Upload
lalovic-zdenko
View
220
Download
0
Embed Size (px)
Citation preview
8/19/2019 C TPLM30 67 Sample Questions
http://slidepdf.com/reader/full/c-tplm30-67-sample-questions 1/5
SAP EDUCATION
SAMPLE QUESTIONS: C_TPLM30_67
SAP Certified Application Associate - SAP Maintenance and Repair with SAP ERP 6.0 EHP7
Disclaimer: These sample questions are for self-evaluation purposes only and do not appear on the actual certification exams. Answering the sample questions correctly is no guarantee that you will pass the certification exam. The certification examcovers a much broader spectrum of topics, so do make sure you have familiarized yourself with all topics listed in the examcompetency areas before taking the certification exam.
Questions
1. What is the definition of a DataSource?
Please choose the correct answer.
a) O All available data of a business transaction type
b) O An extraction structure for data transfer to SAP
BusinessWarehouse
c) O A superordinate term for characteristics, key figures, and units
d) O A superordinate term for BI objects that can be analyzed using
BEx queries
2. To which maintenance object types can you link a priority type?
Note: There are 2 correct answers to this question.
a) O The combination of the order category and order type
b) O The order type only
c) O The notification type only
d) O The combination of the notification category and notification
type
3. In order costing, what is the allocation structure used for?
Please choose the correct answer.
x
x
x
y
y
y
8/19/2019 C TPLM30 67 Sample Questions
http://slidepdf.com/reader/full/c-tplm30-67-sample-questions 2/5
a) O To provide a hierarchy structure for posting costs to the general
ledger
b) O To provide a structure to summarize postings across cost
elements
c) O To determine the cost element for debit to the order and creditfrom the order
d) O To determine the overhead costs that need to be applied to each
cost element
4. What do maintenance planner groups represent?
Please choose the correct answer.
a) O A group of persons who plan maintenance capacities
b) O A group of persons responsible for maintenance plans
c) O A group of persons who plan maintenance task lists
d) O A group of persons who plan maintenance activities for technical
assets
5. For which purpose do you use the sequence number in a cycle set?Please choose the correct answer.
a) O To sequence the operations in the task list assigned to a
maintenance item
b) O To determine which strategy applies to each cycle
c) O To assign a cycle set to the task list of a maintenance item
d) O To assign the cycle set to a maintenance item
6. You want to set up an external refurbishment process through subcontracting, using material
requirements planning (MRP)?
Which of the following must you set in the system?
Please choose the correct answer.
x
x
x
y
y
y
8/19/2019 C TPLM30 67 Sample Questions
http://slidepdf.com/reader/full/c-tplm30-67-sample-questions 3/5
a) O The Special Procurement indicator in the material master record
b) O The Subcontracting flag for the refurbishment order type
c) O The Material Provision indicator for special stock in the
refurbishment order header
d) O The Subcontracting flag in the refurbishment order header
7. You want to record changes to equipment master data fields in the usage history.
For which of the following objects can you activate the usage history?
Please choose the correct answer.
a) O Equipment class
b) O Equipment category
c) O Object type
d) O Planning plant
8. You are using a maintenance plan for test equipment calibrations.
When is an inspection lot created?
Please choose the correct answer.
a) O After entering measuring point data that is out of tolerance
b) O When a follow-up action is triggered from a malfunction report
c) O Before the calibration order is created
d) O When the calibration order is created
9. How is a new functional location initially assigned to its place in the hierarchy?
Please choose the correct answer.
x
x
x
y
y
y
8/19/2019 C TPLM30 67 Sample Questions
http://slidepdf.com/reader/full/c-tplm30-67-sample-questions 4/5
a) O Automatically based on the structure indicator
b) O Manually using the List Editing transaction
c) O Automatically based on the Bill of Material (BOM)
d) O Manually using the Install transaction
10. All maintenance plans in your systems are scheduled automatically via deadline monitoring.
What happens when you set a manual call?
Please choose the correct answer.
a) O The original scheduled dates of the maintenance plan remain.
b) O All scheduled calls on hold are skipped.
c) O All scheduled calls on hold are deleted.
d) O The waiting call dates are re-scheduled on the basis of the
manual call.
Solutions
1 a) Incorrect 2 a) Incorrect 3 a) Incorrect 4 a) Incorrect 5 a) Incorrect
1 b) Correct 2 b) Correct 3 b) Incorrect 4 b) Incorrect 5 b) Incorrect
1 c) Incorrect 2 c) Incorrect 3 c) Correct 4 c) Incorrect 5 c) Incorrect
1 d) Incorrect 2 d) Correct 3 d) Incorrect 4 d) Correct 5 d) Correct
6 a) Correct 7 a) Incorrect 8 a) Incorrect 9 a) Correct 10 a) Correct
6 b) Incorrect 7 b) Correct 8 b) Incorrect 9 b) Incorrect 10 b) Incorrect
6 c) Incorrect 7 c) Incorrect 8 c) Incorrect 9 c) Incorrect 10 c) Incorrect
x
x
y
y
8/19/2019 C TPLM30 67 Sample Questions
http://slidepdf.com/reader/full/c-tplm30-67-sample-questions 5/5
6 d) Incorrect 7 d) Incorrect 8 d) Correct 9 d) Incorrect 10 d) Incorrect
Want to learn more? Contact SAP for more information.