Upload
iftikhar
View
327
Download
3
Embed Size (px)
DESCRIPTION
Arab Circle Jeddah, KSA for Innovation, Technology & Business Development in Renewable Energy ( Solar & Waste Energy)
Citation preview
1.Networking
2.Knowledge Base and Tool Kits
3.Capacity Building
4.Company Financing
5.Monitoring and Evaluation
6.Linking to Other Networks
• Dynamic Tech Entrepreneur
• Rich Business & Tech. Expertise
• Motivated Team
• Growing Market
• Reputed Firm
• High Funds Requirement
• Good reputation
with Banks, Suppliers
• Provides Growth, Wealth,
Employment and hope
Common Production Facilities
Nursery
Incubators
Training &Knowledge Inputs
Young S & Tpersons with
• No Experience• No Business
Knowledge• No Team • No Funds• But Big Dreams
Counselling & Escorting
Messengers, Mentors and Models
Works on this for
Proof of Concept
Picks up an
Innovative
Tech. Bus. Idea
Puts up a Proposal to convince Resource support
Promotes concept to reality thru’venturing
Professionally grows in to Tech Venture creating wealth, jobs and QoL
STEPs / TBIs
STEP/TBIINC FUND
Banks
VCs
O
W
N
F
U
N
D
?
?
PhysicalInfrastructure
Connectivity to
New marketsand
Others
Intellectual Infrastructure
EducationTrainingSkillsKnowledge
NetworksResearch
InstitutesSocial Visionand The Will
Cultural Infrastructure
Risk CultureInnovationAmbienceVenture MindSocial Recognition& Reorgiztn
FinancialInfrastructure
Venture FundInnovation
FundIncubation
FundProject
FundTech. Dev.
BridgeFund
Business and Social Environment
Business Incubators PerformanceBusiness Incubators
Performance
PAK- SAUDIACADEMIA INDUSTRY LINKAGES
RENEWABLE ENERGY & GREENFIELD FUNDS
OUR PARTNER:
Academia Industry Linkage Forum, Peshawar( RE) 2008
FEB, 2010, GUJRANWALARE. PAPER PRESENTATION US. CONSULATE GENERAL
PAK-US ACADEMIA-INDUSTRY LINKAGES INBIO AND SOLAR ENERGY PROJECTS 2010
MY PRESENTATION MODEL MODEL “ABCD” RIYADH
Academia- Industry Linkages, RE
ALIF SAUDI ARABIA 2008AT INTERCONTINENTAL
HOTEL,RIYADH
NUST- ACRE COOPERATION : BIO-DIESEL
WHY TO CHOOSE SOLAR THERMAL TECHNOLOGY ?• Pakistan is has the 6th largest solar radiation availability, 14 hours average daily with 1800~2200 KWh per square meter with an annual sunshine duration 8~8.5 hours.
• If 0.25% of Baluchistan is used for solar generation with efficiency of 20% would produce enough electricity to cover all Pakistan demand
•Solar Thermal Power system is need of time for farmers and for remote locations which can be operated with little maintenance or intervention after initial setup.
• Once the initial capital cost of building the plant has been spent, operating cost are low when compared to existing technologies.
Looking for developing a micro CSP Pilot Project at your facilities.
Parabolic Trough Parabolic Dish