© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED DRAFT – FOR DISCUSSION PURPOSES ONLY Lou Lombardi Buyer Side Mitigation: Overview Senior Engineer, ICAP Market Mitigation & Analysis Buyer Side Mitigation Information Session July 26, 2019

Buyer Side Mitigation: All slides

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Lou Lombardi

Buyer Side Mitigation: Overview

Senior Engineer, ICAP Market Mitigation & Analysis

Buyer Side Mitigation Information SessionJuly 26, 2019

Page 2: Buyer Side Mitigation: All slides

DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED. 2

Capacity Mitigation Measures

Page 3: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Mitigation Measures NYISO Market Power Mitigation Measures:

• Are intended to provide the means for the ISO to mitigate the market effects of conduct that would substantially distort competitive outcomes in the ISO Administered Markets, while avoiding unnecessary interference with competitive price signals

Capacity Market Mitigation Measures include:• Supplier-Side Mitigation• Buyer-Side Mitigation

Installed Capacity Market Mitigation Measures are further detailed in Services Tariff (MST) Att. H, Section 23.4.5

3

Page 4: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Mitigated Measures Applied Capacity market mitigation measures are applied in

Mitigated Capacity Zones (MCZ) Mitigated Capacity Zones are:

• NYC• G-J Locality

4

Page 5: Buyer Side Mitigation: All slides

DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED.DRAFT – FOR DISCUSSION PURPOSES ONLY

5

Buyer Side Mitigation Measures

The purpose of Buyer Side Mitigation is to prevent uneconomic entry from artificially suppressing capacity prices.

Page 6: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Buyer-Side Mitigation Measures Resources subject to the BSM rule are:

• Proposed new MCZ generators in a MCZ, and UDR projects with a terminus in a MCZ, that request CRIS or a transfer of CRIS from a different location, or seek a transfer CRIS from the same location

• Existing generators or UDR projects that seek to increase CRIS (“Additional CRIS MW”) either through a Class Year or a transfer

Proposed new generators, UDR projects, and Additional CRIS MW are referred to as “Examined Facilities”• Examined Facilities are examined in a two-part test to determine whether

an Offer Floor is applicable• An examined facility may request a Competitive Entry Exemption,

Renewable Exemption or Self-Supply Exemption

6

Page 7: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Buyer-Side Mitigation Measures Additional CRIS projects

• Facilities grandfathered under the BSM rules (i.e., existing by March 2008) and facilities that were determined to be exempt from BSM “on their own economics” (“passing” the Part B test)

• Offer Floor exemption test based only on the revenues and costs associated with Additional CRIS MW

• Facilities subject to an Offer Floor, or that were determined to be exempt under the Part A test

• Offer Floor exemption test based on the whole facility, inclusive of the costs associated with increasing to the Additional CRIS

– Unit Net CONE will be the greater of the Net Cone of the Additional CRIS MW and the Total Evaluated MW (Additional CRIS + other non-exempt MW)

7

Page 8: Buyer Side Mitigation: All slides

DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED. 8

Process OverviewBSM analysis is done concurrent with the Class Year in which the CRIS request is evaluated, or if a transfer of CRIS at the same location, in the specified study period

Page 9: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Interconnection Process Overview

Interconnection Studies•Feasibility Study•Deliverability Study

Class Year•Part 1 Study for ERIS•Part 2 Study for CRIS•BSM Process

•On-going data requests and evaluation

Construction•Project awarded

appropriate ERIS and/or CRIS

9

Page 10: Buyer Side Mitigation: All slides

© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED.DRAFT – FOR DISCUSSION PURPOSES ONLY

Questions?We are here to help. Let us know if we can add anything.

10

Page 11: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Lou Lombardi

Buyer Side Mitigation: Rules and Application

Senior Engineer, ICAP Market Mitigation & Analysis

Buyer Side Mitigation Information SessionJuly 26, 2019

Page 12: Buyer Side Mitigation: All slides

DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED. 12

Mitigation Exemption Tests

Each Examined Facility is evaluated under the Part A test and Part B test

Page 13: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Mitigation Study Period Examined Facilities are evaluated during the

Mitigation Study Period (MSP)• This represents the Capability Periods of

expected entry• The Starting Capability Period is the Summer

Capability Period commencing three years from the start of the year of the Class Year

13

Page 14: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Unit Net CONE The NYISO identifies an Examined Facility’s Unit Net CONE (Cost of New Entry) CONE includes the following costs, from which certain revenues are netted

• Embedded costs• Capital costs• Construction costs • Interconnection costs

• Estimated Annual Energy and Ancillary Services revenues• Certain revenues associated with other energy products (e.g., energy

services, RECs) This value is compared to the ICAP Forecast to determine if an Examined Facility

passes either the Part A or Part B test

14

Page 15: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Mitigation Exemption Tests

15

Page 16: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Example Given two Examined Facilities:

• Unit X• 100 MW• Unit Net CONE = $170/kW-yr

• Unit Y• 200 MW• Unit Net CONE = $140/kW-yr

16

Part A Test Part B Test

ExaminedFacility

Size (MW)

75% Mitigation Net CONE ($/kW-yr)

1 Year ICAP Forecast ($/kW-yr)

Unit Net CONE($/kW-yr)

3 Year ICAP Forecast ($/kW-yr)

Unit X 100 200 175 170 120

Unit Y 200 200 165 140 150

Page 17: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Example

17

“Fail” in these examples means not exempt;“Pass” means exempt

Part A

ExaminedFacility

Size (MW)

75% Mitigation Net CONE ($/kW-yr)

1 Year ICAP Forecast ($/kW-yr)

Unit X 100 200 175

Unit Y 200 200 165

Page 18: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Example

18

Part B

ExaminedFacility

Size (MW)

Unit Net CONE($/kW-yr)

3 Year ICAP Forecast ($/kW-yr)

Unit X 100 170 120

Unit Y 200 140 150

“Fail” in these examples means not exempt;“Pass” means exempt

Uni t X

Page 19: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Example Only Unit Y Passes

• Unit X• Part A: 75% Mitigation Net CONE > 1 Year ICAP Forecast = FAIL• Part B: Unit Net CONE > 3 Year ICAP Forecast = FAIL

• Unit Y• Part A: 75% Mitigation Net CONE > 1 Year ICAP Forecast = FAIL• Part B: Unit Net CONE < 3 Year ICAP Forecast = PASS

19

Part A Test Part B Test

ExaminedFacility

Size (MW)

75% Mitigation Net CONE ($/kW-yr)

1 Year ICAP Forecast ($/kW-yr)

Unit Net CONE($/kW-yr)

3 Year ICAP Forecast ($/kW-yr)

Unit X 100 200 175 170 120

Unit Y 200 200 165 140 150

Page 20: Buyer Side Mitigation: All slides

DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED. 20

Non-Exempt Examined Facility

An Examined Facility that does not receive an exemption will be subject to an offer floor.

Page 21: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Application of Offer Floors If the Examined Facility does not receive an exemption, it may

only offer into the Spot Market Auction• Offer Floors are established for projects at the time the

Class Year is completed• The Offer Floor will apply except for the MW amount that

has cleared for any twelve, not necessarily consecutive months

Application of Offer Floors detailed in the Services Tariff (MST) Att. H, Sec 23.4.5.7

21

Page 22: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Determination of Offer Floors Seasonal offer floors are shaped from the lower of the Annual Unit

Net CONE or the Default net CONE of the first year of the MSP• Summer Offer Floor • Winter Offer Floor

If an Examined Facility first offers capacity during a Capability Year other than the first year of the MSP, the Offer Floor is adjusted using the Inflation Rate• The inflation rate is defined in the MST as the most recently

accepted ICAP Demand Curve or its Annual Update

22

Page 23: Buyer Side Mitigation: All slides

© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED.DRAFT – FOR DISCUSSION PURPOSES ONLY

Questions?We are here to help. Let us know if we can add anything.

23

Page 24: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Lou Lombardi

Buyer Side Mitigation: Data Requirements

Senior Engineer, ICAP Market Mitigation & Analysis

Buyer Side Mitigation Information SessionJuly 26, 2019

Page 25: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Data Requirements Developers are expected to submit, a completed template through the ICAP

Reference System• Template includes:

• General unit information• Capital costs• Fixed and variable O&M costs• Financing parameters• Plant performance curves

Template must be completed even if the developer requests a Competitive Entry, Renewable, or Self Supply Exemption

An example BSM input template and template instructions are on the NYISO’s website under the Data Submission subfolder of the ICAP Market Mitigation folder

25

Page 26: Buyer Side Mitigation: All slides

DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED.DRAFT – FOR DISCUSSION PURPOSES ONLY

26

Additional Resources

Page 27: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Resources ICAP Reference System User’s Guide

• https://www.nyiso.com/documents/20142/2922803/ICAP_RS_UG.pdf/d57402d5-4a1d-d737-21b2-2678e8700f6a

BSM Template (example)• https://www.nyiso.com/documents/20142/3026303/BSM%20Input%20Template.xls/2b1ec47f-ce46-e812-367b-

7b439ac20be0

BSM Template Instructions• https://www.nyiso.com/documents/20142/3026303/BSM%20Input%20Template%20Instructions.pdf/0628036a-afd6-

fc43-c4e2-0a9bfd1e8857

Narrative and Numerical Example• https://www.nyiso.com/documents/20142/3026079/BSM_Narrative%20and%20Numerical%20Example%20Updated%2

0December%201%202016.pdf/0be44f0f-a3ea-b1b3-5bf3-bc0a8839fcd2

Reports and Documentation from past Class Years• https://www.nyiso.com/market-monitoring → ICAP Market Mitigation → Buyer Side Mitigation

27

Page 28: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Additional Assistance Issues related to accessing IRS, contact NYISO

Stakeholder Services• [email protected]

Data submission related issues, contact NYISO ICAP Market Mitigation• [email protected]

28

Page 29: Buyer Side Mitigation: All slides

© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED.DRAFT – FOR DISCUSSION PURPOSES ONLY

Questions?We are here to help. Let us know if we can add anything.

29

Page 30: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Lou Lombardi

Buyer Side Mitigation: Exemptions

Senior Engineer, ICAP Market Mitigation & Analysis

Buyer Side Mitigation Information SessionJuly 26, 2019

Page 31: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Buyer-Side Mitigation Measures Exemptions

• Mitigation Exemption Tests (Part A and Part B)• Applicable to:

– New generators and UDR projects– Additional CRIS projects

• Competitive Entry Exemption• Proposed Renewable Exemption• Proposed Self-Supply Exemption

If non-exempt, then Offer Floor applies • May only offer into the Spot Market Auction• Applied until UCAP clears in any 12 months

31

Page 32: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Buyer-Side Mitigation Exemptions Competitive Entry Exemption

• The main criteria to receive this exemption are if it a) does not have any “non-qualifying contractual relationship” as defined in MST Att. H Section 23.4.5.7.9.1.2, with a Non-Qualifying Entry Sponsor and b) is not itself a Non-Qualifying Entry Sponsor

• “because a purely merchant generator places its own capital at risk, … any such resource will have strong incentive to bid its true costs into the auction.”

A unit that requests a Competitive Entry Exemption, but is determined to not qualify for such exemption can still be exempt if it “passes” either the Part A or Part B Tests

32

Page 33: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Buyer-Side Mitigation Exemptions Proposed Renewable Exemption

• FERC directed the NYISO to create this exemption, and the following NYISO-proposed tariff revisions are pending before it:

• A proposed new unit can apply for a Renewable Exemption if it is an Intermittent Power Resource, or a Limited Control Run-of-River Hydro Resource

– Intermittent Power Resources are solely fueled by wind, solar, or landfill gas • Renewable Exemptions are limited to 1,000 MW of ICAP in any Class Year

– Note that this cap is in terms of ICAP, not UCAP

A unit that requests a Renewable Exemption, but is determined to not qualify for such exemption can still be exempt if it “passes” either the Part A or Part B Tests

33

Page 34: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

FERC Pending Renewable Exemption The NYISO anticipates potential wind and solar entrants in the soon-to-commence Class Year

2019. The NYISO filed a request on [July 15th] that the Commission issue an order accepting the

pending compliance Filing as soon as possible. • If the Commission does not act prior to the start of Class Year 2019, the NYISO will move

forward and administer the exemption as proposed in the April 2016 Filing. • If FERC acts prior to one month before the completion of Class Year 2019 and modifies

elements of the filed exemption, the NYISO anticipates being able to apply these modifications to Class Year 2019.

• If FERC does not act prior to one month prior to the end of the Class Year, the NYISO will plan to issue determinations based on the exemption proposed in the April 2016 Filing.

• The NYISO included in its July filing a request for conditional waiver that will request that these determinations be final, even in the event that the Commission subsequently modifies elements of the filed exemption.

34

Page 35: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Request for a CEE or Renewable Exemption Requests for a Renewable Exemption or Competitive

Entry Exemption must be received by the ISO no later than the deadline to notify the ISO of a Projects election to enter the Class Year, as set forth in 25.5.9 of the OATT• If any Examined Facility submits a Competitive Entry

Exemption the ISO shall not consider any request for a Renewable Exemption

35

Page 36: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Buyer-Side Mitigation Exemptions Proposed Self-Supply Exemption

• FERC directed the NYISO to create this exemption, and the following NYISO-proposed tariff revisions are pending before it:

• An LSE with a “self-supply business model” can apply for a Self-Supply Exemption

– Generally, an LSE that supplies more than 50% of its own capacity obligations

• Net Long and Net Short Thresholds are calculated to ensure self-supply LSE does not have incentive and ability to artificially suppress ICAP market prices by developing a unit

36

Page 37: Buyer Side Mitigation: All slides

© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED.DRAFT – FOR DISCUSSION PURPOSES ONLY

Questions?We are here to help. Let us know if we can add anything.

37

Page 38: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Lorenzo Seirup

Buyer Side Mitigation: Examples

Supervisor, ICAP Market Mitigation & Analysis

Buyer Side Mitigation Information SessionJuly 26, 2019

Page 39: Buyer Side Mitigation: All slides

DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED. 39

Preliminaries

Page 40: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Revenues associated with other energy products Considered on a case by case basis

• Must be substantiated by appropriate documentation

These may include, but are not limited to:• Sale of byproduct (e.g., heat, condensed water)• Sale of environmental attributes (e.g. RECs)• Services to another entity

40

Page 41: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Contracts Contracts for the sale of NYISO market products are not reflected in BSM

determinations. The NYISO estimates market-based Net E&AS revenues and forecasts ICAP prices as part of its BSM evaluation process.

Notwithstanding the above, cost advantages (e.g. advantageous financing arrangements) resulting from such a contract, and contracts for other energy byproducts may be included may be included if the contract was received under all the of following conditions:• Nondiscriminatory (resource type agnostic, existing and new resources)• Arm’s length (fair market value)• Competitive manner (open)

41

Page 42: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Unit Net CONE (Review) The NYISO identifies an Examined Facility’s Unit Net CONE (Cost of New Entry) CONE includes the following costs, from which certain revenues are netted

• Embedded costs• Capital costs• Construction costs • Interconnection costs

• Estimated Annual Energy and Ancillary Services revenues• Certain revenues associated with other energy products (e.g., energy

services, RECs) This value is compared to the ICAP Forecast to determine if an Examined Facility

passes either the Part A or Part B test

42

Page 43: Buyer Side Mitigation: All slides

DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED. 43

Examples

Page 44: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Example 1 NYISO may consider additional value of attributes not

compensated through the NYISO Administered Markets • NYISO may reflect value provided in a contract or

substitute an estimated fair market value if appropriate

• The implementation of proposed dual participation rules may alter how the NYISO estimates the value of additional services

44

Page 45: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Examined Facility 1-A The project produces a sellable byproduct through

its energy production (e.g., steam) The project is able to sell this byproduct to a market NYISO may include a fair market estimate of the

value of the byproduct

45

Page 46: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Examined Facility 1-AAs Submitted Data NYISO BSM

Project Cost $1,000 /kW $1,000 /kWNYISO validated

Levelized Carrying Charge 14% 14%NYISO validated

Unit Gross CONE $140 /kW-yr $140 /kW-yr

Net E&AS $50 /kW-yrNYISO estimated value

Byproduct sales Some value $50 /kW-yrNYISO estimated value

Unit Net CONE $40 /kW-yr

46

Page 47: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Examined Facility 1-B The project entered into a contract with a Utility to receive payment as a non-wires

alternative for T&D deferral• The contract was received through an RFP that was only open to bulk energy storage

projects• The contract reduced the project’s risk allowed it to receive favorable financing

NYISO would not use the contracted price for the attribute since the RFP process was not open to all resource types

• This does not meet the non-discriminatory criteria • NYISO would instead substitute a fair market value

NYISO would not use the favorable financing resulting from the contract, and would substitute its own estimate

47

Page 48: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Examined Facility 1-BAs Submitted Data NYISO BSM

Project Cost $1,000 /kW $1,000 /kWNYISO validated

Levelized Carrying Charge 12% 15%NYISO substituted value

Unit Gross CONE $120 /kW-yr $150 /kW-yr

Net E&AS $50 /kW-yrNYISO estimated value

T&D Contract $30 /kW-yr $25 /kW-yrNYISO estimated value

Unit Net CONE $75 /kW-yr

48

Page 49: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Examined Facility 1-C The project entered into a contract with a Utility to receive

payment as an NWA for T&D deferral• The contract was received through an RFP that was open

to any type of supply resource, both new and existing NYISO may use the contractual revenue since the RFP process

was non-discriminatory• If the project secured favorable financing as a result of

the contract, the NYISO may use that as well

49

Page 50: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Examined Facility 1-CAs Submitted Data NYISO BSM

Project Cost $1,000 /kW $1,000 /kWNYISO validated

Levelized Carrying Charge 12% 12%NYISO validated

Unit Gross CONE $120 /kW-yr $120 /kW-yr

Net E&AS $50 /kW-yrNYISO estimated value

T&D Contract $30 /kW-yr $30 /kW-yrNYISO validated

Unit Net CONE $40 /kW-yr

50

Page 51: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Example 2 NYISO would only consider possible revenue streams

that are sufficiently supported by documented evidence • Support may include executed agreements, evidence of

similar transactions, etc. • Evidence of on-going and productive contract

negotiations may be sufficient documentation, but it will be determined on a case-by-case basis

51

Page 52: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Examined Facility 2-A The project claimed it has the potential to provide services to

another entity in addition to participating in the NYISO Administered Markets

The project also claimed to have advantageous financing parameters

The project has not provided any documentation to substantiate either claim

NYISO would not include any claimed value for unsupported benefits

52

Page 53: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Examined Facility 2-AAs Submitted Data NYISO BSM

Project Cost $1,000 /kW $1,000 /kWNYISO validated

Levelized Carrying Charge 5% 15%NYISO proxy value

Unit Gross CONE $50 /kW-yr $150 /kW-yr

Net E&AS $50 /kW-yrNYISO estimated value

Additional Value $30 /kW-yr * --

Unit Net CONE $100 /kW-yr

53

Page 54: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Examined Facility 2-B The project has provided documentation that supports its claim that it has

the capability to provide services to another entity in addition to participating in the NYISO Administered Markets• The NYISO has been able to validate the attribute• Contractual revenues meet the open & competitive standard as

outlined in Example 1 The project secured and provided evidence of advantageous financing

parameters NYISO may include the contracted value for substantiated benefits

achieved in a competitive manner

54

Page 55: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Examined Facility 2-BAs Submitted Data NYISO BSM

Project Cost $1,000 /kW $1,000 /kWNYISO validated

Levelized Carrying Charge 10%NYISO validated

10%NYISO validated

Unit Gross CONE $100 /kW-yr $100 /kW-yr

Net E&AS $50 /kW-yrNYISO estimated value

Additional Value $30 /kW-yr $30 /kW-yrNYISO validated

Unit Net CONE $20 /kW-yr

55

Page 56: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Example 3

Attributes not presently compensated in the NYISO Wholesale Market, but that have a discernable market value may be considered on a case-by-case basis

NYISO would not value multiple revenue streams for the same attribute

56

Page 57: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Examined Facility 3-A The project has contracted with a third party to receive an incentive

payment, which is contingent upon the project providing installed capacity sales into the wholesale market

The fixed incentive payment is in addition to revenues the project may receive in compensation for wholesale energy, ancillary services, and installed capacity sales• The NYISO would not reflect incentive payments, nor contractual

payments received for services already compensated in the wholesale markets.

57

Page 58: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Examined Facility 3-AAs Submitted Data NYISO BSM

Project Cost $1,000 /kW $1,000 /kW

Incentive Payment $200 /kW --

Levelized Carrying Charge 10% 15%NYISO proxy value

Unit Gross CONE $80 /kW-yr $150 /kW-yr

Net E&AS $55 /kW-yr $50 /kW-yrNYISO estimated value

Unit Net CONE $100 /kW-yr

58

Page 59: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Examined Facility 3-B The project receives a one-time incentive payment and expects to

sell its energy products directly in the NYISO administered markets

The one-time incentive payment was awarded to any project that meets certain carbon emission standards• This was open to any resource type as well as existing or new

projects The project entered into a competitive contract with advantageous

financing based on lower perceived risk due to the fixed incentive

59

Page 60: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Examined Facility 3-BAs Submitted Data NYISO BSM

Project Cost $1,000 /kW $1,000 /kWNYISO validated

Non-Emitting Resource Value $200 /kW $200 /kWNYISO validated

Levelized Carrying Charge 10% 10%NYISO validated

Unit Gross CONE $80 /kW-yr $80 /kW-yr

Net E&AS $50 /kW-yrNYISO estimated value

Unit Net CONE $30 /kW-yr

60

Page 61: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Examined Facility 3-C

The project has secured an arms length, open and competitive contract to provide energy to an entity at a specified price instead of receiving market revenues• The contract also provides the project with beneficial financial

parameters due perceived decreased risk

NYISO would consider including the identified financing provided all requested data and relative support has been validated

61

Page 62: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Examined Facility 3-CAs Submitted Data NYISO BSM

Project Cost $1,000 /kW $1,000 /kWNYISO validated

Levelized Carrying Charge 10% 10%NYISO validated

Unit Gross CONE $100 /kW-yr $100 /kW-yr

Net E&AS $60 /kW-yr $50 /kW-yrNYISO estimated value

Unit Net CONE $40 /kW-yr $50 /kW-yr

62

Page 63: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Example 4 NYISO may reflect value a project receives from

Federal Programs such as:• Production Tax Credit • Investment Tax Credit

63

Page 64: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Examined Facility 4

The project qualified and provided sufficient evidence of qualification for Federal Production Tax Credits

The NYISO would reflect the revenue received from the tax credits based on the project’s estimated energy production

64

Page 65: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Examined Facility 4As Submitted Data NYISO BSM

Project Cost $1,000 /kW $1,000 /kWNYISO validated

Levelized Carrying Charge 13% 13%NYISO validated

Unit Gross CONE $130 /kW-yr $130 /kW-yr

Net E&AS $50 /kW-yrNYISO estimated value

PTC Some value $0.02/kWh or $20 /kW-yrNYISO estimated value

Unit Net CONE $60 /kW-yr

65

Page 66: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Key Takeaways The value of attributes and revenues from other energy products

(not compensated for in the NYISO wholesale markets) will be considered on a case by case basis and may be valued• Sufficient supporting documentation must be provided by the

developer

Cost advantages (e.g. advantageous financing) resulting from contracts may be considered if the contracts are procured through a nondiscriminatory, arms length, and competitive process

66

Page 67: Buyer Side Mitigation: All slides

© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED.DRAFT – FOR DISCUSSION PURPOSES ONLY

Questions?We are here to help. Let us know if we can add anything.

67

Page 68: Buyer Side Mitigation: All slides

DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED. 68

Appendix: ICAP Reference System

Page 69: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

BSM Template Instructions Red fields in template must be completed Do not add or delete rows/columns Data should be rounded & truncated to two decimal places Include Documentation References on template input tab Verify entries against Template check list upon completion, before

submitting• If data incorrect or incomplete, IRS will generate error message• Must fix to re-submit• **Template should be completed according to Template

Instructions found on NYISO Website**

69

Page 70: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Intro to ICAP Reference System Provides automation of ICAP market mitigation processes relating to…

• Going Forward Costs• Physical Withholding• Buyer-Side Mitigation• Reliability Must Run (Deactivation Notices)

Market Parties upload forms, submit data, and receive and send communications• Designed to enhance communications & facilitate mitigation

processes

70

Page 71: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Requirement for ICAP Reference System A Valid NAESB or NYISO Digital Certificate is

required Market Party contacts NYISO Stakeholder Services

to obtain ICAP Reference System access

71

Page 72: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Accessing ICAP Reference System Accessible from NYISO Website

• Login > Market Access > ICAP Reference System (IRS)> *User Login

• Support > Market Monitoring > ICAP Reference System Login

https://irs.nyiso.com/irs/

72

Page 73: Buyer Side Mitigation: All slides

DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED. 73

Process Initiation

Page 74: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Process Initiation: Set-up A proposed project identified as an Examined Facility is

subject to a buyer-side mitigation evaluation MMA creates a buyer side mitigation interaction in the

ICAP Reference System An interaction will have a status of open once it has

been created by NYISO and is awaiting initial data submittal from the market party

74

Page 75: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Process Initiation: Notification ICAP Reference System will auto-generate email to

Market Party• Notifying Market Party that an interaction has been

opened and is available for data submittals to be uploaded through ICAP Reference System

• The email will also specify a deadline for the data submission

75

Page 76: Buyer Side Mitigation: All slides

DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED. 76

Submitting Cost Data to ICAP Reference System

Page 77: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Uploading Cost Data: Accessing Interaction Market Party logs into IRS• The default view on the home screen will be the full list

of interactions created for your organization. • There may be one interaction or many • Each interaction will have an ID number for tracking

purposes• Interactions will also be categorized by type

• Buyer-side mitigation will be denoted by “BSM”

77

Page 78: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Uploading Cost Data: Submission Once a Market Party locates the interaction, hover over and

click the interaction row to select it Market Party downloads and completes the required BSM

template• Example Template & Template instructions available on

NYISO web site Market Party uploads the completed BSM template and any

supporting attachments to IRS

78

Page 79: Buyer Side Mitigation: All slides

DRAFT – FOR DISCUSSION PURPOSES ONLY© COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED. 79

Interaction StatusThere are three different status types; they are open, review, and closed.

Page 80: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Review Status An interaction will have a status of review once the market

party’s data has been submitted to the NYISO• Market party will be unable to make changes to their

submittal data, unless NYISO unlocks the necessary fields upon market participant request

If a market party needs to re-submit cost data for significant changes, then the interaction would change from a status of review to open to begin the cycle over again

80

Page 81: Buyer Side Mitigation: All slides

©COPYRIGHT NYISO 2019. ALL RIGHTS RESERVED

DRAFT – FOR DISCUSSION PURPOSES ONLY

Review Status and Closed Status During the review state, NYISO will be reviewing the

uploaded data and working to make its determination• Market party will be unable to make changes to

their submittal data in the review status Finally, an interaction will have a status of closed once

NYISO has made and issued its determination to the market party through the ICAP Reference System

81