26
PUBLIC HEARING TO CONSIDER SANITARY SEWER SERVICES RATE INCREASES FOR 5 YEARS, FISCAL YEARS 2015-2021 PUBLIC HEARING June 16, 2015 BURBANK SANITARY DISTRICT 1

BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

PUBLIC HEARING TO CONSIDER SANITARY SEWER SERVICES RATE

INCREASES FOR 5 YEARS, FISCAL YEARS 2015-2021

PUBLIC HEARING June 16, 2015

BURBANK SANITARY DISTRICT

1

Page 2: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

BURBANK SANITARY DISTRICT

• Burbank Sanitary District (BSD) was formed in 1940

• The District serves an unincorporated pocket within City of San Jose mainly from Forest Avenue south to Parkmoor Avenue and from Bascom Avenue east to Richmond Avenue

• BSD serves approximately 1,000 properties with a population of 4,926

• The flow is conveyed to the San Jose/Santa Clara Water Pollution Control Plant (approximately 10 miles away)

2

Page 3: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

BURBANK SANITARY DISTRICT (BSD) SERVICES

• Garbage services collection

• Street sweeping services

• Sanitary sewer collection and treatment services

3

Page 4: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

SANITARY SERVICES

• Respond to residents’ inquiries and assist in locating cleanouts, backflow devices, and laterals

• Respond to sanitary sewer overflows/stoppages

• Maintain & repair mains and lower laterals

• Implement District capital improvement projects • Coordinate with the State Board and Federal Regulatory

Agencies • Work with City of San Jose for District’s use of the San

Jose/Santa Clara Water Pollution Control Plant

4

Page 5: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

San Jose-Santa Clara Treatment Improvements

• Plant was constructed in the 1956, upgraded in 1964 and 1979 • Plant is undertaking a major 30-year Rehabilitation Program • Proposed Treatment Plant costs are estimated at $2.1 billion

5

Page 6: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

Tributary Discharger % Cost Share of $1,324,640,631

City of San Jose 67.97% $900,380,034

City of Santa Clara 13.81% $182,993,139

City of Milpitas 6.93% $91,732,407

West Valley Sanitation District 6.34% $83,942,060

Cupertino Sanitary District 4.13% $54,754,366

County Sanitation District 2-3 0.58% $7,682,188

Burbank Sanitary District 0.24% $3,156,438

COST BREAKDOWN OF 10-YEAR CAPITAL IMPROVEMENTS

FOR THE TREATMENT PLANT - FY 2016 THROUGH 2025

6

Page 7: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

Discharge improvements to the Bay Digesters and bio-solid disposal

Improvements to water and air quality

Mechanical/Electrical equipment improvements 7

Page 8: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the
Page 9: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

9

Page 10: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

DISTRICT CIP CHRONOLOGY

10

ITEM Date Completed Condition Assessment completed initial 10 year CIP strategy

July 10, 2014

First Public Outreach presentation

November 10, 2014

Zone A additional investigation - Easement letters sent

January 9, 2015

- Field inspection

February 18, 2015

- Mapping

March 15, 2015

- Preliminary engineering

April 21, 2015

- Present CIP strategy

June 1, 2015

Page 11: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

DISTRICT CAPITAL PROJECTS There are 3 types of rehabilitations: Zone A, Zone B, and Zone C

• Zone A (located between Scott Street and I-280) will require all sewer mains to be fully replaced. Most sewer mains are located in the backyards between two properties; therefore, they are difficult to replace. District is considering pipe busting to rehabilitate.

• Zone B is all other portions of the District north of Zone A and will require spot repairs. Sewer mains in Zone B are located in the street.

• Zone C is the potential commercial redevelopment (formally part of Zone A) that will require full sewer replacement in the backyards/alley.

Page 12: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

ZONES A & C REHABILITATION STRATEGY

• Construction method: Pipe Bursting • Cost: $1,400,000 • Construction Implementation Strategy:

– In third year, one construction package with financing or – Staggered 3rd, 5th and 7th year, pay as you go

Page 13: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

ZONE B REHABILITATION

• Construction methods: – Total spots to be repaired: 125

– 581 feet of pipe replacement on Cleveland Avenue

• Total cost: $1,876,000

Page 14: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

ALTERNATIVE 1 10 YEAR CIP IMPLEMENTATION

Third Year, One construction Package for Zones A and C and finance $1,000,000

YEAR ZONE LOCATON DESCRIPTION COST

1 B Arleta Ave, Irving Ave 20 spot repairs $246,000

2 B Leland Avenue 16 spot repairs $253,000

3 A/C All Streets, includes Scott St Pipe Bursting $1,400,000

4 B Boston Avenue, Bailey Avenue 15 Spot repairs $246,000

5 B Cleveland Avenue 4 Spot repairs + Replacement

$285,000

6 B Bailey Avenue, Laswell Avenue, Richmond Avenue, Brooklyn 31 Spot repairs $330,000

7 B Rutland Avenue, Vaughn Avenue 12 Spot repairs $174,000

8 B Bascom Avenue, Wabash Avenue, Leigh Avenue 11 Spot repairs $137,000

9 B Cecil Avenue, Clifton Avenue , Raymond Avenue 9 Spot repairs $141,000

10 B Forest Avenue, Arleta Avenue 3 Spot repairs $51,000 Total Cost = $3,276,000

Page 15: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

ALTERNATIVE 2 10 YEAR CIP IMPLEMENTATION

Zones A and C divided into 3 construction packages 3rd, 5th and 7th year.

YEAR ZONE LOCATON DESCRIPTION COST 1 B Arleta Ave, Irving Ave 20 spot repairs $246,000

2 B Leland Ave 27 spot repairs $253,000

3 A Easement between Laswell Ave and Arleta Ave, portion of easement between Arleta Ave and Raymond Ave, Scott St

1/3 Pipe Bursting $450,000

4 B Boston Ave, Bailey Ave 15 spot repairs $246,000

5 A Portion of easement between Arleta Ave and Raymond Ave, portion of easement between Raymond Ave and Irving Ave

1/3 Pipe Bursting $450,000

6 B Cleveland Ave, Brooklyn Ave 15 Spot repairs + Replacement

$449,000

7 A/C Portion of easement between Raymond Ave and Irving Ave, easement between Bascom Ave and Laswell Ave

1/3 Pipe Bursting $500,000

8 B Bailey Ave, Laswell Ave, Richmond Ave 20 Spot repairs $166,000

9 B Rutland Ave, Vaughn Ave, Bascom Ave, Wabash Ave, Leigh Ave 23 Spot repairs $301,000

10 B Cecil Ave, Clifton Ave, Raymond Ave, Forest Ave, Arleta Ave 12 Spot repairs $192,000

Total Cost = $3,276,000

Page 16: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

16

Page 17: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

17

Page 18: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

18

Page 19: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

$259,549.00 $270,000.00 $280,800.00 $292,032.00 $303,713.00

$246,000.00 $430,000.00 $450,000.00

$246,000.00 $400,161.00

$538,026.00

$547,697.00

$760,593.00

$552,416.00

$0

$200,000

$400,000

$600,000

$800,000

$1,000,000

$1,200,000

$1,400,000

$1,600,000

PROJECTED EXPENSES FOR BSD

FY2014-15 FY 2015 - 16 FY2016 - 17 FY2017 - 18 FY2018 - 19

SJ/SC COST BSD CIP BSD O&M

ACTUAL COST

PROJECTED COST AT

END OF THIS FISCAL YEAR

FUTURE THREE YEAR PROJECTED COSTS

19

Page 20: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

20

Projected Revenue $721,700 Reserve Fund $259,333 Total Funds Required To Balance Expenses $981,033

Expenses for District’s Operations FY 2015 - 2016

Total Projected Expenses - $981,033

Revenue for District’s Operations FY 2015 - 2016

District Operation and Maintenance,

$374,005 , 38.12%

Treatment Plant Operation and Maintenance,

$212,159 , 21.63%

Treatment Plant Capital Outlay, $95,769 , 9.76%

District Capital Construction,

$246,000 , 25.08%

Joint Use (CSJ Payment),

$20,000 , 2.04%

Treatment Plant O & M Equip Repl, $1,000 ,

0.10%

Debt Related Expenses,

$32,100 , 3.27%

Permits, Fees & Misc, $3,000

, 0.31% Sewer Service

Charges, $715,700 ,

72.95%

Interest Earning,

$3,000 , 0.31%

Transfer Funds from Reserve to

Balance Expenses, $259,333 ,

26.43%

Page 21: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

21

$516

,067

$531

,490

$549

,744

$576

,583

$622

,232

1

$303

,345

$245

,377

$270

,472

$315

,418

$241

,050

$302

,394

$254

,955

$245

,457

$372

,738

$223

,761

$767

,150

$874

,300

$822

,800

$1,2

94,9

50

$95

3,00

0

$277

,387

$0

$200,000

$400,000

$600,000

$800,000

$1,000,000

$1,200,000

$1,400,000

LAST FIVE YEAR COMPARISION ACTUAL REVENUES, EXPENSES AND BUDGET

Approved Budget

District CIP

SJ/SC O&M & CIP

BSD O&M

Actual Tax Roll Revenue

FY2010 - 11 FY 2011 - 12 FY2012 - 13 FY2013 - 14 FY2014 - 15 FY14-15 Estimated thru June 30, 2015

Actu

al R

ev

Actu

al E

xp

Appr

oved

Bu

dget

Actu

al R

ev

Actu

al E

xp

Appr

oved

Bu

dget

Actu

al R

ev

Actu

al E

xp

Appr

oved

Bu

dget

Actu

al R

ev

Actu

al E

xp

Appr

oved

Bu

dget

Actu

al R

ev

Actu

al E

xp

Appr

oved

Bu

dget

Page 22: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

22 22

Proposed Percentage Increase for FY 2015-16

8% 10% 8% 5% 15% 0% 4%

Santa Clara WVSD CuSD CSD 2-3 Burbank San Jose MilpitasFY 2009-10 $195.60 $279.48 $288.00 $286.00 $354.91 $334.00 $334.00FY 2010-11 $232.80 $294.48 $288.00 $315.00 $369.00 $366.00 $366.00FY 2011-12 $277.03 $311.88 $330.00 $343.32 $383.76 $372.00 $390.48FY 2012-13 $350.40 $330.60 $330.00 $429.12 $399.23 $394.32 $425.64FY 2013-14 $396.00 $363.72 $363.00 $493.49 $415.20 $405.96 $455.52FY 2014-15 $415.80 $400.08 $381.15 $542.84 $456.72 $405.96 $521.64FY 2015-16 PROPOSED $449.06 $440.09 $411.64 $569.98 $525.23 $405.96 $542.51

$0.00

$100.00

$200.00

$300.00

$400.00

$500.00

$600.00

Annu

al R

ate

Char

ges

San Jose-Santa Clara Treatment Plant Agency Single Family Residential Rates

Page 23: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

23

Page 24: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

RATE INCREASE NEEDED TO . . . • Continue to pay City of San Jose for the Treatment Plant cost

• Maintain current level of District operations and maintenance

• Increase BSD capital project program to be in compliance with

Sewer System Management Plan (SSMP).

• Repair infrastructure, as over 85% of the District’s sanitary sewer pipes and laterals were constructed in the 1950’s, and most pipes are beyond the expected useful life.

24

Page 25: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

Type of Services Current Rates Proposed Rates for FY 2015-2016

Residential Per Unit (Single Family/Townhouse/Condo)

$456.72/Year $38.06/Month

$525.24/Year $43.77/Month

Residential Multiple Per Unit (Duplex/Apartment)

$259.68/Year $21.64/Month

$298.68/Year $24.89/Month

Commercial Properties $3.15/HCF $327.36/Year Minimum

$3.62/HCF $376.44/Year Minimum

Restaurant $8.39/HCF $1,368.36/Year Minimum

$9.65/HCF $1,573.56/Year Minimum

Garage $3.66/HCF $1,298.64/Year Minimum

$4.21/HCF $1,493.40/Year Minimum

25

Current District Rates Versus Proposed Rates

• HCF - Hundred Cubic Feet

Page 26: BURBANK SANITARY DISTRICT PUBLIC HEARING TO …j.b5z.net/i/u/10227713/f/BSD_Rate_increases__FY15-16_6-16-2015_FINAL.pdfJun 16, 2015  · • Continue to pay City of San Jose for the

QUESTIONS AND CONTACT INFORMATION

Questions or further suggestions please write to the District office at: 20863 Stevens Creek Blvd

Cupertino, CA 95014 Or please feel free to call us at or visit:

408-253-7863 http://www.burbanksanitary.org/

BOARD OF DIRECTORS STAFF Michelle Kaelker-Boor – President Richard K. Tanaka Keri Russo – Secretary District Manager - Engineer Rebecca Yoder – Director (Mark Thomas & Company, Inc.) Ken Colson – Director Rene Prupes – Director