DWG No. DESCRIPTION DESCRIPTION C01 KEY PLAN, DRAWING LIST, & GENERAL NOTES KEY PLAN, DRAWING LIST, & GENERAL NOTES C02 PROPOSED TRAILWAY - PLAN/PROFILE PROPOSED TRAILWAY - PLAN/PROFILE STA. 3+000 TO 3+150 C03 PROPOSED TRAILWAY - PLAN/PROFILE PROPOSED TRAILWAY - PLAN/PROFILE STA. 3+150 TO 3+300 C04 PROPOSED TRAILWAY - PLAN/PROFILE PROPOSED TRAILWAY - PLAN/PROFILE STA. 3+300 TO 3+420 C05 TYPICAL CROSS SECTIONS TYPICAL CROSS SECTIONS C06 EROSION & SEDIMENT CONTROL PLAN EROSION & SEDIMENT CONTROL PLAN XS-1 CROSS SECTIONS STA. 3+010 TO 3+100 CROSS SECTIONS STA. 3+010 TO 3+100 XS-2 CROSS SECTIONS STA. 3+110 TO 3+200 CROSS SECTIONS STA. 3+110 TO 3+200 XS-3 CROSS SECTIONS STA. 3+210 TO 3+300 CROSS SECTIONS STA. 3+210 TO 3+300 XS-4 CROSS SECTIONS STA. 3+310 TO 3+420 CROSS SECTIONS STA. 3+310 TO 3+420 E1 STREET LIGHTING LAYOUT STREET LIGHTING LAYOUT L1 LANDSCAPE PLANTING LANDSCAPE PLANTING I1 IRRIGATION PLAN IRRIGATION PLAN I2 IRRIGATION DETAILSIRRIGATION DETAILS
AutoCAD SHX Text
KEY PLAN 1:1000
AutoCAD SHX Text
0
AutoCAD SHX Text
20
AutoCAD SHX Text
60m
AutoCAD SHX Text
1:1000
AutoCAD SHX Text
HAMMOND BAY ROAD
AutoCAD SHX Text
GENERAL NOTES: 1. ALL WORK AND MATERIALS ARE TO BE AS DESCRIBED IN THE CITY OF NANAIMO ALL WORK AND MATERIALS ARE TO BE AS DESCRIBED IN THE CITY OF NANAIMO ENGINEERING STANDARDS & SPECIFICATIONS LATEST EDITION (No. 12, NOVEMBER 2019) OR AS OTHERWISE APPROVED BY THE CITY ENGINEER. 2. CONNECTION TO, OR ALTERATION OF, EXISTING CITY-OWNED UTILITIES, REQUIRES CONNECTION TO, OR ALTERATION OF, EXISTING CITY-OWNED UTILITIES, REQUIRES AUTHORIZATION BY THE CITY ENGINEER. 3. A "PERMIT TO INSTALL WORKS WITHIN STREETS, LANES AND CITY PROPERTY AREAS" WILL A "PERMIT TO INSTALL WORKS WITHIN STREETS, LANES AND CITY PROPERTY AREAS" WILL BE REQUIRED WHERE CONSTRUCTION IS TO BE UNDERTAKEN IN CITY OF NANAIMO RIGHT-OF-WAYS AND/OR CITY OF NANAIMO-OWNED UTILITIES OR PROPERTIES. 4. UPON APPROVAL OF THE PERMIT, THE CITY OF NANAIMO'S CONSTRUCTION DIVISION SHALL UPON APPROVAL OF THE PERMIT, THE CITY OF NANAIMO'S CONSTRUCTION DIVISION SHALL BE NOTIFIED 48 HOURS PRIOR TO COMMENCEMENT OF WORK. 5. THE ENGINEER SHALL BE NOTIFIED 48 HOURS PRIOR TO COMMENCEMENT OF WORK. THE ENGINEER SHALL BE NOTIFIED 48 HOURS PRIOR TO COMMENCEMENT OF WORK. 6. CONTRACTOR TO COMPLY WITH ALL APPLICABLE MINISTRY OF ENVIRONMENT AND CONTRACTOR TO COMPLY WITH ALL APPLICABLE MINISTRY OF ENVIRONMENT AND DEPARTMENT OF FISHERIES & OCEANS CANADA REQUIREMENTS AT ALL TIMES DURING CONSTRUCTION. 7. CONTRACTOR TO CONFIRM LOCATION OF EXISTING UTILITIES AT ALL CROSSINGS AND CONTRACTOR TO CONFIRM LOCATION OF EXISTING UTILITIES AT ALL CROSSINGS AND CONNECTIONS AND REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO CONSTRUCTION. 8. CONTRACTOR TO CONFIRM THAT ELEVATION, LOCATION AND GRADIENT OF ASPHALT MATCH CONTRACTOR TO CONFIRM THAT ELEVATION, LOCATION AND GRADIENT OF ASPHALT MATCH EXISTING PRIOR TO PLACEMENT OF ASPHALT OR CONCRETE. 9. ALL TREES NOT BEING REMOVED IN THE CONSTRUCTION AREA SHALL BE PROTECTED. ALL TREES NOT BEING REMOVED IN THE CONSTRUCTION AREA SHALL BE PROTECTED. 10. TREE REMOVAL PERMIT REQUIRED - BY OTHERS. TREE REMOVAL PERMIT REQUIRED - BY OTHERS. 11. ADJUST ALL MANHOLES, WATER VALVES, HYDRO VAULTS, ETC. TO MATCH NEW ADJUST ALL MANHOLES, WATER VALVES, HYDRO VAULTS, ETC. TO MATCH NEW CONSTRUCTION. 12. ALL LOCATIONS AND ELEVATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE ONLY ALL LOCATIONS AND ELEVATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE ONLY AND SHOULD BE CONFIRMED BY USE OF A PIPE LOCATOR AND MANUAL DIGGING. ALL OR ANY STRUCTURES NOT NECESSARILY SHOWN. 13. ALL ELEVATIONS ARE TO GEODETIC DATUM AND ARE REFERENCED TO MONUMENT 82H5677 ALL ELEVATIONS ARE TO GEODETIC DATUM AND ARE REFERENCED TO MONUMENT 82H5677 AT THE INTERSECTION OF MCGUFFIE ROAD & HAMMOND BAY ROAD. ELEVATION = 31.807. 14. DATA SOURCES: DATA SOURCES: -TOPOGRAPHIC SURVEY COMPLETED BY 3D GEOMATICS IN JUNE 2017. -ASBUILTS PROVIDED BY THE CITY OF NANAIMO. ROAD NOTES: 1. ALL CURB AND GUTTER TO BE C.O.N. TYPE CS-1 UNLESS OTHERWISE NOTED. ALL CURB AND GUTTER TO BE C.O.N. TYPE CS-1 UNLESS OTHERWISE NOTED. PRIVATE UTILITY NOTES: 1. GAS MAIN AND SERVICE LOCATIONS ARE APPROXIMATE ONLY AND ARE BASED ON FORTIS GAS MAIN AND SERVICE LOCATIONS ARE APPROXIMATE ONLY AND ARE BASED ON FORTIS BC INFORMATION. 2. BC HYDRO TELUS AND SHAW CABLE INFORMATION IS BASED ON BCONE CALL INFORMATION BC HYDRO TELUS AND SHAW CABLE INFORMATION IS BASED ON BCONE CALL INFORMATION STORM SEWER NOTES: 1. ALL CATCH BASINS TO BE C.O.N. TYPE 1 UNLESS OTHERWISE NOTED. ALL CATCH BASINS TO BE C.O.N. TYPE 1 UNLESS OTHERWISE NOTED. 2. ALL CATCH BASIN LEADS TO BE 200 PVC SDR35 UNLESS OTHERWISE NOTED.ALL CATCH BASIN LEADS TO BE 200 PVC SDR35 UNLESS OTHERWISE NOTED.
AutoCAD SHX Text
LOCATION PLAN NTS
AutoCAD SHX Text
ELEVATIONS
AutoCAD SHX Text
43.170
AutoCAD SHX Text
UNDERGROUND HYDRO
AutoCAD SHX Text
UNDERGROUND TELEPHONE
AutoCAD SHX Text
CENTERLINE AND STATIONING
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
MONUMENT
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
DITCH/SWALE
AutoCAD SHX Text
STORM DRAIN (SIZE AND MATERIAL NOTED)
AutoCAD SHX Text
SANITARY SEWER (SIZE AND MATERIAL NOTED)
AutoCAD SHX Text
WATERMAIN (SIZE AND MATERIAL NOTED)
AutoCAD SHX Text
REDUCER
AutoCAD SHX Text
WATER METER
AutoCAD SHX Text
CURB
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
AIR VALVE
AutoCAD SHX Text
JUNCTION BOX
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
UTILITY POLE AND STREET LIGHT (LABELED PP,TP,PP/LS ETC.)
AutoCAD SHX Text
FIRE HYDRANT
AutoCAD SHX Text
CAPPED END
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
WATER VALVE
AutoCAD SHX Text
CATCH BASIN
AutoCAD SHX Text
EDGE OF GRAVEL
AutoCAD SHX Text
CURB AND GUTTER
AutoCAD SHX Text
EDGE OF PAVEMENT
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
CLEANOUT
AutoCAD SHX Text
SSIC/SDIC
AutoCAD SHX Text
SANITARY SEWER SERVICE CONNECTION AT MAIN
AutoCAD SHX Text
PROPOSED
AutoCAD SHX Text
PROPOSED
AutoCAD SHX Text
W
AutoCAD SHX Text
S
AutoCAD SHX Text
D
AutoCAD SHX Text
T
AutoCAD SHX Text
H
AutoCAD SHX Text
PAVEMENT REMOVAL
AutoCAD SHX Text
5+100
AutoCAD SHX Text
5+110
AutoCAD SHX Text
32.75
AutoCAD SHX Text
SANITARY/STORM INSPECTION CHAMBER (200%%C RISER)
AutoCAD SHX Text
SSIC/SDIC
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
CO
AutoCAD SHX Text
FH
AutoCAD SHX Text
CB
AutoCAD SHX Text
WV
AutoCAD SHX Text
TB/BB
AutoCAD SHX Text
TOP/BOTTOM OF BANK
AutoCAD SHX Text
NEW ASPHALT
AutoCAD SHX Text
AR
AutoCAD SHX Text
AR
AutoCAD SHX Text
MH
AutoCAD SHX Text
JB
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
W
AutoCAD SHX Text
S
AutoCAD SHX Text
D
AutoCAD SHX Text
T
AutoCAD SHX Text
H
AutoCAD SHX Text
File: H:\Projects\0837-047 GNPCC Frontage Works\04C Drawings\0837-047 Civil Drawings.dwg Plot Time: Apr. 16, 20 3:10 PM User: Patrick RyanH:\Projects\0837-047 GNPCC Frontage Works\04C Drawings\0837-047 Civil Drawings.dwg Plot Time: Apr. 16, 20 3:10 PM User: Patrick Ryan Plot Time: Apr. 16, 20 3:10 PM User: Patrick RyanApr. 16, 20 3:10 PM User: Patrick Ryan User: Patrick RyanPatrick Ryan
AutoCAD SHX Text
PROJECT No.
AutoCAD SHX Text
ENGINEER'S SEAL
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DESIGN REVIEW
AutoCAD SHX Text
DRAFTED
AutoCAD SHX Text
DRAFTING REVIEW
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
RDN DRAWING No.
AutoCAD SHX Text
PERMIT No.
AutoCAD SHX Text
HEL DRAWING No.
AutoCAD SHX Text
No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text
CLIENT
AutoCAD SHX Text
YYYY.MM.DD
AutoCAD SHX Text
ISSUES
AutoCAD SHX Text
OF
AutoCAD SHX Text
DESTROY ALL DRAWINGS SHOWING PREVIOUS REVISION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
H:
AutoCAD SHX Text
V:
AutoCAD SHX Text
Copyright reserved. This drawing remains the exclusive property of Herold Engineering Limited and may not be reused or reproduced without written consent of Herold Engineering Limited.
NOTES: 1. FOR GENERAL NOTES SEE DWG. No. C01 FOR GENERAL NOTES SEE DWG. No. C01 2. FOR FURTHER DETAIL ON PLANTINGS AND MAINTENANCE FOR FURTHER DETAIL ON PLANTINGS AND MAINTENANCE REQUIREMENTS SEE ENVIRONMENTAL DYNAMICS INC. SEE ENVIRONMENTAL DYNAMICS INC. (EDI) REPORT: 'TREE REPLACEMENT AND RIPARIAN ENHANCEMENT FOR GNPCC FRONTAGE WORKS'
AutoCAD SHX Text
File: H:\Projects\0837-047 GNPCC Frontage Works\04C Drawings\0837-047 Civil Drawings.dwg Plot Time: Apr. 16, 20 3:10 PM User: Patrick RyanH:\Projects\0837-047 GNPCC Frontage Works\04C Drawings\0837-047 Civil Drawings.dwg Plot Time: Apr. 16, 20 3:10 PM User: Patrick Ryan Plot Time: Apr. 16, 20 3:10 PM User: Patrick RyanApr. 16, 20 3:10 PM User: Patrick Ryan User: Patrick RyanPatrick Ryan
AutoCAD SHX Text
PROJECT No.
AutoCAD SHX Text
ENGINEER'S SEAL
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DESIGN REVIEW
AutoCAD SHX Text
DRAFTED
AutoCAD SHX Text
DRAFTING REVIEW
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
RDN DRAWING No.
AutoCAD SHX Text
PERMIT No.
AutoCAD SHX Text
HEL DRAWING No.
AutoCAD SHX Text
No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text
CLIENT
AutoCAD SHX Text
YYYY.MM.DD
AutoCAD SHX Text
ISSUES
AutoCAD SHX Text
OF
AutoCAD SHX Text
DESTROY ALL DRAWINGS SHOWING PREVIOUS REVISION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
H:
AutoCAD SHX Text
V:
AutoCAD SHX Text
Copyright reserved. This drawing remains the exclusive property of Herold Engineering Limited and may not be reused or reproduced without written consent of Herold Engineering Limited.
TIE ASPHALT TRAILWAY INTO EXISTING CONCRETE SIDEWALK
AutoCAD SHX Text
EXISTING PROPERTY LINE (TYP.)
AutoCAD SHX Text
START OF CHAIN-LINK FENCE REMOVAL
AutoCAD SHX Text
A
AutoCAD SHX Text
C05
AutoCAD SHX Text
B
AutoCAD SHX Text
C05
AutoCAD SHX Text
C
AutoCAD SHX Text
C05
AutoCAD SHX Text
FUTURE ROAD DESIGN (TYP.)
AutoCAD SHX Text
CONCRETE PEDESTRIAN RAMP AS PER CoN DWG. No. CS-7A
AutoCAD SHX Text
RELOCATE EXISTING STREET SIGNS
AutoCAD SHX Text
1.5:1 DAYLIGHT LINE (TYP.)
AutoCAD SHX Text
PROPOSED STREET LIGHT. SEE ELECTRICAL DWGS FOR DETAILS (TYP.)
AutoCAD SHX Text
PROPOSED STREET LIGHT CONDUIT. SEE ELECTRICAL DWG E-1 FOR DETAILS (TYP.)
AutoCAD SHX Text
MATCH ASPHALT TRAILWAY WITH EXISTING CS-1 CURB AND GUTTER
AutoCAD SHX Text
GRASS BOULEVARD c/w TREES @ 6-10m SPACING (TYP.) c/w INTERIM WATERING BAGS SEE LANDSCAPING DWGS FOR DETAILS. SEE PLANTING DETAIL ON DWG. No. C05 (TYP.)
AutoCAD SHX Text
REMOVE EXISTING CONC. SIDEWALK. STA. 3+015.63 TO STA. 3+382.40 3+015.63 TO STA. 3+382.40 CS-1 CURB & GUTTER TO REMAIN (TYP.)
AutoCAD SHX Text
REMOVE EXISTING CB AND CAP LEAD
AutoCAD SHX Text
PROPOSED BUS PULLOUT AS PER CoN DWG. No. CS-20
AutoCAD SHX Text
ADJUST EXISTING WATER VALVE TO MATCH FINISHED ASPHALT
AutoCAD SHX Text
CURB INLET CATCH BASIN AS PER CoN DWG. No. SW-3
AutoCAD SHX Text
AREA OF ENCROACHMENT ONTO RDN PROPERTY = 1040m²
AutoCAD SHX Text
WALLEY CREEK
AutoCAD SHX Text
PROPOSED HABITAT WOOD RAIL FENCE AS PER CoN DWG. No. CS-19 (TYP.)
AutoCAD SHX Text
0.50m GRAVEL SHOULDER (TYP.)
AutoCAD SHX Text
EXISTING CHAIN-LINK FENCE TO BE REMOVED (TYP.)
AutoCAD SHX Text
EXISTING S.R.W. SEE DWG. I1 FOR DETAILS
AutoCAD SHX Text
EXISTING UTILITY POLE
AutoCAD SHX Text
PLAN SP402 STRATA LOT 5 4604 HAMMOND BAY ROAD
AutoCAD SHX Text
PLAN EPP49694 LOT A 4600 HAMMOND BAY ROAD
AutoCAD SHX Text
CAUTION: EXISTING GAS & HYDRO DUCT EXISTING GAS & HYDRO DUCT CROSSING. GAS - APPROX. 0.60m DEPTH HYDRO DUCT - APPROX. 0.90m DEPTH
File: H:\Projects\0837-047 GNPCC Frontage Works\04C Drawings\0837-047 Civil Drawings.dwg Plot Time: Apr. 16, 20 3:11 PM User: Patrick RyanH:\Projects\0837-047 GNPCC Frontage Works\04C Drawings\0837-047 Civil Drawings.dwg Plot Time: Apr. 16, 20 3:11 PM User: Patrick Ryan Plot Time: Apr. 16, 20 3:11 PM User: Patrick RyanApr. 16, 20 3:11 PM User: Patrick Ryan User: Patrick RyanPatrick Ryan
AutoCAD SHX Text
PROJECT No.
AutoCAD SHX Text
ENGINEER'S SEAL
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DESIGN REVIEW
AutoCAD SHX Text
DRAFTED
AutoCAD SHX Text
DRAFTING REVIEW
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
RDN DRAWING No.
AutoCAD SHX Text
PERMIT No.
AutoCAD SHX Text
HEL DRAWING No.
AutoCAD SHX Text
No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text
CLIENT
AutoCAD SHX Text
YYYY.MM.DD
AutoCAD SHX Text
ISSUES
AutoCAD SHX Text
OF
AutoCAD SHX Text
DESTROY ALL DRAWINGS SHOWING PREVIOUS REVISION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
H:
AutoCAD SHX Text
V:
AutoCAD SHX Text
Copyright reserved. This drawing remains the exclusive property of Herold Engineering Limited and may not be reused or reproduced without written consent of Herold Engineering Limited.
REPLACE EXISTING CONC. CURB WITH CS-1 CURB AND GUTTER (TYP.) STA. 3+064.82 TO STA. 3+423.49
AutoCAD SHX Text
REMOVE EXISTING CONC. SIDEWALK
AutoCAD SHX Text
PAVEMENT RESTORATION TYPE 2 AS PER CoN DWG. No. T-4A
AutoCAD SHX Text
PROPOSED STREET LIGHT. SEE ELECTRICAL DWGS. FOR DETAIL (TYP.)
AutoCAD SHX Text
PROPOSED STREET LIGHT CONDUIT. SEE ELECTRICAL DWGS. FOR DETAIL (TYP.)
AutoCAD SHX Text
EXISTING PROPERTY LINE (TYP.)
AutoCAD SHX Text
1.5:1 DAYLIGHT LINES (TYP.)
AutoCAD SHX Text
0.50m GRAVEL SHOULDER (TYP.)
AutoCAD SHX Text
APPROX. CREEK
AutoCAD SHX Text
PROPOSED HABITAT WOOD RAIL FENCE AS PER CoN DWG. No CS-19 (TYP.)
AutoCAD SHX Text
EXISTING CHAIN-LINK FENCE TO BE REMOVED (TYP.)
AutoCAD SHX Text
CAUTION: 88 DP/PE GAS MAIN. 88 DP/PE GAS MAIN. CONTRACTOR TO LOCATE AND EXPOSE PRIOR TO EXCAVATION,
AutoCAD SHX Text
GRASS BOULEVARD c/w TREES @ 6-10m SPACING (TYP.) c/w INTERIM WATERING BAGS. SEE LANDSCAPING DWGS. FOR DETAILS. SEE PLANTING DETAIL ON DWG. No. C05 (TYP.)
AutoCAD SHX Text
EXISTING HYDRO POLE
AutoCAD SHX Text
D
AutoCAD SHX Text
C05
AutoCAD SHX Text
WALLEY CREEK
AutoCAD SHX Text
2.0%
AutoCAD SHX Text
2.0%
AutoCAD SHX Text
2.0%
AutoCAD SHX Text
PROPOSED ASPHALT TRAILWAY
AutoCAD SHX Text
CS-1
AutoCAD SHX Text
CS-1
AutoCAD SHX Text
PROPOSED AREA OF ENCROACHMENT ONTO RDN PROPERTY = 1040m²
AutoCAD SHX Text
GUTTERLINE DESIGN PROFILE
AutoCAD SHX Text
OPEN AREA ADJACENT TO NEW TRAIL. (SEE NOTE No. 2 THIS DWG.)
AutoCAD SHX Text
BLACKBERRY INFESTATION ADJACENT TO NEW TRAIL. (SEE NOTE No. 2 THIS DWG.)
AutoCAD SHX Text
OPEN AREA WITH BLACKBERRY INFESTATION ADJACENT TO NEW TRAIL. (SEE NOTE No. 2 THIS DWG.)
AutoCAD SHX Text
NOTES: 1. FOR GENERAL NOTES SEE DWG. No. C01 FOR GENERAL NOTES SEE DWG. No. C01 2. FOR FURTHER DETAIL ON PLANTINGS AND FOR FURTHER DETAIL ON PLANTINGS AND MAINTENANCE REQUIREMENTS SEE ENVIRONMENTAL SEE ENVIRONMENTAL DYNAMICS INC. (EDI) REPORT: 'TREE REPLACEMENT AND RIPARIAN ENHANCEMENT FOR GNPCC FRONTAGE WORKS'
AutoCAD SHX Text
ADDITIONAL ENHANCEMENT AREA (SEE NOTE No. 2 THIS DWG.
AutoCAD SHX Text
ADDITIONAL ENHANCEMENT AREAS (SEE NOTE No. 2 THIS DWG.
HAMMOND BAY RD. /SHORES DRIVE. DESIGN GUTTER ELEVATIONS
AutoCAD SHX Text
FOR CONTINUATION SEE DWG. No. C03
AutoCAD SHX Text
WALLEY CREEK
AutoCAD SHX Text
File: H:\Projects\0837-047 GNPCC Frontage Works\04C Drawings\0837-047 Civil Drawings.dwg Plot Time: Apr. 16, 20 3:11 PM User: Patrick RyanH:\Projects\0837-047 GNPCC Frontage Works\04C Drawings\0837-047 Civil Drawings.dwg Plot Time: Apr. 16, 20 3:11 PM User: Patrick Ryan Plot Time: Apr. 16, 20 3:11 PM User: Patrick RyanApr. 16, 20 3:11 PM User: Patrick Ryan User: Patrick RyanPatrick Ryan
AutoCAD SHX Text
PROJECT No.
AutoCAD SHX Text
ENGINEER'S SEAL
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DESIGN REVIEW
AutoCAD SHX Text
DRAFTED
AutoCAD SHX Text
DRAFTING REVIEW
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
RDN DRAWING No.
AutoCAD SHX Text
PERMIT No.
AutoCAD SHX Text
HEL DRAWING No.
AutoCAD SHX Text
No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text
CLIENT
AutoCAD SHX Text
YYYY.MM.DD
AutoCAD SHX Text
ISSUES
AutoCAD SHX Text
OF
AutoCAD SHX Text
DESTROY ALL DRAWINGS SHOWING PREVIOUS REVISION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
H:
AutoCAD SHX Text
V:
AutoCAD SHX Text
Copyright reserved. This drawing remains the exclusive property of Herold Engineering Limited and may not be reused or reproduced without written consent of Herold Engineering Limited.
REPLACE EXISTING CONC. CURB WITH CS-1 CURB AND GUTTER (TYP.)
AutoCAD SHX Text
REMOVE EXISTING ASPHALT SIDEWALK (TYP.)
AutoCAD SHX Text
PROPOSED STREET LIGHT. SEE ELECTRICAL DWGS. FOR DETAIL (TYP.)
AutoCAD SHX Text
PROPOSED STREET LIGHT CONDUIT. SEE ELECTRICAL DWGS. FOR DETAIL (TYP.)
AutoCAD SHX Text
EXISTING PROPERTY LINE (TYP.)
AutoCAD SHX Text
1.5:1 DAYLIGHT LINES (TYP.)
AutoCAD SHX Text
0.50m GRAVEL SHOULDER (TYP.)
AutoCAD SHX Text
APPROX. CREEK
AutoCAD SHX Text
PROPOSED HABITAT WOOD RAIL FENCE AS PER CoN DWG. No CS-19 (TYP.)
AutoCAD SHX Text
EXISTING CHAIN-LINK FENCE TO BE REMOVED (TYP.)
AutoCAD SHX Text
CAUTION: 88 DP/PE GAS MAIN. 88 DP/PE GAS MAIN. CONTRACTOR TO LOCATE AND EXPOSE PRIOR TO EXCAVATION,
AutoCAD SHX Text
GRASS BOULEVARD c/w TREES @ 6-10m SPACING (TYP.) c/w INTERIM WATERING BAGS. SEE LANDSCAPING DWGS. FOR DETAILS. SEE PLANTING DETAIL ON DWG. No. C05 (TYP.)
AutoCAD SHX Text
FUTURE ROAD DESIGN (TYP.)
AutoCAD SHX Text
E
AutoCAD SHX Text
C05
AutoCAD SHX Text
F
AutoCAD SHX Text
C05
AutoCAD SHX Text
INFILL WITH 50mm OF ASPHALT BETWEEN CS-1 CURB & EXISTING ASPHALT
NOTES: 1. FOR GENERAL NOTES SEE DWG. No. C01. FOR GENERAL NOTES SEE DWG. No. C01. 2. FOR FURTHER DETAIL ON PLANTINGS AND MAINTENANCE FOR FURTHER DETAIL ON PLANTINGS AND MAINTENANCE REQUIREMENTS SEE ENVIRONMENTAL DYNAMICS INC. (EDI) SEE ENVIRONMENTAL DYNAMICS INC. (EDI) REPORT: TREE REPLACEMENT RECOMMENDATIONS FOR GNPCC FRONTAGE WORKS FROM NOVEMBER 20, 2019. 3. ALL SIGNAGE TO BE AS PER THE 'MANUAL OF UNIFORM ALL SIGNAGE TO BE AS PER THE 'MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES' (MUTCD) LATEST EDITION. 4. ALL SIGN LOCATIONS AND PAINT MARKINGS TO BE AS PER ALL SIGN LOCATIONS AND PAINT MARKINGS TO BE AS PER CITY OF NANAIMO STANDARDS. 5. ALL PAINT MARKINGS TO BE THERMOPLASTIC PAINT.ALL PAINT MARKINGS TO BE THERMOPLASTIC PAINT.
AutoCAD SHX Text
PROPOSED ASPHALT TRAILWAY
AutoCAD SHX Text
CS-1
AutoCAD SHX Text
CS-1
AutoCAD SHX Text
PROPOSED AREA OF ENCROACHMENT ONTO RDN PROPERTY = 1040m²
AutoCAD SHX Text
GUTTERLINE DESIGN PROFILE
AutoCAD SHX Text
28.24
AutoCAD SHX Text
28.14
AutoCAD SHX Text
27.94
AutoCAD SHX Text
27.80
AutoCAD SHX Text
27.80
AutoCAD SHX Text
27.80
AutoCAD SHX Text
27.74
AutoCAD SHX Text
27.61
AutoCAD SHX Text
27.51
AutoCAD SHX Text
27.28
AutoCAD SHX Text
26.91
AutoCAD SHX Text
26.68
AutoCAD SHX Text
26.51
AutoCAD SHX Text
26.34
AutoCAD SHX Text
26.25
AutoCAD SHX Text
25.68
AutoCAD SHX Text
25.08
AutoCAD SHX Text
24.97
AutoCAD SHX Text
24.71
AutoCAD SHX Text
24.58
AutoCAD SHX Text
24.31
AutoCAD SHX Text
24.08
AutoCAD SHX Text
23.86
AutoCAD SHX Text
23.68
AutoCAD SHX Text
SIGN QTY LOCATION
AutoCAD SHX Text
SIGNS SCHEDULE - THIS DRAWING
AutoCAD SHX Text
(EAST SIDE OF ENTRANCE TO
AutoCAD SHX Text
STA 3+420
AutoCAD SHX Text
TURNAROUND)
AutoCAD SHX Text
P-1D
AutoCAD SHX Text
(WEST SIDE OF EXIT TO
AutoCAD SHX Text
STA 3+420
AutoCAD SHX Text
TURNAROUND)
AutoCAD SHX Text
P-1D
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
3.00m WIDE X-WALK c/w 0.30m WIDE SOLID WHITE BARS (THERMOPLASTIC)
File: H:\Projects\0837-047 GNPCC Frontage Works\04C Drawings\0837-047 Civil Drawings.dwg Plot Time: Apr. 16, 20 3:11 PM User: Patrick RyanH:\Projects\0837-047 GNPCC Frontage Works\04C Drawings\0837-047 Civil Drawings.dwg Plot Time: Apr. 16, 20 3:11 PM User: Patrick Ryan Plot Time: Apr. 16, 20 3:11 PM User: Patrick RyanApr. 16, 20 3:11 PM User: Patrick Ryan User: Patrick RyanPatrick Ryan
AutoCAD SHX Text
PROJECT No.
AutoCAD SHX Text
ENGINEER'S SEAL
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DESIGN REVIEW
AutoCAD SHX Text
DRAFTED
AutoCAD SHX Text
DRAFTING REVIEW
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
RDN DRAWING No.
AutoCAD SHX Text
PERMIT No.
AutoCAD SHX Text
HEL DRAWING No.
AutoCAD SHX Text
No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text
CLIENT
AutoCAD SHX Text
YYYY.MM.DD
AutoCAD SHX Text
ISSUES
AutoCAD SHX Text
OF
AutoCAD SHX Text
DESTROY ALL DRAWINGS SHOWING PREVIOUS REVISION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
H:
AutoCAD SHX Text
V:
AutoCAD SHX Text
Copyright reserved. This drawing remains the exclusive property of Herold Engineering Limited and may not be reused or reproduced without written consent of Herold Engineering Limited.
STRUCTURAL FILL IN LONGITUDINAL TRENCH SEE PLANTING DETAIL ON THIS DWG.
AutoCAD SHX Text
STRUCTURAL FILL IN LONGITUDINAL TRENCH SEE PLANTING DETAIL ON THIS DWG.
AutoCAD SHX Text
TREE PLANTING IN GRASS BOULEVARD
AutoCAD SHX Text
PRUNE FOR CLEARANCE (REFER TO SPECIFICATIONS CLAUSE 14.2.5) AND FOR TREE HEALTH (CLAUSE 14.61).
AutoCAD SHX Text
150mm MIN. DEPTH "A HORIZON" AMENDED TOPSOIL PER SPECIFICATIONS.
AutoCAD SHX Text
NOTE: PLANT TREE WITH NURSERY SOIL LINE AT 50mm ABOVE FINISH GRADE. FORM 50mm DEEP SAUCER AT BASE OF TREE.
AutoCAD SHX Text
75mm DEPTH BARK MULCH TO 600mm RADIUS AT TREE.
AutoCAD SHX Text
SUBSOIL (REFER TO CLAUSE 14.17 OF SPECIFICATIONS).
AutoCAD SHX Text
ROUGHEN PIT BOTTOM AND SIDES TO REMOVE GLAZING.
AutoCAD SHX Text
PROVIDE 12mm FREEBOARD BETWEEN FINISHED GRADE AND ADJACENT PAVED SURFACES.
AutoCAD SHX Text
UNDISTURBED NATIVE SOILS OR COMPACTED SUBGRADE..
AutoCAD SHX Text
UNTIE AND REMOVE TOP 1/3 OF BURLAP FROM ROOTBALL. NOTE: BALLED AND BURLAP TREE IS ILLUSTRATED. IF CONTAINER OR BAG GROWN TREES ARE USED, COMPLETELY REMOVE IMPERISHABLE CONTAINERS.
AutoCAD SHX Text
NOTE: CONDITIONAL ITEM CONDITIONAL ITEM TEST PLANTING PITS FOR DRAINAGE AS PER CLAUSE 14.58.2 OF SPECIFICATIONS PRIOR TO PLANTING. REPORT INADEQUATE DRAINAGE TO THE ENGINEER. ON DIRECTION OF THE ENGINEER INSTALL PVC DRAIN IN 150mm DEPTH DRAIN ROCK C/W FILTER CLOTH AND DRAIN TO STORM SEWER.
AutoCAD SHX Text
nts
AutoCAD SHX Text
REFER TO SPECIFICATION CLAUSE 14.30.1 AND 14.59 FOR STAKING MATERIALS AND INSTALLATION.
AutoCAD SHX Text
500mm MIN.
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
1m MIN.
AutoCAD SHX Text
FACE OF CURB
AutoCAD SHX Text
FROM FACE OF CURB
AutoCAD SHX Text
2m MIN. WIDTH OF BOULEVARD
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
SOD ON 150mm DEPTH TOPSOIL AS PER SPECIFICATION.
AutoCAD SHX Text
TYP.
AutoCAD SHX Text
1.0m MAX.
AutoCAD SHX Text
0.30m
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
IRRIGATION TRENCH
AutoCAD SHX Text
±0.40m
AutoCAD SHX Text
APPROVED TREE SPECIES AS PER PLANTING PLAN
AutoCAD SHX Text
SECTION VIEW-P-2
AutoCAD SHX Text
1000mm MIN.
AutoCAD SHX Text
J.G.
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
P-2
AutoCAD SHX Text
Date:
AutoCAD SHX Text
Dwg. No.
AutoCAD SHX Text
Scale
AutoCAD SHX Text
Drawn
AutoCAD SHX Text
JAN. 1998
AutoCAD SHX Text
LABOUR
AutoCAD SHX Text
AND
AutoCAD SHX Text
FAITH
AutoCAD SHX Text
City of Nanaimo
AutoCAD SHX Text
TREE PLANTING IN GRASS BOULEVARD
AutoCAD SHX Text
150mm OF 20mm MINUS CRUSHED GRAVEL
AutoCAD SHX Text
200mm OF SUBBASE
AutoCAD SHX Text
60mm
AutoCAD SHX Text
200mm OF APPROVED SUBBASE
AutoCAD SHX Text
60mm
AutoCAD SHX Text
200mm OF APPROVED SUBBASE
AutoCAD SHX Text
60mm
AutoCAD SHX Text
200mm OF APPROVED SUBBASE
AutoCAD SHX Text
200mm OF APPROVED SUBBASE
AutoCAD SHX Text
EXISTING ROAD STRUCTURE 75mm ASPHALT PAVEMENT 100mm BASE 250mm SUBBASE
AutoCAD SHX Text
EXISTING ROAD STRUCTURE 75mm ASPHALT PAVEMENT 100mm BASE 250mm SUBBASE
AutoCAD SHX Text
1.5
AutoCAD SHX Text
ACER TRUNCATUM 'RUBY SUNSET' (RUBY SUNSET PURPLEBOW MAPLE) @ 6-10m SPACING (TYP.) c/w SPACING (TYP.) c/w INTERIM WATERING BAGS. SEE WATERING BAGS. SEE LANDSCAPING DWG L-1 FOR DWG L-1 FOR DETAILS.
AutoCAD SHX Text
ACER TRUNCATUM 'RUBY SUNSET' (RUBY SUNSET PURPLEBOW MAPLE) @ 6-10m SPACING (TYP.) c/w SPACING (TYP.) c/w INTERIM WATERING BAGS. SEE WATERING BAGS. SEE LANDSCAPING DWG L-1 FOR DWG L-1 FOR DETAILS.
TEMPORARY SILT FENCING (TYP.) (EXACT LOCATION TO BE VERIFIED IN FIELD)
AutoCAD SHX Text
EROSION & SEDIMENT CONTROL NOTES: 1. EROSION AND SEDIMENT CONTROL FOR THIS PROJECT WILL BE AS OUTLINED IN EROSION AND SEDIMENT CONTROL FOR THIS PROJECT WILL BE AS OUTLINED IN THE FISHERIES AND OCEANS CANADA & MINISTRY OF WATER, LANDS AND AIR PROTECTION HANDBOOK ENTITLED "LAND DEVELOPMENT GUIDELINES FOR THE PROTECTION OF THE AQUATIC HABITAT, SEPTEMBER 1993" AND "ENVIRONMENTAL BEST MANAGEMENT PRACTICES FOR URBAN AND RURAL LAND DEVELOPMENT IN BRITISH COLUMBIA, JUNE 2004" AND "EROSION & SEDIMENT CONTROL GUIDELINE" BY THE CITY OF NANAIMO. IT IS INCUMBENT UPON THE CONTRACTOR TO ACQUIRE THESE GUIDELINES AND FAMILIARIZE HIMSELF WITH THE REQUIREMENTS WITHIN. 2. THE CONSULTANT ASSUMES NO RESPONSIBILITY FOR DAMAGES RESULTING FROM THE CONSULTANT ASSUMES NO RESPONSIBILITY FOR DAMAGES RESULTING FROM IMPROPER EROSION AND SEDIMENT CONTROL MEASURES UNDERTAKEN BY THE CONTRACTOR. 3. ANY DIRECTION GIVEN BY THE CONSULTANT OR CITY TO THE CONTRACTOR FOR ANY DIRECTION GIVEN BY THE CONSULTANT OR CITY TO THE CONTRACTOR FOR EROSION AND SEDIMENT CONTROL AND NOT FOLLOWED BY THE CONTRACTOR IS TO BE REPORTED TO THE CITY IMMEDIATELY. 4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE NO MUD, DIRT, IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE NO MUD, DIRT, SOIL, SILT OR ANY OTHER SUBSTANCES ARE SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC RIGHTS OF WAY, OR AREAS THAT LEAD TO CATCH BASINS CONNECTED TO PUBLIC SYSTEMS. THE CONTRACTOR IS TO CLEAN ANY SUCH MATERIAL IMMEDIATELY. i.e. STREETS ARE TO BE SWEPT WITH A VACUUM STREET SWEEPER AFTER WORK STOPPAGE EACH DAY. 5. PRIOR TO CONSTRUCTION, INSTALL A TEMPORARY GRAVEL CONSTRUCTION PRIOR TO CONSTRUCTION, INSTALL A TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT TO LIMIT TRACKING OF SITE SOILS ONTO OFFSITE ROADWAYS. THE WIDTH OF THE PAD SHOULD NOT BE LESS THAN THE FULL WIDTH OF POINT OF INGRESS OR EGRESS IN ANY CASE SHOULD NOT BE LESS THAN 6m WIDE WITH A LENGTH OF THE PAD NOT LESS THAN 20m AND HAVING A MINIMUM THICKNESS OF 200mm (8") OF COARSE GRANULAR MATERIAL. COARSE GRANULAR MATERIAL SUCH AS 75mm PLUS SHOT ROCK OR FRACTURED DRAIN ROCK UNDERLAIN WITH GEO-TEXTILE FABRIC IS RECOMMENDED. 6. THE ENTRANCE SHOULD BE MAINTAINED FOR THE DURATION OF CONSTRUCTION, THE ENTRANCE SHOULD BE MAINTAINED FOR THE DURATION OF CONSTRUCTION, IN A CONDITION THAT WILL PREVENT TRACKING OF SEDIMENT ONTO PUBLIC RIGHT OF WAYS, OR AREAS THAT LEAD TO CATCH BASINS CONNECTED TO PUBLIC SYSTEMS. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL MATERIAL AS CONDITIONS DEMAND. THE PAD MAY BE REMOVED ONCE PERMANENT PAVEMENTS ARE IN PLACE AT THE SITE. A WHEEL WASH MAY BE REQUIRED IF THE TEMPORARY GRAVEL PAD IS NOT WORKING. 7. PRIOR TO CONSTRUCTION, CONTRACTOR TO CLEARLY FLAG OR FENCE AREAS OF PRIOR TO CONSTRUCTION, CONTRACTOR TO CLEARLY FLAG OR FENCE AREAS OF NO DISTURBANCE AS WELL AS ANY DESIGNATED TREES AND SHRUBS THAT ARE TO BE PRESERVED. MARKINGS SHALL REMAIN IN PLACE THROUGHOUT CONSTRUCTION. 8. CONTRACTOR TO STRIP AND GRUB ONLY THOSE AREAS NECESSARY FOR THE CONTRACTOR TO STRIP AND GRUB ONLY THOSE AREAS NECESSARY FOR THE CURRENT CONSTRUCTION. STAGE CONSTRUCTION OPERATIONS TO LIMIT DISTURBANCE AND DO NOT STRIP ANY AREA UNTIL REQUIRED. 9. GRADE WORK AREAS AWAY FROM ADJACENT PROPERTIES AND TOWARDS THE GRADE WORK AREAS AWAY FROM ADJACENT PROPERTIES AND TOWARDS THE SEDIMENT POND ON THE SITE FOR DISPERSAL INFILTRATION. 10. REVEGETATION OPERATIONS SHOULD BE CARRIED OUT WITHIN ONE WEEK OF REVEGETATION OPERATIONS SHOULD BE CARRIED OUT WITHIN ONE WEEK OF GRADING COMPLETION OR NO LATER THAN SEPT. 15th. 11. SILT FENCING IS TO BE INSTALLED AROUND ALL STOCK/SPOIL PILES, OR PILES SILT FENCING IS TO BE INSTALLED AROUND ALL STOCK/SPOIL PILES, OR PILES ARE TO BE OTHERWISE COVERED TO LIMIT EROSION AND SEDIMENT GENERATION. 12. WHEN SHOWN ON THE CONTRACT DRAWINGS, CONTRACTOR TO INSTALL WHEN SHOWN ON THE CONTRACT DRAWINGS, CONTRACTOR TO INSTALL SETTLEMENT PONDS EQUIPPED WITH EMERGENCY OVERFLOW, FOR RETENTION/INFILTRATION TREATMENT OF RUNOFF COLLECTED BY INTERCEPTOR SWALES (DITCHES) AND/OR SILT BARRIERS. THE SETTLEMENT PONDS ARE TO HAVE A MINIMUM VOLUME TO CONTAIN FLOWS FROM A 10-YEAR RETURN PERIOD, 24-HOUR RAINFALL EVENT. THE PONDS SHOULD BE USED AND MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION. 13. ROUTINE INSPECTION AND MAINTENANCE OF THE SYSTEM COMPONENTS WILL BE ROUTINE INSPECTION AND MAINTENANCE OF THE SYSTEM COMPONENTS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHOULD DESIGNATE AN ON-SITE PERSON TO BE RESPONSIBLE FOR DAY-TO-DAY MANAGEMENT OF THE ESCP. AT A MINIMUM, INSPECT ALL BMP'S WEEKLY TO ENSURE PROPER FUNCTION WITH INSPECTION REPORTS PROVIDED TO THE ENGINEER AND THE CITY OF NANAIMO FOR REVIEW. 14. 48 HOURS PRIOR TO ANY PREDICTED SIGNIFICANT STORM EVENT, THE 48 HOURS PRIOR TO ANY PREDICTED SIGNIFICANT STORM EVENT, THE DESIGNATED SITE PERSON SHOULD INSPECT THE E&SC WORKS AND ENSURE THAT THE WORKS ARE ADEQUATE TO PROTECT THE SITE DURING THE STORM EVENT AND PROVIDE A WRITTEN REPORT TO THE ENGINEER AND/OR THE CITY UPON REQUEST. IF THE DESIGNATED SITE PERSON DETERMINES THAT THE E&SC WORKS ARE NOT ADEQUATE TO PROTECT THE SITE DURING THE ANTICIPATED STORM EVENT, THEN HE/SHE IS TO IMMEDIATELY INFORM THE ENGINEER AND CONTRACTOR SO THAT THE WORKS CAN BE MODIFIED TO ADEQUATELY PROTECT THE SITE DURING THE STORM EVENT AND PROVIDE A WRITTEN REPORT TO THE ENGINEER AND/OR THE CITY UPON REQUEST. 15. DURING AND/OR FOLLOWING EACH SIGNIFICANT STORM EVENT, THE DESIGNATED DURING AND/OR FOLLOWING EACH SIGNIFICANT STORM EVENT, THE DESIGNATED SITE PERSON SHOULD OBSERVE THE SETTLEMENT PONDS AND STORM DRAIN TO CONFIRM THAT TURBID WATERS FROM SOURCES ASSOCIATED WITH CONSTRUCTION ARE NOT ENTERING THE STORM DRAINAGE SYSTEM. TAKE IMMEDIATE CORRECTIVE ACTION IF INSPECTION INDICATES A PROBLEM. RECORD INSPECTION DATES, ANY SIGNIFICANT OBSERVATIONS, AND ACTIONS TAKEN, THEN INFORM THE CONSULTANT IN CHARGE AND THE CITY OF NANAIMO. 16. CITY OF NANAIMO STANDARD EROSION & SEDIMENT CONTROL SIGNAGE IS CITY OF NANAIMO STANDARD EROSION & SEDIMENT CONTROL SIGNAGE IS REQUIRED TO BE PLACED ON-SITE PRIOR TO THE START OF CONSTRUCTION AND MAINTAINED IN PLACE UNTIL LANDSCAPING IS COMPLETED.
AutoCAD SHX Text
File: H:\Projects\0837-047 GNPCC Frontage Works\04C Drawings\0837-047 Civil Drawings.dwg Plot Time: Apr. 16, 20 3:11 PM User: Patrick RyanH:\Projects\0837-047 GNPCC Frontage Works\04C Drawings\0837-047 Civil Drawings.dwg Plot Time: Apr. 16, 20 3:11 PM User: Patrick Ryan Plot Time: Apr. 16, 20 3:11 PM User: Patrick RyanApr. 16, 20 3:11 PM User: Patrick Ryan User: Patrick RyanPatrick Ryan
AutoCAD SHX Text
PROJECT No.
AutoCAD SHX Text
ENGINEER'S SEAL
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DESIGN REVIEW
AutoCAD SHX Text
DRAFTED
AutoCAD SHX Text
DRAFTING REVIEW
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
RDN DRAWING No.
AutoCAD SHX Text
PERMIT No.
AutoCAD SHX Text
HEL DRAWING No.
AutoCAD SHX Text
No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text
CLIENT
AutoCAD SHX Text
YYYY.MM.DD
AutoCAD SHX Text
ISSUES
AutoCAD SHX Text
OF
AutoCAD SHX Text
DESTROY ALL DRAWINGS SHOWING PREVIOUS REVISION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
H:
AutoCAD SHX Text
V:
AutoCAD SHX Text
Copyright reserved. This drawing remains the exclusive property of Herold Engineering Limited and may not be reused or reproduced without written consent of Herold Engineering Limited.
File: H:\Projects\0837-047 GNPCC Frontage Works\04C Drawings\0837-047 Civil Drawings.dwg Plot Time: Apr. 16, 20 3:11 PM User: Patrick RyanH:\Projects\0837-047 GNPCC Frontage Works\04C Drawings\0837-047 Civil Drawings.dwg Plot Time: Apr. 16, 20 3:11 PM User: Patrick Ryan Plot Time: Apr. 16, 20 3:11 PM User: Patrick RyanApr. 16, 20 3:11 PM User: Patrick Ryan User: Patrick RyanPatrick Ryan
AutoCAD SHX Text
PROJECT No.
AutoCAD SHX Text
ENGINEER'S SEAL
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DESIGN REVIEW
AutoCAD SHX Text
DRAFTED
AutoCAD SHX Text
DRAFTING REVIEW
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
RDN DRAWING No.
AutoCAD SHX Text
PERMIT No.
AutoCAD SHX Text
HEL DRAWING No.
AutoCAD SHX Text
No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text
CLIENT
AutoCAD SHX Text
YYYY.MM.DD
AutoCAD SHX Text
ISSUES
AutoCAD SHX Text
OF
AutoCAD SHX Text
DESTROY ALL DRAWINGS SHOWING PREVIOUS REVISION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
H:
AutoCAD SHX Text
V:
AutoCAD SHX Text
Copyright reserved. This drawing remains the exclusive property of Herold Engineering Limited and may not be reused or reproduced without written consent of Herold Engineering Limited.
File: H:\Projects\0837-047 GNPCC Frontage Works\04C Drawings\0837-047 Civil Drawings.dwg Plot Time: Apr. 16, 20 3:11 PM User: Patrick RyanH:\Projects\0837-047 GNPCC Frontage Works\04C Drawings\0837-047 Civil Drawings.dwg Plot Time: Apr. 16, 20 3:11 PM User: Patrick Ryan Plot Time: Apr. 16, 20 3:11 PM User: Patrick RyanApr. 16, 20 3:11 PM User: Patrick Ryan User: Patrick RyanPatrick Ryan
AutoCAD SHX Text
PROJECT No.
AutoCAD SHX Text
ENGINEER'S SEAL
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DESIGN REVIEW
AutoCAD SHX Text
DRAFTED
AutoCAD SHX Text
DRAFTING REVIEW
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
RDN DRAWING No.
AutoCAD SHX Text
PERMIT No.
AutoCAD SHX Text
HEL DRAWING No.
AutoCAD SHX Text
No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text
CLIENT
AutoCAD SHX Text
YYYY.MM.DD
AutoCAD SHX Text
ISSUES
AutoCAD SHX Text
OF
AutoCAD SHX Text
DESTROY ALL DRAWINGS SHOWING PREVIOUS REVISION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
H:
AutoCAD SHX Text
V:
AutoCAD SHX Text
Copyright reserved. This drawing remains the exclusive property of Herold Engineering Limited and may not be reused or reproduced without written consent of Herold Engineering Limited.
File: H:\Projects\0837-047 GNPCC Frontage Works\04C Drawings\0837-047 Civil Drawings.dwg Plot Time: Apr. 16, 20 3:11 PM User: Patrick RyanH:\Projects\0837-047 GNPCC Frontage Works\04C Drawings\0837-047 Civil Drawings.dwg Plot Time: Apr. 16, 20 3:11 PM User: Patrick Ryan Plot Time: Apr. 16, 20 3:11 PM User: Patrick RyanApr. 16, 20 3:11 PM User: Patrick Ryan User: Patrick RyanPatrick Ryan
AutoCAD SHX Text
PROJECT No.
AutoCAD SHX Text
ENGINEER'S SEAL
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DESIGN REVIEW
AutoCAD SHX Text
DRAFTED
AutoCAD SHX Text
DRAFTING REVIEW
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
RDN DRAWING No.
AutoCAD SHX Text
PERMIT No.
AutoCAD SHX Text
HEL DRAWING No.
AutoCAD SHX Text
No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text
CLIENT
AutoCAD SHX Text
YYYY.MM.DD
AutoCAD SHX Text
ISSUES
AutoCAD SHX Text
OF
AutoCAD SHX Text
DESTROY ALL DRAWINGS SHOWING PREVIOUS REVISION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
H:
AutoCAD SHX Text
V:
AutoCAD SHX Text
Copyright reserved. This drawing remains the exclusive property of Herold Engineering Limited and may not be reused or reproduced without written consent of Herold Engineering Limited.
File: H:\Projects\0837-047 GNPCC Frontage Works\04C Drawings\0837-047 Civil Drawings.dwg Plot Time: Apr. 16, 20 3:11 PM User: Patrick RyanH:\Projects\0837-047 GNPCC Frontage Works\04C Drawings\0837-047 Civil Drawings.dwg Plot Time: Apr. 16, 20 3:11 PM User: Patrick Ryan Plot Time: Apr. 16, 20 3:11 PM User: Patrick RyanApr. 16, 20 3:11 PM User: Patrick Ryan User: Patrick RyanPatrick Ryan
AutoCAD SHX Text
PROJECT No.
AutoCAD SHX Text
ENGINEER'S SEAL
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DESIGN REVIEW
AutoCAD SHX Text
DRAFTED
AutoCAD SHX Text
DRAFTING REVIEW
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
RDN DRAWING No.
AutoCAD SHX Text
PERMIT No.
AutoCAD SHX Text
HEL DRAWING No.
AutoCAD SHX Text
No.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ISSUED FOR
AutoCAD SHX Text
CLIENT
AutoCAD SHX Text
YYYY.MM.DD
AutoCAD SHX Text
ISSUES
AutoCAD SHX Text
OF
AutoCAD SHX Text
DESTROY ALL DRAWINGS SHOWING PREVIOUS REVISION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
H:
AutoCAD SHX Text
V:
AutoCAD SHX Text
Copyright reserved. This drawing remains the exclusive property of Herold Engineering Limited and may not be reused or reproduced without written consent of Herold Engineering Limited.
Acer Truncatum 'Ruby Sunset' Ruby Sunset Purplebow Maple
See Plant List this sheet
RDN DWG. No. GN-L-GEN-221
HAMMOND BAY ROAD
MCG
UFFIE RO
AD
BFTREE DRIP4.81 GPM C1
1"
FVAVR
C
PLANTING AREAS AS INDICATED IN THE REPORTPREPARED BY EDI, TYPICAL.
REFER TO IRRIGATION NOTES
REFER TO CIVIL PLANS FOR 1" (25mm)IRRIGATION WATER SERVICE.
HAM
MO
ND
BAY R
OAD
TREE-SHRUB ROTOR9.3 GPM C3
1"
TREE-SHRUB ROTOR8.56 GPM C6
1"
TREE-SHRUB ROTOR11.14 GPM C5
1"
TREE-SHRUB ROTOR8.65 GPM C4
1"FV
AVR
1"C2 4.72
TREE-SHRUB DRIP1"
1" 1" 1"
1"
1"
1"
PLANTING AREAS AS INDICATED IN THE REPORTPREPARED BY EDI, TYPICAL.
REFER TO IRRIGATION NOTES
of
Date:
Draw
n:
Scale:
Project N
um
ber:
DRAW
IN
G N
UM
BER:
Checked:
Date
#
REVISIO
N SCH
ED
ULE
NO
TES
814 Shorew
ood D
rive, Parksville, BC V9P 1S1
TEL(: 250) 248-3089 EM
AIL: info@
macdonaldgray.ca
ww
w.m
acdonaldgray.ca
March 26, 2020
NG
20-0260
2N
anaim
o, BC
Regional D
istrict of N
anaim
o
Greater N
anaim
o Pollution
THIS DRAWING IS NOT FINAL AND SHALL NOT BE USED
FOR CONSTRUCTION WORK UNTIL IT HAS BEEN
STAMPED AND SIGNED BY THE LANDSCAPE ARCHITECT
Issued for Tender
26M
AR2020
0
THE COPYRIGHTS TO ALL DESIGNS AND DRAWINGS ARE THE PROPERTY
OF MACDONALD GRAY CONSULTANTS. REPRODUCTION OR USE FOR ANY
PURPOSE OTHER THAN THAT AUTHORIZED BY MACDONALD GRAY
CONSULTANTS IS FORBIDDEN
Control Centre Frontage W
orks
IRRIG
ATIO
N PLAN
CM
1:250 m
etric
I-1
VALVE NUMBER AND CONTROLLER DESIGNATIONGALLONS PER MINUTEZONE DESCRIPTIONVALVE SIZE
2"C1 10.0 GPM
LAWN SPRAY
IRRIGATION EQUIPMENT LEGENDSYMBOL
HUNTER
HUNTER
NIBCO
HUNTER
HUNTER
NDS
HUNTER
MODEL DESCRIPTION
1" (25mm) ELECTRIC REMOTE CONTROL VALVE TO BE INSTALLED IN AMOULDED STRUCTURAL FOAM VALVE BOX WITH BOLT DOWN COVERPER DETAIL E/I-2 AND MANUFACTURER'S RECOMMENDATIONS.
1" (25mm) DRIP ZONE CONTROL KIT WITH ELECTRIC REMOTE CONTROLVALVE, WYE FILTER AND PRESSURE REGULATOR TO BE INSTALLED IN AMOULDED STRUCTURAL FOAM VALVE BOX IWTH BOLT DOWN COVER,REFER TO DETAIL D/I-2. SIZE PER PLAN.
LINE-SIZE BRONZE GATE VALVE IN VALVE BOX WITH WITH BOLT DOWNCOVER, REFER TO DETAIL B/I-2
1" (25mm) DOUBLE CHECK VALVE BACKFLOW PREVENTER TO INSTALLEDDOWNSTREAM OF WATER CHAMBER PER MANUFACTURER'SRECOMMENDATIONS AND PER DETAIL A/I-2.
6-STATION BATTERY OPERATED IRRIGATION CONTROLLERMOUNTED IN ZONE C1 VALVE BOX PER MANUFACTURER'SRECOMMENDATIONS.
AIR VACUUM RELEASE VALVE, INSTALL PER DETAIL J/I-2
FLUSH VALVE, INSTALL PER DETAIL K/I-2
PVC LATERAL LINE, 3/4" (19mm) UNLESS NOTED OTHERWISE AT THEBEGINNING AND END OF EACH LENGTH OF PIPE, REFER TO DETAIL C/1-2
1" (25mm) PVC MAINLINE, REFER TO DETAIL C/I-2
ICV-101G
ICZ-101-40
T113
007
NODE-600
AVRV 50
PLD BV
CLASS 200
SCHEDULE 40
MANUFACTURER
IRRIGATION SPRINKLER LEGEND - REFER TO DETAIL F/I-2
SYMBOL
HUNTER
HUNTER
HUNTER
MODEL PATTERN
PROS-12-PRS40-CV-MP2000-90
PROS-12-PRS40-CV-MP2000-210
PROS-12-PRS40-CV-MP2000-360
MFR RADIUSft / m
90° - 210°
210° - 270°
360°
13-20 / 4-6
13-20 / 4-6
13-20 / 4-6
0.43-0.86 (1.6-3.3)
0.86-1.10 (3.3-4.2)
1.48 (5.6)
FLOW RATE @40 PSI / 2.76bar
GPM (l/m)
C
SYMBOL MODELMAKE LINE SPACINGft / m
EMITTER SPACINGft / m
FLOW RATE @40 PSI / 2.75 bar
GPH (l/h)
NDS SFCV-BR-1712 0.45 1.0 / 0.3 0.6 (2.27)
MAX. LENGTHOF RUN ft / m
460 / 140
IRRIGATION DRIPLINE LEGEND - REFER TO DETAILS G - K/I-2
FV
AVR
BF
REFER TO TREE REPLACEMENT AND RIPARIAN ENHANCEMENT FOR GNPCC FRONTAGE WORKS REPORTPREPARED BY ENVIRONMENTAL DYNAMICS INC. (EDI) DATED MARCH 20, 2020 FOR ALL RIPARIAN AREA TREEAND VEGETATION REMOVAL AND REPLACEMENT SPECIFICATIONS AND PROCEDURES.
IRRIGATION SYSTEM INSTALLATION AND MAINTENANCE SHALL MEET OR EXCEED THE THE REQUIREMENTS SETOUT IN SECTION 5 - IRRIGATION SYSTEMS OF THE CANADIAN NURSERY LANDSCAPE ASSOCIATION (CNLA)/CANADIAN SOCIETY OF LANDSCAPE ARCHITECTS (CSLA) CANADIAN LANDSCAPE STANDARD AND THEIRRIGATION DETAILS.
THE IRRIGATION SYSTEM IS DESIGNED TO OPERATE WITH A MINIMUM STATIC PRESSURE OF 110 PSI. THEMAXIMUM FLOW DEMAND FOR THE SYSTEM IS 12 GPM.
THE IRRIGATION PLAN IS DIAGRAMMATIC. NO IRRIGATION MAINLINE OR LATERAL LINE SHALL BE INSTALLEDBEYOND ANY KNOWN LIMIT OF WORK, PROPERTY LINE OR ROAD RIGHT-OF-WAY. ALL EQUIPMENT AND PIPINGSHALL BE INSTALLED WITHIN PLANTING AREAS.
THE CONTRACTOR SHALL ADJUST THE PLACEMENT AND RADIUS OF SPRINKLERS AS REQUIRED BY FIELDCONDITIONS TO ACHIEVE FULL COVERAGE OF ALL PLANTED AREAS AND TO MINIMIZE OVER-SPRAY ONTOADJACENT HARD SURFACES, FENCES AND PROPERTY LINES.
OPERATE IRRIGATION CONTROLLERS WITHIN THE CITY OF NANAIMO WATER RESTRICTION SCHEDULE.
THE CONTRACTOR SHALL PROVIDE, INSTALL AND PROGRAM THE BATTERY OPERATED CONTROLLER AND ALLCONTROL WIRE.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING OR REPLACING ALL EXISTING SPRINKLER EQUIPMENTOR PROPERTY TO REMAIN DAMAGED BY CONSTRUCTION OPERATIONS.
THE CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER TRADES TO ENSURE PROGRESS OF WORK ISNOT INTERRUPTED AND CAN BE COMPLETED IN A TIMELY MANNER.
INSTALL SPRINKLER HEADS PERPENDICULAR TO SLOPES OR GRADE.
ALL EQUIPMENT MAKES AND MODELS SHALL BE PER THE IRRIGATION LEGEND OR APPROVED EQUAL. CONTACTTHE LANDSCAPE ARCHITECT IN WRITING PRIOR TO PURCHASE FOR SUBSTITUTIONS.
THE LANDSCAPE ARCHITECT CANNOT PROVIDE ASSURANCES FOR WORK WITHOUT THE FOLLOWING FIELDREVIEW ATTENDANCE:A. REVIEW OF UNCOVERED PRESSURIZED IRRIGATION MAINLINE AND LATERALS.B. REVIEW OF COMPLETE IRRIGATION INSTALLATION AND COVERAGE.
IRRIGATION NOTES1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
LIM
IT O
F IRRIG
ATIO
N W
ORK
MATCH
LIN
E, SEE BELO
W LEFT
MATCH
LIN
E, SEE ABO
VE RIG
HT
AutoCAD SHX Text
200 AC WM
AutoCAD SHX Text
200 AC WM
AutoCAD SHX Text
200 PVC WM
AutoCAD SHX Text
200 AC WM
AutoCAD SHX Text
0+020
AutoCAD SHX Text
0+040
AutoCAD SHX Text
0+060
AutoCAD SHX Text
0+080
AutoCAD SHX Text
0+100
AutoCAD SHX Text
0+120
AutoCAD SHX Text
0+140
AutoCAD SHX Text
0+160
AutoCAD SHX Text
3+000
AutoCAD SHX Text
3+020
AutoCAD SHX Text
3+040
AutoCAD SHX Text
3+060
AutoCAD SHX Text
3+080
AutoCAD SHX Text
3+100
AutoCAD SHX Text
3+120
AutoCAD SHX Text
3+140
AutoCAD SHX Text
30.0
AutoCAD SHX Text
31.0
AutoCAD SHX Text
29.5
AutoCAD SHX Text
30.5
AutoCAD SHX Text
31.5
AutoCAD SHX Text
200 AC WM
AutoCAD SHX Text
200 AC WM
AutoCAD SHX Text
200 AC WM
AutoCAD SHX Text
0+180
AutoCAD SHX Text
0+200
AutoCAD SHX Text
0+220
AutoCAD SHX Text
0+240
AutoCAD SHX Text
0+260
AutoCAD SHX Text
0+280
AutoCAD SHX Text
0+300
AutoCAD SHX Text
3+160
AutoCAD SHX Text
3+180
AutoCAD SHX Text
3+200
AutoCAD SHX Text
3+220
AutoCAD SHX Text
3+240
AutoCAD SHX Text
3+260
AutoCAD SHX Text
3+280
AutoCAD SHX Text
26.0
AutoCAD SHX Text
27.0
AutoCAD SHX Text
28.0
AutoCAD SHX Text
29.0
AutoCAD SHX Text
30.0
AutoCAD SHX Text
25.5
AutoCAD SHX Text
26.5
AutoCAD SHX Text
27.5
AutoCAD SHX Text
28.5
AutoCAD SHX Text
29.5
AutoCAD SHX Text
26.0
AutoCAD SHX Text
27.0
AutoCAD SHX Text
28.0
AutoCAD SHX Text
29.0
AutoCAD SHX Text
26.5
AutoCAD SHX Text
27.5
AutoCAD SHX Text
28.5
AutoCAD SHX Text
29.5
pryan
Text Box
RDN DWG. No. GN-L-GEN-222
of
Date:
Draw
n:
Scale:
Project N
um
ber:
DRAW
IN
G N
UM
BER:
Checked:
Date
#
REVISIO
N SCH
ED
ULE
NO
TES
814 Shorew
ood D
rive, Parksville, BC V9P 1S1
TEL(: 250) 248-3089 EM
AIL: info@
macdonaldgray.ca
ww
w.m
acdonaldgray.ca
March 26, 2020
NG
20-0260
2N
anaim
o, BC
Regional D
istrict of N
anaim
o
Greater N
anaim
o Pollution
THIS DRAWING IS NOT FINAL AND SHALL NOT BE USED
FOR CONSTRUCTION WORK UNTIL IT HAS BEEN
STAMPED AND SIGNED BY THE LANDSCAPE ARCHITECT
Issued for Tender
26M
AR2020
0
THE COPYRIGHTS TO ALL DESIGNS AND DRAWINGS ARE THE PROPERTY
OF MACDONALD GRAY CONSULTANTS. REPRODUCTION OR USE FOR ANY
PURPOSE OTHER THAN THAT AUTHORIZED BY MACDONALD GRAY
CONSULTANTS IS FORBIDDEN
Control Centre Frontage W
orks
IRRIG
ATIO
N D
ETAILS
CM
1:250 m
etric
I-2
Section
Backflow PreventerNot to Scale
300
MIN
.
FLOW
1 2 3 4 9 8 10 12 13 9
8 8 11 8
8
5 9 14 7
15 PIPE FROM POINT OFCONNECTION OFF EXISTINGWATER MAIN
14" X 19" (355mm X 480mm)LOCKING VALVE BOX
LINE-SIZED BRONZE GATE VALVE
17" X 30" X 18" (430mm X760mm X 450mm) LOCKINGVALVE BOX
BRASS NIPPLE, (30cm) 12"LENGTH
BRASS TEE
BRASS REDUCING BUSHING,WITH 19mm HOSE BIB
BRASS NIPPLES, TYP. LENGTH ASREQUIRED
BRASS 90° ELL, TYP.
DOUBLE CHECK BACKFLOWPREVENTER. SEE IRRIGATIONLEGEND FOR MAKE AND MODEL.FOLLOW MANUFACTURER'SINSTALLATIONRECOMMENDATIONS
BRASS TEE
1" (25mm) QUICK COUPLINGVALVE WITH COVER, BRASSREDUCING BUSHING AND NIPPLEUSED FOR MAIN BLOWOUT
LIQUID FILLED PRESSURE GAUGE
19mm (3/4") MINUS DRAIN ROCK,100mm DEPTH MIN.
FINISHED GRADE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
ENSURE ALL DIMENSIONS AND CLEARANCESCOMPLY WITH MANUFACTURER'S INSTALLATIONRECOMMENDATIONS.
INSTALLATION MUST BE APPROVED BY LOCALPLUMBING INSPECTOR.
ALL MATERIALS TO BE IN ACCORDANCE WITHCURRENT BC PLUMBING CODES.
UTILITY BOX SHOWN FOR BACKFLOW PREVENTER ISDIAGRAMMATIC.
PROVISIONS FOR FREEZING WINTER CONDITIONSARE NOT SHOWN. WHERE CLIMATE REQUIRES THEYSHALL BE ADDED TO MEET THE REQUIREMETNS OFTHE CITY ENGINEER.
1.
NOTES:
2.
5.
4.
3.
6REF
ER T
O C
IVIL
PLA
NS F
OR 1
" (25m
m) IR
RIG
ATI
ON
WATE
R S
ERVIC
E
LIM
IT O
F LU
MP
SUM
PAYM
ENT
FOR IR
RIG
ATI
ON
Section
Gate ValveNot to Scale
VALVE BOX WITH BOLT DOWNCOVER
LINE-SIZED GATE VALVE, REFERTO IRRIGATION LEGEND
SCH. 40 PVC MALE ADAPTORTYP. OF (2) PLACES
PVC MAINLINE PIPE, REFER TOIRRIGATION PLAN
BRICK, (4) PLACES
4" (100mm) MIN. DEPTH OF 3/4"(19mm) MINUS WASHED GRAVEL
1
2
3
4
5
USE TEFLON TAPE ON ALLTHREADED FITTINGS
REFER TO IRRIGATION PLANS ANDLEGEND FOR ADDITIONALINFORMATION.
1.
NOTES:
1
2
3 6
4
5
6
450m
m (18")
MIN
.
100m
mM
IN.
2.
Section
TrenchingNot to Scale
450m
m (18")
CO
VER
OVER
MAIN
LINE
300m
m (12")
CO
VER
OVER
LATE
RAL
LINE
MIN
.
SURFACE MATERIAL TO MATCHADJACENT LANDSCAPE AREAS
COMPACTED BACKFILL TOMATCH ADJACENT BACKFILLBELOW REQUIRED DEPTH OFGROWING MEDIUM INLANDSCAPE AREAS
PVC PIPE, REFER TO IRRIGATIONPLAN
COMPACTED BEDDING MATERIALHAND-PLACED 50mm (2") MIN.ON ALL SIDES OF PIPE. BEDDINGMATERIAL TO BE FREE OFROCKS, OTHER DELETERIOUSMATERIAL
1
2
3
4
PARALLEL PIPES TO BE MIN. 50mmHORIZONTAL DISTANCE APART.
IRRIGATION PIPING TO BESEPARATED A MIN. OF 300mmFROM ELECTRICAL & OTHERUTILITIES.