Assumptions
• C6 L1B delivery expected by July 31, 2009• Following C6 Atmospheric products should be
available by Sept 30 2009– MOD35 (for LST, Snow and Sea_Ice, All land PGEs except
LSR and Fire)– MOD07 (for LST)– Deep Blue Aerosol for Terra and Aqua for years 2007and
2008 (for LST)
• Final Land Cover product (MOD12Q1) and land water mask for use in C6 reprocessing by August 31, 2009
• C6 MOD09 (PGE11) first version available by early October 2009
Major C6 Science Tests• C6 L1B Test (Aqua + Terra) in Aug 2009
– 2 16-day Global Test (2003001 and 2003193)– Compare C5 L1B vs C6 L1B
• C6 Land Baseline Test (Aqua + Terra) in Aug/Sept 2009– 2 16-day Global Test (2003001 and 2003193)– Compare C5 Land with C5 L1B vs C5 Land with C6 L1B– C5 Land products with C6 L1B will be used as baseline for evaluation of C6
changes.• 1st 16-day Global Test in October 2009
– C6 L1B, Cloud Mask and Atmospheric Profile– First C6 updates to land PGEs – All available land PGEs will be run with the first C6 version of PGE11– For LST this will be the C6 baseline Test with the C6 Cloud Mask and
Atmospheric Profile• 2nd 16-day Global Test in Nov/Dec 2009
– Second C6 updates to Land PGEs– 1st and/or 2nd revisions to LST C6 algorithm
• N-tiles 3-month time series Test in Dec 09/Jan 2010– All land PGEs– Test and evaluation to conclude by end of Feb 2010
• Final Global Test/Time series Test in Feb/March 2010– For all/selected PGEs as required
Time Line of Testing and PGE Deliveries (1/3)
08/01/09 09/01/09 10/01/09
C6 L1B PGE21 8DAY-LSR gapfilled
PGE11 C6.1 Daily LSR
PGE11 C6.2 Daily LSR
C6 MOD35, MOD07,
PGE16 C6.1 LST
Land PGEs 1st drop
Complete PGE11 C6 baseline test – 1 year
Daily LSR Test evaluation and C6 development
Daily LSR Test evaluation and C6 development
Repeat PGE11 C6 1-year global test
10/30/09
1st 16-day Global Test
C6 L1B Test C6 Land Baseline
Test – 16-day Global
C6 LST Baseline Test
Land-Cover, Land-water mask
Time Line of Testing and PGE Deliveries (2/3)
11/01/09 12/01/09 01/01/10
PGE16 C6.2 LST
PGE16 C6.3 LSTLand PGEs
2nd DropLand PGEs 3rd Drop
Repeat 16-day Global Test
N-tile 3-month time series
Time Line of Testing and PGE Deliveries (3/3)
02/01/10 03/01/10 04/01/10
Land PGEs Last drop
Complete Time series test and evaluation
Final Science Test Start of C6
Processing
Integration of C6 PGEs to MODAPS