Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
INTRODUCING A QUALITY DEVELOPMENT BY:
EXCLUSIVELY MARKETED BY:
Kyle Roberts, SIOR, [email protected]
Lucas M. [email protected]
Building One99,216 SF
BUILDING ONE201 MOUNTAIN VIEW PARK
X X X X X X X X X
XX
X
XX
X X
X
X X X X X X X X X X X X X
X
X
99,216 SF BUILDING ON 5.65 ACRES25
50 S
OU
TH(9
" CO
NC
RETE
OVE
R 12
" BAS
E)
PARTNERED WITH:4 Ground Level Doors (14'x16')
26 Dock High Doors (9'x10') – All Equipped with Shelters and Bumpers
8 Equipped with Shelters, Bumpers and 40,000 lb Mechanical Pit Levelers
SUITE 10029,389 SF
Potential Trailer Parking
SUITE 20019,648 SF
SUITE 30019,264 SF
SUITE 40029,350 SF
52'
45'
40'
60'
60'
520'19
0'
MVP 1 – SITE PLAN
64
28 26
Total Auto Parking Stalls: 118
BUILDING ONE201 MOUNTAIN VIEW PARK
FOR LEASE99,216 SF Building 5.65 AcresDivisible to 19,264 SF Office Built to SuitLease Rates: Warehouse: $0.55 PSF/Month NNN Office: $1.25 PSF/Month NNNLoading:
- Four (4) Ground Level Doors (14’ x 16’) - Twenty-Six (26) Dock High Doors (9’ x 10’) - Eight (8) Equipped with Shelters, Bumpers and 40,000 lb Pit Levelers
Clear Height: 28’Column Spacing: 52’ x 40’ & 45’ Staging Area Columns Spacing: 52’ x 60’ Power Supply: Sized for 3 Phase 277 / 480 V 2500 A 4 WireSprinklered: ESFRLighting: High Efficiency LED lighting, 30' candles at 36" AFFTilt Up ConstructionSlab Thickness : 6" with 4500 PSIRear Loading Configuration Four (4) Store Fronts Building Depth: 190’Building Length: 520’ Truck Court Depth: 160'Potential On Site Trailer Parking
MVP 1 – PRO
PERTY SPECIFIC
ATION
S
BUILDING ONE201 MOUNTAIN VIEW PARK
"
"
"
"
"
"
" "" "
"
"
" ""
" "
""
"
"
"
"
"
"
"
"
"
"
"
"
"
MVP 1 – AC
CESS 64
00 W
est
6400
Wes
t
3500 South3500 South
California AvenueCalifornia Avenue
700 South700 South
2700 South2700 South
5600
Wes
t56
00 W
est
Red
woo
d R
oad
Red
woo
d R
oad
201 193 111 75
15 80 8421515 80 84215
15 80 84215
Bang
erte
r Hig
hway
Bang
erte
r Hig
hway
Mountain View Corridor
Mountain View Corridor
MOUNTAIN VIEW CORRIDOR
EXTENSIONSUMMER 2020-2021FUNDED & UNDER
CONSTRUCTION
2550 SOUTH EXTENSION(PHASE 2 – 2020/2021)
2550 SOUTH EXTENSION(PHASE 1 – SUMMER 2019)
DRIVE TIMES
12 MINUTES
3 MINUTES
9 MINUTES
12 MINUTES
8 MINUTES
7 MINUTES
9 MINUTES
6 MINUTESBANGERTER
HIGHWAY
SALT LAKE INTERMODAL HUB
CALIFORNIA AVENUE
201 193 111 75
15 80 84215
15 80 84215
15 80 84215
SALT LAKE SALT LAKE INTERMODAL HUBINTERMODAL HUB
EXCLUSIVELY MARKETED BY:Kyle Roberts, SIOR, [email protected] M. [email protected] [email protected]
This document has been prepared by Newmark Knight Frank for advertising and general information purposes only. While the information contained herein has been obtained from what are believed to be reliable sources, the same has not been verified for accuracy or completeness. Newmark Knight Frank accepts no responsibility or liability for the information contained in this document. Any interested party should conduct an independent investigation to verify the information contained herein.
376 East 400 South, Suite 120 l Salt Lake City, Utah 84111801.578.5555 l www.ngacres.com