Building Structure Fettuccine Bridge Analysis Report

Embed Size (px)

Citation preview

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    1/30

    BUILDING STRUCTURES[ARC 2213 ]

    FETTUCCINE TRUSS

    BRIDGE ANALYSISREPORT

    C H O O A I L I N0 3 1 7 2 5 3

    E L A I N E B O N G

    0 3 1 0 4 3 2

    L A U E E T I A N

    0 3 0 9 5 9 6

    SOH YOH SH IN G

    0 3 0 8 0 1 0

    SURAYYN SELVAN

    0 3 0 9 8 1 8

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    2/30

    BUILDING STRUCTURES [ ARC 2213 ]

    TA B L E O F C O N T E N T S

    1 I N T R O D U C T I O N

    2 M E T H O D L O G Y

    2 . 1 P R E C E D E N T S T U D Y

    2 . 2 M A K I N G O F F E T T U C C I N E B R I D G E

    2 . 3 R E Q U I R E M E N T

    3 P R E C E D E N T S T U D Y

    4 A N A L YS I S4 . 1 S T R E N G T H O F M A T E R I A L

    4 . 2 A D H E S I V E A N A LY S I S

    5 M O D E L MA K I N G

    5 . 1 M E T H O D O F C O N S T R U C T I O N

    5 . 2 J O I N T

    6 T E S T I N G

    6 . 1 F I R S T B R I D G E

    6 . 2 S E C O N D B R I D G E

    6 . 3 T H I R D B R I D G E

    6 . 4 F I N A L B R I D G E

    7 D E S I G N M O D I F I C AT I O N

    7 . 1 FA I L U R E R E A S O N I N G

    7 . 2 S O L U T I O N

    8 C O N C L U S I O N

    9 A P P E N D I X

    1 0 R E F E R E N C E S

    0 1

    02

    02

    03

    0 4

    0 8

    1 0

    11

    1 3

    1 4

    1 6

    1 8

    2 0

    2 4

    2 5

    26

    27

    2 8

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    3/30

    BUILDING STRUCTURES [ ARC 2213 ] 01

    1 I N T R O D U C T I O N

    This project aims to develop our understanding of tensile and compressive strength of

    construction materials by understanding the distribution of force in a truss.

    In order to do achieve that, we were required carry out a precedent study on a truss

    bridge of our choice, analyzing the connections, arrangements and orientations of the

    members. Once that was completed, we were required to design and construct a truss

    bridge made out of fettuccine.

    The requirements for this bridge include it having a 750mm clear span and a maximum

    weight of 200g. This bridge will then be tested to fail and we were required to analyze

    the reasons of its failure and calculate its efficiency.

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    4/30

    BUILDING STRUCTURES [ ARC 2213 ]

    2 M E T H O D O L O G Y

    2.1 PRECEDENT STUDY

    By looking through precedent studies to have a better understanding of the types of trussesavailable. Next, understanding the forces that would be exerted to the trusses;

    compression and tension, would allow us to make adjustment to our bridge, that would best

    suit the given material; fettuccine.

    2.2 MAKING OF FETTUCCINE BRIDGE

    PHASE 01: STRENGTH OF MATERIAL

    Understanding the properties of the fettuccine is important in order to build one bridge that

    can carry maximum load. For the tensile strength in the fettuccine is considerable low when

    compare to aluminium which has the same amount of stiffness to the fettuccine.

    PHASE 02 : ADHESIVE

    Choosing the right type of adhesive is important as it plays a huge role in this assignment.

    As there are many types of adhesive in the market that each has their own function and

    characteristics. Not only the type of adhesive is important but the brand of adhesive is

    important as well, for different brand has different quality and choosing one that suits

    constructing the fettuccine bridge is primary.

    PHASE 03: MODEL MAKING

    To ensure precision in our model making, Autocad drawings are drawn in 1:1 scale and

    plotted out to ensure precision and ease our process. And in order to strengthen our bridge

    as much as possible, each pasta is marked individually as each has their own location of

    placement and length, and are glued accordance.

    02

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    5/30

    BUILDING STRUCTURES [ ARC 2213 ] 03

    2 M E T H O D O L O G Y

    PHASE 04 : MODEL TESTING

    Finished models are being tested after placing aside to allow the adhesive to sit on the model.By placing weight on the middle of intermediate member to ensure that load is evenly

    distributed. All these are being recorded to allow us to fix and analysis our bridge.

    2.3 REQUIREMENTS

    To have a clear span of 750mm

    Not exceeding the weight of 200g

    Only material allowed is fettuccine pasta and adhesive

    Allowed to use any type of adhesive possible

    Workmanship is put to consideration as part of aesthetic value

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    6/30

    BUILDING STRUCTURES [ ARC 2213 ]

    3 P R E C E D E N T S T U D Y

    The Heshbon Bridge, located at Indiana, Pennsylvania state in the United State of America,

    is one of the last state-standard truss bridges built. Many bridge were constructed acrossthe Pennsylvania state from the late 1920's through 1941. This bridge was constructed in

    1941 by Paul Construction Company and Pennsylvania State Highway Department which

    has a main span of 153ft(46.6m) with a total length of 158 ft(48.2m) and 26ft(7.9m)

    r o a d w a y w i d t h o v e r t h e B l a c k L i c k C r e e k .

    HESHBON BRIDGE, INDIANA (1941)

    04

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    7/30

    3 P R E C E D E N T S T U D Y

    This bridge is a relatively small example of Pennsylvania's very attractive standard plan of

    1930s to 1940s truss bridge design. As such, it features a shallower portal bracing design

    that other bridges built to this standard. In 2009, the government wanted to replaced the

    bridge but fortunately they decided to rehabilitate it instead of replacing it. This will include a

    deck replacement as well as structural steel repairs. So, the Heshbon bridge represents a

    good preservation project and it became one of the tourist attraction in Pennsylvania.

    BUILDING STRUCTURES [ ARC 2213 ]

    Heshbon Bridge from 1941-2009

    Old railroad bridge with wooden

    pathway.

    Heshbon Bridge 2009 until today

    After rehabilitate, the bridge

    became a bike path

    Heshb on Brid ge Before Restore Heshbon Brid ge After Restore

    The map above shows the bridge is located over Black Lick Creek In Heshbon,

    Indiana County, Pennsylvania.

    05

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    8/30

    3 P R E C E D E N T S T U D Y

    BUILDING STRUCTURES [ ARC 2213 ]

    The 1941, skewed, 158ft long, riveted Parker truss bridge is supported on ashlar

    abutments with concrete caps. The trusses are traditionally composed with the upper

    and lower chords being built up box sections, and the verticals and diagonals rolled I

    sections. Lateral and sway bracing are laced channels. The deck is reinforced

    concrete, and the s teel ra i l ings ins ide the t russ l ines are or ig inal .

    TRUSS CONNECTIONS AND MEMBERS

    Portal view on bridge Top chord connections

    Bottom chord connections.Connections of truss web

    06

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    9/30

    3 P R E C E D E N T S T U D Y

    Vertical member detail End Post

    BUILDING STRUCTURES [ ARC 2213 ]

    Railing detailRailing

    Abutments Ashlar abutment

    07

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    10/30

    BUILDING STRUCTURES [ ARC 2213 ] 08

    4 A N A LY S I S4 . 1 S T R E N G T H O F M A T E R I A L

    WEIGHT

    With the requirement of only 200G, we had to creative solution, to reinforce our bridge

    while making sure that the weight of bridge does not exceed the requirement. Thus we

    came our with solution by selecting parts that holds load and reinforce it by adding layers

    to it. But bearing in mind that the more layers added, the more weight it holds.

    Before we started our model making, we did a little experiment of the maximum weight the

    fettuccine can carry. We tried out with 4 different layers to carry out this experiment.

    Experiment (left to right):I. One Layer

    II. Two Layers

    III. Three Layers

    IV. Four Layers

    Experiment 03: Three Layers

    When load is applied, members could be seen slightly sturdier

    when compare to Experiment 2. But a slight bend in the middle

    could be seen. Total weight being 2.8G

    Experiment 02: Two Layers

    In the two layer of fettuccine, a slight bend could be seen in the

    fettuccine, although it is not as extreme as Experiment 1. Total

    weight being 1.17G

    Experiment 01: One Layer

    Members starts to bend after load is applied with just one layer of

    fettuccine. Total weight being 0.56G.

    Experiment 4: Four Layers

    With four layers, it has proven to be the most stable option

    among all experiments. Total weight being 2.05G.

    Properties of spaghetti (dry)

    1. Ultimate tensile strength ~2000 psi

    2. Stiffness (Youngs modulus)

    E ~10,000,000 psi

    (E=stress/strain)

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    11/30

    BUILDING STRUCTURES [ ARC 2213 ]

    4 A N A LY S I S4 . 1 S T R E N G T H O F M A T E R I A L

    ORIENTATION

    Horizontal members were placed between

    trusses, to hold both pieces of the bridge

    together. They held no force besides balancing

    the whole truss bridge. Hence, we reduced thehorizontal members to one layer in our second

    and third bridge, for our bridge to fit the

    requirement in terms of the bridges weight.

    VS

    Method 01 was used in our case

    because the members were fitted

    between the arch and the bottom

    chord. This can ensure that the

    load was distributed evenly to thearch. Comparing to Method 02,

    which the bracings were glued on

    the outside truss. Thus, Method 01

    was a better choice of orientation.

    Where Method 02 is still able to

    distribute the load but the bracings

    were not secured onto arch and

    bottom chord, relying on the glueMethod 01 Method 02

    The intermediate member is where

    the hook that held on load is

    placed. Making its role important.

    Where the orientation and its

    layers are vital. We found out the

    load can be transferred moreefficiently when it was placed

    exactly in the middle in upright

    position, where the load can be

    distributed evenly to the sides.

    09

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    12/30

    BUILDING STRUCTURES [ ARC 2213 ]

    4 A N A LY S I S4 . 2 A D H E S I V E A N A L Y S I S

    Type of Adhesive Advantages Disadvantages

    XtrasealsSuper Glue High efficiency Fast solidify time

    Easy to use

    Easy to bend fettuccinewhen applied

    Cracked joint after

    dried for few days

    SelleysSupa Glue High efficiency Fastest solidify time

    Easy to use

    Cracked joint after

    dried for few days

    UHU Glue Easy to use Low efficiency Causes flexible joints

    Longer solidify time

    Causes bridge to

    weigh more

    Three different kinds of glue used to ensure the joints are strong and thus strengthen

    the bridge.

    SelleysSupa Glue was used the most while constructing our fettuccine bridge. It has

    high efficiency and it dried faster compared to the other adhesives, as it is more

    concentrated when compare to XtrasealsSuper Glue. To make sure the glue worked

    at its best, allow the glue to settle in the bridge to make sure it is dry before the

    t e s t i n g i t . T h i s i s t o e n s u r e t h e b r i d g e p e r f o r m a t i t s b e s t .

    The Xtraseal super glue is only used on the arch where slower solidify of glue is

    needed in order to buy some time while constructing the arch, for better precision.

    UHU Glue is avoided if possible, as it causes the joints to be flexible. It also requireslonger time to dry. Making it the worst option, for joints should be rigid.

    10

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    13/30

    BUILDING STRUCTURES [ ARC 2213 ]

    5 M O D E L M A K I N G5 . 1 M E T H O D O F C O N S T R U C T I O N

    02. We started off by doing the

    bottom chord of the bridge by

    dividing the base of the bridge into 4layers with different length.

    03. Then we glued the it together

    using the method above to distribute

    the breaking point of the base

    evenly.

    04. For the arc of the bridge, we

    also divided it into 4 layers. In order

    the get the shape of the arc, gluing

    it layer by layer and bend it

    accordingly.

    01. First, we printed out a copy of

    the design of our bridge so that it will

    be easier for us to bend thefettuccine to get the shape of the

    arc.

    05. We cut and glued the verticaltruss and the bracing of the bridge.

    After completing one side of bridge,

    we used the same method for the

    other side

    06. Finally, we connected the 2 sidesof the bridge by placing horizontal

    fettuccine in between.

    Joint

    11

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    14/30

    BUILDING STRUCTURES [ ARC 2213 ] 12

    5 M O D E L M A K I N G

    7. The middle piece of the

    horizontal truss is reinforced as it

    was the piece that holds theweight.

    9. The completed final model.

    8. The top parts of the bridge are

    joined with double layers of

    fattucine.

    5 . 1 M E T H O D O F C O N S T R U C T I O N

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    15/30

    BUILDING STRUCTURES [ ARC 2213 ]

    5 M O D E L M A K I N G5 . 2 J O I N T

    PLAIN BUTT JOINT

    1. Two fettuccine

    doubled-layer to make it

    stronger

    3: Repeat this procedure.

    2. Join one fettuccine to

    other the end of another

    fettuccine.

    Final Product

    OVERLAID JOINT

    1. Randomly choose 2

    fettuccine.

    2. Place a fettuccine

    horizontally in between of

    the 2 fettucine.

    3. Trim the excess and

    repeat the procedure.

    Final Product

    13

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    16/30

    BUILDING STRUCTURES [ ARC 2213 ] 14

    6 T E S T I N G6 . 1 F I R S T B R I D G E

    For our first bridge we used the

    precedent study as a guideline for our

    first bridge. By changing it to an arch to

    allow the bridge to increase the

    compression member. On our first trial

    we did not focus much on the weight of

    our bridge but more our reinforcing it andunderstanding the adhesive and the orientation of the trusses. Although our required clear

    span is just 750MM we added an additional 74MM on each sides of our bridge to allow it to

    rest on the table, in order to spread the load applied on bridge. Each segments having atotal length of 80MM allowing us to produce total of an odd 11segments where we produce

    just one Xtruss on the middle segments. This is part of our technique in order to produce

    as little weight than producing an even number of segments where we would be force toproduce two Xtruss in order to be centralized.

    Model Testing

    Middle of intermediate member broke off after 6KG

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    17/30

    BUILDING STRUCTURES [ ARC 2213 ]

    6 T E S T I N G6 . 1 F I R S T B R I D G E

    Length:

    Width:

    Height:

    Weight:

    Max. Load

    Efficiency

    After a few trials, only the intermediate member would

    broke after applying force. Proving that our truss is

    stable. Thus, the only problem with our bridge is the

    weight of it. Resulting in the second bridge.

    L

    O

    A

    D

    Compression

    Tension

    209MM

    908MM

    90MM

    FAILURE

    Two layers

    Four layers

    908MM

    90MM

    209MM

    225G

    6KG

    0.16

    15

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    18/30

    BUILDING STRUCTURES [ ARC 2213 ]

    6 T E S T I N G6 . 2 S E C O N D B R I D G E

    The second bridge also

    followed the design of the

    precedent study - Heshbon

    Bridge similar to the first bridge.

    The first bridge was too heavy

    as we have a weight limit stated

    by the brief which was 200g.

    We decided to maintain the

    height and the bottom chordchord because these two were the most important members in a truss. So we reduced the

    layers of the zero force members which were the horizontal members holding both truss

    together. Two intermediate members were place in the middle where the load would be

    hung. One, which had four layers, was placed in the centre of the whole truss to hold the

    both trusses together. The other, which had eight layers, was placed diagonally on the

    bottom chord intersecting with the middle member.

    Intermediate member bending just before it breaks.

    Broken intermediate members

    16

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    19/30

    209MM

    900MM

    90MM

    L

    O

    A

    D

    Compression

    Tension

    FAILURE

    Two layers

    Four layersOne layer

    BUILDING STRUCTURES [ ARC 2213 ]

    6 T E S T I N G6 . 2 S E C O N D B R I D G E

    Length:

    Height:

    Width:

    Weight:

    Max. Load:

    Efficiency:

    Only the intermediate members of the second bridge

    broke off without damaging the truss which means that

    it had not achieved its maximum efficiency yet with the

    load of 5KG.

    908MM

    90MM

    209MM

    225G

    5KG

    0.12

    17

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    20/30

    BUILDING STRUCTURES [ ARC 2213 ]

    6 T E S T I N G6 . 3 T H I R D B R I D G E

    besides increasing stability, we also reduced 0.7G of weight which contributes into higher

    efficiency. Total height of the third bridge is 178MM. Proven that our proposal of reducingthe height was a success. Conversely, when the height decreased, the center of gravity

    become lower hence the bridge become more stable., standing up straight raises the

    center of gravity above the base of support and decreases stability. The amount of layer

    used in each location of the member is the same because we couldntafford to lessen thelayers of the bottom chord or the arch, thus we choose to shorten the height instead.

    After considering from

    failure of the second

    brid ge design, we

    intended to reduce thehe ight o f the arch

    Perspective view of third bridge.

    Placement of horizontal member is the

    same with previous bridge

    Model testing.

    18

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    21/30

    Two layers

    Four layersOne layer

    BUILDING STRUCTURES [ ARC 2213 ]

    6 T E S T I N G6 . 3 T H I R D B R I D G E

    L

    OA

    D

    Compression

    Tension

    178MM

    908MM

    90MM

    FAILURE

    The reason third bridge failed is because the horizontal

    member was just one layer causing the joint not to be

    strong enough to withstand the load exerted onto the

    bridge. And the intermediate member broke fall off,

    i s s u i n g a p r o b l e m w i t h w o r k m a n s h i p .

    908MM

    90MM

    178MM

    200G

    3.8KG

    0.0.722

    FAILURE

    Length

    Width

    Height

    Weight

    Max. Load:Efficiency:

    19

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    22/30

    BUILDING STRUCTURES [ ARC 2213 ] 20

    6 T E S T I N G6 . 4 F I N A L B R I D G E

    were broken. We decided to rearrange our horizontal bracing. Instead of using one strip of

    fettuccine we decided to have two layers but reduce the number of horizontal bracing, thus

    we managed not to exceed much weight as stated in requirement. We mainly placed these

    bracings where the forces would act most upon.

    By rearranging and adding the additional layer of to the horizontal fettuccine members, it

    managed to increased the efficiency of our bridge. During the final testing of our bridge, the

    middle of the immediate member of our bridge broke under the force exerted by the load.

    After the testing of our third bridge,our arch and trusses were still in

    tact and only the horizontalbraces connecting the trusses

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    23/30

    BUILDING STRUCTURES [ ARC 2213 ] 21

    6 T E S T I N G6 . 4 F I N A L B R I D G E

    L

    O

    A

    D

    Compression

    Tension

    178MM

    908MM

    90MM

    FAILURE

    Two layers

    Four layersOne layer

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    24/30

    BUILDING STRUCTURES [ ARC 2213 ] 22

    6 T E S T I N G6 . 4 F I N A L B R I D G E

    MODEL TESTING

    Weight: ~ 500g Weight: ~ 1000g

    Weight: ~ 1500g Weight: ~ 2000g

    Weight: ~ 2500g Weight: ~ 3000g

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    25/30

    BUILDING STRUCTURES [ ARC 2213 ] 23

    6 T E S T I N G6 . 4 F I N A L B R I D G E

    Weight: ~ 3500g Weight: ~ 4000g

    Weight: ~ 4500g Weight: ~ 4700g

    Length:

    Width:

    Height:

    Weight:

    Max. Load:

    Efficiency:

    908mm

    90mm

    178mm

    202g

    4.7kg

    0.109

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    26/30

    BUILDING STRUCTURES [ ARC 2213 ] 24

    7 D E S I G N M O D I F I C A T I O N7 . 1 F A I L U R E R E A S O N I N G

    Reason 01:The bottom chord of our bridges arentcompletely touching the base at both sides, as it is

    only partially touching the base. This is due to the lack of precision in our workmanship.

    This cause our bridge to be unbalance and not stable. Our models could have slipped off

    when load is being exerted towards bridge. Causing our bridge to be twisted.

    Reason 02:

    As some of the is slanted and not 180flat, for nothing is perfect. As it is crucial to use a flat

    fettuccine pasta for when layering the width of layered fettuccine would be uneven at

    slanted area. And with the slanted part the load distribution would be disturb and unstable

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    27/30

    BUILDING STRUCTURES [ ARC 2213 ] 25

    7 D E S I G N M O D I F I C A T I O N7 . 2 S O L U T I O N

    Solution 01:Using masking tape on the members onto the printed drawing, to ensure that members

    does not slipped off. Thus member would remain constant and provide precision. But one

    would need to make take into consideration that masking tape is not as strong as we want

    them to , so members wou ld sh i f t when work ing on o ther members .

    Solution 02:

    Using UHU Glue to fill the gaps in between joints would help Reason 01, but bearing in

    mind that weight of bridge would increase and aesthetic value of the bridge would fall. By

    reinforcing both Super Glue and UHU Glue, structure seems to work just fine with it.

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    28/30

    BUILDING STRUCTURES [ ARC 2213 ] 26

    8 C O N C L U S I O N

    From this assignment we were able to have a better grasp of understanding

    the load and compressive strength of construction material. Teaching us

    methods as to constructing a building structurally stable. As forces and loads

    plays an important role in this assignment, aiding us to understand how it is

    distributed in truss. Not forgetting that we were to be creative and maintain

    high level of aesthetic value while putting the minimizing the amount of

    mate r ia l s used . Hence p romot ing sus ta inab le a rch i tec tu re .

    Group photo along with final bridge

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    29/30

    BUILDING STRUCTURES [ ARC 2213 ] 27

    9 A P P E N D I X

    As for our individual part, we were assigned to further analyse total of 5 trusses. Each

    were distributed to following :

    First Case:

    Second Case:

    Third Case:

    Fourth Case:

    Fifth Case:

    The analysis and calculations of trusses are attached after this page.

    Elaine Bong Poh Hui

    Lau Ee Tian

    Surayyn Selvan

    Choo Ai Lin

    Soh You Shing

  • 8/10/2019 Building Structure Fettuccine Bridge Analysis Report

    30/30

    1 0 R E F E R E N C E S

    Historic Bridges.org.(2012,January 11)..Retrived September

    20,2014,from http://www.historicbridges.org/info/about.htm

    http://www.historicbridges.org/info/about.htmhttp://www.historicbridges.org/info/about.htm