BUSINESS PROFILE
Business Information
Company Registration Number: 2006/013002/07
Contact Information:
Postal: P.O. Box 781436 Sandton City
2146
Physical: 48 Sixth Street
Parkhurst
JOHANNESBURG
2193
Telephone: (011) 268-0300
(011) 268-0261
Fascimile: (011) 268 0319
E-mail: [email protected]
Website: www.tmtj-jhb.co.za
Company Overview
Overview:
tmtj was founded in 2004 by Moira Tlhagale, a Quantity Surveyor by profession and Thembi Jacobs an Architect by profession. tmtj had offices in Gauteng and Cape Town headed by the two founders respectively. Due to economic pressure the Cape Town office has been closed and therefore tmtj is currently operating from the Gauteng office only where Ms Moira Tlhagale is the sole Director.
tmtj is 100% black woman owned and offers these services:
• Construction Project Management • Programme Management • Development Facilitation • Tenant Installation
tmtj has undertaken various projects in both the public and private sector. tmtj is a Level 1 B-BBEE
Contributor.
Director:
Managing Director
Ms Tlhagale is the Owner and Managing Director of tmtj Consulting Gauteng (Pty) Ltd. She is a Quantity Surveyor by profession and a registered Construction Project Manager with the South African Council for Project and Construction Management Professions (SACPCMP) and a member of the Institute of Directors in Southern Africa (IoDSA).
She holds a National Diploma in Building Surveying from Peninsula Technikon (1993) and a BSc Honours Degree in Quantity Surveying from University of Cape Town (1998), Certificate in Property Intermediate Programme, Certificate in Shopping Centre Management. She has completed the JSE AltX Director Introduction Programme, Being a Director (Part 1- 4) and Mastering Chairmanship with IoDSA.
Ms Tlhagale has over 20 years’ experience in the Built Environment ranging from being a Quantity Surveyor, Property Development Manager and Construction Project Manager. Ms Tlhagale has been involved in various projects in the public and private sector. These include her role in projects such as the Cape Town International Departures Terminal as a Quantity Surveyor, to the Development Management role at Propnet (Division of Transnet) and V&A Waterfront focusing on Retail and Commercial Developments.
She was also the Leader of the 2010 FIFA Local Organising Committee of South Africa Technical Team, with the role of the team being Oversight Project Management to ensure successful delivery of all 10 Stadiums that were used for the 2010 FIFA World Cup. Furthermore, she was involved as an Oversight Project Manager for the performance of Flagship Projects for the Office of the Premier of Gauteng. Lastly, one of the key projects she was involved with was as a Programme Manager in the Accelerated Schools Infrastructure Delivery Initiative (ASIDI) where 50 schools were built in the Eastern Cape.
Currently, Ms Tlhagale is a Project Director on various projects undertaken by tmtj Consulting in project management which vary from Housing Developments, Stadiums, Offices Refurbishments and Shopping Centres Development and Refurbishments.
1 | P a g e
Service Offering
1. Project Management:
This is the process of initiating, planning, executing, monitoring and controlling the project to achieve set goals. This process typically includes the following:
• Identifying requirements • Addressing various needs, concerns, expectations of the stakeholders throughout the planning & implementation phase • Balancing of the project constraints i.e. Scope, Quality, Budget & Time
Construction Project Management services is divided into the following 6 project stages:
• Inception • Concept & Viability • Design Development • Documentation & Procurement • Construction Monitoring • Close-Out
We at tmtj apply the necessary technical and administrative skills to help our Clients meet the desired objectives. We oversee the adherence to the project deliverables per project stage, coordinate the flow of information amongst the project stakeholders and manage the process to ensure that the project is successful.
2 | P a g e
2. Programme Management:
Programme Management is the process of managing multiple related projects to obtain maximum benefits. Our key focus on managing multiple projects in on the Strategy and Implementation. Our sucess in undertaking Programme Management underlies in our ability to:
• Define the programme • Careful preparation of a Project Execution Plan • Implementation of the Project Execution Plan • Monitoring of the programme and Project Execution Plan
tmtj has successfully managed interdependent projects under one programme.
3. Development Facilitation:
Real Estate Development or Property Development is a multifaceted business process, encompassing activities such as renovations/extensions of existing building structures to the development of new building structures on either green or brown fields. Some developers require the services of development facilitation which is the process of enabling development that comprise of a range of activities with the end result being a constructable, bankable, sustainable development. tmtj therefore offers development facilitation services and the key processes to undertake such entail the following:
• Project Viability • Identifying all Statutory requirements • Project Sustainability - both cost and design to ensure a successful project • Recommendation for the appointment of a relevant and appropriate consultant team for the project
3 | P a g e
Service Offering (cont.)
4. Tenant Installation:
Changes made to the interior of a commercial or industrial property by its owner such as floor and wall coverings, ceilings, partitions, airconditioning, fire protection and security is to accomodate the needs of a tenant.
tmtj undetakes the management of the tenant improvement where necessary and specific tenant installation. In doing this, we ensure that we adhere to the design guideline parameters by the property owner as well as execute the brief by the tenant to ensure a successful quality space to be handed over to the tenant within budget.
PROJECT NAME
Jakaranda Shopping Centre - Phase 2
Central House
Dawn Park Retail Development
Public Transport Service Centre - Phase 1 & 2
Woolworths Stores
Gabonewe Housing Estate Development
House Pezula
House Jacobs
House Trilby
DESCRIPTION
Refurbishment & Upgrade of Jakaranda Shopping Centre
Alterations & Refurbishment of existing office spaces
Development of a ShoppingCentre
Construction of an office building for the Western Cape Dept. of Transport & Public Works
Alterations & Refurbishments of various Woolworths stores in the Western Cape
Construction of a Housing Development for Gabonewe Housing Estate
Construction of a 3-storey house at Pezula Private Estate (Kynsna)
Designing house for construction
Alterations & Renovations
OUR ROLE
Project Managers
Project Managers
Project Managers
Project Managers & Principal Agents
Project Managers
Development Facilitators & Project Managers
Project Managers
Architects & Principal Agents
Project Managers
PROJECT VALUE
R2.3 Million
R4.5 Million
R174 Million
R155 Million
R200 000 - R3 Million
R63.2 Million
R20 Million
R3.2 Million
R8 Million
DURATION
June 2016 - May 2018
July 2015 - Nov. 2017
Nov. 2010 - May. 2015
Nov. 2006 - Dec 2016
Apr. 2006 - Dec. 2013
Jan. 2012 - Feb. 2018
Jul. 2014 - Nov. 2017
May. 2011 - Dec. 2016
Feb. 2009 - Dec. 2009
Offices & Commercial:
4 | P a g e
Projects
Completed Projects:
Residential:
Completed Projects:
PROJECT NAME
2010 FIFA World Cup
2022 Commonwealth Games Candidate City Bid
Independence Stadium
Suitability Assessment & Comparative Analysis
Accelerated Schools Infrastructure Delivery Initiative (ASIDI)
Grade R Classrooms: Phase 1 & 2
PGWC Transport Precincts Initiative
CODESA Museum
DESCRIPTION
Oversight Project Management for the building & refurbishment of soccer stadiums for the 2010 FIFA Soccer World Cup
Project Management for Cluster 4 Consultant Team for the 2022 Commonwealth Games Candidate City Bid Book
Project Management & Facilitation of the Supply, Delivery, Installation, Testing & Removal of Tented Roof Structures
Conducted a Suitability Study & Comparative Analysis on land intended for a world-class soccer facility
Construction of 50 new schools in the Eastern Cape Province
Development & construction of prototypes for Grade R single &double classrooms for various primary schools in the Western Cape
Developing a TPI policyframework document
Provided a Concept Document
OUR ROLE
Team Leaders & Oversight Project Managers
Programme Managers
Project Managers
Development Facilitators
Programme Managers
Project Managers & Principal Agents
Project Managers & Principal Agents
Project Managers
PROJECT VALUE
R17 Billion
R400 Million
R2 Million
R 307 800.00
R818 Million
R100 Million
R 750 000.00
R 200 000.00
DURATION
May 2006 - Sep. 2010
Jan. 2015 - Feb. 2015
Feb. 2015 - Mar. 2015
Feb. 2011 - Apr. 2011
Sep. 2011 - Jun. 2014
Aug. 2009 - Mar. 2012
Aug. 2007 - Nov. 2010
Nov. 2010 - Feb. 2011
Sport:
Education:
Transport:
5 | P a g e
Projects (cont.)
Heritage:
Projects (cont.)
PROJECT NAME
Global Fund GrantProgrammes: ARVTreatment Facilities
Oversight Project Management for the Office of the Premier of Gauteng
Western Cape Department of Transport & Public Works
Strategic Infrastructure Plan (SIP)
DESCRIPTION
Installing/remodelling existing units within Community Health Facilities as part of the ARV treatment roll-out in the following areas: - Kraaifontein CHC - Crossroads CHC - Gugulethu CHC - Retreat CHC - Michael Mapongwana CHC - Mitchell’s Plain CHC
Oversight Project Management of Flagship Projects for the Office of the Premier
Department of HousingSpecial Projects
Develop the SIP plan for the Western Cape to understandthe Province’s needs forthe future
OUR ROLE
Project Managers & Principal Agents
Project Managers
Project Managers & Principal Agents
Programme Managers
PROJECT VALUE
R 7,5 Million R 9,5 Million R 7,8 Million R 7,6 Million R 8,7 Million R30,8 Million
R30 Million - R150 Billion
R 600 000.00
R 500 000.00
DURATION
Completed in: Oct. 2009 Oct. 2010 Jun. 2010 Jan. 2010 Nov. 2010 May 2011
Jan. 2012 - Feb. 2013
Aug. 2007 - Nov. 2010
Jun. 2006 - Sep. 2006
6 | P a g e
Completed Projects (cont.):
Health:
Capacitation:
Strategy Development:
7 | P a g e
Dawn Park Shopping Centre
Accelerated Schools Infrastructure Delivery Initiative (ASIDI)
Gallery
8 | P a g e
House Trilby
Gallery (cont.)
House Jacobs
9 | P a g e
2010 FIFA World Cup Stadiums
Gallery (cont.)
Independent Stadium, Namibia
Public Transport Service Centre
10 | P a g e
Gallery (cont.)
Global Fund Grant Programmes: ARV Treatment Facilities
Grade R Classrooms
11 | P a g e
Gallery (cont.)