By Mrs. Suthimol Kessomboon Deputy Director General of Department of Drainage and Sewerage
Bangkok Metropolitan Administration
• Bangkok : Area 1,568.74 km2 (Inner 266.77, Middle 426.20, Outer 875.77)
• Population : Register Population 5.69 million (2015) • Surface Water: Canal 1,682 canals Length 2,604 km • Chao Praya River 372 km (Total Length) Bangkok 35 km • Source of Water Supply to Bangkok and vicinity:
Upstream of Chao Praya River at Sam Lae,Pathum Thani • Water Consumption (2015) : 2.54 mil.m3/day
NONTHABURI
PATHUMTHANI
SAMUT PRAKAN
SAMUT SONGKRAM
BANGKOK
THAILAND BANGKOK MAP
2
• 300 Sampling Points in 165 major canals and 9 Sampling Points in Chao Praya River
• The BOD and DO of 300 sampling points are highly polluted about 70%
• Major Sources of Wastewater 1. Domestic 75%
2. Industry 20% 3. Agriculture 5%
Water Quality Monitoring Program in Bangkok
75%
20%
5%
300 Sampling Points
Domestic Agriculture Industrial
BOD (2016)
0-4 mg/l (5 points)
>4-10 mg/l (69 points)
10-15 mg/l (93 points)
15-55 mg/l (133points)
DO (2016)
>3 mg/l (70 points)
2-<3 mg/l (50 points)
1-<2 mg/l (59 points)
<1 mg/l (121 points)
3
4
1. Central Wastewater treatment System
2. Community Wastewater treatment System
3. Cluster Wastewater treatment System
4. Onsite Wastewater treatment System
Bangna WWTP
Bangsue WWTP Anaerobic Filter
BMA
Base on the regulation “the Building Control Act, B.E. 2522 (1979)”
Septic Tank
Wastewater Treatment System
15 WWTPs in Future Plan Bangsue EECC 1. Year of operation : August 2014 2. Service Area: 20.7km2
3. Population 223,990 4. Capacity120,000m3/d
4 WWTPs Implementation 8 WWTPs under O&M
• Capacity 0.665 mil m3/d (Total Capacity 1.777 mil m3/d) • 71% of WW generation • Construction Cost 34,170 mil B • O&M Cost 485 mil. Baht/year (~13.65 mil. USD)
• Capacity 1.631 mil m3/d (Total Capacity 3.408 mil m3/d) • 96% of WW generation • Construction Cost 71,033 mil B • O&M Cost 1,190 mil. Baht/year (~33.48 mil. USD)
Wastewater 2.54 mil m3/d
Wastewater 2.54 mil m3/d
Future Wastewater 3.55 mil m3/d
Year 2015
Year 2022
Year 2040
• Capacity 1.112 mil m3/d • 45% of WW generation • Construction Cost 26,578 mil B • O&M Cost 612 mil. Baht/year (~17.22 mil. USD)
Remark : Exchange rate 35.542 Bath = 1 USD (November 2016) 5
Existing Project and Future Plan
• In 2016, ~6% of treated water is reused for
several purposes such as planting, cleaning the
road and market
6 Cleaning the road
Planting
Cleaning the road
Planting
Treated Wastewater Reuse
• Digested Sludge from WWTPs used as raw material for composting and then mainly provide to BMA public park
• In 2016, about 11,679 m3 of sludge compost has been used
Sirikit Park
Thonburirom Park
0 5,000 10,000 15,000
2549
2550
2551
2552
2553
2554
2555
2556
2557
2558
2559
979
5,320
9,673
5,193
7,625
10,713
10,439
15,340
9,181
16,421
13,750
281
3,689
9,431
5,201
7,609
8,473
10,507
12,946
10,304
13,153
11,679
ปุ๋ ยหมกัที่แจกจา่ย
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
Used
Produced
Sludge for Land Application
7
“Service-Pay-Principle”
2
3 4
5
6
7 8
1
Nong Khaem Bang Khae
Phasi Charoen
Tung Kru
Rat Burana Chom Thong
Pom Prap Sattru Phai Phra Nakhon
Samphanthawong
Chatuchak
Bangsue
Huai Khwang
Dindaeng Phaya Thai Dusit
Ratchathewi
Pathum Wan
Yannawa
Bang Kho Laem
Sathon
Bang Rak
5. Tung Kru WWTP
6. Din Daeng WWTP
7. Chatu Chak WWTP
8. Bangsue EECC
“Polluter-Pay-Principle”
• Principle of Wastewater Tariff in Bangkok
No. of District 21
Area Coverage (m2) 212.74
8
1. Si Phraya WWTP
2. Rattanakosin WWTP
3. Chong Non Si WWTP
4. Nong Khaem WWTP
Wastewater Tariff
1. Household > 10 𝐦𝟑/month
Fix cost = 30 Baht/month
2. Government Sector, Real Estate, Office, Religion Place, Foundation, Education Organization, Hospital and Clinic
• <500 𝐦𝟑/month = 500 Baht/month • 500 – 1,000 = 1,000 Baht/month • > 1,000 = 1,500 Baht/month
3. Hotel, Industry, Shopping Mall, and Department Store
80% × Water Supply ×4 Baht/𝐦𝟑
9
Propose from Special Committee of
Bangkok Metropolitan Council
-
100
200
300
400
500
600
700
10.64 12.72 12.70 13.45 15.59 16.92 14.53 15.82 18.96 18.80 21.53 18.00 19.70 19.58 19.06 29.99 17.65 20.21 20.68 20.71 21.73 20.53 20.40 21.50 21.00 20.09 21.18 22.77 25.31 21.67
56.03 52.14 62.73
109.80 100.32 102.54 101.38 102.65 59.80 52.74 65.53 66.35 60.54
91.05 104.06
76.66
82.39 95.34 102.71 103.97 105.34
63.80 57.24 61.15 63.62 88.00
86.44 85.44 27.97
24.29 24.26 37.03 48.15 51.07
32.21 30.90
32.39 33.56
47.29
47.72 47.48
252.36 211.67 211.73 226.43
224.06
195.56 160.99 159.28
164.40
171.54 175.81
36.34 62.24 77.11
65.49
63.60
69.17 105.64 111.84
110.33
90.40 87.73
27.31
71.06
Mil
lio
n b
ah
t
สี่พระยา รตันโกสินทร ์ ชอ่งนนทรี หนองแขม ทุง่ครุ ดินแดง จตุจกัร บางซ่ือ Dindaeng
The Construction cost to the 8 WWTPs = 26,578 M.b. The Construction cost of WWTPs (2009 – 2015) = 6,449.58 M.b. 10
96.66 82.51
200.28
250.61
544.93 554.85 577.40 587.20
483.92 445.41
467.32 473.82 513.03
559.35
612.31
Sripraya Rattanakosin Chongnonsi Nongkhaem Tungkru Jatujak BangSue
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Operation Cost of BMA Wastewater Treatment Plants
• Education Program
• Selected community especially nearby canal for participation in with strong point of strong leader with their strike rule for water quality control
• Planning • Sharing
• Project • Phase I (2015) 9 communities + 4 canals • Phase II (2016-7) 150 communities+1 canal • Phase III (2018) in planning/ budgeting
11
Community Participation
•Meeting & Discuss & Implementation
• Classify 150 Communities
in 8 districts
• Give Knowledge
• Improving water quality in the Canals by people in their communities
12
Community Participation
1. Most area of Bangkok should be serviced by Wastewater Treatment Facility according to the Master Plan
2. In some certain area, onsite and community wastewater treatment systems should be the alternatives choices
3. By-product from wastewater treatment process such as effluent, sludge and the reuse should be improved in quality and their reuse should be promoted as much as possible
4. Collecting the wastewater tariff is the BMA future plan and should be pushed to practices
13
Challenges
14
Thank You