BUREAU OF INDIAN STANDARDS (Western Region Office, Mumbai)
DRAFT PRODUCT CERTIFICATION MANUAL FOR COMMENTS
Our Ref: DDGW Sectt(PCO/RD) 23 Jan 2014
Sub: Preparation & review of draft manuals for product certification
This has reference to CMD circular CMD-1/31 dtd:11 Nov 2013 on the above subject. In this connection, please find enclosed the draft product certification manuals prepared by WRO as indicated in Annex-I
Kindly examine the draft product certification manuals and forward your comments on the drafts to the ROs/ BO’S indicated against them in Annex-I and a copy of the comments may also be forwarded to at [email protected]
Last date for comments: 3 Feb 2014.
Comments, if any, may please be made in the format as given below:
Sl. Name Clause/ Paragraph / Type of Comments Proposed Change No. of RO / Sub-clause Figure / comment
BO Table (General / Technical / Editorial)
Note: Separate sheets may be attached in case comments are lengthy and cannot be incorporated in the table.
(Rosy Dhawan) Sc ‘E’ & PCO (DDGW Sectt)
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 1 of 36
PRODUCT MANUAL
ON
OPENWELL SUBMERSIBLE
PUMPSETS
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 2 of 36
AMENDMENT SHEET
To ensure that each copy of the Product Quality Manual contains a complete record of Amendments, this Amendment page should be updated by controlled copy holders with each set of revised/new pages of the Product Quality Manual. An acknowledgment slip will be sent alongwith revised/new pages of Product Quality Manual for signature and return by all holders of controlled copies
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 3 of 36
Amendment No
Date of Issue Section/Page/Clause No
Reason for Change
FOREWORD
This product quality manual contains a description of the product, raw material/components requirements, manufacturing process , in process controls, Certification criteria and Inspection and testing requirement for Openwell submersible Pumpsets as per IS 14220:1994.
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 4 of 36
The document control system provides for regular updating of the manual through amendments to various sections. An amendment sheet placed in manual enlists the amendments carried out to the current version of the Manual.
Manual Issue No : 01
Issue Date : 20 Nov 2013
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 5 of 36
TABLE OF CONTENTS
Sr. No. Section Contents Page No.
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 6 of 36
1 1 Product Description 5 - 6 2 2 Raw Material/components 7 3 3 Manufacturing process and in process Quality controls 8 - 9 4 4 Certification criteria 10 - 12 5 5 Inspection and testing 13 - 14 6 Annexure 1 15 - 17 7 Annexure 2 18 – 22 8 Annexure 3 23 – 26 9 Annexure 4 27 – 29
SECTION NO.1 PRODUCT DESCRIPTION
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 7 of 36
1.1 DESCRIPTION OF PRODUCT
Horizontal and vertical Openwell Submersible Pumpset are normally used in open wells for handling clear cold water for application in agriculture, water supply, etc. This works under water and it rest at the bottom of the well. Pump portion is of single stage (horizontal pump) & single or multi stage (Vertical pump).
1.2 LATEST INDIAN STANDARD NO WITH PRODUCT TITLE AND NUMBER OF AMENDEMNTS
IS 14220:1994 Amendment No. 1 to 5 – Openwell Submersible Pumpset
1.3 LIST OF REFERRED INDIAN STANDARDS FOR RAW MATERIAL/COMPONENTS AND TEST METHODS.
LIST OF REFERRED INDIAN STANDARDS
.IS NO. TITLE
210 : 1993 Grey iron castings ( fourth revision )
304 : 1981 High tensile brass ingots and castings ( second revision )
318 : 1981 Leaded tin bronze ingots and castings ( second revision )
613 : 1984 Copper rods and bars for electrical purposes ( second revision )
617 : 1994 Aluminium and aluminium alloy ingots and castings for general engineering purposes ( third revision )
694 : 1990 PVC insulated cables for working voltages up to and including 1 100 V ( third revision )
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 8 of 36
1570 (Pt 2/Sec 1) :1979 Schedule for wrought steels :Part 2 Carbon steels (unalloyed steels), Section 1 Wrought products (other than wire) with specified chemical
composition and related properties ( first revision )
1570 (Pt 5) :1985 Schedule for wrought steels : Part 5 Stainless and heatresisting steels ( second revision )
3444 : 1987 Corrosion resistant alloy steel and nickel base castings for general applications ( second revision )
4800 (Part 7) :1970 Enamelled round winding wires : Part 7 Wires with good dielectric properties under humid conditions
5120 : 1977 Technical requirements for rotodynamic special purpose pumps ( first revision )
8783 : 1978 PVC insulated winding wires for submersible motors for 85°C operation
9137 : 1978 Code for acceptance tests for centrifugal, mixed flow and axial pumps — Class C
9283 : 1995 Motors for submersible pumpsets
10572 : 1983 Methods of sampling for pumps
11346 : 1985 Testing set up for agricultural pumps
11723 : 1985 Balance quality of rotating rigid bodies
14582 : 1998 Single phase small a.c. electric motors for centrifugal pumps for agricultural applications
Latest versions of the above standards shall be applicable.
1.4 CHECK LIST FOR SUBMISSION OF APPLICATION FOR GRANT OF LICENCE
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 9 of 36
Checklist as enclosed at Annexure 1 may be used for submission of application for grant of licence.
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 10 of 36
SECTION NO.2 RAW MATERIAL/COMPONENTS
2.1 LIST OF IMPORTANT RAW MATERIALS INCLUDING THOSE WHICH ARE REQUIRED TO CONFORM TO RELEVANT INDIAN STANDARDS.
As per IS 14220:1994, Clause 6.1 indicates the material of construction . It is mentioned in the clause that some typical material used for construction of Openwell Submersible Pumpset are indicated in Table 1 of IS 14220:1994, which is only for the guidance of the manufacturer and the user. Thus, the conformity to the standard mentioned in Table 1 is not mandatory.
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 11 of 36
SECTION NO.3 MANUFACTURING PROCESS AND IN-PROCESS QUALITY CONTROLS
3.1 The manufacturing process of Openwell Submersible Pumpset mainly consists of manufacturing rotor and stator part, which are then assembled to make the Openwell Submersible Pumpset.
Incoming inspection of raw materials consists of visual and dimensional checks. The physical and chemical properties of the raw material are tested in outside laboratory by the manufacturer before use.
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 12 of 36
The process of manufacturing of rotor starts with the rotor shaft which is a bought out item. The shaft is taken for machining on lathe machine. After machining the rotor shaft is inspected for length and outside diameter. This is then taken on hydraulic press and the stampings bunch is pressed on the shaft. The rotor is then mounted on lathe machine and machining is done to the required diameter. Keyway is done on the rotor by keyway machine or lathe machine. The rotor outside diameter is then coated with epoxy paint. Thereafter rotor sleeve is grinded on cylindrical grinding machine to obtain surface roughness less than 0.75 Ra. After this the rotor is taken on balancing machine and is dynamically balanced as per Grade 6.3 of IS 11723(Pt.1):1992 .The rotor is thus ready for assembly.
The process of manufacturing of stator starts with the inspection of bought out stator body. The stampings are pressed by hydraulic press inside the stator body.. Thereafter varnishing is done on the inner side by air dry or vacuum varnish machine. Winding coil prepared on winding former is then inserted into the slots of stamping. The cable connection is done to the winding and the winding is tested for insulation test by meggar and high voltage test is also done. The stator is thus ready for assembly.
The rotor is inserted into the stator. Upper and lower housing is fitted and Gun metal bush is inserted at centre of Upper and lower housing. This motor body is then tested for no load test. The dynamically balanced impeller as per Grade 6.3 of IS 11723(Pt.1):1992 is then mounted on rotor shaft with the help of keyway and nut. The volute is fitted with upper housing covering the impeller. Suction inlet and delivery outlet are provided in the volute as per the requirement. Strainer is provided on the suction inlet, drain plug is provided on water inlet and brass plug are provided on air vent. The cable gland is provided with cable for protection. Breather diaphragm is provided on lower housing to control the temperature of water. Screw with washer is provided on the body for earthing purpose. The direction of rotation is marked on the volute by embossing.
The openwell submersible pumpset thus prepared is then taken for testing.
3.2 INFRASTRUCTRE FOR PRODUCTION
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 13 of 36
A typical infrastructure required for production is as follows:
1. Lathe machines for machining of casting, rotor, stator, etc. 2. Hydraulic press for fitting of stampings, inserting bush, etc. 3. Induction brazing machine for brazing of stamping. 4. Grinding machine for grinding of sleeve on shaft 5. Baking oven for drying of varnish/paint 6. Cutting machine for cutting of pipe. 7. Drilling machine for drilling of holes, etc. 8. Power saw for cutting. 9. Winding former/ machine for preparation of winding. 10. Bench grinder for grinding of tools. 11. Spray gun for painting 12. Painting booth for painting 13. Material handling equipments
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 14 of 36
SECTION NO.4 CERTIFICATION CRITERIA
4.1 IDENTIFICATION OF CRITICAL REQUIREMENT OF THE INDIAN STANDARD
As per CMD note dated 11 Nov 2013, the critical requirements of an Indian Standard shall be determined by a committee comprising the identified officer in the concerned CMD, member secretary of the concerned technical committee and an officer from Central laboratory.
4.2 SCHEME OF TESTING AND INSPECTION
The applicable Scheme of Testing and Inspection is DOC:STI/14220/2, January 2008 and the same is enclosed at Annexure-2.
4.3 MARKING FEE RATES
The marking fee applicable is as follows:
Unit- 1 PUMPSET
Rs 17.3 per unit for the first 200 Units
Rs 10 per unit for the next Rest Units
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 15 of 36
Minimum marking fee for large scale units : Rs 39200
Minimum marking fee for small scale units : Rs 32200
4.4 GROUPING GUIDELINES
The grouping guidelines applicable are as per CMD-3 note ref. CMD-III/16:8034/9079/ 14220/9283 dated 04.07.2011 and 10.05.2012 and the same is enclosed at Annexure-3.
4.5 GUIDELINES FOR WRITING SCOPE OF LICENCE
The scope of licence may be written as follows:
“Recommended grant of licence for ‘Openwell Submersible Pumpsets’ as per IS 14220:1994 with Amendment No. 1 to 5 for the varieties mentioned below
Sr. No
Model Delivery Size (mm)
No. of stages
Duty point Motor , Hz, Cat , Type ……… Duty ……
Min Sub. (m)
Head Nom. (m)
Disch. (lps) Nom.
Overall Eff. (%)
Rated Speed (rpm)
Rating (kW)
Max. Current
(A)
Winding Conn.
No. of Phases
Rated Voltage
(V)
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 16 of 36
Besides above, in case values of ‘Operating head range’ and ‘Minimum starting Torque (% of full load torque)’ as declared by manufacturer are superior to that given in the specification, the same shall also be mentioned. Also in case of single phase pump the capacitor details, value of capacitor start and run, motor efficiency needs to be mentioned in above format. In addition, if the discharge and/or head range is beyond the graphs depicted in Figure 5 & 6 of IS 14220:1994, pump efficiency factor needs to be declared by the manufacturer and included in above format.
In short, the parameters not declared in the standard and required for testing of pumpsets needs to be mentioned.
4.6 GUIDELINES FOR INCLUSION OF NEW VARIETIES
The inclusion of new varieties may be done as per normal/simplified procedure by testing the samples as per CMD-3 note ref. CMD-III/16:8034/9079/14220/9283 dated 04.07.2011 and 10.05.2012 and the copy of same is enclosed at Annexure-3
4.7 SAMPLE SIZE INCLUDING GUIDELINES FOR DRAWAL OF SEPARATE SAMPLES WHEN SAMPLES ARE REQUIRED TO BE SENT TO DIFFERENT LABS FOR TESTING
Since all the tests as per IS 14220:1994 can be done on a single Openwell Submersible Pumpset, only 1 pumpset shall be sent for testing and no separate raw material are required to be sent.
4.8 MANNER OF SEALING OF SAMPLE
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 17 of 36
The sample can be tied with a strong thread and wax sealed with BIS logo seal. Label shall be inserted in the thread before sealing. Alternatively, the sample can be punched with ISI punch on the casing and the code number can be written with marker pen and signed on the pumpset.
4.9 WHETHER REMNANT OF THE SAMPLE ARE RETURNABLE/NON RETURNABLE, TO BE SCRAPPED, USED, TO BE DE-SHAPED BEFORE DISPOSAL IN CASE OF SAFETY ITEMS ANY OTHER PRECAUTION REQUIRED FOR DEALING WITH REMNANTS
The Openwell Submersible Pumpset shall be returned to the licensee/applicant after testing. For this, sample release letter shall be issued both to laboratory and the applicant/.licensee after the test report of the same is received.
4.10 PROCEDURE TO BE FOLLOWED FOR DESTROYING/DE-SHAPING/RECYCLING THE PRODUCT THAT DOES NOT MEET THE QUALITY PARAMETERS DURING REGULAR PRODUCTION
Any rejection during regular production is normally re-cycled by the firm. In case, re-cycling is not possible, the rejection is scrapped. Also since the product is not under mandatory certification, the products not conforming to BIS requirements are often sold as non ISI product.
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 18 of 36
SECTION 5 INSPECTION AND TESTING
5.1 PACKING MATERIAL REQUIREMENTS TO BE AVAILABLE IN FACTORY FOR PACKING/DESPATCH OF SAMPLES
For sealing of samples, sealing wax, strong thread, blank yellow labels, candle, match box, permanent marker is required. The samples can then be packed in cardboard/wooden boxes.
5.2 LIST OF REQUIRED TEST EQUIPMENTS/FACILITIES WITH REQUIREMENT AND FREQUENCY OF CALIBRATION
As per note a) of typical framework of Product Manual, the list of test equipment is to be prepared /provided by CL.
5.3 STATUS OF TEST FACILITIES IN BIS LAB AND OSLs WITH TESTING CHARGES AND APPROXIMATE TIME REQUIRED FOR TESTING BY BIS LABS/OSLs.
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 19 of 36
The testing facility for Openwell Submersible Pumpset is not available in any of the BIS labs. The details of testing facilities available in OSL along with testing charges is enclosed at Annexure-5.
The testing time required for one pumpset is 2 days maximum.Thus, the testing time required shall be not more than 7 days depending upon the work load in the laboratory and the number of samples sent for testing.
5.3 WHETHER GRANT OF LICENCE WILL BE BASED ON - FACTORY TESTING BASIS OR - INDEPENDENT TESTING BASIS OR - MIXED
Since complete testing facilities are available in the laboratories, grant of licence will be based on independent testing basis.
5.4 DETAILS OF TESTS TO BE CARRIED OUT IN THE FACTORY IN CASE OF - APPLICANT SAMPLE/VERIFICATION SAMPLE - SURVEILLANCE/MARKET SAMPLES - RAW MATERIAL SAMPLES TO BE GOT TESTED IF ANY
All the tests as required as per IS 14220:1994 can be carried out in the factory in case of applicant sample/verification sample/surveillance sample. No separate raw material sample needs to be tested.
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 20 of 36
ANNEXURE 1.
CHECK-LIST FOR APPLICATION TO BE SUBMITTED BY APPLICANT TO BIS
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 21 of 36
WHILE APPLYING FOR BIS LICENCE UNDER PRODUCT CERTIFICATION SCHEME OF BIS
The following check-list is required to be submitted with all the applications for grant of BIS licence under the Product Certification Scheme of BIS. Please tick (√) in the relevant box.
Whether applied under: Simplified Procedure Normal Procedure
Note: Refer BIS website or details of “Simplified Procedure” and “Normal Procedure” for grant of licence.
No. Check-point Requirement Observations Page
No. General Is the application form completely filled?
1. Name &
Address
Is the name and address of applicant (manufacturing unit
applying for licence) same in the application as given in the
2. Status of
Applicant
(Manufacturing
Unit)
a. Has it been indicated whether the applicant is a large scale or
small scale unit?
b. In case the applicant is a small scale unit, does the applicant
hold valid Registration Certificate from the Local / State
authority or from a Chartered Accountant, and is the certificate
c. Has it been indicated whether the applicant is a Public Sector
or a Private Sector company?
3. IS No. &
Varieties
a. Has applicant recorded the applicable Indian Standard with
correct title of the Standard?
b. Where applicable, has applicant mentioned designation,
grade, type, variety, size, etc., of the product for which the BIS
5. History a. Where applicable, has the applicant provided information
regarding earlier BIS licence(s) held by them and / or
b. Where applicable, has the applicant provided information
regarding BIS licences currently held by them?
6. Signature a. Is the application signed by the CEO of the applicant?
b. In case the application is signed by a person other than the
CEO, is the application signed by the authorized signatory of
the applicant and his authorization is attached by the
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 22 of 36
7. Machinery a. Does applicant possess requisite manufacturing infrastructure
to manufacture the product as per the Indian Standard?
b. Is installed capacity of production indicated in the application?
c. Does applicant have all machineries installed as per
manufacturing process at the applicant’s manufacturing
d. If answer to ‘c’ above is no, does the applicant outsource any
of its manufacturing processes and possesses valid
agreement(s) with other manufacturing units for the
e. If answer to ‘d’ above is yes, does the applicant has any
control over such outsourced activity? Are these outsourced
process will ensure testing the quality of final product for all
8. Test Equipment
&
Calibration
a. Does applicant possesses requisite test facilities in-house as
per the relevant Indian Standard at its factory address?
b. Are valid calibration certificates for relevant test equipment
attached are complete and valid at least 3 months after the
c. If reply to ‘a’ above is no, does applicant have arrangement
with a BIS recognized outside lab for testing of the
requirements for which it does not possess test facilities in-
house? Is the consent letter as attached by applicant in this
regard in order?
Note: Relaxation in in-house test facilities may be allowed on
9. QC personnel Does the applicant employ qualified & experienced Quality
Control (QC) personnel on permanent basis and possess
documentary evidence to establish the same? Are the copies of
10. Raw Materials
and
Components
Where ever requirements for raw materials/ components used in
the manufacturing of the product are specified in the standard, do
test reports/suppliers’ test certificates, as submitted by the
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 23 of 36
11. Plant Layout Does copy of the plant (applicant manufacturing premises) layout
clearly indicates locations of manufacturing machinery,
12. Test Report(s) a. Is the attached test report of in-house or from independent
laboratory cover all requirements of the Indian Standard and is
b. In case the application is filed under “simplified Procedure” is
the test report(s), in original, as submitted a) from BIS or its
recognized laboratories? b) the test report is not older than
one month from the date of submission of application, c)
13. Undertaking In case application is under simplified procedure, an undertaking
shall be obtained from the applicant on his letter-head that the
licence if granted against his application shall be put under Stop
Marking by BIS if the verification sample(s) (any sample including
the long duration test samples) drawn during visit of the BIS
officer prior to grant of licence fail to conform to the requirements
of relevant Indian Standards. The licensee shall take necessary
corrective actions and inform the same to BIS along with fresh
samples (of rating/size/variety which facilitates verification of
corrective actions on the reported failures) manufactured after
taking the corrective actions. The resumption of marking in such
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 24 of 36
ANNEXURE 2 STI
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 25 of 36
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 26 of 36
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 27 of 36
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 28 of 36
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 29 of 36
ANNEXURE 3 GROUPING/GUIDELINES
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 30 of 36
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 31 of 36
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 32 of 36
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 33 of 36
ANNEXURE 4
List of BIS Laboratories
Date :- 20/11/2013
Record not Found !
Lab Quantity Lab Type Testing Facility Remarks
Record not found !
IS No. Testing Charges Remarks
Testing Facility:: C=Complete Test facility / P=Partial Test Facility/ N=No Test Facility
List of Outside Recognized Laboratories
IS Number :- IS 14220 - OPENWELL SUBMERSIBLE PUMPSETS
Sl No.
Name of the Recognized Laboratory Lab Code Testing Charges Remarks
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 34 of 36
1 Electronics and Quality Development Centre
B 177/178, GIDC Electronics Estate
Sector-25
Gandhinagar-382044
Gujarat
Contact : Mr. L.S. Sharma, Director
Tel : 079-23287119/20/22
Fax : 079-23287121
7118234 Upto 3.7kW-Rs.3,750/-, Above 3.7kW to 7.5kW- Rs.4,000/-, Above 7.5kW to 11 kW-Rs.4,750/-, Above 11kW to 15 kW-Rs.5,000/-, Above 18kW to 20 kW-Rs.5,250/-, Above 20 kW to 45 kW-Rs.7,250/-,
2 MSME Development Institute
386, Patel Road
Ramnagar
Coimbatore-641009
Tamilnadu
Contact : M. Palanivel, Deputy Director
Tel : 0422-2233956,
Fax : 0422-2230426
6105534 Pump only:- Rs.3,700/- upto 3.7kW; Rs.3,800/- above 3.7kW & upto 7.5kW; Rs.4,000/- above 7.5kW & upto 11kW; Rs.4,700/- above 11kW & upto 15kW. Pumpset:- Rs.6,500/- upto 3.7kW; Rs.7,000/- above 3.7kW & upto 7.5kW; Rs.7,700/- above 7.5kW & upto 11kW; Rs.9,200/- above 11kW & upto 15kW.
3 NSIC Technical Services Centre
80 Ft. Road, Near Bhavnagar Road
Crossing,
Aji Industrial Area
Rajkot-360003
Gujarat
Contact : Shri N.K. Subramani, Deputy
General Manager
Tel : 0281-2387613,2387396
Fax : 0281-2387729
7104734 Rs.4320/- Upto 3.7kW; Rs.5040/- above 3.7kW to 7.5kW; Rs.5760/- above 7.5kW to 11kW; Rs.6120/- above 11kW to 15kW; Rs.6480/- above 15kW to 20kW; Rs.7200/- above 20 kW to 25kW; Rs.7920/- above 25kW to 30kW; Rs.8424/- above 30kW to 35kW; Rs.9000/- above 35kW to 40kW; Rs.9504/- above 40kW to 45kW; Rs.10800/- above 45kW to 50kW; Rs.12600/- above 50kW to 60kW; Rs.14400/-
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 35 of 36
above 60kW to 70kW; Rs.17280/- above 70kW to 100kW
4 Scientific & Industrial Testing & Research Centre
83 & 84, Avarampalayam Road,
K.R. Puram P.O.
Coimbatore-641006
Tamilnadu
Contact : Sh. K. Gunabal, Joint Director
Tel : 0422-2562612,2560473
Fax : 0422-2562612
6104904 Rs.7500/- upto 3.7 kW, Rs.8100/- above 3.7 kW & upto 7.5 kW, Rs.9200/- above 7.5 kW & upto 11.0 kW, Rs.11500/- above 11.0 kW & upto 15.0 kW, Rs.15700/- above 15.0 kW & upto 20.0 kW, Rs.18200/- above 20.0 kW & upto 25.0 kW, Rs.20700/- abvoe 25.0 kW & upto 30.0 kW, Rs.23100/- above 30.0 kW & upto 35.0 kW, Rs.26200/- abvoe 35.0 kW & upto 40.0 kW, Rs.27300/- abvoe 40.0 kW & upto 45.0 kW, Rs.29500/- above 45.0 kW & upto 50.0 Kw
5 Electrical Research & Development Association
P.B. No. 760, ERDA Road,
Makarpura Industrial Estate
Vadodara-390010
Gujarat
Contact : Dr. M.K. Shah, JD&Quality
Manager -Mob:09978940911
Tel : 0265-2642942,964,377
Fax : 0265-2648382
7101125 upto 5.5kW: Rs.5505/-, 5.5kW to 11kW :Rs.6745/-, 11kW to 22 kW:Rs.7850/-, 22kW to 45kW :Rs.10820/- [25% discount for
-
BUREAU OF INDIAN STANDARDS
PRODUCT QUALITY MANUAL
OPENWELL SUBMERSIBLE PUMPSET
ISSUE NO. 01 PAGE REV NO. 0
DOC NO. BIS/PQM/OSP
DATE: 20 NOV 2013
PREPARED BY PAGE NO APPROVED BY SANJIV MAINI., Sc D, ABO Page 36 of 36