Upload
haven-hardage
View
218
Download
2
Embed Size (px)
DESCRIPTION
Studio11’s first project. Studio11 was selected to do the installation for the College of Architecture annual C3 week; Create, Collaborate, Construct. We were given a budget of $1,000 and came in $2 over budget! I continued the idea an research of the project which led to it recently being published at the 2014 ASA National Conference in Miami, FL
Citation preview