17

C O N T E N T S · PDF fileC O N T E N T S 1. ... 3 THAI UAC PP(Gas Separation) ... 13 HYUNDAI OIL BANK BTX FEED Verification Project 2011.06~2011.12 E

Embed Size (px)

Citation preview

Page 1: C O N T E N T S · PDF fileC O N T E N T S 1. ... 3 THAI UAC PP(Gas Separation) ... 13 HYUNDAI OIL BANK BTX FEED Verification Project 2011.06~2011.12 E
Page 2: C O N T E N T S · PDF fileC O N T E N T S 1. ... 3 THAI UAC PP(Gas Separation) ... 13 HYUNDAI OIL BANK BTX FEED Verification Project 2011.06~2011.12 E

1

C O N T E N T S

1. Company Profile 02

2. Business Area 04

3. Core Competence 05

4. Major Clients 08

5. Project Experience 09

Page 3: C O N T E N T S · PDF fileC O N T E N T S 1. ... 3 THAI UAC PP(Gas Separation) ... 13 HYUNDAI OIL BANK BTX FEED Verification Project 2011.06~2011.12 E

Engineering

P.M.

Construction

BIO

Staff

HQ Office / Cheongwon

Bio Center / Osong

EPC Center / Seoul

SCT-Thai / Tailand

■ SCT E&C Co., Ltd.

Established on Feb. 17, 2003

Annual Turnover USD 30 Million ☞ USD 45 Million (’13 E)

Employee 150 (Permanent)

70

30

20

15 15

1. Company Profile

2

Page 4: C O N T E N T S · PDF fileC O N T E N T S 1. ... 3 THAI UAC PP(Gas Separation) ... 13 HYUNDAI OIL BANK BTX FEED Verification Project 2011.06~2011.12 E

2003

• SCT E&C Established • ISO 9001 Certified

2004

• Certified as a Venture Company

2005

• R&D Center Opened

2006 • Certified as an INNO-BIZ •Grand Prize Awarded for Excellent Venture Company

2008 •Grand Prize Awarded for Excellent Company in Chungbuk Province

2009 • Certified as an Excellent Company for Human Resource

2011 •Award Petrochemical Plant as an EPC basis in Thailand

2012

• Selected as a Best Company to Work

2013

•USD 45 Million in Sales • Contract 5 Overseas Projects mart reative rusted

History

3

2010

•USD 42 Million in Sales

SCT has grown steadily for 11 years since established in 2003 and successfully set up the

basis for long-term growth through getting contracts from overseas market.

Page 5: C O N T E N T S · PDF fileC O N T E N T S 1. ... 3 THAI UAC PP(Gas Separation) ... 13 HYUNDAI OIL BANK BTX FEED Verification Project 2011.06~2011.12 E

Syste

m Fa

cility

Industrial Plant Oil & Gas Plant

4

2. Business Area

Wate

r Rela

ted

Facto

ry/B

uild

ing

(Chemical/Painting/Scrubber /Clean Room/Other Facilities)

(Industrial Water/Pure Water/RO /Waste Water Treatment)

(Including all facilities)

Power / Energy

Refinery / Petrochemical

Gas

Utilities

Mechanical/Piping

Water Treatment/Supply

Renewable Energy

Page 6: C O N T E N T S · PDF fileC O N T E N T S 1. ... 3 THAI UAC PP(Gas Separation) ... 13 HYUNDAI OIL BANK BTX FEED Verification Project 2011.06~2011.12 E

1. Total Service Provider

SCT, as a Total Service Provider, provides comprehensive range of services to cover any

client’s requirements from Business Planning to E.P.C. and Commissioning.

•Industrial Plant

•Civil / Architecture

•Oil & Gas Plant

•Power / Energy

Feasibility

Study

BASIC &

FEED

Detail

Engineering

Procurement

Construction

Commissioning

Start-Up

TO

TA

L S

ERVIC

E P

RO

VID

ER

Who will provide one stop total

Service ?

5

3. Core Competence

Page 7: C O N T E N T S · PDF fileC O N T E N T S 1. ... 3 THAI UAC PP(Gas Separation) ... 13 HYUNDAI OIL BANK BTX FEED Verification Project 2011.06~2011.12 E

Engineering Tools Engineering Specialist (Over 20 year Experience)

2. Engineering Capability

SCT provides professional engineering service through using various engineering software

and utilizing many of engineering specialist.

10

7

5

5

• PRO-II, ASPEN Plus - Simulator

• PDMS/ PDS – 3D Modeling Tool

• HTRI – Heat Exchanger Thermal Rating

• AFES – Foundation Design

• TRI 650 – Tank Design

• COMPRESS – Pressure Vessel

Who will provide qualified Engineering

Service

6

Civil Architecture

Mechanical Piping

Process Fire Fighting

Electrical Instrument

Page 8: C O N T E N T S · PDF fileC O N T E N T S 1. ... 3 THAI UAC PP(Gas Separation) ... 13 HYUNDAI OIL BANK BTX FEED Verification Project 2011.06~2011.12 E

3. Effective Project Management

Based on the Project Management System, SCT always concentrates on Quality, Cost and

Schedule from the point of Client.

QA / HSE

<Quality Assurance>

ISO 9001 KEPIC for Power

<Safety and Environment>

• Applying Process Safety Management Regulation

• HSE is always the first priority at site ; TRIR Goal is 0.05 !

• Provide Value Engineering service from proposal stage

• Suggest our own Process Improvement Idea to Client

• Executing Engineering work considering constructability

• Economic purchasing through worldwide vendor sources.

Cost Saving Progress Control

• PRIMAVELA

• EPC Total Progress Control

• Real time information sharing with Client using PMIS

Who will give project management service

efficiently ?

7

Page 10: C O N T E N T S · PDF fileC O N T E N T S 1. ... 3 THAI UAC PP(Gas Separation) ... 13 HYUNDAI OIL BANK BTX FEED Verification Project 2011.06~2011.12 E

E : Engineering / P : Procurement / C : Construction

No. NAME PERIOD REMARK

1 UGCC Water Treatment Project 2013.03~2014.05 E.P

2 UGCC WAO Project 2013.01~2014.05 E.P

3 THAI UAC PP(Gas Separation) Project 2012.07~2013.04 E.P.C.

4 QLC PX Revamp Project 2012.06~2013.11 E

5 HYUNDAI OIL BANK LNG Pipeline Project 2012.06 ~2012.09 C

6 LG TOYO B2B Pilot Plant Project 2012.05~2012.09 E.P.C.

7 HYUNDAI OIL BANK # 1 Alkylation Revamp Project 2012.08~2013.06 C

8 HYUNDAI OIL BANK Alkylation Revamping(Engineering) Project 2012.04~2013.06 E

9 LG CHEMICAL MS Letdown Facility Project 2012.03~2012.05 C

10 LG CHEMICAL Polishing Slurry Recycling Project 2012.03~2012.08 C

11 S-OIL Tail Gas Catalytic Incineration Project 2011.07~2012.01 E.P.C.

12 SAMSUNG ENGINEERING Eni Zubair DGS South Package Project 2011.07~2011.08 E

13 HYUNDAI OIL BANK BTX FEED Verification Project 2011.06~2011.12 E

14 THAI HMC PP Project 2011.04~2012.06 E.P. C.

15 LG CHEMICAL No.2 CA/EDC Project 2011.04~2012.12 E

16 GS CALTEX No.1 PX Revamp Project 2011.03~2011.12 E

17 QATAR Barzan Engineering Service Project 2010.09~2010.10 E

18 LG CHEMICAL PE Revamping Project 2010.09~2011.06 E.P.C.

19 LG CHEMICAL COLD BOX Project 2010.09-2010.11 E.P.C.

9

[ Oil & Gas Plant ① ]

5. Project Experience

Page 11: C O N T E N T S · PDF fileC O N T E N T S 1. ... 3 THAI UAC PP(Gas Separation) ... 13 HYUNDAI OIL BANK BTX FEED Verification Project 2011.06~2011.12 E

E : Engineering / P : Procurement / C : Construction

No. NAME PERIOD REMARK

20 YEOCHUN NCC BTX#1 Sulfolane Unit Revamping Project 2010.09-2010.12 E

21 HYUNDAI OIL BANK HDO/ HCP Equipment Project 2010.04~2010.06 C

22 LG CHEMICAL BUTENE-1 Project 2008.12~2009.06 E.P.C.

23 LG CHEMICAL CAA Revamping Project 2008.09~2009.05 C

24 CPC Dearomatic Plant Engineering Service Project 2008.05~2009.05 E

25 LOTTE CHEMICAL NCC/BRU/BDR Intertray Project 2007.12~2008.06 C

26 SAMSUNG TOTAL HPEO Column Revamping Project 2007.08~2008.03 E.P.C.

27 LOTTE CHEMICAL Wet Air Oxidation Project 2007.07~2008.04 E.P.C.

28 LG CHEMICAL OS-BOG Unit Project 2007.06 ~2008.04 E.P.C.

29 SEETEC DAESAN Port Pipeline Project 2006.10 ~2007.12 C

30 TAEYOUNG Tank Terminal Project 2006.09~2007.02 E

31 HONAM HEG D.I Water SYSTEM Project 2003.09~2004.04 E.P.C.

10

[ Oil & Gas Plant ② ]

Page 12: C O N T E N T S · PDF fileC O N T E N T S 1. ... 3 THAI UAC PP(Gas Separation) ... 13 HYUNDAI OIL BANK BTX FEED Verification Project 2011.06~2011.12 E

THAI Gas Separation Plant ▶ 3 HYUNDAI OIL BANK Alkylation Plant ▶ 7

SAMSUNG TOTAL HPEO Plant ▶ 26 SEETEC DAESAN Port Pipe Line ▶ 29

LOTTE CHEMICAL NCC Plant ▶ 25

LOTTE CHEMICAL WAO Unit ▶ 27

11

[ Oil & Gas Plant ③ ]

Page 13: C O N T E N T S · PDF fileC O N T E N T S 1. ... 3 THAI UAC PP(Gas Separation) ... 13 HYUNDAI OIL BANK BTX FEED Verification Project 2011.06~2011.12 E

E : Engineering / P : Procurement / C : Construction

No. NAME PERIOD REMARK

1 KORAIL JAECHUN Dust Collecting Facility Project 2013.07~2013.08 C

2 CHEONGJU Printing Exhibit Hall Firefighting Facility Project 2013.05~2013.12 C

4 EGIS Rust Preventing Oil Factory Project 2012.12~2013.04 E.P.C.

5 DUPONT Scagliola Facility Project 2012.10~2013.01 E.P.C.

6 HYUNDAI OIL TERMINAL Oil Storage Facility Project 2012.04~2012.10 E

8 SANNOPKO Korea Rust Preventing Oil Facility Project 2011.07~2011.11 E.P.C.

9 KCC Resin Plant Pipeline Project 2011.07~2012.04 C

10 LG DISPLAY Clean Room Project 2011.04~2011.12 E.P.C.

11 LG DISPLAY P9 Plant Basic Engineering Project 2010.12~2011.04 E

12 LG INOTEK UDI SYSTEM Project 2010.05~2010.08 E.P.C.

13 LG INOTEK Utility and Hook-Up Project 2010.05~2010.12 E.P.C.

14 NOF METAL COATING KOREA PLANT Moving Project 2010.03~2010.07 E.P.C.

15 DUPONT New facility installation work for 3G CSP delivery system Project 2009.08~2009.12 E.P.C.

16 LG INOTEK LED Plant Process Engineering Project 2009.08~2010.06 E

17 KCC Piping, Mechanical, Electric Project 2009.01~2010.05 E.P.C.

18 LG MICRON Ultra Pure Water Project 2007.12~2008.03 E.P.C.

19 LG MICRON Chemical Supply System Project 2006.01~2006.05 E.P.C.

[ Industrial Plant/Architectural ① ]

12

Page 14: C O N T E N T S · PDF fileC O N T E N T S 1. ... 3 THAI UAC PP(Gas Separation) ... 13 HYUNDAI OIL BANK BTX FEED Verification Project 2011.06~2011.12 E

No. NAME PERIOD REMARK

20 LG MICRON Water Purifying Project 2005.12~2006.03 E.P.C.

21 LG MICRON PM F4 Ultra Pure Water Project 2005.05~2005.12 E.P.C.

22 LG CHEMICAL Electrolyte Mixing System Project 2004.09~2005.02 E.P.C.

23 LG MICRON PDP LINE Chemical Mixing & Supply System Project

2003.04~2003.08

2004.01~2004.04

2005.01~2005.09

E.P.C.

[ Industrial Plant/Architectural ② ]

13

E : Engineering / P : Procurement / C : Construction

Page 15: C O N T E N T S · PDF fileC O N T E N T S 1. ... 3 THAI UAC PP(Gas Separation) ... 13 HYUNDAI OIL BANK BTX FEED Verification Project 2011.06~2011.12 E

EGIS Rust Preventing Oil Plant ▶ 4

LG CHEMICAL ELECTROLYTE Mixing System ▶ 22

DUPONT Scagliola Facility ▶ 5 LG DISPLAY P9 Facility ▶ 10

LG MICRON Ultra Pure Water System ▶ 20 SANNOPKO Rust Preventing Plant ▶ 8

14

[ Industrial Plant/Architectural ③ ]

Page 16: C O N T E N T S · PDF fileC O N T E N T S 1. ... 3 THAI UAC PP(Gas Separation) ... 13 HYUNDAI OIL BANK BTX FEED Verification Project 2011.06~2011.12 E

E : Engineering / P : Procurement / C : Construction

No. NAME PERIOD REMARK

1 SEJONG CITY Solar Power Project 2013.04~2013.07 C

2 KHNP ULJIN Rubber Expansion Joint Neck Project 2011.09~2012.05 C

3 KHNP YEONGKWANG Piping Project 2012.12~2012.03 C

4 KHNP GORI Contaminated Water Pipeline Replacement Project 2011.04~2012.09 C

5 KHNP YOUNGKWANG Mechanical Maintenance Project 2011.09~2012.08 C

6 KHNP YOUNGKWANG Heat Exchanger Pipeline Replacement Project 2011.08~2011.10 C

7 KHNP GORI Pipeline Replacement Project 2011.01~2011.02 C

8 CAPRO BCHE Removal System Installation Project 2010.06~2011.01 E.P.C

9 WOONG JIN POLY SILICON TCS FBR Project 2010.12~2011.12 E.P.C.

10 OCI P1.5 & P2 Piping Project 2008.11~2009.02 C

11 OCI KP-2 Mechanical and Piping Project 2007.06~2007.09 C

12 OCI RW-SYSTEM Installation Project 2007.04~2007.06 C

[POWER/ENERGY]

KHNP YOUNGKWANG Heat Exchanger

Pipeline Replacement Project

KHNP ULJIN Rubber Expansion Joint Neck Project

KHNP GORI Contaminated Water

Pipeline Replacement Project

15

▶ 2 ▶ 6 ▶ 4

Page 17: C O N T E N T S · PDF fileC O N T E N T S 1. ... 3 THAI UAC PP(Gas Separation) ... 13 HYUNDAI OIL BANK BTX FEED Verification Project 2011.06~2011.12 E

SCT E&C Seoul (EPC Center)

5th Floor, A-dong, BYC Highcity Bl. Gasan Digital 1-ro,

Geumcheon-gu, Seoul, Korea.

Tel. +82-2-860-9600 Fax. +82-2-6947-7800

SCT E&C Head Office/Factory

615 Checksan-ri, Nami-myeon, Cheongwon-gun,

Chungcheonbuk-do, Korea

Tel. +82-43-269-2900. Fax. +82-43-269-2950

Bio Center

637 Yeonje-ri, Gangoe-myeon, Cheongwon-gun,

Chungcheongbuk-do, Korea

Tel. +82-43-234-2314. Fax.+82-43-269-2950

WHY SCT ?

• SCT, as a Total Service Provider, provides comprehensive range of services to cover any client’s

requirements from Business Planning to E.P.C. and Commissioning.

• SCT provides professional engineering service through using various engineering software and

utilizing many of engineering specialist.

• Based on the Project Management System, SCT always concentrates on Quality, Cost and Schedule

from the point of Client.

www.scteng.co.kr

16