BUILDING STRONG ® US Army Engineering and Support Center, Huntsville 11 October 2012 DLA Headquarters Ft. Belvoir, VA DLA-Energy Recurring Maintenance and Minor Repair Program Review

BUILDING STRONG ® US Army Engineering and Support Center, Huntsville 11 October 2012 DLA Headquarters Ft. Belvoir, VA DLA-Energy Recurring Maintenance

Embed Size (px)

Citation preview

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

11 October 2012

DLA Headquarters Ft. Belvoir, VA

DLA-Energy Recurring Maintenance and Minor Repair

Program Review

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Presenters• Levi Gabre, Program Manager, USACE-Huntsville

• Earl Johnson, Contracting Officer, USACE-Huntsville

• Chaquandra Wilson, Contracting Officer/Specialist, USACE-Huntsville

Slide 2

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Agenda

• Program Execution• Capabilities• Expansion• Issues

Slide 3

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Program Execution

Slide 4

DLA-Energy Recurring Maintenance and Minor Repair Program IPR

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Overview• Program Support (since May 2010)

− 188 installations in CONUS/OCONUS 112 Army; 44 Navy/MC; 9 Air Force; 23 MLA (Navy/AF)

– 50 installations added since JAN IPR 10 Army (Pacific); 31 Navy (Mid-Atl/West); 9 Air Force (SE)

• 2849 Service Orders Approved and 2443 Completed

– Army: 2048 Approved; 1806 Completed; 301 Emergency– Navy/MC: 717 Approved; 584 Completed; 102 Emergency– Air Force: 41 Approved; 28 Completed; 4 Emergency– MLA: 43 Approved; 25 Completed

Slide 5

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Funding/Execution• Since Program’s Inception (May 2010), USACE-Huntsville:

- Received $49.7M (as of 30 Sep 2012)

- Executed $38.8M

Army - Received $27.2M

- Executed $23.8M

Navy/MC - Received $15.0M

- Executed $10.3M

AF - Received $4.0M

- Executed $1.1M

MLA - Received $3.5M

- Executed $3.5M

Slide 6

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

FY Breakout

Slide 7

Received Executed Received Executed Received ExecutedArmy $3.3M $3.1M $10.6M $9.8M $13.3M $10.9M

Navy/MC - - $2.3M $2.1M $12.7M $8.2M

Air Force - - - - $4.0M $1.1M

MLA - - - - $3.5M $3.5M

Program Total $3.3M $3.1M $12.9M $11.9M $33.5M $23.7M

FY 10 FY 11 FY 12

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

FY 12 Funding/Obligations

Slide 8

0

2.8 4.3 4.38

10.9 10.9 12.316

18 19.525

1.37.1

3.5

38.8 10.6

12.916.2

18.2 20.718.2

23.7

10.87.2

3.21.8

25 25

33.5 33.5 33.533.5

33.5 33.5

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

50.0

($M

)

Planned 0 2.8 4.3 4.3 8 10.9 10.9 12.3 16 18 19.5 25

Actual 1.3 3 3.5 7.1 8.8 10.6 12.9 16.2 18.2 18.2 20.7 23.7

Funds Received 1.8 3.2 7.2 10.8 25 25 33.5 33.5 33.5 33.5 33.5 33.5

Oct Nov Dec Jan Feb March April May June July Aug Sept

Carryover to FY 13 - $9.8M

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Program Execution (since inception)

Slide 9

49%$18.9M

46%$17.7M

5%$2.1M

Maintenance (Q, S/A, A)SOsCOE S&A

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Army Execution

54%$12.8M

41%$9.7M

5%$1.3M

Maintenance (Q, S/A, A)SOsCOE S&A

Slide 10

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Navy/MC Execution

40%$4.1M

54%$5.5M

6%$0.6M

Maintenance (Q, S/A, A)SOsCOE S&A

Slide 11

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Air Force Execution12%

$0.1M

88%$1.1M

Site VisitsSOs

Slide 12

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

MLA Execution

52%$1.8M

42%$1.5M

6%$0.2M

Maintenance (Q, S/A, A)SOsCOE S&A

Slide 13

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Slide 14

25

75

125

175

225

275

SO

's

Service Orders All Services

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Slide 15

Service Order Stats

Total No. of Approved SOs (since inception)

Total No. of Completed SOs (since inception)

Avg. Cost of Routine SOs

Avg. Cost of Emer. SOs

No. of Backlogged SOs (awaiting approval)

Total No. of Days from Def. identification to repair

Army 2048 1806 $4,083 $3,893 62 39

Navy/MC 717 584 $5,075 $4,095 31 35

Air Force 41 28 $4,342 $5,294 4 21

MLA 43 25 $13,048 - 4 15

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Top Repair Items

Slide 16

List was generated by querying SO database

Key Word # RankPump 542 1Dispenser 474 2Leak 462 3Valve 347 4Hose 333 5Filters 277 6Mobilization 263 7

Meter 194 8Troubleshoot 188 9

Nozzle 158 10

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Capabilities

Slide 17

DLA-Energy Recurring Maintenance and Minor Repair Program IPR

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Contracting Capabilities• $35M Services SATOC

- Awarded to Pond Constructors, Inc. in March 2010- $12M capacity increase performed in August 2012 ($47M total)

Anticipate expending capacity by Jan/Feb 2013

• $400M Services BOA (in process)

- Expected award date of January 2013

- Multiple award contract vehicle Additional contractors available to support significant program

growth Potential impact to contracting process as task orders will be

competed against pool of vendors

Slide 18

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Pond & Subcontractor

Locations

Skytanking

Estes

Geeding

PMI

Franzen-Hill

Acterra GroupEaton

SME

Semper

Pond

• Involved Offices Shown• Other Offices as Needed• Other Specialty Subcontractors as

Needed

Bristol

Island Mechanical

Swissport

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Huntsville Center Support• Project Management

- 2 FTEs

- Adding 1 FTE in near future to support program growth

• Engineering

- 1 FTE

- Work Plan reviews; QA visits

• Contracting

- 1.5 FTEs

Slide 20

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Expansion

Slide 21

DLA-Energy Recurring Maintenance and Minor Repair Program IPR

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Navy/Air Force

• Navy/Marine Corps– Phase 4: 11 Installations West/Mid-Atl regions

Funding ROM recently submitted to DLA-E SRM Anticipate initial visits in NOV/DEC 2012

– OCONUS: 26 Installations in Pacific region NB Guam/MCAS Iwakuni to be included under existing contract

ROM in process; initial visits in JAN 2013 Remaining installations executed under new contract

• Air Force– One additional phase of 10-15 sites in CONUS and Andersen AFB

to be executed under existing contract– Future expansions executed under new contract

Slide 22

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Issues

Slide 23

DLA-Energy Recurring Maintenance and Minor Repair Program IPR

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Slide 24

• Real Property Inventory (RPI) - Facility RP nos. at times not matching up with Huntsville EBS RPI reports, or not listed in EBS RPI at all

- Possible to provide Huntsville/contractor with real-time, read-only EBS access?

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Slide 25

QUESTIONS?

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Backup Slides

Slide 26

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Slide 27

Jun-

10

Jun-

10

Jul-1

0

Aug-1

0

Sep-1

0

Oct-1

0

Nov-1

0

Dec-1

0

Jan-

11

Jan-

11

Feb-1

1

Mar

-11

Apr-1

1

May

-11

Jun-

11

Jul-1

1

Aug-1

1

Sep-1

1

Sep-1

1

Oct-1

1

Nov-1

1

Dec-1

1

Jan-

12

Feb-1

2

Mar

-12

Apr-1

2

May

-12

May

-12

Jun-

12

Jul-1

2

Aug-1

20

20

40

60

80

100

120

140

160

Approved

Completed

Service Orders Army

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Service Orders Navy/MC

Slide 28

10

30

50

70

90

110

Nu

mb

ers

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Service Orders Air Force

Slide 29

1

3

5

7

9

11

13

15

Nu

mb

er

BUILDING STRONG®

US Army Engineering and Support Center, Huntsville

Service Orders MLA

Slide 30

Dec-1

1

Dec-1

1

Dec-1

1

Dec-1

1

Jan-

12

Jan-

12

Jan-

12

Feb-1

2

Feb-1

2

Feb-1

2

Feb-1

2

Mar

-12

Mar

-12

Mar

-12

Apr-1

2

Apr-1

2

Apr-1

2

May

-12

May

-12

May

-12

May

-12

Jun-

12

Jun-

12

Jun-

12

Jul-1

2

Jul-1

2

Jul-1

2

Jul-1

2

Aug-1

2

Aug-1

2

Aug-1

20

5

10

15

20

25

Approved

Completed