©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Lou Lombardi
Buyer Side Mitigation: Overview
Senior Engineer, ICAP Market Mitigation & Analysis
Buyer Side Mitigation Information SessionJuly 26, 2019
DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED. 2
Capacity Mitigation Measures
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Mitigation Measures NYISO Market Power Mitigation Measures:
• Are intended to provide the means for the ISO to mitigate the market effects of conduct that would substantially distort competitive outcomes in the ISO Administered Markets, while avoiding unnecessary interference with competitive price signals
Capacity Market Mitigation Measures include:• Supplier-Side Mitigation• Buyer-Side Mitigation
Installed Capacity Market Mitigation Measures are further detailed in Services Tariff (MST) Att. H, Section 23.4.5
3
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Mitigated Measures Applied Capacity market mitigation measures are applied in
Mitigated Capacity Zones (MCZ) Mitigated Capacity Zones are:
• NYC• G-J Locality
4
DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED.DRAFT – FOR DISCUSSION PURPOSES ONLY
5
Buyer Side Mitigation Measures
The purpose of Buyer Side Mitigation is to prevent uneconomic entry from artificially suppressing capacity prices.
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Buyer-Side Mitigation Measures Resources subject to the BSM rule are:
• Proposed new MCZ generators in a MCZ, and UDR projects with a terminus in a MCZ, that request CRIS or a transfer of CRIS from a different location, or seek a transfer CRIS from the same location
• Existing generators or UDR projects that seek to increase CRIS (“Additional CRIS MW”) either through a Class Year or a transfer
Proposed new generators, UDR projects, and Additional CRIS MW are referred to as “Examined Facilities”• Examined Facilities are examined in a two-part test to determine whether
an Offer Floor is applicable• An examined facility may request a Competitive Entry Exemption,
Renewable Exemption or Self-Supply Exemption
6
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Buyer-Side Mitigation Measures Additional CRIS projects
• Facilities grandfathered under the BSM rules (i.e., existing by March 2008) and facilities that were determined to be exempt from BSM “on their own economics” (“passing” the Part B test)
• Offer Floor exemption test based only on the revenues and costs associated with Additional CRIS MW
• Facilities subject to an Offer Floor, or that were determined to be exempt under the Part A test
• Offer Floor exemption test based on the whole facility, inclusive of the costs associated with increasing to the Additional CRIS
– Unit Net CONE will be the greater of the Net Cone of the Additional CRIS MW and the Total Evaluated MW (Additional CRIS + other non-exempt MW)
7
DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED. 8
Process OverviewBSM analysis is done concurrent with the Class Year in which the CRIS request is evaluated, or if a transfer of CRIS at the same location, in the specified study period
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Interconnection Process Overview
Interconnection Studies•Feasibility Study•Deliverability Study
Class Year•Part 1 Study for ERIS•Part 2 Study for CRIS•BSM Process
•On-going data requests and evaluation
Construction•Project awarded
appropriate ERIS and/or CRIS
9
© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED.DRAFT – FOR DISCUSSION PURPOSES ONLY
Questions?We are here to help. Let us know if we can add anything.
10
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Lou Lombardi
Buyer Side Mitigation: Rules and Application
Senior Engineer, ICAP Market Mitigation & Analysis
Buyer Side Mitigation Information SessionJuly 26, 2019
DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED. 12
Mitigation Exemption Tests
Each Examined Facility is evaluated under the Part A test and Part B test
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Mitigation Study Period Examined Facilities are evaluated during the
Mitigation Study Period (MSP)• This represents the Capability Periods of
expected entry• The Starting Capability Period is the Summer
Capability Period commencing three years from the start of the year of the Class Year
13
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Unit Net CONE The NYISO identifies an Examined Facility’s Unit Net CONE (Cost of New Entry) CONE includes the following costs, from which certain revenues are netted
• Embedded costs• Capital costs• Construction costs • Interconnection costs
• Estimated Annual Energy and Ancillary Services revenues• Certain revenues associated with other energy products (e.g., energy
services, RECs) This value is compared to the ICAP Forecast to determine if an Examined Facility
passes either the Part A or Part B test
14
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Mitigation Exemption Tests
15
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Example Given two Examined Facilities:
• Unit X• 100 MW• Unit Net CONE = $170/kW-yr
• Unit Y• 200 MW• Unit Net CONE = $140/kW-yr
16
Part A Test Part B Test
ExaminedFacility
Size (MW)
75% Mitigation Net CONE ($/kW-yr)
1 Year ICAP Forecast ($/kW-yr)
Unit Net CONE($/kW-yr)
3 Year ICAP Forecast ($/kW-yr)
Unit X 100 200 175 170 120
Unit Y 200 200 165 140 150
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Example
17
“Fail” in these examples means not exempt;“Pass” means exempt
Part A
ExaminedFacility
Size (MW)
75% Mitigation Net CONE ($/kW-yr)
1 Year ICAP Forecast ($/kW-yr)
Unit X 100 200 175
Unit Y 200 200 165
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Example
18
Part B
ExaminedFacility
Size (MW)
Unit Net CONE($/kW-yr)
3 Year ICAP Forecast ($/kW-yr)
Unit X 100 170 120
Unit Y 200 140 150
“Fail” in these examples means not exempt;“Pass” means exempt
Uni t X
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Example Only Unit Y Passes
• Unit X• Part A: 75% Mitigation Net CONE > 1 Year ICAP Forecast = FAIL• Part B: Unit Net CONE > 3 Year ICAP Forecast = FAIL
• Unit Y• Part A: 75% Mitigation Net CONE > 1 Year ICAP Forecast = FAIL• Part B: Unit Net CONE < 3 Year ICAP Forecast = PASS
19
Part A Test Part B Test
ExaminedFacility
Size (MW)
75% Mitigation Net CONE ($/kW-yr)
1 Year ICAP Forecast ($/kW-yr)
Unit Net CONE($/kW-yr)
3 Year ICAP Forecast ($/kW-yr)
Unit X 100 200 175 170 120
Unit Y 200 200 165 140 150
DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED. 20
Non-Exempt Examined Facility
An Examined Facility that does not receive an exemption will be subject to an offer floor.
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Application of Offer Floors If the Examined Facility does not receive an exemption, it may
only offer into the Spot Market Auction• Offer Floors are established for projects at the time the
Class Year is completed• The Offer Floor will apply except for the MW amount that
has cleared for any twelve, not necessarily consecutive months
Application of Offer Floors detailed in the Services Tariff (MST) Att. H, Sec 23.4.5.7
21
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Determination of Offer Floors Seasonal offer floors are shaped from the lower of the Annual Unit
Net CONE or the Default net CONE of the first year of the MSP• Summer Offer Floor • Winter Offer Floor
If an Examined Facility first offers capacity during a Capability Year other than the first year of the MSP, the Offer Floor is adjusted using the Inflation Rate• The inflation rate is defined in the MST as the most recently
accepted ICAP Demand Curve or its Annual Update
22
© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED.DRAFT – FOR DISCUSSION PURPOSES ONLY
Questions?We are here to help. Let us know if we can add anything.
23
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Lou Lombardi
Buyer Side Mitigation: Data Requirements
Senior Engineer, ICAP Market Mitigation & Analysis
Buyer Side Mitigation Information SessionJuly 26, 2019
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Data Requirements Developers are expected to submit, a completed template through the ICAP
Reference System• Template includes:
• General unit information• Capital costs• Fixed and variable O&M costs• Financing parameters• Plant performance curves
Template must be completed even if the developer requests a Competitive Entry, Renewable, or Self Supply Exemption
An example BSM input template and template instructions are on the NYISO’s website under the Data Submission subfolder of the ICAP Market Mitigation folder
25
DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED.DRAFT – FOR DISCUSSION PURPOSES ONLY
26
Additional Resources
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Resources ICAP Reference System User’s Guide
• https://www.nyiso.com/documents/20142/2922803/ICAP_RS_UG.pdf/d57402d5-4a1d-d737-21b2-2678e8700f6a
BSM Template (example)• https://www.nyiso.com/documents/20142/3026303/BSM%20Input%20Template.xls/2b1ec47f-ce46-e812-367b-
7b439ac20be0
BSM Template Instructions• https://www.nyiso.com/documents/20142/3026303/BSM%20Input%20Template%20Instructions.pdf/0628036a-afd6-
fc43-c4e2-0a9bfd1e8857
Narrative and Numerical Example• https://www.nyiso.com/documents/20142/3026079/BSM_Narrative%20and%20Numerical%20Example%20Updated%2
0December%201%202016.pdf/0be44f0f-a3ea-b1b3-5bf3-bc0a8839fcd2
Reports and Documentation from past Class Years• https://www.nyiso.com/market-monitoring → ICAP Market Mitigation → Buyer Side Mitigation
27
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Additional Assistance Issues related to accessing IRS, contact NYISO
Stakeholder Services• [email protected]
Data submission related issues, contact NYISO ICAP Market Mitigation• [email protected]
28
© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED.DRAFT – FOR DISCUSSION PURPOSES ONLY
Questions?We are here to help. Let us know if we can add anything.
29
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Lou Lombardi
Buyer Side Mitigation: Exemptions
Senior Engineer, ICAP Market Mitigation & Analysis
Buyer Side Mitigation Information SessionJuly 26, 2019
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Buyer-Side Mitigation Measures Exemptions
• Mitigation Exemption Tests (Part A and Part B)• Applicable to:
– New generators and UDR projects– Additional CRIS projects
• Competitive Entry Exemption• Proposed Renewable Exemption• Proposed Self-Supply Exemption
If non-exempt, then Offer Floor applies • May only offer into the Spot Market Auction• Applied until UCAP clears in any 12 months
31
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Buyer-Side Mitigation Exemptions Competitive Entry Exemption
• The main criteria to receive this exemption are if it a) does not have any “non-qualifying contractual relationship” as defined in MST Att. H Section 23.4.5.7.9.1.2, with a Non-Qualifying Entry Sponsor and b) is not itself a Non-Qualifying Entry Sponsor
• “because a purely merchant generator places its own capital at risk, … any such resource will have strong incentive to bid its true costs into the auction.”
A unit that requests a Competitive Entry Exemption, but is determined to not qualify for such exemption can still be exempt if it “passes” either the Part A or Part B Tests
32
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Buyer-Side Mitigation Exemptions Proposed Renewable Exemption
• FERC directed the NYISO to create this exemption, and the following NYISO-proposed tariff revisions are pending before it:
• A proposed new unit can apply for a Renewable Exemption if it is an Intermittent Power Resource, or a Limited Control Run-of-River Hydro Resource
– Intermittent Power Resources are solely fueled by wind, solar, or landfill gas • Renewable Exemptions are limited to 1,000 MW of ICAP in any Class Year
– Note that this cap is in terms of ICAP, not UCAP
A unit that requests a Renewable Exemption, but is determined to not qualify for such exemption can still be exempt if it “passes” either the Part A or Part B Tests
33
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
FERC Pending Renewable Exemption The NYISO anticipates potential wind and solar entrants in the soon-to-commence Class Year
2019. The NYISO filed a request on [July 15th] that the Commission issue an order accepting the
pending compliance Filing as soon as possible. • If the Commission does not act prior to the start of Class Year 2019, the NYISO will move
forward and administer the exemption as proposed in the April 2016 Filing. • If FERC acts prior to one month before the completion of Class Year 2019 and modifies
elements of the filed exemption, the NYISO anticipates being able to apply these modifications to Class Year 2019.
• If FERC does not act prior to one month prior to the end of the Class Year, the NYISO will plan to issue determinations based on the exemption proposed in the April 2016 Filing.
• The NYISO included in its July filing a request for conditional waiver that will request that these determinations be final, even in the event that the Commission subsequently modifies elements of the filed exemption.
34
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Request for a CEE or Renewable Exemption Requests for a Renewable Exemption or Competitive
Entry Exemption must be received by the ISO no later than the deadline to notify the ISO of a Projects election to enter the Class Year, as set forth in 25.5.9 of the OATT• If any Examined Facility submits a Competitive Entry
Exemption the ISO shall not consider any request for a Renewable Exemption
35
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Buyer-Side Mitigation Exemptions Proposed Self-Supply Exemption
• FERC directed the NYISO to create this exemption, and the following NYISO-proposed tariff revisions are pending before it:
• An LSE with a “self-supply business model” can apply for a Self-Supply Exemption
– Generally, an LSE that supplies more than 50% of its own capacity obligations
• Net Long and Net Short Thresholds are calculated to ensure self-supply LSE does not have incentive and ability to artificially suppress ICAP market prices by developing a unit
36
© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED.DRAFT – FOR DISCUSSION PURPOSES ONLY
Questions?We are here to help. Let us know if we can add anything.
37
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Lorenzo Seirup
Buyer Side Mitigation: Examples
Supervisor, ICAP Market Mitigation & Analysis
Buyer Side Mitigation Information SessionJuly 26, 2019
DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED. 39
Preliminaries
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Revenues associated with other energy products Considered on a case by case basis
• Must be substantiated by appropriate documentation
These may include, but are not limited to:• Sale of byproduct (e.g., heat, condensed water)• Sale of environmental attributes (e.g. RECs)• Services to another entity
40
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Contracts Contracts for the sale of NYISO market products are not reflected in BSM
determinations. The NYISO estimates market-based Net E&AS revenues and forecasts ICAP prices as part of its BSM evaluation process.
Notwithstanding the above, cost advantages (e.g. advantageous financing arrangements) resulting from such a contract, and contracts for other energy byproducts may be included may be included if the contract was received under all the of following conditions:• Nondiscriminatory (resource type agnostic, existing and new resources)• Arm’s length (fair market value)• Competitive manner (open)
41
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Unit Net CONE (Review) The NYISO identifies an Examined Facility’s Unit Net CONE (Cost of New Entry) CONE includes the following costs, from which certain revenues are netted
• Embedded costs• Capital costs• Construction costs • Interconnection costs
• Estimated Annual Energy and Ancillary Services revenues• Certain revenues associated with other energy products (e.g., energy
services, RECs) This value is compared to the ICAP Forecast to determine if an Examined Facility
passes either the Part A or Part B test
42
DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED. 43
Examples
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Example 1 NYISO may consider additional value of attributes not
compensated through the NYISO Administered Markets • NYISO may reflect value provided in a contract or
substitute an estimated fair market value if appropriate
• The implementation of proposed dual participation rules may alter how the NYISO estimates the value of additional services
44
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Examined Facility 1-A The project produces a sellable byproduct through
its energy production (e.g., steam) The project is able to sell this byproduct to a market NYISO may include a fair market estimate of the
value of the byproduct
45
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Examined Facility 1-AAs Submitted Data NYISO BSM
Project Cost $1,000 /kW $1,000 /kWNYISO validated
Levelized Carrying Charge 14% 14%NYISO validated
Unit Gross CONE $140 /kW-yr $140 /kW-yr
Net E&AS $50 /kW-yrNYISO estimated value
Byproduct sales Some value $50 /kW-yrNYISO estimated value
Unit Net CONE $40 /kW-yr
46
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Examined Facility 1-B The project entered into a contract with a Utility to receive payment as a non-wires
alternative for T&D deferral• The contract was received through an RFP that was only open to bulk energy storage
projects• The contract reduced the project’s risk allowed it to receive favorable financing
NYISO would not use the contracted price for the attribute since the RFP process was not open to all resource types
• This does not meet the non-discriminatory criteria • NYISO would instead substitute a fair market value
NYISO would not use the favorable financing resulting from the contract, and would substitute its own estimate
47
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Examined Facility 1-BAs Submitted Data NYISO BSM
Project Cost $1,000 /kW $1,000 /kWNYISO validated
Levelized Carrying Charge 12% 15%NYISO substituted value
Unit Gross CONE $120 /kW-yr $150 /kW-yr
Net E&AS $50 /kW-yrNYISO estimated value
T&D Contract $30 /kW-yr $25 /kW-yrNYISO estimated value
Unit Net CONE $75 /kW-yr
48
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Examined Facility 1-C The project entered into a contract with a Utility to receive
payment as an NWA for T&D deferral• The contract was received through an RFP that was open
to any type of supply resource, both new and existing NYISO may use the contractual revenue since the RFP process
was non-discriminatory• If the project secured favorable financing as a result of
the contract, the NYISO may use that as well
49
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Examined Facility 1-CAs Submitted Data NYISO BSM
Project Cost $1,000 /kW $1,000 /kWNYISO validated
Levelized Carrying Charge 12% 12%NYISO validated
Unit Gross CONE $120 /kW-yr $120 /kW-yr
Net E&AS $50 /kW-yrNYISO estimated value
T&D Contract $30 /kW-yr $30 /kW-yrNYISO validated
Unit Net CONE $40 /kW-yr
50
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Example 2 NYISO would only consider possible revenue streams
that are sufficiently supported by documented evidence • Support may include executed agreements, evidence of
similar transactions, etc. • Evidence of on-going and productive contract
negotiations may be sufficient documentation, but it will be determined on a case-by-case basis
51
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Examined Facility 2-A The project claimed it has the potential to provide services to
another entity in addition to participating in the NYISO Administered Markets
The project also claimed to have advantageous financing parameters
The project has not provided any documentation to substantiate either claim
NYISO would not include any claimed value for unsupported benefits
52
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Examined Facility 2-AAs Submitted Data NYISO BSM
Project Cost $1,000 /kW $1,000 /kWNYISO validated
Levelized Carrying Charge 5% 15%NYISO proxy value
Unit Gross CONE $50 /kW-yr $150 /kW-yr
Net E&AS $50 /kW-yrNYISO estimated value
Additional Value $30 /kW-yr * --
Unit Net CONE $100 /kW-yr
53
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Examined Facility 2-B The project has provided documentation that supports its claim that it has
the capability to provide services to another entity in addition to participating in the NYISO Administered Markets• The NYISO has been able to validate the attribute• Contractual revenues meet the open & competitive standard as
outlined in Example 1 The project secured and provided evidence of advantageous financing
parameters NYISO may include the contracted value for substantiated benefits
achieved in a competitive manner
54
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Examined Facility 2-BAs Submitted Data NYISO BSM
Project Cost $1,000 /kW $1,000 /kWNYISO validated
Levelized Carrying Charge 10%NYISO validated
10%NYISO validated
Unit Gross CONE $100 /kW-yr $100 /kW-yr
Net E&AS $50 /kW-yrNYISO estimated value
Additional Value $30 /kW-yr $30 /kW-yrNYISO validated
Unit Net CONE $20 /kW-yr
55
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Example 3
Attributes not presently compensated in the NYISO Wholesale Market, but that have a discernable market value may be considered on a case-by-case basis
NYISO would not value multiple revenue streams for the same attribute
56
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Examined Facility 3-A The project has contracted with a third party to receive an incentive
payment, which is contingent upon the project providing installed capacity sales into the wholesale market
The fixed incentive payment is in addition to revenues the project may receive in compensation for wholesale energy, ancillary services, and installed capacity sales• The NYISO would not reflect incentive payments, nor contractual
payments received for services already compensated in the wholesale markets.
57
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Examined Facility 3-AAs Submitted Data NYISO BSM
Project Cost $1,000 /kW $1,000 /kW
Incentive Payment $200 /kW --
Levelized Carrying Charge 10% 15%NYISO proxy value
Unit Gross CONE $80 /kW-yr $150 /kW-yr
Net E&AS $55 /kW-yr $50 /kW-yrNYISO estimated value
Unit Net CONE $100 /kW-yr
58
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Examined Facility 3-B The project receives a one-time incentive payment and expects to
sell its energy products directly in the NYISO administered markets
The one-time incentive payment was awarded to any project that meets certain carbon emission standards• This was open to any resource type as well as existing or new
projects The project entered into a competitive contract with advantageous
financing based on lower perceived risk due to the fixed incentive
59
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Examined Facility 3-BAs Submitted Data NYISO BSM
Project Cost $1,000 /kW $1,000 /kWNYISO validated
Non-Emitting Resource Value $200 /kW $200 /kWNYISO validated
Levelized Carrying Charge 10% 10%NYISO validated
Unit Gross CONE $80 /kW-yr $80 /kW-yr
Net E&AS $50 /kW-yrNYISO estimated value
Unit Net CONE $30 /kW-yr
60
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Examined Facility 3-C
The project has secured an arms length, open and competitive contract to provide energy to an entity at a specified price instead of receiving market revenues• The contract also provides the project with beneficial financial
parameters due perceived decreased risk
NYISO would consider including the identified financing provided all requested data and relative support has been validated
61
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Examined Facility 3-CAs Submitted Data NYISO BSM
Project Cost $1,000 /kW $1,000 /kWNYISO validated
Levelized Carrying Charge 10% 10%NYISO validated
Unit Gross CONE $100 /kW-yr $100 /kW-yr
Net E&AS $60 /kW-yr $50 /kW-yrNYISO estimated value
Unit Net CONE $40 /kW-yr $50 /kW-yr
62
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Example 4 NYISO may reflect value a project receives from
Federal Programs such as:• Production Tax Credit • Investment Tax Credit
63
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Examined Facility 4
The project qualified and provided sufficient evidence of qualification for Federal Production Tax Credits
The NYISO would reflect the revenue received from the tax credits based on the project’s estimated energy production
64
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Examined Facility 4As Submitted Data NYISO BSM
Project Cost $1,000 /kW $1,000 /kWNYISO validated
Levelized Carrying Charge 13% 13%NYISO validated
Unit Gross CONE $130 /kW-yr $130 /kW-yr
Net E&AS $50 /kW-yrNYISO estimated value
PTC Some value $0.02/kWh or $20 /kW-yrNYISO estimated value
Unit Net CONE $60 /kW-yr
65
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Key Takeaways The value of attributes and revenues from other energy products
(not compensated for in the NYISO wholesale markets) will be considered on a case by case basis and may be valued• Sufficient supporting documentation must be provided by the
developer
Cost advantages (e.g. advantageous financing) resulting from contracts may be considered if the contracts are procured through a nondiscriminatory, arms length, and competitive process
66
© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED.DRAFT – FOR DISCUSSION PURPOSES ONLY
Questions?We are here to help. Let us know if we can add anything.
67
DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED. 68
Appendix: ICAP Reference System
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
BSM Template Instructions Red fields in template must be completed Do not add or delete rows/columns Data should be rounded & truncated to two decimal places Include Documentation References on template input tab Verify entries against Template check list upon completion, before
submitting• If data incorrect or incomplete, IRS will generate error message• Must fix to re-submit• **Template should be completed according to Template
Instructions found on NYISO Website**
69
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Intro to ICAP Reference System Provides automation of ICAP market mitigation processes relating to…
• Going Forward Costs• Physical Withholding• Buyer-Side Mitigation• Reliability Must Run (Deactivation Notices)
Market Parties upload forms, submit data, and receive and send communications• Designed to enhance communications & facilitate mitigation
processes
70
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Requirement for ICAP Reference System A Valid NAESB or NYISO Digital Certificate is
required Market Party contacts NYISO Stakeholder Services
to obtain ICAP Reference System access
71
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Accessing ICAP Reference System Accessible from NYISO Website
• Login > Market Access > ICAP Reference System (IRS)> *User Login
• Support > Market Monitoring > ICAP Reference System Login
https://irs.nyiso.com/irs/
72
DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED. 73
Process Initiation
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Process Initiation: Set-up A proposed project identified as an Examined Facility is
subject to a buyer-side mitigation evaluation MMA creates a buyer side mitigation interaction in the
ICAP Reference System An interaction will have a status of open once it has
been created by NYISO and is awaiting initial data submittal from the market party
74
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Process Initiation: Notification ICAP Reference System will auto-generate email to
Market Party• Notifying Market Party that an interaction has been
opened and is available for data submittals to be uploaded through ICAP Reference System
• The email will also specify a deadline for the data submission
75
DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED. 76
Submitting Cost Data to ICAP Reference System
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Uploading Cost Data: Accessing Interaction Market Party logs into IRS• The default view on the home screen will be the full list
of interactions created for your organization. • There may be one interaction or many • Each interaction will have an ID number for tracking
purposes• Interactions will also be categorized by type
• Buyer-side mitigation will be denoted by “BSM”
77
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Uploading Cost Data: Submission Once a Market Party locates the interaction, hover over and
click the interaction row to select it Market Party downloads and completes the required BSM
template• Example Template & Template instructions available on
NYISO web site Market Party uploads the completed BSM template and any
supporting attachments to IRS
78
DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED. 79
Interaction StatusThere are three different status types; they are open, review, and closed.
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Review Status An interaction will have a status of review once the market
party’s data has been submitted to the NYISO• Market party will be unable to make changes to their
submittal data, unless NYISO unlocks the necessary fields upon market participant request
If a market party needs to re-submit cost data for significant changes, then the interaction would change from a status of review to open to begin the cycle over again
80
©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED
DRAFT – FOR DISCUSSION PURPOSES ONLY
Review Status and Closed Status During the review state, NYISO will be reviewing the
uploaded data and working to make its determination• Market party will be unable to make changes to
their submittal data in the review status Finally, an interaction will have a status of closed once
NYISO has made and issued its determination to the market party through the ICAP Reference System
81