface. (1) (ISO) A shared boundary between two functional units, defined by functional characteristics, common physical interconnection characteristics, signal characteristics, and other characteristics, as appropriate. The concept involves the specification of the connection of two devices having different functions. (2) A point of communication between two or more processes, persons, or other physical entities. (3) A peripheral device which permits two or more devices to communicate.

interface analysis. (IEEE) Evaluation of: (1) software requirements specifications with hardware, user, operator, and software interface requirements documentation, (2) software design description records with hardware, operator, and software interface requirements specifications, (3) source code with hardware, operator, and software interface design documentation, for correctness, consistency, completeness, accuracy, and readability. Entities to evaluate include data items and control items.

interface requirement. (IEEE) A requirement that specifies an external item with which a system or system component must interact, or sets forth constraints on formats, timing, or other factors caused by such an interaction.

International Electrotechnical Commission. Geneva, Switzerland. An organization that sets standards for electronic products and components which are adopted by the safety standards agencies of many countries.

International Organization for Standardization. Geneva, Switzerland. An organization that sets international standards. It deals with all fields except electrical and electronics which is governed by IEC. Syn: International Standards Organization.

International Standards Organization. See: International Organization for Standardization.

International Telecommunications Union - Telecommunications Standards Section. Geneva, Switzerland. Formerly, Consultive Committee for International Telephony and Telegraphy. An international organization for communications standards.

interpret. (IEEE) To translate and execute each statement or construct of a computer program before translating and executing the next. Contrast with assemble, compile.

interpreter. (IEEE) A computer program that translates and executes each statement or construct of a computer program before translating and executing the next. The interpreter must be resident in the computer each time a program [source code file] written in an interpreted language is executed. Contrast with assembler, compiler.

interrupt. (1) The suspension of a process to handle an event external to the process. (2) A technique to notify the CPU that a peripheral device needs service, i.e., the device has data for the processor or the device is awaiting data from the processor. The device sends a signal, called an interrupt, to the processor. The processor interrupts its current program, stores its current operating conditions, and executes a program to service the device sending the interrupt. After the device is serviced, the processor restores its previous operating conditions and continues executing the interrupted program. A method for handling constantly changing data. Contrast with polling.

Page 357: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-31

interrupt analyzer. A software tool which analyzes potential conflicts in a system as a result of the occurrences of interrupts.

invalid inputs. (1) (NBS) Test data that lie outside the domain of the function the program represents. (2) These are not only inputs outside the valid range for data to be input, i.e. when the specified input range is 50 to 100, but also unexpected inputs, especially when these unexpected inputs may easily occur; e.g., the entry of alpha characters or special keyboard characters when only numeric data is valid, or the input of abnormal command sequences to a program.

I/O port. Input/output connector.

- J -

JCL. job control language.

job. (IEEE) A user-defined unit of work that is to be accomplished by a computer. For example, the compilation, loading, and execution of a computer program. See: job control language.

job control language. (IEEE) A language used to identify a sequence of jobs, describe their requirements to an operating system, and control their execution.

- K -

KB. kilobyte.

KLOC. one thousand lines of code.

Kermit. An asynchronous file transfer protocol developed at Columbia University, noted for its accuracy over noisy lines. Several versions exist. Contrast with Xmodem, Ymodem, Zmodem.

key. One or more characters, usually within a set of data, that contains information about the set, including its identification.

key element. (QA) An individual step in an critical control point of the manufacturing process.

kilobyte. Approximately one thousand bytes. This symbol is used to describe the size of computer memory or disk storage space. Because computers use a binary number system, a kilobyte is precisely 210 or 1024 bytes.

- L -

LAN. local area network.

Page 358: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-32 Version 9.1

LSI. large scale integration.

ladder logic. A graphical, problem oriented, programming language which replicates electronic switching blueprints.

language. See: programming language.

large scale integration. A classification of ICs [chips] based on their size as expressed by the number of circuits or logic gates they contain. An LSI IC contains 3,000 to 100,000 transistors.

latency. (ISO) The time interval between the instant at which a CPU's instruction control unit initiates a call for data and the instant at which the actual transfer of the data starts. Syn: waiting time.

latent defect. See: bug, fault.

life cycle. See: software life cycle.

life cycle methodology. The use of any one of several structured methods to plan, design, implement, test. and operate a system from its conception to the termination of its use. See: waterfall model.

linkage editor. (IEEE) A computer program that creates a single load module from two or more independently translated object modules or load modules by resolving cross references among the modules and, possibly, by relocating elements. May be part of a loader. Syn: link editor, linker.

loader. A program which copies other [object] programs from auxiliary [external] memory to main [internal] memory prior to its execution.

local area network. A communications network that serves users within a confined geographical area. It is made up of servers, workstations, a network operating system, and a communications link. Contrast with MAN, WAN.

logic analysis. (IEEE) Evaluates the safety-critical equations, algorithms, and control logic of the software design. (2) Evaluates the sequence of operations represented by the coded program and detects programming errors that might create hazards.

longitudinal redundancy check. (IEEE) A system of error control based on the formation of a block check following preset rules.

low-level language. See: assembly language. The advantage of assembly language is that it provides bit-level control of the processor allowing tuning of the program for optimal speed and performance. For time critical operations, assembly language may be necessary in order to generate code which executes fast enough for the required operations. The disadvantage of assembly language is the high-level of complexity and detail required in the programming. This makes the source code harder to understand, thus increasing the chance of introducing errors during program development and maintenance.

- M -

Page 359: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-33

MAN. metropolitan area network.

Mb. megabit.

MB. megabyte.

MHz. megahertz.

MIPS. million instructions per second.

MOS. metal-oxide semiconductor.

MOSFET. metal-oxide semiconductor field effect transistor.

MSI. medium scale integration.

MTBF. mean time between failures.

MTTR. mean time to repair.

MTTF. mean time to failure.

machine code. (IEEE) Computer instructions and definitions expressed in a form [binary code] that can be recognized by the CPU of a computer. All source code, regardless of the language in which it was programmed, is eventually converted to machine code. Syn: object code.

machine language. See: machine code.

macro. (IEEE) In software engineering, a predefined sequence of computer instructions that is inserted into a program, usually during assembly or compilation, at each place that its corresponding macroinstruction appears in the program.

macroinstruction. (IEEE) A source code instruction that is replaced by a predefined sequence of source instructions, usually in the same language as the rest of the program and usually during assembly or compilation.

main memory. A non-moving storage device utilizing one of a number of types of electronic circuitry to store information.

main program. (IEEE) A software component that is called by the operating system of a computer and that usually calls other software components. See: routine, subprogram.

mainframe. Term used to describe a large computer.

maintainability. (IEEE) The ease with which a software system or component can be modified to correct faults, improve performance or other attributes, or adapt to a changed environment. Syn: modifiability.

maintenance. (QA) Activities such as adjusting, cleaning, modifying, overhauling equipment to assure performance in accordance with requirements. Maintenance to a software system includes correcting software errors, adapting software to a new environment, or making enhancements to software. See: adaptive maintenance, corrective maintenance, perfective maintenance.

Page 360: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-34 Version 9.1

mean time between failures. A measure of the reliability of a computer system, equal to average operating time of equipment between failures, as calculated on a statistical basis from the known failure rates of various components of the system.

mean time to failure. A measure of reliability, giving the average time before the first failure.

mean time to repair. A measure of reliability of a piece of repairable equipment, giving the average time between repairs.

measure. (IEEE) A quantitative assessment of the degree to which a software product or process possesses a given attribute.

measurable. Capable of being measured.

measurement. The process of determining the value of some quantity in terms of a standard unit.

medium scale integration. A classification of ICs [chips] based on their size as expressed by the number of circuits or logic gates they contain. An MSI IC contains 100 to 3,000 transistors.

megabit. Approximately one million bits. Precisely 1024 K bits, 220 bits, or 1,048,576 bits.

megabyte. Approximately one million bytes. Precisely 1024 K Bytes, 220 bytes, or 1,048,576 bytes. See: kilobyte.

megahertz. A unit of frequency equal to one million cycles per second.

memory. Any device or recording medium into which binary data can be stored and held, and from which the entire original data can be retrieved. The two types of memory are main; e.g., ROM, RAM, and auxiliary; e.g., tape, disk. See: storage device.

menu. A computer display listing a number of options; e.g., functions, from which the operator may select one. Sometimes used to denote a list of programs.

metal-oxide semiconductor. One of two major categories of chip design [the other is bipolar]. It derives its name from its use of metal, oxide and semiconductor layers. There are several varieties of MOS technologies including PMOS, NMOS, CMOS.

metal-oxide semiconductor field effect transistor. Common type of transistor fabricated as a discrete component or into MOS integrated circuits.

metric based test data generation. (NBS) The process of generating test sets for structural testing based upon use of complexity metrics or coverage metrics.

metric, software quality. (IEEE) A quantitative measure of the degree to which software possesses a given attribute which affects its quality.

metropolitan area network. Communications network that covers a geographical area such as a city or a suburb. Contrast with LAN, WAN.

microcode. Permanent memory that holds the elementary circuit operations a computer must perform for each instruction in its instruction set.

microcomputer. A term used to describe a small computer. See: microprocessor.

Page 361: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-35

microprocessor. A CPU existing on a single IC. Frequently synonymous with a microcomputer.

million instructions per second. Execution speed of a computer. MIPS rate is one factor in overall performance. Bus and channel speed and bandwidth, memory speed, memory management techniques, and system software also determine total throughput.

minicomputer. A term used to describe a medium sized computer.

mishap. (DOD) An unplanned event or series of events resulting in death, injury, occupational illness, or damage to or loss of data and equipment or property, or damage to the environment. Syn: accident.

mnemonic. A symbol chosen to assist human memory and understanding; e.g., an abbreviation such as "MPY" for multiply.

modeling. Construction of programs used to model the effects of a postulated environment for investigating the dimensions of a problem for the effects of algorithmic processes on responsive targets.

modem. (ISO) A functional unit that modulates and demodulates signals. One of the functions of a modem is to enable digital data to be transmitted over analog transmission facilities. The term is a contraction of modulator-demodulator.

modem access. Using a modem to communicate between computers. MODEM access is often used between a remote location and a computer that has a master database and applications software, the host computer.

modifiability. See: maintainability.

modular decomposition. A structured software design technique, breaking a system into components to facilitate design and development. Syn: functional decomposition, hierarchical decomposition. See: abstraction.

modular software. (IEEE) Software composed of discrete parts. See: structured design.

modularity. (IEEE) The degree to which a system or computer program is composed of discrete components such that a change to one component has minimal impact on other components.

modulate. Varying the characteristics of a wave in accordance with another wave or signal, usually to make user equipment signals compatible with communication facilities. Contrast with demodulate.

modulation. Converting signals from a binary-digit pattern [pulse form] to a continuous wave form [analog]. Contrast with demodulation.

module. (1) In programming languages, a self- contained subdivision of a program that may be separately compiled. (2) A discrete set of instructions, usually processed as a unit, by an assembler, a compiler, a linkage editor, or similar routine or subroutine. (3) A packaged functional hardware unit suitable for use with other components. See: unit.

module interface table. A table which provides a graphic illustration of the data elements whose values are input to and output from a module.

Page 362: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-36 Version 9.1

multi-processing. (IEEE) A mode of operation in which two or more processes [programs] are executed concurrently [simultaneously] by separate CPUs that have access to a common main memory. Contrast with multi-programming. See: multi-tasking, time sharing.

multi-programming. (IEEE) A mode of operation in which two or more programs are executed in an interleaved manner by a single CPU. Syn: parallel processing. Contrast with multi-tasking. See: time sharing.

multi-tasking. (IEEE) A mode of operation in which two or more tasks are executed in an interleaved manner. Syn: parallel processing. See: multi-processing, multi-programming, time sharing.

multiple condition coverage. (Myers) A test coverage criteria which requires enough test cases such that all possible combinations of condition outcomes in each decision, and all points of entry, are invoked at least once. Contrast with branch coverage, condition coverage, decision coverage, path coverage, statement coverage.

multiplexer. A device which takes information from any of several sources and places it on a single line or sends it to a single destination.

multipurpose systems. (IEEE) Computer systems that perform more than one primary function or task are considered to be multipurpose. In some situations the computer may be linked or networked with other computers that are used for administrative functions; e.g., accounting, word processing.

mutation analysis. (NBS) A method to determine test set thoroughness by measuring the extent to which a test set can discriminate the program from slight variants [mutants] of the program. Contrast with error seeding.

- N -

NBS. National Bureau of Standards.

NIST. National Institute for Standards and Technology.

NMI. non-maskable interrupt.

NMOS. n-channel MOS.

National Bureau of Standards. Now National Institute for Standards and Technology.

National Institute for Standards and Technology. Gaithersburg, MD 20899. A federal agency under the Department of Commerce, originally established by an act of Congress on March 3, 1901 as the National Bureau of Standards. The Institute's overall goal is to strengthen and advance the Nation's science and technology and facilitate their effective application for public benefit. The National Computer Systems Laboratory conducts research and provides, among other things, the technical foundation for computer related policies of the Federal Government.

n-channel MOS. A type of microelectronic circuit used for logic and memory chips.

Page 363: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-37

network. (1) (ISO) An arrangement of nodes and interconnecting branches. (2) A system [transmission channels and supporting hardware and software] that connects several remotely located computers via telecommunications.

network database. A database organization method that allows for data relationships in a net-like form. A single data element can point to multiple data elements and can itself be pointed to by other data elements. Contrast with relational database.

nibble. Half a byte, or four bits.

node. A junction or connection point in a network, e.g. a terminal or a computer.

noncritical code analysis. (IEEE) (1) Examines software elements that are not designated safety-critical and ensures that these elements do not cause a hazard. (2) Examines portions of the code that are not considered safety-critical code to ensure they do not cause hazards. Generally, safety-critical code should be isolated from non-safety-critical code. This analysis is to show this isolation is complete and that interfaces between safety-critical code and non-safety-critical code do not create hazards.

nonincremental integration. A reformation of a program by immediately relinking the entire program following the testing of each independent module. Integration testing is then conducted on the program as a whole. Syn: "big bang" integration. Contrast with incremental integration.

non-maskable interrupt. A high priority interrupt that cannot be disabled by another interrupt. It can be used to report malfunctions such as parity, bus, and math co-processor errors.

null. (IEEE) A value whose definition is to be supplied within the context of a specific operating system. This value is a representation of the set of no numbers or no value for the operating system in use.

null data. (IEEE) Data for which space is allocated but for which no value currently exists.

null string. (IEEE) A string containing no entries. Note: It is said that a null string has length zero.

- O -

OCR. optical character recognition.

OEM. original equipment manufacturer.

OOP. object oriented programming.

object. In object oriented programming, A self contained module [encapsulation] of data and the programs [services] that manipulate [process] that data.

object code. (NIST) A code expressed in machine language ["1"s and "0"s] which is normally an output of a given translation process that is ready to be executed by a computer. Syn: machine code. Contrast with source code. See: object program.

Page 364: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-38 Version 9.1

object oriented design. (IEEE) A software development technique in which a system or component is expressed in terms of objects and connections between those objects.

object oriented language. (IEEE) A programming language that allows the user to express a program in terms of objects and messages between those objects. Examples include C++, Smalltalk and LOGO.

object oriented programming. A technology for writing programs that are made up of self-sufficient modules that contain all of the information needed to manipulate a given data structure. The modules are created in class hierarchies so that the code or methods of a class can be passed to other modules. New object modules can be easily created by inheriting the characteristics of existing classes. See: object, object oriented design.

object program. (IEEE) A computer program that is the output of an assembler or compiler.

octal. The base 8 number system. Digits are 0, 1, 2, 3, 4, 5, 6, & 7.

on-line. (IEEE) Pertaining to a system or mode of operation in which input data enter the computer directly from the point of origin or output data are transmitted directly to the point where they are used. For example, an airline reservation system. Contrast with batch. See: conversational, interactive, real time.

operating system. (ISO) Software that controls the execution of programs, and that provides services such as resource allocation, scheduling, input/output control, and data management. Usually, operating systems are predominantly software, but partial or complete hardware implementations are possible.

operation and maintenance phase. (IEEE) The period of time in the software life cycle during which a software product is employed in its operational environment, monitored for satisfactory performance, and modified as necessary to correct problems or to respond to changing requirements.

operation exception. (IEEE) An exception that occurs when a program encounters an invalid operation code.

operator. See: end user.

optical character recognition. An information processing technology that converts human readable data into another medium for computer input. An OCR peripheral device accepts a printed document as input, to identify the characters by their shape from the light that is reflected and creates an output disk file. For best results, the printed page must contain only characters of a type that are easily read by the OCR device and located on the page within certain margins. When choosing an OCR product, the prime consideration should be the program's level of accuracy as it applies to the type of document to be scanned. Accuracy levels less than 97% are generally considered to be poor.

optical fiber. Thin glass wire designed for light transmission, capable of transmitting billions of bits per second. Unlike electrical pulses, light pulses are not affected by random radiation in the environment.

optimization. (NIST) Modifying a program to improve performance; e.g., to make it run faster or to make it use fewer resources.

Page 365: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-39

Oracle. A relational database programming system incorporating the SQL programming language. A registered trademark of the Oracle Corp.

original equipment manufacturer. A manufacturer of computer hardware.

overflow. (ISO) In a calculator, the state in which the calculator is unable to accept or process the number of digits in the entry or in the result. See: arithmetic overflow.

overflow exception. (IEEE) An exception that occurs when the result of an arithmetic operation exceeds the size of the storage location designated to receive it.

- P -

PAL. programmable array logic.

PC. personal computer.

PCB. printed circuit board.

PDL. program design language.

PLA. programmable logic array.

PLD. programmable logic device.

PMOS. positive channel MOS.

PROM. programmable read only memory.

paging. (IEEE) A storage allocation technique in which programs or data are divided into fixed length blocks called pages, main storage/memory is divided into blocks of the same length called page frames, and pages are stored in page frames, not necessarily contiguously or in logical order, and pages are transferred between main and auxiliary storage as needed.

parallel. (1) (IEEE) Pertaining to the simultaneity of two or more processes. (2) (IEEE) Pertaining to the simultaneous processing of individual parts of a whole, such as the bits of a character or the characters of a word, using separate facilities for the various parts. (3) Term describing simultaneous transmission of the bits making up a character, usually eight bits [one byte]. Contrast with serial.

parallel processing. See: multi-processing, multi- programming.

parameter. (IEEE) A constant, variable or expression that is used to pass values between software modules. Syn: argument.

parity. An error detection method in data transmissions that consists of selectively adding a 1-bit to bit patterns [word, byte, character, message] to cause the bit patterns to have either an odd number of 1-bits [odd parity] or an even number of 1-bits [even parity].

parity bit. (ISO) A binary digit appended to a group of binary digits to make the sum of all the digits, including the appended binary digit, either odd or even, as predetermined.

parity check. (ISO) A redundancy check by which a recalculated parity bit is compared to the predetermined parity bit. Contrast with check summation, cyclic redundancy check [CRC].

Page 366: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-40 Version 9.1

Pascal. A high-level programming language designed to encourage structured programming practices.

password. (ISO) A character string that enables a user to have full or limited access to a system or to a set of data.

patch. (IEEE) A change made directly to an object program without reassembling or recompiling from the source program.

path. (IEEE) A sequence of instructions that may be performed in the execution of a computer program.

path analysis. (IEEE) Analysis of a computer program [source code] to identify all possible paths through the program, to detect incomplete paths, or to discover portions of the program that are not on any path.

path coverage. See: testing, path.

perfective maintenance. (IEEE) Software maintenance performed to improve the performance, maintainability, or other attributes of a computer program. Contrast with adaptive maintenance, corrective maintenance.

performance requirement. (IEEE) A requirement that imposes conditions on a functional requirement; e.g., a requirement that specifies the speed, accuracy, or memory usage with which a given function must be performed.

peripheral device. Equipment that is directly connected a computer. A peripheral device can be used to input data; e.g., keypad, bar code reader, transducer, laboratory test equipment; or to output data; e.g., printer, disk drive, video system, tape drive, valve controller, motor controller. Syn: peripheral equipment.

peripheral equipment. See: peripheral device.

personal computer. Synonymous with microcomputer, a computer that is functionally similar to large computers, but serves only one user.

physical configuration audit. (IEEE) An audit conducted to verify that a configuration item, as built, conforms to the technical documentation that defines it. See: functional configuration audit.

physical requirement. (IEEE) A requirement that specifies a physical characteristic that a system or system component must posses; e.g., material, shape, size, weight.

pixel. (IEEE) (1) In image processing and pattern recognition, the smallest element of a digital image that can be assigned a gray level. (2) In computer graphics, the smallest element of a display surface that can be assigned independent characteristics. This term is derived from the term "picture element".

platform. The hardware and software which must be present and functioning for an application program to run [perform] as intended. A platform includes, but is not limited to the operating system or executive software, communication software, microprocessor, network, input/output hardware, any generic software libraries, database management, user interface software, and the like.

Page 367: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-41

polling. A technique a CPU can use to learn if a peripheral device is ready to receive data or to send data. In this method each device is checked or polled in-turn to determine if that device needs service. The device must wait until it is polled in order to send or receive data. This method is useful if the device's data can wait for a period of time before being processed, since each device must await its turn in the polling scheme before it will be serviced by the processor. Contrast with interrupt.

positive channel MOS. A type of microelectronic circuit in which the base material is positively charged.

precision. The relative degree of repeatability, i.e. how closely the values within a series of replicate measurements agree. It is the result of resolution and stability. See: accuracy, bias, calibration.

preliminary design. (IEEE) (1) The process of analyzing design alternatives and defining the architecture, components, interfaces, and timing and sizing estimates for a system or component. See: detailed design. (2) The result of the process in (1).

preliminary design review. (IEEE) A review conducted to evaluate the progress, technical adequacy, and risk resolution of the selected design approach for one or more configuration items; to determine each design's compatibility with the requirements for the configuration item; to evaluate the degree of definition and assess the technical risk associated with the selected manufacturing methods and processes; to establish the existence and compatibility of the physical and functional interfaces among the configuration items and other items of equipment, facilities, software and personnel; and, as applicable, to evaluate the preliminary operational and support documents.

printed circuit board. A flat board that holds chips and other electronic components. The board is "printed" with electrically conductive pathways between the components.

production database. The computer file that contains the establishment's current production data.

program. (1) (ISO) A sequence of instructions suitable for processing. Processing may include the use of an assembler, a compiler, an interpreter, or another translator to prepare the program for execution. The instructions may include statements and necessary declarations. (2) (ISO) To design, write, and test programs. (3) (ANSI) In programming languages, a set of one or more interrelated modules capable of being executed. (4) Loosely, a routine. (5) Loosely, to write a routine.

program design language. (IEEE) A specification language with special constructs and, sometimes, verification protocols, used to develop, analyze, and document a program design.

program mutation. (IEEE) A computer program that has been purposely altered from the intended version to evaluate the ability of program test cases to detect the alteration. See: testing, mutation.

programmable array logic. A programmable logic chip. See: programmable logic device.

programmable logic array. A programmable logic chip. See: programmable logic device.

programmable logic device. A logic chip that is programmed at the user's site. Contrast with PROM.

Page 368: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-42 Version 9.1

programmable read only memory. A chip which may be programmed by using a PROM programming device. It can be programmed only once. It cannot be erased and reprogrammed. Each of its bit locations is a fusible link. An unprogrammed PROM has all links closed establishing a known state of each bit. Programming the chip consists of sending an electrical current of a specified size through each link which is to be changed to the alternate state. This causes the "fuse to blow", opening that link.

programming language. (IEEE) A language used to express computer programs. See: computer language, high-level language, low-level language.

programming standards. See: coding standards.

programming style analysis. (IEEE) Analysis to ensure that all portions of the program follow approved programming guidelines. See: code audit, code inspection. coding standards.

project plan. (NIST) A management document describing the approach taken for a project. The plan typically describes work to be done, resources required, methods to be used, the configuration management and quality assurance procedures to be followed, the schedules to be met, the project organization, etc. Project in this context is a generic term. Some projects may also need integration plans, security plans, test plans, quality assurance plans, etc. See: documentation plan, software development plan, test plan, software engineering.

PROM programmer. Electronic equipment which is used to transfer a program [write instructions and data] into PROM and EPROM chips.

proof of correctness. (NBS) The use of techniques of mathematical logic to infer that a relation between program variables assumed true at program entry implies that another relation between program variables holds at program exit.

protection exception. (IEEE) An exception that occurs when a program attempts to write into a protected area in storage.

protocol. (ISO) A set of semantic and syntactic rules that determines the behavior of functional units in achieving communication.

prototyping. Using software tools to accelerate the software development process by facilitating the identification of required functionality during analysis and design phases. A limitation of this technique is the identification of system or software problems and hazards. See: rapid prototyping.

pseudocode. A combination of programming language and natural language used to express a software design. If used, it is usually the last document produced prior to writing the source code.

- Q -

QA. quality assurance.

QC. quality control.

Page 369: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-43

qualification, installation. (FDA) Establishing confidence that process equipment and ancillary systems are compliant with appropriate codes and approved design intentions, and that manufacturer's recommendations are suitably considered.

qualification, operational. (FDA) Establishing confidence that process equipment and sub-systems are capable of consistently operating within established limits and tolerances.

qualification, process performance. (FDA) Establishing confidence that the process is effective and reproducible.

qualification, product performance. (FDA) Establishing confidence through appropriate testing that the finished product produced by a specified process meets all release requirements for functionality and safety.

quality assurance. (1) (ISO) The planned systematic activities necessary to ensure that a component, module, or system conforms to established technical requirements. (2) All actions that are taken to ensure that a development organization delivers products that meet performance requirements and adhere to standards and procedures. (3) The policy, procedures, and systematic actions established in an enterprise for the purpose of providing and maintaining some degree of confidence in data integrity and accuracy throughout the life cycle of the data, which includes input, update, manipulation, and output. (4) (QA) The actions, planned and performed, to provide confidence that all systems and components that influence the quality of the product are working as expected individually and collectively.

quality assurance, software. (IEEE) (1) A planned and systematic pattern of all actions necessary to provide adequate confidence that an item or product conforms to established technical requirements. (2) A set of activities designed to evaluate the process by which products are developed or manufactured.

quality control. The operational techniques and procedures used to achieve quality requirements.

- R -

RAM. random access memory.

RFI. radiofrequency interference.

RISC. reduced instruction set computer.

ROM. read only memory.

radiofrequency interference. High frequency electromagnetic waves that emanate from electronic devices such as chips and other electronic devices. An electromagnetic disturbance caused by such radiating and transmitting sources as electrostatic discharge [ESD], lightning, radar, radio and TV signals, and motors with brushes can induce unwanted voltages in electronic circuits, damage components and cause malfunctions. See: electromagnetic interference.

random access memory. Chips which can be called read/write memory, since the data stored in them may be read or new data may be written into any memory address on these chips. The

Page 370: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-44 Version 9.1

term random access means that each memory location [usually 8 bits or 1 byte] may be directly accessed [read from or written to] at random. This contrasts to devices like magnetic tape where each section of the tape must be searched sequentially by the read/write head from its current location until it finds the desired location. ROM memory is also random access memory, but they are read only not read/write memories. Another difference between RAM and ROM is that RAM is volatile, i.e. it must have a constant supply of power or the stored data will be lost.

range check. (ISO) A limit check in which both high and low values are stipulated.

rapid prototyping. A structured software requirements discovery technique which emphasizes generating prototypes early in the development process to permit early feedback and analysis in support of the development process. Contrast with incremental development, spiral model, waterfall model. See: prototyping.

read only memory. A memory chip from which data can only be read by the CPU. The CPU may not store data to this memory. The advantage of ROM over RAM is that ROM does not require power to retain its program. This advantage applies to all types of ROM chips; ROM, PROM, EPROM, and EEPROM.

real time. (IEEE) Pertaining to a system or mode of operation in which computation is performed during the actual time that an external process occurs, in order that the computation results can be used to control, monitor, or respond in a timely manner to the external process. Contrast with batch. See: conversational, interactive, interrupt, on-line.

real time processing. A fast-response [immediate response] on-line system which obtains data from an activity or a physical process, performs computations, and returns a response rapidly enough to affect [control] the outcome of the activity or process; e.g., a process control application. Contrast with batch processing.

record. (1) (ISO) a group of related data elements treated as a unit. [A data element (field) is a component of a record, a record is a component of a file (database)].

record of change. Documentation of changes made to the system. A record of change can be a written document or a database. Normally there are two associated with a computer system, hardware and software. Changes made to the data are recorded in an audit trail.

recursion. (IEEE) (1) The process of defining or generating a process or data structure in terms of itself. (2) A process in which a software module calls itself.

reduced instruction set computer. Computer architecture that reduces the complexity of the chip by using simpler instructions. Reduced instruction set does not necessarily mean fewer instructions, but rather a return to simple instructions requiring only one or a very few instruction cycles to execute, and therefore are more effectively utilized with innovative architectural and compiler changes. Systems using RISC technology are able to achieve processing speeds of more than five million instructions per second.

region. A clearly described area within the computer's storage that is logically and/or physically distinct from other regions. Regions are used to separate testing from production [normal use]. Syn: partition.

Page 371: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-45

register. A small, high speed memory circuit within a microprocessor that holds addresses and values of internal operations; e.g., registers keep track of the address of the instruction being executed and the data being processed. Each microprocessor has a specific number of registers depending upon its design.

regression analysis and testing. (IEEE) A software V&V task to determine the extent of V&V analysis and testing that must be repeated when changes are made to any previously examined software products. See: testing, regression.

relational database. Database organization method that links files together as required. Relationships between files are created by comparing data such as account numbers and names. A relational system can take any two or more files and generate a new file from the records that meet the matching criteria. Routine queries often involve more than one data file; e.g., a customer file and an order file can be linked in order to ask a question that relates to information in both files, such as the names of the customers that purchased a particular product. Contrast with network database, flat file.

release. (IEEE) The formal notification and distribution of an approved version. See: version.

reliability. (IEEE) The ability of a system or component to perform its required functions under stated conditions for a specified period of time. See: software reliability.

reliability assessment. (ANSI/IEEE) The process of determining the achieved level of reliability for an existing system or system component.

requirement. (IEEE) (1) A condition or capability needed by a user to solve a problem or achieve an objective. (2) A condition or capability that must be met or possessed by a system or system component to satisfy a contract, standard, specification, or other formally imposed documents. (3) A documented representation of a condition or capability as in (1) or (2). See: design requirement, functional requirement, implementation requirement, interface requirement, performance requirement, physical requirement.

requirements analysis. (IEEE) (1) The process of studying user needs to arrive at a definition of a system, hardware, or software requirements. (2) The process of studying and refining system, hardware, or software requirements. See: prototyping, software engineering.

requirements phase. (IEEE) The period of time in the software life cycle during which the requirements, such as functional and performance capabilities for a software product, are defined and documented.

requirements review. (IEEE) A process or meeting during which the requirements for a system, hardware item, or software item are presented to project personnel, managers, users, customers, or other interested parties for comment or approval. Types include system requirements review, software requirements review. Contrast with code review, design review, formal qualification review, test readiness review.

retention period. (ISO) The length of time specified for data on a data medium to be preserved.

retrospective trace. (IEEE) A trace produced from historical data recorded during the execution of a computer program. Note: this differs from an ordinary trace, which is produced

Page 372: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-46 Version 9.1

cumulatively during program execution. See: execution trace, subroutine trace, symbolic trace, variable trace.

revalidation. Relative to software changes, revalidation means validating the change itself, assessing the nature of the change to determine potential ripple effects, and performing the necessary regression testing.

review. (IEEE) A process or meeting during which a work product or set of work products, is presented to project personnel, managers, users, customers, or other interested parties for comment or approval. Types include code review, design review, formal qualification review, requirements review, test readiness review. Contrast with audit, inspection. See: static analysis.

revision number. See: version number.

risk. (IEEE) A measure of the probability and severity of undesired effects. Often taken as the simple product of probability and consequence.

risk assessment. (DOD) A comprehensive evaluation of the risk and its associated impact.

robustness. The degree to which a software system or component can function correctly in the presence of invalid inputs or stressful environmental conditions. See: software reliability.

routine. (IEEE) A subprogram that is called by other programs and subprograms. Note: This term is defined differently in various programming languages. See: module.

RS-232-C. An Electronic Industries Association (EIA) standard for connecting electronic equipment. Data is transmitted and received in serial format.

- S -

SCSI. small computer systems interface.

SOPs. standard operating procedures.

SQL. structured query language.

SSI. small scale integration.

safety. (DOD) Freedom from those conditions that can cause death, injury, occupational illness, or damage to or loss of equipment or property, or damage to the environment.

safety critical. (DOD) A term applied to a condition, event, operation, process or item of whose proper recognition, control, performance or tolerance is essential to safe system operation or use; e.g., safety critical function, safety critical path, safety critical component.

safety critical computer software components. (DOD) Those computer software components and units whose errors can result in a potential hazard, or loss of predictability or control of a system.

security. See: computer system security.

Page 373: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-47

sensor. A peripheral input device which senses some variable in the system environment, such as temperature, and converts it to an electrical signal which can be further converted to a digital signal for processing by the computer.

serial. (1) Pertaining to the sequential processing of the individual parts of a whole, such as the bits of a character or the characters of a word, using the same facilities for successive parts. (2) Term describing the transmission of data one bit at a time. Contrast with parallel.

server. A high speed computer in a network that is shared by multiple users. It holds the programs and data that are shared by all users.

service program. Syn: utility program.

servomechanism. (ANSI) (1) An automatic device that uses feedback to govern the physical position of an element. (2) A feedback control system in which at least one of the system signals represents a mechanical motion.

severity. See: criticality.

side effect. An unintended alteration of a program's behavior caused by a change in one part of the program, without taking into account the effect the change has on another part of the program. See: regression analysis and testing.

simulation. (1) (NBS) Use of an executable model to represent the behavior of an object. During testing the computational hardware, the external environment, and even code segments may be simulated. (2) (IEEE) A model that behaves or operates like a given system when provided a set of controlled inputs. Contrast with emulation.

simulation analysis. (IEEE) A software V&V task to simulate critical tasks of the software or system environment to analyze logical or performance characteristics that would not be practical to analyze manually.

simulator. (IEEE) A device, computer program, or system that behaves or operates like a given system when provided a set of controlled inputs. Contrast with emulator. A simulator provides inputs or responses that resemble anticipated process parameters. Its function is to present data to the system at known speeds and in a proper format.

sizing. (IEEE) The process of estimating the amount of computer storage or the number of source lines required for a software system or component. Contrast with timing.

sizing and timing analysis. (IEEE) A software V&V task to obtain program sizing and execution timing information to determine if the program will satisfy processor size and performance requirements allocated to software.

small computer systems interface. A standard method of interfacing a computer to disk drives, tape drives and other peripheral devices that require high-speed data transfer. Up to seven SCSI devices can be linked to a single SCSI port. Contrast with ST-506, EDSI, IDE.

small scale integration. A classification of ICs [chips] based on their size as expressed by the number of circuits or logic gates they contain. An SSI IC contains up to 100 transistors.

software. (ANSI) Programs, procedures, rules, and any associated documentation pertaining to the operation of a system. Contrast with hardware. See: application software, operating system, system software, utility software.

Page 374: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-48 Version 9.1

software audit. See: software review.

software characteristic. An inherent, possibly accidental, trait, quality, or property of software; e.g., functionality, performance, attributes, design constraints, number of states, lines or branches.

software configuration item. See: configuration item.

software design description. (IEEE) A representation of software created to facilitate analysis, planning, implementation, and decision making. The software design description is used as a medium for communicating software design information, and may be thought of as a blueprint or model of the system. See: structured design, design description, specification.

software developer. See: developer.

software development notebook. (NIST) A collection of material pertinent to the development of a software module. Contents typically include the requirements, design, technical reports, code listings, test plans, test results, problem reports, schedules, notes, etc. for the module. Syn: software development file.

software development plan. (NIST) The project plan for the development of a software product. Contrast with software development process, software life cycle.

software development process. (IEEE) The process by which user needs are translated into a software product. the process involves translating user needs into software requirements, transforming the software requirements into design, implementing the design in code, testing the code, and sometimes installing and checking out the software for operational activities. Note: these activities may overlap or be performed iteratively. See: incremental development, rapid prototyping, spiral model, waterfall model.

software diversity. (IEEE) A software development technique in which two or more functionally identical variants of a program are developed from the same specification by different programmers or programming teams with the intent of providing error detection, increased reliability, additional documentation or reduced probability that programming or compiler errors will influence the end results.

software documentation. (NIST) Technical data or information, including computer listings and printouts, in human readable form, that describe or specify the design or details, explain the capabilities, or provide operating instructions for using the software to obtain desired results from a software system. See: specification; specification, requirements; specification, design; software design description; test plan, test report, user's guide.

software element. (IEEE) A deliverable or in- process document produced or acquired during software development or maintenance. Specific examples include but are not limited to:

(1) Project planning documents; i.e., software development plans, and software verification and validation plans.

(2) Software requirements and design specifications.

(3) Test documentation.

(4) Customer-deliverable documentation.

(5) Program source code.

Page 375: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-49

(6) Representation of software solutions implemented in firmware.

(7) Reports; i.e., review, audit, project status.

(8) Data; i.e., defect detection, test.

Contrast with software item. See: configuration item.

software element analysis. See: software review.

software engineering. (IEEE) The application of a systematic, disciplined, quantifiable approach to the development, operation, and maintenance of software; i.e., the application of engineering to software. See: project plan, requirements analysis, architectural design, structured design, system safety, testing, configuration management.

software engineering environment. (IEEE) The hardware, software, and firmware used to perform a software engineering effort. Typical elements include computer equipment, compilers, assemblers, operating systems, debuggers, simulators, emulators, test tools, documentation tools, and database management systems.

software hazard analysis. (ODE, CDRH) The identification of safety-critical software, the classification and estimation of potential hazards, and identification of program path analysis to identify hazardous combinations of internal and environmental program conditions. See: risk assessment, software safety change analysis, software safety code analysis, software safety design analysis, software safety requirements analysis, software safety test analysis, system safety.

software item. (IEEE) Source code, object code, job control code, control data, or a collection of these items. Contrast with software element.

software life cycle. (NIST) Period of time beginning when a software product is conceived and ending when the product is no longer available for use. The software life cycle is typically broken into phases denoting activities such as requirements, design, programming, testing, installation, and operation and maintenance. Contrast with software development process. See: waterfall model.

software reliability. (IEEE) (1) the probability that software will not cause the failure of a system for a specified time under specified conditions. The probability is a function of the inputs to and use of the system in the software. The inputs to the system determine whether existing faults, if any, are encountered. (2) The ability of a program to perform its required functions accurately and reproducibly under stated conditions for a specified period of time.

software requirements specification. See: specification, requirements.

software review. (IEEE) An evaluation of software elements to ascertain discrepancies from planned results and to recommend improvement. This evaluation follows a formal process. Syn: software audit. See: code audit, code inspection, code review, code walkthrough, design review, specification analysis, static analysis.

software safety change analysis. (IEEE) Analysis of the safety-critical design elements affected directly or indirectly by the change to show the change does not create a new hazard, does not impact on a previously resolved hazard, does not make a currently existing hazard

Page 376: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-50 Version 9.1

more severe, and does not adversely affect any safety-critical software design element. See: software hazard analysis, system safety.

software safety code analysis. (IEEE) Verification that the safety-critical portions of the design are correctly implemented in the code. See: logic analysis, data analysis, interface analysis, constraint analysis, programming style analysis, noncritical code analysis, timing and sizing analysis, software hazard analysis, system safety.

software safety design analysis. (IEEE) Verification that the safety-critical portion of the software design correctly implements the safety-critical requirements and introduces no new hazards. See: logic analysis, data analysis, interface analysis, constraint analysis, functional analysis, software element analysis, timing and sizing analysis, reliability analysis, software hazard analysis, system safety.

software safety requirements analysis. (IEEE) Analysis evaluating software and interface requirements to identify errors and deficiencies that could contribute to a hazard. See: criticality analysis, specification analysis, timing and sizing analysis, different software systems analyses, software hazard analysis, system safety.

software safety test analysis. (IEEE) Analysis demonstrating that safety requirements have been correctly implemented and that the software functions safely within its specified environment. Tests may include; unit level tests, interface tests, software configuration item testing, system level testing, stress testing, and regression testing. See: software hazard analysis, system safety.

source code. (1) (IEEE) Computer instructions and data definitions expressed in a form suitable for input to an assembler, compiler or other translator. (2) The human readable version of the list of instructions [program] that cause a computer to perform a task. Contrast with object code. See: source program, programming language.

source program. (IEEE) A computer program that must be compiled, assembled, or otherwise translated in order to be executed by a computer. Contrast with object program. See: source code.

spaghetti code. Program source code written without a coherent structure. Implies the excessive use of GOTO instructions. Contrast with structured programming.

special test data. (NBS) Test data based on input values that are likely to require special handling by the program. See: error guessing; testing, special case.

specification. (IEEE) A document that specifies, in a complete, precise, verifiable manner, the requirements, design, behavior,or other characteristics of a system or component, and often, the procedures for determining whether these provisions have been satisfied. Contrast with requirement. See: specification, formal; specification, requirements; specification, functional; specification, performance; specification, interface; specification, design; coding standards; design standards.

specification analysis. (IEEE) Evaluation of each safety-critical software requirement with respect to a list of qualities such as completeness, correctness, consistency, testability, robustness, integrity, reliability, usability, flexibility, maintainability, portability, interoperability, accuracy, auditability, performance, internal instrumentation, security and training.

Page 377: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-51

specification, design. (NIST) A specification that documents how a system is to be built. It typically includes system or component structure, algorithms, control logic, data structures, data set [file] use information, input/output formats, interface descriptions, etc. Contrast with design standards, requirement. See: software design description.

specification, formal. (NIST) (1) A specification written and approved in accordance with established standards. (2) A specification expressed in a requirements specification language. Contrast with requirement.

specification, functional. (NIST) A specification that documents the functional requirements for a system or system component. It describes what the system or component is to do rather than how it is to be built. Often part of a requirements specification. Contrast with requirement.

specification, interface. (NIST) A specification that documents the interface requirements for a system or system component. Often part of a requirements specification. Contrast with requirement.

specification, performance. (IEEE) A document that sets forth the performance characteristics that a system or component must possess. These characteristics typically include speed, accuracy, and memory usage. Often part of a requirements specification. Contrast with requirement.

specification, product. (IEEE) A document which describes the as built version of the software.

specification, programming. (NIST) See: specification, design.

specification, requirements. (NIST) A specification that documents the requirements of a system or system component. It typically includes functional requirements, performance requirements, interface requirements, design requirements [attributes and constraints], development [coding] standards, etc. Contrast with requirement.

specification, system. See: requirements specification.

specification, test case. See: test case.

specification tree. (IEEE) A diagram that depicts all of the specifications for a given system and shows their relationship to one another.

spiral model. (IEEE) A model of the software development process in which the constituent activities, typically requirements analysis, preliminary and detailed design, coding, integration, and testing, are performed iteratively until the software is complete. Syn: evolutionary model. Contrast with incremental development; rapid prototyping; waterfall model.

ST-506. A standard electrical interface between the hard disk and controller in IBM PC compatible computers. Contrast with EDSI, IDE, SCSI.

standard operating procedures. Written procedures [prescribing and describing the steps to be taken in normal and defined conditions] which are necessary to assure control of production and processes.

Page 378: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-52 Version 9.1

state. (IEEE) (1) A condition or mode of existence that a system, component, or simulation may be in; e.g., the pre-flight state of an aircraft navigation program or the input state of a given channel.

state diagram. (IEEE) A diagram that depicts the states that a system or component can assume, and shows the events or circumstances that cause or result from a change from one state to another. Syn: state graph. See: state-transition table.

statement coverage. See: testing, statement.

state-transition table. (Beizer) A representation of a state graph that specifies the states, the inputs, the transitions, and the outputs. See: state diagram.

static analysis. (1) (NBS) Analysis of a program that is performed without executing the program. (2) (IEEE) The process of evaluating a system or component based on its form, structure, content, documentation. Contrast with dynamic analysis. See: code audit, code inspection, code review, code walk-through, design review, symbolic execution.

static analyzer. (ANSI/IEEE) A software tool that aides in the evaluation of a computer program without executing the program. Examples include checkers, compilers, cross-reference generators, standards enforcers, and flowcharters.

stepwise refinement. A structured software design technique; data and processing steps are defined broadly at first, and then further defined with increasing detail.

storage device. A unit into which data or programs can be placed, retained and retrieved. See: memory.

string. (IEEE) (1) A sequence of characters. (2) A linear sequence of entities such as characters or physical elements.

structure chart. (IEEE) A diagram that identifies modules, activities, or other entities in a system or computer program and shows how larger or more general entities break down into smaller, more specific entries. Note: The result is not necessarily the same as that shown in a call graph. Syn: hierarchy chart, program structure chart. Contrast with call graph.

structured design. (IEEE) Any disciplined approach to software design that adheres to specified rules based on principles such as modularity, top-down design, and stepwise refinement of data, system structure, and processing steps. See: data structure centered design, input-processing-output, modular decomposition, object oriented design, rapid prototyping, stepwise refinement, structured programming, transaction analysis, transform analysis, graphical software specification/design documents, modular software, software engineering.

structured programming. (IEEE) Any software development technique that includes structured design and results in the development of structured programs. See: structured design.

structured query language. A language used to interrogate and process data in a relational database. Originally developed for IBM mainframes, there have been many implementations created for mini and micro computer database applications. SQL commands can be used to interactively work with a data base or can be embedded with a programming language to interface with a database.

Page 379: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-53

stub. (NBS) Special code segments that when invoked by a code segment under test will simulate the behavior of designed and specified modules not yet constructed.

subprogram. (IEEE) A separately compilable, executable component of a computer program. Note: This term is defined differently in various programming languages. See: coroutine, main program, routine, subroutine.

subroutine. (IEEE) A routine that returns control to the program or subprogram that called it. Note: This term is defined differently in various programming languages. See: module.

subroutine trace. (IEEE) A record of all or selected subroutines or function calls performed during the execution of a computer program and, optionally, the values of parameters passed to and returned by each subroutine or function. Syn: call trace. See: execution trace, retrospective trace, symbolic trace, variable trace.

support software. (IEEE) Software that aids in the development and maintenance of other software; e.g., compilers, loaders, and other utilities.

symbolic execution. (IEEE) A static analysis technique in which program execution is simulated using symbols, such as variable names, rather than actual values for input data, and program outputs are expressed as logical or mathematical expressions involving these symbols.

symbolic trace. (IEEE) A record of the source statements and branch outcomes that are encountered when a computer program is executed using symbolic, rather than actual values for input data. See: execution trace, retrospective trace, subroutine trace, variable trace.

synchronous. Occurring at regular, timed intervals, i.e. timing dependent.

synchronous transmission. A method of electrical transfer in which a constant time interval is maintained between successive bits or characters. Equipment within the system is kept in step on the basis of this timing. Contrast with asynchronous transmission.

syntax. The structural or grammatical rules that define how symbols in a language are to be combined to form words, phrases, expressions, and other allowable constructs.

system. (1) (ANSI) People, machines, and methods organized to accomplish a set of specific functions. (2) (DOD) A composite, at any level of complexity, of personnel, procedures, materials, tools, equipment, facilities, and software. The elements of this composite entity are used together in the intended operational or support environment to perform a given task or achieve a specific purpose, support, or mission requirement.

system administrator. The person that is charged with the overall administration, and operation of a computer system. The System Administrator is normally an employee or a member of the establishment. Syn: system manager.

system analysis. (ISO) A systematic investigation of a real or planned system to determine the functions of the system and how they relate to each other and to any other system. See: requirements phase.

system design. (ISO) A process of defining the hardware and software architecture, components, modules, interfaces, and data for a system to satisfy specified requirements. See: design phase, architectural design, functional design.

Page 380: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-54 Version 9.1

system design review. (IEEE) A review conducted to evaluate the manner in which the requirements for a system have been allocated to configuration items, the system engineering process that produced the allocation, the engineering planning for the next phase of the effort, manufacturing considerations, and the planning for production engineering. See: design review.

system documentation. (ISO) The collection of documents that describe the requirements, capabilities, limitations, design, operation, and maintenance of an information processing system. See: specification, test documentation, user's guide.

system integration. (ISO) The progressive linking and testing of system components into a complete system. See: incremental integration.

system life cycle. The course of developmental changes through which a system passes from its conception to the termination of its use; e.g., the phases and activities associated with the analysis, acquisition, design, development, test, integration, operation, maintenance, and modification of a system. See: software life cycle.

system manager. See: system administrator.

system safety. (DOD) The application of engineering and management principles, criteria, and techniques to optimize all aspects of safety within the constraints of operational effectiveness, time, and cost throughout all phases of the system life cycle. See: risk assessment, software safety change analysis, software safety code analysis, software safety design analysis, software safety requirements analysis, software safety test analysis, software engineering.

system software. (1) (ISO) Application- independent software that supports the running of application software. (2) (IEEE) Software designed to facilitate the operation and maintenance of a computer system and its associated programs; e.g., operating systems, assemblers, utilities. Contrast with application software. See: support software.

- T -

TB. terabyte.

TCP/IP. transmission control protocol/Internet protocol.

tape. Linear magnetic storage hardware, rolled onto a reel or cassette.

telecommunication system. The devices and functions relating to transmission of data between the central processing system and remotely located users.

terabyte. Approximately one trillion bytes; precisely 240 or 1,099,511,627,776 bytes. See: kilobyte, megabyte, gigabyte.

terminal. A device, usually equipped with a CRT display and keyboard, used to send and receive information to and from a computer via a communication channel.

Page 381: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-55

test. (IEEE) An activity in which a system or component is executed under specified conditions, the results are observed or recorded and an evaluation is made of some aspect of the system or component.

testability. (IEEE) (1) The degree to which a system or component facilitates the establishment of test criteria and the performance of tests to determine whether those criteria have been met. (2) The degree to which a requirement is stated in terms that permit establishment of test criteria and performance of tests to determine whether those criteria have been met. See: measurable.

test case. (IEEE) Documentation specifying inputs, predicted results, and a set of execution conditions for a test item. Syn: test case specification. See: test procedure.

test case generator. (IEEE) A software tool that accepts as input source code, test criteria, specifications, or data structure definitions; uses these inputs to generate test input data; and, sometimes, determines expected results. Syn: test data generator, test generator.

test design. (IEEE) Documentation specifying the details of the test approach for a software feature or combination of software features and identifying the associated tests. See: testing functional; cause effect graphing; boundary value analysis; equivalence class partitioning; error guessing; testing, structural; branch analysis; path analysis; statement coverage; condition coverage; decision coverage; multiple-condition coverage.

test documentation. (IEEE) Documentation describing plans for, or results of, the testing of a system or component, Types include test case specification, test incident report, test log, test plan, test procedure, test report.

test driver. (IEEE) A software module used to invoke a module under test and, often, provide test inputs, control and monitor execution, and report test results. Syn: test harness.

test harness. See: test driver.

test incident report. (IEEE) A document reporting on any event that occurs during testing that requires further investigation. See: failure analysis.

test item. (IEEE) A software item which is the object of testing.

test log. (IEEE) A chronological record of all relevant details about the execution of a test.

test phase. (IEEE) The period of time in the software life cycle in which the components of a software product are evaluated and integrated, and the software product is evaluated to determine whether or not requirements have been satisfied.

test plan. (IEEE) Documentation specifying the scope, approach, resources, and schedule of intended testing activities. It identifies test items, the features to be tested, the testing tasks, responsibilities, required, resources, and any risks requiring contingency planning. See: test design, validation protocol.

test procedure. (NIST) A formal document developed from a test plan that presents detailed instructions for the setup, operation, and evaluation of the results for each defined test. See: test case.

test readiness review. (IEEE) (1) A review conducted to evaluate preliminary test results for one or more configuration items; to verify that the test procedures for each configuration item

Page 382: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-56 Version 9.1

are complete, comply with test plans and descriptions, and satisfy test requirements; and to verify that a project is prepared to proceed to formal testing of the configuration items. (2) A review as in (1) for any hardware or software component. Contrast with code review, design review, formal qualification review, requirements review.

test report. (IEEE) A document describing the conduct and results of the testing carried out for a system or system component.

test result analyzer. A software tool used to test output data reduction, formatting, and printing.

testing. (IEEE) (1) The process of operating a system or component under specified conditions, observing or recording the results, and making an evaluation of some aspect of the system or component. (2) The process of analyzing a software item to detect the differences between existing and required conditions, i.e. bugs, and to evaluate the features of the software items. See: dynamic analysis, static analysis, software engineering.

testing, 100%. See: testing, exhaustive.

testing, acceptance. (IEEE) Testing conducted to determine whether or not a system satisfies its acceptance criteria and to enable the customer to determine whether or not to accept the system. Contrast with testing, development; testing, operational. See: testing, qualification.

testing, alpha []. (Pressman) Acceptance testing performed by the customer in a controlled environment at the developer's site. The software is used by the customer in a setting approximating the target environment with the developer observing and recording errors and usage problems.

testing, assertion. (NBS) A dynamic analysis technique which inserts assertions about the relationship between program variables into the program code. The truth of the assertions is determined as the program executes. See: assertion checking, instrumentation.

testing, beta []. (1) (Pressman) Acceptance testing performed by the customer in a live application of the software, at one or more end user sites, in an environment not controlled by the developer. (2) For medical device software such use may require an Investigational Device Exemption [IDE] or Institutional Review Board [IRB] approval.

testing, boundary value. A testing technique using input values at, just below, and just above, the defined limits of an input domain; and with input values causing outputs to be at, just below, and just above, the defined limits of an output domain. See: boundary value analysis; testing, stress.

testing, branch. (NBS) Testing technique to satisfy coverage criteria which require that for each decision point, each possible branch [outcome] be executed at least once. Contrast with testing, path; testing, statement. See: branch coverage.

testing, compatibility. The process of determining the ability of two or more systems to exchange information. In a situation where the developed software replaces an already working program, an investigation should be conducted to assess possible comparability problems between the new software and other programs or systems. See: different software system analysis; testing, integration; testing, interface.

testing, component. See: testing, unit.

Page 383: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-57

testing, design based functional. (NBS) The application of test data derived through functional analysis extended to include design functions as well as requirement functions. See: testing, functional.

testing, development. (IEEE) Testing conducted during the development of a system or component, usually in the development environment by the developer. Contrast with testing, acceptance; testing, operational.

testing, exhaustive. (NBS) Executing the program with all possible combinations of values for program variables. Feasible only for small, simple programs.

testing, formal. (IEEE) Testing conducted in accordance with test plans and procedures that have been reviewed and approved by a customer, user, or designated level of management. Antonym: informal testing.

testing, functional. (IEEE) (1) Testing that ignores the internal mechanism or structure of a system or component and focuses on the outputs generated in response to selected inputs and execution conditions. (2) Testing conducted to evaluate the compliance of a system or component with specified functional requirements and corresponding predicted results. Syn: black-box testing, input/output driven testing. Contrast with testing, structural.

testing, integration. (IEEE) An orderly progression of testing in which software elements, hardware elements, or both are combined and tested, to evaluate their interactions, until the entire system has been integrated.

testing, interface. (IEEE) Testing conducted to evaluate whether systems or components pass data and control correctly to one another. Contrast with testing, unit; testing, system. See: testing, integration.

testing, interphase. See: testing, interface.

testing, invalid case. A testing technique using erroneous [invalid, abnormal, or unexpected] input values or conditions. See: equivalence class partitioning.

testing, mutation. (IEEE) A testing methodology in which two or more program mutations are executed using the same test cases to evaluate the ability of the test cases to detect differences in the mutations.

testing, operational. (IEEE) Testing conducted to evaluate a system or component in its operational environment. Contrast with testing, development; testing, acceptance; See: testing, system.

testing, parallel. (ISO) Testing a new or an altered data processing system with the same source data that is used in another system. The other system is considered as the standard of comparison. Syn: parallel run.

testing, path. (NBS) Testing to satisfy coverage criteria that each logical path through the program be tested. Often paths through the program are grouped into a finite set of classes. One path from each class is then tested. Syn: path coverage. Contrast with testing, branch; testing, statement; branch coverage; condition coverage; decision coverage; multiple condition coverage; statement coverage.

Page 384: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-58 Version 9.1

testing, performance. (IEEE) Functional testing conducted to evaluate the compliance of a system or component with specified performance requirements.

testing, qualification. (IEEE) Formal testing, usually conducted by the developer for the consumer, to demonstrate that the software meets its specified requirements. See: testing, acceptance; testing, system.

testing, regression. (NIST) Rerunning test cases which a program has previously executed correctly in order to detect errors spawned by changes or corrections made during software development and maintenance.

testing, special case. A testing technique using input values that seem likely to cause program errors; e.g., "0", "1", NULL, empty string. See: error guessing.

testing, statement. (NIST) Testing to satisfy the criterion that each statement in a program be executed at least once during program testing. Syn: statement coverage. Contrast with testing, branch; testing, path; branch coverage; condition coverage; decision coverage; multiple condition coverage; path coverage.

testing, storage. This is a determination of whether or not certain processing conditions use more storage [memory] than estimated.

testing, stress. (IEEE) Testing conducted to evaluate a system or component at or beyond the limits of its specified requirements. Syn: testing, boundary value.

testing, structural. (1) (IEEE) Testing that takes into account the internal mechanism [structure] of a system or component. Types include branch testing, path testing, statement testing. (2) Testing to insure each program statement is made to execute during testing and that each program statement performs its intended function. Contrast with functional testing. Syn: white-box testing, glass-box testing, logic driven testing.

testing, system. (IEEE) The process of testing an integrated hardware and software system to verify that the system meets its specified requirements. Such testing may be conducted in both the development environment and the target environment.

testing, unit. (1) (NIST) Testing of a module for typographic, syntactic, and logical errors, for correct implementation of its design, and for satisfaction of its requirements. (2) (IEEE) Testing conducted to verify the implementation of the design for one software element; e.g., a unit or module; or a collection of software elements. Syn: component testing.

testing, usability. Tests designed to evaluate the machine/user interface. Are the communication device(s) designed in a manner such that the information is displayed in a understandable fashion enabling the operator to correctly interact with the system?

testing, valid case. A testing technique using valid [normal or expected] input values or conditions. See: equivalence class partitioning.

testing, volume. Testing designed to challenge a system's ability to manage the maximum amount of data over a period of time. This type of testing also evaluates a system's ability to handle overload situations in an orderly fashion.

testing, worst case. Testing which encompasses upper and lower limits, and circumstances which pose the greatest chance finding of errors. Syn: most appropriate challenge conditions.

Page 385: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-59

See: testing, boundary value; testing, invalid case; testing, special case; testing, stress; testing, volume.

time sharing. (IEEE) A mode of operation that permits two or more users to execute computer programs concurrently on the same computer system by interleaving the execution of their programs. May be implemented by time slicing, priority-based interrupts, or other scheduling methods.

timing. (IEEE) The process of estimating or measuring the amount of execution time required for a software system or component. Contrast with sizing.

timing analyzer. (IEEE) A software tool that estimates or measures the execution time of a computer program or portion of a computer program, either by summing the execution times of the instructions along specified paths or by inserting probes at specified points in the program and measuring the execution time between probes.

timing and sizing analysis. (IEEE) Analysis of the safety implications of safety-critical requirements that relate to execution time, clock time, and memory allocation.

top-down design. Pertaining to design methodology that starts with the highest level of abstraction and proceeds through progressively lower levels. See: structured design.

touch sensitive. (ANSI) Pertaining to a device that allows a user to interact with a computer system by touching an area on the surface of the device with a finger, pencil, or other object, e.g., a touch sensitive keypad or screen.

touch screen. A touch sensitive display screen that uses a clear panel over or on the screen surface. The panel is a matrix of cells, an input device, that transmits pressure information to the software.

trace. (IEEE) (1) A record of the execution of a computer program, showing the sequence of instructions executed, the names and values of variables, or both. Types include execution trace, retrospective trace, subroutine trace, symbolic trace, variable trace. (2) To produce a record as in (1). (3) To establish a relationship between two or more products of the development process; e.g., to establish the relationship between a given requirement and the design element that implements that requirement.

traceability. (IEEE) (1) The degree to which a relationship can be established between two or more products of the development process, especially products having a predecessor-successor or master-subordinate relationship to one another; e.g., the degree to which the requirements and design of a given software component match. See: consistency. (2) The degree to which each element in a software development product establishes its reason for existing; e.g., the degree to which each element in a bubble chart references the requirement that it satisfies. See: traceability analysis, traceability matrix.

traceability analysis. (IEEE) The tracing of (1) Software Requirements Specifications requirements to system requirements in concept documentation, (2) software design descriptions to software requirements specifications and software requirements specifications to software design descriptions, (3) source code to corresponding design specifications and design specifications to source code. Analyze identified relationships for correctness, consistency, completeness, and accuracy. See: traceability, traceability matrix.

Page 386: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-60 Version 9.1

traceability matrix. (IEEE) A matrix that records the relationship between two or more products; e.g., a matrix that records the relationship between the requirements and the design of a given software component. See: traceability, traceability analysis.

transaction. (ANSI) (1) A command, message, or input record that explicitly or implicitly calls for a processing action, such as updating a file. (2) An exchange between and end user and an interactive system. (3) In a database management system, a unit of processing activity that accomplishes a specific purpose such as a retrieval, an update, a modification, or a deletion of one or more data elements of a storage structure.

transaction analysis. A structured software design technique, deriving the structure of a system from analyzing the transactions that the system is required to process.

transaction flowgraph. (Beizer) A model of the structure of the system's [program's] behavior, i.e., functionality.

transaction matrix. (IEEE) A matrix that identifies possible requests for database access and relates each request to information categories or elements in the database.

transform analysis. A structured software design technique in which system structure is derived from analyzing the flow of data through the system and the transformations that must be performed on the data.

translation. (NIST) Converting from one language form to another. See: assembling, compilation, interpret.

transmission control protocol/Internet protocol. A set of communications protocols developed for the Defense Advanced Research Projects Agency to internetwork dissimilar systems. It is used by many corporations, almost all American universities, and agencies of the federal government. The File Transfer Protocol and Simple Mail Transfer Protocol provide file transfer and electronic mail capability. The TELENET protocol provides a terminal emulation capability that allows a user to interact with any other type of computer in the network. The TCP protocol controls the transfer of the data, and the IP protocol provides the routing mechanism.

trojan horse. A method of attacking a computer system, typically by providing a useful program which contains code intended to compromise a computer system by secretly providing for unauthorized access, the unauthorized collection of privileged system or user data, the unauthorized reading or altering of files, the performance of unintended and unexpected functions, or the malicious destruction of software and hardware. See: bomb, virus, worm.

truth table. (1) (ISO) An operation table for a logic operation. (2) A table that describes a logic function by listing all possible combinations of input values, and indicating, for each combination, the output value.

tuning. (NIST) Determining what parts of a program are being executed the most. A tool that instruments a program to obtain execution frequencies of statements is a tool with this feature.

twisted pair. A pair of thin-diameter insulated wires commonly used in telephone wiring. The wires are twisted around each other to minimize interference from other twisted pairs in the

Page 387: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-61

cable. Twisted pairs have less bandwidth than coaxial cable or optical fiber. Abbreviated UTP for Unshielded Twisted Pair. Syn: twisted wire pair.

- U -

unambiguous. (1) Not having two or more possible meanings. (2) Not susceptible to different interpretations. (3) Not obscure, not vague. (4) Clear, definite, certain.

underflow. (ISO) The state in which a calculator shows a zero indicator for the most significant part of a number while the least significant part of the number is dropped. For example, if the calculator output capacity is four digits, the number .0000432 will be shown as .0000. See: arithmetic underflow.

underflow exception. (IEEE) An exception that occurs when the result of an arithmetic operation is too small a fraction to be represented by the storage location designated to receive it.

unit. (IEEE) (1) A separately testable element specified in the design of a computer software element. (2) A logically separable part of a computer program. Syn: component, module.

UNIX. A multitasking, multiple-user (time-sharing) operating system developed at Bell Labs to create a favorable environment for programming research and development.

usability. (IEEE) The ease with which a user can learn to operate, prepare inputs for, and interpret outputs of a system or component.

user. (ANSI) Any person, organization, or functional unit that uses the services of an information processing system. See: end user.

user's guide. (ISO) Documentation that describes how to use a functional unit, and that may include description of the rights and responsibilities of the user, the owner, and the supplier of the unit. Syn: user manual, operator manual.

utility program. (ISO) A computer program in general support of the processes of a computer; e.g., a diagnostic program, a trace program, a sort program. Syn: service program. See: utility software.

utility software. (IEEE) Computer programs or routines designed to perform some general support function required by other application software, by the operating system, or by the system users. They perform general functions such as formatting electronic media, making copies of files, or deleting files.

- V -

V&V. verification and validation.

VAX. virtual address extension.

VLSI. very large scale integration.

Page 388: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-62 Version 9.1

VMS. virtual memory system.

VV&T. validation, verification, and testing.

valid. (1) Sound. (2) Well grounded on principles of evidence. (3) Able to withstand criticism or objection.

validate. To prove to be valid.

validation. (1) (FDA) Establishing documented evidence which provides a high degree of assurance that a specific process will consistently produce a product meeting its predetermined specifications and quality attributes. Contrast with data validation.

validation, process. (FDA) Establishing documented evidence which provides a high degree of assurance that a specific process will consistently produce a product meeting its predetermined specifications and quality characteristics.

validation, prospective. (FDA) Validation conducted prior to the distribution of either a new product, or product made under a revised manufacturing process, where the revisions may affect the product's characteristics.

validation protocol. (FDA) A written plan stating how validation will be conducted, including test parameters, product characteristics, production equipment, and decision points on what constitutes acceptable test results. See: test plan.

validation, retrospective. (FDA) (1) Validation of a process for a product already in distribution based upon accumulated production, testing and control data. (2) Retrospective validation can also be useful to augment initial premarket prospective validation for new products or changed processes. Test data is useful only if the methods and results are adequately specific. Whenever test data are used to demonstrate conformance to specifications, it is important that the test methodology be qualified to assure that the test results are objective and accurate.

validation, software. (NBS) Determination of the correctness of the final program or software produced from a development project with respect to the user needs and requirements. Validation is usually accomplished by verifying each stage of the software development life cycle. See: verification, software.

validation, verification, and testing. (NIST) Used as an entity to define a procedure of review, analysis, and testing throughout the software life cycle to discover errors, determine functionality, and ensure the production of quality software.

valid input. (NBS) Test data that lie within the domain of the function represented by the program.

variable. A name, label, quantity, or data item whose value may be changed many times during processing. Contrast with constant.

variable trace. (IEEE) A record of the name and values of variables accessed or changed during the execution of a computer program. Syn: data-flow trace, data trace, value trace. See: execution trace, retrospective trace, subroutine trace, symbolic trace.

Page 389: CABA_CBOK_Ver_9-1

Vocabulary

Version 9.1 A-63

vendor. A person or an organization that provides software and/or hardware and/or firmware and/or documentation to the user for a fee or in exchange for services. Such a firm could be a medical device manufacturer.

verifiable. Can be proved or confirmed by examination or investigation. See: measurable.

verification, software. (NBS) In general the demonstration of consistency, completeness, and correctness of the software at each stage and between each stage of the development life cycle. See: validation, software.

verify. (ANSI) (1) To determine whether a transcription of data or other operation has been accomplished accurately. (2) To check the results of data entry; e.g., keypunching. (3) (Webster) To prove to be true by demonstration.

version. An initial release or a complete re-release of a software item or software element. See: release.

version number. A unique identifier used to identify software items and the related software documentation which are subject to configuration control.

very large scale integration. A classification of ICs [chips] based on their size as expressed by the number of circuits or logic gates they contain. A VLSI IC contains 100,000 to 1,000,000 transistors.

virtual address extension. Identifies Digital Equipment Corporation's VAX family of computers, ranging from a desktop workstation to a large scale cluster of multiprocessors supporting thousands of simultaneous users.

virtual memory system. Digital Equipment Corporation's multiprocessing, interactive operating system for the VAX computers.

virus. A program which secretly alters other programs to include a copy of itself, and executes when the host program is executed. The execution of a virus program compromises a computer system by performing unwanted or unintended functions which may be destructive. See: bomb, trojan horse, worm.

volume. (ANSI) A portion of data, together with its data carrier, that can be handled conveniently as a unit; e.g., a reel of magnetic tape, a disk pack, a floppy disk.

- W -

WAN. wide area network.

walkthrough. See: code walkthrough.

watchdog timer. (IEEE) A form of interval timer that is used to detect a possible malfunction.

waterfall model. (IEEE) A model of the software development process in which the constituent activities, typically a concept phase, requirements phase, design phase, implementation phase, test phase, installation and checkout phase, and operation and

Page 390: CABA_CBOK_Ver_9-1

Guide to the CABA CBOK

A-64 Version 9.1

maintenance, are performed in that order, possibly with overlap but with little or no iteration. Contrast with incremental development; rapid prototyping; spiral model.

white-box testing. See: testing, structural.

wide area network. A communications network that covers wide geographic areas such as states and countries. Contrast with LAN, MAN.

word. See: computer word.

workaround. A sequence of actions the user should take to avoid a problem or system limitation until the computer program is changed. They may include manual procedures used in conjunction with the computer system.

workstation. Any terminal or personal computer.

worm. An independent program which can travel from computer to computer across network connections replicating itself in each computer. They do not change other programs, but compromise a computer system through their impact on system performance. See: bomb, trojan horse, virus.

- X -

Xmodem. An asynchronous file transfer protocol initially developed for CP/M personal computers. First versions used a checksum to detect errors. Later versions use the more effective CRC method. Programs typically include both methods and drop back to checksum if CRC is not present at the other end. Xmodem transmits 128 byte blocks. Xmodem-1K improves speed by transmitting 1024 byte blocks. Xmodem-1K-G transmits without acknowledgment [for error free channels or when modems are self correcting], but transmission is cancelled upon any error. Contrast with Kermit, Ymodem, Zmodem.

- Y -

Ymodem. An asynchronous file transfer protocol identical to Xmodem-1K plus batch file transfer [also called Ymodem batch]. Ymodem-G transmits without acknowledgement [for error-free channels or when modems are self correcting], but transmission is cancelled upon any error. Contrast with Kermit, Xmodem, Zmodem.

- Z -

Zmodem. An asynchronous file transfer protocol that is more efficient than Xmodem. It sends file name, date and size first, and responds well to changing line conditions due to its variable length blocks. It uses CRC error correction and is effective in delay-induced satellite transmission. Contrast with Kermit, Xmodem, Ymodem.