28
1 Building an Activity Based Costing Solution Presenter: Heron Jayawardena Supervisor: Gary Lau (Macquarie Analytics)

Building an Activity Based Costing Solution

  • Upload
    sitara

  • View
    37

  • Download
    0

Embed Size (px)

DESCRIPTION

Building an Activity Based Costing Solution. Presenter: Heron Jayawardena Supervisor: Gary Lau (Macquarie Analytics). Agenda. Project Background Project Purpose Business Problem Solution Design - Architecture, Approach , Technologies Demo Benefits Limitations Future Work Questions. - PowerPoint PPT Presentation

Citation preview

Page 1: Building an Activity Based Costing Solution

1

Building an Activity Based Costing Solution

Presenter: Heron Jayawardena

Supervisor: Gary Lau (Macquarie Analytics)

Page 2: Building an Activity Based Costing Solution

2

Agenda• Project Background• Project Purpose• Business Problem• Solution Design

- Architecture, Approach, Technologies• Demo• Benefits• Limitations• Future Work• Questions

Page 3: Building an Activity Based Costing Solution

3

Project Background

What is ABC?

Is A Management Accounting Approach

Which Allocate all Direct and Indirect costs

To Cost objects (products and services)

To Help management understand critical business information

Page 4: Building an Activity Based Costing Solution

4

Project Background -- continued

• Currently there are varieties of ABC approaches and models in place across the Macquarie University  FBE uses spread sheets FoS uses their own system (PHP, MySql)

• Activities for this project - Academic Activities Teaching Research Services

Page 5: Building an Activity Based Costing Solution

FBE Model

Page 6: Building an Activity Based Costing Solution

6

Project Purpose

Develop a web based data collection and reporting capability for ABC

Page 7: Building an Activity Based Costing Solution

7

Business Problem

1. Every faculty has their own methodology

2. No common terminology across the faculties

3. Reporting - Data stored in different locations/formats

Page 8: Building an Activity Based Costing Solution

Solution Design - Architecture

Collection

Data

Report

Data

Data Model

Cube

End User Layer:

Browser Form

Reports

Finance HR Time Table

Data Bank

Data

Cost Pools

Cost Objects

Allocate

ABC (On Virtual Server)

Page 9: Building an Activity Based Costing Solution

9

Solution Design – Approach

1. Obtain data sets (OFS, HR, Unit Bank..etc)

2. Analyse data sets

3. Load data in to the Databank (Analytics)

4. Create data cubes to load the acquired data

5. Design web forms to capture academic activities

6. Build ABC reports

Page 10: Building an Activity Based Costing Solution

10

Solution Design - Technologies

Page 11: Building an Activity Based Costing Solution

11

Demo

Personae:

1. Academic Staff – entering data & review

2. Faculty General Manager – reviewing faculty reports

Page 12: Building an Activity Based Costing Solution

Individual Academic Input

Page 13: Building an Activity Based Costing Solution

Teaching Activity Input - 1

Page 14: Building an Activity Based Costing Solution

Teaching Activity Input - 2

Page 15: Building an Activity Based Costing Solution

Research Activity Input

Page 16: Building an Activity Based Costing Solution

Service Activity Input

Page 17: Building an Activity Based Costing Solution

17

Reports

Page 18: Building an Activity Based Costing Solution

Individual Summary Report

Page 19: Building an Activity Based Costing Solution

Faculty Summary Drill-Down Report - 1

Page 20: Building an Activity Based Costing Solution

Faculty Summary Drill-Down Report - 2

Page 21: Building an Activity Based Costing Solution

Faculty Summary Drill-Down Report - 3

Page 22: Building an Activity Based Costing Solution

Faculty Summary Drill-Down Report - 4

Page 23: Building an Activity Based Costing Solution

Faculty Cost Drill-Down Report

Page 24: Building an Activity Based Costing Solution

24

Benefits

Provide a common base for ABC

Data collection & Reporting for ABC

Academic Workload Planning (AWP)

Academic PDR

Meet Macquarie's operational & strategic targets

Page 25: Building an Activity Based Costing Solution

25

Limitations

• Review is done only on two faculties

• Limited feedback and user acceptance testing

Page 26: Building an Activity Based Costing Solution

26

Future Work

• Automate ABC as much as possible to reduce OFS workload.

• Standardise data capturing from other sources.