A 4 s 1 MINUTE ITEM This Calendar Item was approved as Minute Item No. Q{e_ by the California State Lands Commission by a vote toJif_ at rts i./-:Jf-01 meebng. CALENDAR ITEM C56 04/24/01 PRC 2754.9 N. Lee AMENDMENT OF GENERAL PERMIT - PUBLIC AGENCY USE LESSEES: Tahoe City Public Utility District P.O. Box 33 Tahoe City, CA 96145 California Department of Fish and Game, acting through the Wildlife Conservation Board 1807 13th Street, Suite 103 Sacramento, CA 95814 AREA, LAND TYPE, AND LOCATION: Sovereign lands in Lake Tahoe, near Tahoe City, Placer County. AUTHORIZED USE: Operation and maintenance of one (1) boat launching ramp, one (1) pier and existing fill. PROPOSED AMENDMENT: Amend the land description to include additional property covering a proposed expansion, relocation and reconstruction of an existing public pier and boat ramp as shown on the attached Exhibit A. LEASE TERM: Forty-nine (49) years, beginning January 16, 1979. CONSIDERATION: The public use and benefit; with the State reserving the right at any time to set a monetary rent if the Commission finds such action to be in the State's best interest. -1- CALENDAR PAGE 000 MINUTE PAGE

C56 · construction Ughting at the boat ramp facility llhDuld conaist of kM 1eval Pre-convenillllOI figllting on tne pier and ligllling for lhe jlarking Joi and boat ramp from el1111aUMS

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: C56 · construction Ughting at the boat ramp facility llhDuld conaist of kM 1eval Pre-convenillllOI figllting on tne pier and ligllling for lhe jlarking Joi and boat ramp from el1111aUMS

A 4

s 1

MINUTE ITEM This Calendar Item No.~ was approved as

Minute Item No. Q{e_ by the California State Lands Commission by a vote of~ toJif_ at rts i./-:Jf-01 meebng.

CALENDAR ITEM

C56 04/24/01

PRC 2754.9 N. Lee

AMENDMENT OF GENERAL PERMIT - PUBLIC AGENCY USE

LESSEES: Tahoe City Public Utility District P.O. Box 33 Tahoe City, CA 96145

California Department of Fish and Game, acting through the Wildlife Conservation Board

1807 13th Street, Suite 103 Sacramento, CA 95814

AREA, LAND TYPE, AND LOCATION: Sovereign lands in Lake Tahoe, near Tahoe City, Placer County.

AUTHORIZED USE: Operation and maintenance of one (1) boat launching ramp, one (1) pier and existing fill.

PROPOSED AMENDMENT: Amend the land description to include additional property covering a proposed expansion, relocation and reconstruction of an existing public pier and boat ramp as shown on the attached Exhibit A.

LEASE TERM: Forty-nine (49) years, beginning January 16, 1979.

CONSIDERATION: The public use and benefit; with the State reserving the right at any time to set a monetary rent if the Commission finds such action to be in the State's best interest.

-1-

CALENDAR PAGE 000

MINUTE PAGE

Page 2: C56 · construction Ughting at the boat ramp facility llhDuld conaist of kM 1eval Pre-convenillllOI figllting on tne pier and ligllling for lhe jlarking Joi and boat ramp from el1111aUMS

CALENDAR ITEM NO. C56 (CONT'D)

SPECIFIC LEASE PROVISIONS: Insurance:

Combined single limit coverage of $1,000,000.

OTHER PERTINENT INFORMATION: 1. On June 27, 1979, the Commission authorized a General Permit - Public

Agency Use with the Tahoe City Public Utility District and the California Department of Fish and Game, acting through the Wildlife Conservation Board. That permit will expire on January 15, 2028. Applicants are now applying for an amendment to this permit to authorize a proposed expansion, relocation and reconstruction of the existing pier.

2. A Mitigated Negative Declaration was prepared and adopted for this project by the Tahoe City Public Utility District. The California State Lands Commission's staff has reviewed such document. A Mitigation Monitoring Plan (Program) was adopted by the Tahoe City Public Utility District.

3. This activity involves lands identified as possessing significant environmental values pursuant to Public Resources Code sections 6370, et seq. Based upon the staffs consultation with the persons nominating such lands and through the CEQA review process, it is the staffs opinion that the project, as proposed, is consistent with its use classification.

APPROVALS OBTAINED: Tahoe Regional Planning Agency

FURTHER APPROVALS REQUIRED: U.S. Army Corps of Engineers Lahontan Regional Water Quality Control Board

EXHIBITS: A. B. C.

Location and site map Land Description Mitigation Monitoring Plan (Program)

PERMIT STREAMLINING ACT DEADLINE: September 27, 2001

-2-

90

Page 3: C56 · construction Ughting at the boat ramp facility llhDuld conaist of kM 1eval Pre-convenillllOI figllting on tne pier and ligllling for lhe jlarking Joi and boat ramp from el1111aUMS

CALENDAR ITEM NO. C56 (CONT'D)

RECOMMENDED ACTION: IT IS RECOMMENDED THAT THE COMMISSION:

CEQA FINDING: FIND THAT A MITIGATED NEGATIVE DECLARATION AND A MITIGATION MONITORING PLAN (PROGRAM) WERE PREPARED AND ADOPTED FOR THIS PROJECT BY THE TAHOE CITY PUBLIC UTILITY DISTRICT AND THAT THE COMMISSION HAS REVIEWED AND CONSIDERED THE INFORMATION CONTAINED THEREIN.

ADOPT THE MITIGATION MONITORING PLAN (PROGRAM), AS CONTAINED IN EXHIBIT B ATTACHED HERETO.

SIGNIFICANT LANDS INVENTORY FINDING: FIND THAT THIS ACTIVITY JS CONSISTENT WITH THE USE CLASSIFICATION DESIGNATED BY THE COMMISSION FOR THE LAND PURSUANT TO PUBLIC RESOURCES CODE SECTIONS 6370, ET SEQ.

AUTHORIZATION: AUTHORIZE THE .AMENDMENT OF LEASE NO. PRC 2754.9, A GENERAL LEASE -PUBLIC AGENCY USE, FOR THE EXPANSION, RELOCATION AND RECONSTRUCTION OF AN EXISTING PUBLIC PIER; ON LANDS DESCRIBED ON EXHIBIT B ATTACHED AND BY THIS REFERENCE MADE A PART HEREOF, EFFECTIVE APRIL 24, 2001, TO THE TAHOE CITY PUBLIC UTILITY DISTRICT AND THE CALIFORNIA DEPARTMENT OF FISH AND GAME, ACTING THROUGH THE WILDLIFE CONSERVATION BOARD; ALL OTHER TERMS AND CONDITIONS OF THE LEASE WILL REMAIN JN EFFECT WITHOUT AMENDMENT.

-3-

CALENDAR PAG

'"'"""'Os-9 MINUTE PAGE t.<.J'V -

Page 4: C56 · construction Ughting at the boat ramp facility llhDuld conaist of kM 1eval Pre-convenillllOI figllting on tne pier and ligllling for lhe jlarking Joi and boat ramp from el1111aUMS

NO SCALE

SITE MAP

---------

WA~ ON 11/4/fJ) LAKE

'--------- - -----------~

EX1ST. RAMP

I

TAHOE

EXIST Pl(R TO B£ REt.10\tD

f'[ND[R PILES .,, _, 2~ di~ DCOCING OVER W6 STRINGCRS (ll'P)

W6 CAP BE ..

L_ __________ _

Tahoe City Public Utilities District, WCB and F&G, Lake Forest, Lake Tahoe

NO SCALE LOCATION MAP -,. );:;PE5::5-:~

~,;M.~#4=~m::;::;:;::t~)L*'~~-)4,. ( ········· ... i : 11 Rael * • • • * I

I LAKE

Gravel •

TAHOE

This Exhibit is solely for purposes of generally defining the lease premises C is based on unverified information provided by Lessee or other parties, an M

EXHIBIT A PRC 2754

APN 094-140-014 Lake Tahoe

PLACER COUNTY

-~~~I Lake SITE

Tahoe J -~"'

Placer Co. 081-g --"" > E!Do doCo. ~z

u

is not intended to be, nor shall it be construed as a waiver or limitation of '-+---+--==-=------lf'•I any state interest in the subject or any other property. MJB 04-05-01

Page 5: C56 · construction Ughting at the boat ramp facility llhDuld conaist of kM 1eval Pre-convenillllOI figllting on tne pier and ligllling for lhe jlarking Joi and boat ramp from el1111aUMS

EXHIBIT B Pier Lease Area Description

Being a parcel ofland in the bed of Lake Tahoe, Placer County, California, and more particularly described as follows:

Commencing at the southwest comer of Section 32, Township 16 North, Range 17 East, Mount Diablo Base and Meridian; thence, North 88°45' East 1058.94 feet; thence, South 01° West 762 feet, to the point of beginning; thence, leaving said line, South 6°09'05" West 74.83 feet; thence, South 2°24'47" West 293.08 feet; thence, South 87°39'56" East 163.82 feet; thence, North 01°00'00" East 371.34 feet; thence, North 89°00'00" West 149.83 feet; to the point of beginning.

Excepting therefrom, any portion lying landward of the ordinary low watermark of Lake Tahoe.

The basis of bearings for the above described parcel is from that certain document recorded in Book 881, at Page 82, in the Office of the Recorder of Placer County, California.

J: \2257\tlac\\2 2 S? -h:ai:c..Uced·n1>-doc .dwg

CALENDAR PAGE 000393 . ~ -

MINUTE PAGE C00093l

Page 6: C56 · construction Ughting at the boat ramp facility llhDuld conaist of kM 1eval Pre-convenillllOI figllting on tne pier and ligllling for lhe jlarking Joi and boat ramp from el1111aUMS

20"d

EXHIBIT C

Tf'HJE C !TY PUD

RESOUITION NO. 01-02 Of

TAHOE CITY PUBUC UTILITY DISTRICT APPROVING

THE WCB BOAT RAMP RENOVATION

MITIGATION MONITORING PLAN

P.02.·'08

BE IT RESOLVED BY 1llE BOARD Ol' DIRECTORS OF TAHOE CITY PUBLIC UTILITY DISTRICT as follows:

I. That said Board of Directors doCli hereby approve the provisions comained in that cmain plan attached hereto and by this refi:rcnce incorporated herein. said plan being fur the plll]lose ofWCB Boat Ramp nnovation mitigation monitoriD11.

PASSED AND ADOPTED on February 16, 2001 ar a regular meeting oftbe Board of Directors of Tahoe City Public Utility District by the following vote:

A YES: Directors Treabe5$, Wlllkl", Ririnkens, Atchley, HenrikBon

NOES: None

ABSENT: None

TAHOE CITY PUBLIC U'I'IllTY DISTRICT

BY;-1$r~s Ron Trcabess, President

ATIEST:

Dee A. Malone, District Clerk &: Ex-officio Board Secrewy thereof

CALENDAR PAGEOO

MINUTE PAGE "'

29I£-IBS-0£S

Page 7: C56 · construction Ughting at the boat ramp facility llhDuld conaist of kM 1eval Pre-convenillllOI figllting on tne pier and ligllling for lhe jlarking Joi and boat ramp from el1111aUMS

TnHOE: CI r.• PU[>

Table 1 WCB Boat Rll111p RenDviltlon Mlllgllllon llonllorlng P1811

MltJalltion Menu,. lmplemetltlng Monitoring Tlrning Responsibility RespoMlblllly

!l.l'!;•nie guaUty

landscape screening $11811 be provided at the eoutll end of ttie existing pat*ing lot wilhin the plenterB and alDn; the perimeter. All landSC:aping shall 119 conducted with primarily IVlllve 1P9Cies During and inclUde subllantial ttM planting to vl-lly lnlllgnll8 thA developments v;i!ll their natur31 surroundings. Screening does T.C.P.U.D., T.C.P.U.O.

construc;tion.

not need to totally oblcura the paijcing area or w.c.e. Post-

dealrable vi- ffQITl the ractlllilllon81 area to 11111 !dice, blll ii C011$1ructlon

lllOutd signilicanUy l'lcluc:e the visibility at lhe pertdng lot from the llll<e.

The ..w palldng lat ildcfllian &houta require a sulllll8nlial set- -lleiCI< from (lw lherellne to accommoci.t• ar1equate veglllllllla Pre-tcreelling. ~ to the re111roorna ena kiosk llhOUld conslluctlcn, utilizot materials and COICIS that bl&fld with the lllllural T.C.P.U.D., T.C.P.U.D. Outing environ"*ll rmer 111a11 contrast with ii. TMse ~would W.C.B. oonstruction. leMer1 the Visual lmpadt Of the exiatlng perlelng lat anG Posl· expansion by breaking up the laige eirpense ot •pl\all. - CCllSlruetiOll Velliele&.

The T.Jl!.P.A. Scenic Quality Improvement Program (SQIP ..,&-

contains Ille relevant standards far ISildellor lighling. TIM constructlOn.

primaiy aspect• ol tlleM PIOV~ il'IClude lighting which I• no· T.C:PU.O.,

T.C.P.U.D. During

obltusive, but rall1er ac;fS 10 facilitate Sllfely 81\d I.lie, .nis avOIOI w.c.e. COMlrUC:tioo.

lighting ot adjacent sbuc!waa and propenles. Polll• ion

Pre-

Tti. Peslgn Review GUiaelines for Exterior Lighting (Slandan:I COnSIM;tiOn,

30.8) al80 recommenci that "Alea fighting should be directed T.C.P.U.O .. T.C.P.U.O. During

downward with no splay of fighting directed offsite.• w.c.e. conottuctlon, Post• construction

Ughting at the boat ramp facility llhDuld conaist of kM 1eval Pre-convenillllOI figllting on tne pier and ligllling for lhe jlarking Joi

and boat ramp from el1111aUMS Hght ~directed dOwnwald constlUctlon.

.,;tll • cutoff shield to preyent the fight soun=e from being visible T.C.P.Ul>., T.C.P.U.D. During

offsite. Under no c:ln:umslances should light from th.- w.c.e. oonstruction,

slallCllirds be 8lloiAed to llllceed tile height or tile sunounding Posr-

forest canopv. constructiOl1 . •..

COiar and material samplea tor the propoud pier and parkl"I! ilnPl'QV-ls st\afl be submitted lo TJ~.P.A.. All CCIDlll and

T.C.P.U.D., Pre-maUlrlals wiP be appioved by T.R.P.A.. All COiors and materiall T.C.P.U.0. alwll be dssigned to blend, r'lllher lhan contrlllt with existing w.c.e. comwuction

Vegetation and natUl1ll llaekgmund.

CALENDAR PAGe:tJl 0395 ~~Gto.lp Ftl>nmy, 2001 1

- .. WCll"lorR-ion8000933 MINU~g&o.;,,gp...,

EO"d 29IE-ISS-OES

Page 8: C56 · construction Ughting at the boat ramp facility llhDuld conaist of kM 1eval Pre-convenillllOI figllting on tne pier and ligllling for lhe jlarking Joi and boat ramp from el1111aUMS

TAHOE CITY PUD

Mllfgation Meau,.

[§NiDnft

~ Slr\IC:tulal rlj)alr 10. ana expQnsion at, existing llltuclure1 In t,.. '-'lhOre or fQAl$tlol'e muat eamply with the •lndatds ..n forth In Subaeclion 52.3.G Of 1he T.R.P.A Code 0 Ordinanc:es. 11187.

The new pier and ~r must tie designed IMth Oj)Cning1 which do not Impede 9edfmenl ltanlpQf\ (T .R.P A Code S4.11.B(1)). Tiie size. number, - locations of Ille apanlnge I~ lhe breakwater must .,. designed lo avoid interference Wit~ littoral Clrfft anc:t ahoraline erosion (T.R.P.A. Code 54.11.8(3)). fmpl&111enlation of lh- rneaaJtes 'MIUl<I reduce the imi-ct le lea than significant.

L•ndC-raa•

T.C.P.U.O. lhall comply wilh Subpllragraphs 20.5.A (1) mnd (2) of Ille T.R.P.A. Code of Oldlnanc81. SUbparagraph 20.5.A (1) set& tile formula for deletminlng Ille ecoess cover-. of a project atea. A T.R.P.A. llll1d coverage verllic:atlon should tie performed to detennine the eoxact amcunt ol ..illing llnd Ql\lanlge and to verify lfte existing land capabirtly of the 1119. Much of the Site mfl#/ have been ~n-modifiea and ia no k>nQet Class 1 b. Subpanlgqipll 20.5.A (2) ouUinu the options fOI miligaling exceM land ._.,.. n- options Include: a) Reauce coverage Ollliite bl Red\n;o c;overaua ollsile; ar c) P!Oltida coverage mltigalion fem. Either option, ar 8

comCinatian cl !tie three apllona c:an be used to ampiy With SubiiaraQT11ph 20.6.A (2). Acceptable mltlgallan Sllall be dlltsrmined by T.R.P.A. and T.C.P.U.o. during fteld ver111ca!lon of the Jl'Djact site.

To reduce the impact of fiU within the Lake TallQa """-m a level that i1 I- 111811 signilicallt. T.R.P .A. shall make findings to permit the propaaed construetion activities in the shoruone. The findings shell b& canaistAnt INlth Subparagraph 52.3.G (2l. 5'.8.0 (1) and Subllections 54.41.8. and C of Ille T.RP.A. Code of Onlinances.

-EJog; .... ~ig~ F.._,.2DOt

170"d 291:£-l:BS-0£5

2

lmpl•m•ntlng Monitoring Timing

R•ponsibilily Rnp-ibillty

Pre-construction.

T.C.P.U.O., T.C.PU.D. During W.C.B. eo11struction.

Post-construction

Pr. construdion.

T.C.P.U.O .. During T.C.P.U.D. w.c.s. con1tniction.

Post-construction

T.C.P.U.O .. p,.... T.C.P.U.0. w.c.s. construdion

T.C.P.U.O., T.C.P.U.0.

p,.. W.C.B. COllllruclion

CALENDAR PAGE00039~ -·--- . -· -

wee,....~....,--·· MINUlii'*'- v ~"' ·

Page 9: C56 · construction Ughting at the boat ramp facility llhDuld conaist of kM 1eval Pre-convenillllOI figllting on tne pier and ligllling for lhe jlarking Joi and boat ramp from el1111aUMS

FEB-26-2C01 09:27 T~ CITY PUO

Mili9at1on Me .. ure

SUIJaec:lion 54.8.B atates that fol' multlpl- faCillties. allCh 111 the pl'CpOOled pier and braal<water, Subparagraph IW.4.A (4), 1tMi location standilrd for pi11n1, illilll serve as a QUideline and not a lltanelllrd. In order to implement the guidelir1e, the Code providell Subparagr;iph 5'.8.0 (1). IMlich ltlllas !hat the propoud pier and bleekwoaler m.y deviale ftom the length gUldeline if T.R.PA recognizes it as I mufllpje..uN facllity. Tho extent Of de1tiatton ftom the guideline sllall be approved ~ T.R.PA. and slwll be dependent on: a) The l'llductio11 in dellelapment potenliel Of 1h0111ZU118 facilities I ci .. ecl with 1lle epptlc:alion such ll!at Ille fac:ility wiU lie shared bv otho1 lltlctal property - lllld b) The numbet of people uUlm111 the facility er the extMt ta which !he facility i$ av11llabl11 fO genmai pulll'IC use.

SeellOn 54. 14 of 1l!e Cede allOloW fill ta be placed in 11'11 lalllemrle or shorezone if T.FtP.A. finds tta tile fill ia bin~ ta exlatillg Shol8zorl8 QOnditionS or water quality and daily, OI Is llllllOciateel with bypass dredging, beaCh repteni81unant 01 .lhorezone ptOlective st/1JCll.n5.

The Regional w.ar Quality Control Board, Laharltarl Regior mua also make findings 1o auow the brmkwMer 1111d pier fill.

To 11111uce the impec:t ..w permanenr lllllCI cov"'age Willlin ltMi site ilNll to a l8Yel 1Nlt i• less lhlln tigniftcatll, Alqllire<l milie-tion fDt new permanent llllld coverage WOUid be complied With by T.C.P.u.o. as delelmined by T.RP.A. during rl8ld verlfimlion ot the projea Site.

Fi1h-RNOU1C•

To i.ciuce pol.llnlial impaas to fisheries habitat constl\IClion activities shaU blo uodertlkl!ln In ways that minimize impacts or 111e ftshefy resources of 1h• a-. Mlllgllkln ~ tlW nil be lmpemerited include: •l Umlllng Iha COMtruc:llan fWiod I< the~~: OcldJer 1st lhrough April 30th (Ill apecitled by T.R.P .A. and COFG) b) Use of turtliditv Ql!Ulins ti: minimiZe Sill dispersal c) CcndUCllng surveys prior to and aft~ c:onslrudion to daletmiM lhe apec:ffic f mpac!S of Ille project on the fist1ely re80Ul'Call (p:llltlwler1y nofloilllN flsllet) of the ate• d) EM'8Cemellt cl flsll habital, lhe delign ot which WOUid havE to be approved by OFG.

- C.l!liloee(•IQ 13""-'P

~·-·

SO'd Z9YE:-YBS-OE:S

3

11n..ie-n11ng Mon1tor1n9 nintng Rnponslblllty ResPo.-IDility

T,C.P.U.D, T.C.P.U.O.

Pl8-W.C.B. c;OllSllUciion

.

T.C.P.U.D., Pre-T.C.P.U.O. W.C.l!I. construction

T.C.P.U.D., T.C.PU.O. ~

W.C.B. ainstruction

T.C.P.U.O., Pre-T.C.P.U.0. W.C.B. eoo&tructlon

p,.. construction.

T.C.PUD .. T.C.P.U.O.

Ounng W.C.B. OOMtllldion,

POii· cori!ltnldion

CALENDAR PAGi:l C -v t) ~ 1

MIN

Page 10: C56 · construction Ughting at the boat ramp facility llhDuld conaist of kM 1eval Pre-convenillllOI figllting on tne pier and ligllling for lhe jlarking Joi and boat ramp from el1111aUMS

FEB-2t';-2001 0<;1' 27 TH"40E CITY PUD

MIH911tion MMallte lmpll111e11t1119 Monlloring Timing Ruponaibllity Rupanalbility

e.t prac;tical control technology shalt be mnployed to prevenr _,,,.,., mftlrials to be resuspended as a result Df pie! COllllNdion and from being transported to adj-.t lake ....... The exact loc:alion d tll9 tuitidity airtmn "'111 be field verified b) T.R.P.A. and !Ila ~or to inauN protadion of lake daril) ,.,... during consll\ICticn. Th• contl1ICtOr thal1 submit prtlpo98d COfl&trucllan. llDllSlrUClion nMllllOds and proclldurM la T.llPA la verify !ht T.C.P.U.D.,

T.C.P.U.D. Ourfng

acwaJ need and ..ient of the turbidity cul1llin. Thi• - rnsi w.c.a. construction. "" 181n011ed ugon proJ«:t completion only upon aatlsfactory Post-inapec:tion by T.R.P.A. to ,_ !hat all 8U1plndad mat.ri.i. consuuction luw• -led. If T.R.P.A. detennlnes that • turbidity curtain is nal required, U- the contraetor lhlll h11Ve contingency pn:Nislona 81Yallable to i-lh8I Ille clSity of th• lake is not Qamaged dullng constl\ICtiOll. .

Culturm RMou-In the event tllat any culllnl 18!1DUICH er. di8COVered ~

T.C.P.U.O., During the CXlllrse ct proJed. activities. prOjeCI opnllons lhall caaee w.c.e. T.C.P.U.O.

consllUdicn '..,i;I a ~ ...i1fi9d lltCl\aeo"""'SI ..... evalu.ted lhll ailuatlOn. Water Quall"' The dlacherg• of petroleum "'°"ucts. conllfUl:lion wa.ie !Ind During Utter (including lllllWdUat), or earthen m.terial• to 1htl IUlf&Ql water. of the l..aike Tlllloe Basin is prohibited. All 11.1rp1111 T.C.P.U.O., T.C.P.U.D.

COMINction,

C011s1Nc!ion materials 51'11111 be ,_ed from !he p(Oj.et anci WCB. PDGt-

-NCtiOn ·1ec1 onlv Ill a ""illl&of . . Pie-condruclion,

No contail'l4Q of fuel. paint. er alher hazaroo1.11 materials may T.C.P.U.O., T.C.P.U.O.

During be stored on the pier W.C.B. construdlon,

Past-constnic:tiOn

All rock used fol Illa c:flllblng shall be -hed prior lo ~ T.C.P.U.0., T.C.P.U.O. During

in Ille pier. The uu or roc1e 1111111 lhe lake ie prohibited. W.C.B. constn.ictian

The use of wood plllllelVativ,.. on W<lOd In camac:t v.Ull tne During water i• prohibited and axt,_ care llhall 1111 taken to lnS\Jl'e T.C.P.U.O ..

T.C.?.U.D. ccnstruetlon,

lhet wood preservatives ere not introduced il1IO Lale• Ta~oe. w.c.e. Past-~ nalnfinn llllCI tne use of trlbU""''n Is · · . ca>struc!IOll

tilur»anc. of lhc lake bed lllllll!llals shall be Qpl to a T.C.P.U.D., T.C.P.U.D. During

minimum fOr .,.,.._,, c:onlllrUClion. w.c.e. OC1!111tn.1Clion Samples Of the bctlom -.nenta shall be collected ""' analyZeCI pl1or to any cnag;ng and conlllrUCllon actlvilin. Priar to the 11an of aradging, 11 CIJll'IPCISite backgn:u>CI WlllM ump!• lllall be COiiected from the - to be dredged. Thill samp&e T.C.P.U.D .• p,.._ must be represe11lati11e of Ille lypielll condi!lons at Ille piojec:t W.C.B.

T.C.P.U.D. construcliDn

lite, and must not be laken during a runoff 8"ant. The ~· shall be ~ed ror the following collltituenla: a. Turbidity (NTU) b. Tai .. Nilmgen (mg/I as N) c. Total Pho&l>horus (ITlQ/I

CALENDA ~PAGE0 10398. 1111 Pl d. Total Iron 1mnn1

-·-~-R~~ .

ALabach e+www.,. Grciup --..,Y.21111 4 MINU~ · Pl.," G

90"d Z9IE:-I89-0E:9

Page 11: C56 · construction Ughting at the boat ramp facility llhDuld conaist of kM 1eval Pre-convenillllOI figllting on tne pier and ligllling for lhe jlarking Joi and boat ramp from el1111aUMS

TAHOE C IT'i PUD

lliligation Measure lmp"'-ntlng Monltofi11g lt .. ponslbllily ltnpo118ibillty

Timing

Turllldity curtain to be installed around Stage 1 adivllies. inc:IUding COMttuctian Of the ftoal ramp 8lld initial pief. and remav• and replaCam8nt of roclC l1jHBP. &ai:t ICClllian of ""' tultlldity cunaln for all alhllt COllllnJClian aclillllies bel- th& high -er tine of Lake Tlllloe will be field verified by TRPA and the contraculr to inlUfll protection of tne lake clarity durin1 conetruelion. The contractor shllll 1ubmtt Ille .lll'Dl.lOleiCll conaarucaon rnetl1od• and prllClldi.r&G to TRPA IO vetify tl'll! actual ,,..; and lilXlent of the curtain. If TRPA delennil!M thal a twtlidlty CUl1ain is llcM requllllCI. then the oontractar Sllatl have cooting.,cy provisione avliilallle to insure that th• darity al ttMI lalt.e i• not damaged during ca1111\lC1ian.

Caiaaans or 81991181 ehslJ be Ullld during plla driving to preven seclimentmlon or "',.,,..nalon of nuttlents. MathOdS of dredging ti. lllr up bollOll'I Mdiments (buckM "' dam Shell} ltlall not be peJmilted. Only SllCliDn dredging ll!all be dowecl, and dial:loSlll ot Gl9dged malelfall lllU!lt foflowl practices to PtllVllllt sediments from being dlad1atgad back int.l LakaTW!oa.

To limit the movement of suspencled seciments and nulrlents into iqacen1 lalce Willl!IS, IUl1lldlt'( ban1ei. shall be illltalle< aniUlld - being auc:tlon dredged and maintained until thl! enc10Md watws meet the pm.pr!lject background levels.

Composite wnr 1ampl• tram Ille - immeelilltely outside 01 lhe turilidily balliefs shall be collecled Mell QllV ot conctruclion In the lake. Canslltuent level• from a- waier 1111'110iM 1hal not ""ceed the constituent levela al the composite beckgmund water sample by more than 10 pen:ent. If these levels are MCaed.0, construction shall hall until TCPUO ti. conlemod 'Hith l.alloman and implemented additioMI mitigalion .._.,, .. to reduce the conslltuent levels to lhe appropriate levels.

All dredged seclfmanla Biiai! be IW'llOllad from Iha lake Woe dispoeed or In the bUfn llDOl/e the lake's highwater rim in llCCORlance with Beat Ma~ ""'*'*"'- fcir .,.,.ion con1ro1. Propctled disposal sitee and dispolill prgcadurea $hall be rwieWed bV - p~or to the stall of cln!dging. Water-light truck.t Shall be "* to tranaport dnodged eedlmenll b:I the final dispoaal Bfte. Preferential UM of dredged saaimeni. a& n11 m..terilll• In bMin - slated fot r-.c;lamalian <•·Ii· abandon.id quarries and mines, - needing topeoil) shall be considerlld.

T.C.P.U.D .. W.C.B.

TC.P.u.o .. W.C.B.

T.C.P.U.D., W.C.B.

T.C.P.U.D .. W.C.8.

T.C.P.U.D., W.C.B.

T.C.P.U.D .. W.C.B.

All req11ired pennlts (I.e. trom the Colpa, OFG. SLC, TRPA anc . l' C p U 0 l.ahonllln) must be acquired prior to the commencamant ot any · • · · " d • · actlvlttes. W.C.B.

AuMelct\El'lfia1i::g~ ......,,,jtl(lt

LO"d 29IE:-I8S-0£S

5

T.C.P.U.O.

T.C.P.U.O.

T.C.P.u.o.

T.C.P.UO.

T.C.P.U.O.

T.C.P.u.o.

T.C.P.U.C.

Pre­constl\JdiOn, Ourtng CC)NllruCllOl'I

Ourirog ~ion

Ouring COllSttUClion

ounng construction

Ounng construction. Post­construcljon

Pre. COl15truction

000399 CALENDAR PAGE

- . - - -

~,.,,----

Page 12: C56 · construction Ughting at the boat ramp facility llhDuld conaist of kM 1eval Pre-convenillllOI figllting on tne pier and ligllling for lhe jlarking Joi and boat ramp from el1111aUMS

FES-26-2001 Cl9:28 TAHOE: CITY Pl.ID

Miligation Measure

,,.,. reqUil'lkl pursuant to ao.rct oraer No. &-89-t Bli. TCPUC Shall noul)I uncman ot lllllintenance dreelglng opeialion8 Iha .._.., lie requiled for the propoMO project. TCPUD slmll comply will'! atl BMP• MCI monitoring provillont tpeeiliad by lahontan for mamtenanc;a di.aging ill: the prnject site Including but not limited to: a Removal c1 au dnlclg9CI ..atments fn:lm the Lake anCI disposal cl Ille sediments llbOve lh• nlgllwaler rim of I.alee Tll\08. b. Transport d dredged seclfmenll in lined or 18111ed trucks. c. l11$1allalion ol twbidit)' barriers eround mecha11ical dredging aA!aS a'ld temporaiy suc:tlon dledge discharge -· d. Analyli1 of water samples COlt-=ted prior to the &1alt o dredging Ojlllllllons and dllll)' unlil turbidity b;lnien; 119

removed. There &liall be no grading or lilld dllllur'oance !*formed ~u letpecl to tire project belweell Oc::lober 1 S and May 1 P'OI*' ~ - obtained from TRPA. • provided in the limit.a •emption desa1bod In IUbtectiQll -4.2.A of the TRP~ Code of Ooainlll!Cell. Except as p!Ollided in Sui-:tlon &4.2.B of tha Code o Ordinances, lhetw "11111 be no ~g at any time at 1l1e yem during peiiods of precipitation al1d for Ille l'8U1lnQ period OI time ""'811 the site is covenld IMtll lflON or Is In a satUllllllCI • .

, or unstable condillon. All metllilf Oblained tiom ant exaNalion WOik that Js na C0111aflled "'°'lhin founaatlOlls. retaining walls. or by Olhet rnellll>da llPPIO•ad by TRPA 8111111 lie removed from the MjllCI - and . of at a 911& """""'ad "" TRPA. Replring at all 1111poeed llUt1acea In llCCOldance with tne Revegelalion and Slope StabltiZatlon Plan shall be ICl:Mlpflslled Wilhin fhe ftBI glllWlng ~ foll«Mil'l!! disturbance, unless an IPPfOVed r:onslnlCllonlinepectlon lielleduie estabfillhlls_ olheMlse. Outing Qlllding and consllUdion. environmental prct4!Clfon devices lll<Ch aa en:.ion control dellicea, dUat control ena v..,... ... ,on on llarrlers shall be maintain-. Sedllr*U lllllf be deWlltered In a lacallan that Will allDW the waler lo avapar.ale aflCI PottlOlalll into Ille sail rather thAn

di..,...,.......,. into~ T1noe.

Dewatering ilfeai shall be claen to minimize ahorezone i Spray irrigation of setded water onto v119atalad 111811& -. Ile u..d lo incniua d-terina """""'llies. Where local deuatering al suction dredge rnalerial• is Impossible or WOUid cawie -ine impacta. the tueiiOn dredged materials shall be removed by truck anCI lranapotled IO an e 11-"'rina area.

""°"*"Er9'-•if!Gt­Fectua')'. 200t

BO"d 29IE-IBS-OES

6

P.0€Hl8

lmpl•-ntlne Monitoring Timing

R-..onsibility Reapon.ibility

p,.. c:onatructlon,

T.C.P.U.O .. Duling w.c.s. T.C.P.U.P. CC111Slrucdon.

PO$t-conarrucfion

.

-T.C.P.U.O .. T.C.P.U,O.

During w.c.e. OClllllruclion

T.C.P.U.0., OUring w.ce. T.C.P.U.P.

conslNCllon

T.C.P.U.D., T.C.P.U.O. During

W.C.8. c;ans1ruction

During T.C.P.U.O.,

T.C.P.U.O. conllrudion,

W.C.B. Po.t• C011911Wtion

T.C.P.U.D., During T.C.P.U.0.

W.C.B. ClOl\Stnldlon

T.C.P.U.D .• During T.C.PU.O. w.c.e. construdion

T.C.PU.O., T.C.P.U.O.

During w.c.a. construction

T.C.P.U.D., T.C.P.U.O.

During w.c.e. conatrudion

T.C.P.U.O .. T.C.P.U.D.

During ·,w.c.e. """81Ndion

CALENDAR PAce00400

TOTAL P.08