11
1 BUSINESS - OIL & GAS - PETROCHEMICAL CONSULTANCY, ENGINEERING, CONSTRUCTION SERVICE AND EQUIPMENT SOLUTION HTTEK INTRODUCING HUNGTHINH CONSULTANCY AND TECHNICAL SERVICE JSC VISION COOPERATION SUCCESS

BUSINESS OIL & GAS Profile (1).pdfID SOFTWARE Q’ty Status 1 HYSYS VER. 7.1 1 2 TANK CALCULATION-API 650 1 Owner 3 PRESSURE VESSEL CAL 1 Owner 4 CAD WORX (P&ID AND EQUIPMENT) 1 Owner

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BUSINESS OIL & GAS Profile (1).pdfID SOFTWARE Q’ty Status 1 HYSYS VER. 7.1 1 2 TANK CALCULATION-API 650 1 Owner 3 PRESSURE VESSEL CAL 1 Owner 4 CAD WORX (P&ID AND EQUIPMENT) 1 Owner

1

BUSINESS - OIL & GAS

- PETROCHEMICAL

CONSULTANCY, ENGINEERING, CONSTRUCTION SERVICE AND EQUIPMENT SOLUTION

HTTEK

INTRODUCING

HUNGTHINH CONSULTANCY AND TECHNICAL SERVICE JSC

VISION

COOPERATION

SUCCESS

Page 2: BUSINESS OIL & GAS Profile (1).pdfID SOFTWARE Q’ty Status 1 HYSYS VER. 7.1 1 2 TANK CALCULATION-API 650 1 Owner 3 PRESSURE VESSEL CAL 1 Owner 4 CAD WORX (P&ID AND EQUIPMENT) 1 Owner

2

INTRODUCTION

Office:

Head Office: 118/157 Phan Huy Ich St., Ward 15, TanBinh Dist., HoChiMinh City, R.S Vietnam.

Tel.: 84 8 62 816 575

Fax: 84 8 62 816 574

Email: [email protected]

Manpower

Year Established

Services Pre-Feasibility

Feasibility Study

Conceptual design

Front-End Engineering Design

Detail Engineering Design

Cost Estimation

2007

Over 40 Employees

Page 3: BUSINESS OIL & GAS Profile (1).pdfID SOFTWARE Q’ty Status 1 HYSYS VER. 7.1 1 2 TANK CALCULATION-API 650 1 Owner 3 PRESSURE VESSEL CAL 1 Owner 4 CAD WORX (P&ID AND EQUIPMENT) 1 Owner

LEGAL COMPANY‟S LICENSE

3

Page 4: BUSINESS OIL & GAS Profile (1).pdfID SOFTWARE Q’ty Status 1 HYSYS VER. 7.1 1 2 TANK CALCULATION-API 650 1 Owner 3 PRESSURE VESSEL CAL 1 Owner 4 CAD WORX (P&ID AND EQUIPMENT) 1 Owner

COMPANY „S POLICIES

QUALITY POLICY SAFETY POLICY

Satisfying all legitimate demands expected by the Clients is the

key to success.

1/ To implement this policy, our Company:

- Applies a quality management system complying with

ISO 9001:2008 to the production and business activities

throughout the company (under build);

- Ensures to provide Clients with products and services

satisfying their demands;

- Continuously improves and renews to satisfy the demands

of the Clients;

Our aims:

• Acting together for common purposes.

• Performing correctly the task from the beginning.

• Doing better in the next time.

2/ This quality policy has to be disseminated to and understood

by all employees of the Company for implementation.

3/ HTTEK commits to provide sufficient resources for

performing and maintaining this quality policy.

Establishing a safe working environment to protect the

“RESOURCES” is the conscience and responsibility of

all employees of HTTEK in which the highest

responsibility will be taken care by a senior leader who is

assigned to be specialized in safety task.

To implement this policy, HTTEK:

1/ Establishes and operates the "HSE Management System"

and "Safety personnel" to meet the National Standards

and towards the International Standards.

2/ Consider the first objective is the identify and eliminate

all risks and occupational accident hazards.

3/ All risk managements and solutions are aiming towards

the only purpose of creating the security and increasing

the satisfaction for "Employees" when working for

HTTEK.

4/ Regularly and continuously checks and supplies the

finance to maintain “Effect” and “Efficiency” of the Safety

policy.

“HTTEK, CREDIBLE CHOICE OF CLIENTS”

“HTTEK IS ALWAYS WILING TO CLOSED CO-OPERATE WITH

DOMESTIC AND OVERSEA CLIENTS WITH FRIENDSHIP AND

MUALTURE DEVELOPMENT”

“EMPLOYEES ARE THE MOST IMPORTANT FACTORS, THE

MOST VALUABLE ASSETS OF THE COMPANY”

SAFETY POLICY HAS TO BE DISSEMINAT ED TO AND

UNDERSTOOD BY ALL EMPLOYEES SO THAT EACH EMPLOYEE

SHALL BE A “SAFETY OFFICER”. 4

Page 5: BUSINESS OIL & GAS Profile (1).pdfID SOFTWARE Q’ty Status 1 HYSYS VER. 7.1 1 2 TANK CALCULATION-API 650 1 Owner 3 PRESSURE VESSEL CAL 1 Owner 4 CAD WORX (P&ID AND EQUIPMENT) 1 Owner

5

ORGANIZATION

MANAGEMENT BOARD

DIRECTOR

COMMERCIAL DEPT. ENGINEERING DEPT. ACOUNT DEPT.

Page 6: BUSINESS OIL & GAS Profile (1).pdfID SOFTWARE Q’ty Status 1 HYSYS VER. 7.1 1 2 TANK CALCULATION-API 650 1 Owner 3 PRESSURE VESSEL CAL 1 Owner 4 CAD WORX (P&ID AND EQUIPMENT) 1 Owner

6

ENGINEERING

1. Manpower:

Our manpower has much

experience and been doing many

oil & gas projects in Vietnam

2. Codes & Standards:

Local code & standards using the

latest VietNam codes & standards

and other national codes &

standards as required by project.

Foreign codes & standards: API,

ASTM, ASME, NFPA, BS etc and

other one as specified by the

project.

Page 7: BUSINESS OIL & GAS Profile (1).pdfID SOFTWARE Q’ty Status 1 HYSYS VER. 7.1 1 2 TANK CALCULATION-API 650 1 Owner 3 PRESSURE VESSEL CAL 1 Owner 4 CAD WORX (P&ID AND EQUIPMENT) 1 Owner

7

ENGINEERING

3. Engineering Software

ID SOFTWARE Q’ty Status

1 HYSYS VER. 7.1 1

2 TANK CALCULATION-API 650 1 Owner

3 PRESSURE VESSEL CAL 1 Owner

4 CAD WORX (P&ID AND EQUIPMENT) 1 Owner

5 AUTOCAD VER. 2007 10 Owner

6 MICROSOFT OFFICE 30 Owner

7 STRUCTURE ANALYSES – SAP 2000 1 Owner

8 LINE SIZING CAL. – IN HOUSE SOFTWARE 1 Owner

9 PUMP CAL. – IN HOUSE SOFTWARE 1 Owner

10 HYDRAULIC CAL-IN HOUSE SOFTWARE 1 Owner

Page 8: BUSINESS OIL & GAS Profile (1).pdfID SOFTWARE Q’ty Status 1 HYSYS VER. 7.1 1 2 TANK CALCULATION-API 650 1 Owner 3 PRESSURE VESSEL CAL 1 Owner 4 CAD WORX (P&ID AND EQUIPMENT) 1 Owner

8

HUNGTHINH

ID PROJECT SCOPE CLIENT PICTURE

1 LOW PRESS GAS FOR

FRITTA VIETNAM PLANT

EPC CONTRACTOR FRITTA VN

2 UPGRADING FOR NAM VIET

REFINERY PLANT

- FEASIBILITY STUDY

- DETAIL ENGINNERING

DESIGN (PIPING SYS);

-COST ESTIMATION

NAMVIET

OIL & GAS

JSC

3 PHUMY CONDENSATE

PROCESSING PLANT

(JETTY-1 &2 PRODUCT

PIPILINE)

- FEASIBILITY STUDY;

- DETAIL ENGINNERING

DESIGN;

- COST ESTIMATION

PVOIL

EXPERIENCE

Page 9: BUSINESS OIL & GAS Profile (1).pdfID SOFTWARE Q’ty Status 1 HYSYS VER. 7.1 1 2 TANK CALCULATION-API 650 1 Owner 3 PRESSURE VESSEL CAL 1 Owner 4 CAD WORX (P&ID AND EQUIPMENT) 1 Owner

9

ID PROJECT SCOPE CLIENT PICTURE

4 XIJIANG 30-2 FIELD-CHINA

AND OFON FIELD -

INDONESIA

DETAIL ENGINEERING

FOR PRODUCED WATER

TREAMENT SYSTEM

CONOCOP

HILIP / MI

SWACO

5 DAIHUNG CONDENSATE

PROCESSING PLANT

- FEASIBILITY STUDY;

- DETAIL ENGINNERING

DESIGN;

-COST ESTIMATION.

ORIENT

OIL JSC

6 CANTHO GASOLINE /

DIESEL OIL STORAGE TANK

- DETAIL ENGINNERING

FOR 3 X12.000M3

STORAGE TANKS;

- COST ESTIMATION

PVOIL MK

EXPERIENCE

Page 10: BUSINESS OIL & GAS Profile (1).pdfID SOFTWARE Q’ty Status 1 HYSYS VER. 7.1 1 2 TANK CALCULATION-API 650 1 Owner 3 PRESSURE VESSEL CAL 1 Owner 4 CAD WORX (P&ID AND EQUIPMENT) 1 Owner

10

EXPERIENCE

ID PROJECT SCOPE CLIENT PICTURE

7 HAU GIANG GASOLINE / DO

STORAGE TANK PROJECT

-FEASIBILITY STUDY;

- DETAIL ENGINNERING

DESIGN;

-COST ESTIMATION

PVOIL MK

8 LONGHUNG RESIDUE OIL

PROCESSING PLANT

(UPGRADING UP TO 20.000

M3 STORAGE TANKS)

-DETAIL ENGINNERING

DESIGN;

-COST ESTIMATION.

LONGHUN

G VN JSC

9 REFRIGERATED LPG

STORAGE TANK

- FRONT-END

ENGINNERING DESIGN

FOR FIRE PROTECTION

SYSTEM

PVGAS /

WORLEY

PARSONS

Page 11: BUSINESS OIL & GAS Profile (1).pdfID SOFTWARE Q’ty Status 1 HYSYS VER. 7.1 1 2 TANK CALCULATION-API 650 1 Owner 3 PRESSURE VESSEL CAL 1 Owner 4 CAD WORX (P&ID AND EQUIPMENT) 1 Owner

THE END

THANK YOU!

11